HomeMy WebLinkAboutNCG030039 DMR SW (22) DAIMLER
Eric Moser
Sr.Environmental Engineer
Daimler Trucks
11550 Statesville Blvd
Cleveland,NC 27013
704 645 5353 Phone
November 21, 2016 RECEIVED
NOV 292016
Division of Water Quality
Attn: Central Files CENTRAL FILES
1617 Mail Service Center DWR SECTION
Raleigh, North Carolina 27699-1617
To whom it may concern:
Shield Engineering, Inc. was unable to collect storm water samples for Storm water Discharge
Outfalls (SDO) #002 at the Cleveland facility for the month of October. Per Section 2 Part IV of
General Permit No. NCG0300 shield will attempt to perform a substitute sample or a visual
assessment during the next qualifying storm event.
As we reported for the month of March, 2014 the Cleveland facility remains in Tier Three of the
NPDES General Permit No. NCG030000. Daimler Trucks Cleveland facility is awaiting notification
from the Division of Water Quality as to what changes will occur when entering into Tier Three of
the NPDES General Permit.
Should you have any questions, please contact me at 704-645-5353 or
eric.moser@daimler.com.
Sincerely,
Daimler Trucks, LLC
fltki // 06-L - . - -
Eric Moser
Sr. Environmental Engineer
Enclosures
3 '
E G1NEERING, INC.
November 11, 2016 RECEIVED
Mr. Eric Moser NOV 2 9 2016
Daimler Trucks of North America,LLC CENTRAL FILES
11550 Statesville Boulevard SWR SECTION
Cleveland,NC 27013
Subject: Monthly Sampling—October 2016
NPDES General Permit No.NCG030000/CoC No. *e 4 m f'
Daimler Trucks of North America,LLC
11550 Statesville Boulevard,Cleveland,North Carolina
Shield Project No. 1140111-04
Dear Mr. Moser:
Shield Engineering, Inc. (Shield) was unable to collect stormwater samples at the Cleveland
facility for the month of October 2016. According to rainfall data collected for the month,
qualifying storm events occurred on October 7th and October 8th, measuring 0.55 inches and 2.18
inches,respectively. However, each of these events took place after normal business hours or on
the weekend. Shield will continue to monitor daily weather conditions and attempt to continue
coordination of appropriate staff and resources to facilitate adequate sample collection. Per
Section 2 Part N of General Permit No. NCG030000 Shield will attempt to collect a substitute
sample and perform a visual assessment during the next qualifying storm event. A partially
completed DMR form is attached to this cover letter for your signature and submittal to the State.
Daimler's Cleveland facility remains in Tier Three of the NPDES General Permit No.
NCG030000 at SDO #002. The person designated to act as the permittee by Daimler Trucks —
Cleveland Facility should complete all "Red" sections of the attached Stormwater Discharge
Monitoring Report (DMR). The completed DMR form should then be mailed to the regulatory
agency Central Files. Shield greatly appreciates the opportunity to provide environmental
services to Daimler Trucks of North America. If you have any questions in reference to this
document or require further information, please feel free to contact either of the undersigned at
(704) 394-6913.
Respectfully,
SHIELD ENGINEERING,INC.
001111PMelinda M. Greene M;rk C. Boland,P.E.
Senior Engineer Pr neipal Engineer
Attachments: Stormwater Discharge Monitoring Report(DMR)
p .
4301 Taggart Creek Road Telephone 704.394.6913
Charlotte,NC 28208 www.shieldengineering.com
® Fax 704 394 6968
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 11/11/16
CERTIFICATE OF COVERAGE NO. a- ¢"9_'9 SAMPLE COLLECTION YEAR 2016
FACILITY NAME Daimler Trucks North America LLC—Cleveland,NC SAMPLE PERIOD ❑Jan-June ❑July-Dec
PERSON COLLECTING SAMPLES N/A or ®Monthly) October (month)
LABORATORY:N/A Lab Cert.# CHARGING TO CLASS DORW ❑HQW ❑Trout ❑PNA
Comments on sample collection or analysis: Samples for SDO 002 were IVSD ❑Zero-flow ❑Water Supply OSA
not obtained due to no rainfall/discharge during normal business hours NO V 2 L i l6 Other
CENTp,4L FILE PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 )
Part A:Stormwater Benchmarks and Monitoring Results ®1NR SECTION
❑No discharge this period?2
Date Sample 24-hour rainfall pH, Non-Polar O&G/ Total Toxic
Outfall No. Collected) amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics
(mo/dd/yr) Inches; Hydrocarbons
Benchmarks===> - - 100 mg/L or 50 mg/L° 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L
SDO 002
'Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
;The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible fora waiver of the rain gauge requirement.
4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors,manufacture
electronic crystals,or manufacture cathode;ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to=the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor
manufacture use the definition as found in;40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22;and for cathode ray
tube manufacture use the definition found lin 40 CFR 469.31).
i4 i-
Permit Date:11/1/2012-10/31/2017 ,.; r, - - -:‘,-,�,•,J -• SWU-245,last revised 10/25/2012
" ';'--,:, :,-. .�_ _ Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify,and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TM),I certify that to the best of my knowledge and belief,no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
R&w'tfr'4 Eruv3
Name(Print nam
PJa✓t+ Mab1a5er
Title(Pr'nt itle)
-kj k), Akvlq.
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL,<PQL, Non-detect,ND,or other similar non-numerical
format. When results are below the applicable limits,they must be reported in the format,"<XX mg/L",where XX is the numerical value of the detection
limit, reporting limit,etc.in mg/L.
Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new oil per month.
n No discharge this periad?2
Outfall No. Date Sample 24-hour rainfall
Collected amount, Non-polar O&G/TPH by
(mo/dd/yr) Inches3 EPA 1664(SGT-HEM) Total Suspended Solids pH
Benchmarks===> - - 15 mg/L 100 mg/L or 50 mg/L* 6.0—9.0 SU
Footnotes from Part A also apply to this Part B
*See General Permit text,Table 5,identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date:11/1/2012-10/31/2017t .Lr, SWU-245,last revised 10/25/2012
• Page 2 of 3
Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO 0
IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES 0 NO❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR,including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period
in the case of"No Discharge"reports)to:
Division of Water Quality
Attn:DWQ Central Files
1617 Mail Service Center
Raleigh,North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I
am aware th there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations."
Abu (14 3013
(Signature of Permittee) (Date)
.•tom
°;'117 Permit Date:11/1/2012-10/31/2017' "• SWU 245,last revised 10/25/2012
• y` _ 6; Page 3 of 3