HomeMy WebLinkAboutUTBald_92596_MY5_2016FINAL ANNUAL MONITORING REPORT YEAR 5 (2016) UT TO BALD STREAM/WETLAND RESTORATION SITE YANCEY COUNTY, NORTH CAROLINA (DMS Project No. 92596, Contract No. 4997) Construction Completed December 2011 Submitted to: North Carolina Department of Environmental Quality Division of Mitigation Services Raleigh, North Carolina December 2016 FINAL ANNUAL MONITORING REPORT YEAR 5 (2016) UT TO BALD STREAM/WETLAND RESTORATION SITE YANCEY COUNTY, NORTH CAROLINA (DMS Project No. 92596, Contract No. 4997) Construction Completed December 2011 Submitted to: North Carolina Department of Environmental Quality Division of Mitigation Services Raleigh, North Carolina Prepared by: Axiom Environmental, Inc. 218 Snow Avenue Raleigh, North Carolina 27603 Axiom Environmental, Inc. December 2016 Table of Contents 1.0 EXECUTIVE SUMMARY..................................................................................................... 1 2.0 METHODOLOGY.................................................................................................................. 4 2.1 Vegetation Assessment........................................................................................................ 4 2.2 Stream Assessment............................................................................................................... 4 3.0 REFERENCES........................................................................................................................ 5 Appendices APPENDIX A. PROJECT VICINITY MAP AND BACKGROUND TABLES Figure 1. Site Location Map Table 1. Project Components and Mitigation Credits Table 2. Project Activity and Reporting History Table 3. Project Contacts Table Table 4. Project Baseline Information and Attributes APPENDIX B. VISUAL ASSESSMENT DATA Figure 2. Current Conditions Plan View Tables 5.1-5.4. Visual Stream Morphology Stability Assessment Tables Table 6. Vegetation Condition Assessment Table Site Fixed -Station Photos Vegetation Monitoring Photographs APPENDIX C. VEGETATION PLOT DATA Table 7. Vegetation Plot Criteria Attainment Table 8. CVS Vegetation Plot Metadata Table 9. Total and Planted Stems by Plot and Species APPENDIX D. STREAM SURVEY DATA Cross-section Plots Longitudinal Profile Plots Substrate Plots Table 10a - b. Baseline Stream Data Summary Table 11 a - b. Monitoring Data APPENDIX E. HYDROLOGY DATA Table 12. Verification of Bankfull Events APPENDIX F. ADDITIONAL DATA Figure 3. USGS Topographic Map Figure 4. NRCS Soils Map Preconstruction Photographs UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Table of Contents 1.0 EXECUTIVE SUMMARY The UT to Bald Creek Stream and Wetland Restoration Site (hereafter referred to as the "Site") is situated within the US Geological Survey (USGS) hydrologic unit 06010108 of the French Broad River Basin and NC Division of Water Resources (NCDWR) Priority Sub -basin 04-03-07. The Site is located in Yancey County, approximately eight miles west of the City of Burnsville, North Carolina. The Site is encompassed within a 12.74 -acre easement located on two tracts of property. Tract one is owned by Henry and Elizabeth Turner and tract two is owned by Charles Young Jr. and Deana Blanchard. The Site is comprised of five headwater tributaries originating from Mountain seeps and springs, and five adjacent streamside wetlands (Figure 2, Appendix B). Prior to construction, upper reaches of the Site were forested and relatively stable. Downstream reaches were impacted by agricultural activities with minimal riparian buffer. This report (compiled based on the North Carolina Ecosystem Enhancement Program (NCEEP) Procedural Guidance and Content Requirements for EEP Monitoring Reports Version 1.4 dated 11/7/11) summarizes data for Year 5 (2016) monitoring. The project goals (from the approved Unnamed Tributaries to Bald Creek Stream Restoration Project, Final Restoration Plan [NCEEP 2009]) include the following. • Reduce erosion within the Site • Restore a channel capable of transporting watershed flows and sediment loads efficiently • Improve wetland and stream aquatic habitat • Enhance wildlife habitat • Improve overall water quality These goals will be accomplished through the implementation of the following objectives. • Exclude livestock from the stream in order to o Reduce direct inputs of nutrients and fecal coliform bacteria into the stream o Eliminate stress on streambanks caused by hoof shear • Plant a native riparian buffer in order to o Provide woody root mass to stabilize the streambanks o Filter sediment and nutrient pollutants from agricultural fields and prevent them from entering the stream o Provide shade to the stream channel as a means of reducing water temperatures o Provide a source for woody debris and leaf litter that will enhance aquatic habitat • Enhance existing wetlands by excluding livestock, managing invasive species, and planting native wetland vegetation • Restore Site streams to a proper bankfull dimension and stabilize steep and eroding streambanks • Provide Site streams with adequate flood -prone area • Repair headcuts and establish a more diverse bed morphology with riffle -pool sequences supported by in -stream structures • Restore an impounded reach of stream by removing a small dam and culvert • Create protected riparian corridors for wildlife passage • Preserve high-quality forested headwater streams in the steeper reaches of the Site UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina page 1 Vegetation success criteria (from the approved Unnamed Tributaries to Bald Creek Stream Restoration Project, Final Restoration Plan [NCEEP 2009]) is as follows. "Success criteria for the preferred species in restoration areas will be based on annual and cumulative survival and growth over five years. Survival of preferred species must be at a minimum of 320 stems -per -acre at the end of three years of monitoring and 260 stems -per - acre after five years." Six vegetation monitoring plots were monitored on September 2016 for monitoring Year 5 (2016). Overall, Site vegetation averaged 384 planted stems -per -acre (excluding livestakes) in Year 5 (2016), which exceeds the minimum stem count for success criteria of 260 stems -per -acre. Four of the six plots met or exceeded success criteria. Vegetation plots 4 and 5 were below success criteria with 243 planted stems -per -acre each, just one stem shy of success criteria. Low planted stem survival in vegetation plots 4 and 5 may be attributed to competition from herbaceous vegetation (primarily fescue [Festuca spp.] and tearthumb [Polygonum sagitatum]). Thirteen vegetation areas of concern were identified on the site. Planted stem densities were moderate throughout the Site and are low in certain areas (VAC -1 to -4). Planted stems were generally hard to locate due to the thick fescue (Festuca spp.) in drier areas and had poor stem growth due to saturation and competition with sedges (Carex spp.), soft rush (Juncus effusus), and tearthumb (Polygonum sagitatum) in wetter areas. Multiflora rose (Rosa multiflora) was observed scattered throughout the site, however seven small patches of very dense multiflora rose (Rosa multiflora) were identified during Year 5 (2016). A treatment was performed in October 2016 which greatly reduced the density of these populations, however, these patches still appear to be negatively affecting planted stem survivability. Additionally, two patches of dense white poplar (Populus alba) were identified on the Site. These areas of concern are summarized below and depicted on the attached Figure 2 (Appendix B). Vegetation Areas of Concern Map Identifier Feature/Issue VAC -1 Low stem density around Tributary 3 VAC -2 Low stem density on the right bank of the Mainstem in and around Veg Plot 5 VAC -3 Low stem density in and around Veg Plot 4 VAC -4 Low stem density on the right bank of Tributary 2 near an adjacent driveway VAC -5 to -11 Multiflora rose VAC -12 to -13 Dense white poplar Stream success criteria (from the approved Unnamed Tributaries to Bald Creek Stream Restoration Project, Final Restoration Plan [NCEEP 2009]) is as follows. "Monitoring shall consist of the collection and analysis of stream stability and riparian vegetation survivability data to support the evaluation of the project in meeting established restoration objectives." UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina page 2 A visual assessment and geomorphic survey were completed for the Site. Site reaches are conforming to design criteria established in the Unnamed Tributaries to Bald Creek Stream Restoration Project, Final Restoration Plan (NCEEP 2009). No significant bank erosion was recorded and geomorphic measurements are within the range of proposed design parameters. Stream areas of concern include five areas of aggradation (SAC -1 to -5) were observed along the Mainstem, Tributary 2, Tributary 3, and Tributary 4. Several of these areas were documented previously and conditions continue to improve. During Year 3 (2014) monitoring, it was noted that the upper reaches of Tributary 3 and Tributary 4 have indiscernible bed and bank for varying lengths. These tributaries exhibit intermittent flow regimes, and low flow may be responsible for the lack of bed and bank characteristics in these reaches. These areas remained unchanged during Year 4 (2015) and Year 5 (2016) monitoring. The middle reach of the Mainstem, just below the pond, and the lower reach of Tributary 2 appear to be exhibiting aggradation of fine materials, possibly due to surface flows across the adjacent floodplain and extensive herbaceous vegetation growth within the channel bed combined with low energy flow in the channel. Additionally, a failed structure was observed in the downstream reach of Tributary 3, just before its confluence with the Mainstem. Several boulders from the bank of this long step -pool, fallout structure have fallen into the streambed. The structure appears relatively stable with herbaceous vegetation establishing on the dislodged boulders, however it is not yet completely stabilized. Stream areas of concern are summarized in the following table and are depicted on Figure 2 (Appendix B). Stream Areas of Concern Map Identifier Feature/Issue SAC -1 and -2 Aggradation on Mainstem SAC -3 Aggradation on the lower portion of Tributary 2 SAC -4 and -5 Indiscernible bed