Loading...
HomeMy WebLinkAbout20140194 Ver 1_Year 1 Monitoring Report_2016_20170119YEAR 1 MONITORING REPORT ROSES CREEK STREAM MITIGATION SITE Burke County, North Carolina NC DMS Project # 96309 Prepared for: NCDEQ Division of Mitigation Services (DMS) 217 West Jones St., Suite 3000A Raleigh, North Carolina 27603 Construction Completed: May 2016 Morphology Data Collected: November 22, 2016 Vegetation Data Collected: October 5, 2016 Submitted: December 2016 DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 TABLE OF CONTENTS SECTION PAGE 1.0 PROJECT SUMMARY..................................................................................................... 2 1.1 GOALS AND OBJECTIVES........................................................................................................ 2 1.2 SUCCESS CRITERIA................................................................................................................. 3 1.3 BACKGROUND SUMMARY...................................................................................................... 3 1.4 VEGETATION.......................................................................................................................... 3 1.5 STREAM STABILITY................................................................................................................ 3 2.0 METHODOLOGY.............................................................................................................4 3.0 REFERENCES...................................................................................................................4 APPENDIX A. PROJECT VICINITY MAP AND BACKGROUND TABLES ............................................ 6 APPENDIX B. VISUAL ASSESSMENT DATA................................................................................ 13 APPENDIX C. VEGETATION PLOT DATA.................................................................................... 31 APPENDIX D. STREAM SURVEY DATA....................................................................................... 32 APPENDIX E. HYDROLOGIC DATA............................................................................................. 53 APPENDIX F. WARRANTY PLOTS............................................................................................... 60 LIST OF FIGURES FIGURE PAGE Figure1. Vicinity Map.................................................................................................................. 7 Figure 2.0 — 2.8. Current Condition Plan View...................................................................... 14 Figures 3.1 - 3.17. Vegetation Plot Photos............................................................................ 28 Figures 4.1 — 4.12. Cross Section Plots............................................................................... 33 Figures 5.1 - 5.4. Crest Gauge Photos................................................................................... 53 Figures 6.1 - 6.3. Flow Gauge Plots....................................................................56 LIST OF TABLES TABLE PAGE Table 1. Project Components and Mitigation Credits ..................................................... 8 Table 2. Project Activity and Reporting History .............................................................. 9 Table 3. Project Contacts Table................................................................................... 10 Table 4. Visual Stream Morphology Stability Assessment ............................................ 23 Table 5. Vegetation Condition Assessment................................................................... 25 Table 6. Vegetation Plot Mitigation Success Summary ................................................. 31 Table 7. Baseline Stream Data Summary..................................................................... 45 Table 8. Monitoring Data - Dimensional Morphology Summary .................................. 49 Table 9. Verification of Bankfull Events.........................................................................53 Table 10. Tributary Water Level Gauge Data............................................................55 ERZ ICA Page DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 1.0 PROJECT SUMMARY The following report summarizes the vegetation establishment and stream stability for Year 1 monitoring for the Roses Creek Site (hereafter referred to as the "Site") in Burke County, North Carolina. 1.1 Goals and Objectives Primary goals for the Site, as detailed in the Roses Creek Stream Mitigation Site Mitigation Plan (ICA Engineering 2015) include: 1. Reducing water quality stressors and providing/enhancing flood attenuation. 2. Restoring and enhancing aquatic, semi -aquatic and riparian habitat. 3. Restoring and enhancing habitat connectivity with adjacent natural habitats. The following objectives accomplish the goals listed above: 1. Reducing water quality stressors and providing/enhancing flood attenuation through: a. Restoring the existing degraded, straightened and incised/entrenched streams as primarily a Priority 1 restoration where bankfull and larger flows can access the floodplain allowing nutrients, sedimentation, trash and debris from upstream runoff to settle from floodwaters to the extent practical. Restoring a stable dimension, pattern, and profile will ensure the channel will transport and attenuate watershed flows and sediment loads without aggrading or degrading. b. Restore channel banks by relocating the channel, excavating bankfull benches, placing in -stream structures to reduce shearing forces on outside meander bends, and planting native vegetative species to provide soil stability, thus reducing stream bank stressors. c. Reducing point source (i.e. cattle and equipment crossings) and non -point source (i.e. stormwater runoff through pastures) pollution associated with on-site agricultural operations (hay production and cattle) by exclusionary fencing from the stream and riparian buffer and by eliminating all stream crossings from the easement. d. Plant a vegetative buffer on stream banks and adjacent floodplains to treat nutrient enriched surface runoff from adjacent pastureland associated with on- site agricultural operations. e. Restoring riparian buffers adjacent to the streams that are currently maintained for hay production that will attenuate floodwaters, in turn reducing stressors from upstream impacts. 