Loading...
HomeMy WebLinkAbout20170014 Ver 1_Approval Letter_20170123{ Water Resources Environmental Quality January 23, 2017 Thomas Foldesi 5719 Shenandoah Dr. Fayetteville, NC 28304 ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director DWR # 17-0014 Hoke County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Harbor Pointe Dear Mr. Foldesi: You have our approval for the impacts listed below for the purpose described in your application dated December 29, 2016, received by the Division of Water Resources (Division) December 29, 2016. These impacts are covered by the attached Water Quality General Certification Number 3890 and the conditions listed below. This certification is associated with the use of Nationwide Permit Number 18 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b) and (c)]. <:y' NothJng Compares,. State of North Carolina I Environmental Quality 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 919-707-9000 Harbor Pointe DWR# 17-0014 Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary 404/401 Wetlands Impact 1 0.0054 (acres) (acres) 404/401 Wetlands Impact 2 (acres) 0.0044 (acres) 404/401 Wetlands Impact 3 0.0618 (acres) (acres) 404/401 Wetlands Impact 4 0.0142 (acres) (acres) Open Water Impact 1 0.0111 (acres) (acres) 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s)/Permit/Authorization and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. Harbor Pointe DWR# 17-0014 c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 5. No Sediment & Erosion Control Measures in Wetlands or Waters Sediment and erosion control measures should not be placed in wetlands or waters without prior approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or stream beds or banks, adjacent to or upstream and downstream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 6. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the DWR WEBSCAPE Unit at: 1650 Mail Service Center, Raleigh, North Carolina 27699-1650. This approval and its conditions are final and binding unless contested. [G.S. 143-215.51 This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Harbor Pointe DWR# 17-0014 Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 if sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: John Evans, General Counsel Department of Environment Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact Chad Turlington at (910) 433-3320 or chadturlinaton@ncdenr.gov if you have any questions or concerns. Sincerely, Trent Allen Assistant Regional Supervisor Division of Water Resources Water Quality Regional Operations Section Enclosures: GC 3890 cc: Bob Zarzecki —Soil & Environmental Consultants, PA (via email) Brennan Dooley - USACE Wilmington Regulatory Field Office (via email) DWR FRO 401 files DWR 401 & Buffer Permitting Unit (via email) ti s. Water Resources Environmental Quality DWR Project No.: Applicant: Project Name: ROY COOPER Governor MICHAEL S. REGAN 3'ecremry S. JAY ZIMMERMAN Direclor County: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR Central Office— Wetlands and Buffers Permitting Unit at 1650 Mail Service Center, Raleigh, NC 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: If this project was designed by a Certified Professional I, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date Registration No. €-•. 'Nothing Compares.: , State of North Carolina I Environmental Quality 16t I Mail Service Center I Raleigh, North Carolina 27699-16t 1 919-707-9000 Water Quality Certification No. 3890 Water Quality Certification Number 3890 is issued 401, Public Laws 92-500 and 95-217 of the United Division of Water Quality (DWQ) Regulations in 15 for the discharge of fill material to waters and adjal not a part of the surface tributary system to intersh States as described in 33 CFR 330 Appendix A (8', of Engineers regulations and for the Riparian Area 02B.0200. with the requirements of Section subject to the North Carolina 1.0500 and 15A NCAC 02B.0200 areas or to wetland areas that are navigable waters of the United 41, 42, 44; and 46) of the Corps ules (Buffer Rules) in 15A NCAC The State of North Carolina certifies that the specified category of activity will not violate applicable portions of Sections 301„ 302, 303, 306 and 307 of the Public Laws 92-500 and 95-217 if conducted in accordance with the conditions hereinafter set forth. Activities meeting any one (1) of the following thresholds or circumstances require written approval for a 401 Water Quality Certification fromtheDivision of Water Quality (the "Division'T a. Any impacts to streams involving excavation or dredging; or b. Total stream impacts within the project boundaries equal to or greater than 150 linear feet of stream, including temporary and/or permanent impacts; or c. Any stream relocation; or d Any impact associated with a high density project (as defined in item (A)(iv) of the 401 Stormwater Requirements) that is not subject to either a state stormwater program (such as, but not limited to, Coastal Counties, HQW, ORW or state -implemented Phase 11 Npnrgl nr n certified communitv's stormwater oroofam: or e. i emporaryor PeFfnanenn lrl VdUM 5CI4GI IV VI a l VOLVI U 101 vfk .