HomeMy WebLinkAbout20161150 Ver 1_B-4950 Utilities_20161221• �
BEGI N T 1 P PROJECT B-4950
—L — P�C Sta. II fQD.��
��I`.��"I�I��: C��I�� \�C�)I'�"I'I-I ��.��I'�C�)I.I\.�\
II�I��I�IC�)\� �i)l�� I-II��I-I���.a���
L�CATI�11�: REPLA�E BRIDGES l7l A11tD l72 �VER
S� UTH RIT�ER n11t SR 1851/SR 142�
�FAIRCLDTH BRIDGE RnAD}
T�'P� �F W�RK: P� WER Ll11lE REL�CA T1�11 �
BRIDGE
-L - POT l Sta.13 f38 f/-
�Sp�B /Spd9 ;
�_..1�'--�
�•.� •--
' _._ .�_,�J�'���
�� . �.._
�L.._
� TO SR 1$4$ -L- SR 1851 FAIRCLOTH BRIDGE RD
's.��z
N
C
--I
2
7D
rn
�a
UCTURE EXCAVATION
(STR. PAY REM]
— CLASS II RIP RAP —
(STRUCTURE PAY ITEM]
THERE IS NO CONTROL OF ACCESS ON THIS PROJECT.
THIS PROJECT IS N�T WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PR4JECT SHALL BE PERFORMED TQ THE LIMITS ESTABLISHED BY METHOD II (MODIFIED).
END BRIDGE
-L - POT Sta.14 t58 t/-
BEGIN BRIDGE
-L- POT Sta.17t35 t/-
(STR. PAY ITEM]
— CLASS II RIP R
(STRUCTURE PA�
�
-L- SR 1851 FAIRCL4TH BRIDGE RD
END BRI�
-L - POT
T.I.P. NO.
B-4950
SHE]ET NO.
U E-1
� 1223 Jones Franklin Road
� Raleigh, N.C. 27b06
� / ETHERILL License No. F-0377
E NG I N E E R I NG B�S: 9i 9 asi sa��
Fax: 919 851 81fl7
TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN
CIVIL/51TE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION
�'q'Q�0
END TIP PR�JECT 8-4950
—L — POT Sta. 21 f40o00
TO SR 7424 ��
]�l�]E]LINIIN�]L�Y PLANS
DO N�T U5E FOR C�N5TRUCTION
GRAPHIC SCALES 2012 STA2IIDARD SPECIFICATIONS
I11 tDEX OF SH�ETS UTILIT Y O W11 tERS �11 t PR OfECT P�p� �� OFFICE OF:
0 50 100 llIG�IT OF WAY DATE: DIVISl011t OF HIGHWAYS
SHEET 11 t0. DESCRIPTl011 t UTILITIES UKIT
22 .l U LY 2 Q16 o UTILITIES ENGIII�EERING
� o
PLANS U�1 TITLE SHEET {A) SUUTH RIVER EMC {PUWER) � 1355 MAIL SERVICES CENTER
LET "IING DATE: 9 � �IGH NC 2769S�I555
0 50 100 UE-2 UTILITY BY �THERS PLA11l SHEETS � se° FAXN 9 j so-'4isi b�
16 MAY 2 017 oF T�►�
P RD F I LE � H O RI ZO N TAL� �oger Worthangton, P.E. UTILITIES SECTION ENGINEER
0 10 20 Bo Hemphill UTILITIES SQUAD LEADER PRQJECT ENGINEER
John D. Schriner, PLS UTILITIES PROJECT DESIGII�ER
PROFILE ERTICAL
Utility Sum�nary Sheet
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
ac ac ac ac ac ac ac ft ft ft
1 10+88 to 13+87 Power Lines 0.10
2 14+43 to 18+32 Power Lines 0.09
3 18+71 to 20+79 Power Lines 0.05
TOTALS: 0.24
Note: Clearing for utility relocation will not exceed the current clear zone being maintained
for the existing utilities.