and bank on the upper reaches of Tributaries 3 and 4 SAC -6 Failed rock structure on Tributary 3 The stream reach adjacent to cross-section 2 exhibited significant down cutting during years 3 (2014) and 4 (2015). During early summer 2016, a headcut was observed rapidly migrating upstream through this area creating significant incision below it, damaging a log structure. In October 2016, NCDMS performed stream repairs in order to repair the structure and return the streambed to its design elevation. This repair is depicted in the Cross Section 2 plot (Appendix D). A previously observed headcut and resulting incision in the lower portion of Tributary 2 was also repaired at that time. Some down cutting was also observed at cross-section 3 during year 5 (2016); however, this was the result of an isolated high-energy flow, and it does not pose any threat to stream stability or Site success. Summary information/data related to the occurrence of items such as beaver or encroachment and statistics related to performance of various project and monitoring elements can be found in tables and figures within this report's appendices. Narrative background and supporting information formerly found in these reports can be found in the Baseline Monitoring Report (formerly Mitigation Plan) and in the Mitigation Plan (formerly the Restoration Plan) documents available on NCDMS's website. All raw data supporting the tables and figures in the appendices is available from NCDMS upon request. UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina page 3 2.0 METHODOLOGY 2.1 Vegetation Assessment Six vegetation plots were established and marked during the Year 1 (2012) monitoring period. Plots were established by installing 4 -foot, metal U -bar posts at the corners and a 10 -foot, 0.75 inch PVC at the origin. The plots are 10 meters square and are located randomly within the Site. These plots were surveyed in September 2016 for the Year 5 (2016) monitoring season using methods outlined in CVS-EEP Protocol for Recording Vegetation, Levels 1-2 Plot Sampling Only, Version 4.2 (Lee et al. 2008) (http://cvs.bio.unc.edu/methods.htm); results are included in Appendix C. The taxonomic standard for vegetation used for this document was Flora of the Southern and Mid Atlantic States (Weakley 2012). 2.2 Stream Assessment Annual stream monitoring was conducted in April 2016. Measurements were taken using a Topcon GTS 303 total station and Recon data collector. The raw total station file was processed using Carlson Survey Software into a Computer Aided Design (CAD) file. Coordinates were exported as a text/ASCII file to Microsoft Excel for processing and presentation of data. Pebble counts were completed using the modified Wolman method (Rosgen 1993). One crest gauge (PVC with wooden staff gauge and cork filings) was installed in the lower, downstream third of the Site. Six permanent cross-sections, three riffle and three pool, were established and will be used to evaluate stream dimension annually; locations are depicted on Figure 2 (Appendix B). Cross- sections are permanently monumented with 5 -foot metal t -posts at each end point. Cross-sections will be surveyed to provide a detailed measurement of the stream and banks including points on the adjacent floodplain, top of bank, bankfull, breaks in slope, edge of water, and thalweg. Data will be used to calculate width -depth ratios, entrenchment ratios, and bank height ratios for each cross-section. In addition, a pebble count was completed at cross-section 2 and photographs will be taken at each permanent cross-section location annually. Six stream monitoring reaches were established and will be used to evaluate stream pattern and longitudinal profile; locations are depicted on Figure 2 (Appendix B). Measurement of channel pattern will include belt -width, meander length, and radius of curvature (only in year one). Subsequently, data will be used to calculate meander -width ratios. Longitudinal profile measurements will include average water surface slopes and facet slopes and pool -to -pool spacing. Twenty-two permanent photo points were established throughout the restoration reach (12 fixed photo points, 4 cross-section photo points, and 6 vegetation plot photo points); locations are depicted on Figure 2 (Appendix B) and are included in Appendix B. In addition, visual stream morphology stability assessments will be completed in four monitoring reaches annually to assess the channel bed, banks, and in -stream structures. UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina page 4 3.0 REFERENCES Community Collaborative Rain, Hail, and Snow Network (CoCoRaHS). 2015. Station NC-YN- 7. Bald Creek 1.2 Mi NW (online). Available: http://www.cocorahs.orjzNiewData/Station PrecipSummar.aspx [October 19, 2015]. CoCoRaHS. Lee, M.T., R.K. Peet, S.D. Roberts, and T.R. Wentworth. 2008. CVS-EEP Protocol for Recording Vegetation, Levels 1-2 Plot Sampling Only, Version 4.2. Available online at htlp:Hcvs.bio.unc.edu/methods.htm. N.C. Ecosystem Enhancement Program (EEP). Unpublished. Procedural Guidance and Content Requirements for EEP Monitoring Projects, Version 1.4, dated 11/07/11. NC Department of Environment and Natural Resources. Available online at http://portal.ncdenr.org/c/documentalibrary/get®file?pl id=1169848&folderld=2288101 &name=DLFE-3 9268.Ddf N.C. Ecosystem Enhancement Program. 2009. Unnamed Tributaries to Bald Creek Stream Restoration Project, Final Restoration Plan - Yancey County, NC. Rosgen. 1993. Applied Fluvial Geomorphology, Training Manual. River Short Course, Wildland Hydrology, Pagosa Springs, CO. Weakley, Alan S. 2012. Flora of the Southern and Mid -Atlantic States. Available online at: http://www.herbarium.unc.edu/WeakleysFIora.pdf [September 28, 2012]. University of North Carolina Herbarium, North Carolina Botanical Garden, University of North Carolina, Chapel Hill, North Carolina. Weather Underground. 2015. Station at Asheville Airport, North Carolina. (online). Available: http: //www.wunderground. com/history/airport/KAVL/2014/ 1 / 1 /CustomHistory.html?day end=31 &monthend= l 2&yearend=2014&req_city=NA&req_state=NA&req_statename= NA [February 18, 2015]. Weather Underground. UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina page 5 APPENDIX A PROJECT VICINITY MAP AND BACKGROUND TABLES Figure 1. Site Location Map Table 1. Project Components and Mitigation Credits Table 2. Project Activity and Reporting History Table 3. Project Contacts Table Table 4. Project Baseline Information and Attributes UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices tpl P o 1 v J IA !! hhII [�D-[T MA, � rvuA - Project Site ^\ �, t _ " s T Access Point: r - -82.43146, 35.92193 I, Y�- :.,�r�j1• __ Burnsville I k—A 19E_ 5 -1>C0 ". F'1 Bali AT[111A e.�w,.. wi.r a . • - i - ?6+ P _ r-' 9 Yys,' vv,�� !` a,1 f.-,'-'''`�".. t_A \ Z7 S .vR .2 5 " it 0 1 2 4 �.. . Miles - '7 Directions from Raleigh: Take 1-40 West about 212 miles to Marion. Take exit 86, for US -226 North, towards Marion/Shelby. 3, N Follow US -226 North about 23 miles to Spruce Pine, NC. Continue onto US -19E South 21 miles, through Burnsville. eY Take a right on Sweethollow Road._ The site is 0.5 miles on the left. Copyright`© 2013 National Geographic Soie _ Axiom Environmental 218 Snow Avenue Raleigh, NC 27603 (919)215-1693 Axiom Environmental, Inc. SITE LOCATION MAP UT TO BALD STREAM RESTORATION DMS PROJECT NUMBER 92596 Yancey County, North Carolina Dwn. by. KRJ FIGURE Date: October 2015 Project: 12-004.15 Table 1. Project Components and Mitigation Credits UT to Bald Stream and Wetland Restoration Site (DMS Project Number 92596) Miti ation Credits Stream Riparia Wetland Type Restoration Restoration Equivalent Restoration Restoration E uivalent Buffer Totals 2770 168 0 0.62 0 Projects Com onents Existing Restoration/ Restoration Project Linear Priority Restoration Linear Mitigation Component/ Station Range Comment Footage/ Approach Equivalent Footage/ Ratio Reach ID Acreage Acreage Mainstem 10+00 —18+39 800 P Preservation 839 1:5 Headwater channels in mature hardwood forest. Removed earthen dam and small pond. Daylighted culverted stream segment, tied in Mainstem 18+39 —20+50 250 R (P2) Restoration 211 1:1 stable upstream and downstream segments, and added grade control. Pulled channel off the left bank and graded bench, sloped back right bank, and enhanced profile with additional pool habitat. 20+50 — 22+15 Enhancement Riparian plantings to culver under driveway and Mainstem (CMP 22+15 — 22+60) 378 EII Level II 386 1:2.5 wetland plantings around pond. 22+60-24+81 Mainstem 24+81 —25+00 71 NA NA 19 NA Sweet Hallow Road Mainstem 25+00 —26+00 NA R (P 1) Restoration 100 1:1 New alignment on back side of dam/Sweet Hallow Road Enhanced existing vegetated swale from base of dam to confluence with riparian plantings and livestock exclusion. Short reach of incised Mainstem 26+00 —30+72 522 El (P 1) Enhancement 472 1:1.5 channel below headcut was graded back and Level I stabilized. Log silles were placed at the top and bottom of incised reach and bottom of reach above confluence. Reach has one permanent vehicular ford crossing. UT to Bald Stream (final) DMS Project Number 92596 Yancey County, North Carolina Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) December 2016 Appendices Table 1 (continued). Project Components and Mitigation Credits UT to Bald Stream and Wetland Restoration Site (DMS Project Number 92596) UT to Bald Stream (final) DMS Project Number 92596 Yancey County, North Carolina Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) December 2016 Appendices Constructed new B -type channel primarily on existing alignment. Raised channel invert to reconnect with historical floodplain from confluence to the stable cottonwood section, stabilized with rock cross vanes, and added forded Mainstem 30+72 —36+63 W R (P 1 /P2) Restoration 591 1:1 stream crossing below cottonwoods. Transitioned to Priority 2 restoration below the crossing with a step -pool and constructed riffle. Restored dimension by excavating a bankfull bench on the right bank, restored profile with step -pool structures. This reach was limited to small meanders due to a naturally confined valley type. Tributary 1 10+00 — 13+21 321 EII Enhancement 321 1:2.5 Invasive species removal and planting. Level II Installed step -pool structure to stabilized