HomeMy WebLinkAbout20140333 Ver 1_Year 0 Monitoring Report_2016_20170119BASELINE MONITORING DOCUMENT AND AS -BUILT BASELINE REPORT Final HOLMAN MILL MITIGATION SITE Alamance County, NC DEQ Contract 005795 DMS Project Number 96316 Data Collection Period: January 2016 — April 2016 Draft Submission Date: May 20, 2016 Final Submission Date: November 2, 2016 aCaUFTIMIT613 INC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 PREPARED BY: Wk* WILDLANDS E N G I N E E R I N G Wildlands Engineering, Inc. 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 Jason Lorch jlorch@wildlandseng.com Phone: (919) 851-9986 WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL EXECUTIVE SUMMARY Wildlands Engineering, Inc. (Wildlands) completed a full delivery project at the Holman Mill Mitigation Site (Site) for the North Carolina Department of Environmental Quality Division of Mitigation Services (DMS) to restore and enhance a total of 8,717 linear feet (LF) of perennial and intermittent stream in Alamance County, NC. It is anticipated that the Site will generate 3,884 Stream Mitigation Units (SMUs) through the restoration and enhancement of UT to Pine Hill Branch and five unnamed tributaries (UT1, UT1A, UT2, UT2A, UT213). The project is located in the Cape Fear River Basin Hydrologic Unit Code (HUC) 0303002 (Cape Fear 02) near Snow Camp, NC (Figure 1). The Site is also within the Cane Creek Targeted Local Watershed (TLW) (HUC 03030002050050), which flows into Cane Creek and eventually into the Haw River. A conservation easement was recorded on 32.4 acres within 2 parcels. The Site is located within the Jordan Lake Water Supply Watershed, which has been designated as a Nutrient Sensitive Water. The TLW was identified in the DMS's Cape Fear River Basin Restoration Priorities 2009 (RBRP) report. This RBRP plan identifies agricultural operations and degraded water quality based on "fair" and "good -fair" benthic ratings as the impairments in the Cane Creek watershed. The RBRP report also identifies the successful completion of a number of stream and wetland projects within the Cane Creek watershed. The Site fully supports the Cataloging Unit (CU) -wide functional objectives stated in the 2011 Request for Proposals (RFP) to reduce and control nutrient inputs, reduce and control sediment inputs, and protect and augment Significant Natural Heritage Areas in the Cape Fear 02 River Basin. The mitigation project is intended to provide numerous ecological benefits within the Cape Fear River Basin. While many of these benefits are limited to the Holman Mill Mitigation Site project area, others, such as pollutant removal and improved aquatic and terrestrial habitat, have more far-reaching effects. Expected improvements to water quality and ecological processes are outlined below as project goals and objectives. These project goals were established and completed with careful consideration of the goals and objectives described in the RBRP and to meet the DMS's mitigation needs, while maximizing the ecological and water quality uplift within the watershed. The following project specific goals established in the mitigation plan (Wildlands, 2015) are to: • Reduce fecal coliform, nitrogen, and phosphorous inputs by removing cattle from streams and establishing and augmenting a forested riparian corridor to intercept and process sediment and nutrients before they reach the channel during storm events; • Reduce sediment loads by stabilizing eroding stream banks; • Return a network of streams to a stable form that is capable of supporting biological functions; • Install instream structures to improve bed and bank stability, create fish and macroinvertibrate habitat, and help oxygenate streamflows; and • Protect existing high quality streams and forested buffers. The Site construction and as -built surveys were completed between January 2016 and April 2016. Minimal adjustments were made during construction, as needed, based on site conditions and availability of materials. One small section of the design alignment was adjusted to avoid impacts of mature trees. Specific changes are detailed in Section 5.1. Baseline (MYO) profiles and cross section dimensions closely match the design parameters. Cross section widths and pool depths occasionally deviate from the design parameters but fall within a normal range of variability for natural streams. The Site was built as designed and is on track to meeting the upcoming monitoring year's success criteria. WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL HOLMAN MILL MITIGATION SITE Baseline Monitoring Document and As -Built Baseline Report TABLE OF CONTENTS Section 1: PROJECT GOALS, BACKGROUND AND ATTRIBUTES........................................................1-1 1.1 Project Location and Setting......................................................................................................1-1 1.2 Project Goals and Objectives.....................................................................................................1-2 1.3 Project Structure, Restoration Type and Approach...................................................................1-2 1.3.1 Project Structure................................................................................................................1-3 1.3.2 Restoration Type and Approach........................................................................................1-3 1.4 Project History, Contacts and Attribute Data............................................................................1-4 Section 2: PERFORMANCE CRITERIA..............................................................................................2-1 2.1 Streams......................................................................................................................................2-1 2.1.1 Dimension..........................................................................................................................2-1 2.1.2 Pattern and Profile.............................................................................................................2-1 2.1.3 Substrate............................................................................................................................2-1 2.1.4 Photo Documentation........................................................................................................2-1 2.1.5 Hydrology Documentation.................................................................................................2-2 2.2 Vegetation..................................................................................................................................2-2 2.3 Schedule and Reporting.............................................................................................................2-2 Section 3: MONITORING PLAN......................................................................................................3-1 3.1 Stream........................................................................................................................................3-1 3.1.1 Dimension..........................................................................................................................3-1 3.1.2 Pattern and Profile.............................................................................................................3-1 3.1.3 Substrate............................................................................................................................3-1 3.1.4 Photo Reference Points.....................................................................................................3-2 3.1.5 Hydrology Documentation.................................................................................................3-2 3.1.6 Visual Assessment..............................................................................................................3-2 3.2 Vegetation..................................................................................................................................3-2 Section 4: MAINTENANCE AND CONTINGENCY PLAN.....................................................................4-1 4.1 Stream........................................................................................................................................4-1 4.2 Vegetation..................................................................................................................................4-1 4.3 Site Boundary.............................................................................................................................4-1 Section 5: AS -BUILT CONDITION (BASELINE)..................................................................................5-1 5.1 As-Built/Record Drawings..........................................................................................................5-1 5.1.1 UT1.....................................................................................................................................5-1 5.1.2 UT1A...................................................................................................................................5-1 5.1.3 UT2 Reach 2.......................................................................................................................5-1 5.1.4 UT2 Reach 3.......................................................................................................................5-1 5.1.5 UT2 Reach 4.......................................................................................................................5-1 5.1.6 UT2A...................................................................................................................................5-1 5.2 Baseline Data Assessment.........................................................................................................5-2 5.2.1 Morphological State of the Channel..................................................................................5-2 5.2.2 Vegetation..........................................................................................................................5-3 5.2.3 Hydrology...........................................................................................................................5-3 Section6: REFERENCES.................................................................................................................6-1 WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL iv APPENDICES Appendix 1 General Figures and Tables Figure 1 Project Vicinity Map Figure 2 Project Component/ Asset Map Figure 3.0-3.2 Monitoring Plan View Map Table 1 Project Components and Mitigation Credits Table 2 Project Activity and Reporting History Table 3 Project Contact Table Table 4 Project Information and Attributes Table 5 Monitoring Component Summary Appendix 2 Morphological Summary Data and Plots Table 6a -c Baseline Stream Data Summary Table 7 Morphology and Hydraulic Summary (Dimensional Parameters- Cross Section) Longitudinal Profile Plots Cross Section Plots Reachwide and Cross Section Pebble Count Plots Stream Photographs Appendix 3 Vegetation Plot Data Table 8 Planted and Total Stem Counts Vegetation Photographs Appendix 4 Record Drawings WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL v Section 1: PROJECT GOALS, BACKGROUND AND ATTRIBUTES 1.1 Project Location and Setting The Holman Mill Mitigation Site (Site) is located in the southern portion of Alamance County, southeast of Snow Camp (Figure 1). The Site is approximately 20 miles southeast of the City of Burlington. From Raleigh, NC, take 1-40 West towards Durham. Take exit 273A for NC -54 West toward Chapel Hill. Travel approximately three miles and turn right to follow NC -S4 West. Travel approximately 3.9 miles, take the Jones Ferry Road exit towards Carrboro. At the end of the ramp, turn left onto Jones Ferry Road and continue 0.9 miles. Turn right onto Old Greensboro Road. Travel 17.9 miles and turn left onto Holman Mill Road. Travel approximately 3.3 miles; the entrance to the Site is located on the left before reaching Clark Road. The Site is located on two parcels owned by two different property owners. See Holman Mill