Loading...
HomeMy WebLinkAbout20170097 Ver 1_Shoreline Stabilization_20170123DUKE ENERGY EXCAVATION PERMIT APPLICATION FORM FOR DUKE ENERGY USE ONLY Duke File No. Application Fee $ Security Deposit S Check # Date Recv'd Initials Date of Duke Energy Lake Services, applicant and/or contractor on-site inspections Date Initials Date Final Protection/Avoidance Area Markings Field - Verified Initials Approved to Start Work By * : Date Completion Required Date Passed Closeout Inspection* (Print) Date of Any Approved Extension Initials (Sign) Initials Any Stop Work Orders or SMG Violations*? (check one) ❑Yes ONo (If Yes, explain in PART V) Date Deposit Refunded Initials Date Permit Database Updated * Forward copy of approved application (all pages, plus any attachments that Duke Energy with Approval Letter and highlight any changes. File copies of Approval and Close-out Cl Date PART I. - APPLICANT INFORMATION (Please Print) D -WATE �t p 4 F E CES Name (itJ � "` / Telephone s Lake Address 155 / f /' I✓e- sf .CC C 4 rC, L Mailing Address 7T ZW1 rl L D v Inoc 'G31lo /Iet /VC �� (If different) �}'1 AP/7 Of Contractor Company .116.-v e ,C4ec ye w, Contractor Contact Person Telephone (70�) 4p 6 'o 5-11 / LAKE LOT INFORMATION ,J �/�] / Lake OrM County [ C.Gt City � / I &O I'Z°S Vib-_ State Tax Map No. Subdivision Nor o r / ^ wo o d Lot / Section No. /D _k/ Lot Size 7 'Z Acres Are there any Co -Applicants*? (check one) OYes ONo (If Yes, include names, addresses, phone nos., lot nos., lot sues in PART V — ADDITIONAL INFORMATION) * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project and is done to benefit multiple owners / lease holders of project -front properties within a single development. The check for the application filing fee and security deposit should be from the party shown as Applicant and not several checks from the Applicant and Co -Applicants. Do not continue the application until an on-site inspection has been conducted between a Duke Energy Lake Services Representative (DELSR) and the applicant and/or the excavation contractor. NOTE. Initializing this portion of the application by a DELSR in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. Date of on-site inspection 1 ( Initials (Duke Energy) v I� (applicant/contractor) Duke Energy Page 1 of 14 rev 9/19/14 Excavation Program c:\users\ann\appdata\local\microsoft\windows\temporary internet files\content.outlook\mp7eolj9\c-w excavation application 113 10.docx 0/ DUKE ENERGY EXCAVATION PERAHT APPLICATION FORM PART IL - DESCRIPTION OF PROJECT A. BASIC INFO 1. Type of excavation: (check one) )4New excavation [ Maintenance excavation 2. Purpose of excavation: (check one)Boat Access Channel [ Water Intake Channel gwaswwata Discharge Channel [ Other (specify): 3. Lake user category: (check one)&b1 vate OResidential Marina OCommercial Marina lC [Other (spec): NO, 80 4. Max. Excavation Area Dimensions (ft): Length A 00 Width —X5 Depth Z/ (Note: include additional area dimensions if necessary so response to #5 below equals max area dimensions in #4) 5. Volume of Excavated Material (TOTAL for the project): Cubic yards L 6. Type of material removed (applicant determines by field sample if practical): Ayd i � %b 7. Excavation Site area: Acre (s) Disposal Site area D • 3 L Acre (s) 8. Total Disturbed Area (including equipment staging area): 0-A, Acre (s) 9. Does the project meet the requirements of the applicable General Permit? (check one) )(Yes ONo 10. Do you claim title to the disposal area? (check one) AYes [No 11. Do you claim title to the equipment staging area? (check one) Itles [No 12. Are there any water -treatment facilities within 50 feet of the proposed excavation area? (check one) [Yes *o (If Yes, specify): 13. How will the excavated material be entrappedend the erosioncqn rollyd? e.. see att hed grosion controlplan and disposal area design): li e w K td i !1 174 aame. 6 ay± t— f 72 VAI 3 14. Type(s) of excavation equipment to be used: 15. Will waters or wetlands be crossed in transporting equipment to or from the site? (check one) OYes *0 (Ifyes, explain) 16. Will return water re-enter the reservoir? (Check one) show on Excavation Area Drawing) [Yes *o ON/A (If Yes, specify points) of re-entry and IT Is there an existing facility (e.