HomeMy WebLinkAbout19981196 Ver 1_More Info Received_19990429 (13)05A24}1999 1-6:14
Facsimile Sheet
Cov Dumber (919) 846-9467
PAGE 01
Inc.1
19) 846-9467
Date, 04/29199
T;,- Name: Mr. John Dorne -
Company: DWLQ - Central Office
Fax Number: 733-99$9
From' Bob Zarzecki
me Sent: 12:57 PM
cc:Dann Smith .0571-4719
Craig Lang/ FORTIS 872-3320
Robbie Bell / BNK. 851-8968
Subject: Arbor Green Project Update
Number of pages including transmittal 4heet-, 14
For your comments/apprcval For your information
[ Per our conversation ? Per your request
Please advise ?? Please call
? Would like to discuss Please handle
bard Copy Sent:
US regular mail ? Hand deliw ?SONh ??1
? LIPS overnight Q US certif />
Federal Express No hardy ' t
a ?,? Lbw
? Other -
?s
Remarks: Please find attached the Pro; ect Update for Arbor Green disccusstng the curr,
status of the compliance actions that have taken place within the community and a letter &o
discussing alternatives to the "T" intersection of Arbor Green Drive.
If you have any questions or problems with the transmission, please contact BZ
at (919) 846-5900.
Confidentiality Notice
This transmission is intended only for the 1L5e of th.- individual or entity to Nvhii In it is addre_ed and tray contain information tl}^' s
privileged sLua confidcatial. If the reader of this me slagc is not the inta nded recipient., you are hereby notified that nay disclosu
distribution or copying of this information is strictly Prohibited. if you have received this transmission in error, please notify u:.
immediately by telephone and return the faxed documents to us at the above address via the United States Postal Service.
Soil/Site ';valuation AapPing and Fnysica: Analysis 0 We:titst7ci.tia mapping and Mitigation r Lnv rornm ntal u
thin-Site Waste Treatment Systen's, ?valuation and Design
9198469467
SaEC
Soil & E vi ron
,244 West Millbrook Road ¦ Raleigh, Iv
05V24/1999 16:14 9198469467 S & EC PAGE 02
Arbor Green Community Development / S&EC, Inc. Project # 97-3'71
Soil & mr iron mcn.tal Consultants, Inc.
244 West Millbrook Road B Raleigh, Notch Carolina 27609 ¦ (919) 846-5900 ¦ Fax (919) 846-9467
April 29, 1999
S&EC, Inc. Project # 97-3071
N_C. Division of Water Quality - DE1 NR
Attn: Mr. Danny Smith
3800 Barrett Drive, Suite 101
Raleigh, NC 27609
N.C. Division of Water (duality - DEKNR
Attn: Mr. John Dorney
4401 Reedy Creek Road
Raleigh, NC 27607
Re, Project Update - Post March :i5, 1999 Meeting,
NPDES NCG010000 / NBRP.0-99-030 / NCDWQ # 981196,
Arbor Green Subdivision, Wake County, NC
Dear Sirs:
The purpose of this letter is to notify 11ou of activities that have taken place within the Arbor Green
Community Development since our meeting held on 3/15/99. The activities listed below were
executed in response to concerns stated within the `Notice of Violation/Notice Of EnforOment°
letter bated 2/5/99 and compliance actions agreed upon during the 3/15/99 meeting. The activities
involved the removal of Sediment and Erosion Control devices from the Neuse River Basin. 50-ft.
Buffers, compliance actions involvinE; the installation of the sanitary sewer line and discussion of
potential alternatives to the "T"-inteniection of Arbor Green Drive.
Sediment and Erosion C08-101 DevicA§: (Please refer to the attached maps depicting the location of
the sediment control devises within tb a community.)