-D,,.p or open waters; or f Any impacts to wetlands adjacent to waters designated as: CRW, SA, WS -I, WS -11, or Trout, or wetlands contiguous to waters designated as a North Carolina or National Wild and Scenic River; or g. Any impacts to coastal wetlands [15A NCAC 07H .0205)], or Unique Wetlands (UWL) [15A NCAC 02H.0506]; or h. Any impact associated with a Notice of Violation or an enforcement action for violation(s) of DWQ Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rales (15A NCAC 0211 .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B.0200); or i. Any impacts to streams and/or buffers in the Neuse, Tar -Pamlico, or Catawba River Basins or'inthe Randleman, Jordan or Goose Creek Watersheds (or any other basin or watershed with Riparian Area Protection Rules [Buffer Rules] in effect at the time of application) unless the activities are listed as "EXEMPT" from these rules or aBuffer Authorization Certificate is issued through N.C. Division of Coastal Management (DCM) delegation for "ALLOWABLE" activities, In accordance with North Carolina General Statute 143-215.3D(e), written approval for a 401 Water Quality General Certification must include the appropriate fee. If a project also requires a CAMA Permit, then one payment to both agencies shall be submitted and will be the higher of the two fees. Water Quality Certification No. 3890 Water Quality Certification No. 3890 Activities included in this General Certification that do not meet one of the thresholds listed above do not require written approval from the Division as long as they comply with the Conditions of Certification listed below, If any of those Conditions cannot be met, then written approval from the Division is required. Conditions of Certification: 1. No Impacts Beyond those Authorized in the Written Approval or Beyond the Threshold of Use of this: Certification No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification, as authorized in the written approval from the Division or beyond the thresholds established for use of this Certification without written authorization, including incidental impacts. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices shall be performed so that no violations of state water quality standards, statutes, or rules occur. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of this permit. 2. Standard Erosion and Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices and if applicable, comply with the specific conditions and requirements of the NPDES Construction Stormwater Permit issued to the site: a. Design, installation, operation, and maintenance of the sediment and erosion control' measures must be such that they equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects„ including contractor -owned or leased borrow pits associated with the project. 7M recent version of the c Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. d, Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. e. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), SA, WS -I, WS -II, High Quality (HQW), or Outstanding Resource (ORW) waters, then the sedimentation and erosion control designs must comply with the requirements set forth in15ANCAC 04B.0124, Design Standards in Sensitive Watersheds. Water Quality Certification No.. 3890 Water Quality Certification No. 3890 3. No Sediment and Erosion Control Measures in Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters. Exceptions to this condition require application submittal to and written approval by the Division.. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands stream beds, or banks, adjacent to or upstream and downstream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources (DLR) or locally delegated program has released the specific area within the project. 4. Construction Stormwater Permit NOG01.0000 An NPDES Construction Stormwatt one (1) or more acres of land. This disturbing construction activities as is covered by this permit, full comp) sedimentation control plan, inspect] and reporting requirements is requi inspection log sheets, and other inti is required for construction protects that disturb liows stormwater to be discharged during land J in the conditions of the permit. If your project i permit conditions including the erosion '& naintepance, self-monitoring, record keeping py of the general permit (NCG010000), may be found at The North Carolina Department of Transportation (NCDOT) shall be required to be in full compliance with the conditions related to construction activities within the most recent version of their individual NPDES (NCS000250) stormwater permit. 