Mitigation Plan Table 1 (Wildlands, 2015) for property owners, and Parcel Identification Numbers (PIN). A conservation easement was recorded on 32.4 acres within two parcels (Deed Book 3472, Pages 951- 968). The Site is located within the Jordan Lake Water Supply Watershed, which has been designated as a Nutrient Sensitive Water. The Site's watershed is within the Cane Creek Targeted Local Watershed (TLW) HUC 03030002050050 and was identified in the North Carolina Division of Mitigation Services (DMS) Cape Fear River Basin Restoration Priorities 2009 (RBRP) report. This RBRP plan identifies agricultural operations and degraded water quality based on "fair" and "good -fair" benthic ratings as the impairments in the Cane Creek watershed. The RBRP report also identifies the successful completion of a number of stream and wetland projects within the Cane Creek watershed. The Site is located in the Carolina Slate Belt of the Piedmont Physiographic Province. The Piedmont Province is characterized by gently rolling, well-rounded hills with long low ridges, with elevations ranging anywhere from 300 to 1,500 feet above sea level. The Carolina Slate Belt consists of heated and deformed volcanic and sedimentary rocks. The area is called "Slate Belt" because of the slatey cleavage of many of the surficial rocks. The region's geology also includes coarse-grained intrusive granites. Specifically, the proposed restoration site is located in the CZfv subregion within the Carolina Slate Belt. The CZfv subregion is classified as felsic metavolcanic rock. These rock types are described as metamorphosed dacitic to rhyolitic flows and tuffs interbedded with mafic and intermediate metavolcanic rock, meta-argillite, and metamudstone. The six streams on the Site are located within the North Carolina Division of Water Resources (NCDWR) subbasin 03-06-04 of the Cape Fear River Basin. The NCDWR assigns best usage classifications to State Waters that reflect water quality conditions and potential resource usage. None of the six tributaries are classified by NCDWR and therefore are required to meet standards for Class C waters. Class C waters are protected for secondary recreation, fishing, and aquatic life. The downstream receiving water, UT to Pine Hill Branch (NCDWR Index No. 16-28-5-1), is classified as Water Supply V — Upstream (WS -V) and Nutrient Sensitive Waters (NSW) by NCDWR. Class WS -V waters are protected as water supplies and typically flow into other water bodies that are directly used as sources for drinking, culinary or food processing purposes. NSW classification represents water bodies that require nutrient management plans to reduce water quality impacts due to excessive nitrogen and phosphorus levels and algal populations. Prior to construction activities, the stream channels had been degraded by livestock access and agricultural practices. Impacts to the stream included direct access by livestock, trampling of the riparian vegetation and stream banks, channelization, eroding banks, and a lack of stabilizing riparian vegetation. The adjacent floodplain area had been cleared for pasture and was grazed by livestock. The riparian WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 1-1 vegetation was either absent, limited to the streambanks, or periodically disturbed. Table 4 in Appendix 1 and Tables 5a -b in Appendix 2 present the pre -restoration conditions in detail. 1.2 Project Goals and Objectives The mitigation project is intended to provide numerous ecological benefits within the Cape Fear River Basin. While many of these benefits are limited to the Holman Mill Mitigation Site project area, others, such as pollutant removal and improved aquatic and terrestrial habitat, have more far-reaching effects. Expected improvements to water quality and ecological processes are outlined below as project goals and objectives. These project goals were established and completed with careful consideration of the goals and objectives described in the RBRP and to meet the DMS's mitigation needs while maximizing the ecological and water quality uplift within the watershed. The following project specific goals established in the mitigation plan (Wildlands, 2015) are to: The primary project goals will be: • Reduce fecal coliform, nitrogen, and phosphorous inputs by removing cattle from streams and establishing and augmenting a forested riparian corridor to intercept and process sediment and nutrients before they reach the channel during storm events; • Reduce sediment loads by stabilizing eroding stream banks; • Return a network of streams to a stable form that is capable of supporting biological functions; • Install instream structures to improve bed and bank stability, create fish and macroinvertibrate habitat, and help oxygenate streamflows; and • Protect existing high quality streams and forested buffers. Secondary project objectives are expected to include: • Improving instream nutrient cycling by incorporating woody debris into constructed riffles and bank stabilization measures; • Reducing thermal loadings through establishment of riparian shading; • Reconnecting channels with floodplains to raise the local water table; and • Create and implement a stream and riparian area restoration design that is both natural and aesthetically pleasing. 1.3 Project Structure, Restoration Type and Approach The site design was developed to restore a small stream complex to a naturally occurring community, to create riparian habitat, and to improve water quality. Key factors addressed in the design were the establishment of stable habitats, improvement of riparian buffers, and the restoration of natural migration patterns for fish spawning. Figure 2 and Table 1 in Appendix 1 present the stream mitigation components for the Holman Mill Mitigation Site. The final mitigation plan was submitted and accepted by DMS in May 2015. Construction activities were completed by Land Mechanic Designs, Inc in March 2016 and the planting was completed by Bruton Natural Systems, Inc. in March 2016. The baseline as -built survey was completed by Kee Mapping and Surveying, in April 2016. There were minor deviations reported in the as -built project elements compared to the design plans. A few structures were either added, eliminated, or adjusted slightly based on field conditions. In one location the stream alignment was adjusted to avoid impacts with mature trees. Field adjustments made during construction are described in detail in section 5.1. Appendix 1 provides more detailed project activity, history, contact information, and watershed/site background information for this project. WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 1-2 1.3.1 Project Structure The project will provide 3,884 stream mitigation units (SMUs). Refer to Figure 2: Project Component/Asset Map for depiction of the stream restoration features and Table 1 for the project component and mitigation credit information for the Site. 1.3.2 Restoration Type and Approach The design streams were restored with the appropriate level of intervention based on the surrounding landscape, climate, and natural vegetation communities but also with strong consideration of existing watershed conditions and trajectory. The Site consists of stream restoration and enhancement (Figure 2) activities. The specific proposed restoration activities are described below. The stream restoration portion of this project includes five reaches: • UT1 Reach 1: UT1 beginning at Holman Mill Road and running directly downstream of UT1A, approximately 208 feet in length; • UT1 Reach 3: UTI following 423 feet of enhancement 2 on UTI Reach 2, approximately 309 feet in length; • UT2A: UT2A from Northern property boundary to confluence with UT2, approximately 540 feet in length; • UT2 Reach 3: UT2 following section of enhancement 1 and running to the confluence with UT2A, approximately 482 feet; and • UT2 Reach 4: UT2 directly downstream of confluence of UT2 and UT2A to its terminus with UT to Pine Hill Branch, approximately 167 feet. The project also includes stream enhancement on six reaches classified as enhancement II (Ell) and one reach classified as enhancement I (EI): • UT1 Reach 2: UTI between restoration reaches 1 and 3, approximately 423 feet; • UT1 Reach 4: UT1 following restoration reach 3 to UT1 terminus with UT to Pine Hill Branch, approximately 1,658 feet in length; • UT1A: short spring fed channel starting near Holman Mill Road, approximately 94 feet in length; • UT2 Reach 2: approximately 293 feet of enhancement I starting at bedrock knick point; • UT2 Reach 1: UT2 at northern property line transitioning to reach 2 at bedrock knick point, approximately 588 feet; and • UT213: approximately 429 feet flowing southwest to northeast to its terminus with UT2. • UT to Pine Hill Branch: 3,526 feet in length near eastern property boundary; The restoration reaches were designed to be similar to C/E type streams according to the Rosgen classification system (Rosgen, 1996). The specific values for the design parameters were selected based on designer experience and judgment and were supported by morphologic data from reference reach data sets. The design width to depth ratios range from 13 to 14. A width to depth ratio in the 10 to 14 range is the delineating line between the C and E stream type. The morphologic design parameters are shown in Appendix 2, Tables 6a, 6b, and 6c for the restoration reaches, and fall within the ranges specified for C/E streams (Rosgen, 1996). WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 1-3 1.4 Project History, Contacts and Attribute Data The Site was restored by Wildlands through a full delivery contract with DMS. Tables 2, 3, and 4 in Appendix 1 provide detailed information regarding the Project Activity and Reporting History, Project Contacts, and Project Baseline Information and Attributes, respectively. WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 1-4 Section 2: PERFORMANCE CRITERIA The stream and wetland performance criteria for the project site follow approved performance criteria presented in the DMS Mitigation Plan Template (version 2.2, 06/08/2012), the DMS Monitoring Requirements and Performance Standards for Stream and/or Wetland Mitigation (11/7/2011), and the Stream Mitigation Guidelines issued in April 2003 by the United States Army Corps of Engineers (USACE) and NCDWR. Annual monitoring and semi-annual site visits will be conducted to assess the condition of the finished project. The stream restoration and enhancement sections of the project will be assigned specific performance criteria components for stream morphology, hydrology, and vegetation. Performance criteria will be evaluated throughout the seven-year post -construction monitoring period. If all performance criteria have been successfully met and two bankfull events have occurred during separate years, Wildlands may propose to terminate stream and/or vegetation monitoring after year five. An outline of the performance criteria components follows. 2.1 Streams 2.1.1 Dimension Riffle cross sections on the restoration and enhancement I reaches should be stable and should show little change in bankfull area, maximum depth ratio, and width -to -depth ratio. Per DMS guidance, bank height ratios shall not exceed 1.2 and entrenchment ratios shall be at least 2.2 for restored channels to be considered stable. All riffle cross sections should fall within the parameters defined for channels of the appropriate Rosgen stream type. If any changes do occur, these changes will be evaluated to assess whether the stream channel is showing signs of instability. Indicators of instability include a trend in vertical incision or eroding channel banks over the seven year monitoring period. Changes in the channel that indicate a movement toward stability or enhanced habitat include a decrease in the width -to -depth ratio in meandering channels or an increase in pool depth. Remedial action would not be taken if channel changes indicate a movement toward stability. 