2. Restoring and enhancing aquatic, semi -aquatic and riparian habitat through: a. Restoration of a sinuous gravel bed channel that promotes a stable bed form, and accommodates benthic macroinvertebrate and fish propagation. Additionally, woody materials such as log structures, overhanging planted vegetation and toe wood/brush toe in submerged water will provide a diversity of shading, bed form and foraging opportunities for aquatic organisms. b. Restoring native vegetation to the stream channel banks and the adjacent riparian corridor, that is currently grass dominated, will diversify flora and create a protected habitat corridor, which will provide an abundance of available foraging and cover habitat for a multitude of amphibians, reptiles, mammals and birds. 3. Restoring and enhancing habitat connectivity with adjacent natural habitats through: a. Planting the riparian buffer with native vegetation. ERZ ICA Page DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 b. Protection of the restored community will ensure a protected wildlife corridor between the Site and the upstream and downstream mature riparian buffers and upland habitats. c. Converting approximately 15 acres from existing agricultural land to riparian buffer protected by permanent conservation easement. 1.2 Success Criteria Monitoring of restoration efforts will be performed until success criteria are fulfilled. Monitoring includes stream channel/hydraulics and vegetation. In general, the restoration success criteria, and required remediation actions, are based on the Stream Mitigation Guidelines (USACE et al. 2003) and the Ecosystem Enhancement Program Monitoring Requirements and Performance Standards for stream and/or Wetland Mitigation (NCEEP 2011). Project success criteria are further detailed in the Baseline Monitoring Document & As -Built Baseline Report (HDRIICA 2016). 1.3 Background Summary The North Carolina Department of Environmental Quality Division of Mitigation Services (DMS) contracted HDRJICA to restore 4,746 linear feet of Roses Creek and three of its unnamed tributaries within the Site to assist in fulfilling stream mitigation needs in the watershed. The Site is located approximately 12 miles northwest of downtown Morganton in Burke County, NC. The Site contains Roses Creek and three unnamed headwater tributaries of Roses Creek (UT 1, UT 2 and UT 3). The Site is located within the 03050101060030 14 -digit Hydrologic Unit, which is also a DMS Targeted Hydrologic Unit for Cataloging Unit 03050101 of the Catawba River Basin. Roses Creek is classified as a Water Supply Watershed (WS -III), as it is part of the headwaters that feed Lake Rhodhiss. The Site is comprised of one property owned by Robert B. Sisk and Martha M. Sisk (PIN # 1767479652) (known as the Sisk Farm). Additional information concerning project history is presented in Table 2. 1.4 Vegetation Bare root plantings within vegetation plots are surviving well across the site. Vegetation plots are averaging 703.5 planted stems per acre, exceeding Year 3 monitoring success criteria of 320 stems per acre or greater. While vegetation plots are also exceeding success criteria individually, with average planted stem counts per plot ranging from 550 to 950 stems per acre, the stems do not appear to be healthy, and the majority of plots average a vigor of two or less. Due to the low vigor and visual assessment of vegetation throughout the site, HDRJICA surveyed ten, 30 foot radius warranty plots throughout the Site to determine the survivability of stems outside of vegetation plots. Warranty plots exhibited low survivability rates and the Site is scheduled to receive supplemental planting in the winter of 2017. Warranty plot locations are shown in Appendix F. 1.5 Stream Stability Roses Creek and its tributaries appear to be in stable and functioning condition. Cross Section dimensions remain consistent with baseline surveys. Cross Sections 7 and 8 have decreased slightly in depth and area. Both cross sections are located on UT 1, which currently has vegetation in the channel. It is likely that in -channel vegetation has trapped sediment, F)l ICA Page 3 DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 contributing to reduced channel area. It is expected that when flows increase over the winter, the sediment will flush out. Two small holes were noted on-site where backfill from construction has settled. HDRJICA will monitor these areas to ensure that they do not increase in size. Woody vegetation is not well established along the stream banks; however, there are currently no signs of stream bank erosion. The live stakes along the stream banks are scheduled to be supplemented in the winter of 2017. Bank pins were examined during morphological surveys and were not exposed. A pebble count was conducted on site indicating that particle size has increased since baseline from and average of 46.44 to 61.39 mm. The site has not experienced an overbank flow during the monitoring period. It is required that the site experiences at least two bankfull flows during the course of the seven year monitoring period. Crest gauge records can be found in Appendix E. It should be noted that the site has been in drought or near -drought conditions since construction was completed. An overview of the site's drought status according to the NC Drought Management Advisory Council can be found in Appendix E. 2.0 METHODOLOGY Year 1 monitoring surveys were completed using a Total Station. Each cross section was marked with a rebar monument at their beginning and ending points. The rebar has been located vertically and horizontally in NAD 83 -State Plane. Surveying these monuments throughout the Site ensured proper orientation. The survey data was imported into MicroStation for verification. RIVERMorph and the Ohio Department of Natural Resources' "The Reference Reach Spreadsheet Version 4.3L" were used to analyze cross section data. Tables and figures were created using Microsoft Excel. A pebble count was conducted and analyzed in RIVERMorph. Vegetation monitoring was completed using CVS level II methods, for 17, 100 square meter vegetation plots (Lee et al. 2006). The taxonomic standard for vegetation used for this document was Flora of the Southern and Mid -Atlantic States (Weakley 2011). 3.0 REFERENCES Lee, Michael T., R. K. Peet, S. D. Roberts, and T. R. Wentworth. 2006. CVS-EEP Protocol for Recording Vegetation, Version 4.0 (http://cvs.bio.unc.edu/methods.htm). ERZ ICA Page DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 Mecklenburg, Dan. 2006. The Reference Reach Spreadsheet Version 4.31L. 2006. Ohio Department of Natural Resources. Division of Soil and Water. (http://www.d nr.state.oh.us/tabid/9188/defauIt.aspx) Weakley, Alan S. 2011. Flora of the Southern and Mid -Atlantic States (online). Available: http://www.herbarium.unc.edu/FloraArchives/WeakleVFlora 2011-May-nay.pdf [May 15, 2011]. University of North Carolina Herbarium, North Carolina Botanical Garden, University of North Carolina, Chapel Hill, North Carolina. ERZ ICA Page DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 APPENDICES Appendix A. Project Vicinity Map and Background Tables ERZ ICA Page K> ao N o N m No O 3 �iw „o o 3 mpc3_0. CD -o�n UD 0 O o� CD o CD O O O 3 N m � � n m CD N 3 O CD _ x . C Q O U1 O CD O_ z O o CL �0o�� o6 C O <D CD X. CO .Z1 3a Z1 0 N fl) O O fl N O U) G 3. CO N ZF 6 O� = ,'< CD CL a � \ Q• O O O O N 0 O Omr ®z 7"I N C m ,1 O CD CD ChD l 1 r� Ind ZIO Z31 _Y not �....