5, Construction Moratoriums and Coordination If activities must occur during periods of high biological' activity (i.e. sea turtle nesting, fish spawning, or bird nesting), then biological monitoring may be required at request of other state or federal agencies and coordinated with these activities. Commission (WRC), US Fish and W (DMF), or National Marine Fisheries fish, larval/post-larval fishes and cru; implemented. Exceptions to this con responsible for the given moratorium FS) to lessen impacts on trout, anadromous other aquatic species' of concern shall be written approval by the resource agency Work within the twenty-five (25) designated trout counties or identified state or federal endangered or threatened species habitat shall be coordinated with the appropriate WRC, USFWS, NMFS,,and/or DMF personnel. 6. Work in the Dry All work in or adjacent to stream waters shall be conducted so thatthe flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. Exceptions to this condition require application submittal to and written approval by the Division. Water Quality Certification No. 3890 Water Quality Certification No. 3890 7. Riparian Area Protection (Buffer) Rules Activities located in the protected riparian areas (whether jurisdictional wetlands or not), within the Neuse, Tar -Pamlico, or Catawba River Basins or in the Randleman, Jordan, or Goose Creek Watersheds (or any other basin or watershed with buffer rules) shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 02B 0233, .0259, .0243, :0250, .0267 and .0605, and shallbe located, designed, constructed, and maintained to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices. All buffer rule requirements, including diffuse flow requirements; must be met. 8. If concrete is used during the construction, then all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state due to the potential for elevated pH and possible aquatic life/ fish kills. 9. Bridge deck drains shall not discharge directly into the stream. =Stormwater shall be directed across the bridge and pre-treated through site -appropriate means (grassed swales,.pre- formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of Stormwater Best Management Practices. Exceptions to this condition require written approval by the Division. 10. Compensatory Mitigation In accordance with 15A NCAC 02H .0506 (h), compensatory mitigation may be required for losses of equal to or greater than 150 linear feet of streams (intermittent and perennial) and/or equal to or greater than one (1) acre of wetlands. For linear public transportation projects„ impacts equal to or exceeding 150 linear feet per stream shall require mitigation. Buffer mitigation may be required for any project with Buffer Rules in effect at the time of application for activities classified as "Allowable with Mitigation' or 'Prohibited" within the Table. of Uses, General Water Quality Certification for this Nationwide and/or Regional General Permit, Design and monitoring protocols shall follow the US Army Corps of Engineers Wilmington District Stream Mitigation Guidelines (April 2003) or its subsequent updates. Compensatory mitigation plans shall be submitted to the Division for written approval as required in those protocols. The mitigation plan must be implemented and/or constructed before any impacts occur on site Alternatively, the Division will accept payment into an in -lieu fee program or a mitigation bank; In these cases, proof of payment shall be provided to the Division before any impacts occur on site. Water Quality Certification No. 3890 Water Quality Certification No. 3890 11. Relocated stream designs should include the same dimensions, patterns, and profiles as the existing channel (or a stable reference reach if the existing channel is unstable) to the maximum extent practical. The new channel should be constructed in the dry and water shall not be turned into the new channel until the banks are stabilized. Vegetation used for bank stabilization shall be limited to native woody species, and should include establishment of a 30 -foot wide wooded and an adjacent 20 -foot wide vegetated buffer on both sides of the relocated channel to the maximum extent practical.. A transitional phase incorporating appropriate erosion control matting materials and seedling establishment is allowable, however matting that incorporates plastic mesh and/or plastics twine shall not be used in wetlands, riparian buffers or floodplains as recommended by the North Carolina Sediment and Erosion Control Manual. Rip -rap, A -Jacks, concrete, gabions or other hard structures may be allowed if it is necessary to maintain the physical integrity of the stream; however, the applicant must provide written justification and any calculations used to determine the extent of rip -rap coverages Please note that if the stream,relocation is conducted as a stream restoration asdefined in the US Army Corps of Engineers Wilmington District, April 2003 Stream Mitigation Guidelines (or its subsequent updates), the restored length may be used as compensatory mitigation for the impacts resulting from the relocation. 