headcut and meet pond elevation. Multi -thread channel Tributary 1 13+21 — 14+60 220 R (PI) Restoration 139 1:1 was graded and replaced with a single -thread channel. Log sills were added for grade control at the top. Tributary 2 10+00 —18+26 826 EII Enhancement 826 1:2.5 Invasive species treatment and planting Level II Installed step -pool system to stabilize a series of Tributary 2 18+26 —19+49 123 R (P2) Restoration 123 1:1 severe head -cuts. Pulled channel off of the steep left bank and tied in to culvert under Sweet Hallow Road. Tributary 2 19+49 —19+93 51 NA NA 44 NA Sweet Hollow Road Tributary 2 19+93 —24+43 450 EII Enhancement 450 1:2.5 Planted and installed grade control structures near Level II the confluence with the Mainstem. Enhanced spring -fed swale for potential Tributary 3 10+00 — 12+17 217 Ell Enhancement 217 1:2.5 amphibian and reptile habitat. Removed invasive Level II species, preserved existing trees on slope, and planted. Constructed a new channel through pasture to Tributary 3 12+17-14+54 NA R (P1) Restoration 237 1:1 reconnect Tributary 3 to the Mainstem and provide a stable conveyance for higher flows. Planted and excluded livestock. Installed grade Enhancement control to stabilize tie-in at the confluence with Tributary 4 10+00 —14+35 42K Ell Level II 435 1:2.5 the Mainstem. In addition, several log sills were installed for grade control and habitat enhancement. UT to Bald Stream (final) DMS Project Number 92596 Yancey County, North Carolina Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) December 2016 Appendices Table 1 (continued). Project Components and Mitigation Credits UT to Bald Stream and Wetland Restoration Site (DMS Project Number 92596) UT to Bald Stream (final) DMS Project Number 92596 Yancey County, North Carolina Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) December 2016 Appendices Planted wetland plants around pond Wetland 1 0.18 Enhancement 0.18 1:2 fringe and littoral shelf, and riparian plants on left embankment of pond. Wetland 1 0.48 Enhancement 0.48 1:2 Removed invasive species and supplementally planted. Removed invasive species, excluded Wetland 3 0.2 Enhancement 0.2 1:2 livestock, and supplementally planted. Removed invasive species, excluded Wetland 4 0.11 Enhancement 0.11 1:2 livestock, and supplementally planted. Removed invasive species, excluded Wetland 5 0.26 Enhancement 0.26 1:2 livestock, and supplementally planted. Component Summation Restoration Level Stream (linear footage) Riparian Wetland (acres) Buffer (square footage) Restoration 1401 Enhancement (Level I) 472 Enhancement (Level II) 2635 Preservation 839 Creation Wetland Enhancement 1.23 Totals 5347 1.23 Mitigation Units 2938 SMUs 0.62 WMUs UT to Bald Stream (final) DMS Project Number 92596 Yancey County, North Carolina Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) December 2016 Appendices Table 2. Project Activity and Reporting History UT to Bald Stream and Wetland Restoration Site (DMS Project Number 92596) Elapsed Time Since Grading Complete: 5 years 2 month Elapsed Time Since Planting Complete: 4 years 11 months Number of Reporting Year: 5 Activity or Deliverable Data Collection Complete Completion or Delivery Restoration Plan June 2009 Final Design — Construction Plans River Works, Inc. November 2010 Construction September 2011 Temporary S&E mix applied to entire project area Turner Land Surveying, PLLC December 2011 Permanent seed mix applied to entire project area December 2011 Containerized and B&B plantings for entire reach David Turner 919-875-1378 December 2011 As -built Construction Drawings Years 1-5 Monitoring Performers March 2012 Restoration Plan 218 Snow Avenue June 2009 Final Design — Construction Plans November 2010 Construction September 2011 Year 1 Monitoring (2012) December 2012 February 2013 Year 2 Monitoring (2013) August 2013 November 2013 Year 3 Monitoring (2014) February 2015* March 2015 Year 4 Monitoring (2015) October 2015 December 2015 Year 5 Monitoring (2016) November 2016 December 2016 *Year 3 (2014) monitoring was performed in February 2015 due to site access restrictions during a landowner dispute. Table 3. Project Contacts Table UT to Bald Stream and Wetland Restoration Site (DMS Project Number 92596) Designer URS Corporation — North Carolina Morrisville, NC 919-461-1597 Construction, Planting, and Seeding River Works, Inc. Contractor Cary, NC 919-459-9001-692-4633 Surveyor Turner Land Surveying, PLLC 3201 Glenridge Drive Raleigh, NC 27604 David Turner 919-875-1378 Seed Mix Source Unknown Years 1-5 Monitoring Performers Axiom Environmental, Inc. 218 Snow Avenue Raleigh, NC 27603 Grant Lewis 919-215-1693 UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices Table 4. Project Baseline Information and Attributes UT to Bald Stream and Wetland Restoration Site (DMS Proiect Number 92596) Project Information Project Name UT to Bald Creek Restoration Site Project County Yancey Project Area (Acres) 12.74 Project Coordinates (NAD83 2007) 807,670.33, 984,247.33 Project Watershed Summary Information Physiographic Region Blue Ridge Ecoregion Southern Crystalline Ridges and Mountains Project River Basin French Broad USGS 8 -digit HUC 06010108 USGS 14 -digit HUC 06010108080020 NCDWQ Subbasin 04-03-07 Project Drainage Area (Sq. Mi.) 0.19 Project Drainage Area Impervious Surface <5% Watershed Type 85% wooded, 12% agriculture, 3% rural Reach Summa Information Parameters Mainstem UT 1 UT 2 UT 3 1 UT 4 Restored/Enhanced Length (Linear Feet) 2590 460 1392 454 435 Drainage Area (Square Miles) 0.19 0.03 0.06 0.01 0.01 NCDWQ Index Number 7-3-22 NCDWQ Classification C Valley Type/Morphological Description IUB- and C-type Dominant Soil Series Saunook and Thunder-Saunook Complex Drainage Class Well drained Soil Hydric Status Nonhydric Slope 0.050 — 0.160 FEMA Classification Not in a detailed FEMA flood zone Native Vegetation Community 100% Percent Composition of Exotic Invasives < 5% Regulatory Considerations Regulation Applicable Waters of the U.S. —Sections 404 and 401 Yes -Received Appropriate Permits Endangered Species Act No effect Historic Preservation Act No effect CZMA/CAMA No FEMA Floodplain Compliance Not in a detailed FEMA flood zone Essential Fisheries Habitat No UT to Bald Stream (final) DMS Project Number 92596 Yancey County, North Carolina Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) December 2016 Appendices APPENDIX B VISUAL ASSESSMENT DATA Figure 2. Current Conditions Plan View Tables 5.1-5.4. Visual Stream Morphology Stability Assessment Tables Table 6. Vegetation Condition Assessment Table Site Fixed -Station Photos Vegetation Monitoring Photographs UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices Axiom Environmental 218 Snow Avenue Raleigh, NC 27603 (919) 215-1693 Axiom Environmental. Inc. CURRENT CONDITIONS PLAN VIEW UT TO BALD STREAM RESTORATION DMS PROJECT NUMBER 92596 Yancey County, North Carolina Dwn. by. KRJ FIGURE Date: Dec. 2016 2 Project: 12-004.15 Table 5.1 Visual Stream Morphology Stability Assessment Reach ID Main Tributary Assessed Length 1487 Footage Adjusted % Number Number with with for Major Stable, Total Number of Amount of % Stable, Stabilizing Stabilizing Stabilizing Channel Channel Performing Number in Unstable Unstable Performing Woody Woody Woody Cate o Sub-Cateaory Metric as Intended As -built Se ments Footage as Intended Vegetation Vegetation Vegetation 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars) 2 375 75% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 10 14 71% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6) — 10 18 56% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle) 14 14 100 43halweg Position 1. Thalweg centering at upstream of meander bend (Run) 14 14 100% 2. Thalweg centering at downstream of meander (Glide) 10 10 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 o 100 /0 0 0 ° 100/° Banks undercut/overhanging to the extent that mass wasting appears 2. Undercut likely. Does NOT include undercuts that are modest, appear sustainable 0 0 100% 0 0 100% and are providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% Totals 0 0 100% 0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 10 10 ° 100/o 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 10 10 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 10 10 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 10 10 100% 4. Habitat Pool forming structures maintaining — Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base -flow. 10 10 100% Table 5.2 Visual Stream Morphology Stability Assessment Reach ID Tributary 2 Assessed Length 460 Footage Adjusted % Number Number with with for Major Stable, Total Number of Amount of % Stable, Stabilizing Stabilizing Stabilizing Channel Channel Performing Number in Unstable Unstable Performing Woody Woody Woody Cate o Sub-Cateciory Metric as Intended As -built Se ments Footage as Intended Vegetation Vegetation Vegetation 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars) 1 125 73% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 7 11 64% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6) — 6 10 60% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle) 1 1 1 1 100% 43halweg Position 1. Thalweg centering at upstream of meander bend (Run) 11 11 100% 2. Thalweg centering at downstream of meander (Glide) 10 10 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 o 100 /0 0 0 ° 100/° Banks undercut/overhanging to the extent that mass wasting appears 2. Undercut likely. Does NOT include undercuts that are modest, appear sustainable 0 0 100% 0 0 100% and are providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% Totals 0 0 100% 0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 2 2 ° 100/o 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 2 2 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 2 2 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 2 2 100% 4. Habitat Pool forming structures maintaining — Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base -flow. 2 2 100% Table 5.3 Visual Stream Morphology Stability Assessment Reach ID Tributary 3 Assessed Length 317 Footage Adjusted % Number Number with with for Major Stable, Total Number of Amount of % Stable, Stabilizing Stabilizing Stabilizing Channel Channel Performing Number in Unstable Unstable Performing Woody Woody Woody Cate o Sub-Cateaory Metric as Intended As -built Se ments Footage as Intended Vegetation Vegetation Vegetation 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars) 1 160 50% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 4 4 100% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6) — 5 7 71% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle) 7 7 100% 43halweg Position 1. Thalweg centering at upstream of meander bend (Run) 11 11 100% 2. Thalweg centering at downstream of meander (Glide) 11 11 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 o 100 /0 0 0 ° 100/° Banks undercut/overhanging to the extent that mass wasting appears 2. Undercut likely. Does NOT include undercuts that are modest, appear sustainable 0 0 100% 0 0 100% and are providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% Totals 0 0 100% 0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 2 3 ° 67/o 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 3 3 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 2 3 67% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 2 3 67% 4. Habitat Pool forming structures maintaining — Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base -flow. 3 3 100% Table 5.4 Visual Stream Morphology Stability Assessment Reach ID Tributary 4 Assessed Length 224 Footage Adjusted % Number Number with with for Major Stable, Total Number of Amount of % Stable, Stabilizing Stabilizing Stabilizing Channel Channel Performing Number in Unstable Unstable Performing Woody Woody Woody Cate o Sub-Cateciory Metric as Intended As -built Se ments Footage as Intended Vegetation Vegetation Vegetation 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars) 1 50 78% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 2 5 40% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6) — 2 5 40% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstream riffle) 5 5 100% 43halweg Position 1. Thalweg centering at upstream of meander bend (Run) 5 5 100% 2. Thalweg centering at downstream of meander (Glide) 5 5 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 o 100 /0 0 0 ° 100/° Banks undercut/overhanging to the extent that mass wasting appears 2. Undercut likely. Does NOT include undercuts that are modest, appear sustainable 0 0 100% 0 0 100% and are providing habitat. 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100% 0 0 100% Totals 0 0 100% 0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs. 3 3 ° 100/o 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 3 3 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms. 3 3 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 3 3 100% 4. Habitat Pool forming structures maintaining — Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base -flow. 3 3 100% Table 6 Vegetation Condition Assessment Planted Acreage' 6.4 Vecietation Cateqory Mapping Definitions Threshold CCPV Depiction Number of PolVqons Combined Acreage o/ of Planted Acreage 1. Bare Areas NA 0.1 acres NA 0 0.00 0.0% 2. Low Stem Density Areas Woody stem densities clearly below target levels based on MY5 stem count criteria. 0.1 acres Purple 5 0.47 7.3% Pol ons Total 5 0.47 7.3% 3. Areas of Poor Growth Rates or Vigor NA 0.25 acres NA 0 0.00 0.0% Im Cumulative Totall 5 0.47 7.3% Easement Acreage" 14 asEnter the Ri laotheer e�reag is riot dlteetleaslanlentas hart o berro ec�l effot d as the easement acreage minus any existing mature tree stands that were not subject to supplemental planting of the understory, the channel acreage, 9 Y YP P P 1 = The acreage within the easement boundaries. = Encroachment may occur within or outside of planted areas and will therefore be calculated against the overall easement acreage. In the event a polygon is cataloged into items 1, 2 or 3 in the table and is the result of croachment, the associated acreage should be tallied in the relevant item (i.e., item 1,2 or 3) as well as a parallel tally in item 5. are areas of prior encroachment are identified on Figure 2 (Appendix B), however these areas appear to have recovered and are no longer considered areas of concern. % of Mapping CCPV Number of Combined Easement Vegetation Category Definitions ThresholdDe iction Pol ons Acrea a Acrea e Pink spotted 4. Invasive Areas of Concern' Dense multiflora rose and white poplar 1000 SF and yellow 9 0.16 1.1% of ons 5. Easement Encroachment Areas' NA none NA 0' 0.00 0.0% asEnter the Ri laotheer e�reag is riot dlteetleaslanlentas hart o berro ec�l effot d as the easement acreage minus any existing mature tree stands that were not subject to supplemental planting of the understory, the channel acreage, 9 Y YP P P 1 = The acreage within the easement boundaries. = Encroachment may occur within or outside of planted areas and will therefore be calculated against the overall easement acreage. In the event a polygon is cataloged into items 1, 2 or 3 in the table and is the result of croachment, the associated acreage should be tallied in the relevant item (i.e., item 1,2 or 3) as well as a parallel tally in item 5. are areas of prior encroachment are identified on Figure 2 (Appendix B), however these areas appear to have recovered and are no longer considered areas of concern. UT to Bald Creek Site Fixed -Station Photographs Taken September 2016 UT to Bald Stream (final) DMS Project Number 92596 Yancey County, North Carolina Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) December 2016 Appendices UT to Bald Creek Site Fixed -Station Photographs (continued) Taken September 2016 PP11 PP10 UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices IP x = +s '�.. t t tri ,'n iM� a PP10 UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices UT To Bald Vegetation Monitoring Photographs Taken September 2016 UT to Bald Stream (final) DMS Project Number 92596 Yancey County, North Carolina Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) December 2016 Appendices APPENDIX C VEGETATION PLOT DATA Table 7. Vegetation Plot Criteria Attainment Table 8. CVS Vegetation Plot Metadata Table 9. Total and Planted Stems by Plot and Species UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices Table 7. Vegetation Plot Criteria Attainment UT to Bald Stream and Wetland Restoration Site (DIVIS Project Number 92596) Vegetation Plot ID Vegetation Survival Threshold Met? Tract Mean 1 Yes 2 Yes 3 Yes 4 No 67% 5 No 6 Yes UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices Table 8. CVS Vegetation Plot Metadata UT to Bald Stream and Wetland Restoration Site (DMS Project Number 92596) Report Prepared By Corri Faquin Date Prepared 9/14/2016 15:25 database name Axiom-UTBald-2016-A-v2.3.l.mdb database location S:\Business\Projects\12\12-004 EEP Monitoring\12-004.15 UT to Bald\2016\CVS computer name PHILLIP-PC Me size 47017984 DESCRIPTION OF WORKSHEETS IN THIS DOCUMENT------------ Metadata Description of database file, the report worksheets, and a summary of projects) and project data. Pro', planted Each project is listed with its PLANTED stems per acre, for each year. This excludes live stakes. Pro', total stems Each project is listed with its TOTAL stems per acre, for each year. This includes live stakes, all planted stems, and all natural/volunteer stems. Plots List of plots surveyed with location and summary data (live stems, dead stems, missing, etc.). Vigor Frequency distribution of vigor classes for stems for all plots. Vigor bSpp Frequency distribution of vigor classes listed by species. Damage List of most frequent damage classes with number of occurrences and percent of total stems impacted by each. Damage by Spp Damage values tallied by type for each species. Damage by Plot Damage values tallied by type for each plot. Planted Stems by Plot and Spp A matrix of the count of PLANTED living stems of each species for each plot; dead and missing stems are excluded. ALL Stems by Plot and spp A matrix of the count of total living stems of each species (planted and natural volunteers combined) for each plot; dead and missing stems are excluded. PROJECT SUMMARY -------------------------------- ----- Pro'ect Code 92596 project Name UT to Bald River Basin French Broad length(ft) stream -to -edge width (ft) Required Plots (calculated) Sampled Plots 6 UT to Bald Stream (final) DMS Project Number 92596 Yancey County, North Carolina Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) December 2016 Appendices Table 9. Total and Planted Stems by Plot and Species DMS Project Code 92596. Project Name: UT to Bald Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 109/c Fails to meet requirements by more than 109/, Pnol-S = Planted excluding livestakes P -all = Planting including livestakes T = All planted and natural recruits including livestakes T includes natural recruits Current Plot Data (MY5 2016) Annual Means Scientific Name Common Name Species Type 92596-01-0001 PnoLS P -all T 92596-01-0002 Pnol-S P -all T 92596-01-0003 PnoLS P -all T 92596-01-0004 Pnol-S P -all T 92596-01-0005 Pnol-S P -all T 92596-01-0006 PnoLS P -all T MY5 (2016) Pnol-S P -all T MY4 (2015) Pnol-S P -all T MY3 (2015) Pnol-S P -all T MY2 (20 3) PnoLS P -all T MY1(2012) Pnol-S P -all T Acer saccharum sugar maple Tree 6 6 6 6 6 6 6 6 6 6 6 6 7 7 7 7 7 7 Alnus serrulata hazel alder Shrub 2 2 2 2 1 1 2 3 3 6 3 3 7 1 1 1 1 1 3 Betula nigra river birch Tree 1 1 1 1 1 1 1 1 1 1 1 1 3 3 3 10 10 10 Carpinus caroliniana American hornbeam Tree 3 3 3 2 2 2 5 5 5 5 5 5 6 6 6 7 7 7 7 7 7 Celtis laevigata sugarberry Tree 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 Cornus amomum silky dogwood Shrub 1 4 4 4 4 4 5 8 8 5 8 10 5 8 8 5 8 8 4 7 7 Fraxinus pennsylvanica green ash Tree 1 1 1 3 3 3 2 2 2 1 1 1 7 7 7 7 7 7 7 7 7 6 6 6 3 3 3 Lindera benzoin northern spicebush Shrub 2 2 2 1 1 1 3 3 3 3 3 3 3 3 3 5 5 5 2 2 2 Liriodendron tulipifera tuliptree Tree 3 2 5 1 Platanus occidentalis American sycamore Tree 3 3 3 3 3 31 3 31 4 31 31 3 3 3 3 2 2 2 Quercus oak Tree I I 1 1 1 1 Quercus michauxii swamp chestnut oak Tree 4 4 4 4 4 4 2 2 2 10 10 10 10 10 10 10 10 10 10 10 10 8 8 8 Quercus pagoda cherrybark oak Tree 1 1 1 1 1 1 Quercus rubra northern red oak Tree 1 1 1 1 1 1 2 2 2 3 3 3 3 3 3 3 3 3 Robinia pseudoacacia black locust Tree 3 2 1 1 Salix willow Shrub or Tree 11 10 1 221 13 2 Salix nigra black willow Tree 6 9 6 Salix sericea silky willow Shrub 26 Ulmus elm Tree 2 2 2 1 1 1 3 3 3 3 3 3 4 4 4 4 4 4 6 6 6 Ulmus americana JAmerican elm ITree 41 41 4 11 11 1 1 11 1 1 1 1 11 11 1 81 8 8 91 91 9 91 9 9 8 8 8 Stem count size (ares) size (ACRES) Species count per ACRE 91 4 364.2 91 1 0.02 4 364.2 20 5 8094 111 5 445.2 141 1 0.02 5 566.6 27 7 1093 8 81 11 1 0.02 3 3 5 323.7 323.7 445.2 61 61 6 1LO.02 0.02 4 4 4 242.8 242.8 242.8 61 6 6 5 242.8 171 7 688 171 1 0.02 7 688 20 8 809.4 571 14 384.5 601 6 0.15 14 404.7 90 16 607 581 13 391.2 611 91 6 0.15 13 17 411.4 613.8 591 13 397.9 62 6 0.15 13 418.2 90 15 607 63 13 424.9 66 78 6 0.15 13 15 445.2 526.1 531 11 357.51 561 65 6 0.15 11 14Stems 377.71 438.4 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 109/c Fails to meet requirements by more than 109/, Pnol-S = Planted excluding livestakes P -all = Planting including livestakes T = All planted and natural recruits including livestakes T includes natural recruits APPENDIX D STREAM SURVEY DATA Cross-section Plots Longitudinal Profile Plots Substrate Plots Tables l0a-b. Baseline Stream Data Summary Tables 11 a -b. Monitoring Data UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices River Basin: French Broad 37.5 BanWull Cross -Sectional Area: Y i t Site Name 0.19 UT to Bald 4/19/2016 Field Crew: Perkinson, Jernigan XS [D I . l XS - 1, Pool (Mainstem) 0.7 :: W / D Ratio11) --- Drainage --- Bank Height Ratio: LO Station Elevation 0.0 41.6 40 5.3 39.1 . sankfidl 6.9 38.7 w. . . . . . . . . . . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- •Flood Prone Area �Mv-oi Iznvtz 8.2 38.6 MY -026/20/13 9.7 38.1 My -03 2/16/15 10.8 37.8 My-oa lonzns 11.4 37.5 40 Station (feet) 11.6 37.5 12.3 37.3 12.9 37.1 13.3 36.4 14.0 36.4 Stream Type B/C 14.5 36.6 14.7 36.33 15.1 36.70 15.7 36.53 15.9 36.43 16.0 37.43 16.6 37.67 17.3 37.98 18.1 38.01 19.4 38.16 21.0 38.95 23.6 39.77 26.5 40.90 29.8 41.96 SUMMARY DATA Banldull Elevation: 37.5 BanWull Cross -Sectional Area: 3.1 Area (s mi): 0.19 Date: 4/19/2016 Field Crew: Perkinson, Jernigan SUMMARY DATA Banldull Elevation: 37.5 BanWull Cross -Sectional Area: 3.1 BanWull Width: 4.5 Flood Prone Area Elevation: --- Flood Prone Width: --- Max Depth at BankfulL• I . l Mean Depth at BankfulL• 0.7 :: W / D Ratio11) --- Entrenchment Ratio: --- Bank Height Ratio: LO 31.5 42.34 French Broad River Basin, UT to Bald, XS - 1, Pool (Mainstem) Station 08+71 44 42 0 40 . sankfidl w. . . . . . . . . . . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- •Flood Prone Area �Mv-oi Iznvtz 38 MY -026/20/13 My -03 2/16/15 36 My-oa lonzns 0 10 20 30 -MY-054/,g,,e 40 Station (feet) River Basin: Elevation French Broad 54.58 3.78 54.68 Site Name 0.19 UT to Bald 11/16/2016 Field Crew: Perkinson, Jernigan XS ID 53.23 XS - 2, Riffle Mainstem 52.77 13.70 52.38 Drainage Area (s mi): 15.03 52.19 15.39 52.29 15.97 52.82 17.04 53.23 18.33 53.46 22.32 53.89 25.07 54.24 26.45 54.72 28.71 55.10 29.84 55.18 31.26 55.34 Stream Type B/C French Broad River Basin, UT to Bald, XS - 2, Riffle (Mainstem) Station 05+82 56 55 54 :7 ___________________ ______________________. 0 53 52 �__ • Bankfull W 10 20 30 ' ' _ • Flood Prone Area 51 +MY-my12/11/12 MY -02 6/20/13 50 MY -03 2/16/15 MY -04 10/12/15 Station (feet) MY -0511/16/16 Station Elevation 0.00 54.58 3.78 54.68 6.05 0.19 Date: 11/16/2016 Field Crew: Perkinson, Jernigan Station Elevation 0.00 54.58 3.78 54.68 6.05 53.72 7.94 53.33 10.09 53.47 11.98 53.23 12.89 52.77 13.70 52.38 14.52 52.22 15.03 52.19 15.39 52.29 15.97 52.82 17.04 53.23 18.33 53.46 22.32 53.89 25.07 54.24 26.45 54.72 28.71 55.10 29.84 55.18 31.26 55.34 SUMMARY DATA Bankfull Elevation: 53.2 Bankfull Cross -Sectional Area: 3.0 Bankfull Width: 5.1 Flood Prone Area Elevation: 54.2 Flood Prone Width: 33.0 Max Depth at Bankfull: 1.0 Mean Depth at Bankfull: 0.6 W / D Ratio: 8.7 Entrenchment Ratio: 6.5 Bank Height Ratio: 1.0 River Basin: Elevation French Broad 99.07 1.80 98.64 Site Name 0.06 UT to Bald 4/19/2016 Field Crew: Perkinson, Jernigan XS ID 96.88 XS - 3, Riffle (UT 2 96.03 7.55 95.86 Drainage 96.31 8.43 96.88 1 96.80 10.18 97.07 11.55 98.19 12.81 98.39 14.38 98.44 15.4 98.54 a Stream Type B/C French Broad River Basin, UT to Bald, XS - 3, Riffle (UT 2) Station 01+01 100 99 98 - ------ --- --- --- -- ----- ------------- - ---------------- z 0 97 Bankfull • Flood Prone Area 96 MY -01 2/25/13 MY -02 6/20/13 95 MY -03 2/16/15 0 1 O MY -04 10/12/15 .Station (feet) MY -054/19/16 Station Elevation 0.00 99.07 1.80 98.64 Area (s mi): 0.06 Date: 4/19/2016 Field Crew: Perkinson, Jernigan Station Elevation 0.00 99.07 1.80 98.64 3.35 98.30 4.36 98.10 5.84 97.80 6.78 96.88 7.13 96.03 7.55 95.86 7.87 96.31 8.43 96.88 9.39 96.80 10.18 97.07 11.55 98.19 12.81 98.39 14.38 98.44 15.4 98.54 SUMMARY DATA Bankfull Elevation: 97.8 Bankfull Cross -Sectional Area: 4.7 Bankfull Width: 5.2 Flood Prone Area Elevation: 99.7 Flood Prone Width: 16.0 Max Depth at Bankfull: 1.9 Mean Depth at Bankfull: 0.9 W / D Ratio: 5.8 Entrenchment Ratio: 3.1 Bank Height Ratio: 1.0 River Basin: Elevation French Broad 57.7 23.5 57.4 Site Name 56.6 UT to Bald Field Crew: Perkinson, Jernigan XS ID 55.4 XS - 4, Poo] (Mainstem) 55.2 13.2 55.2 Drama a Area (s mi): 0.04 12.8 54.9 12.5 Date: 12.0 4/19/2016 11.3 55.1 11.1 55.30 10.4 55.48 9.8 55.61 8.9 55.92 8.2 56.11 6.6 56.68 4.1 57.14 1.7 57.22 0.0 57.26 Stream Type B/C French Broad River Basin, UT to Bald, XS - 4, Pool (Mainstem) Station 05+11 60 58 0 56 kV - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- • Bankfull - - • Flood Prone A- rea - AMY -0112/11/12 MY-01 MY -02 6/20/13 54 MY -03 2/16/15 0 10 20 MY -0410/12/15 30 Station (feet) MY -05 4/19/16 Station Elevation 26.6 57.7 23.5 57.4 19.9 56.6 17.3 Field Crew: Perkinson, Jernigan Station Elevation 26.6 57.7 23.5 57.4 19.9 56.6 17.3 55.7 15.8 55.4 14.5 55.4 13.6 55.2 13.2 55.2 13.1 55.1 12.8 54.9 12.5 55.1 12.0 55.0 11.3 55.1 11.1 55.30 10.4 55.48 9.8 55.61 8.9 55.92 8.2 56.11 6.6 56.68 4.1 57.14 1.7 57.22 0.0 57.26 SUMMARY DATA Bankfull Elevation: 55.7 Bankfull Cross -Sectional Area: 3.2 Bankfull Width: 7.9 Flood Prone Area Elevation: - Flood Prone Width; - Max Depth at Bankfull: 0.9 Mean Depth at Bankfull: 0.4 W / D Ratio: - Entrenchment Ratio: - Bank Height Ratio: 1.0 River Basin: French Broad Site Name UT to Bald XS ID XS - 5, Riffle (UT 1 Drainage Area (sq mi): 0.025 Date: 4/19/2016 Field Crew: Perkinson, Jernigan Station Elevation -0.11 99.62 1.40 99.71 2.42 99.69 3.82 99.23 4.69 98.99 4.98 99.05 5.38 98.86 6.26 98.90 6.50 98.23 7.12 97.89 7.51 97.82 7.84 97.55 8.11 97.52 8.50 97.64 9.01 97.77 9.5 97.95 10.2 98.86 11.2 98.69 12.62 99.11 14.34 99.84 16.22 100.22 17.00 100.40 SUMMARY DATA Bankfull Elevation: 98.9 Bankfull Cross -Sectional Area: 3.6 Bankfull Width: 3.9 Flood Prone Area Elevation: 100.2 Flood Prone Width: 16.0 Max Depth at Bankfull: 1.3 Mean Depth at Bankfull: 0.9 W / D Ratio: 4.2 Entrenchment Ratio: 4.1 Bank Height Ratio: 1.0 Stream Type B/C French Broad River Basin, UT to Bald, XS - 5, Riffle (UT 1) Station 00+62 101 ____________________________________________________________________ 100 99 ----------------------- -------------- ----------- a ,�; _ � _ • Bankfull w _ • Flood Prone Area 98 MY -01 2/25/13 MY -02 6/20/13 97 MY -03 2/16/15 0 10 MY -04 10/12/15 .Station (feet) MY -054/19/16 River Basin: French Broad Site Name UT to Bald XS ID XS - 6, Pool Mainstem Upstream) Drainage Area (sq mi): 0.04 Date: 4/19/2016 Field Crew: Perkinson, Jernigan Station Elevation -0.3 142.9 1.4 142.8 3.1 142.4 4.6 142.1 5.5 141.7 6.1 140.4 7.0 141.1 7.9 140.9 8.7 140.7 9.0 140.7 9.7 140.8 10.1 140.7 10.8 141.6 12.0 141.59 13.6 141.57 15.1 141.71 16.3 141.70 SUMMARY DATA Bankfull Elevation: 141.6 Bankfull Cross -Sectional Area: 3.6 Bankfull Width: 5.3 Flood Prone Area Elevation: - Flood Prone Width: - Max Depth at Bankfull: 1.1 Mean Depth at Bankfull: 0.7 W / D Ratio: - Entrenchment Ratio: - Bank Height Ratio: 1.0 Stream Type I B/C Project Name UT to Bald Creek - Profile Reach Mainstem Station 00+00 - 06+00 Feature Profile Date 4/19/16 Crew Perkinson, Jernigan 2012 2013 2014 2015 2016 Year 1 Monitoring \Survey Year 2 Monitoring \Survey Year 3 Monitoring \Survey Year 4 Monitoring \Survey Year 5 Monitoring \Survey Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation UT to Bald Creek Year S (2016) Profile - Mainstem, Station 00+00 to 06+00 95 90 85 80 s ca 75 v ? c ° 70 Z v W 65 60 55 50 0 100 —$—Year 1 (2012) Bed —41—Year 2 (2013) Bed 200 (Year 3 (2014) Bed 300 Distance (feet) Year 4 (2015) Bed T 400 —0—Year 5 (2016) Bed rA O U T 500 —*—Year 5 (2016) Water Surface N UD 600 2012 2013 2014 2015 2016 Avg. Water Surface Slope 0.0558 0.0540 0.0556 0.0542 0.0554 Riffle Length 37 35 27 34 38 Avg. Riffle Slope 0.0509 0.0609 0.0715 0.0630 0.0574 Pool Length 13 12 17 11 10 Pool to Pool Spacing 40 38 38 44 45 rA O U T 500 —*—Year 5 (2016) Water Surface N UD 600 Project Name UT to Bald Creek - Profile Reach Mainstem Station 06+00 - 11+12 Feature Profile Date 4/19/16 Crew Perkinson, Jernigan 2012I 2013 I 2014 I 2015 I 2016 Year 1 Monitoring \Survey Year 2 Monitoring \Survey Year 3 Monitoring \Survey Year 4 Monitoring \Survey Year 5 Monitoring \Survey Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation UT to Bald Creek Year 5 (2016) Profile - Mainstem, Station 06+00 to 11+12 55 50 30 1 25 �- 600 Le 700 800 Distance (feet) —$—Year 1 (2012) Bed —0—Year 2 (2013) Bed —d -Year 3 (2014) Bed —*@ —Year 4 (2015) Bed 900 —*Year 5 (2016) Bed 1000 tYear5 (2016) Water Surface 1100 2012 2013 2014 2015 2016 Avg. Water Surface Slope 0.0558 0.0540 0.0556 0.0542 0.0554 Riffle Length 37 35 27 34 38 Avg. Riffle Slope 0.0509 0.0609 0.0715 0.0630 0.0574 Pool Length 13 12 17 11 10 Pool to Pool Spacing 40 38 38 44 45 1000 tYear5 (2016) Water Surface 1100 Project Name UT to Bald Creek - Profile Reach Mainstem Upstream Station 00+00 - 04+00 Feature Profile Date 4/19/16 Crew Perkinson, Jernigan 2012I 2013 I 2014 2015 I 2016 Year 1 Monitoring \Survey Year 2 Monitoring \Survey Year 3 Monitoring \Survey Year 4 Monitoring \Survey Year 5 Monitoring \Survey Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation UT to Bald Creek Year 5 (2016) Profile - Mainstem Upstream, Station 00+00 to 04+00 150 140 100 90 0 50 —$—Year 1 (2012) Bed 100 (Year 2 (2013) Bed 150 —A -Year 3 (2014) Bed 200 Distance (feet) i(—Year 4 (2015) Bed 250 300 350 400 —w—Year 5 (2016) Bed —40 --Year 5 (2016) Water Surface 2012 2013 2014 2015 2016 Avg. Water Surface Slope 0.1301 0.1313 0.1315 0.1324 0.1290 Riffle Length 16 43 75 42 34 Avg. Riffle Slope 0.0750 0.0846 