- . le �D S.'m m� = an oCl� y m m m m 0 Z N mi =� n ¢r d m 3 nQ m = n o ��. -m o < 3 m � K a x o ma o m a'a O m m d m n m m a N-= N= C O O M m25=3= -m m m o 29 =0n� 3 nm m f'm m CDo Cn� nn� y m 2 z = .� 3 S � n m 0 dam`°=yd m o n y c m N O y? 0ID 0 N m (n N •�-•. n nm ti. n0 FD CD M N m O m o Q y N n m m m CD OCT CD y== N y O N N= 0 0= 0 ID n m � v o a 0 5 ID V O CD 0 e --h 'a)'^ V' CD 3 CD 1--l' r• cD C F CL 1 m5.0cn �nma, � c- vo 3 ,0ti - CD v CD 3 0 3 C $y �n�. m 0 m o M- 3 �z-rn (D o3 �I sDv DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 Table 1. Project Components and Mitigation Credits Roses Creek, Burke County DMS Project No. 96309 Credit Summary Stream Riparian Non- Buffer Nitrogen Phosphorous SMU Wetland riparian Nutrient Nutrient Offset WMU Wetland Offset Type R RE R RE R RE Totals 5,009 Enhancement II 679 Project Components Project Stationing/ Existing Approach Restoration Restoration Mitigation SMU Component Location Footage/(PI, PII, or Footage or Ratio or Reach ID Acreage etc. Restoration Equivalent Acreage Roses 10+00- 3,643 PI Restoration 3,181 1:1 3,121 Creek 41+81 Roses 41+81- 38 - Ell 38 2.5:1 15 Creek 42+19 UT 1 10+00- 267 PI Restoration 289 1:1 289 12+54; 16+11- 16+46 UT 1 12+54- 641 - Ell 641 2.5:1 256 16+11; 16+46- 19+30 UT 2 10+00- 610 PI Restoration 707 1:1 707 17+07 UT 3 10+00- 558 PI Restoration 621 1:1 621 16+21 Total NA 5,757 PI Restoration/ 5,477 1-2.5:1 5,009 Ell * Stream Mitigation Units decreased by 60 to account for break in easement at the stream crossing on Sisk Farm Road Component Summation Restoration Stream Level linear fee!J Riparian Wetland (acres) Non -Riparian Buffer (square feet) Upland acres Wetland acres Riverine Non-Rivenne Restoration 4,798 Enhancement II 679 ERZ ICA Page DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 Table 2. Project Activity and Reporting History Activity or Report Data Collection Complete Completion or Delivery Mitigation Plan September 2015 September 2015 Final Design — Construction Plans September 2015 March 2016 Construction February 25, 2016 May 18, 2016 Temporary S&E Mix Applied to Entire Project Area --- May 18, 2016 Permanent Seed Mix Applied to Entire Project Area --- May 18, 2016 Bare Root, Containerized, and B&B plantings for Entire Project Area --- May 27, 2016 Mitigation Plan/As-built Year 0 Monitoring -Baseline) May 2016 July 2016 Year 1 Monitoring November 2016 December 2016 Year 2 Monitoring Year 3 Monitoring Year 4 Monitoring Year 5 Monitoring Year 6 Monitoring Year 7 Monitoring ERZ ICA Page DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 Table 3. Project Contacts Table Designer ICA Engineering 5121 Kingdom Way, Suite 100 Raleigh, North Carolina 27607 Primary project design POC Chris Smith (919) 851-6066 Construction Contractor Land Mechanic Designs, Inc. 126 Circle G Lane Construction Contractor POC Willow Spring, NC 27592 Lloyd Glover 919 639-6132 Planting Contractor Land Mechanic Designs, Inc. 126 Circle G Lane Planting Contractor POC Willow Spring, NC 27592 Lloyd Glover 919 639-6132 Seeding Contractor Land Mechanic Designs, Inc. 126 Circle G Lane Willow Spring, NC 27592 Seeding Contractor POC Lloyd Glover 919 639-6132 Seed Mix Sources Green Resources — Triangle Office Nursery Stock Suppliers 1) Dykes and Son Nursery, McMinnville, TN 2 Foggy Mountain Nurser live stakes HDRJICA Engineering Inc. 5121 Kingdom Way, Suite 100 Monitoring Performers Raleigh, North Carolina 27607 Ben Furr 919 851-6066 HDRJICA Engineering Inc. 5121 Kingdom Way, Suite 100 Stream Monitoring POC Raleigh, North Carolina 27607 Ben Furr 919 851-6066 HDRJICA Engineering Inc. 5121 Kingdom Way, Suite 100 Vegetation Monitoring POC Raleigh, North Carolina 27607 Ben Furr (919) 851-6066 ERZ ICA Page DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 Table 4. Project Information ERZ ICA Page Project Information Project Name Roses Creek Stream Mitigation Site County Burke Project Area acres 17.3 Project Coordinates (latitude and 35.850953,-81.819541 longitude) Project Watershed Summary Information Physiographic Province Piedmont / Mountain River Basin Catawba USGS Hydrologic Unit 03050101 USGS Hydrologic Unit 14 -digit 03050101060030 8 -digit NCDWQ Sub -basin 03-08-31 Project Drainage Area acres Roses: 3,309, UT 1: 35, UT 2: 47, UT 3: 10 Project Drainage Area Percentage <1% of Impervious Area CGIA Land Use Classification Agricultural/Pasture Ecore ion Northern Inner Piedmont Geological Unit I Zab : Alligator Back Formation; Gneiss Reach Summary Information Parameters Roses Creek UT 1 UT 2 UT 3 Length of reach 3,681 existing 900 existing 610 existing 558 existing linear feet Valley Classification VIII VIII VIII VIII Drainage Area 3,309 35 47 13 acres NCDWQ Stream 56 30 33.5 34 Identification Score NCDWQ Water WS -III; Tr WS -III; Tr WS -III; Tr WS -III; Tr Quality Classification Morphological Description (stream E4, 134, and F4 135,F5 B5 135,G5 type) Evolutionary Trend Simon Is Could maintain Stages: a B type Premodified » channel in Constructed » majority of G » B/E G » B Degradation reach and Widening Or F»B ERZ ICA Page DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 Regulatory Considerations (cont.) Coastal Zone Management (CZMA)/ No Coastal Area Management Act CAMA) N/A N/A FEMA Floodplain Compliance Yes Yes* CLOMR/LOMR Essential Fisheries Habitat No N/A N/A *The CLOMR was approved before construction. The LOMR has been supported by the local floodplain administrator and is currently being reviewed by FEMA. ERZ ICA Page DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 Appendix B. Visual Assessment Data ERZ ICA Page a - ON 0 en1.0ON V W 0 W V �J J 0 C4 181 Rd. \� o PISGAHNA77ONAL "'.oso .., 1263 1 N FOREST ? Creek Tasck State h ' h � amkery 125E \ Y,ycc 1240 Table Rock F 1240 \ 1240 `� 181 12 7 1eek 1240 Rd', 4� � 1240 VICINITY MAP YEAR 1 CONDITIONS BANK/BED CONDITION MINOR EROSION HOLE VEGETATION PROBLEM AREAS THIN GRASS VEGETATION PLOT CONDITION. ElulCRITERIA MET DCRITERIA UNME NOTE: 650/650 - REPRESENTS TOTA STEMS PER ACRE /PLANTED STEMS PER ACRE BEGINS STA 10+00.00 �f.YE' CURRENT CONDITIONS PLAN VIEW (CCPV) ROSES CREEK 7; LOCATION: BURKE COUNTY, NORTH CAROLINA LAT: 35051'01" N LONG: -81049'11" W TYPE OF WORK: CCPV PLANS - YEAR 1 BEGIN UT 1 ROSES CREEK .REEK i` STA 20+50.52 END UT 2 ;j STA 17 +10.07 END ROSES CREE 0, 0 0 DESIGN Ln ASBUILT ALIGNMENTS & STATIONING ---------- THALWEG Prepared in the Office of BANKFULL - - EPHEMERAL POOL CONSERVATION EASEMENT X FENCE XSX3«. 