12. Stormwater Management Plan Requirements All applications shall address stormwater management throughout the entire project area per the 401 Stormwater Requirements, referenced herein as "Attachment Kat the end of this Certification 13. Placement of Culverts and Other Structures in Waters and Wetlands Culverts required for this project shall be designed and installed in such a manner that the original stream profiles are not altered and allow for aquatic life movement during low flows. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Placement of culverts and other structures in waters and streams must be: below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, allow When topographic constraints indicate culvert slopes of greater than 5%, culvert burial is not required, provided that all alternative options for flattening the slope have been investigated and aquatic life movement/ connectivity has been provided when possible (rock ladders, crossvanes, etc). Notification to the Division including supporting documentation to include a location map of the culvert, culvert profile drawings, and slope calculations shall be provided to the Division 60 days prior to the installation of the culvert. When bedrock is present in culvert locations, culvert burial is not required provided that there is sufficient documentation of the presence of bedrock. Notification to the Division including supporting documentation such as, but not limited to, a location map of the culvert, geotechnical reports, photographs, etc shall be provided to the Division a minimum of 60 days prior to the installation of the culvert. If bedrock is discovered during construction, then the Division shall be notified by phone or email within 24 hours of discovery. If otherslte-specific topographic constraints preclude the ability to bury the culverts as described above and/or it can be demonstrated that burying the culvert would result in destabilization of the channel, then exceptions to this condition require application submittal to; and written approval by, the Division of Water Quality, regardless of the total impacts to streams or wetlands from the project. Water Quality Certification No. 3890' Water Quality Certification No. 3890 Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate High wafer or flood conditions. Additionally,, when roadways, causeways, or other fill projects are constructed across FEMA -designated floodways or wetlands, openings such as culverts or bridges must be provided to maintain the natural hydrology of the system as well as prevent constriction of the floodway that may result in destabilization of streams or wetlands The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of riprap or other bank hardening methods. 14. All temporary fill and culverts shall be removed and the impacted area returned to natural conditions within 60 days of the determination that the temporary impact is no longer necessary. The impacted areas shall be restored: to original grade, including each stream's original cross sectional dimensions, plan form pattern, and longitudinal bed and bed profile, and the various sites shall be stabilized with natural woody vegetation (except for the approved maintenance areas) and restored to prevent erosion. 15. All temporary pipes/ culverts/ pads etc, shall be installed in all streams as outlined in the most recent edition of the North Carolina Sediment and Erosion Control Planning and Design Manual or the North .Carolina Surface Mining Manual so as not to restrict stream flow or cause dis-equilibrium during use of this General Certification, 16. Any riprap required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All rip -rap shall burled and/or "keyed in' such that the original stream elevation and streambank contours are restored and maintained. Placement of rip -rap or other approved materials shall not result in de -stabilization of the stream bed or banks upstream or downstream of the area. 17. Any rip -rap used for stream stabilization shall be of a size and density so as not to be able to be carried off by wave; current action, or stream flows and consist of clean rock or masonry material free of debris or toxic pollutants. Rip -rap shall not be installed in the streambed except -in specificereas.required for velocity control and to ensure structural integrity of bank etahili7atinn 18. A one-time application of fertilizer to re-establish vegetation is allowed in disturbed areas including riparian buffers, but is restricted to no closer than 10feet from top of bank of streams. Any fertilizer application must comply with all other Federal, State and Local regulations. 