2.1.2 Pattern and Profile Longitudinal profile surveys will not be conducted during the seven year monitoring period unless other indicators during the annual monitoring indicate a trend toward vertical and lateral instability. If a longitudinal profile is deemed necessary, monitoring will follow standards as described in the DMS Monitoring Requirements and Performance Standards for Stream and/or Wetland Mitigation (11/7/2011) and the 2003 USACE and NCDWR Stream Mitigation Guidance for the necessary reaches. Visual assessments and photo documentation should indicate that streams are remaining stable and do not indicate a trend toward vertical or lateral instability. A longitudinal profile was conducted as part of the as -built survey to provide a baseline for comparison should it become necessary to perform longitudinal profile surveys later during monitoring and to insure accordance with design plans. 2.1.3 Substrate A reach -wide pebble count will be performed annually in restoration and enhancement level I reaches for classification purposes. A pebble count will be performed at each surveyed riffle cross section to characterize the pavement. Substrate materials in the restoration and enhancement level I reaches should indicate a progression towards or the maintenance of coarser materials in the riffle features and smaller particles in the pool features. 2.1.4 Photo Documentation Photographs should illustrate the site's vegetation and morphological stability on an annual basis. Cross section photos should demonstrate no excessive erosion or degradation of the banks. Longitudinal WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 2-1 photos should indicate the absence of persistent bars within the channel or vertical incision. Grade control structures should remain stable. Deposition of sediment on the bank side of vane arms is preferable. Maintenance of scour pools on the channel side of vane arms is expected. 2.1.5 Hydrology Documentation Two bankfull flow events must be documented on the restoration reaches within the seven year monitoring period. The two bankfull events must occur in separate years. Stream monitoring will continue until success criteria in the form of two bankfull events in separate years have been documented. 2.2 Vegetation The final vegetative success criteria will be the survival of 210 planted stems per acre in the riparian corridor at the end of the required monitoring period (year seven). The interim measure of vegetative success for the site will be the survival of at least 320 planted stems per acre at the end of the third monitoring year and at least 260 stems per acre at the end of the fifth year of monitoring. Planted vegetation must average 10 feet in height in each plot at the end of the seventh year of monitoring. If this performance standard is met by year five and stem density is trending towards success (i.e., no less than 260 five-year-old stems/acre), monitoring of vegetation on the site may be terminated with written approval by the USACE in consultation with the NC Interagency Review Team (IRT). The extent of invasive species coverage will also be monitored and controlled as necessary throughout the required monitoring period (year five or seven). 2.3 Schedule and Reporting Monitoring reports will be prepared in the fall of each year of monitoring and submitted to DMS. Based on the DMS Monitoring Report Template (version 1.5, 06/08/2012), the monitoring reports will include the following: • Project background which includes project objectives, project structure, restoration type and approach, location and setting, history and background; • Monitoring current condition maps with major project elements noted such items as grade control structures, vegetation plots, permanent cross sections, crest gages, and pressure transducers; • Photographs showing views of the restored Site taken from fixed point stations; • Assessment of the stability of the Site based on the cross sections; • Vegetative data as described above including the identification of any invasion by undesirable plant species; • Stream flow gage attainment; • A description of damage by animals or vandalism; • Maintenance issues and recommended remediation measures will be detailed and documented; and • Wildlife observations. WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 2-2 Section 3: MONITORING PLAN Monitoring will consist of collecting morphological, vegetative, and hydrological data to assess the project performance based on the restoration goals and objectives on an annual basis or until performance criteria is met. The performance of the project will be assessed using measurements of the stream channel's dimension, pattern, substrate composition, permanent photographs, vegetation, and surface water hydrology. Any areas with identified high priority problems, such as streambank instability, aggradation/degradation, or lack of vegetation establishment will be evaluated on a case-by- case basis. The monitoring period will extend seven years beyond completion of construction or until performance criteria have been met. Figures 3.0 — 3.2 depict locations of all monitoring activities described below. 3.1 Stream Geomorphic assessments will follow guidelines outlined in the Stream Channel Reference Sites: An Illustrated Guide to Field Techniques (Harrelson et al., 1994), methodologies utilized in the Rosgen stream assessment and classification document (Rosgen, 1994 and 1996), and in the Stream Restoration: A Natural Channel Design Handbook (Doll et al, 2003). Refer to Figure 3 in Appendix 1 for the monitoring locations discussed below. 3.1.1 Dimension A total of eight cross sections were installed along the stream restoration reaches. Two cross sections were installed per 1,000 linear feet of stream restoration work, with riffle and pool sections in proportion to DMS guidance. Each cross section was permanently marked with pins to establish its location. Cross section surveys include points measured at all breaks in slope, including top of bank, bankfull, edge of water, and thalweg to monitor any trends in bank erosion. If moderate bank erosion is observed at a stream reach during the monitoring period, a series of bank pins will be installed in representative areas where erosion is occurring for reaches with a bankfull width of greater than three feet. Bank pins will be installed in at least three locations (one in upper third of the pool, one at the mid- point of the pool, and one in the lower third of the pool). Bank pins will be monitored by measuring exposed rebar and maintaining pins flush to bank to capture bank erosion progression. Annual cross section and bank pin surveys (if applicable) will be conducted in monitoring years one (MY1), two (MY2), three (MY3), five (MY5), and seven (MY7). Photographs will be taken annually of the cross sections looking upstream and downstream. 3.1.2 Pattern and Profile Longitudinal profile surveys will not be conducted during the seven year monitoring period unless other indicators during the annual monitoring show a trend toward vertical and lateral instability. If a longitudinal profile is deemed necessary, monitoring will follow standards as described in the DMS Monitoring Requirements and Performance Standards for Stream and/or Wetland Mitigation (11/7/2011) and the 2003 USACE and NCDWR Stream Mitigation Guidance for the necessary reaches. Stream pattern and profile will be assessed visually as described below in section 3.1.6. 3.1.3 Substrate A reach -wide pebble count will be performed in each restoration and enhancement I reach each year for classification purposes. A pebble count will be performed at each surveyed riffle cross section to characterize the pavement during the years of the cross section survey. WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 3-1 3.1.4 Photo Reference Points A total of 45 permanent photograph reference points were established within the project area after construction. Photographs will be taken once a year to visually document stability for seven years following construction. Permanent markers were established so that the same locations and view directions on the site are monitored each year. Photographs will be used to monitor stream restoration and enhancement reaches. The photographer will make every effort to maintain the same view in each photo over time. The representative digital photo(s) will be taken on the same day(s) the surveys are conducted. 3.1.5 Hydrology Documentation Three manual crest gages and three pressure transducer automated crest gages were installed on the Site (Figure 3, Appendix 1). The crest gages were installed at three surveyed riffle cross sections along UT1, UT2 and UT2a (XS 4, 5 and 7), and will be checked during each site visit to determine if a bankfull event has occurred since the last visit. Photographs will be used to document the occurrence of debris lines and sediment deposition as evidence of bankfull events. Additionally, the pressure transducer data will be plotted and included in the annual monitoring reports. 3.1.6 Visual Assessment Visual assessments will be performed along all stream and wetland areas on a semi-annual basis during the seven year monitoring period. Problem areas will be noted such as channel instability (i.e. lateral and/or vertical instability, in -stream structure failure/instability and/or piping, headcuts), vegetated health (i.e. low stem density, vegetation mortality, invasive species or encroachment), beaver activity, or livestock access. Areas of concern will be mapped in the Current Condition Plan View (CCPV) map, photographed, and accompanied by a written description in the annual report. Problem areas will be re- evaluated during each subsequent visual assessment. Should remedial actions be required, recommendations will be provided in the annual monitoring report. 3.2 Vegetation Planted woody vegetation will be monitored in accordance with the guidelines and procedures developed by the Carolina Vegetation Survey -DMS Level 2 Protocol (Lee et al., 2006) to monitor and assess the planted woody vegetation. A total of 17 standard 10 meter by 10 meter vegetation plots were established within the project easement area. Vegetation plots were randomly established within the planted corridor of the restoration areas to capture the heterogeneity of the designed vegetative communities. The vegetation plot corners have been marked and are recoverable either through field identification or with the use of a GPS unit. Reference photographs were taken at the origin looking diagonally across the plot to the opposite corner during the baseline monitoring in March 2016. Subsequent annual assessments following baseline survey will capture the same reference photograph locations. Species composition, density and survival rates will be evaluated on an annual basis by plot and for the entire site. Individual plot data will be provided and will include height, density, vigor, damage (if any), and survival. Planted woody stems will be marked annually, as needed, based off of a known origin so they can be found in succeeding monitoring years. Mortality will be determined from the difference between the baseline year's living planted stems and the current year's living planted stems. WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 3-2 Section 4: MAINTENANCE AND CONTINGENCY PLAN Wildlands will perform maintenance as needed on the mitigation project. A physical inspection of the Site shall be conducted a minimum of once per year throughout the post -construction monitoring period until performance standards are met. These site inspections may identify components and features that require routine maintenance. Routine maintenance should be expected most often in the first two years following site construction and may include one or more of the following components. 4.1 Stream Stream problem areas will be mapped and included in the Current Condition Plan View (CCPV) as part of the annual stream assessment. Stream problems areas may include bank erosion, structure failure, beaver dams, aggradation/degradation, etc. Routine channel maintenance and repair activities may include chinking of in -stream structures to prevent piping, securing loose coir matting, and supplemental installations of live stakes and other target vegetation along the channel. Areas where storm water runoff flows into the channel may also require maintenance to prevent bank failures and head -cutting. 