1 CROSS-SECTION ASBUILT LOCATION FM FLOW METER 50 25 0 50 100 CREST GAUGE ® PHOTO POINT C5 & DIRECTION C5 EXISTING C5 WETLANDS STREAM LENGTH = 3,219.20 FT 10 x 10 VEG PLOT FT 5 x 20 VEG PLOT i BRUSH TOE ROCK L -VANE = BANKFULL AREA (FT2) = ROCK BANKFULL AREA (FT2) = CROSS VANE BANKFULL AREA (FT2) = ROCK STEP BANKFULL AREA IF) = STRUCTURE w/ UT 1 BOULDERS 950.69 ROCK STEP STRUCTURE w/ 10 5 0 10 20 CLASS B RIP RAP 30.5 2.72 14.0 ROCK /LOG 5.0 0.58 13.0 CROSS VANE 9 FLOODPLAIN 5.5 0.63 13.1 INTERCEPTOR GRAPHIC SCALES DESIGN DATA PROJECT LENGTH Prepared in the Office of PROPOSED DESIGN ASBUILT 50 25 0 50 100 ROSES CREEK DESIGN STREAM TYPE C4 UT 1 DESIGN STREAM TYPE = C5 UT 2 DESIGN STREAM TYPE = C5 UT 3 DESIGN STREAM TYPE = C5 ROSES CREEK STREAM LENGTH = 3,219.20 FT STREAM LENGTH 3,222.56 FT ' 5121 Kingdom Way, 100 Rdl NCC 2%60% Raleigh, PLANS = BANKFULL AREA (FT2) = 66.4 BANKFULL AREA (FT2) = 2.1 BANKFULL AREA (FT2) = 2.1 BANKFULL AREA IF) = 2.6 UT 1 _ 930.38 FT 950.69 FT Un NC License No F-0258 10 5 0 10 20 CROSS-SECTIONED BANKFULL WIDTH (FT) = MAX DEPTH (FT) = WIDTH /DEPTH RATIO = 30.5 2.72 14.0 CROSS-SECTIONED BANKFULL WIDTH (FT) = MAX DEPTH (FT) = WIDTH /DEPTH RATIO = 5.0 0.58 13.0 CROSS-SECTIONED BANKFULL WIDTH (FT) = MAX DEPTH (FT) = WIDTH /DEPTH RATIO 5.0 0.58 13.0 CROSS-SECTIONED BANKFULL WIDTH (FT) = MAX DEPTH (FT) = WIDTH /DEPTH RATIO = 5.5 0.63 13.1 UT 2 UT 3 = 707.59 FT 621.03 FT 710.07 627.80 FT FT PROFILE (HORIZONTAL) DRAINAGE AREA (MIF) = 5.17 DRAINAGE AREA (MIF) = 0.06 DRAINAGE AREA (MIF) 0.07 DRAINAGE AREA (MIP) = 0.02 20 10 0 20 40 BANKFULL SLOPE(FT/FT) = 0.0062 BANKFULL SLOPE(FT/FT) = 0.0021 BANKFULL SLOPE(FT/FT) = 0.0021 BANKFULL SLOPE(FT/M = 0.0021 CHRISTOPHER L. SMITH PROJECT MANAGER PROFILE (VERTICAL) MSEEHSHEELINE T 71 rn VP2 550,550 I � I 2 I I "� I I� � I L 0 w O\ � O q BEGIN ROSES CREEK STA 10+00.00 CURRENT CONDITIONS PLAN VIEW VC A 1) '1 E E- cn �E �. .. ROSES CREEK 1 STA 11 + 00.90 f ' END UT 1 STA 19 + 50.69 \\ VP3 600/600 4 0 Rei CCPV O O v --E- t ,REEK db- 3 0 CONTROL POINT RBC "KEE" (505) 0 N: 776804.78' E: 1163861.97' DTHIN ELEV:1238.0' Ln PLOT CONDITIONS 0 Rei CCPV O O v --E- t ,REEK db- 3 0 PROBLEM AREAS 0 CROSS-SECTION DTHIN GRASS Ln PLOT CONDITIONS ASBUILT ALIGNMENTS l & STATIONING ------------ THALWEG BANKFULL EPHEMERAL POOL E CONSERVATION EASEMENT a FENCE X VI -E - E FLOODPLAIN INTERCEPTOR LEGEND PHOTO POINT & DIRECTION V /8 850850 G YEAR 1 CONDITIONS VEGETATION PROBLEM AREAS CROSS-SECTION DTHIN GRASS VEGETATION PLOT CONDITIONS 5 x 20 VEG PLOT CRITERIA MET CRITERIA UNMET NOTE: 650/650 - REPRESENTS TOTAL STEMS PER ACRE /PLANTED STEMS PER ACRE XS -1 CREST CROSS-SECTION LOCATION 10 x 10 VEG PLOT 5 x 20 VEG PLOT ROCK STEP BRUSH TOE N n I ­a w z O 0 CL Q CL V Z V� 0 00 Z LU NN > 0 Lu Z D 0 V LU w N m W J V "' N N N V Z = g o Ln N DATE: 11-30-16 CCPV YEAR 1 SHEET 2 EEP# 96309 CREST GAUGE ROCK L -VANE ROCK CROSS VANE ROCK STEP STRUCTURE w/ BOULDERS ROCK STEP STRUCTURE w/ CLASS B RIP RAP a FLOODPLAIN 8$ INTERCEPTOR N n I ­a w z O 0 CL Q CL V Z V� 0 00 Z LU NN > 0 Lu Z D 0 V LU w N m W J V "' N N N V Z = g o Ln N DATE: 11-30-16 CCPV YEAR 1 SHEET 2 EEP# 96309 3 LEGEND CURRENT CONDITIONS PLAN VIEW (CC MATCHLINE 2 SEE SHEET 8 7— E E + r U- 0 CREST y mZ �r m (V GAUGE „ 950950 =?J 850850, —i ,- Q VP5_ `'---� - - 70WOO � ----- ------ — - G FLOODPLAIN y \ \ INTERCEPTOR o CREST PHOTO POINT + & DIRECTION Ln r ROCK CROSS VANE ASBUILT ALIGNMENTS XS -1 __ & STATIONING CROSS-SECTION BOULDERS LOCATION •------------ THALWEG N CLASS B RIP RAP BANKFULL 10 x 10 VEG PLOT a INTERCEPTOR = — EPHEMERAL POOL CL o 5 x 20 VEG PLOT E CONSERVATION N EASEMENT DATE; 11-30-16 CCPV z BRUSH TOE YEAR 1 FENCE SHEET 3ROSES CREEK � STA 20+51.69 END UT 2 STA 17+10.07 YEAR 1 CONDITIONS BANK13ED CONDITION HOLE VEGETATION PROBLEM AREAS OTHIN GRASS VEGETATION PLOT CONDITIONS CRITERIA MET CRITERIA UNMET NOTE: 6500650 - REPRESENTS TOTAL STEMS PER ACRE /PLANTED STEMS PER ACRE CONTROL POINT RBC "KEE" (5031 N: 776233.40' E: 1164358.71' ELEV: 1228.8' �I V n ML ~ Z W_ J Q O CL U Y Z = w w — � U;� O Z N Q w N N F oLu j O U W Lu Y H N m CREST GAUGE ROCK L -VANE 0 ROCK CROSS VANE W ROCK STEP STRUCTURE w/ Q BOULDERS ROCK STEP U Ln N N STRUCTURE w/ N CLASS B RIP RAP g FLOODPLAIN a INTERCEPTOR 3ROSES CREEK � STA 20+51.69 END UT 2 STA 17+10.07 YEAR 1 CONDITIONS BANK13ED CONDITION HOLE VEGETATION PROBLEM AREAS OTHIN GRASS VEGETATION PLOT CONDITIONS CRITERIA MET CRITERIA UNMET NOTE: 6500650 - REPRESENTS TOTAL STEMS PER ACRE /PLANTED STEMS PER ACRE CONTROL POINT RBC "KEE" (5031 N: 776233.40' E: 1164358.71' ELEV: 1228.8' �I V n ML ~ Z W_ J Q O CL U Y Z = w w — � U;� O Z N Q w N N F oLu j O U W Lu Y H N m 0 W Q U Ln N N N V Z g = CL o N DATE; 11-30-16 CCPV z YEAR 1 SHEET 3 EEP# 96309 CONTROL POINT CURRENT CONDITIONS PLAN VIEW (CC E: 1164568.34' ELEV: 1229.8' YEAR 1 CONDITIONS VEGETATION PLOT CONDITIONS i CRITERIA MET CRITERIA UNMET NOTE: 650/650 - REPRESENTS TOTAL STEMS PER ACRE /PLANTED STEMS PER ACRE 1 r'd.-r'\ 1r1 O PHOTO POINT 0 & DIRECTION XS -1 CROSS-SECTION Lo LOCATION ASBUILT ALIGNMENTS & STATIONING •------------ THALWEG BRUSH TOE BANKFULL EPHEMERAL POOL E CONSERVATION EASEMENT FENCE X �I V N r1 a U Z W_ J O 0 'oe Q 1 u Z Lu U� O Lu NOO �W Z O U w w m 0 Ln W J V "' N N N V Z = g o Ln N DATE: 11_30-16 CCPV YEAR 1 SHEET 4 EEP# 96309 PHOTO POINT & DIRECTION XS -1 CROSS-SECTION LOCATION 10 x 10 VEG PLOT 5 x 20 VEG PLOT �o STRUCTURE w/ BRUSH TOE BOULDERS �I V N r1 a U Z W_ J O 0 'oe Q 1 u Z Lu U� O Lu NOO �W Z O U w w m 0 Ln W J V "' N N N V Z = g o Ln N DATE: 11_30-16 CCPV YEAR 1 SHEET 4 EEP# 96309 CREST GAUGE ROCK L -VANE ROCK CROSS VANE ROCK STEP �o STRUCTURE w/ BOULDERS ROCK STEP STRUCTURE w/ CLASS B RIP RAP FLOODPLAIN INTERCEPTOR �I V N r1 a U Z W_ J O 0 'oe Q 1 u Z Lu U� O Lu NOO �W Z O U w w m 0 Ln W J V "' N N N V Z = g o Ln N DATE: 11_30-16 CCPV YEAR 1 SHEET 4 EEP# 96309 YEAR 1 CONDITIONS BANKBED CONDITION MINOR EROSION VEGETATION PLOT CONDITIONS CRITERIA MET CRITERIA UNMET NOTE: 650/650 - REPRESENTS TOTAL STEMS PER ACRE /PLANTED STEMS PER ACRE LEGEND CURRENT CONDITIONS PLAN VIEW VCAD l CONTROL POINT RBC -KEE" 514 N: 776112.06' E: 1165366.13' ELEV: 1223.7' CC C E� E E E O ROSES CREEK O STA 34 + 65.21 X END UT 3 �O STA 16+27.80 - - ----\ IVP14 75M50 0 o 600/600 (j, °w 1 o 'CREST GAUGE I41, _ oc/ X0 �M 0 O 0 FM FLOW A ROCK L -VANE ASBUILT ALIGNMENTS & STATIONING •------------ THALWEG BANKFULL - EPHEMERAL POOL E CONSERVATION EASEMENT y FENCE CREST GAUGE 1, 9 E �I eq P4z Ln Q V a U Z OO02 0 °" v Y Z = Lu OLU i- o NOz w } N N F 0LuZ Z) �O Lu Y t m L- w J V ' N N N u g = a a O N DATE: 11-30-16 CCPV YEAR 1 SHEET 5 EEP# 96309 FM FLOW A ROCK L -VANE METER XS -1 ROCK CROSS-SECTION CROSS VANE LOCATION ROCK STEP 10 x 10 VEG PLOT STRUCTURE w/ BOULDERS ROCK STEP 5 x 20 VEG PLOT � STRUCTURE w/ CLASS B RIP