0.0953 0.0927 0.1050 Pool Length 5 2 6 4 4 Pool to Pool Spacing 14 46 102 59 36 250 300 350 400 —w—Year 5 (2016) Bed —40 --Year 5 (2016) Water Surface Project Name UT to Bald Creek - Profile Reach Tributary 1 Station 00+00 - 01+00 Feature Profile Date 4/19/16 Crew Perkinson, Jernigan 2012 2013 2014 2015 2016 Year 1 Monitoring \Survey Year 2 Monitoring \Survey Year 3 Monitoring \Survey Year 4 Monitoring \Survey Year 5 Monitoring \Survey Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation UT to Bald Creek Year 5 (2016) Profile - Tributary 1, Station 00+00 to 01+00 104 103 102 m 101 s m 100 v v w c 0 99 v W 98 97 96 95 0 10 tYear:1 (2012) Bed 20 30 (Year 2 (2013) Bed 40 50 Distance (feet) —*—Year 3 (2014) Bed —0—Year 4 (2015) Bed 60 kn 70 *—Year 5 (2016) Bed 80 —0—Year 5 (2016) Water Surface 90 100 2012 2013 2014 2015 2016 Avg. Water Surface Slope 0.0674 0.0782 0.0679 0.0766 0.0660 Riffle Length 7 19 14 13 15 Avg. Riffle Slope 0.0418 0.0777 0.0391 0.0631 0.0460 Pool Length 6 6 6 6 4 Pool to Pool Spacing 13 24 19 19 16 80 —0—Year 5 (2016) Water Surface 90 100 Project Name UT to Bald Creek - Profile Reach Tributary 2 Station 00+00 - 01+50 Feature Profile Date 4/19/16 Crew Perkinson, Jernigan 2012 2013I 2014 I 2015 I 2016 Year 1 Monitoring \Survey Year 2 Monitoring \Survey Year 3 Monitoring \Survey Year 4 Monitoring \Survey Year 5 Monitoring \Survey Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation UT to Bald Creek Year 5 (2016) Profile -Tributary 2, Station 00+00 to 01+50 106 104 102 100 a m v 98 v c ° 96 v W 94 92 90 88 0 20 40 60 —$--Year 1 (2012) Bed —41—Year 2 (2013) Bed Year 3 (2014) Bed Distance (feet) 80 —*(--Year 4 (2015) Bed 100 SIM—Year 5 (2016) Bed 120 —41—Year 5 (2016) Water Surface 140 2012 2013 2014 2015 2016 Avg. Water Surface Slope 0.0814 0.0844 0.0823 0.0881 0.0865 Riffle Length 10 32 49 39 26 Avg. Riffle Slope 0.0542 0.0611 0.0693 0.0751 0.0745 Pool Length 4 4 4 5 4 Pool to Pool Spacing 15 29 51 39 24 120 —41—Year 5 (2016) Water Surface 140 Project Name UT to Bald Creek - Profile Reach Tributary 3 Station 00+00 - 02+50 Feature Profile Date 4/19/16 Crew Perkinson, Jernigan 2012 2013I 2014 I 2015 I 2016 Year 1 Monitoring \Survey Year 2 Monitoring \Survey Year 3 Monitoring \Survey Year 4 Monitoring \Survey Year 5 Monitoring \Survey Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation UT to Bald Creek Year 5 (2016) Profile -Tributary 3, Station 00+00 to 02+50 85 80 75 m 70 s 65 v v w c ° 60 a W 55 50 45 40 + 0 Year 1 (2012) Bed 50 -4&-Year 2 (2013) Bed 100 —&—Year 3(2014) Bed Distance (feet) —i�c—Year 4 (2015) Bed 150 200 250 —7U—Year 5 (2016) Bed -*--Year 5 (2016) Water Surface 2012 2013 2014 2015 2016 Avg. Water Surface Slope NA* NA* NA* NA* NA* Riffle Length 25 44 33 19 30 Avg. Riffle Slope NA* NA* NA* NA* NA* Pool Length 18 7 10 16 7 Pool to Pool Spacing 28 45 25 25 32 150 200 250 —7U—Year 5 (2016) Bed -*--Year 5 (2016) Water Surface Project Name UT to Bald Creek - Profile Reach Tributary 4 Station 00+00 - 02+50 Feature Profile Date 4/19/16 Crew Perkinson, Jernigan 2012I 2013 I 2014 I 2015 I 2016 Year 1 Monitoring \Survey Year 2 Monitoring \Survey Year 3 Monitoring \Survey Year 4 Monitoring \Survey Year 5 Monitoring \Survey Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation Station Bed Elevation Water Elevation UT to Bald Creek Year 5 (2016) Profile -Tributary 4, Station 00+00 to 02+50 60 55 50 m s 6 45 v v c 0 40 v W 35 30 25 4- 0 —4 --Year 1 (2012) Bed 50 --W-Year 2 (2013) Bed 100 150 Distance (feet) •Year 3 (2014) Bed —Year 4 (2015) Bed —Year 5 (2016) Bed 200 +Year 5 (2016) Water Surface 250 2012 2013 2014 2015 2016 Avg. Water Surface Slope 0.0074 0.1228 0.1147 0.1229 0.0120 Riffle Length 23 22 11 24 32 Avg. Riffle Slope 0.0118 0.1118 0.0814 0.1008 0.0132 Pool Length 34 6 5 7 5 Pool to Pool Spacing 57 13 13 21 37 200 +Year 5 (2016) Water Surface 250 Wei hted Pebble Count Percent Riffle: Percent Pool: 100 Percent Run: Percent Glide: Pebble Count, Material Size Range (mm) Total # # # # # # # # # # # # #gp% # # # # # # # # #50%Oleo # # # #;i # #20% # # # # # # # # # # # Note: UT to Bald Creek silt/clay 0 0.062 7.5 French Broad very fine sand fine sand medium sand coarse sand very coarse sand 0.062 0.13 3.8 --- 0.13 0.25 5.7 Cross Section 2 - Mainstem 0.25 0.5 1.9 100% 80% 70% 60% 40% 30% a 10% 0% 0.01 Pebble Count, UT to Bald Creek 10000 0.5 1 5.7 1 2 7.5 very fine gravel fine gravel fine gravel medium gravel medium gravel coarse gravel coarse gravel very coarse gravel very coarse gravel 2 4 0.0 4 6 0.0 6 8 3.8 8 11 7.5 11 16 9.4 16 22 3.8 22 32 1.9 32 45 3.8 45 64 11.3 small cobble medium cobble large cobble very large cobble 64 90 9.4 90 128 5.7 128 180 7.5 180 256 3.8 small boulder small boulder medium boulder large boulder very large boulder 256 362 0.0 362 512 0.0 Particle Size (mm) 0.1 -11--Cumulative 1 10 100 1000 512 1024 0.0 1024 2048 0.0 Percent ♦ Percent Item - Riffle Pool -Run -4�-Glide 2048 4096 0.0 bedrock 0.0 Size percent less than (mm) Percent by substrate type IF True Weighted Count:EE] Total Particle Count: D16 D35 D50 D84 D95 silt/clay sand gravel cobble boulder bedrock 0.222 7.50 14.3 96 170 8% 25% 42% 26% 0% 0% Shaded cells indicate that these will typically not be tilled in. I= The distributions for these parameters can include information from both the cross-section surveys and the longitudinal profile. 2 =For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification -rare). 3. Utilizing survey data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 Table 10a.1 Baseline Stream Data Summary UT to Bald Stream Restoration Site/92596 - Mainstem (1,112 feet Parameter e Regional Curve Pre -Existing Condition Reference Reach(es) Data Design Mainstem Monitoring Baseline Dimension and Substrate - Riffle Only LL UL Eq. Min Mean Med Max SID n Mainstem Upstream Mainstem Downstream Tributary 2 Min Med Max Min Mean Med Max SID n Bankfull Width (ft) 5.5 1 1 7.1 5.8 1 5.1 2.7 5.5 Floodprone Width (ft) 7 9 10 9 7 2.0 Bankfull Mean Depth (ft) 0.4 0.8 0.5 0.5 0.1 1 0.5 lBankfull Max Depth (ft) 0.7 1.1 0.6 0.8 0.2 0.6 Bankfull Cross Sectional Area (ft) 2.7 3.9 2.9 2.6 0.4 2.5 2.6 Width/Depth Ratio 6.9 17.8 11.6 10.2 27 12 Entrenchment Ratiol I I 1 1 1.2 1 1.2 1 1.8 1.8 2.5 2.0 'Bank Height Ratiol I I I 1 1.0 1 2.4 1 1 1 1.0 1 1.0 1.0 1.0 Profile Riffle Length (ft) Riffle Slope (ft/ft) 0.048 0.144 0.0014 0.041 0.0508 0.0003 0.0012 Pool Length (ft) 1 None Distinct Not Available 1.15 15 1 1.38 100 Pool Max depth (ft) Pool Spacing (ft)l I I I Pattern Channel Beltwidth (ft) 12 32 12.0-25.0 25.0-32.0 10.0-25.0 12 32 Radius of Curvature (ft) 36 134 36.0-60.0 97.0-134.0 21.0 - 31.0 36 134 Rc:Bankfull width (ft/ft) 5.1 24.4 6.2-10.3 19.0-26.3 7.8 - 11.5 6.5 24.4 Meander Wavelength (ft) 60 245 200.0 - 245.0 60.0-220.0 35.0-47.0 60 220 6� Meander Width Ratiol Transport parameters I I I 1 10.9 1 1 40 1 2.1 -4.3 4.9-6.3 3.7-9.3 10.9 44.5 Reach Shear Stress (competency) lb/f2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/mz 69-217 46-183 Additional Reach Parameters Rosgen Classification B/G5 B5 B5 Bankfull Velocity (fps) 5.9-8.9 8.9-9.7 Bankfull Discharge (cfs) 23-24 Valley length (ft) Channel Thalweg length (ft) Sinuosity (ft) 1.05 - 1.11 1.11 1.05 1.3 1.03 - 1.09 Water Surface Slope (Channel) (ft/ft) 0.0476 - 0.1441 0.1441 0.0476 0.0508 0.0321 - 0.1213 BF slope (ft/ft) 3Bankfull Floodplain Area (acres) 4% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be tilled in. I= The distributions for these parameters can include information from both the cross-section surveys and the longitudinal profile. 2 =For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification -rare). 3. Utilizing survey data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 Shaded cells indicate that these will typically not be tilled in. I - The distributions for these parameters can include information from both the cross-section surveys and the longitudinal profile. 2 - For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing survey data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the ten ace riser/slope. 4 -Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if then exceeds 3 Table 10a.2 Baseline Stream Data Summary UT to Bald Stream Restoration Site/92596 - Tributary 2 (459 feet Parameter ez Regional Curve Pre -Existing Condition Reference Reach(es) Data Design Tributary 2 Monitoring Baseline Dimension and Substrate - Riffle Only LL UL Eq. Min Mean Med Max SD n alnstem Mainstern Upstream Downstream Tributary 2 Min Med Max Min Mean Med Max SID n Bankfull Width (ft) 5.5 1 1 7.1 5.8 5.1 1 2.7 3 Floodprone Width (ft) 7 9 10 9 7 6.0 Bankfull Mean Depth (ft) 0.4 0.8 0.5 0.5 0.1 1 0.2 'Bankfull Max Depth (ft) 0.7 1.1 0.6 0.8 0.2 0.3 Bankfull Cross Sectional Area (ft) 2.7 3.9 2.9 2.6 0.4 0.5 Width/Depth Ratio 6.9 17.8 11.6 10.2 27 14 Entrenchment Ratiol I I 1 1 1.2 1 1 1.2 1 1.8 1.8 2.5 2.0 'Bank Height Ratiol I I I 1 1.0 1 2.4 1 1 1 1.0 1 1.0 1 1.0 1 1.0 Profile Riffle Length (ft) Riffle Slope (ft/ft) 0.048 0.144 0.0014 0.041 0.0508 0.128 Pool Length (ft) None Distinct Not Available Pool Max depth (ft) 0.43 Pool Spacing (ft) 10-60 Pattern Channel Beltwidth (ft) 12 32 12.0-25.0 25.0-32.0 10.0-25.0 10-25 Radius of Curvature (ft) 36 134 36.0-60.0 97.0-134.0 21.0 - 31.0 21-31 Rc:Bankfull width (ft/ft) 5.1 24.4 6.2-10.3 19.0-26.3 7.8 - 11.5 7-10.3 Meander Wavelength (ft) 60 245 200.0 - 245.0 60.0-220.0 35.0-47.0 35-50 Meander Width Ratiol I I I 1 10.9 1 1 1 40 1 2.1 -4.3 4.9-6.3 3.7-9.3 3.3-8.3 Transport parameters Reach Shear Stress (competency) Ib/f2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/m2 69-217 3 Additional Reach Parameters Rosgen Classification B/G5 B5 135 Bankfull Velocity (fps) 5.9-8.9 1.5 Bankfull Discharge (cfs) 23-24 Valley length (ft) Channel Thalweg length (ft) Sinuosity (ft) 1.05 - 1.11 1.11 1.05 1.3 1.04 Water Surface Slope (Channel) (ft/ft) 0.0476 - 0.1441 0.1441 0.0476 0.0508 0.0641 BF slope (ft/ft) 3Bankfull Floodplain Area (acres) 4% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be tilled in. I - The distributions for these parameters can include information from both the cross-section surveys and the longitudinal profile. 2 - For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing survey data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the ten ace riser/slope. 