Loading...
HomeMy WebLinkAboutMulti ID#'s_Additional Assessment Extension Request_20170127gT DUKE ENERGY January 27, 2017 Mr. S. Jay Zimmerman, Director rJivision of Water Resuar=s North Carolina Department of EnvirotImerRal Quality 1611 Mail Service Center Raleigh, North Carulina 27699-1611 En;IrenT® ,t -l. RaaItn 6 Sti tvtr 50 south Cnurcrl street IVUI r-vaa EC13K Charlotte, North Carolina zszvz Subjuct: Extensio,, Ragaest - Additional Slte Asaeasments James E. rtagers Energy Complex (formerly Cliffaide Steam Station) NPDES Permit NC0005088 - Rutherford and Cleveland Counties Roxboro Steam Electric Plant NPDES Permit NC0003425 - Person County W.H. Waaltherspoun Power Pia, it NPDES Permit NC0005363 - Rvbazon County Dear Mr. Zimmerman. On August 18, 2015. Dake Energy (Duke) submitted Work Pla,,s fu. additional asscssmcnt activities at the Jamul E. Rogers Energy Comple,& (Rogers), Ruxbum Steam Electric Plant (RuAbu,u), and W.H. Weatherspuun (Weatherspoon) Power Plant. On November 23, (ruJsud December z, 0 l t3) DuRe received North Carolina Di,lw ,n of Environmental Ucallty Divisiun of Water Rvuoa us3 (DWR) approval to the Additional Site Assessment Approvals for those three facilities noting a repoRing doe date of Larch 31; 2017. On November 30, 2016 in a mustiny wash DWR Regional office personnel, Duke made DWR aware that permitting ana constructability of monitoring vvulla would likely extend the 5vhedole5 for assusamunt beyond the March 31, 2017 date specified in the November « letter. With this lutter, Duke requests a 60 -day mduri3icn for the Additional Site Assessment Plans at Rm,buru aT,d Weatherspoon, and an extens;un antiI after ash removal is complete at Rogers. The extension request for these sites is outlined in more detail balu.Y: The arca ruquuated fur additional assessment at Rogers i5 an ash area across the Broad River near the Unit 5 swuchyard. This area Ras tentatively been scheduled ro begin excavation in the second quarter of 2017 pending r-cusipt of necessary permits. Wella installed in the area of eAuavatiun would seed to be abanaaned prior to beginning excavation resulting in reinstallation of most of the wells. Duku requests that installation of the additional site aasessmant wells be postponed until completion of ash removal from the area acts the Brad River. Dake intenas to propose an alternate schedale ante there is more clarity on the completion date of ash uemuval. Preliminary dlsoassiuraa have uLoarred with Asheville Regional Oiiice on this topic. Mr. S. Jay Zimmerman. Director January 2 t, zo Page 2 RoAbor Steam Electric Plant Work Plan Schedule Section 8.17 Proposed Schedule of the York plan noted that field work would begin appruximataiy 45 days following final NCDEQ approval with the CSA Report submitted 60 days after receipt and validati%n of analytical data. The prvposetl schedule accounted for permitting and asaassmenr of data obtained during the site assessment. The schedule submitted in the Work Plan .as aggressive with any alterations leading to the potential submittal Uf an incomplete report. • Additional r noniror ing well location The Correctiun to the Additional Site Assessriient Approvals requested one additional monitoring well cluster at a location southeast of MW-12BR. Dake noted that the requested lucat;on ,was likely an error with rhe actual location south,.eat of MW-12BR. Clarification for well cluster location was directed to NCDEQ an November ei, e-016. uonfirmati%n of final cluster location was received from NCDEw on Da4ember 1, 2016. • Permit Requirement he area of diaturbance for the 7 wall cluster IOcaiions is greater than 1 acre and ther-ufur a requires an Erosion and Seaiment Control (E&SC) Permit frim NCDEQ Division of band uuality. The initial E&SC permit application was submitted on November 30, 2016 with a revision for the additional well cluster submitted on Dece, , iber 6, c0 113. Clearing and creation of mrd-.aya/pads cannot begin until the E&SC permit is recei.ad. • Feasibility of compressed schetlule Installation of accesa rads/pads and utility clearance will begin upon receipt of E&SC permit. However, the work is weather -dependent .,ith driller mobilit-ation not anticipates until approximately two weeks after Start of work with clearing ant] road/pad inataliation continuing as well installation begins. o Well installation and development - appmAmately 2 to 3 weeks o Collection of gmaadwater and other media samples - approximately 1 week o Analytical analysis - approx;matuly 3 to 4 weeks a Data „alidativn of analytical rvabultb - approximately i week o Report develcprinent and review - appru.imataly 4 wasks Weatherowgun Poweraro it • Work Plan Schedule Sortion 8.0 P,opused Schedule of the work plan noted that fiuid work Yyoald begin approximately 45 days follu.-ing final NCDEu approval with the CSA Report submitted 60 days after receipt and validation of analytical data. The propc5ed schadule accounted for permitting and assessment of data obtained daring the site assessment. The schedule 5abn,itted in the work plan was aggrussiye .,ith any alterations leading to the potential submittal of an incomplete comprehensive report. Mr. S. Jay Zimmerman, Director Jai mary 27, 20 Page 3 Permit Requirement The installation of ai, ..ella e, i the couliny pond dam required Darn Safety .York Plan approval by the NC Division of Energy, Mineral, and Oand Resources. Approval was received on Januaiy 12, 2017. Aligni,ig drilling resources could not begin until this appru-Yal was received. Feasibility of Compressed Schedul-W The follu..ing estimated durations beginning on the receipt date of the Dam Safety approval will move completion beyond the March 31, 2017 report date specified in the -Currectium tv the Additional Site Assessment Appru„als" letter: o Well installation and development - appruximately 2 to 3 wccks o Collection of ground..ateu and other media samples - approximately 1 week o Analytical analysis - approximately 3 to 4 weeks o Data validation of analytical resalts - approximately i week o Report davelopment and review - approximately 4 weeks If you have comments and/or ganstiur,a, please direct them to me at 980-373-3719. Sincerely, D. Edwin M. SulliYan Director, Waste and Groundwater Programs Environmental, Health, & Safety Lu NCDEu (electrnic): Eric Rice - NCDEu Raleigh Regional Office Ted Campbell - NCDEQ Asheville Regional Office Kent White - MCDE4r Fayuttuville Regional Ottice Steve Lanter - NCDEU Raleigh Eric Smith - NCDEQ Raleigh Cu Duke (elemronic): Ryan Czup Kimberlee Wirt