RAP FLOODPLAIN BRUSH TOES INTERCEPTOR PHOTO POINT ROCK /LOG O & DIRECTION CROSS VANE 1, 9 E �I eq P4z Ln Q V a U Z OO02 0 °" v Y Z = Lu OLU i- o NOz w } N N F 0LuZ Z) �O Lu Y t m L- w J V ' N N N u g = a a O N DATE: 11-30-16 CCPV YEAR 1 SHEET 5 EEP# 96309 -.ifti E---- CURRENT CONDITIONS PLAN VIEW (CCPV YEAR 1 F m r YEAR 1 CONDITIONS BANKBED CONDITION HOLE VEGETATION PLOT CONDITIONS Iu CRITERIA MET CRITERIA UNMET NOTE: 650/650 - REPRESENTS TOTAL STEMS PER ACRE /PLANTED STEMS PER ACRE I 3 lro Xo o�/ i —W A W END ROSES CREEK STA 42+22.56 e O LEGEND + Lo ASBUILT ALIGNMENTS ROCK L -VANE & STATIONING 10 x 10 VEG PLOT ------------- THALWEG ROCK BANKFULL O 5 x 20 VEG PLOT CROSS VANE EPHEMERAL POOL ROCK STEP BRUSH TOE STRUCTURE w/ E CONSERVATION BOULDERS EASEMENT PHOTO POINT ROCK STEP FENCE & DIRECTION STRUCTURE w/ CLASS B RIP RAP XS -1 CROSS-SECTION CREST a Q FLOODPLAIN INTERCEPTOR LOCATION GAUGE ISI V N n U Z W_ J OO w W V Z 0 V) 0 z N N 0 LuZ D O g v W W � Y N � CG W J V "' t', N N V Z = g CL O L! Ln N DATE: 11-30-16 CCPV YEAR 1 SHEET 6 EEP# 96309 ,3 9 O . r— ONTROL POINT RBC "KEE" 509 N: 777730.62' E: 1164336.81' ELEV: 1286.2' t_r 3 CONTROL POINT RBC "KEE" (5081 N: 777608.60' E: 1164092.39' ELEV: 1267.9' CURRENT CONDITIONS PLAN VIEW (CC �I ---- --- VEGETATION PROBLEM AREAS THIN GRASS CREST I E L6 - � GAUGE i VP1Lu 650900 X FLOW W N XS -1 c ------------ THALWEG �` --- - BANKFULL W FM -' ,�• ---- E W Q) FM EASEMENT U g = a n- o Lli PHOTO POINT Nh J w >s & DIRECTION O _ a o CREST x to N 3 Wo 3 ROCK STEP ccpv STRUCTURE w/ CLASS B RIP RAP 3 YEAR 1 FLOODPLAIN o SHEET 3 3 NO z 7 CONTROL POINT EEP# 96309 NN o Lu z RBC "KEE" 507 0 N: 777247.89' E: 1163857.23' a w Lu ELEV: 1249.6' D N in YEAR 1 CONDITIONS VEGETATION PROBLEM AREAS THIN GRASS VEGETATION PLOT CONDITIONS L6 - CRITERIA MET CRITERIA UNMET NOTE: 650/650 - REPRESENTS TOTAL STEMS PER ACRE /PLANTED STEMS PER ACRE 0 LEGEND 0 CROSS-SECTION LOCATION Lo L6 - 10 x 10 VEG PLOT ASBUILT ALIGNMENTS X FLOW & STATIONING METER XS -1 c ------------ THALWEG BANKFULL EPHEMERAL POOL E CONSERVATION FM EASEMENT FENCE CROSS-SECTION LOCATION L6 - 10 x 10 VEG PLOT FLOW METER 0 L6 - Lu J Q U ' N N N U g = a n- o PHOTO POINT & DIRECTION CREST GAUGE DATE: 11-30-16 ROCK STEP ccpv STRUCTURE w/ CLASS B RIP RAP YEAR 1 FLOODPLAIN SHEET INTERCEPTOR 7 EEP# 96309 II lz W FLOODPLAIN I INTERCEPTOR x; j BEGIN UT 2 STA 10 + 00.00 0 0 roll CURRENT CONDITIONS PLAN VIEW (CC 3 SISK FARM RD E E 1 lb 3 41 —g— .da CONTROL POINT RBC "KEE" 517 N: 776741.35' E: 1164591.65' ELEV: 1238.7' YEAR 1 CONDITIONS VEGETATION PROBLEM AREAS ITHIN GRASS VEGETATION PLOT CONDITIONS CRITERIA MET CRITERIA UNMET NOTE: 650/650 - REPRESENTS TOTAL STEMS PER ACRE /PLANTED STEMS PER ACRE It 41. vP67 809809 Flow Direction : � _ VP7 650/650 3 ----------,! 3— X o LEGEND to + O PHOTO POINT & DIRECTION ASBUILT ALIGNMENTS X FENCE & STATIONING XS -1 CROSS-SECTION CREST GAUGE ------------ THALWEG LOCATION BRUSH TOE BANKFULL 10 x 10 VEG PLOT EPHEMERAL POOL ROCK STEP STRUCTURE w/ E CONSERVATION 5 x 20 VEG PLOT CLASS B RIP RAP EASEMENT FLOODPLAIN FM FLOW INTERCEPTOR METER V u J 0 0 a� Z Lu U� O V) Z NV 0 L Z Z) O u Lu Lu � Y H � N co 00 0 - Ln W J V"' N N N u Z = g � o Ln N DATE: 11-30-16 CCPV YEAR 1 SHEET 8 EEP#96309 0 M W BEGIN UT 3 p STA 10+00.00 CURRENT CONDITIONS PLAN VIEW (CCPV r r x1 UT 3 YEAR 1 CONDITIONS VEGETATION PLOT CONDITIONS CRITERIA MET CRITERIA UNMET NOTE: 650/650 - REPRESENTS TOTAL STEMS PER ACRE /PLANTED STEMS PER ACRE U) m m —I C31 g LEGEND _ Flow Direction - m -� Cn m m YEAR 1 CONDITIONS VEGETATION PLOT CONDITIONS CRITERIA MET CRITERIA UNMET NOTE: 650/650 - REPRESENTS TOTAL STEMS PER ACRE /PLANTED STEMS PER ACRE U) m m —I C31 g LEGEND Ln r ______ ___ ASBUILT ALIGNMENTS �XS-1 CROSS-SECTION & STATIONING LOCATION •------------ THALWEG 10 x 10 VEG PLOT BANKFULL EPHEMERAL POOL EXISTING / WETLANDS E CONSERVATION _.- EASEMENT ROCK STEP STRUCTURE w/ X FENCE CLASS B RIP RAP ® PHOTO POINT a FLOODPLAIN INTERCEPTOR & DIRECTION I IV in u 00 a a U Z w0 W u O� W NO Z w N N 12 Z D O < U < w Lu Y V)co O i(1 - w J Q U N N N g = a CL o DATE: 11-30-16 CCPV YEAR 1 SHEET 9 EEP# 96309 T W a N CD N N W N .- 9 m so w � oo o. A n S d Q N CD C dn c CD' m to O N A x W 03G1 N N O W N c N A z (') W 3 N ;0 N (n n 3 G o c a ' o 0 _ T 0 v ' _. cG G o `0 :0 (D V l N l W -o p 0o 0 d W N N N HT ° o m x m c n c F N n Z0. N S A 0 4 o' o H o a B ni M om' n n ma m o m oFi M n O .°. F,�. 3 A o o- ?. m d Q - a m m 'm 3 o m �' d ? y 0O t 3 x57 wm x 0 3 m 3 m ? o " 'm d Cl) m x o m m '" m a °�' DCD' CL 0m mo r 00 0. o m 0 CD g9 N N x m m o m m O_ CD 3U)0 mm n m won a m o i N N M � � O N O rt Z 3a D 3 s tC CD N N c0 c0 co co c0 J J OD OD J d N y � N 3 m s N 3 � � A CL CL D c c0 c0 c0 c0 c0 � w Df N J J OD OD J C A d .r 7 cn C r 0 0 0 0 0 0 � N 3 3 a fD s_ m N N M D 0 3 0 0 0 0 0 0 E c en a = CD 0 m ga,a O O O O O p O O p O O O O O O O ry C N O O O O O O O O O O O O O O 3 d a o 0 0 o a o o � o 0 0 0 0 0 0 �� c C. 0 W m N T Yj N CD N W W N .- 9 m so w � oo o. A n S d Q N CD C dn c CD' m to O N A x W 03G1 N N O W N c N A z (') W N N (n n 3 G o c a ' o o _ T _. cG G o o `0 :0 (D -0 l N l W a p 0o 0 d W0w N N N HT 0 o m x m c n c F N n Z0. N S cn �7m o N m HT a D <'o vg� m c c gym' n n ma o- a n 6 m om F n o v d o < m m as M v N a CD N0.3 o m Q a m° - m y 3 x o m _ El M CCD m m O m o0 cl cD CD 0) m o c m G om f ;2 o o m y m o m� ; f° � s W _ r00 ID •a �^ G S m �o p � � N � y v CD =L _ o c 3 W W N N o s D N N N N N N D y y 3 s N N 3 _m Q m a N � •* D c W W N N Z S S c N N N N N � w Df N D C N d = .r 7 cn C r 0 0 0 0 0 0 N3 3 c fD s_ m N N M D 0 3 0 0 v o o E c to a = CD 0 m ga,a O O O O O p O O p O O O O O O O ry N O O O O O O O O O O O O O O 3 d a o 0 0 o a o o � o 0 0 0 0 0 0 �� c CL m m m N T Yj a N CD N W N .- 9 m so w � oo o. A n S d Q N CD C dn c CD' m to O N A x W 03G1 N N O W N c N A z (') W N N (n n 3 O G o c a ' o o _ T O 0 v ' _. cG G o o `0 :0 m V l N l W a p 0o 0 m W0w N N N HT 0 o m x m c n c F N n Z0. Ncn S o N m HT <'o m c < 3 aoF,6 m 0 o m 0 F n o v d o < m m as m o G> v N � a my m Q a m° o p o m� C a'. - _d o 3 x o ? m 0 m _ El M CD d s n N n y£ o m A m O cD CD om o m m o m g m G0) r0OZ o y _ m _ m U2 0 c a = a = a V "n V G � � N s v CD o c 3 N N N N N N N N N N 3 s CC CD D N (/) N N N y N CD 3 s N N 3 _m Q m a N � D c N 3 1 0 w Df N = .r 7 cn C r 0 0 0 0 0 0 N3 3 c fD s_ m N O M D 0 3 0 0 v o o E c ea a = CD 0 m ga,a O O O O O p O O p O O O O O O O ry O N O O O O O O O O O O O O O O 3 d a o 0 0 o a o o o 0 0 0 0 0 0 CD c CL m m m N T W a N CD N Ul W N + m m W (c m J C a O' 3 0 (D (D C 0 a) CD to N O Q A 2 W WO N N + O W 3 N c + va A T n w 3 N ,'p N n C y 0 = S CL d N m c F ^ m (7 j r ID _ A N 3 C 0 c ?� 07 (D c a o CD v 3 G c O,y-,r a 3 O O _ ;w 3 t7 0 �7 (D °o_ Co (n 2 G) m (n c W 'O O W m d W a N N m N o IV O Q N N O r O X SD D Z O m C C N Z O SD J J N J C � N J d OEr J _ 9I CC. fD O O C1 O' _, m w a N N J Ip O- Dl (D O N ... 