Area "A" - This area contains a temporary "meat basin as required under the original approved
Sediment and Erosion Control plan. As per the decision agreed upon during the 3/15/99 meeting,
the temporary basin within this area :,s still in place and will remain until the construction within
the drainage area is complete. Additional sediment control measures (including silt fencing and
seeding) have been installed in an effort to reduce any potential sediment from reaching the stream.
The basin is being maintained on a regular schedule as well as immediately after heavy rain events.
The basin will be removed and the surrounding area restored once construction within the drainage
is complete.
Area "B" - This basin was mistakenly placed within the stream buffers. In addition to the basin, a
small amount of fill material had alsa mistakenly been placed within the stream buffers. The basin
and fill material have been entirely r-,moved from the stream buffers and the impacted area has
been re-vegetated. The basin is in working order and is being maintained on a regular schedule and
immediately after heavy rain events.
Soiu Site Evaluation ¦ Mapping and Physical Analysis ¦ Wetlands Mapping and Mitigation ¦ Environmental Aud
On-Site Waste Treatment System, Evaluation and Design
05/24/1999 16:14 9198469467 S & EC PAGE 03
Arbor Green Communit!? Development / S&FC, Ine. Project # 97-3071
4/29199
Area "C" -'t'his area contained a rock-check dam and small temporary sediment basin as required
under the original approved Sediment s nd Erosion. Control plan. As per the decision agreed upon
during the 3/15/99 meeting, the rock-check dam will remain in place until the construction within
the drainage area is complete. 't'ire small sediment basin has been removed and the drainage
diverted directly to the rock-check dam, The rock-check daze is in working order and is being
maintained on a regular schedule and i-arnediately after heavy rain events. The rock-check dam
will be removed and the surrounding a."ea restored once construction within the drainage is
complete-
Area "°D" - This area contained a small temporary sediment basin as required under the original
approved Sediment and Erosion Control plan. This basin has since been removed and the impacted
area has been re-vegetated. The drainage has been diverted away f rn the stream and associated
buffers _
Aarea °`E" -'O'bis area contained a small temporary sediment basin as required under the approved
original Sediment and Erosion Control plan. This basin has since been removed and the impacted
area has been re-vegetated. The drainage has been diverted away from the stream and associated
buffers.
Area "F"- This area contained a small temporary sediment basin as required under the approved
original Sediment an Erosion Control plan and a stormwater discharge pipe within the stream
buffers. The basin has since been revioved and the impacted area has been re-vegetated. The
stormwater discharge pipe has been r x irected and will now discharge into a small detention basin
and "sheet-flow" the stormwater prior to entering the stream buffer.
Area "G" -This area contained a small temporary sediment basin as required under the original
approvers Sediment and Erosion Control plan.. This basin is still in place, in working order and is
being maintained on a regular schedule and immediately after heavy rain events. The developer
and engineer are currently working mith the Sediment and Erosion Control agent on a revised plan
that will keep all devices outside of the buffered area. This has proven to be somewhat challenging
given the steep topography and oven.ll site conditions. Once a revised plan is approved and
installed, the original basin will be removed from the buffered area and the impacted area restored.
Mr. Jake Taylor, of Wake County Environmental Services (the Sediment and Erosion Control
agent for the community), has meet the developer on the site on several occasions since the 3/15/99
meeting. He has stated that the site i s in compliance with the revised Sediment and Erosion
Control plan. Mr, Craig Lang, of FORTIS Homes (the developer) has been on the site almost
every day since the initial notice of ,iolation in an effort to insure that the sediment and erosion
control devices are in working order, that no sediment is reaching the strear s or wetland areas and
that the impacted stream buffers are being restored as per the decisions agreed upon during the
3115/99 meeting.
