Loading...
HomeMy WebLinkAbout20170079 Ver 1_Shoreline Stabilization_20170130construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: 4i ��' Nearest Town: �'�� ��'�_ Subdivision name or site address (include phase/lot number): W e- b Directions to site - please include road names and numbers, landmarks, etc.: _Zi M Latitude (in decimal degrees),!�0 Longitude (decimal de reesj2?� / 64 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): — 0 vd '01 6. Property size (acres): 7. Lake/ river/ ocean adjacent to property: 1_ -Ke k Of MF. A/ 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): v^t t 9. Will work be conducted from land? From water? 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, backfill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 12. Please describe the vegetation above the normal pool lake level/ Normal Watr Level and 50 feet landward to be impacted (number of trees, for instance): re-S-Z,. l� A-1 Owner/Agent's Signature# �:�. ��" �, /z,. � •s alb Printed Name (15A NCAC 02H .0502(f)) 'Agent's signature is valid only if an authorization letter from the owner is provided. Date FORM: SSGP 10-2013 Page 2 of 3