4 -Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if then exceeds 3 Shaded cells indicate that these will typically not be filled in. I = The distributions for these parameters can include information from both the cross-section surveys and the longitudinal profile. 2 = For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing survey data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 Table 10a.3 Baseline Stream Data Summary UT to Bald Stream Restoration Site/92596 - Tributary 3 (318 feet Parameter ez Regional Curve Pre-Existing Condition Reference Reach(es) Data Design Tributary 3 Monitoring Baseline Dimension and Substrate - Riffle Only LL UL Eq. Min Mean Med Max SID n Mainstem Mainstem Upstream Downstream Tributary 2 Min Med Max Min Mean Med Max SID n Bankfull Width (ft) 5.5 7.1 5.8 5.1 2.7 1.8 Floodprone Width (ft) 7 9 10 9 7 10.0 Bankfull Mean Depth (ft) 0.4 0.8 0.5 0.5 0.1 1 0.3 'Bankfull Max Depth (ft) 0.7 1.1 0.6 0.8 0.2 0.3 Bankfull Cross Sectional Area (ft) 2.7 3.9 2.9 2.6 0.4 0.54 Width/Depth Ratio 6.9 17.8 11.6 10.2 27 6 Entrenchment Ratiol I I 1 1 1.2 1 1 1.2 1 1.8 1.8 2.5 5.6 'Bank Height Ratiol I I I 1 1.0 1 2.4 1 1 1 1.0 1 1.0 1 1.0 1 1.0 Profile Riffle Length (ft) Riffle Slope (ft/ft) 0.048 0.144 0.0014 0.041 0.0508 0.155 Pool Length (ft) None Distinct Not Available 0.9 10-100 Pool Max depth (ft) Pool Spacing (ft) Pattern Channel Beltwidth (ft) 12 32 12.0-25.0 25.0-32.0 10.0-25.0 10-20 Radius of Curvature (ft) 36 134 36.0-60.0 97.0-134.0 21.0 - 31.0 Rc:Bankfull width (ft/ft) 5.1 24.4 6.2-10.3 19.0-26.3 7.8 - 11.5 Meander Wavelength (ft) 60 245 200.0 - 245.0 60.0-220.0 35.0-47.0 Meander Width Ratiol Transport parameters I I I 1 10.9 1 1 40 1 2.1 -4.3 4.9-6.3 1 3.7-9.3 1 15.6-11 Reach Shear Stress (competency) lb/f2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/mz 69-217 8 Additional Reach Parameters Rosgen Classification B/G5 B5 135 Bankfull Velocity (fps) 5.9-8.9 Bankfull Discharge (cfs) 23-24 Valley length (ft) Channel Thalweg length (ft) 318 Sinuosity (ft) 1.05 - 1.11 1.11 1.05 1.3 1.03 Water Surface Slope (Channel) (ft/ft) 0.0476 - 0.1441 0.1441 0.0476 0.0508 0.1548 BF slope (ft/ft) 3Bankfull Floodplain Area (acres) 4% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. I = The distributions for these parameters can include information from both the cross-section surveys and the longitudinal profile. 2 = For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing survey data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 Table 10b.1 Baseline Stream Data Summary (Substrate, Bed, Bank, and Hydrologic Containment Parameter Distributions) UT to Bald Stream Restoration Site/92596 Parameter Pre -Existing Condition Reference Reach(es) Data Design As-built/Baseline RI% / Ru% / P% / G% / S% SC% / Sa% / G% / C% / B% / Be% d16/d35/d50/d84/d95/dip /disp(mm) 2Entrenchment Class <1.5 / 1.5-1.99 / 2.0-4.9 / 5.0-9.9 / >10 Incision Class <1.2 / 1.2-1.49 / 1.5-1.99 / >2.0 Shaded cells indicate that these will typically not be filled in. 1 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 2 = Entrenchment Class - Assign/bin the reach footage into the classes indicated and provide the percentage of the total reach footage in each class in the table. This will result from the measured cross-sections as well as visual estimates 3 = Assign/bin the reach footage into the classes indicated and provide the percentage of the total reach footage in each class in the table. This will result from the measured cross-sections as well as the longitudinal profile Footnotes 2,3 - These classes are loosley built around the Rosgen classification and hazard ranking breaks, but were adjusted slightly to make for easier assignment to somewhat coarser bins based on visual estimates in the field such that measurement of every segment for ER would not be necessary. The intent here is to provide the reader/consumer of design and monitoring information with a good general sense of the extent of hydrologic containment in the pre-existing and the rehabilitated states as well as comparisons to the reference distributions. ER and BHR have been addressed in prior submissions as a subsample (cross-sections as part of the design survey), however, these subsamples have often focused entirely on facilitating design without providing a thorough pre-constrution distribution of these parameters, leaving the reader/consumer with a sample that is weighted heavily on the stable sections of the reach. This means that the distributions for these parameters should include data from both the cross-section surveys and the longitudinal profile and in the case of ER, visual estimates. For example, the typical longitudinal profile permits sampling of the BHR at riffles beyond those subject to cross-sections and therefore can be readily integrated and provide a more complete sample distribution for these parameters, thereby providing the distribution/coverage necessary to provide meaningful comparisons. Table 11a. Monitoring Data - Dimensional Morphology Summary (Dimensional Parameters - Cross Sections) UT to Bald Stream Restoration Site/92596 Cross Section 1 (Pool) Cross Section 2 (Riffle) Cross Section 3 (Riffle) Cross Section 4 (Pool) Based on fixed baseline bankfull elevation' Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Record elevation (datum) used 37.4 37.4 37.5 37.5 37.5 53.4 53.7 53.0 53.0 53.2 97.7 97.7 97.7 97.8 97.8 55.4 55.6 55.7 55.7 55.7 Bankfull Width (ft) 4.9 5.1 4.7 5.1 4.5 4.2 4.5 4.0 4.6 5.1 4.1 3.5 4.5 4.3 5.2 6.1 6.6 7.5 7.3 7.9 Floodprone Width (ft) NA NA NA NA NA 13.0 20.0 33.0 33.0 33.0 14.0 14.0 16.0 16.0 16.0 NA NA NA NA NA Bankfull Mean Depth (ft) 0.8 1 0.9 0.9 1 0.7 0.7 1 1 0.3 0.2 1 1.3 0.9 1 0.6 0.6 1 0.5 0.7 1 0.7 0.9 0.5 0.5 1 0.4 0.4 0.4 Bankfull Max Depth (ft) 1.1 1.1 1.1 1.1 1.1 0.4 0.6 2.0 1.9 1.0 0.8 0.9 1.1 1.1 1.9 0.8 0.6 0.7 0.8 0.9 Bankfull Cross Sectional Area(ft) 3.8 4.5 4.3 3.4 3.1 1.1 1.0 5.2 4.2 3.0 2.3 1.8 3.3 3.2 4.7 3.2 3.2 2.9 3.0 3.2 Bankfull Width/Depth Ratio NA NA NA NA NA 16.0 20.3 3.1 5.0 8.7 7.3 6.8 6.1 5.8 5.8 1 NA NA NA NA NA Bankfull Entrenchment Ratio NA NA NA NA NA 3.1 4.4 8.3 7.2 6.5 3.4 4.0 3.6 3.7 3.1 NA NA NA NA NA Bankfull Bank Height Ratio NA NA NA NA NA 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 NA NA NA NA NA Cross Sectional Area between end pins(ft) ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- d50 (mm) ---- ---- ---- ---- ---- NA` 0.2 1.0 0.3 14.3 ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- Cross Section 5 (Riffle) Cross Section 6 (Pool) Based on fixed baseline bankfull elevation Base MY1 MY2 MY3 MY4 MY5 MY+ Base MY1 MY2 MY3 MY4 MY5 MY+ Record elevation (datum) used 98,7 98,7 98,7 98,9 98,9 141.6 141.6 141.6 141.6 141.6 Bankfull Width ft 4.0 4.2 3.8 3.9 3.9 5.6 5.4 6.4 5.7 5.3 Floodprone Width ft 16.0 16.0 16.0 16.0 16.0 NA NA NA NA NA Bankfull Mean Depth ft 0.8 0.7 0.8 0.8 0.9 0.7 0.6 0.4 0.4 0.7 Bankfull Max Depth ft 1.1 1.1 1.1 1.3 1.3 1.0 1.1 0.6 0.6 1.1 Bankfull Cross Sectional Area(ft) 3.0 3.0 3.1 3.3 3.6 3.9 3.3 2.4 2.3 3.6 Bankfull Width/Depth Ratio 5.3 5.9 4.7 4.6 4.2 NA NA NA NA NA Bankfull Entrenchment Ratio 4.0 3.8 4.2 4.1 4.1 NA NA NA NA NA Bankfull Bank Hei ht Ratio 1.0 1.0 1.0 1.0 1.0 NA NA NA NA NA Cross Sectional Area between end pins(ft) ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- d50mm ---- ---- ---- ---- ---- ---- ---- 1 = Widths and depths for monitoring resurvey will be based on the baseline bankfull datum regardless of dimensional/depositional development. Input the elevation used as the datum, which should be consistent and based on the baseline datum established. used If the performer has inherited the project and cannot acquire the datum for prior years this must be discussed with EEP. If this cannot be resolved in time for a given years report submission a footnote in this should be included that states: "It is uncertain if the monitoring datum has been consistent over the monitoring history, which may influence calculated values. Additional data from a prior performer is being acquired to provide confirmation. Values will be recalculated in a future submission based on a consistent datum if determined to be necessary." Greater than 50% of the material identified in the pebble count was characterized as silt/clay particle size. Shaded cells indicate that these will typically not be tilled in. 1 = The distributions for these parameters can include information from both the cross-section surveys and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Exhibit Table 11b.1 Monitoring Data -Stream Reach Data Summary UT to Bald Stream Restoration Site/92596 - Mainstem Downstream 1,112 feet Parameter Baseline MY-1 MY-2 MY- 3 MY- 4 MY- 5 Dimension and Substrate - Riffle only Min Mean Med Max SD n Min Mean Med Max SD' n Min Mean Med Max SD n Min Mean Med Max SD n Min Mean Med Max SID n Min Mean Med Max SD n Bankfull Width (ft) 4.2 4.5 4.0 4.6 5.1 Floodprone Width (ft) 13 20 33.0 33 33 Bankfull Mean Depth (ft) 0.3 0.2 1.3 0.9 0.6 'Bankfull Max Depth ft 0.4 0.6 2.0 1.9 1.0 Bankfull Cross Sectional Area (ft2) 1.1 1 5.2 4.2 3.0 Width/Depth Ratio 14 19.6 3.1 5.1 8.6 Entrenchment Ratio 3.1 4.5 8.2 7.1 6.5 'Bank Height Ratio 1.0 11.0 1.0 1.0 1.0 Profile Riffle Length (ft) 4.6 37.3 33 105.1 28 14 2.9 34.8 25.3 130 34.7 20 2.5 27.2 25.9 64.2 19.1 22 1.9 33.5 29.5 108.9 28.4 18 3 37.8 28.2 132.8 34.4 21 Riffle Slope (ft/ft) 0.0170 0.0508 0.0509 0.1221 0.03 14 0.018 0.061 0.051 0.116 0.028 20 0.0265 0.0715 0.0651 0.1397 0.0321 22 0.0225 0.0630 0.0607 0.1146 0.0283 18 0.0206 0.0574 0.0551 0.1193 0.0232 20 Pool Length (ft) 5.5 12.9 12 33.8 6.2 18 4.8 12.2 10.2 32 6.4 23 5.6 16.5 12.6 45.3 10.6 24 4.1 11 9.6 24.2 5.6 17 4.2 10.4 9.5 24.1 4.6 24 Pool Max depth (ft) 1.1 1.1 0.6 1.1 0.7 2.0 0.6 1.1 0.9 1.1 Pool Spacing (ft) 8.9 40 39 116.5 29.2 18 8.7 37.8 22.2 162 34.2 23 8.3 37.6 30 98.2 25.7 24 8.6 43.9 37 122 32.1 19 6.3 44.5 31.6 143.5 37.8 24 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rc:Bankfull width (ft/ft) Meander Wavelength (ft) 25 97 17.6 60 32 134 24.4 220 Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Meander Width Ratio 4.5 5.8 Additional Reach Parameters Rosgen Classification BC Cb Cb Cb Cb Channel Thalweg length (ft) 1112 1102 1102 1102 1102 Sinuosity (ft) 1.03 1.03 1.03 1.03 1.3 Water Surface Slope (Channel) (ft/ft) 0.0558 0.054 0.0556 0.0542 0.0554 BF slope (ft/ft) RI% / Ru% / P% / G% / S% SC% / Sa% / G% / C% / B% / Be% 38 28 20 14 0 0 