4.2 Vegetation Vegetation shall be maintained to ensure the health and vigor of the targeted community. Vegetative problem areas will be mapped and included in the CCPV as part of the annual vegetation assessment. Vegetation problems areas may include planted vegetation not meeting performance criteria, persistent invasive species, barren areas with little to no herbaceous cover, or grass suffocation/crowding of planted stems. Routine vegetation maintenance and repair activities may include supplemental planting, pruning, mulching, and fertilizing. Exotic invasive plant species shall be controlled by mechanical and/or chemical methods. Any vegetation control requiring herbicide application will be performed in accordance with NC Department of Agriculture (NCDA) rules and regulations. 4.3 Site Boundary Site boundary issues will be mapped and included in the CCPV as part of the annual visual assessment. Site boundaries shall be identified in the field to ensure clear distinction between the mitigation site and adjacent properties. Boundaries may be identified by fence, marker, bollard, post, tree -blazing, or other means as allowed by site conditions and/or conservation easement. Boundary markers disturbed, damaged, or destroyed will be repaired and/or replaced on an as needed basis. WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 4-1 Section 5: AS -BUILT CONDITION (BASELINE) The Site construction and as -built surveys were completed in March 2016. The survey included developing an as -built topographic surface, locating the channel boundaries, structures, and cross sections. For comparison purposes, the baseline monitoring divided the reach assessments in the same way they were established for design parameters: UTI, UT2 Reach 2, UT2 Reach 3, UT2 Reach 4, and UT2a. 5.1 As-Built/Record Drawings A half size set of record drawings are located in Appendix 4 with the post -construction survey, alignments, and any significant field adjustments made during construction for the project. Minimal adjustments were made during construction, where needed, based on field evaluation. 5.1.1 UT1 • Station 100+00 rock added to roadside ditch to provide flow dissipation and structural support; • Station 100+75 brush toe was not installed in order to avoid impacts to existing mature trees; • Station 101+35 rock outlet was relocated due to changes in drainage patterns between project design and construction; • Stations 105+10, 106+30, and 106+60, constructed riffles were installed where channel stabilization was needed. • Station 107+50 angled log drops were installed rather than log j -hooks to avoid impacts to existing mature trees.; • Station 111+90 constructed riffle was shifted upstream where channel stabilization was needed; • Station 114+45 brush toe was not installed in order to minimize impacts to steep hillslope; • Station 116+45 sod mats were extended further downstream to stabilize the bank; and • Station 117+90 constructed riffle was installed for grade stabilization. 5.1.2 UT1A • UT1A was stabilized during construction due to degradation that occurred between project design and construction. 5.1.3 UT2 Reach 2 • Station 206+125 constructed riffle was not installed in order to allow plunge pool downstream of bedrock to remain; and • Station 207+50 angled log drop was not installed to avoid impacts to existing mature trees. 5.1.4 UT2 Reach 3 • No field adjustments were made during construction. 5.1.5 UT2 Reach 4 • Station 213+90 to Station 215+30 alignment changed to avoid impacts to existing mature trees and to avoid impacting eroded banks that had formed on UT to Pine Hill Branch. 5.1.6 UT2A • Station 301+15 brush toe was not installed in order to avoid impacts to existing mature trees. WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 5-1 5.2 Baseline Data Assessment Baseline monitoring (MYO) was conducted between March 2016 and April 2016. The first annual monitoring assessment (MY1) will be completed in the fall of 2016. The streams will be monitored for a total of seven years, with the final monitoring activities concluding in 2022. The close-out for the Holman Mill Mitigation Site will be conducted in 2023 given the performance criteria has been met. As part of the closeout process, DMS will evaluate the Site at the end of the fourth year monitoring period to determine whether or not the Site is eligible to closeout following monitoring year five. If the Site is meeting performance criteria, DMS will propose to the IRT to proceed with the closeout process. If the Site is not meeting performance criteria, then an additional two years of monitoring will be conducted by Wildlands. 5.2.1 Morphological State of the Channel Refer to Appendix 2 for summary data tables, morphological plots, and stream photographs. Profile The MYO profiles closely match the profile design parameters with the exception of the pool depths and riffle slopes. On the design profiles, riffles were depicted as straight lines with consistent slopes. However, at some locations the as -built survey riffle profiles are not consistent in slope due to natural deposition and scour within some riffle reaches. The surveyed riffle slopes exceed design parameters on UT2 Reach 4 due to the straightening of the channel from stations 213+90 through 215+30 to avoid existing mature trees. Additionally, constructed pool depths exceed design parameters and are expected to trend towards design depths as a result of natural deposition over time. These variations in riffle slope and pool depths do not constitute a problem or indicate a need for remedial actions and will be assessed visually during the CCPV site walks. The plotted longitudinal profiles and related summary data can be found in Appendix 2. Dimension The MYO dimension numbers fall within standard ranges as compared to the design parameters. Variations are primarily associated with a wider constructed bankfull width as reflected in the cross sections. It is expected that over time as vegetation is established, the channels may narrow more toward dimensions characteristic of an E channel. This narrowing over time would not be seen as an indicator of instability in and of itself. Summary data and cross section plots of each project reach can be found in Appendix 2. Pattern The MYO pattern metrics fell within the design parameters for all six reaches. A major alignment change occurred on UT2 Reach 4 between stations 213+90 and 215+30 in order to avoid impact to existing mature trees and to realign the confluence away from a bank on UT to Pine Hill Branch which had become unstable since the site design. Pattern data will be evaluated in monitoring year five if there are any indicators through the profile or dimensions that significant geomorphic adjustments have occurred. Sediment Transport As -built shear stresses and velocities are similar to design calculations and should reduce the risk of further erosion along all restoration reaches. The as -built condition for each of these reaches indicates an overall increase in substrate particle size (Tables 6a — 6c). The substrate data for each constructed reach was compared to the design shear stress parameters from the mitigation plan to assess the potential for bed degradation. The shear stresses calculated for the constructed channels are within the allowable range, which indicates the channel is not at risk to trend toward channel degradation. WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 5-2 5.2.2 Vegetation The MYO vegetation survey was complete in March 2016. The average MYO planted density is 634 stems/acre, which exceeds the MY3 interim stem density requirement of 320 planted stems per acre. Summary data and photographs of each plot can be found in Appendix 3. 5.2.3 Hydrology At this time, there have been no bankfull events recorded since completion of construction. Bankfull events recorded during 2016 will be included in the year one monitoring report. WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 5-3 Section 6: REFERENCES Doll, B.A., Grabow, G.L., Hall, K.A., Halley, J., Harman, W.A., Jennings, G.D., and Wise, D.E. 2003. Stream Restoration A Natural Channel Design Handbook. Harrelson, Cheryl C; Rawlins, C.L.; Potyondy, John P. 1994. Stream Channel Reference Sites: An Illustrated Guide to Field Technique. Gen. Tech. Rep. RM -245. Fort Collins, CO: U.S. Department of Agriculture, Forest Service, Rocky Mountain Forest and Range Experiment Station. 61 p. Lee, Michael T., Peet, Robert K., Steven D., Wentworth, Thomas R. 2006. CVS -DMS Protocol for Recording Vegetation Version 4.0. Retrieved from http://www.nceep.net/business/ monitoring/veg/datasheets.htm. Multi -Resolution Land Characteristics Consortium (MRLC). 2001. National Land Cover Database. http://www.mrlc.gov/nlcd.php North Carolina Division of Water Resources (NCDWR). 2011. Surface Water Classifications. http://portal.ncdenr.org/web/wq/ps/csu/classifications North Carolina Division of Mitigation Services (DMS), 2009. Cape Fear River Basin Restoration Priorities (RBRP). http://porta 1.ncdenr.org/c/document_library/get_file?uuid=864e82e8-725c-415e-8ed9- c72dfcb55012&groupld=60329 Rosgen, D. L. 1994. A classification of natural rivers. Catena 22:169-199. Rosgen, D.L. 1996. Applied River Morphology. Pagosa Springs, CO: Wildland Hydrology Books. United States Army Corps of Engineers (USACE), 2003. Stream Mitigation Guidelines. USACE, NCDENR- DWQ, USEPA, NCWRC. United States Geological Survey (USGS), 1998. North Carolina Geology. http://www.geology.enr.state.nc.us/usgs/carolina.htm Wildlands Engineering, Inc (2015). Holman Mill Mitigation Site Mitigation Plan. DMS, Raleigh, NC. WHolman Mill Mitigation Site Baseline Monitoring Document and As -Built Baseline Report -FINAL 6-1 APPENDIX 1. General Tables and Figures 03030003070010 03030002050050 ii I The subject project site is an environmental restoration site oft he NCDEQ Division of Mitigation Services (DMS) and is encompassed by a recorded conservation easement, but is bordered by land under private ownership. Accessing the site may require traversing areas near or along the easement boundary and therefore access by the general public is not permitted. Access by authorized personnel of state and federal agencies or their designees/contractors involved in the development, oversight, and stewardship of the restoration site is permitted within the terms and timeframes of their defined roles. Any intended site visitation or activity by any person outside of these previously sanctioned roles and activites requires prior coordination with DMS. �WILDLANDS ENGINEERING rk� 111-1 � A, - . — . �I Hydrologic Unit Code (14) DMS Targeted Local Watersheds - Project Area ft- r� / J , f, f �sy 232 Figure 1 Project Vicinity Map Holman Mill Mitigation Site 0 0.5 1 Miles DMS Project No. 96316 Monitoring Year 0 - 2016 Alamance County, NC Directions: From Raleigh, NC, take 1-40 West towards Durham. Take exit 273A for NC -54 West toward Chapel Hill. Travel approximately three miles and turn right to follow Rd f NC -54 West. Travel approximately 3.9 miles, take the - Jones Ferry Road exit towards Carrboro. At the end ` of the ramp, turn left onto Jones Ferry Road and continue V2?,: 0.9 miles. Turn right onto Old Greensboro Road. Travel 17.9 miles and turn left onto Holman Mill Road. Travel approximately 3.3 miles; the entrance to the Site a is located on the left before reaching Clark Road. I Figure 1 Project Vicinity Map Holman Mill Mitigation Site 0 0.5 1 Miles DMS Project No. 96316 Monitoring Year 0 - 2016 Alamance County, NC c 2014 Aerial Photography P -•-• •-•-•-•-•-s._._._._._._:_._._._._......._.__._._._. Sheet 2 L ° �T 1 I �• * UT 1 I 2 •� each 4 -k V� Vis' '•/•�•`•`• \/'� ^* ' � �' �' mp * 1 q •�z7T2 Reach 3'�.�• 1 ! x 1 i i MA c j I • 'i o ' I h- �•.. ° i -- '�. �• '•rte ° i Red * i •e I l i w 1 i iWO �.�.�•�•r•r•r• Ch W''P7 .r..�.r.Rea $ 9 •UT1 Reach 2• - UT1 P? s . .