?Mr L he:
In Nation o the Saga ry I
Additional erosion control fencing and seeding has been installed to stabilize the sanitary sewer line
e mstruction corridor. The sewer laze has been moved further into the side-slope fill area of home
lots 3, 4 and 5 and away from the sl:ream in an effort to reduce the amou=nt of impact to the
associated wetlands. The sewer crc ssizng of the secondary stream channel (for Phase 1; between
65/24/1599 16:14 9198469467 S & EC PAGE 04
Arbor Green Conaasunltg Development / S&EC,1nc. Project ## 97-3071
< 4/29/49
home lots 5 and 14) will be done in compliance with the General Conditions of Nationwide Permit
12. Specifically, the temporary fill tlta: had been placed within the stream channel during the site
prep work will be removed and the charnel returned as close as possible to its original condition.
Altern atives Analysis to thy. "T inter ection gf Arbor Green Drive:
Mr. K. Robert Bell of Bass, Nixon anti Kennedy (the project engineer) has prepared the attached
altematives analysis for the " T"-inters,wtion of Arbor Green Drive for your review.
CONCLUSION:
Please note that all the compliance actions agreed upon during the 3/15199 meeting have or are
currently being implemented within th(,' Arbor Green Community Development. The developer has
made every effbrt to insure that the project site is in compliance with the current regulations. We
believe that this revised site plan and 4iediment any Erosion Control plan has minimized the
wetland impacts and Neuse River Buffer impacts to the maximum extent practicable. Please use
this information when reviewing the 401 Permit Application.. Due to the actions that have taken
place since the 3/15199 meeting, we r(quest that you send written approval of the 401 Permit
Application-
Please feel free to call myself at 846-:5900 if you have any questions, require additional information
or would like to visit the site so that someone may accompany you.
Sincerely,
Bob Zarzeclo,
Biologist
Cc; Mr_ Craig Lang / FORTIS Homes
Mr. Robert Bell / 13NK
05124/1999 16:14 9198469467 S & EC
NEW M/C RIA1?
9
INTO E?, OtlR ,?s+ •? ??? r?
C
tot OOV-
RECREATION AREA
-? \ (PROPOSED PC OL AND CLUBH0u3C 1 !
1 t
WA
1r 1
Cc- Zzma
`? ` ? - 1g
TrNO
-.3 X
r'
'r1
1?1
I
?1 ?i
` 14..
10,
,FFE ?
1
1 1?J 1
? r
1 f
I 1
r 1 '„
lei
r i ?
wlI FF - "? ? "?f?
r ?
[ P sP
44A" , ••
--
ti
PHA
PH E I TI r
?
! rrt ?
;01 1
' 1 I
/
IN F- 6
.r S a17 fr f
?h
tt* ! i
Y441,11,
1
1
PAGE 05
L -51.93'
e -04.13'14"
T -- 70-00'
25.98'
?!N • 1i13.aS=?3
OKHE Ft I JOHN W. !IA
T 0. X
RILECON.lIOV
24NiNOt 0&1
us&% VACANT
wrr ??
.f
rx I?.y
%S?r
.? .sue
pie • tati.03-31-9414
1"969 jONM I. @&u:UNAN • !. Kzr(METn µA111
0 a+ 11az 4006I
i(ALE=ON• N. G. gT6t9°006•
I;I"sNN? ro ESTFFARM
?.-.•-
Of
WETLAND 11
NQDE p SCRIPTIQN LF SF
.?
05/24/1999 16:14 919$469467 S 9, EC
+cls.oa-sa-c?:Is .
Y. EARL ORITT IL JUDITH M. bgITT
!4A RANO ROAD
GARNER. M.C. !Tits
R--12
RESIDENTIAL
i
,
<y 67
1y \
SO p 00
i
AREA 'T" s6
VA
RIAIILE
UTIL[rf
EASEMENT r a
/ C6 4ySO I'
rY?y fir.
t J l w ..q *
l J
•~~?? ?' . fir / r 64 ?...r? .?? ? } ?' ,
? r
ti 1 ^.
AREA 64EI?
t
owl
r ?
I 1` ?