19. If this Water Quality Certification is used to access building sites, then all lots owned by the applicant must be buildable: without additional impacts to streams or wetlands. The applicant is required to provide evidence that the lots are buildable without requiring additional impacts to wetlands, waters, or buffers if required to do so in writing by the Division. For road construction purposes, this Certification shall only be utilized from natural high ground to natural high ground. 20. Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters, and protective buffers within the project boundaries in order to assure compliance for future wetland, water, and buffer impact. These mechanisms shall be put in place at the time of recording of the property or of individual lots whichever is appropriate. A sample deed notification can be downloaded from the 401ANetiands Unit web site at http�/lportal ncdehr orgfweblwa/swplwsf401/certsandpermitslapply/forms: The text of the sample deed notification may ba modified as appropriate to suit to a specific project. Documentation of deed notifications shall be provided to the Division upon request. Water Quality Certification No, 3890 6 Water Quality Certification No. 3890 21. If an environmental document is required under the National or State Environmental Policy Act (NEPA or SEPA), then this General Certification is not valid until a Finding of No Significant impact (FONSI) or Record of Decision (ROD) is issued by the State Clearinghouse. 22. In the twenty (20) coastal counties, the appropriate DWQ Regional Office must be contacted to determine if Coastal Stormwater Regulations will be required. 23 This General Certification does not relieve the applicant of the responsibility to obtain all other required Federal; State, or Local approvals. 24. The applicant/permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. If the Division determines that such standards or laws are not being met, including failure to sustain a designated or achieved use, or that State or Federal law is being violated, or that further conditions are necessary to assure compliance, then the Division may reevaluate and modify this General Water Quality Certification. 25. When written authorization is required for use of this certification; upon completion of all permitted Impacts included within the approval and any subsequent modifications, the applicant shall be required to return the certificate of completion attached to the approval. One copy of the certificate shall be sent to the DWQ Central Office in Raleigh at 1650 Mail Service Center, Raleigh, NC„ 27699-1650. 26. Additional site-specific conditions, including monitoring and/or modeling requirements, may be added to the written approval letter for projects proposed under this Water Quality Certification in order to ensure compliance with all applicable water quality and effluent standards. 27. This certification grants permission to the director; an authorized representative of the Director, or DENR staff, upon the presentation of proper credentials, to enter the property during normal business hours. This General Certification shall expire on the same day as the expiration date of the corresponding Nationwide and/or Regional General Permit. The conditions in effect on the date of issuance of Certification for a, specific project shall remain in effect for the life of the project, regardlessof the expiration date of this Certification. Non-compliance with or violation of the conditions herein set forth by a specific project may result in revocation of this General Certification for the project and may also result in criminal and/or civil penalties. , The Director of the North Carolina Division of Water Quality may require submission of a' formal application for Individual Certification for any project in this category of activity if it is determined that the project is likely to have a significant adverse effect upon water quality, including state or federally listed endangered or threatened aquatic species, or degrade the waters so that existing uses of the wetland or downstream waters are precluded. Water Quality Certification No. 3890 Water Quality Certification No. 3890 Public hearings may be held for specific applications or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Carolina Division of Water Quality. Effective date: March 19, 2012 DIVISION OF WATER QUALITY By Charles Wakild, P.E. Director History Note: Water Quality Certification (WQC) Number 3890 issued March 19, 2012 replaces WQC Number 3821 Issued April 6, 2010; WQC Number 3631 issued March 19, 2007; WQC 3402 issued March, 2003' WQC Number 3362, issued March 18, 2002; WQC 3287, issued June 1, 2000; WQCs 3106 and 3108 issued February 11, 1997. This Water Quality Certification is rescinded when the Corps of Engineers reauthorizes any of the corresponding Nationwide or Regional General Permits and/or when deemed appropriate by the Director of the Division of Water Quality. Water Quality Certification No. 3890 8 Water Quality Certification No. 3890 Attachment A 401 Stormwater