-------------------- y• - - . > .may, . h, I ►. vi •' i ., �; � fir: ��•i'� !�f�1���+� 2014 Aerial Photography • ��• .• PP 10 -0 ` PP 11 • pp -•►•'►•�•�.�.�.�.�.�.�.�.�.r.r•r•'•— PP 15 PPrb2 �PP 14 UTI Reach 4 AC/ ------------------------------------------ j PP 22 1 j � 1 1 1 f Am 1 � 1 PP 1 j j 1�' 1 1 JP1 d 1 P P 20 / / / / / V / m I r4 / Z c 1 4 � O ; ti � 1 1 1 1 1 pp 1 81 1 � / 1 / PP 17 1 1 ,r•a,'••r ►moi mm 2014 Aerial Photography PP 6 O' PP 42 .�.—.—+—.—.—. —.—. —. o. e. —.... e { ------ .............. ---------------------------------- ------------------------ % PP 33 * . 'a3'jc• -' 1 •• UT2 Reach 4 * PP 29 P.P 44 •• PP 40PP 41 ,► PP 28 PP 45'1 Reach 3 '0 �\ i * PP 37 uTf� w� PP 3$ y �* PPi39 \ * PP 27 1 •`•�•�• PP 26 1. - i • � i 1 1 1 j PP 25 i 1 * 1 1 1 1 "t 1 PP 24 ,�•� each 3 PP 7 PP 8 PP 9 PP 10 PP 11 e •�'� _ash 4 a 12 Table 1. Project Components and Mitigation Credits Holman Mill Mitigation Site DMS Project No.96316 Monitoring Year 0 - 2016 MITIGATION Stream Riparian Wetland Nitrogen Non -Riparian Wetland Buffer Nutrient Offset Phosphorous Nutrient Offset Type R RE R RE R RE Totals 3,884 N/A N/A N/A N/A N/A • • '• Reach ID As -Built Stationing/ Location Existing Footage/ Approach Acreage Restoration or Restoration Equivalent Restoration Footage/ Acreage Mitigation Ratio Credits (SMU/ WMU) STREAMS UT to Pine Hill Branch 600+00 - 635+26 3,526 Ell Restoration 3,526 5 705 UT1 Reach 1 100+00-102+08 215 P1 Restoration 208 1 208 UT1 Reach 2 102+08 - 106+31 433 Ell Restoration 423 2.5 169 UT1 Reach 3 106+31- 109+40 331 Pl Restoration 309 1 309 UT1 Reach 4 109+40 -125+98 1,687 Ell Restoration 1,658 2.5 663 UT1A 400+00-400+94 84 Ell Restoration 94 2.5 38 UT2A 300+00-305+40 468 Pl Restoration 540 1 540 UT2 Reach 1 200+00 - 205+88 588 Ell Restoration 588 2.5 235 UT2 Reach2 205+88 - 208+81 298 El Restoration 293 1.5 195 UT2 Reach 3 208+81-213+63 396 Pi Restoration 482 1 482 UT2 Reach 4 213+63 - 215+30 242 P1 Restoration 167 1 167 UT2B 500+00 - 504+29 429 Ell Restoration 429 2.5 172 Restoration Level Stream (LF) Riparian Wetland Non -Riparian Wetland Buffer Upland (acres) (acres) (acres) (acres) Riverine Non-Riverine Restoration 1,706 - - - - - Enhancement Enhancement 1 293 Enhancement 11 6,718 Creation - - - Preservation - - - - - High Quality Preservation N/A: not applicable Table 2. Project Activity and Reporting History Holman Mill Mitigation Site DMS Project No.96316 Monitoring Year 0 -2016 Activity or Report Date Collection Complete Completion or Scheduled Delivery Designer April 2014- 312 West Millbrook Road, Suite 225 Mitigation Plan May 2015 April 2015 919.851.9986 May 2015- Land Mechanic Designs, Inc. Final Design -Construction Plans October 2015 October 2015 Willow Spring, NC 27592 Construction January 2016- March 2016 Planting Contractor March 2016 P.O. Box 1197 Temporary S&E mix applied to entire project areal March 2016 March 2016 Permanent seed mix applied to reach/segments March 2016 March 2016 Bare root and live stake plantings for reach/segments March 2016 March 2016 March 2016- Willow Spring, NC 27592 Baseline Monitoring Document (Year 0) Seed Mix Sources May 2016 April 2016 Year 1 Monitoring 2016 December 2016 Year 2 Monitoring 2017 December 2017 Year 3 Monitoring 2018 December 2018 Year 4 Monitoring 2019 December 2019 Year 5 Monitoring 2020 December 2020 Year 6 Monitoring 2021 December 2021 Year 7 Monitoring 2022 December 2022 Seed and mulch is added as each section of construction is completed. Table 3. Project Contact Table Holman Mill Mitigation Site DMS Project No.96316 Monitoring Year 0 - 2016 Wildlands Engineering, Inc. Designer 312 West Millbrook Road, Suite 225 Angela Allen, PE Raleigh, NC 27609 919.851.9986 Land Mechanic Designs, Inc. Construction Contractor 126 Circle G Lane Willow Spring, NC 27592 Bruton Natural Systems, Inc Planting Contractor P.O. Box 1197 Fremont, NC 27830 Land Mechanic Designs, Inc. Seeding Contractor 126 Circle G Lane Willow Spring, NC 27592 Seed Mix Sources Green Resource, LLC Nursery Stock Suppliers Bare Roots Dykes and Son Nursery Bruton Natural Systems, Inc Live Stakes Monitoring Performers Wildlands Engineering, Inc. Monitoring, POC Jason Lorch 919.851.9986, ext. 107 Table 4. Project Information and Attributes Holman Mill Mitigation Site DMS Project No.96316 Monitoring Year 0 -2016 PROJECT• • Project Name I Holman Mill Mitigation Site County IAIIIamance County Project Area (acres) 32.4 acres Project Coordinates (latitude and longitude; 35°51'310.12"N, 79"23'16.00"W PROJECT11- • SUMMARY INFORMATION Physiographic Province Carolina Slate Belt of the Piedmont Physiographic Province River Basin Cape Fear River USGS Hydrologic Unit 8 -digit 03030002 USGS Hydrologic Unit 14 -digit 0303000205005C DWR Sub -basin 03-06-04 Project Drainiage Area (acres) 1,077 Project Drainage Area Percentage of Impervious Area 3% CGIA Land Use Classification 49% Forested/ Scrubland, 42% Agriculture/ Managed Herbaceous, 4% Pasture, 3% Watershed Impervious Cover, 2% Residential, <1% Open Water REACH SUMMARY INFORMATION Parameters UT to Pine Hill UTI Branch UT1A UT2 UT2A UT2B Length of reach (linear feet) - Post -Restoration 3,526 2,598 94 1,530 540 429 Drainage area (acres) 1,077 102 20 130 47 18 NCDWR stream identification score 44.5 33.5/30.5 25.5 35 36.75 26.5 NCDWR Water Quality Classification N/A Morphological Desription (stream type; P P I P P I Evolutionary trend (Simon's Model) - Pre- Restoration 1 11 NA III/IV III/IV NA Underlying mapped soils Georgeville silty clay loam, Local alluvial land, Herndon silt loam, Goldston Channery Silt Loam Drainage class --- --- --- --- Soil Hydric status --- --- --- --- Slope --- --- FEMA classification AE AE --- AE AE --- Native vegetation community Piedmont bottomland forest, Bottomland hardwood forest Percent composition exotic invasive vegetation -Post- Restoration 0% REGULATORY• • Regulation Applicable? Resolved? Supporting Documentation Waters of the United States - Section 404 Yes Yes USACE Nationwide Permit No.27 and DWQ 401 Water Quality Certification No. 3885. Waters of the United States - Section 401 Yes Yes Division of Land Quality (Dam Safety; No N/A N/A Endangered Species AM Yes Yes Holman Mill Mitigation Plan(2015); Wildlands determined "no effect" on Alamance County listed endangered species. Historic Preservation Act Yes Yes No historic resources were found to be impacted (letter from SHPO dated 3/24/14). Coastal Zone Management Act (CZMA)/Coastal Area Management Act (CAMA) No N/A N/A FEMA Floodplain Compliance Yes Yes UTto Pine Hill Branch and portions of UT2 and UT2A are located within the floodway and flood fringe (FEMA Zone AE, FIRM panel 8786). Essential Fisheries Habitat No N/A N/A Table 5. Monitoring Component Summary Holman Mill Mitigation Site DMS Project No.96316 Monitoring Year 0 - 2016 Parameter Monitoring Feature Quantity/Length by Reach Frequency UT to Pine UTI UT1a UT2-R1 UT2-R2, R3, R4 UT2a UT2b Hill Branch Riffle Cross Section N/A 2 N/A N/A 1 1 N/A Dimension Pool Cross Section N/A 2 N/A N/A 1 1 N/A Annual Pattern Pattern N/A N/A N/A N/A N/A N/A N/A N/A Profile Longitudinal Profile N/A N/A N/A N/A N/A N/A N/A N/A Substrate Reach -wide (RW), Riffle (RF) 100 pebble N/A 1 RW, 2 RF N/A N/A 1 RW, 1 RF 1 RW, 1 RF N/A Annual Hydrology Crest Gage N/A 1 N/A N/A 1 1 N/A Annual Vegetation Vegetation Plots 12 Annual Visual Assessment All Streams Y Bi -annual Exotic and Nuisance vegetation Photos 45 Annual Project Boundary Annual Reference Photos Annual APPENDIX 2. Morphological Summary and Data Plots Table 6a. Baseline Stream Data Summary Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 0 - 2016 UTI ( --- ): Data was not provided N/A: Not Applicable RESTORATIONPRE- REFERENCE REACH DATA DESIGN AS-BUILT/BASELINE Parameter Gage UTI - Reach 1/3 Agony Acres UT1A- Reach 1 UT to Polecat Creek UT to Varnals Creek UTI - Reach 1/3 U71 -Reach 1/3 Min Max Min Max Min I Max Min I Max Min Max Dimension and Substrate - Riffle Bankfull Width (ft) N/A 5.7 9.1 10.4 5.3 10.9 9.3 10.5 7.8 7.5 7.9 Floodprone Width (ft) 11.5 >36 25 65 20 64.0 15 T 65 23.4 23.6 Bankfull Mean Depth 0.7 1.0 T 1.2 1.0 1.1 1.1 1.2 0.6 0.6 Bankfull Max Depth 1 1.8 1.4 1.7 1.5 1.7 0.8 1.0 0.9 Bankfull Cross Sectional Area (ft) 4.3 10.7 11.3 5.4 12.4 10.3 12.3 4.3 4.3 4.6 Width/Depth Ratio 8.1 7.3 10.1 5.2 9.6 8.1 9.3 14.1 13.1 13.6 Entrenchment Ratio 2 >3.9 3.2 8.3 1.9 6.1 1.9 8.3 3.0 3.1 Bank Height Ratio H1.0 1.0 1.1 0.9 1.0 0.9 1.1 1.0 D50 (m m) 33.11 28.8 1 32 Profile Riffle Length (ft) -- --- -- 12.5 31.4 Riffle Slope (ft/ft) -- 0.004 0.047 0.024 0.057 0.0158 0.0661 0.0200 0.0690 Pool Length (ft) -- --- -- 6.0 23.6 Pool Max Depth (ft) N/A -- LN/A 1.8 1.5 3.4 Pool Spacing (ft) Pool Volume (ft) Pattern -- 34 52 "88 "24 20 EM 53 Channel Beltwidth(ft) N/A 62 1 82 1 21 1 93 28 50 15 45 12 69 11 1 45 Radius of Curvature (ft) 56 90 14 60 19 50 8 47 10 45 9 37 Rc:Bankfull Width (ft/ft) 6.2 9.9 1.5 5.8 2.0 5.3 0.6 3.2 1.3 5.8 1.2 4.7 Meander Length (ft) 209 300 N/A -- -- -- -- 25 128 31 75 Meander Width Ratio 6.8 9 2.3 8.9 3.0 5.3 1.0 3.0 1.6 8.9 1.5 S.7 Substrate, Bed and Transport Parameters Ri%/Ru%/P%/G%/S% N/A 0.18/8.66/33.11/ 128/2655/>2048 1.6 -- -- -- 0.85 .22/2.97/6.6/38.7/ 69.7/128 0.7 SC%/Sa%/G%/C%/B%/Be% d16/d35/d50/d84/d95/d100 Reach Shear Stress (Competency) Ib/ftz Max part size (mm) mobilized at bankfull Stream Power (Capacity) W/mz Additional Reach Parameters Drainage Area (SM) N/A 0.16 0.30 0.41 0.41 0.16 0.16 Watershed Impervious Cover Estimate (%) 2% --- --- --- 2% 2% Rosgen Classification 34 E4 E4 E4 C4 C4 Bankfull Velocity (fps) 3 2.2 2.4 2.2 3.5 4.4 5.2 3.2 3.5 3.6 Bankfull Discharge (cfs) 14 25.3 20.3 54.000 14.0 15.0 16.7 Q-NFF regression ---MENEEMENNEEMENNEEM ---MENEEMENNEEM --- ---- -- -- 468 468 Q-USGS extrapolation Q -Mannings Valley Length (ft) Channel Thalweg Length (ft) 2,648 519 517 1.12 1.35 1.4 1.2 1.15 1 1.20 1 1.1 Sinuosity Water Surface Slope(ft/ft)z --- -- --- 0.0246 Bankfull Slope (ft/ft) 0.025 0 O-O4F 0.028 0.012 0.017 0.015 1 0.03 0.0203 ( --- ): Data was not provided N/A: Not Applicable Table 6b. Baseline Stream Data Summary Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 0 - 2016 UT2 +: Alignment change duringconsturction created .steeper riffles (---): Data was not provided N/A: Not Applicable ®®®®®®®®®®Dimension PRE -RESTORATION WNDITION J U- .1. DATA DESIGN AS-BUILT/BASELINE and Substrate - RiffleBankfull Width (ft)Floodprone Width (ft)Bankfull Mean DepthBankfull Max DepthBankfull Cross Sectional Area ft) ®� Izzzz zzzzz �� zzzzz zzzzz�� c, ®®�mmomom©mmmmm 1111 zzzz zzzz zzzz zzzz zzzz zzzz zzzz zzzz mmmmmmmm®mmmm�mm0 mmmmmmmmommmmmmm0 zzzz® zzzzE zzzzz zzzzz zzzz® zzzzz zzzzz ®®®®® zzzzz zzzzz zzzzz ®®®®® zzzz® zzzzz zzzzz zzzzz zzzzz zzz ®® zzzz zzzzz zzzz zzzz zzzzz zzzz zzzzz zzzz �� zzzzz zzzz zzzzz zzzz zzzzz zzzz zzzzz zzzz 1���Mmmmffl Watershed Impervious Cover Estimate (%) Rosgen Classification ®00000®0Bankfull Velocity (fps) ®ems zzzz zzzzz zzzzz zzzzz zzzzz ®ems »»® zzzzz »zzz zzzzz »»® ®ems zzzzz zzzzz zzzzz zzzzz zzzzz zzzzz zzzzz zzzzz Channel Thalweg Length (ft) �� zzzzz zzzzz zzzzz����Water Surface Slope (ft/ft)'Bankfull Slope (ft/ft) MR. +: Alignment change duringconsturction created .steeper riffles (---): Data was not provided N/A: Not Applicable Table 6c. Baseline Stream Data Summary Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 0 - 2016 UT2A (---): Data was not provided N/A: Not Applicable RESTORATION PRE- REFERENCE REACH DATA Parameter Gage UT2A Agony Acres UT1A- Reach 1 UT to Polecat Creek UT to Varnals Creek UT2A UT2A Min Max Min Max Min I Max Min I Max Min I Max Dimension and Substrate - Riffle Bankfull Width (ft) N/A 5.1 9.1 10.4 5.3 10.9 9.3 10.5 6.4 6.6 Floodprone Width (ft) 11.5 >36 25 65 20 64.0 14 1 100.0 Bankfull Mean Depth 0.4 1.0 1.2 1.0 1.1 1.1 1.2 0.5 0.5 Bankfull Max Depth 0.9 1.8 1.4 1.7 1.5 1.7 0.7 0.9 0.7 Bankfull Cross Sectional Area (ft) 2.1 10.7 11.3 5.4 12.4 10.3 12.3 3.3 3.2 Width/Depth Ratio 12 7.3 10.1 5.2 9.6 8.1 9.3 13.0 13.5 Entrenchment Ratio 2.3 >3.9 3.2 8.3 1.9 6.1 2.2 12.5 15.1 Bank Height Ratio 3.4 1.0 1.0 1.1 0.9 1.00.9 1.1 1.0 D50 (mm)l 3.18 18.3 Profile Riffle Length (ft) -- -- -- -- 17.9 38.2 Riffle Slope (ft/ft) -- N/A 0.004 0.047 0.024 0.057 0.018 0.08 