( +1
r
r
r 82
erq
;HASF R
t ?`, ? 1?? rrr?
r r.-
rr
r"
1
1 111
PAGE 06
L Y L 1 1. Y a r F ••
usE1 *c
N
SO' fEIISE j
flA"ER I IN i
s s ` AREA if
r
/' \ r rr
\ J•'? Y . r u
r r-
yr r
^„ r
h
,ra' F ? 1
rr?iT'\ rte'
opt
a
72
? rM,• s
rr ?rr 7? /???
r ?
1 ?? ??? '?? 74 Y
I Of
80 ??? w?,75
r
r
r
1
i `
r i
i x . I %
1 1
,r79 76 i i
J
77
M
??ps
l?
r ?
/ t a 1
o
f
l
f
13
r e
{ti 14
r.
15
r
I
r
??}JJ
J r J
r ! ?
J ,
it rr 16
J
ti.' Nth! F 1
f
ri MlN.FFS-23?.so• r
05/24/1999 16:14 9198469467
• j ?.,../ j as
?Q 15 I, I
f a? ????1111
1, ??IIF
t I? I
g 1 4 ? 11 •?.___
1
ICE I 1
1
1
!I 1) 1
1 ! 1
L-?` DMIfwL1?E ?. 1
1 f 1
r i ?J rr ??I !
Vl I
? f 1 I
I I
?" ; 15 i?l I
f
i • ?'""{1 I
f^:•J 1 1 I i N f
1 1 i
I 1
?I r
I I
I
9 1.99' f ? 1
1 I r
i 1 1
1 ?. I
S&EC
i
i
i
i
f r1liz
MTO !E JjS
11 ERpZ
p j flit By 1.0631 ACt?1
oft
0n 1, 5 133' 58'01"?
? 195.31;
161
1
I
y
1.
1
f
AREA 66W
1
''
t
12 4"
1 f 4 h?
I rjP19N ?\ r.
1
t --?9 P two TO ,
S 89.03'55"E S 09*3?'z ?
I ` ' ! I 1
1 ?` r
1 1@57 ef I 1 1 L:
(5? D6?! 1 I ? ,? 1 1 of
51 I ft r 1 !
Q
?y„-fir r f ? j r ` .. N4
r
y y'''am ??wr ~•,? ,? ~„?,
yr rl I ? ! ?ti ?ti.
co t
PAGE 07
?It
Di
N
rill r
OIIMRR O
zol!"Cl
usE?
xollsNa: ?.
usE1RESERVE0
OMOT PART 01
kill-03-2;
M- EARL •I
?A! RANO l
R M
OAR=ER•
RE=1pEMTt
1i
ti 1 e
05/24/1999 16:14 9198469467 S & EC PAGE 08
BASS, NIXON & KENNEDY, INC., CONSULTING ENGINEERS
7416 CHAPEL HILL ROAD, RALEIGH, NC 27607
919/851-4422 5 FAX 919/851-8968
March 25, 1999
Soil and Environmental Consultants, Inc.
244 Millbrook Road
Raleigh, NC 27609
Attn- Mr. Kevin Martin
REF: Arbor Greene Wetlands and Neuse River Impact
Garner, NC
Dear Kevin.
Per your request, I have investige1ed the different impacts of wetlands and Neuse
River Buffers regarding the Arbor G7reene Drive, with and without the T-Intersection.
Please find the following attaches color coded summary for Exhibits A through E,
yellow shading is for wetland imps-,ts and orange shading for the Neuse River Buffer
Impacts.
EXHIBIT A
Exhibit A shows the existing T-Intersection which received the Town of Garner's
approval over two years ago. The area highlighted in yellow represents the Wetlands
Impacts delineation confirmed by the Corps of Engineers and permitted under 404.
EXHIBIT B
Exhibit B shows elimination of the T-Intersection. The cul-de-sac, as shown roughly
sketched, violates the Town of Garner's Maximum Cul-de-sac Length Use Ordinance
Article XIV, Section 217 ( c), which is more stringent than all the municipalities in this
area. Even with this additional connection of Street E we are inclined to believe that
we may still encounter problems with the Ordinance and or the Town's Board of
Alderman. Any changes to the street alignments will require re-approval which will
take considerable time and incur lost finances, Also coupled with this connection is
the fact that extending Street E will violate the Town's horizontal and vertical design
criteria., not to mention the possibliS loss of lots).
