Loading...
HomeMy WebLinkAbout20160149 Ver 2_Email_20160118 (2)Carpenter,Kristi From: Sent: To: Cc: Subject: Follow Up Flag: Flag Status: Hello, Peele, Catherine D Sunday, January 15, 2017 7:07 AM Wheeler, Tracey L CIV USARMY CESAW (US); Daisey, Greg; Ward, Garcy Brittingham, Cathy; Carpenter,Kristi Southdock Dredging Project Follow up Completed In our original request for the Southdock dredging project we stated that we would only be working on the "hump" in the approach channel resulting in the removal of 5,000 cubic yards of material. After speaking with captains of the ferries the shoaling has gotten worse inside the basin making it hard for them to turn around; therefore, we will be removing an additional 8,000 cubic yards from the basin. If you have any questions or concerns please feel free to contact me Thank you, Catherine Peele Environmental Specialist Ferry Division 252 305 7288 mobile cdpeele@ncdot.gov 159 Lucinda Drive Powells Point, NC 27966 *�.. �- � / .IFi �l�.j i Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties 6,=,nail correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third partie:-s.