Requirements The requirements listed below shall be implemented in order to comply with Condition 12 of this General Certification For 'the .North Carolina Department•of Transportation, compliance with NCDOT's Individual NPDES permit NCS000250 shall serve to satisfy the 401 and Isolated Wetland Stormwater Requirements.' A. Design and implementation Requirements. All projects, regardless of project area, amount of built -upon area or amount of jurisdictional impact, shall meet the following stormwater design requirements: I. Non -Erosive Discharge to Streams and Wetlands. Stormwater conveyances that discharge to streams and wetlands must discharge at a non-erosive'velocityprior to entering the stream or wetland during the peak flow from the ten-year storm. ii. Vegetated Setbacks. A 30 -foot wide vegetated setback must be maintained adjacent to streams, rivers and tidal waters in areas that are not subject to a state Riparian Area Protection Rule or other more stringent vegetated setback requirements. The width of the setback shall be measured horizontally from the normal pool elevation of impounded structures, the tap -of -bank of streams and rivers, and the mean high waterline of tidal waters, perpendicular to shoreline. Vegetated setback and filters required by state rules or local governments may be met • concurrently with this requirement and may contain coastal isolated or 404 jurisdictional wetlands, ;Non-jurisdiotional portions of the vegetated setback may be cleared and graded, but must be planted with and maintained in grass or other vegetative or plant material:' iii: Construction and Operation. The stormwater management plan must be constructed and operational before any permanent building or other structure is occupied or utilized at the site The stormwater management plan, including drainage patterns, must be maintained in perpetuity:° iv. Coordination with Other Stormwater Programs. Projects that are subject to another Division of Water Quality (DWQ) stormwater program, including (but not limited to) the 20 CoastaC`Coun"t es,'HOW ORW or state -implemented Phase II NPDES, or a Certified -- Community's stormwater management program, must be constructed and maintained in compliance with the approved stormwater management plan. v. Stormwater Design Requirements for Projects Not Covered Under Item (iv). Projects that are not subject to another DWQ stormwater }grogram or a Certified Community's stormwater program shall meet all of the following requirements: a. Low Density. A site is low density if all the following requirements are met: The development has a built upon area e considering both current and future leve of built upon area, coastal wetlands shall rivers as specified in North Carolina's Sc excluded. If a portion of project has a der density area must be located in an uplan and drainageways to the maximum exter twenty-four percent (24%) or less, pment. When determining the amount a included; however, ponds, lakes and :dule of Classifications shall be ity greater than 24%, the higher area and away from surface waters practicable.e 2 All stormwater runoff from the built upon areas is transported primarily via vegetated conveyances designed in accordance with the most recent version of the NC DWQ Stormwater Best Management Practices Manual. Alternative designs may be approvedif' the applicant can show that the design provides Water Quality Certification No. 3890 Water Quality Certification No. 3890 equal or better water quality protection than the practices specified in the manual. The project must not include a stormwater collection system (such as piped conveyances) as defined in 15A NCAC 02B .0202(60).' b. High Density. Projects that do not meet the, Low Density requirements shall meet the following requirements: 1. Stormwater runoff from the entire site 'must be treated by structural stormwater controls (BMPs) that are designed to remove eighty-five percent (85%v) of the average annual amount of Total Suspended Solids (TSS). Stormwater runoff that drains directly to Nutrient Sensitive Waters (NSW) must also be treated to remove thirty percent (30%) of Total Nitrogen (TN) and Total phosphorus (TP).8 2. All BMPs must be designed in accordance with the version of the NC DWQ Stormwater Best Management Practices Manual that is in place on the date of stormwater management plan submittal. Alternative designs may be approved if the applicant can show that the design provides equal or better water quality protection than the practices specified in the manuals 3. DWQ may add specific stormwater management requirements on a case-by- case basis in order to ensure that a proposed activity will not violate water quality standards.10 4. DWQmay approve Low Impact Developments (LIDS) that meet the guidance set forth in the Low Impact Development., A Guidebook for North Carolina 11 5, Proposed new development undertaken by a local government solely as a public road project shall follow the requirements of the NC DOT BMP Toolbox rather than Items (1)-(4) above. 