In finalizing the review of Exhibit 13 please note that the total wetland impacts at this
location are the same with or without the T-intersection.
05/24/1999 16:14 9198469467 S & EC PAGE 09
Soil and Environmental Consultants
March 25, 1999
Page two
EXHIBIT C
Exhibit C shows the existing T-Intersection. The area highlighted in orange
represents the Neuse River Buffer Impacts.
EXHIBIT Q
Exhibit D shows the elimination of the T-Intersection. The area in orange represents
they Neuse River Buffer Impact as a result of eliminating the intersection.
EXHIBIT E
Exhibit E shows the net increase of the
orange) as a result of the T-Intersection.
increase, 1,780 SF, is located in Zone 2,
the total increase is 2,764 SF.
Neuse River Buffer Impacts (highlighted
Please note that the majority of this net
The net increase in Zone 1 is 979 SF and
SUMMARY
A review of Exhibits A and B reveals no additional wetlands being impacted by the
intersection. After reviewing Exhibits C, D, E and the actual field topo (prior to
grading), it is my professional opinlon that the additional impacted Neuse River Buffer
Area was somewhat ineffective mi a buffer for infiltration. The original topo shows
vertical grades to be in excess of 20 percent (latitudinal to wet weather draw). As you
continue in a southerly direction along the wet weather draw, at about the half way
point on Lot 11, the draw and sideslopes flatten out thus allowing the buffer to provide
for biological protection measures as it was intended. Any shifting of Arbor Greene
Drive from its present location will only increase damage to wetlands and buffers and
present further delay in preparing and finalizing the site.
Should you have any questions, please call.
Very truly yours,
Bas ixon Kennedy, Inc.
.`
K:- Robert Bell, Jr., PE, CPESC
K:R Bj r/rt
CC: Craig Lang
Pnclosures
05/24/1999 16:14 9198469467 S & EC
• v?
Yr r
a ry ? ?-,?r
66
? r t rr
PAGE 10
N$yy
CLIT INTO EXURE
a
V* ke
/ ! 1 BUFFS rr y/ ; ?w?r -`, to
..?I?..?'.W.tOEw? tl
I lie
9 *05 146
f „??" ?" ? ra M M• ? I IQ7
0 I'll 1?
?;, ^. Si'D?WA1,.f.4 1?" \ \ 1,? \ ?a ti`1???'("611?? ?? 1 ' 1 ? 1 1? yr
72
73
82 \\k
87
74 QP SPA
IV %N
f , 8t3 75 t ; i 4? -?
K4) 10,
? I
f,,/ '?\ , ??? 7? ,?\ it i r ?r ? ,/ / ?\ ,
85
77
(8 6)
F tF I / / I
! i^ w I
as fy"I'r'? \ \ `\? ??r ?? /? T' ?'Urr? ?''+ I 1 r? l
17
s •/ /? ¢I
88 X H
1 B T
a
Elmo
p r JJ I
r r ?'
? / ? rr y'H? /r r r
? ?•• ?J/ .. ... r frY / ,? y /r j// r?rf fr??? / `? ?''J? F?S?
6 ` r/Y/!r !•'r r*r f 4
tw/` r Jr/ rf ?
1 H X.3 /F' 4? rrr,•Jr'' ,?,
Ile
rlr'' X11 \' „- Il !? I? // ir'???j'? ?~?. ?? ! ?I
APA
"\ oy tip. s ?, ? \ ? ? ?. ? \
CV- J) k
dS da
t 3L
110
\
\ 1 w? ? ? \ y? \ _.
%
v I
?;?• NA,?`,
001.