30 22 30 16 0 0 63 26 30 8 0 08 25 42 26 0 0 d16 / d35 / d50 / d84 / d95 NA NA 0.2 57 98 NA 0.1 1 64 122 NA NA 0.3 40 98 0.222 7.5 14.3 96 170 z% of Reach with Eroding Banks 0 0 0 0 0 Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be tilled in. 1 = The distributions for these parameters can include information from both the cross-section surveys and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Shaded cells indicate that these will typically not be tilled in. 1 = The distributions for these parameters can include information from both the cross-section surveys and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Exhibit Table 11b.2 Monitoring Data -Stream Reach Data Summary UT to Bald Stream Restoration Site/92596 - Mainstem Upstream 375 feet Parameter Baseline MY-1 MY-2 MY- 3 MY- 4 MY- 5 Dimension and Substrate - Riffle only Min Mean Med Max SD' n Min Mean Med Max SD' n Min Mean Med Max SD' n Min Mean Med Max SD' n Min Mean Med Max SD' n Min Mean Med Max SD' n Bankfull Width (ft) Floodprone Width (ft) Bankfull Mean Depth (ft) 'Bankfull Max Depth ft Bankfull Cross Sectional Area ftz Width/Depth Ratio Entrenchment Ratio 'Bank Height Ratio Profile Riffle Length (ft) 4.6 17 13 66 17 11 6.6 1 43.3 40.3 1 86.7 33.5 1 8 47.7 82.5 74.6 133.0 41.6 4 8.3 42 39.4 134.2 44.4 1 7 6.5 34.3 24.8 100.1 30.1 10 Riffle Slope (ft/ft) 0.0102 0.0750 0.0845 0.1515 0.047 11 0.0295 0.085 0.076 0.154 0.047 8 0.0827 0.1045 0.0953 0.145 0.0276 4 0.0633 10.0927 0.9920 0.1157 0.0267 3 0.0327 0.1050 0.1030 0.2077 0.0504 10 Pool Length (ft) 1.6 5.5 5.3 10.2 2.5 16 0.1 2.2 1.9 5.5 1.8 7 2.1 12.7 5.6 30.5 15.5 3 2.9 4.1 4.3 5.1 1.1 3 1.7 3.5 3.7 5.3 1.2 9 Pool Max depth (ft) 1 1 1.1 1.1 0.6 0.6 0.6 0.6 1.1 1.1 Pool Spacing (ft) 12.4 14.3 12.4 42.2 9 16 8.9 46.4 46.1 92.2 37 7 79.6 106.8 102.1 138.6 29.7 3 10.1 58.9 44.1 137.1 54.6 4 10.5 36.3 23.7 102.3 30.9 9 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rc:Bankfull width (ft/ft) Meander Wavelength (ft) 12 36 6.5 200 25 60 10.9 245 Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Meander Width Ratio 2.2 4.5 Additional Reach Parameters Rosgen Classification B B B B B Channel Thalweg length (ft) 375 361 368.1 368.1 374 Sinuosity (ft) 1.09 1.09 1.09 1.09 1.09 Water Surface Slope (Channel) (ft/ft) 0.1301 0.1313 0.1315 0.1324 0.129 BF slope (ft/ft) Ri%I Ru%/P%/G%/S% SC% / Sa% / G% / C% / B% / Be% d16/d35/d50/d84/d95 '% of Reach with Eroding Banks 0 0 0 0 0 Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be tilled in. 1 = The distributions for these parameters can include information from both the cross-section surveys and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Parameter IBaseline Dimension and Substrate - Riffle only Min Mean Med Max SD' Bankfull Width (ft) Floodprone Width (ft) Bankfull Mean Depth (ft) 'Bankfull Max Depth ft Bankfull Cross Sectional Area(ft) Width/Depth Ratio Entrenchment Ratio 'Bank Height Ratio Profile - Tributary 1 Riffle Length (ft) Riffle Slope (ft/ft) Pool Length (ft) Pool Max depth (ft) Pool Spacing (ft) Profile - Tributary 2 Riffle Length (ft) Riffle Slope (ft/ft) Pool Length (ft) Pool Max depth (ft) Pool Spacing (ft) Profile - Tributary 3 Riffle Length (ft) Riffle Slope (ft/ft) Pool Length (ft) Pool Max depth (ft) Pool Spacing (ft) Profile - Tributary 4 Riffle Length (ft) Riffle Slope (ft/ft) Pool Length (ft) Pool Max depth (ft) Pool SDacino (ft) Rc:Bankfull width Meander Waveleno 14 28.4 MY -1 48.1 13.3 1.9 9.0 MY- 3 Min Mean Med Max SD' 4 4.1 4.1 4.1 10.7 14 15 15 16 7.3 1 0.6 0.7 0.7 0.8 Mean 0.8 1 1 1.1 3.9 2.3 2.7 1 2.7 3 13.7 5 18 4.1 14 3.4 15 16 1.0 1.0 16.0 16 1.0 0.5 0.6 0.6 0.7 7.3 5.1 7.3 6.9 10.3 2.3 0.0050 0.0418 0.0362 0.0896 0.0368 3.4 6.2 7.2 8.4 2.1 5.1 1.1 1.1 1.1 1.1 7.2 12.6 12.3 18.6 5.3 18.6 27.7 3.1 3.2 3.2 3.6 10 9.9 17.5 4.5 0.0117 0.0542 0.0433 0.0987 0.0352 2.1 4.1 3.9 6.8 1.6 6.4 0.0111 3.8 3.9 3.9 8.8 15 13.7 26.7 5.9 3.9 4.2 16.1 1.0 27.6 21.1 25.4 24.6 31.1 4.8 14 28.4 29.6 48.1 13.3 1.9 9.0 MY- 3 13.2 4.9 .0276 0.0637 0.0814 6.4 15.1 9.6 31.6 10.7 7.5 No water in channel during field visit. 4.6 7.3 1 8.1 1 10.1 1 2.3 Min Mean Med Max SD' 3.5 3.9 3.9 4.2 3.3 8.1 13.7 14.4 18 4.1 14.7 25.3 1 20.5 45.4 1 14.1 Exhibit Table 11b.3 Monitoring Data - Stream Reach Data Summary UT to Bald Stream Restoration Site/92596 - Tributaries 562 feet MY- 4 MY -2 1.9 9.0 MY- 3 13.2 4.9 .0276 0.0637 0.0814 0.0821 0.031 3.1 5.3 5.2 7.5 2.2 Min Mean Med Max SD' n Min Mean Med Max SD' 3.5 3.9 3.9 4.2 3.3 3.8 4.2 4.2 4.5 14 15 15 16 1.0 16.0 16.0 16 6.0 0.5 0.6 0.6 0.7 7.3 13.3 0.7 0.8 0.8 0.8 0.0631 0.9 1 1 1.1 6.3 5.1 1.1 1.1 1.1 1.1 1.8 2.4 1 2.4 3 18.6 27.7 3.1 3.2 3.2 3.3 6 6.5 6.5 7 69.6 1 27.2 4.8 5.6 5.6 6.4 0.0111 3.8 3.9 3.9 4 1.1 3.6 3.9 3.9 4.2 16.1 1.0 27.6 74.4 1.0 1.0 1.0 19.4 19.4 20.8 2 16.3 18.8 19.9 20.2 2.2 3 1 5.2 14.4 13.6 25.1 7.6 0.0712 0.0777 0.0721 0.0897 0.0104 3 0.0308 0.0391 0.0393 0.0843 0.0211 4.2 6.3 4.2 10.6 3.7 3 4.9 5.5 5.1 6.6 0.8 24.1 24.3 24.3 24.4 0.2 2 11.8 18.9 14.8 30.0 8.2 10.5 32.3 32.6 53.5 23.5 4 9.9 49.4 54.9 83.5 37.1 0.0233 0.0611 0.0549 0.1114 0.0399 4 0.0465 0.0693 0.0657 0.0955 0.0247 3.1 4.2 4 5.5 1 4 3.6 4.1 4.1 4.7 0.7 13.6 29.5 19.1 55.7 22.9 1 3 13.5 1 50.8 50.8 88.1 52.8 6.2 43.5 1 35.2 90.9 33.5 5 7.5 32.9 13.7 123.6 44.9 14.7 25.3 1 20.5 45.4 1 14.1 MY- 4 1.9 9.0 10.5 13.2 4.9 .0276 0.0637 0.0814 0.0821 0.031 3.1 5.3 5.2 7.5 2.2 16 0.7 0.8 0.8 0.8 1.1 1.2 1.2 5.1 1 13.0 16.7 1 17.1 6.8 15.5 24.5 1 20.4 37.7 11.6 MY- 4 10.9 23.7 Min Mean Med Max SD' 3.9 4.1 4.1 4.3 7.1 16 16 16 16 0.7 0.8 0.8 0.8 1.1 1.2 1.2 1.3 21.4 3.2 3.3 1 3.3 3.3 4.9 5.5 5.5 6.1 3.7 3.9 3.9 4.1 1.0 1.0 7.3 13.3 15.6 18.5 4.7 0.0423 0.0631 0.0518 1 0.0988 0.0253 3.1 6.3 5.1 12.1 4 11.5 19.1 18.6 27.7 8.2 10 39.2 1 38.6 69.6 1 27.2 0.0634 0.0751 0.0750 0.0870 0.0111 3.9 4.9 4.8 6.1 1.1 16.1 39.4 27.6 74.4 30.9 17.9 19.4 19.4 20.8 2 15.5 24.5 1 20.4 37.7 11.6 MY- 5 10.9 23.7 14.8 45.4 18.9 0.1008 SD' 3.9 0.1008 4.6 1.3 7.1 4.3 15.9 7.7 16 0.9 0.9 0.9 0.9 1.3 1.6 1.6 16 21.4 21.4 26.8 7.6 Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline 16.1 32.1 1 32.1 48.1 1 22.6 MY- 5 2.3 32.1 Min Mean Med Max SD' 3.9 4.6 4.6 5.2 4.8 16 16 16 16 0.9 0.9 0.9 0.9 1.3 1.6 1.6 1.9 36.9 3.6 4.2 4.2 4.7 4.3 5.1 5.1 5.8 3.1 3.6 3.6 4.1 1.0 1.0 5 15.3 16.9 25.3 8.2 0.0237 0.0460 0.0396 0.0880 1 0.0245 2.3 3.8 3.8 4.8 1 2.3 15.7 12.6 30.1 11.2 2.4 26.4 11.6 1 64 27.7 0.0271 0.0745 0.0680 0.1287 0.0355 3.2 3.8 3.7 4.5 0.6 5.7 23.6 14.9 68.3 25.3 9.7 1 29.8 38.2 41.3 17.4 16.1 32.1 1 32.1 48.1 1 22.6 2.3 32.1 11.1 85.4 37.3 .1008 0.1318 0.1165 0.1925 0.033 2.6 4.8 4.9 6.7 1.8 5.1 1 36.9 17.7 1 88 36.4 Ros en Classificationj I B I B I B I B I B Channel Thalweg length ft 562 1 562 1 562 1 562 1 562 Sinuosity NJ 1 1.03 - 1.05 1 1.03 - 1.05 1 1.03 - 1.05 1 1.03 - 1.05 1 1.03 - 1.05 W.i., 'Z -F. . . ¢Irmo /Channon IffIffill I n nR7d - n 13n1 I n n799 - 199R I n nR7Q - 1147 I n n7RR - 199Q I n nRRn - n 11 QR APPENDIX E HYDROLOGY DATA Table 12. Verification of Bankfull Events UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices Table 12. Verification of Bankfull Events UT to Bald Stream and Wetland Restoration Site (DMS Proiect Number 92596) Date of Data Date of Occurrence Method Photo (if Collection available) Crest gauge observations indicated a bankfull event after June 7, 2013 May 5, 2013 approximately 3.4 inches of rain was documented* at a -- nearby rain station on May 5, 2013. Crest gauge observations indicated a bankfull event after February 10, 2015 September 7, 2014 approximately 2.04 inches of rain was documented* at a nearby rain station on September 7, 2014 and 1.97 inches was documented in the previous 4 days. Crest gauge observations indicated a bankfull event after February 10, 2015 October 14, 2014 approximately 2.41 inches of rain was documented* at a -- nearby rain station on October 14, 2014. Crest gauge observations indicated a bankfull event after October 12, 2015 July 15, 2015 approximately 5.01 inches of rain was documented** at a -- nearby rain station on July 13-15, 2015. Crest gauge observations indicated a bankfull event after October 12, 2015 September 30, 2015 approximately 2.51 inches of rain was documented** at a -- nearby rain station on September 29-30, 2015. Crest gauge observations indicated a bankfull event after September 14, 2016 May 4, 2016 approximately 2.73 inches of rain was documented* * at a -- nearby rain station on May 4, 2016. *Asheville Airport (Weatherunderground 2015) **Bald Creek (CoCoRaHS 2016) UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices APPENDIX F ADDITIONAL DATA Figure 3. USGS Topographic Map Figure 4. NRCS Soils Map Preconstruction Photographs UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices 44 e0i \,\.. _ FF R ` kc K n o FJ e.* -': r^ " # A ��r�e�� Environnnenial, Inc. - � C. ._�" ._ ,�- --= � � �' �,.�^, h' "�` • Prepared for: North Carolina ' ! jv-1';r Department of w i ► Environmental - _ ,, ♦ - ,• r�. /' t d �, * �� i � r Quality r '•� �, _ f •f � i ,�- a- ,r.._ �• ',. Division of + , - - • •'" , Mitigation Services ,`- �. + - � , �{�, � o •+` _ .Y 7 ��� F ' 1 Project: "- r-- �°�, � I - .r� �� �`,- !�.,._,� ;-,�; � '+ ,� � � . • I I,'`UT to BALD rte, { • . a= t f r/ - TREAM/WETLAND .�\ !� • RESTORATION -- - V_ 1, a,. SITE 1 DMS Project I ( 1 *« �.� � � � � • `; -, r Number 92596 i '� •� J �\ .v %j,'- - Yancey County, NC ft : . -. - _, '...`,.` 4 _ • Title: USGS '�► - '<<'� TOPOGRAPHIC --4- _- --•� ' i ` MAP * �� •.* '�,; \ ��' .f �� 1 't ' •� Bald Creek, NC 7.5 Minute Quads ` ` y ' t • + t , , !, " Drawn by: KRJ all �Date: (`: " 'r 1 • ; y "`a Nov 2016 �y i • . gGi , M P 4 ��{ Scale: — 3 �" ,`" d 1 in - 1,000 ft *: .—�.� r lj' ? ProjectNo.: 'w .,,. t = • .� 12-004.15 � _ ..L ....-.—._ • • `si may' ALI ffir. t ".' .• 'ir �f J(f,' �_!s. t! FIGURE 17C s,t Legend Conservation Easement • ✓ :.,� ,� - i , i� ► fes.-- ''c` 1 `: - 3 ."� - .,t �1 �' 1 -�.• !/ l' �, + - _--1-- - Stream . r �, • -ff s•� 1 ! ` — • Ar 0 1,000 2,000 4,000 Feet r e UT To Bald Preconstruction Photographs Taken from Restoration Plan (dated June 2009) UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices UT To Bald Preconstruction Photographs (continued) Taken from Restoration Plan (dated June 2009) UT to Bald Stream (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2016) DMS Project Number 92596 December 2016 Yancey County, North Carolina Appendices