HomeMy WebLinkAboutNCS000581_Roxboro FINAL PERMIT Cover Letter_20170127Fnergy. i ineral &
Land Resources
tN. W§17PH"LNTAL UUALitY
ROY COOPER
MICHAEL S_ REGAN
le' r.
TRACY DAVIS
Lli:d%hu
January 27, 2017
Paul Draovitch, Senior Vice President
526 S Church Street
Office 03233
Charlotte, NC 28202
Subject: NPDES Stormwater Permit Application
Roxboro Steam Electric Plant
1700 Dunnaway Road, Roxboro, NC
Permit Number NCS000581
Person County
Dear Mr. Draovitch:
In response to your application for coverage under NPDES stormwater permit NCS000580, the
Division of Energy, Mineral, and Land Resources (Division or DEMLR) is forwarding herewith the
subject state - NPDES permit. This permit is issued pursuant to the requirements of North Carolina
General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the
U.S. Environmental Protection Agency dated October 15, 2007 (or as subsequently amended).
This final permit includes the following changes from the draft permit posted on our website on
august 31, 2016:
Thank you for your comments submitted on October 31, 2016. Please see our responses below:
1. Duke Energy requested that permit reference Duke Energy Progress, LLC rather than Duke
Energy Progress, Inc. This change has been made in the final permit.
2. Duke Energy requested that certain monitoring parameters be removed for the two outfalls
because the drainage areas do not contain electrical equipment or oil storage. Based on
information contained in the permit application describing potential pollutants in the
drainage basins, results of submitted monitoring data and consistency with previously
issued permits and potential parameters of concern we have maintained most of the
parameters in the final permits. The final version has removed PCB monitoring since there
does not appear to be past exposure to equipment or storage that would lead to this
parameter being included.
3. Duke Energy requested that the monitoring dates in the permit tables be updated to reflect
the effective date of the permit. Since the permits are issued for a five-year cycle, the dates
have been modified to be in line with the final effective date of the permits.
4. Duke Energy noted incorrect reference to the Catawba River Basin. As noted above, these
changes have been made in the final permit.
Stotc cF Norlfi faronna I Enytronmental Qwobty i Energy, Mincraand Land Rcs cs
512 N. SA4jurk Strrrl I lrA7 MAI Sea•vlrr Omirt R ale lyli, Nurth r audln � � 'P 1ra1'�
919 707 9200
NPDES NCS00581
January 27, 2017
Page 2
If any parts, measurement frequencies or sampling requirements contained in this permit are
unacceptable to you, you have the right to an adjudicatory hearing upon written request within
thirty (30) days following receipt of this letter. This request must be in the form of a written
petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the
Office of Administrative Hearings, Post Office Drawer 27447, Raleigh, North Carolina 27611-7447.
Unless such demand is made, this decision shall be final and binding.
Please take notice this permit is not transferable. Part III, B.2. addresses the requirements to be
followed in case of change in ownership or control of this discharge. This permit does not affect the
legal requirements to obtain other permits which may be required by the Division of Energy,
Mineral, and Land Resources, or permits required by the Division of Water Resources, Coastal Area
Management Act or any other federal or local governmental permit that may be required.
If you have any questions or comments concerning this permit, contact Mike Randall at (919) 807-
6374 or at mike.randall@ncdenr.gov.
Sincerely
Original Signed by Tracy Davis
Tracy E. Davis, PE, CPM, Director
Division of Energy, Mineral, and Land Resources
cc: Raleigh Regional Office, DEMLR Land Quality Section
William J. Thacker, Roxboro Station Manager
Sam Sampath, Ph.D., EPA Region IV, 61 Forsyth Street, Atlanta, GA 30303
Stormwater Permitting Program
Central Files