S+' r 11i'?
Cil M's
1 1 y '° f y '? ? r *~ n X'r? y • N
Wi.
DS
TT dJdd 03 'S G9b69b86T6 PT:9T 666T/VZ/90
05/24/1999 ;:14 a!gR469467 S EC PAGE 12
1 I ? r
7„
7 ' ?9 l ti? CulNfo gxoc
I Foal W t1Rf3
,. _IL
\ 1 d +\ "'' r?=?,,,4 =_=esvess-ear
686
I /? r 1+ 1 ? _ aW-r--W-
VANtAfte
Fil
/ / t gib '?, f l , 4\ r { ? ii +r ?iL COM?SiCK1G1 1
eA ti ? •Y?'??' rr` \4?? 'f ? ?F?`+ r,. r 1?( ~ f iyyi t
61 -yA¦S1 r?? " ( I L x. NI t1
IF 1 ?? ;`ti ?f! r-r
d 86 1
R 05146
481
110 r 8
, (fig ?
-}..-
i ??°. -fit" \ ?\ ?` ?? ?a t t \.?} ?,?
7 ARM,
t ?
t ` ?. ) rr\ \ . \`` l ? FER
82
\ \ \ \)? 1 t
83
D \ \ t I I I 4'\
S Ah
,AN
78 rfr? Jai ??/ •y 1 fr r x
?• rte" ??? `\ 1 r •r IF r ?? V 7 \ ? \
rr r h ...?" } C?1_,.'x.vs.YJ /1 1 if ev
EX IBI 'e, It IT
88
( 18 It AW I'
D1?8 >
r .- / "'?}dtsZJ
05/24}1999 16:14 919$469467 S & EC
" ^\ lay W «?.
67
{{
? t
"? , r I I
Il?f
/
??JJ
w .+r ' f oo
Soo
r 7 •-
1
11
{ {
f {
t `
yti r ? ? ? b
gool
r f \
r?
r, ? r1
r1 1 r?
.j. ' \ 'o, -'\
C
-oil ol
i r - ",qftq
!
\ '%A
\? 82 14
@ 83
.tr
r / Ce(iy
I ,•
PAGE 13
_
?J^^ '
"i ?.l
r'
te
.wSN}4{=55= y rr? r ?p93 ?s
Jl
??
y r
J
I f '??f `r i
? ?1
??
r
1
1
t f
` f
e-
h 4 \\??
r \
NO
r rr
I '
i ? I ,• 7 ?
\
(s Ds
78
? t FAR
ti I?f \'
1
1
3 '
1 1i OP
? 44
f ?
f
f
f
1 t r
f I r
f f 1
?? it 1 ? ?
?a
17 r
r??S r
4 i
c EXHIBIT [ 18 . r
,oo
rr rfr r rr •?rr 4 /f rr
Vol / r 19 r
'`?'r,r • ^y?! yti?f ,rte • f rrr " r/ y r r/
1
li
r.
05/24/1999 16:14 9198469467 EC, PAGE 14
1 f w '?!
.: r • ? ` 70 tr ?• r1 >„
60.
ly
NEW
a7 6$ ' 69 ti w? cur INTO FA4
(
n
SLID
w?w.
1
r? ^?+?r. LS ?L4i1r.?iC?lL
IOU
-1 ?Ga
\* ? ? ?\\ ? \?rr 4+? rr ' w? '? 1 1r?+ I ? ?1 1
44 474
s t
` ! \Jr`\? -+ry r? +"1ytSt 451 r?,y f" I I L
\ 5 ? f G 5 - 461,
r iAr. 1 8
IQ
72
Igo'
82 ` @73
@ 83
80 4
+' { { { 1 r t
K4)
! \
to V
pjj
CIS
6)
EXHIBIT E
18 '00;
r rf'
`1\ rr a?I r?r ?K r ? ? `? , f rr r ?f `?
rr' s'+ r \ rrlY rr r 'i