6 m o �°. o o a m w o. 3 J O 5 :E. N (D o ° L.: J me'- v LT O J O O O. J m 3� 7 J—'^ V/ `D 0 0 o co cm CD 3 m > > N N ov of m m= <o m s m °' O. n O r S-1 IV W N A X dLa 3 S O ID o � � rt a, _ 3= < N 5 N N N O. � aCI ' N -I m N � 7 C C (yD 3 0 0 0 0 0 0 3�� CD 0 N 0 O m c D 3 c 0 0 0 0 0 0 w Eir CD m O v 0 0 0 0 0 00 0 00 0 0 0 0 0 o o 0� y 3 0 o 0 a 0 o 0 o 0 e o 0 a 0 o 0 o 0 0 0 0 0 0 0 0 0 o 0 a m C a (n 0 w 0 T Yj ^`V W CD N a) m CD CD m m 0 w D N m o D CD 2.1 m o W m s m F m N D O N O 0 o a < � o 0 N D < CD O CD = m w o 3 N O a A 0CD 0 CL m S O CD o N fl o o a 3 j m N OO m c o 3 O O co o_ m CD ° mo M. v N' mCm N d 0 N m O w � CL m N O < o c N m N w m n CD o a X O m � D D O O <. O 3 z A O m 00 CD n 3 O N N m 2 N N N 3 N - CD N O_ 3 C. nx c 3 F n c N � m m O < 3 ;- z 0 O °z v �. _0.m D m o m CD o O N 3 3 -qO j 0 O d 0 N O d N= CD n O m z 3 m z o D 0 0 m N n O 3 c U Z O m m D pa A D q m D, m 0 O v_ d _ O Z a M 3 m o o D o a n m m m DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 Figures 3.1 - 3.17. Vegetation Plot Photos 3.1 Vegetation Plot 1 3.3 Vegetation Plot 3 3.2 Vegetation Plot 2 3.4 Vegetation Plot 4 3.5 Vegetation Plot 5 ERZ ICA 3.6 Vegetation Plot 6 Page 28 DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 3.7 Vegetation Plot 7 3.8 Vegetation Plot 8 3.9 Vegetation Plot 9 3.10 Vegetation Plot 10 3.11 Vegetation Plot 11 ICA 3.12 Vegetation Plot 12 Page 29 rN `XU 3.7 Vegetation Plot 7 3.8 Vegetation Plot 8 3.9 Vegetation Plot 9 3.10 Vegetation Plot 10 3.11 Vegetation Plot 11 ICA 3.12 Vegetation Plot 12 Page 29 DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 3.13 Vegetation Plot 13 3.14 Vegetation Plot 14 3.15 Vegetation Plot 15 3.16 Vegetation Plot 16 3.17 Vegetation Plot 17 ERZ ICA Page Table 6. EEP Project Code 96309. Project Name: Roses Creek Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% lm)l I Hca Page 31 Current Plot Data (MY1 2016) Scientific Name Common Name common buttonbush Species count 00000000000000000©0 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% lm)l I Hca Page 31 DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 Appendix D. Stream Survey Data ERZ ICA Page River Basin Catawba MY1 MY2 MY3 MY4 MY5 I MY6 Watershed 03050101060030 XS ID XS 1 Bankfull Width ft Drainage Area Acres 3,309 Date 11/22/2016 508.32 Field Crew Bill Wollman, Alex DeGironimo 2.00 Cross Section 1 Dimension and substrate Base MY1 MY2 MY3 MY4 MY5 I MY6 MY7 Based on fixed baseline bankfull elevation Bankfull Width ft 33.80 31.20 Floodprone Width ft 508.32 508.32 Bankfull Mean Depth ft 2.00 2.18 Bankfull Max Depth ft 2.81 2.88 Bankfull Cross Sectional Area (ft) 67.70 67.97 Bankfull Width/Depth Ratio 16.90 14.31 Bankfull Entrenchment Ratio 15.04 16.29 FEZ ICA Page 33 River Basin Catawba Watershed 03050101060030 XS ID XS Drainage Area Acres 3,309 Date 11/22/2016 Field Crew Bill Wollman, Alex DeGironimo XS -2 Pool ^ f �r Baseline -5/1]/2016 -– Bankfull-5/1]/2016—fi—h1V1-11/22/2016; 1238.0 I 123].0 1236.0 = 1235.0 d 1234.0 �+ 1233.0 1232.0 1231.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 ]0.0 50.0 DISW nce (k) Cross Section 2 (Pool) Dimension and substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Based on fixed -baseline bankfull eTe-G—trd"1111F_ Bankfull Width ft 38.53 35.95 Floodprone Width ft Bankfull Mean Depth ft 1.73 1.79 Bankfull Max Depth ft 3.47 3.78 Bankfull Cross Sectional Area(ft) 66.48 64.24 Bankfull Width/Depth Ratio Bankfull Entrenchment Ratio Bankfull Bank Height Ratio F)� ICA Page 34 River Basin Catawba Watershed 03050101060030 XS ID XS 3 Drainage Area Acres 3,309 Date 11/22/2016 Field Crew Bill Wollman, Alex DeGironimo XS -3 Pool 12140 Baseline -5l1 ]I2016 -- B -U.11-5/17/2016 — W1-11/22/2016 1223.0 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1322.0 C y1221.0 - W32200 1219.0 1218.0 0.0 10.0 20.0 30.0 60.0 7.0 DiatHnce ({1) 0 [ Cross Section 3 (Pool) Dimension and substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Based on fixed baseline bankfull elevation Bankfull Width ft 32.44 35.57 Floodprone Width ft Bankfull Mean Depth ft 2.19 2.45 Bankfull Max Depth ft 4.10 4.40 Bankfull Cross Sectional Area(ft) 71.10 87.13 Bankfull Width/Depth Ratio Bankfull Entrenchment Ratio Bankfull Bank Height Ratio FEZ INCA Page 35 River Basin Catawba Watershed 03050101060030 XS ID XS 4 Drainage Area Acres 3,309 Date 11/22/2016 Field Crew Bill Wollman, Alex DeGironimo XS -4 Riffle �Bas1--5/1712016 —— Bankfull-5/1712016 1222.0 MY1-11/26/2016 _ 1221.5 1221.0 —— — — — — — — — — — — — —— y 129.5 - w 12:9,0 _ 1218.5 1218 0 121).5 0.0 10.0 20.0 30.0 60.0 Distance (/t) 50.0 60.0 70.0 Cross Section 4 (Riffle) Dimension and substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Based on fixed baseline bankfull elevation Bankfull Width (ft) 31.11 31.42 Floodprone Width ft 696.00 696.00 Bankfull Mean Depth ft 2.19 2.11 Bankfull Max Depth ft 2.89 2.96 Bankfull Cross Sectional Area(ft) 68.21 66.2 Bankfull Width/Depth Ratio 14.21 1 14.89 Bankfull Entrenchment Ratio 22.37 22.15 Bankfull Bank Height Ratio 1.00 1.00 1=)Z ICA Page 36 River Basin Catawba Watershed 03050101060030 XS ID XS 5 Drainage Area Acres 3,309 Date 11/22/2016 Field Crew Bill Wollman, Alex DeGironimo XS -5 Riffle -Baseline-5/1]/2016 - - 13ankfdl-5/17/2016 -<r MY1-11122/2016 1217.5 1217.0 - - - - - - - - - - - - - 1216.5 1216.0 C � 1215.5 y 1215.0 w I 1214.5 al 1214.0 1213.5 1213.0 10.0 30.0 40.0 60.0 80.0 ,y}A 'G45J 0.0 20.0 50.0 70.0 Distance (ft) Cross Section 5 (Riffle) Dimension and substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Based on fixed baseline bankfull elevation Bankfull Width ft 32.56 33.03 Floodprone Width ft 563.60 563.60 Bankfull Mean Depth ft 2.13 2.23 Bankfull Max Depth ft 3.16 3.22 Bankfull Cross Sectional Area(ft) 69.41 73.79 Bankfull Width/Depth Ratio 15.29 14.81 Bankfull Entrenchment Ratio 17.31 17.06 Bankfull Bank Height Ratio 1.00 1.00 FEZ ICA Page 37 River Basin Catawba Watershed 03050101060030 XS ID XS 6 Drainage Area Acres 3,309 Date 11/22/2016 Field Crew Bill Wollman, Alex DeGironimo XS -6 Pool --�--9ase11ne-511712016 -- Bankfu11-5/1112016 —MY1 - 1112212016 - 1217.0 121- ----- - - - - -- - r. M- 9 1214.0 w 1213.0 1212.0 'fc s 1211.0 00 10.0 20.0 30.0 400 50.0 60.0 IDA Distance 00 80.0 Cross Section 6 (Pool) Dimension and substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Based on fixed baseline Bankfull elevation Bankfull Width ft 31.02 31.30 Floodprone Width ft Bankfull Mean Depth ft 2.37 2.23 Bankfull Max Depth ft 4.07 3.98 Bankfull Cross Sectional Area(ft) 73.63 69.77 Bankfull Width/Depth Ratio Bankfull Entrenchment Ratio Bankfull Bank Height Ratio FEZ ICA Page 38 River Basin Catawba Watershed 03050101060030 XS ID XS 7 Drainage