Loading...
HomeMy WebLinkAbout20041336 Ver 2_Email_20160527 Strickland, Bev From:Hair, Sarah E SAW <Sarah.E.Hair@usace.army.mil> Sent:Friday, May 27, 2016 12:03 PM To:Wilson, Debra Cc:Steenhuis, Joanne Subject:Cedar Point S/D Pender Debbie, Just wanted to give you a head's up that I received the permit modification request for the Salmon/Cedar Point S/D project in Topsail. Two things: 1) There is a former enforcement action on this site which identifies the area proposed for work as 404 wetland; and 2) The project is located within a Corps of Engineers Easement area. I have some investigation to do on my end related to the enforcement action and coordination with Navigation and possibly the Corps Real Estate office to see if they have anything to say about the proposal. The Corps Action ID associated with this project is: SAW-2004-00490. We issued a GP 291 for dredging of the adjacent channel and construction of the docking facility. Wetland fill was not authorized (to my knowledge). Thanks, Liz Liz Hair Project Manager USACE-Wilmington District Wilmington Regulatory Field Office 69 Darlington Avenue Wilmington, NC 28403 910-251-4049 Sarah.e.hair@usace.army.mil 1