Loading...
HomeMy WebLinkAbout20080594 Ver 1_Certification of Completion_20080702,. ? DWQ Project No Applicant: Project Name: Certification of Completion pffl@1ROW19 d JUL 2 2008 County: GlG?? DENR-WATER QUAUTY %WT1-ANOS AutLs1QRMWATER BRANCH Dlck?rfeA Tim &,rl'le - At' /E- =-1YE - x-11 ?l Ruck /Itv Rraoc G yc G?l 1-21-1 C 11514'1 fi?Gt cclDate of Issuance of Wetland Permit: 2C)c. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, ?d?erp?'"1 , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. r Signature: t-&cjC 4-SC4- 1 Date: ?13A Agent's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, AV IP -1-S 1,4AJ K1?LIC,Cg, as a duly registered Professional CPL,S?- (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, fill time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, And other supporting materials. Signature: /6? Registration No. r Date 4 -56-O6