Loading...
HomeMy WebLinkAbout20001432_Certification of Completion_20080630Z13 Certificate of Completeness Utr V?DWQ Project No.: 001432 County: Lee county Bpi X05 Project Name: TIP R-2417 BB ?kv'q4/ 'yivr ry Date of Issuance of 401 Water Quality Certification: September 17, 2004 Certificate of Completion Y *Pon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the Project Engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, .-Jef4u 1P. ?. ?ci?t??,? , as a duly registered Professional E%J& sWeV- (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plarnd specifications, and other supporting materials. Signature Registration No. ZZ 9 79 Date ?? U