0.0007 0.0520 Pool Length (ft) --- --- --- -- 16.3 33.0 Pool Max Depth (ft) N/A 2.4 2.5 1.8 2.5 2.6 0.8 1.6 1.5 3.3 Pool Spacing (ft) Pool Volume (ft) Pattern -- N/A 34 52 8 82 2 36 29 62 ow ow Channel Beltwidth (ft) 15 30 21 93 28 50 15 45 10 57 25 40 Radius of Curvature (ft) N/A 5.8 33 14 60 19 50 8 47 8 37 11 31 Rc:Bankfull Width (ft/ft) 1.1 6.5 1.5 1 5.8 2.0 5.3 0.6 3.2 1.3 5.8 1.7 4.7 Meander Length (ft) 27 69 N/A -- -- -- -- 20 105 41 61 Meander Width Ratio 2.9 5.9 2.3 8.9 3.0 S.3 1.0 3.0 1.6 8.6 3.8 6.1 Substrate, Bed and Transport Parameters Ri%/Ru%/P%/G%/S% N/A Silt/Clay/0.56/3.18/ 17.4/25.53/64 1.85 0.52 3.15/11.86/18.3/43 .5/101.2/362 0.45 SC%/Sa%/G%/C%/B%/Be% d16/d35/d50/d84/d95/d100 Reach Shear Stress (Competency) Ib/ft' Max part size (mm) mobilized at bankfull Stream Power (Capacity) W/mz Additional Reach Parameters Drainage Area (SM) N/A 0.08 0.30 0.41 0.41 0.08 0.08 Watershed Impervious Cover Estimate (%) 2% --- --- --- 2% 2% Rosgen Classification C4b E4 E4 E4 C4 C4 Bankfull Velocity (fps) 2.5 2.2 2.4 2.2 3.5 4.4 5.2 3.1 2.9 Bankfull Discharge (cfs) 9 25.3 20.3 54 9.0 8.6 Q-NFF regression --- --- --- --- --- --- 480 480 Q-USGS extrapolation Q-Mannings Valley Length (ft) Channel Thalweg Length (ft) 468 540 1.15 1.35 1.4 1.2 1.15 1.25 540 1.1 Sinuosity Water Surface Slope (ft/ft)2 -- -- --- 0.0129 Bankfull Slope (ft/ft) 0.023 0.0040 0.028 0.012 0.0170 0.007 0.018 0.0143 (---): Data was not provided N/A: Not Applicable Table 7. Morphology and Hydraulic Summary (Dimensional Parameters - Cross Section) Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 0 - 2016 Cross Section 1 (Riffle) Cross Section 2 (Pool) Cross Section 3 (Pool) Cross Section 4 (Riffle) Dimension and Substrate Base MYI MY2 MY3 MY4 MYS MY6 MY7 Base MYI MY2 MY3 MY4 MY5 MY6 MY7 Base MYI MY2 MY3 MY4 MY5 MY6 MY7 Base MYI MY2 MY3 MY4 MYS MY6 MY7 based on fixed bankfull elevation 570.5 569.8 554.1 553.9 Bankfull Width (ft) 7.9 8.4 9.6 7.5 Floodprone Width (ft) 23.6 N/A N/A 23.4 Bankfull Mean Depth (ft) 0.6 0.9 0.9 0.6 Bankfull Max Depth (ft) 0.9 1.6 1.8 0.9 Bankfull Cross Sectional Area (ftz) 4.6 7.4 8.2 4.3 Bankfull Width/Depth Ratio 13.6 9.5 11.3 13.1 11 Bankfull Entrenchment Ratio 3.0 N/A N/A 3.1 Bankfull Bank Height Ratio 1.0 Cross Section 5 (Riffle) Cross Section 6 (Pool) Cross Section 7 (Riffle) Cross Section 8 (Pool) Dimension and Substrate Base MYl MY2 MY3 MY4 MYS MY6 MY7 Base MYI MY2 MY3 MY4 MYS MY6 MY7 Base MYI MY2 MY3 MY4 MYS MY6 MY7 Base MYI MY2 MY3 MY4 MYS MY6 MY7 based on fixed bankfull elevation 520.1 519.5 520.5 520.2 Bankfull Width (ft) 9.7 9.9 6.6 9.7 Floodprone Width (ft) 100.0 N/A 100.0 N/A Bankfull Mean Depth (ft) 0.5 0.9 0.5 0.9 Bankfull Max Depth (ft) 0.8 1.6 0.7 1.5 Bankfull Cross Sectional Area (fe) 4.5 8.9 3.2 9.1 Bankfull Width/Depth Ratio 20.5 11.0 13.5 10.4 Bankfull Entrenchment Ratio 10.4 N/A 15.1 1 N/A Bankfull Bank Height Ratiol 1.0 1 1 1 1 1.0 1 1 1 1 1.0 1 1 1 1.0 Longitudinal Profile Plots Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 0 - 2016 UT1 Reach 1- Sta 100+00 to Sta 102+08 UT1 Reach 3 - Sta 106+31 to Sta 109+40 575 559 574 558 ♦ A ♦ 573 572 571 --------- -- 570 ____ ♦ � Y 569 —__ - • w568 —--------- ----- ♦♦♦ 567♦ ♦ ♦ — — —_— ___ ___ — ♦ > 566 X N X --- 565 --- c As. 564 555—� — 554 563 ____ — ♦ A ♦ ♦ ♦ ♦ ♦ 2 • 562 561 560 10000 10050 10100 10150 10200 Station (feet) f TW (MYO-3/2016) _ _ _- WS (MYO-3/2016) ♦ LBKF/LTOB (MYO-3/2016) ♦ RBKF/RTOB (MYO-3/2016) UT1 Reach 3 - Sta 106+31 to Sta 109+40 560 - 559 558 ♦ A ♦ 557 556 � ♦ ♦ ♦ ♦ w --- c As. 555—� — 554 ____ — ♦ A ♦ ♦ ♦ ♦ ♦ 2 • 553 552 551 M x x 550 10630 10680 10730 10780 10830 10880 10930 Station (feet) 0 TW (MYO-3/2016) _ _ _ - WS (MYO-3/2016) ♦ LBKF/LTOB (MYO-3/2016) ♦ RBKF/RTOB (MYO-3/2016) Longitudinal Profile Plots Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 0 - 2016 UT2 Reach 2 - Sta 205+88 to Sta 208+81 530 529 528 527 526 v 525 524 w 523 522 521 520 20580 20630 20680 20730 20780 20830 20880 Station (feet) TW (MYO-3/2016) _ _ _ • WS (MYO-3/2016) ♦ LBKF/LTOB (MYO-3/2016) ♦ RBKF/RTOB (MYO-3/2016) m_________ 525 524 X 523 522 521 v 520 m 20931 519 _ ____ w 518 517 516 Ln LD 515 UT2 Reach 3 - Sta 208+81 to Sta 213+63 525 524 X 523 522 521 v 520 m 20931 519 w 518 517 516 Ln LD 515 20881 20981 21031 21081 21131 21181 21231 21281 21331 Station (feet) TW (MYO-3/2016) — — — • WS (MYO-3/2016) ♦ LBKF/LTOB (MYO-3/2016) ♦ RBKF/RTOB (MYO-3/2016) X Longitudinal Profile Plots Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 0 - 2016 UT2 Reach 4 - Sta 213+63 to Sta 215+30 520 519 ♦ ♦ ♦ A - 518 517 ________________________—________ � 516 v 515 514 > 513 512 511 510 21363 21413 21463 21513 Station (feet) ♦ TW (MYO-3/2016) ® _ _ A WS (MYO-3/2016) LBKF/LTOB (MYO-3/2016) ♦ RBKF/RTOB (MYO-3/2016) Longitudinal Profile Plots Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 0 - 2016 UT2A - Sta 300+00 to Sta 305+40 530 529 528 527 526 525 _—♦�, ♦► ♦ ♦ ♦ ♦,♦ ♦ — _. 524 ____ — ♦♦ 523 _____ CU ♦ 522♦ _—_ r m 521 _ ♦ A ♦ _____ 520 _v LL, ----- 519 518 517 516X 00 X 515 30000 30050 30100 30150 30200 30250 30300 30350 30400 30450 30500 Station (feet) TW (MYO-3/2016) — WS (MYO-3/2016) ♦ LBKF/LTOB (MYO-3/2016) ♦ RBKF/RTOB (MYO-3/2016) Cross Section Plots Holman Mill Mitigation Site (NCDMS Project No. 93616) Monitoring Year 0 - 2016 Cross Section I- UTI 100+65 Riffle 574 572 i $ c 570 FloodproneArea O m v w 568 566 0 10 20 30 40 Width (ft) tMYO(03/2016) -Bankfull - Bankfull Dimensions 4.6 x -section area (ft.sq.) 7.9 width (ft) 0.6 mean depth (ft) 0.9 max depth (ft) 8.2 wetted parimeter (ft) 0.6 hyd radi (ft) 13.6 width -depth ratio -=—; 23.6 W flood prone area (ft) 3.0 entrenchment ratio 1.0 low bank height ratio y-- Survey Date: 3/2016 Field Crew: Kee Surveying Y View Downstream FloodproneArea Cross Section Plots Holman Mill Mitigation Site (NCDMS Project No. 93616) Monitoring Year 0 - 2016 Cross Section 2- UTI 100+80 Pool 574 ., 572 570 0 v w 568 566 0 10 20 30 40 Width (ft) tMYO (03/2016) -Bankfull Bankfull Dimensions 7.4 x -section area (ft.sq.) 8.4 width (ft) 0.9 mean depth (ft) 1.6 max depth (ft) _ 9.1 wetted parimeter (ft) 0.8 hyd radi (ft) 9.5 width -depth ratio _ Survey Date: 3/2016 Field Crew: Kee Surveying 3 r View Downstream ., 570 0 v w 568 566 0 10 20 30 40 Width (ft) tMYO (03/2016) -Bankfull Cross Section Plots Holman Mill Mitigation Site (NCDMS Project No. 93616) Monitoring Year 0 - 2016 Cross Section 3- UTI 108+95 Pool sss 556 554 0 v w Ss2 S50 0 10 20 30 40 SO Width (ft) tMYO (03/2016) -Bankfull Bankfull Dimensions 8.2 x -section area (ft.sq.) 9.6 width (ft) 0.9 mean depth (ft) 1.8 max depth (ft) is •• ,� '.. - 10.4 wetted parimeter (ft) 0.8 hyd radi (ft) y 11.3 width -depth ratio Survey Date: 3/2016 Field Crew: Kee Surveying View Downstream 0 v w Ss2 S50 0 10 20 30 40 SO Width (ft) tMYO (03/2016) -Bankfull Cross Section Plots Holman Mill Mitigation Site (NCDMS Project No. 93616) Monitoring Year 0 - 2016 Cross Section 4- UTI 109+10 Riffle 558 556 554 0 v w 552 S50 0 10 20 30 40 SO Width (ft) �MYO(03/2016) -Bankfull-Floodprone Area Bankfull Dimensions �K 4.3 x -section area (ft.sq.) & 16 7.5 width (ft) -9 _ 0.6 mean depth (ft) .. 0.9 max depth (ft) 7.8 wetted parimeter (ft) 0.5 hyd radi (ft) 13.1 width -depth ratio 23.4 W flood prone area (ft) 3.1 entrenchment ratio 1.0 low bank height ratio Survey Date: 3/2016 Field Crew: Kee Surveying View Downstream Cross Section Plots Holman Mill Mitigation Site (NCDMS Project No. 93616) Monitoring Year 0 - 2016 Cross Section 5- UT2 212+00 Riffle 522 520 o m v w 518 0 10 20 30 40 50 60 70 Width (ft) tMYO(03/2016) —Bankfull —FloodproneArea Bankfull Dimensions "y 4.5 x -section area (ft.sq.) 9.7 width (ft) 0.5 mean depth (ft) 0.8 max depth (ft) 9.9 wetted parimeter (ft) 0.5 hyd radi (ft) 20.5 width -depth ratio 100.0 W flood prone area (ft) 10.4 entrenchment ratio . 1.0 low bank height ratio Survey Date: 3/2016 Field Crew: Kee Surveying View Downstream 520 o m v w 518 0 10 20 30 40 50 60 70 Width (ft) tMYO(03/2016) —Bankfull —FloodproneArea Cross Section Plots Holman Mill Mitigation Site (NCDMS Project No. 93616) Monitoring Year 0 - 2016 Cross Section 6- UT2 212+25 Pool 522 520 0 v w 518 S16 0 10 20 30 40 50 60 70 Width (ft) tMYO (02/2015) -Bankfull Bankfull Dimensions 8.9 x -section area (ft.sq.) 9.9 width (ft) 0.9 mean depth (ft) 1.6 max depth (ft) 10.5 wetted parimeter (ft) 0.8 hyd radi (ft) 11.0 width -depth ratio Survey Date: 3/2016 Field Crew: Kee Surveying View Downstream 520 0 v w 518 S16 0 10 20 30 40 50 60 70 Width (ft) tMYO (02/2015) -Bankfull Cross Section Plots Holman Mill Mitigation Site (NCDMS Project No. 93616) Monitoring Year 0 - 2016 Cross Section 7- UT2A 304+85 Riffle szz v w 518 0 10 20 30 40 50 60 70 80 Width (ft) tMYO(02/2015) —Bankfull—FloodproneArea 0 szo Bankfull Dimensions 3.2 x -section area (ft.sq.) 6.6 width (ft) 0.5 mean depth (ft) 0.7 max depth (ft) 6.8 wetted parimeter (ft) 0.5 hyd radi (ft) 13.5 width -depth ratio 100.0 W flood prone area (ft) 15.1 entrenchment ratio 1.0 low bank height ratio Survey Date: 3/2016 Field Crew: Kee Surveying G .: k_ . , View Downstream v w 518 0 10 20 30 40 50 60 70 80 Width (ft) tMYO(02/2015) —Bankfull—FloodproneArea Cross Section Plots Holman Mill Mitigation Site (NCDMS Project No. 93616) Monitoring Year 0 - 2016 Cross Section 8- UT2A 305+10 Pool szo 0 v w szz 518 0 10 20 30 40 50 60 70 80 Width (ft) tMYO (02/2015) —Bankfull Bankfull Dimensions 9.1 x -section area (ft.sq.) 9.7 width (ft) 0.9 mean depth (ft) 1.5 max depth (ft) 10.6 wetted parimeter (ft) 0.9 hyd radi (ft) 10.4 width -depth ratio Survey Date: 3/2016 Field Crew: Kee Surveying View Downstream szo 0 v w 518 0 10 20 30 40 50 60 70 80 Width (ft) tMYO (02/2015) —Bankfull Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site DMS Project No. 93616 Monitoring Year 0 - 2016 UT1, Reachwide Particle Class Diameter (mm) min max Particle Count Riffle Pool Total each Summary Class Percent Percentage Cumulative 0.22 Silt/Clay 0.000 0.062 2 9 11 11 11 Di00 = Very fine 0.062 0.125 3 50 11 Fine 0.125 0.250 6 6 6 17 E Medium 0.25 0.50 2 2 2 19 70 Coarse 0.5 1.0 v � 1 1 1 20 d Very Coarse 1.0 2.0 1 5 6 6 26 Very Fine 2.0 2.8 2 6 8 8 34 Very Fine 2.8 4.0 2 4 6 6 40 Fine 4.0 5.6 2 4 6 6 46 20 Fine 5.6 8.0 4 5 9 9 55 _ Medium 8.0 11.0 3 1 4 4 59 Medium 11.0 16.0 3 2 5 5 64 Coarse 16.0 22.6 6 1 7 7 71 Coarse 22.6 32 5 3 8 8 79 Very Coarse 32 45 9 9 9 88 Very Coarse 45 64 5 1 6 6 94 Small 64 90 4 4 4 98 Small 90 128 2 2 2 100 Large 128 180 100 Large 180 256 1 100 Small 256 362 100 Small Medium Large/Very Large 362 512 1024 512 1024 2048 100 100 100 Bedrock 2048 >2048 100 Total 50 50 100 100 100 UT1, Reachwide Pebble Count Particle Distribution 90 gp Reachwide Channel materials (mm) D16 = 0.22 D85 = 2.97 D50 = 6.6 D80. = 38.7 D95 = 69.7 Di00 = 128.0 UT1, Reachwide Pebble Count Particle Distribution 90 gp SiftlClay T Sand I 1�avel bble r a ro 100 2' 70 j 60 3 50 80 E C 70 40 v � 60 d y 30 u 0 v, 50 a 20 40 u m 3 10 20 10 _ 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) — MYO-03/2016 UT1, Reachwide Individual Class Percent 100 90 80 C 70 v � 60 d 0 v, 50 2 40 u m 3 30 20 10 _ 0 O9 ytiy lih Oh o, o, o• 'r 'L ,y� b y0 0 ,y'v 1b ,L,o 3ti Qh 6A Co t �O ti ti ti Particle Class Size (mm) ■ MYO-03/2016 Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site DMS Project No. 93616 Monitoring Year 0 - 2016 UTI, Cross Section 1 Particle Class Diameter (mm) min max Riffle 100- Count Summary Class Percent Percentage Cumulative 6.69 Silt/Clay 0.000 0.062 6 6 6 D95 = Very fine 0.062 0.125 6 Fine 0.125 0.250 6 Medium 0.25 0.50 80 6 Coarse 0.5 1.0 6 Very Coarse 1.0 2.0 d u 6 Very Fine 2.0 2.8 60 6 Very Fine 2.8 4.0 2 2 8 50 Fine 4.0 5.6 6 6 14 Fine 5.6 8.0 4 4 18 Medium 8.0 11.0 4 1 4 22 Medium 11.0 16.0 6 6 28 Coarse 16.0 22.6 12 12 40 Coarse 22.6 32 10 10 50 Very Coarse 32 45 18 18 68 Very Coarse 45 64 16 16 84 Small 64 90 8 1 8 92 Small 90 128 4 4 96 Large 128 180 2 2 98 Large 180 256 98 Small 256 362 2 2 100 Small Medium Large/Very Large 362 512 1024 512 1024 2048 100 100 100 Bedrock 2048 1 >2048 100 Total 100 1 100 100 100 90 80 70 60 50 E 40 w 30 u a 20 10 UT1, Cross Section 1 Pebble Count Particle Distribution 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MYO-03/2016 