& pier) that access is being maintained to by conducting the excavation? [Yes *0 (If Yes, specify the existing permit number. If No, include a scaled drawing of the proposed facility). Permit # 18. Total planned duration of the work (Include first equipment mobiliton, excavation through final mitigation measures complete): START CZ / _o j_"] FINISH _ . L4 -� v 7 (Montle) (Year) (Month (Year) Duke Energy Page 2 of 14 rev 9/19/14 Excavation Program c:\users\ann\appdata\local\microsoft\windows\temporary intemet files\content.outlook\ np7eolj9\c-w excavation application 113 10.docx DUKE ENERGY EXCAVATION PERMIT APPLICATION FORM PART 1Q. (Continued) B. PROTECTION / AVOIDANCE AREA DESCRIPTION Complete the following table including all land areas within and immediately adjoining the disturbed area: Protection/Avoidance Areas (check all that apply) Apurx. Acrean IdentMadion Avoid (A1 or Mitigate (Ml Held ID Work Area Dwe. ILD a. Marshland, swamp, ponds, beneficial aquatic vegetation or other potential wetlands (circle all that apply) b. Buffer Zones (specify width & source of requirement) '- t�.K4v 6 e 3 oae N W / b,WIR--. M+h- r; pl will c. Environmental Areas as identified by Duke Energy I V d. Natural Areas as identified by Duke Energy L ( A - '''�..1 e. Historic properties (specify) `` I WIAr E Rare or threatened species (specify) or Duke Energy Page 4 of 14 rev 9/19/14 Excavation Program c:\users\ann\appdata\local\microsoMwindows\temporary internet files\content.outlook\mp7eolj9\c-w excavation application 113 l0.docx DUKE ENERGY EXCAVATION PERMIT APPLICATION FORM Protection/Avoidance Areas (check all that apply) Approx. Acreage Identification Method M Avoid (A) or Mitigate (M) ** Field ID Work Area Dwg. ID g. Buried gas, water, sewer, communications or electric lines (circle) �( I V k h. Impact Minimization Zones as identified by Duke Energy I i. Other areas requiring specific avoidance, protection or mitigation (specify) I rjrI * For "Field ID" column, specify entity or person that performed the identification and how it was physically marked (e.g. Duke Energy (John Doe)/Pink and purple -dotted tape, Corps of Eng. (John Smithy yellow flagging). For "Work Area Dwg ID" column, show the symbol that is used on the drawings to identify the protection/avoidance area * * List and attach mitigation plans Duke Energy Page 5 of 14 rev 9/19/14 Excavation Program c:\users\ann\appdata\local\microsoft\windows\temporary intemet files\content.outlook\mp7eolj9\c-w excavation application 113 10.docx DUKE ENERGY EXCAVATION PERMPT APPLICATION FORM C. APPLICANT'S SIGNATURES /���i j j Comments: Dcf JA t� C W �ilc r• I �O J CN/tiGssG�- �� "'G� / Co -Applicant Name (print) Lot # Co -Applicant Signature* Date Co -Applicant Name (print) Lot # Co -Applicant Signature* Date Co -Applicant Name (print) Lot # Co -Applicant Signature* Date Co -Applicant Name (print} Lot # Co -Applicant Signature* Date Co -Applicant Name (print) Lot # Co -Applicant Signature* Date *Per my signal n, the information provided in this application is correct to the best of my knowledge. BEFORE YOU MAIL THE APPLICATION TO DUKE ENERGY LAKE SERVICES ENSURE YOU HAVE: • CHECKED THE INFO THOROUGHLY • MET ALL REQUIREMENTS FOR A COMP . _TE APPLICATION (see cover leer of application package) • INCLUDED A SINGLE CHECK TO DUKE ENERGY FOR TIB; APPLICATION FILING FEE AND SECURITY DEPOSIT • INCLUDED ALL AGENCY PERMITS OR COMMENT LETTERS AND RESOLVED ALL ISSUES RAISED • INCLUDED ALL REQUIRED DRAWINGS (INCLUDING PROPOSED FACIIITTES), PERMIT