HomeMy WebLinkAbout20072254 Ver 1_Certification of Completion_20080602Certification of Completion E d..
JUN 2 2008
DENR - WATER QUALITY
WETLANDS AND STORMWATER BRANCH
DWQ Project No.: 0 7 - COUnty:'
Applicant: r__ k6l, Ile _ec t
c
ProjectName: Z-f/Ae ?p?? ?ik0e (' tfYc?ir r Z - 7- 5 Z71", 5 ? T9-
Date of Issuance of Certification or Authorization: J: Al (A171-I/ F', 2-100 r
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
I, ?4V, B -eC,e` , hereby state that, to the best of my abilities, due care and diligence was
used 'in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other suppo*g)materials.
Signature:
Date: 231
Agent's Certification
1,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature:
, hereby state that, to the best of my abilities, due care and diligence was
construction such that the construction was observed to be built within substantial
Water Quality Certification and Buffer Rules, the approved plans and specifications,.
Date:
If this project was designed by a Certified Professional
I, as a duly registered Professional (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Registration No. Date