Cross Section 1 Channel materials (mm) D16 = 6.69 D35 = 19.57 D50 = 32.0 D84 = 64.0 D95 = 117.2 D100 = 362.0 100 90 80 70 60 50 E 40 w 30 u a 20 10 UT1, Cross Section 1 Pebble Count Particle Distribution 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MYO-03/2016 UT1, Cross Section 1 Individual Class Percent 100 90 80 70 d u d 60 a 50 f0 u 40 R 3 30 20 10 _ 0 ro'L .yh by Oh p0 p1 p• 1 'L ,L0 b 5� 1ti 16 6 3ti by (ob pp ,p, Wp,o yro - 1ti ,yG 0.0 A6 �'1' 1 1 'L °i 5 y0 ,y0 �O Particle Class Size (mm) ■ MYO-03/2016 Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site DMS Project No. 93616 Monitoring Year 0 - 2016 UTI, Cross Section 4 Particle Class Diameter (mm) min max Riffle 100- Count Summary Class Percent Percentage Cumulative 5.15 Silt/Clay 0.000 0.062 6 6 6 D95 = Very fine 0.062 0.125 6 Fine 0.125 0.250 6 Medium 0.25 0.50 80 6 Coarse 0.5 1.0 6 Very Coarse 1.0 2.0 2 2 8 Very Fine 2.0 2.8 4 4 12 Very Fine 2.8 4.0 1 1 13 50 Fine 4.0 5.6 4 4 17 Fine 5.6 8.0 4 4 21 Medium 8.0 11.0 5 1 5 26 Medium 11.0 16.0 8 8 34 Coarse 16.0 22.6 9 9 43 Coarse 22.6 32 10 10 53 Very Coarse 32 45 16 16 69 1 'L ,L0 b 5� 1ti 16 6 3ti by (ob pp ,p, Wp,o yro - 1ti ,yG 0.0 A6 �'1' 1 1 'L °i 5 y0 ,y0 �O Very Coarse 45 64 12 12 81 Small 64 90 11 1 11 92 Small 90 128 6 6 98 Large 128 180 2 2 100 Large 180 256 100 Small 256 362 100 Small Medium Large/Very Large 362 512 1024 512 1024 2048 100 100 100 Bedrock 2048 >2048 100 Total 100 1 100 100 100 90 80 70 60 50 E 40 w 30 u a 20 10 UT1, Cross Section 4 Pebble Count Particle Distribution 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MYO-03/2016 Cross Section 4 Channel materials (mm) D16 = 5.15 D35 = 16.63 D50 = 28.8 D84 = 70.2 D95 = 107.3 D100 = 180.0 100 90 80 70 60 50 E 40 w 30 u a 20 10 UT1, Cross Section 4 Pebble Count Particle Distribution 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MYO-03/2016 UT1, Cross Section 4 Individual Class Percent 100 90 80 70 d u d 60 a 50 f0 u 40 R 3 30 20 10 _ 0 p'L .yh by Oh p0 p1 p• 1 'L ,L0 b 5� 1ti 16 6 3ti by (ob pp ,p, Wp,o yro - 1ti ,yG 0.0 A6 �'1' 1 1 'L °i 5 y0 ,y0 �O Particle Class Size (mm) ■ MYO-03/2016 Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site DMS Project No. 93616 Monitoring Year 0 - 2016 UT2, Reachwide Particle Class Diameter (mm) min max Particle Count Riffle Pool Total each Summary Class Percent Percentage Cumulative Silt/Clay Silt/Clay 0.000 0.062 1 29 30 30 30 D100 = Very fine 0.062 0.125 1 1 1 31 80 Fine 0.125 0.250 r 31 Medium 0.2S 0.50 `w 31 Coarse 0.5 1.0 a r 31 Very Coarse 1.0 2.0 3 3 3 34 Very Fine 2.0 2.8 2 2 4 4 38 Very Fine 2.8 4.0 4 1 S S 43 Fine 4.0 5.6 5 2 7 7 50 Fine S.6 8.0 2 2 4 4 54 Medium 8.0 11.0 6 2 8 8 62 Medium 11.0 16.0 6 2 8 8 70 40 Coarse 16.0 22.6 5 1 6 6 76 Coarse 22.6 32 4 2 6 6 82 Very Coarse 32 45 9 2 11 11 93 Very Coarse 45 64 3 20 3 3 96 Small 64 90 1 1 1 97 Small 90 128 1 1 2 2 99 Large 128 180 99 Large 180 256 99 ................................................ Small 256 362 1 1 1 100 Small Medium Large/Very Large 362 512 1024 512 1024 2048 100 100 100 Bedrock 2048 >2048 0 0.01 0.1 1 10 100 1000 10000 100 � MYO-03/2016 Total 50 50 100 100 100 UT2, Reachwide Pebble Count Particle Distribution 90 Reachwide Channel materials (mm) D16= Silt/Clay D35 — 2.18 D50 = 5.6 D80. = 34.0 D95 = 56.9 D100 = 362.0 UT2, Reachwide Pebble Count Particle Distribution 90 SIR/clay T Sand avel 90 80 bble r C 70 gp m 60 `w 0 50 a r 2' 70 M 40 u m 30 j 60 20 c 10 3 50 0 Doti yti5 tih Oh 'r 'L ,y� b 5� 0 ,y'v 1� tib 3ti Ah 6A 1 Ao •�� p ti p g 1ti •lb R$ 0�O 1 3 h ,y0 �O TO Particle Class Size (mm) ■ MYO-03/2016 E 40 y 30 u 20 COL 10 0 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) � MYO-03/2016 UT2, Reachwide Individual Class Percent 100 90 80 C 70 m 60 `w 0 50 - M 40 u m 30 20 c 10 0 Doti yti5 tih Oh 'r 'L ,y� b 5� 0 ,y'v 1� tib 3ti Ah 6A 1 Ao •�� p ti p g 1ti •lb R$ 0�O 1 3 h ,y0 �O TO Particle Class Size (mm) ■ MYO-03/2016 Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site DMS Project No. 93616 Monitoring Year 0 - 2016 UT2, Cross Section 5 Particle Class Diameter (mm) min max Riffle 100- Count Summary Class Percent Percentage Cumulative 2.00 Silt/Clay 0.000 0.062 12 12 12 D95 = Very fine 0.062 0.125 12 Fine 0.125 0.250 12 Medium 0.25 0.50 80 12 Coarse 0.5 1.0 2 2 14 Very Coarse 1.0 2.0 2 2 16 Very Fine 2.0 2.8 60 16 Very Fine 2.8 4.0 6 6 22 50 Fine 4.0 5.6 10 10 32 Fine 5.6 8.0 4 1 4 36 Medium 8.0 11.0 12 12 48 Medium 11.0 16.0 20 20 68 Coarse 16.0 22.6 4 4 72 Coarse 22.6 32 6 6 78 Very Coarse 32 45 6 6 84 Very Coarse 45 64 6 1 6 90 Small 64 90 8 8 98 Small 90 128 2 2 100 Large 128 180 100 Large 180 256 100 Small 256 362 100 ............:::::::::...... Small Medium Large/Very Large 362 512 1024 512 1024 2048 100 100 100 Bedrock 2048 >2048 100 Total 100 100 100 100 90 80 70 60 50 E 40 w 30 u a 20 10 UT2, Cross Section 5 Pebble Count Particle Distribution 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MYO-03/2016 Cross Section S Channel materials (mm) D16 = 2.00 D35 = 7.32 D50 = 11.4 D84 = 45.0 D95 = 79.2 D100 = 128.0 100 90 80 70 60 50 E 40 w 30 u a 20 10 UT2, Cross Section 5 Pebble Count Particle Distribution 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MYO-03/2016 UT2, Cross Section 5 Individual Class Percent 100 90 80 70 d u d 60 a 50 m u 40 R 3 30 20 10 _ 0 p'L .yh by Oh p0 p1 p• 1 'L ,L0 b 5� 1ti 16 6 3ti by (ob pp ,l'b Wp,o yro - 1ti ,yG 0.0 A6 �'1' 1 1 'L °i 5 y0 ,y0 �O Particle Class Size (mm) ■ MYO-03/2016 Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site DMS Project No. 93616 Monitoring Year 0 - 2016 UT2A, Reachwide Particle Class Diameter (mm) min max Particle Count Riffle Pool Total each Summary Class Percent Percentage Cumulative Silt/Clay Silt/Clay 0.000 0.062 3.5 36 36 36 36 D100 = Very fine 0.062 0.125 90 36 Fine 0.125 0.250 36 Medium 0.25 0.50 1 1 1 37 70 Coarse 0.5 1.0 m 1 1 1 38 !, d Very Coarse 1.0 2.0 1 3 4 4 42 Very Fine 2.0 2.8 2 3 5 5 47 Very Fine 2.8 4.0 2 3 5 5 52 Fine 4.0 5.6 8 3 11 11 63 20 Fine 5.6 8.0 8 10 8 8 71 _ Medium 8.0 11.0 7 7 7 78 Medium 11.0 16.0 5 9 Oytiy lih Oh o, o, o• 5 5 83 Particle Class Size (mm) Coarse 16.0 22.6 5 5 5 88 Coarse 22.6 32 7 7 7 95 Very Coarse 32 45 95 Very Coarse 45 64 1 a 1 1 96 Small 64 90 3 3 3 99 Small 90 128 99 Large 128 180 1 1 1 100 Large 180 256 100 Small 256 362 0 - 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) 100 Small Medium Large/Very Large lBedrock 362 512 1024 512 1024 2048 100 100 100 2048 >2048 100 Total 50 50 100 100 100 UT2A, Reachwide Pebble Count Particle Distribution 90 Reachwide Channel materials (mm) D16= Silt/Clay D35 = Silt/Clay D50 = 3.5 D80. = 17.1 D95 = 32.0 D100 = 180.0 UT2A, Reachwide Pebble Count Particle Distribution 90 SIR/clay T Sand 1 1avel Individual Class Percent bble 100 r 80 90 a ro 80 2° 70 70 m 60 !, d j 60 v, 50 40 3 50 m 3 30 M E 40 20 c 10 _ 0 9 Oytiy lih Oh o, o, o• 'r 'L ,y� b y0 0 ,y'v 41 tib 3ti Qh 6A Co ."tttip h6 ti Particle Class Size (mm) y 30 u ■ MYO-03/2016 20 a 10 Ak—L 0 - 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) — MYO-03/2016 UT2A, Reachwide Individual Class Percent 100 90 80 C 70 m 60 !, d 0 v, 50 40 U m 3 30 M Z 20 c 10 _ 0 9 Oytiy lih Oh o, o, o• 'r 'L ,y� b y0 0 ,y'v 41 tib 3ti Qh 6A Co ."tttip h6 ti Particle Class Size (mm) ■ MYO-03/2016 Reachwide and Cross Section Pebble Count Plots Holman Mill Mitigation Site DMS Project No. 93616 Monitoring Year 0 - 2016 UT2A, Cross Section 7 Particle Class Diameter (mm) min max Riffle 100- Count Summary Class Percent Percentage Cumulative 3.15 Silt/Clay 0.000 0.062 9 9 9 D95 = Very fine 0.062 0.125 9 Fine 0.125 0.250 9 Medium 0.25 0.50 80 9 Coarse 0.5 1.0 9 Very Coarse 1.0 2.0 d u 9 Very Fine 2.0 2.8 6 6 15 Very Fine 2.8 4.0 3 3 18 50 Fine 4.0 5.6 4 4 22 Fine 5.6 8.0 4 4 26 Medium 8.0 11.0 7 1 7 33 Medium 11.0 16.0 10 10 43 Coarse 16.0 22.6 18 18 61 Coarse 22.6 32 14 14 75 Very Coarse 32 45 10 10 85 Very Coarse 45 64 7 7 92 Small 64 90 2 1 2 94 Small 90 128 3 3 97 Large 128 180 1 1 98 Large 180 256 98 Small 256 362 2 2 100 Small Medium Large/Very Large 362 512 1024 512 1024 2048 100 100 100 Bedrock 2048 >2048 100 Total 100 1 100 100 100 90 80 70 60 50 E 40 w 30 u a 20 10 UT2A, Cross Section 7 Pebble Count Particle Distribution 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MYO-03/2016 Cross Section 7 Channel materials (mm) D16 = 3.15 D35 = 11.86 D50 = 18.3 D84 = 43.5 D95 = 101.2 D100 = 362.0 100 90 80 70 60 50 E 40 w 30 u a 20 10 UT2A, Cross Section 7 Pebble Count Particle Distribution 0.01 0.1 1 10 100 1000 10000 Particle Class Size (mm) MYO-03/2016 UT2A, Cross Section 7 Individual Class Percent 100 90 80 70 d u d 60 a 50 f0 u 40 R 3 30 20 10 _ 0 �'L .yh by Oh pp p1 p• 1 'L ,L0 b 5� 1ti 16 6 3ti by (oC` CO ,l'b Wp yro pti 1ti ,yG 0.0 A6 �ti 1 1 ti °i 5 y0 ,y0 �O Particle Class Size (mm) ■ MYO-03/2016 STREAM PHOTOGRAPHS Holman Mill PHOTO POINT 1— looking upstream (03/09/2016) 1 PHOTO POINT 1— looking downstream (03/09/2016) PHOTO POINT 2 — looking upstream (03/09/2016) 1 PHOTO POINT 2 — looking downstream (03/09/2016) PHOTO POINT 3 — looking upstream (03/09/2016) PHOTO POINT 3 — looking downstream (03/09/2016) p " C l Tik 1 .i IBi I �sJ i 1 r�. U.- i�x A t � t 0 Mq�4 4fi 1 r�. 0 Mq�4 4fi PHOTO POINT 7 — looking upstream (03/09/2016) 1 PHOTO POINT 7 — looking downstream (03/09/2016) PHOTO POINT 8 — looking upstream (03/09/2016) PHOTO POINT 8 — looking downstream (03/09/2016) PHOTO POINT 9 — looking upstream (03/09/2016) PHOTO POINT 9 — looking downstream (03/09/2016) PHOTO POINT 10 — looking upstream (03/09/2016) PHOTO POINT 10 — looking downstream (03/09/2016) PHOTO POINT 11— looking upstream (03/09/2016) 1 PHOTO POINT 11— looking downstream (03/09/2016) PHOTO POINT 12 — looking upstream (03/09/2016) PHOTO POINT 12 — looking downstream (03/09/2016) PHOTO POINT 13 — looking upstream (03/09/2016) 1 PHOTO POINT 13 — looking downstream (03/09/2016) PHOTO POINT 14— looking upstream (03/09/2016) 1 PHOTO POINT 14 — looking downstream (03/09/2016) 1 PHOTO POINT 15 — looking upstream (03/09/2016) PHOTO POINT 15 — looking downstream (03/09/2016) PHOTO POINT 16 — looking upstream (03/09/2016) PHOTO POINT 16 — looking downstream (03/09/2016) PHOTO POINT 17 — looking upstream (03/24/2016) 1 PHOTO POINT 17 — looking downstream (03/24/2016) PHOTO POINT 18 — looking upstream (03/24/2016) PHOTO POINT 18 — looking downstream (03/24/2016) � u �" L '' x �'� �4�� �' � � � � air.. •r (�• U" t PHOTO POINT 22 — looking upstream (03/24/2016) 1 PHOTO POINT 22 — looking downstream (03/24/2016) PHOTO POINT 23 — looking upstream (03/24/2016) PHOTO POINT 23 — looking downstream (03/24/2016) PHOTO POINT 24 — looking upstream (03/24/2016) PHOTO POINT 24 — looking downstream (03/24/2016) PHOTO POINT 28 — looking upstream (03/24/2016) 1 PHOTO POINT 28 — looking downstream (03/24/2016) PHOTO POINT 29 — looking upstream (03/24/2016) PHOTO POINT 29 — looking downstream (03/24/2016) PHOTO POINT 30 — looking upstream (03/09/2016) PHOTO POINT 30 — looking downstream (03/09/2016) Ili : � r' �.•� Ix*: 1t dt vt 'y r Jp J1rl s a !I a� dt 'y Jp J1rl s a !I a� r A� b J ' 11,11lam y 2!� ofF 0 i TIMI 9yP�- �� , • �q�N d4ryl 5 �'l� �§ 1 +�.� � I � �✓ r� '�2 F � ll�lY � Y�'f ro Plip..y� �k�in • ��faYl yid. )l,.� r 1•I'�.`Zn.''el.'��1;1�r Hill • •• • I I' I • • • •• •• I 1' I AL r•,.i "kr, r �Lr � At 01 ° It ip ! : �� ' 1 PI! � � ..2� � v ..p7♦F^ _ �5 3aMEOW0 E • • •• •• • I I• I • • •• •• •• I I' I 6 At MIN., t'! M �' 1 V s �n �l d� �i � I �,�9�, �"'V�,IT• V I � u� � ����,��I F _ `: {'� �.IN.' - �;_ r a _ y I {t ! .✓".�niF' Yk i t'"`K.�� .. ,may t �F � �A..