t# FOR EXISTING FACILITIES, SURVEYS AND PLANS • INCLUDED COPIES OF DEEDS AND AUTHORIZATION LETTERS Duke Energy Page 6 of 14 rev 9119114 Excavation Program c:\users\am\appdata\local\microsoft\wmdows\temporary internet files\contentoutlooklmp7eolj9\o-w excavation application 113 IO.docx State of North Carolina Department of Environment and Natural Resources Division of Water Resources _DWR 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization Division of Water Resources FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Info�Fj ion // ,, Name: ri sCAMp/1 Mailing Address: Loti✓•i c— bag, 17b1— M/ %`Y7po rCSJt��t� 1i�C -7-8/( 7 Telephone Number: Fax Number: E-mail Address: CLiriS ►'i ✓ASCorlSt�(�►'i✓q • COM 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http•//www saw usace army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHO RIZATION FORM. df) must be attached if the Agent has signed this application form. Name: cAr/) /3Y-J,cs Company Affiliation: Cl 3C' SrUnre %iCG c�� Mailing Address: 3 9 619-Kr1d i c- 'PAY -P4 14wy ayY-r-5(/•i /I I Telephone Number: 70�, 6(00.5 //( Fax Number: �v0 • S1 E-mail Address: cbc,5e qt,_� s o— wiMd5fre*#,r7 . Mc Person to receive the Certification Approval (',k,4, %3n49G5 II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and FORM: SSGP 10-2013 Page 1 of 3 construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: �Nearest Town: "ores Ir & 11 Subdivision name or site address (include phase/lot number): Mor IJ 00d o 7L Directions to si - please in lode rod names and numers, Ian dmar , etc.00 %7 N A! G 1�00� Gr FdL• 12-0A) Latitude (in decimai degrees)c1J -6 1 3 � Longitude (decimal degrees) 60 • 16 4F 191 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Y'e-S iAe O�) -�; a t 6. Property size (acres): • Z 7. Lake/ river/ ocean adjacent to property: Ke %�lorWl 8. Describe proposed work (include discussion as to how har enin of shoreline has been avoided, or why it is necessary): A.-ea.,�00p�Tt S S 9. Will work be conducted from land?From water? 41 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: Lou X 80'x �3' 3 0O �x a-5 �x � 11. Total amount of disturbance (including all clearing, backfill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 12. Please describe the vegetation above the normal pool lake level/ Normal Water Leve) and 50 feet landward to be impacted (number of trees, for instance): 4VOOd led A,� Owner/Agent's Sieg rats re; V Printed Name Date I 15 NCAC 02H .0502(f)] Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 A /Z Full Pond/ Normal Water Level Shoreline Lake Normal Water Level) u�a IpA-T TN ssccG'vr1G- 5�' L Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 IOMd diti0'Id 53si N?DIONB tV MONg my aw3vys LOII YdNIOIsIOs BILL 1 IOo001:I M sMWMdiO ONP sianu n ae aIL= sY NOW3sd A oLLVM am WILL 3oVd ~)pas M ®oY0a3Y MMldlpss0 ®O ND.M" M Y30111Y 3"R3�11M161gIWV NN It0lW NOWAVI G M M301MI WW O VM ON SSLL 1VN1 LALWO W M 'p RWM , NOLLVMAD 3JJ btlQaMM 9111SY SN1T10.7 6107 � ,��` \ � \ 1 3$/scol 377 dhow OOOMN1a0N - .H 1 - selvxirL - s -I 0 mwrc 7�u r � ` .�.� � `wwN ' 4' � ` �,•\ � _ ' _ s �� �r � ti�wrww.r► LIM 7M' �W�il t01 �A�7 - WO Nd PMO 11'1 � I� d�,°'taP�' �� � � —. __ `� u ��, 'd sa arta 0 .Bt 11 Nally pod Ool `1 cQ "JN Ld 7 MIA st hTwAoff 'SSMv! F wJ,iu 407 r� �/�a 1 ` -r4 \ sst�i►L�77a�m 9S703P award 9.907 11 SaNIA d� 87 )=A � � 1 1, \\ 7L' 'NP1GlOti•T7 M1dNN3X ` 8081/859! 1 us"M T PSI M1 NBNN►'d0*4 0 � NNZY , a9 \ 107 1107919N NS9?70J Wt 'HOM '3 O7PN00 \ \ \ roAr 1 f� `1 's "1¢ sn \ F \ V st7 \ IZ►L LJNALg \,\ , ,33 Il FOP l �-- ,001 A - � _.____-• � � a `JNoI 3 lntld 213NM0 ,� 34LLV13a3A .00 ` 110L t1 W30MON MY4 .w -.1 3TMB `W113QiN "d6Ml VIN NOW" s i im •aans aOOAHMOX s If z Mal , L!0 A3A8ns ANVONnOG1.LB319 sleet N11035 NMA"�v saL ` ♦ \ a 107 X07 \ el�Rvio. \ ` $� MD1W YICIIpO ML \ OL�thin 0I30MN 30NMAM and (s �, � � \ NPMNON W 8XP7 zssewscs► s ewzsosco► osKt6rYW 3atas3ddN %VL (9 \Jw \ \ IeAN omrw 1pirswop mro 0.N `•► `pNIN1y,3, MOA oVM11B10 f 1 MOONY sLIDNffiV3 MY OL AYII SMLL (1 ,yjd °"I�, 'r €. 