Loading...
HomeMy WebLinkAbout20072254 Ver 1_Certification of Completion_20080602Certification of Completion E d.. JUN 2 2008 DENR - WATER QUALITY WETLANDS AND STORMWATER BRANCH DWQ Project No.: 0 7 - COUnty:' Applicant: r__ k6l, Ile _ec t c ProjectName: Z-f/Ae ?p?? ?ik0e (' tfYc?ir r Z - 7- 5 Z71", 5 ? T9- Date of Issuance of Certification or Authorization: J: Al (A171-I/ F', 2-100 r Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, ?4V, B -eC,e` , hereby state that, to the best of my abilities, due care and diligence was used 'in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other suppo*g)materials. Signature: Date: 231 Agent's Certification 1, used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: , hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications,. Date: If this project was designed by a Certified Professional I, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date