Area Acres 38.40 Date 11/22/2016 Field Crew I Bill Wollman, Alex DeGironimo XS -7 Riffle Baseline -5/25/2016 1266:0 1265.5 C 1365.0 .2 W 1264.5 -- BankN11-5252016-ar-MY1-11/22/2016 1264.4 1263.5 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 Distance (it) 4Y 1 Cross Section 7 (Riffle) Dimension and substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Based on fixed baseline Bankfull elevation Bankfull Width ft 5.12 4.46 Floodprone Width ft 91.80 91.80 Bankfull Mean Depth ft 0.45 0.41 Bankfull Max Depth ft 0.78 0.59 Bankfull Cross Sectional Area(ft) 2.30 1.82 Bankfull Width/Depth Ratio 11.38 10.88 Bankfull Entrenchment Ratio 17.93 20.58 Bankfull Bank Height Ratio 1.00 1.00 FEZ ICA Page 39 River Basin Catawba Watershed 03050101060030 XS ID XS 8 Drainage Area Acres 38.40 Date 11122/2016 Field Crew Bill Wollman, Alex DeGironimo XS -8 Pool _ Baseline -5/17/2016 –– Bankfull-5117/2016 —lr MY1-1122/2016 126x.0 1263.8 1263.6 1263.4 1263.2 S 63.0 > 1262.8 W 1262.6 1262.4 1262.2 1262.0 1261.8 0.0 5.0 10.025 d 30.0 sfllstance lR) 0 3M Cross Section 8 (Pool) Dimension and substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Based on fixed baseline bankfull elevation Bankfull Width ft 6.24 6.00 Floodprone Width ft Bankfull Mean Depth ft 0.58 0.47 Bankfull Max Depth ft 0.96 0.73 Bankfull Cross Sectional Area(ft) 3.64 2.83 Bankfull Width/Depth Ratio Bankfull Entrenchment Ratio Bankfull Bank Height Ratio FEZ ICA Page 40 River Basin Catawba Watershed 03050101060030 XS ID XS 9 Drainage Area Acres 44.80 Date 11/22/2016 Field Crew Bill Wollman, Alex DeGironimo 124LO 1240.8 12- 12- 1-2 240.61240.412401 m uao.D 1239.8 1239.6 1239.4 1x39.2 0.0 XS -9 Pool —Baseline -5/17/2016 –– 13-Vl-5/17/2016 —MY1,11/22/2016 5.0 10.0 15.0 20.0 250 300 35.0 4D.0 45.0 _ Distance (ft) FEZ I ICA Page 41 Cross Section 9 (Pool) Dimension and substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Based on fixed baseline bankfull elevation Bankfull Width ft 5.56 5.70 Floodprone Width ft Bankfull Mean Depth (ft) 0.37 0.48 Bankfull Max Depth ft 0.86 0.86 Bankfull Cross Sectional Area(ft) 2.07 2.72 Bankfull Width/Depth Ratio Bankfull Entrenchment Ratio Bankfull Bank Heiqht Ratio 1.00 1.00 FEZ I ICA Page 41 River Basin Catawba Watershed 03050101060030 XS ID XS 10 Drainage Area Acres 44.80 Date 11/22/2016 Field Crew Bill Wollman, Alex DeGironimo ti—Baseline-.5/17/2016 1237.4 .3- XS-10 Riffle -— B.Wd-5/17/2016 MY1 - 11/2212016 -7.0 C 1236.8 m 1236.4 1236.7 0.0 i0 10.0i. ., 20.0 ]5.2 30.0 350 s Distance (ft) Cross Section 10 (Riffle) Dimension andF(ft) Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Based on fixed baseline bankfull elevation Bankfull Width 6.7 7.1 Floodprone Wid 93.36 93.36 Bankfull Mean DDepth0.4 0.38 Bankfull Max Depth ft 0.77 0.74 Bankfull Cross Sectional Area(ft) 2.79 1 2.69 Bankfull Width/Depth Ratio 16.75 18.68 Bankfull Entrenchment Ratio 13.93 13.14 Bankfull Bank Height Ratio 1.00 1.00 FEZ ICA Page 42 River Basin Catawba Watershed 03050101060030 XS ID XS 11 Drainage Area Acres 12.80 Date 11/22/2016 Field Crew Bill Wollman, Alex DeGironimo XS -11 Riffle Baseline -5/172016 -- Bankfu11-5/17/2016 -WW1-11/2212016 1222.5 qq,ti, ,.,'kq 11 � 1221.5 f� W 1221.0 1220.5 122000.0 50 10.0 15.0 20.0 25.0 30.0 35.0 00.0 65.0 Distance )R) 50.0 Cross Section 11 (Riffle) Dimension and substrate Base MY1 MY2 MY3 MY4 I MY5 MY6 MY7 Based on fixed baseline bankfull elevatio Bankfull Width (ft) 6.00 7.28 Floodprone Width ft 175.41 175.41 Bankfull Mean Depth ft 0.36 0.21 Bankfull Max Depth ft 0.69 0.46 Bankfull Cross Sectional Area(ft) 2.19 1 1.51 Bankfull Width/Depth Ratio 16.67 34.67 Bankfull Entrenchment Ratio 29.24 24.09 Bankfull Bank Height Ratio 1.00 1.00 FEZ ICA Page 43 River Basin Catawba Watershed 03050101060030 XS ID XS 12 Drainage Area Acres 12.80 Date 11/2212016 Field Crew Bill Wollman, Alex DeGironimo —Baseline-5/1712016 XS-12 Pool -- B.Wd-5117/2016 —MY1-112212016 1221.0 1220.8 1220.4 r 1220.2 y 1220.0 w un, --- -- 4+ 1219.6 1219.0 0.0 5.0 10.0 15.0 20.0 25.0 30.0 '35.0 40.0 Dist— (ft) Cross Section 12 (Pool) Dimension and substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Based on fixed baseline bankfull elevation Bankfull Width (ft) 8.85 8.34 Floodprone Width ft Bankfull Mean Depth ft 0.4 0.46 Bankfull Max Depth ft 0.9 0.87 Bankfull Cross Sectional Area W 3.61 3.85 Bankfull Width/Depth Ratio Bankfull Entrenchment Ratio Bankfull Bank Height Ratio FEZ ICA Page 44 T V N 0 3 C d m 3 D J m o' W fD - �3An m J � Mcnm -0N m v x rn y W o y 6 a a �r N m W m Dr o a•NNo W m ^� v .'vm Nov T c d fn v n n 3 m Jm_ W' m A v 3 J 0 $ J DW1 �" 0A y N O a 3 y? w n m m H N c T 3 2 91 N O N tU a, p p p N 3 �. F O J o co .J.. __ p CO pO N N] co N= J n m 2 A w o c o °i D a CO'm `2 m m Z °' to x r N r n 0. 3 y o y m m N 3 v y v a° a o: >• 3 s c o: m n 3, m o m m0 0 m n a Q 3 y m " v m m rtc >• >• n -„ °: o [n y 'x, Q 3 m >• m >: °' >• 3 v v m >• >• >• >• q \ Nc s rn M w 3 N � O J d M a c O O 3 fD A V W .Z1 tOn O N D) CD V N D (D ID O N (OO A t00 Q1 O O W Uf V O O W O O J CD 7� O O 0 W O O p UD V w O W 0 � O m C O; T C N 0 o 3 x m m � m O AOV H6rl OwiOWU� O W W W� m� O V O J t00 W O V N W N O OJ J Ut 0 0 (p A A A N V W� W (aD N O N Ut O O W O V N O x N N N Ut O 0 0 O O N N O W 0 0 O O N W 0 O W O 0 W W O O 0 0 W W O O 0 0 W W O O 0 0 W O J 0 T V N b a � m\ (til Q x � o_ N- J e A m J N O o 'ZL A a W °i c p m c n m O UCJ7 m o n < J J d mN m. 3 m 2 d m ? m m m J d 3 .m. m m m vl C J _ (^ m d 3 o h m ry m 3 3 o• Q JC d m S d (n d a N O 0 3 w o ' Q3 W n Dp i o co� m ry m m J a J N O g 3 J d m J o a n D O °o m x o N oom rn J m J m o 3 m P. m m m c n W F N D O m m m �� w mF LOom ymj O m 5 o N O J m c m v m zA W m� 3 a rn o m � m 3 ro m m 0 J m a d n � w o cn S W J W o C -I J O y 3 N W CD m O N N A (7 m N N fD N m N -� 0) J m m T. Ncn tD tD O O J J J J J J J N ? 4J 4J w IV A m O 0 N 6% Ui(7 I O O O N N N N tD tD N N tD N N N O O O O^ J J K m fD m d d d d a a s t0 fD � O N j' .me O N O A A W A N m N N O N T W O v N A A `G W 3 O N m P O O O P N N N O _ N O O O O ONOO O O O D) V O) 01 W W W V O O O O] W O f0 NPH" J 0 0 0 0 0 O N O A m N N O W V A A O 0 0 N O O N 3 A W t�0 N O O `I W OWO O W (AP O m N S D O t0 �0 v N 0 0 0 N N W N N W O c0 O N 0 0 0 0 O O O O O O O O O O O O O O O O O O O O O O O J T V N b a CD V a c v o n N A o' A 3 A m_ m x m y m -0 3 m z W ti W c r W N d O a' N N e .3n. 91 N V m c 3 3 m 0 c 01 m N c m 0 -p 3 -n m v 2 o` ° m 3 3 3 o O m A A n o C) o A m N 0 a) 0 N nm nyon W m O Fc _m m z n an m mv fy o WgNNn 0 o mo-_ o m y my o 3 °3p . c o 0 A 0 �A i0l apo m S2W o o° MD. 3 m °' 5 9� 3 >• c n m m m -ecc f... 3�° ° m� Q m S� Q 3 m� v 3� m 3 °' r. s z� s 3 m d m d 0 C O O O y m A �a 0 v m c m a N y J W O O O O O » N c A -4 O N N W W O N N n0(1 S S S n C) S S ssO ; O � O O� O 6cn O O O N V O N N N N N N O O O m N Vt O O j 0 CD 3 x m M • V j 9 O 4 V y N (AT N O N O O (n 0 N C O W N O ' j O O N� W O Ut N? d ,4 n O A W A J O� 0 0 O NN A O m 3 C O O J OI V O A _ _ O J O ON p d> OON O OO O+ w N ONO 0_�pOOOO W W W NO J O A N (O J N N O D V m '� � A O A N tV0 J N N O j O N O) � D N a Ot ip O O O Oo J J ? N w �I N O n O O O N w N J V O A N N O O N O) 3 Rt O x 3 O O tit Q m O O O O O O O O N V IV V O A 0 0 0 0 0 0 0 0 W A 0 0 0 0 A W 0 0 0 0 W 0 0 0 0 0 0 0 0 0 0 T Yj 8 a n H m o' m 3 d C ^ W ry J A J 0 co O Z1 d J mm m m x p rn a a m mm m -0 m 3 v o a. zwti N a w c 0 v U) 3 N m n No .0 o m m r' oo= o' n 3 C' s m m 2 m m} 3 3 w oNiw o o �. m A Ao0 0 n m A 3 m 0- OO N pD a 3 N to A� GWi dZ N mS of N^_ OT'om m om mA m <npm o2 O J o_ J yZ oO O . o -0O 0 Zm1 EB d2 ' d0 m m D m m N m Or r T.3 A mo'>>yoc Awmj 3 o a N D 0 mJ m o c N W N N O O y m A a o vc J m m '�� y 6 W 3 N O O O O » m N A n O W / W D N O N y C'm nOnnC) S S S S S ssv N 3 O p A A N O O N J d d J J N N J J ?