Loading...
HomeMy WebLinkAbout20061939 Ver 1_Certification of Completion_20080626 Certificate of Completion Y l , 4 7nnill ol `? v+r;r,;on-?aern DWQ Project No.: 19 County: R ar\d e 1_ R"a' ° `"P Applicant: UCAX 1??Qil 'lAe , gUk 0inev OL.w O"Y'a"k, NC 1-1203 Project Name: Date of Issuance of 402 Water Quality Certification: h? ??U Y y n , 2 c+o i Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the Winston-Salem Regional Office, North Carolina Division of Water Quality, 585 Waughtown Street, Winston-Salem NC, 27107. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary. to send certificates from all of these. Applicant's Certification I, P r ?bhu st?u?.ka r S?; ., v6, SA K , hereby state that, to the bil my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent-of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification,- N/,4 Date: (- I %(l I, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. V@[90162 Signature: Date: JUN 2 6 2008 If this project was designed by a Certified Professional DENR - WATER QUALITY WETLANDS AND STORMWATER BRANCH I' ?e 6 8 f P , as a duly registered Professional 1[6! Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my ab4WA14hill and diligence was used in the observation of the construction such that % the construction ... o * built within substantial compliance and intent of the 401 Water Quality Certification`'. ? Approved plans and specifications, and other supporting materials. .Ap t, - It Signature: >c,_S r n4 _ Registration No.: ?( .36 Date: • psi '? ??° . CtlNE • ? • ryes "little rt 111010