12 B. Submittal Requirements. The submittal requirements listed below apply only to projects that require written authorization as indicated in the applicable General Certification as well as projects that require an Isolated Wetlands Permit. Any required documentation shall ha sant to ?ha Watlanda_ auffars and Starmwater Combliance and Petmittina Unit at I. Projects that are Subject to Another DWQ Stormwater Program; If the project is subject to another DV%Q stormwater program, such as the 20 Coastal Counties, HQW, ORW or state -implemented Phase II NPDES, then the applicant shall submit a copy of the stormwater approval letter before any impacts occur on site." ii. Projects that are Subject to a Certified Community's Stormwater Program. if the project is subject to a certified local government's stormwater program, then the applicant shall submit one set of approved stormwater management.plan details and calculations with documentation of the local government's approval before any impacts occur on site.5 iii. Projects Not Covered Under Items (i) or (ii). If the project is not subject to another DWQ Stormwater Program or a Certified Community's stormwater program, then it shall be reviewed and approved by the DWQ through the Water Quality Certification authorization process. a. Low Density. For low density projects, the applicant shall submit two copies of the DWQ Low Density Supplement Form with all required' items, 13 Water,Quality Certification No. 3890 10 Water Quality Certification No. 3890 b. High Density. For high density projects, the applicant shall submit two copies of a DWQ BMP Supplement Form and all required items at the specified scales for each BMP that is proposed;' iv. 'Phasing. Stormwater management plans may be phased on a case-by-case basis, with the submittal of a final stormwater management plan per Items (i) -(iii) above required for the current phase and a conceptual stormwater management plan for the future phase($). The stormwater management plan for each future phase must be approved by the appropriate, entity before construction of that phase is commenced. The approved stormwater managementplan for each future phase must be constructed and operational before any, permanent building or other structure associated with that phase is occupied. 4 v. Stormwater Management Plan Modifications. The stormwater management plan may not be modified without prior written authorization from the entity that approved the plan. If the project is within a Certified Community, then the applicant shall submit one set of approved stormwater management' plan details and calculations with documentation of the local government's approval for record-keeping purposes. If the project is subject to DWQ review, then the applicant shall submit two copies of the appropriate Supplement Forms per Item (iii) above for any BMPs that have been modified for DWQ's review and approval.' The stormwater requirement for 401 applications is codified in 15A NCAC 02H .0506(b)(5) and (c)(5) 2 Non erosive discharge rates are required in SL 2008-211§2(b)(1). The 10 -year design storm standard is codified in 15A NCAC 02H .1008(f)(2) and .1008(g)(1). 3 30 -foot vegetated setbacks are required in SL 2006-246§9(d), SL 2008-211§2(b), 15A NCAC 02H 1006(2)(c) and .1007(1)(a). 4 ....J ......:..a...,. --- s rNe c4xrMuiatar nlan ie nanaecnw to aatlafv 15A NCA(: 02H e Conveys application' procedure to streamline the permitting process and reduce any unnecessary duplication in the review of stormwater management plans. 6 Low density built upon area thresholds are set in SL 2006-246§9(c) and SL 2008-21.1§2(b). The requirement for low density development to use vegetated conveyances is codified in SL 2006-246§9(c), SL 2008-211§2(b), 15A NCAC 02H .1006(2)(b) and .1007(1)(a). The Stormwater BMP Manual is also referenced in 15A NCAC 02B .0265(3)(a) and .0277(4)(e), 3 85% TSS removal is required in SL 2006-246§9(d), SL 2008-211§2(b), 15A NCAC 02H .1006(2)(c), 15A NCAC 02H_1007(1)(a). The 30% TN and TP removal requirements for NSW waters are set forth in 15A NCAC 0213.0232, 15A NCAC 02B .0257(a)(1), 1'5A NCAC 02B :0265(3)(a) and 15A NCAC 028.0277(4). 9 The Stormwater BMP Manual is also referenced in 15A NCAC 02B .0265(3)(a) and .0277(4)(e). 1° The requirement for DWQ to ensure that water quality standards are protected before issuing a 401 certification is codified in 15A NCAC 02H .0506; The LID Toolbox is also referenced in 15A NCAC 02B' .0277(4)(8). 12 The term "public road project" is defined in15A NCAC 02B 0265(3)(a). ' Conveys application procedure to streamline the permitting process. 14 Phased development is addressed as a 'common plan of development' in 15A NCAC 02H .1003(3). 15 Procedures for modifying stormwater plans are set forth in 15A NCAC 02H.101 1. Water Quality Certification No. 3890 11