1a31'B(Is 3g l,LN3dOMd Sam �\ \ M9FMM Nudvauo b� MOA71ss own zee!E 30tld'y�101 JO AYO SSLL TI3s LtW ONWI p MI -� MAI 3X(4aUO'N• Y N d3YYd]Yd M dVlt SUd LYNL 3Wd �— mos M Od NOLLvmknmm ONII Solt08�L"; 318Y1 MM IOMd diti0'Id 53si N?DIONB tV MONg my aw3vys LOII YdNIOIsIOs BILL 1 IOo001:I M sMWMdiO ONP sianu n ae aIL= sY NOW3sd A oLLVM am WILL 3oVd ~)pas M ®oY0a3Y MMldlpss0 ®O ND.M" M Y30111Y 3"R3�11M161gIWV NN It0lW NOWAVI G M M301MI WW O VM ON SSLL 1VN1 LALWO W M 'p RWM , NOLLVMAD 3JJ btlQaMM 9111SY SN1T10.7 6107 � ,��` \ � \ 1 3$/scol 377 dhow OOOMN1a0N - .H 1 one I Joel H. Patiersan�, made he mb Rd "" — ceder my auperMsbn t Page e, my ��an (dam description and/or Page that from informati That the troundarles not surveyed are clearly in Boots Pori oa calculaton found ed is 1: 10,000+ that this plot creates with' o county or munkipalMM has Mhas an ordinance"that if lord. The ratio of precision as calculated Is 1': 10,000'+ Prepared i1 accordance with G.S. 47-30 as amended. signature, registration number and seat. 3n°--. A.D. 7997. � Property Zorrert RR Total bacf to be subdhAfed Mh sheet 34.70+/- Ave, Total rwmbr or lots aV~ td," sheet t I 1 ''5'" sir lot asofsd Mts sheet Lot 2 O.EJ Acne 1 AN Oreo designated am rM rwevtion led and mofntoined by Me homeown u>b �� a ere aadlo Inan tM1e afPATTERSON SURV,�'Y11►rG, P.A. � ns ash IO' ang waterfront lot, aNy. P.O. BOX '3871 lit—10, N.C. 20115 (704) 662-0100 . Fox (704) 662-0101 GRAPHIC SCALE 7110 a 100 a» .aa woo ( IN FEET ) 1 Lace - 200 tL - OV �L ��% � JOQ H. PATTFRSON III REGISTRATION NUMBER: L-3717 _n nroWy. the County and state ateresoid, certify that o Registered Land Surveyor, personally appeared w1d acknowledged the execution of the forego' ny hand and official weal, stomp or this n+ q 4L SEAL"' Nonl; 4az. na ofhotdP5 Public ta+damone xUi:es my --- —Pir'ea: -01- the 1.. the su"Asion pat shown hereon has been found to comply eguldions of the county of Iredell, North Caplin OL I I etreeta, utilities and other required Improvements ho" x:ceptable manner a the Installation of the required and amount and moaner eMisfoctory to the County of ed, and that the fFIng fee for this PIM it the amount snreceied This pat hos been approved by the subdivhlal ding in the Office of the Register of Deeds of Iredell Subdivieion Admmi� y{rR o�- rd Subdivision to the beat M my knowledge Iia xi area of the Lake Norman/Catawba watershed bond, lorth Carolina Divfslon of EnNranmen 0 Management WOtershed Protection Mop of bedd County. V" - --b Subdivision Administrator ""'e owner of the property shown and daacrbed l the wrDdivhion M%1rlsdctior 01 the County of Iredell. ng setbgFka as nooted.ia plan of ntewith my Tree consent and d. Manger/Northwood Group. LLC unty Nm�gef County and State, do hereby e me this do and aek(1C a limned liebsny eampany. Y edged the due 7 instrument on behalf of td, company. doll stamp err seal, ".1L" day rI fAL" ry Public lellrotina my commission ones "2'2 �Z f�e ter. IJOB NAME: FINAL PLAT OF "NORTHWOOD SUBDIVISION'' PHASE I LOCATION: DAKCISON ro#W p 490EU COU'Vry, NC DRAWN BY: ,MP CHECKED BY: .,FIP TAX PARM N6 46J9 -5g -6J11 SCALE: t' - 200. OWNER/DEVELOPER: DATE OF FIELD SURVEY: AIRK 23 1997 NpR7HWOX GROUP, LLC fB701-A HWY. 73 DATE OF MAP: ,bre 16, 1997 CORNEUUSt NC 280JI DEED REFERENCE.J02J poge.8f JOB NUMBER BOOK NO: Google Maps Go gle Maps nnessee xF F TP 7� &album O N The Gospelaires© �a �F e e L 3 0. Map data 02017 Google 500 ft r Page 1 of 1 / https://www.google.com/maps/@35.6492437,-80.9048191,16z 1/14/2017 MapCard - Print your custom map Page 1 of 1 < <��i�F1111�ii N 0 0.5 Mi jvl 0 2000 Ft http://map-pass.mytopo.com/maps/print_local.asp?print= 1 &scale=5.00&layer=DRG&lat=... 1/14/2017 yy a. Y♦ K xae { ,