Loading...
HomeMy WebLinkAbout20110896 Ver 4_More Info Letter_20170119waterResources L JV41,PONVE`drAL QUALITY January 19, 2017 Orton Plantation Holdings, LLC Attn: Mr. Peter J. Talty 11 Times Square, 37t" Floor New York, NY 10036 ROY C0011ER MIC'HA FL S. R[=GAN S. JAY ZIMMERMAN DWR # 11-0896 v4 Brunswick County Subject: REQUEST FOR ADDITIONAL INFORMATION Pleasant Oaks Plantation Rice Field Restoration and Protection Project Dear Mr. Talty: On November 28, 2016, the Division of Water Resources (Division) received your application dated November 18, 2016, requesting a 401 Water Quality Certification from the Division for the subject project. On January 12, 2017, the Division received an email message chain in which Brennan Dooley of the US Army Corps of Engineers notified the applicant's environmental consultant on December 6, 2016 that the proposed project would be processed under the Standard Permit procedures. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. Please provide the Division a copy of your response to the January 12, 2017 email from the U.S. Army Corps of Engineers requesting additional information. [15A NCAC 02H .0502(c)] 2. A Public Notice issued by the U.S. Army Corps of Engineers (USACE) will be necessary to begin the proper consideration of an application (pursuant to 15A NCAC 02H .0503). The Division will be notified by the USACE when a Public Notice is issued for your project. No action is necessary by you for this item at this time. This letter is to serve as notification to you that your application cannot be processed until a Public Notice has been issued. Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate State of North Carolina I Envirorunental Quality I Water Resources 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919 807 6300 Orton Plantation Holdings, LLC DWR# 11-0896 v4 Request for Additional Information Page 2 of 2 reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending three copies of all of the above requested information to the 401 & Buffer Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617. Please be aware that you have no authorization under the Section 401 of the Clean Water Act for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact Chad Coburn at 910-796-7379 or chad.coburn@ncdenr.gov or Jennifer Burdette at 919-807-6364 or jennifer.burdette@ncdenr.gov if you have any questions or concerns. Sincerely, IN Karen Higgins, Supe isor 401 & Buffer Permitting Branch cc: Steve Morrison, 3805 Wrightsville Avenue, Ste 15, Wilmington, NC 28404 USACE Wilmington Regulatory Field Office DWR WiRO 401 file DWR 401 & Buffer Permitting Branch file Filename: 110896v4PleasantOaksPlantation(Brunswick)_401_IC_NeedApp&PN