Loading...
HomeMy WebLinkAbout20160130 Ver 1_Followup Site visit_20170119 Strickland, Bev From:Merritt, Katie Sent:Thursday, January 19, 2017 11:46 AM To:'Kenton Beal' Cc:'Daniel Taylor' Subject:Follow-up Site vist - North Fork Hey Daniel & Kenton, Thanks again for meeting me out at the site yesterday to visit the As-Built conditions of the North Fork Little River Mitigation Bank. As a followup to the site visit, I documented the following:  A majority of the site was planted in compliance with the approved Bank Parcel Development package.  All monitoring plots were installed with stems flagged  Most of Feature A, the main stream onsite, and a few areas along Feature D and Feature G were lacking in planted stems from TOB to +/- 15’.  Additionally, there were a few areas on the East side of Feature A that were void of planted stems from TOB to +/- 50’.  Within the areas voided of planted stems, we observed primarily briars but also some weeds, grasses and random early successional woody stems. There were a small number of mature woody stems seen along the banks. As a result of the site visit, DWR requests the following: 1.Enumerate the square footage of riparian buffer that was not planted according to the BPDP and submit to DWR to use for the next credit release. The square footage will be used to deduct riparian buffer credits from the credit release issued for Task 2 as described in the UMBI. 2.Perform a reasonable amount of transects (amount, shape and size to be determined by Wildlands) within the riparian areas that were not planted to get a representative condition of the problem areas. Submit transect data with the As-Built Report. Pre-planting transect data shall include the following: Aerial Figure showing where the transects were taken o Designate transects a number or letter for reference o Shape & size of the transects (table would be preferable) o Quantity of woody stems (volunteers) present (table would be preferable) o 3.Mow and plant in areas voided of planted stems 4.Perform 5 random transects showing “post planting” conditions within areas that needed to be planted and submit the data to DWR. Post-planting transect data shall include the following: Aerial Figure showing where the transects were taken (must be different than locations used for “pre- o planting conditions”). (1) transect shall be placed along Feature D; (1) along Feature G; (3) along Feature A Designate transects a number or letter for reference o Shape & size of the transects (table would be preferable) o Quantity of woody stems (volunteers) and (planted) o Once DWR has received the square footage from Wildlands as noted in item #1 above, a credit release will be issued for partial completion of Task 2. Due to the site not being planted as approved in the BPDP, a full 20% credit release cannot be issued. Therefore, DWR will issue a 15% credit release with a contingency that the remaining 5% (along with the square footage that was deducted), will be issued when confirmation from Wildlands that items 2-4 above have been performed in full has been received by DWR. If you have any questions please give me a call. 1 Thank you, Katie Katie Merritt Nutrient Offset & Buffer Banking Coordinator 401 & Buffer Permitting Unit North Carolina Department of Environmental Quality Work: 919-807-6371 http://portal.ncdenr.org/web/wq/401bufferpermitting Website: 512 N. Salisbury Street, Raleigh, NC 27620 1617 Mail Service Center, Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 2