} O O W f0 N N A O A N O J m N N N V% N O N N O O J N N N N (� N cD W W N N W A J O O N O� W O O O j n x ^•. iA n 3 •� O N N N N N N N N �3v NN vi (n O m 3 C N N V O N O N (T N N N N A O O O W N O 10 o O W N O O J N O) N O O v O o O A N O O O J N m w m N OON' O O A tp N m A O J N m N O O J 0 N A N O W O IV 01 -' D1 W N O N D N W O J _ m W N O O J PMP m m y O O A W W tNp ' W O O A t0 N N m d J w 0 0 p N N O O .-mw- o p, <O (OO m A O O 3' N O O O Q O O O O O O O O O N A N O O A N o 0 o 0 o o o o p Mir %J 401 � � � [ [ 7 cn ( \ � CL a 7 E a ; » i § = rQ / ; 7 / m 7 . 03 } 0 \ E \ � 7 cn % _Co7 CL o : k ©0 [ID co \ % J & ; E ' o Eh \ 2 \ \ k ( 0 = § « e 2 \ / f ( � / / 0 k CO m \ \ ( k ( 0 Co § ! ; e § § (a CDI3\/2=\\ % : E D (§ f/ 0 m { k m Er! A $ / » z \ \ ) / 0 2 (\ \ \ \ \ [ (ƒ / 0 § ( % % \ \ § ) § 0 § � : ¥ | ° Z ) \ m ) ( \ 2 00 t \ \ §/ \ /§ \\k [; f o o f o: [ 7 cn ( \ CL 7 E a § rQ / ; 7 / 7 . } 0 E � cn % CL o : cr = co \ o ' o f § « e co f ( � / / k CO m \ \ \ k ( 0 Co § ! ; EP % : } (§ 0 , R { _r m 2 ] z \ \ CID cD » 2 (\ \ I 0 § ( % % \ 0 § � : ¥ | ° Z ) \ m ) ( \ 2 00 t M < [; f o o f o: 0 ) aLn $ 4 m ¥ ¥) % �\ 4 f — @ m w a m= IN) m — _ ) CL rQ / / . } 0 E cn o : o ' o f f ( � / / ( LO Cl) 0 § ( \ 0 � ¥ | ° Z ) \ ) ( \ < f f % ) aLn / 0 \ a = \ ƒ cn 0 f f f + + + } / / § \ \\ \( §j \§( \/ \\ -4 Co§\ CID ro m� ¥) 6 2@ a \ )E/ f f o : � T N a T Q) CQ CD cyl0 v m 3 W. O 7 W U) Q O 3 W C1 x (p 7 x G W m W c a 91 7 F n W m O E N C W? CD < I;L A O = d nO (D p 0 N X 7 N E - Q CD Av v N a a< N 3 S 3 S M v a V N O O fn co co O w 0 O OVo m O _ N C O O O O O Ja O_ O 0o Qo ao N 0 A � O O W { O O O NW Ci Q. = O N Q N = N VJ C O O n Z n Zl 0 W 0 7 O 0 N V N O N O N � C7 N O < A CD F N C O N ^*. y A y T O < -<v m m 'm o 3 + + v .9 v W O O W W W CA N O A Cn 00 ACDry N C7 N O O p O) { N W W V N < n N C N N N � 1D O W O 7 co O t { T Yj a CD cn g 3 3 O 7 W N fD CL O 3 W X (D 3 CL W c a co W — 9) (7 W m co 3 ou QW� :D CD nCD 0 3 ID ID 91 X 7 (D Dm S 3- N "O "6 c v v v fD w a V N O O A Ul W O N O O O] W w Ul y O W V O V WO W (D 'a S O O -� CO O N O CD A A O W A N m 7 W Cn W 00 a x � n CD n = N N C O C n N A O < w =. O O N 5.0 N N CD N O N c0 n n m A N fD A CD P Vl N F a n O � O < O 1D 7 N 7 d 4 V T d Gt N O O 01 W 3 O V V -P- V y fD C) O CO V N O CD ID N n N O O V O O A W N COO < O N N cn � n w O 7 O A 0 O O_ O O) V ir %J A) � � � T k 7 2 v 2 \ � E ; i CT _ CT § ( « e E [ \ (\ \ i [ 0 _ § / [ ƒ , / } C k x s � ( [ 2r 2 ° \ \ ( m cr $ { » » 2 $ k — ƒ § E k§§» 2 k[ S @ k 0 ¥ / C C ) < f } 0 C N)/ w cn \ / { [ 2 § / \ \ M 2 \ 3 ) n\k ( CD < & CD f ~ } I i \ (3) k § 4 £ § < 1 111 1-4 101 ( ® ow \ } C < j ( j0 a � \ f f DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 Appendix E. Hydrologic Data Table 9. Verification of Bankfull Events Figures 5.1 - 5.4 Crest Gauge Photos 5.1 Crest Gauge Roses Creek Lower (10/5/2016) 5.2 Crest Gauge UT 1 (10/5/2016) F)� ICA Page 53 Crest Gauge Height Info Gauge Gauge Crest Bankfull above Reading Elevation Elevation Elevation 11 Bankfuft (ft) (ft) (ft) (ft) Date Site Sta. Photo Roses Creek 10/5/2016 1 Lower 0.00 1212.11 N/A 1213.93 N/A 5.1 10/5/2016 2 UT 1 0.00 1267.45 N/A 1267.95 N/A 5.2 10/5/2016 3 UT 2 0.35 1227.81 1228.16 1228.19 N/A 5.3 10/5/2016 4 UT 3 0.25 1216.94 1217.19 1217.36 N/A 5.4 Roses Creek 11/22/2016 1 Lower 0.00 1212.11 N/A 1213.93 N/A 5.5 11/22/2016 2 UT 1 0.00 1267.45 N/A 1267.95 N/A 5.6 11/22/2016 3 UT 2 0.00 1227.81 N/A 1228.19 N/A 5.7 11/22/2016 4 UT 3 0.35 1216.94 1217.29 1217.36 N/A 5.8 Figures 5.1 - 5.4 Crest Gauge Photos 5.1 Crest Gauge Roses Creek Lower (10/5/2016) 5.2 Crest Gauge UT 1 (10/5/2016) F)� ICA Page 53 DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 5.3 Crest Gauge UT 2 (10/5/2016) 5.4 Crest Gauge UT 3 (10/5/2016) 5.5 Crest Gauge Roses Creek (11/22/2016) dlm � 4 an a� az a� as ss fi � ov �e oa ty�. 5.7 Crest Gauge UT 2 (11/22/2016) 5.6 Crest Gauge UT 1 (11/22/2016) 5.8 Crest Gauge UT 3 (11/22/2016) ERZ ICA Page DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 Table 10. Burke County Drought Status Month Drought Status June Abnormally Dr July Abnormally Dr August Abnormally Dr September Moderate Drought October Moderate Drought November Severe Drought Source: NC Drought Management Advisory Council ERZ ICA Page Figure 6.1 UT 1 Water Level 8/8/2016 UT 1 Water Surface 8/28/2016 Time 9/17/2016 10/7/2016 10/27/2016 11/16/2016 Figure 6.2 UT 2 Water Level UT 2 Water Surface 1.0 0.9 0.8 - 0.7 0.6 - r 0.5 a m O 0.4 0.3 0.2 0.1 0.0 -i 6/9/2016 6/29/2016 7/19/2016 8/8/2016 8/28/2016 9/17/2016 10/7/2016 10/27/2016 Time Figure 6.3 UT 3 Water Level UT 3 Water Surface 1.0 0.9 0.8 0.7 0.6 C r 0.5 m W 0.4 0.3 0.2 - jw 0.1 0.0 6/9/2016 6/29/2016 7/19/2016 8/8/2016 8/28/2016 9/17/2016 10/7/2016 10/27/2016 Distance (ft) DMS IMS No. 96309 Roses Creek Stream Mitigation Site Burke County, North Carolina YEAR ONE MONITORING REPORT December 2016 Appendix F. Warranty Plots ERZ ICA Page 60 VEGETATION MORTALITY MAP END ROSES CREEK T 2 + 22.56 BEGIN UT 1 STA 10+00.00 o� FENCE C� C\ O F.O N w / �c ou.. 10 X00 z c�a z � c 4aRl1THERFVDE0..... R,W BEGIN UT 2 m — ELECTft�G MEMBERSHIP . L ow wW, S ` \ow- PER O �RPORAiION. f-ow-owow� 1ud� \ow EHHEAo P_aw—w , I\ STA 10+00.00 ow_ow __ ROSES CREEK \ o� W I O STA 34 + 65.21 w ,1 w, , �, g kp0 END UT 3 p 3 ROSES CREEK �0 STA 16+27.80 O 1 s B e STA 11 +00.90 a X 0� 1I END UT I< o / 8/ ;z 4 s STA 19 + 50.69 g I= �$ 8 o $� o o %=__-== 5 + 00 v 0 8 i N B Q M l W z a $ 7 to cp Lu O H Qcv) Lu 0 g 8 X00 0.� F% g 'N� y I'��� % __ O Lu z 1p a W Lu CREEKLn o ` X00 � -�_ + o 0 0 In o a BEGIN UT 3 kn STA 10+00.00 u z END UT 2 ��V��°°��LEGEND o g y STA 17 +10.07 oti� i yB V ,^ BEGIN ROSES CREEK 's� CRITERIA MET STA 10+00.00 E a DATE: 11-14-76 CRITERIA UNMET m VEGETATION MORTALITY 0 v' MAP VEGETATION MORTALITY CRITERIA SHEET s 85% SURVIVAL (578 STEMS/AC) 2 Ne EEP# 963090