` PHOTO POINT 37 — looking upstream (03/09/2016) 1 PHOTO POINT 37 — looking downstream (03/09/2016) PHOTO POINT 38 — looking upstream (03/09/2016) 1 PHOTO POINT 38 — looking downstream (03/09/2016) PHOTO POINT 39 — looking upstream (03/09/2016) PHOTO POINT 39 — looking downstream (03/09/2016) PHOTO POINT 40 — looking upstream (03/09/2016) 1 PHOTO POINT 40 — looking downstream (03/09/2016) PHOTO POINT 41— looking upstream (03/09/2016) PHOTO POINT 41— looking downstream (03/09/2016) PHOTO POINT 42 — looking upstream (03/09/2016) PHOTO POINT 42 — looking downstream (03/09/2016) PHOTO POINT 43 — looking upstream (03/09/2016) 1 PHOTO POINT 43 — looking downstream (03/09/2016) PHOTO POINT 44 — looking upstream (03/09/2016) 1 PHOTO POINT 44 — looking downstream (03/09/2016) PHOTO POINT 45 — looking upstream (03/09/2016) PHOTO POINT 45 — looking downstream (03/09/2016) APPENDIX 3. Vegetation Plot Data Table 8. Planted and Total Stems Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 0 - 2016 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% PnoLS: Number of Planted stems excluding live stakes P -all: Number of planted stems including live stakes, T: Total Stems Current Plot Data (MYO 2016) Scientific Name Common Name Species Type 96316-WEI-0001 96316-WEI-0002 96316-WEI-0003 96316-WEI-0004 96316-WEI-0005 PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T Betula nigra River Birch, Red Birch Tree 6 6 6 6 6 6 3 3 3 3 3 3 Fraxinus pennsylvanica Green Ash, Red Ash Tree 6 6 6 4 4 4 4 4 4 6 6 6 4 4 4 Liriodendron tulipifera Tulip Poplar Tree 3 3 3 3 3 3 5 5 5 5 5 5 4 4 4 Platanus occidentalis Sycamore, Plane -tree Tree 3 3 3 3 3 3 Quercus palustris Pin Oak Tree 2 2 2 2 2 2 2 2 2 2 2 2 Quercus phellos Willow Oak Tree 1 1 1 1 1 1 1 1 1 Stem count size (ares) size (ACRES) Species count Stems per ACRE 16 16 16 16 1 16 16 15 15 15 16 16 1 16 16 1 16 16 1 1 1 1 1 0.02 0.02 0.02 0.02 0.02 5 4 4 4 5 5 5 5 5 5 4 4 4U47.51647.5 5 647.5 647.5 647.5 647.5 647.5 647.5 607 607 607 647.5 647.5 647.5 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% PnoLS: Number of Planted stems excluding live stakes P -all: Number of planted stems including live stakes, T: Total Stems Table 8. Planted and Total Stems Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 0 - 2016 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% PnoLS: Number of Planted stems excluding live stakes P -all: Number of planted stems including live stakes, T: Total Stems Current Plot Data (MYO 2016) Scientific Name Common Name Species Type 96316-WEI-0006 96316-WEI-0007 96316-WEI-0008 96316-WEI-0009 96316-WEI-0010 PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T Betula nigra River Birch, Red Birch Tree 2 2 2 1 1 1 5 5 5 Fraxinus pennsylvanica Green Ash, Red Ash Tree 7 7 7 3 3 3 5 5 5 Liriodendron tulipifera Tulip Poplar Tree 2 2 2 1 1 1 1 1 1 3 3 3 Platanus occidentalis Sycamore, Plane -tree Tree 5 5 5 6 6 6 11 11 11 5 5 5 Quercus palustris Pin Oak Tree 3 3 3 2 2 2 1 1 1 1 1 1 1 1 1 Quercus phellos Willow Oak Tree 5 S 5 4 4 4 2 2 2 2 2 2 Stem count size (ares) size (ACRES) Species count Stems per ACREI 14 14 14 16 16 16 16 16 16 16 16 16 16 16 16 1 1 1 1 1 0.02 0.02 0.02 0.02 0.02 4 4 4 5 5 5 4 4 45 5 5 5 5 5 566.6 1 566.61 566.6 647.5 1 647.51 647.5 647.5 1 647.5 647.5 647.5 647.5 647.5 47.51 647.5 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% PnoLS: Number of Planted stems excluding live stakes P -all: Number of planted stems including live stakes, T: Total Stems Table 8. Planted and Total Stems Holman Mill Mitigation Site DMS Project No. 96316 Monitoring Year 0 - 2016 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% PnoLS: Number of Planted stems excluding live stakes P -all: Number of planted stems including live stakes, T: Total Stems Current Plot Data (MYO 2016) Annual Means Scientific Name Common Name Species Type 96316-WEI-0011 96316-WEI-0012 MYO (2016) PnoLS P -all T PnoLS P -all T PnoLS P -all T Betula nigra River Birch, Red Birch Tree 4 4 4 1 1 1 31 31 31 Fraxinus pennsylvanica Green Ash, Red Ash Tree 1 39 39 39 Liriodendron tulipifera Tulip Poplar Tree 3 3 3 5 5 5 35 35 35 Platanus occidentalis Sycamore, Plane -tree Tree 5 5 5 7 7 7 45 45 45 Quercus palustris Pin Oak Tree 1 1 1 1 1 1 18 18 18 Quercus phellos Willow Oak Tree 3 3 3 1 1 1 20 20 20 Stem count size (ares) size (ACRES) Species count Stems per ACRE 16 16 16 15 15 15 188 188 188 1 1 12 0.02 0.02 0.30 5 5 5 5 1 5 1 5 6 6 6 647.5 1647.5 647.5 607 1 607 1 607 634 634 634 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% PnoLS: Number of Planted stems excluding live stakes P -all: Number of planted stems including live stakes, T: Total Stems VEGETATION PHOTOGRAPHS Holman Mill VEG PLOT 1(03/24/2016) 1 VEG PLOT 2 (03/24/2016) 1 VEG PLOT 3 (03/24/2016) 1 VEG PLOT 4 (03/24/2016) 1 VEG PLOT 5 (03/24/2016) 1 VEG PLOT 6 (03/24/2016) VEG PLOT 7 (03/24/2016) VEG PLOT 8 (03/24/2016) VEG PLOT 9 (03/24/2016) 1 VEG PLOT 10 (03/24/2016) 1 VEG PLOT 11(03/24/2016) 1 VEG PLOT 12 (03/24/2016) 1 APPENDIX 4. As -Built Plan Sheets Cape Feer ]diver Basin 03030002 Alamance County, North Carolina for Vicinity Map Not to Scale CERTIFICATE OF SURVEY ecrp. ACCURACY I, NOLAN R. CARMACK, CERTIFY THAT THE GROUND TOPOGRAPHIC SURVEY PORTION OF THIS PROJECT WAS COMPLETED UNDER MY DIRECT SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION AND THAT THE ORIGINAL DIGITAL FILES WERE PROVIDED BY KEE MAPPING AND SURVEYING, PA AS SHOWN ON AN AS—BUILT SURVEY FOR "THE STATE OF NC, DIVISION OF MITIGATION SERVICES", JOB #1510161—A8, DATED OCTOBER 25TH, 2016 AND WERE INCORPORATED HEREIN BY WILDLANDS ENGINEERING, INC TO PRODUCE THE RECORD DRAWINGS; THAT THIS SURVEY WAS PERFORMED AT THE 95% CONFIDENCE LEVEL TO MEET THE FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS; THAT THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A TOPOGRAPHIC SURVEY TO THE ACCURACY OF CLASS A HORIZONTAL AND CLASS C VERTICAL; THAT TH RIGINAL A A WAS OBTAINED BETWEEN THE DATES OF 31 9(6-/o i " . THAT THE CONTOURS SHOWN AS BROKEN LINES MAY NOT MEET THE STATED STANDARD AND ALL COORDINATES ARE BASED ON NAD 83 (NSRS 2011) AND ALL ELEVATIONS ARE BASED ON NAVD 88; THAT THIS MAP MEETS THE SPECIFICATIONS FOR TOPOGRAPHIC SURVEYS AS STATED IN TITLE 21, CHAPTER 56, SECTION .1606; WITNESS MY ORIGINAL SIGNATURE, REGISTRATION NUMBER, AND SEAL THIS THE 31ST DAY OF OCTOBER, 2016. OFFICIAL SEAL CAfe /// 'Q SEAL �,� L•5078 �� NOLAN R. CARM L-5076 �lq sUR��•'•pV: NC DEQ Division ®f Mitigation Services FINAL RECORD DRAWINGS Issued October 2016 Stream Origins Streams Latitude Longitude UTI N 35° 51'09.14" W 790 23' 29.27' UT2 N 350 51'18.47" W 790 23' 15.11" UT2A N 350 51' 19.28" W 790 23'06.82" Sheet Index Title Sheet Streams Overlay Overview Legend Streams Overlay Plans Cross Section and Typical Section Overlays Planting Plan Project Directory Surveying: Kee Mapping & Surveying, PA 88 Central Avenue Asheville, NC 28801 Brad Kee, PLS 828-575-9021 Enggineerir! Wildlands Engineering, Inc ]License No. F-0831 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 Angela N. Allen, PE 919-851-9986 Owner: NCD EQ Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 Kristic Corson 919-707-8935 DEQ Contract No. 005795 DMS ID No. 96316 i „CARO/ B,,. ESS/0 9,----. 4 SEAL v 040280 I -,�'.cFtA N PYO z NOTE: AS -BUILT PROFILE BASED ON PROPOSED ALIGNMENT. NOTE: 1. AT STATION 100+00 LT, ROCK WAS ADDED TOROADSIDE DITCH. SEE SECTION 5.1 OF AS BUILT REPORT. 2. AT STATION 100+75 RT, BRUSH TOE WAS NOT INSTALLED IN ORDER TO AVOID IMPACTS TO EXISTING, MATURE TREES. 3. AT STATION 101+35 RT, ROCK OUTLET WAS RELOCATED DUE TO CHANGES IN DRAINAGE PATTERNS BETWEEN PROJECT DESIGN AND CONSTRUCTION. 4. UT1A WAS STABILIZED DURING CONSTRUCTION DUE TO DEGRADATION THAT OCCURRED BETWEEN PROJECT DESIGN AND CONSTRUCTION. 575 570 560 555 100+00 AS -BUILT BANKFULL PROPOSED BANKFULL PRO POSED THALWEG i AS-BUILTTHALWEG 100+50 101+00 101+50 102+00 102+50 103+00 575 570 565 560 555 103+50 103+80 cl \ TIES TO EXISTING FENCE EX_ / V 575 — Y C I d I U I 1 \ II00 y IO o io2+00 50 i V P .'<=/'� \ 102+DD Q o , O- moo- - - I 57o I f 33, C_ 33 3J 5 37 0' 2' 4' 6' Iveancay 0' 20' 40' 60' (HORIZ-) I, zZ J?oe Q 6 o z az oqw w v Z Qmm S �Z�srE w3 LL i JC�20�OF ESS/p / 9•,�''. 4 SEAL v 040280 01 NEED 4,,pC: E ,a2 565 565 560 560 PROPOSEDTHALWEG PROPOSED BANKFULL AS-BUILTBANKFULL 555 -- . � 555 / / 1 � AS-BUILTTHALWEG 550 550 NOTE: AS -BUILT PROFILE BASED ON PROPOSED 545545 ALIGNMENT. 103+80 104+00 104+50 105+00 105+50 106+00 106+50 107+00 107+50 108+00 106+50 12' STEEL GATE EX ---f= o' z' a' 6' --XX I c 20' 40' 60' I / hoRrory nq I Sg0 ILn- pI M c) 7_ 00 oil O_ a—I: QI I _ I I 560 I I I •� NOTE: 1. AT STATIONS 105+10,106+30 AND 3� 106+60, CONSTRUCTED RIFFLES WERE - 3J 3J 37 I INSTALLED WHERE CHANNEL 3J 3J 33 3J D 3J 3J 3J D H STABILIZATION WAS NEEDED. I 2. AT STATION 107+50, ANGLED LOG DROPS WERE INSTALLED RATHER I THAN LOG J -HOOKS TO AVOID IMPACTS TO EXISTING, MATURE TREES ON LEFT BANK. �✓ I, zz 6 z Q azogw w z v z Qmm R �w3 LL i i pC,20�pF ESS/0 T•'�-s 4 SEAL v 040280 �'UG I NEED 4,,pC: cV ca 560 560 3 i (VERTI 0' 20' AL 40' 60' (HORIZONTA) AS -BUILT BANKFULL PROPOSED BANKFULL PROPOSEDTHALWEG 555 555 550 550 AS-BUILTTHALWEG 545 545 NOTE: AS-BUILT540 540 PROPOSED ALIGNMENT. 106+50 109,00 109+50 110+00 110+50 111+00 111+50 viz+oo 112+50 112+90 NOTE: 1. AT STATION 111+90, CONSTRUCTED RIFFLE WAS SHIFTED UPSTREAM WHERE CHANNEL STABILIZATION WAS NEEDED. I I I � I y6� 555 I 550 I UT1 �1�Okp0 I O --�•1 I p + 111+00 ._ 112+00L'_..- +- I Q 00o yyy C� I L Z Q I � I --� �J 3J 3J 7aJ / 3J 3J 30 3J 3D �— I I I I 0' 2' 4' 6' (VERTI 0' 20' AL 40' 60' (HORIZONTA) I zo J? aw � ory�m Q o `Y viz z 2 z m w z Qmm u raz E l�'3 LL i i pC,20�pF ESS/0 T,'�•'. 4 SEAL v 040280 �'UG I NEED 4,,pC: NOTE: AS -BUILT PROFILE BASED ON PROPOSED ALIGNMENT. 535 530 6d:'1 520 515 204+40 204+50 205+00 205+50 PROPOSED THALWEG PROPOSED BANKFULL AS -BUILT BAN KFULL AS -BUILT THALWEG 206+00 --------------- -zp�-----_--_ Cf F - - 00 U I 1 I NOTE: 1. AT STATION 206+25, CONSTRUCTED 3 -DX 3J RIFFLE WAS NOT INSTALLED IN ORDER TO ALLOW PLUNGE POOL 1 DOWNSTREAM OF KNICK POINT TO REMAIN. X� 2. AT STATION 207+50, ANGLED LOG DROP WAS NOT INSTALLED TO AVOID IMPACTS TO EXISTING, MATURE TREES. 206+50 207+00 T 535 530 525 520 515 207+50 208+00 208+50 208+70 2' 4' 6' ,veanuq 20' 40' 60' ,HORIZO-) I z� �� awJorym Q `Y zv'�6 u iz z11 Qmm R �Z �srE w3 LL i JC�20�OF ESS/0 T•,,•�. 4 SEAL v 040280 G I NEED 4,,pC: A cV bu N O �m`' 00 n/ ,aa� I NOTE: AS -BUILT PROFILE BASED ON PROPOSED ALIGNMENT. 530 525 520 515 PROPOSED BAN KFULL _ PROPOSED THALWEG AS -BUILT BANKFULL 510 ; 1 1i 208+70 209+00 AS-BUILTTHALWEG 530 525 520 N 209+50 I 210+00 I I i I I I I i I I I i I 210+50 211+00 211+50 I I I I I 212+00 I I 1 1 4 510 212+50 212+80 I O 00 �o 00 00 Q v1 - eti J v S�0 o 3J 3J 3D 3J 3J pC,ZO�pF ESS/p 9,•''. 4 SEAL v " 040280 " O O U F O b� z ,} 0' 2' 4' 6' (VERT-) .i O 0' 20' 40' 60' /u (HORIZONTAL) N I'••�Io•�, 1,�•) 1� NOTE: AS -BUILT PROFILE BASED ON PROPOSED ALIGNMENT UP TO POINT WHERE AS -BUILT ALIGNMENT DEVIATES FROM PROPOSED ALIGNMENT. AT THIS POINT, ONLY THE AS -BUILT PROFILE BASED ON THE AS -BUILT ALIGNMENT IS SHOWN. NOTE: 1. AT STATION 213+90, ALIGNMENT CHANGED TO AVOID IMPACTS TO EXISTING, MATURE TREES AND TO AVOID IMPACTING ERODED BANKS THAT HAD FORMED ON RIGHT BANK OF UT TO PINE HILL BRANCH. 525 PROPOSED BANKFULL AS -BUILT BANKFULL 520 51 PROPOSED THALWEG AS -BUILT THALW EG AM 505 4- 212+80 213+00 213+50 214+00 I I520 I VT2 214+50 215+00 525 520 ML.t 510 i F 505 215+50215+60 214+ 0 _ ,--- c -i 305+40 Ln DO - x I may, Q - l x -- I 213+00 Tc I I I r� I � I I 0' 2' 4' 6' Iveanuq 0' 20' 40' 60' HORIZOMALI i i I, zz o z Q azogw w z v z Qmm � raz �srE l�'3 LL i i CARO� JC�20�OF ESS /0 •'. 4 SEAL v 040280 A,, I NEED N NOTE: AS -BUILT PROFILE BASED ON PROPOSED ALIGNMENT. 3 NOTE: 1. AT STATION 301+15, BRUSH TOE WAS NOT INSTALLED IN ORDER TO AVOID IMPACTS TO EXISTING, MATURE TREES. 535 530 AS -BUILT BANKFULL I I I I I I I I I I I I I I I I I I I I PROPOSED BANKFULL ---1 I I I 1 r-- PROPOSED THALWEG I I I I I I I I 525 520 515 +_ 300+00 AS -BUILT THALW EG 535 L/n� ry I-� m zZ'o 0 Jorym Q `Y z v'�o u iz w o z � v z Qmm B ra 3 LL 530 m 525 520 515 300+50. 301+00 301+50 302+00 302+50 303+00 303+50 303+60 Sti5 525 \ v 300+00 al �O tl SZS � °SEAL�9 040280 O 05 U -F i•� 7O H 0' 2' 4' 6' r )VERTICAL) '� 0' 20' 40' 60'J (HORIZONTAL) l W � V W E VN o � •rel 3 o �9 Q n 4 NOTE: AS -BUILT PROFILE BASED ON PROPOSED ALIGNMENT. 530 530 525 520 6167 510 i I i 303+80 304+00 / PROPOSEDTHALWEG 304+50 305+00 AS -BUILT BANKFULL PROPOSEQ BANKFULL --I 305305=50 525 520 MR iF 510 306+00 306+20 0' 2' 4' 6' I�HTIU LI 0' 20' 40' 60' (HOPIZONTAII I, zz � Jo e z ' Q o aw`Y�v'iz w z Qmm B E ral�'3 LL i i .CA�O. pC,ZO�OF ESS/0 T,'�•'. 4 SEAL v 040280 �'UG I NEED 4,,pC: bA Q 4 g 4� N 75 r-+ E a 2