HomeMy WebLinkAboutNCG030063 DMR SW (18) L]l_*(.* :_nerConnections
Industrial Solutions
Michael A.Roux
Environmental,Health&Safety Manager
6801 Industrial Drive
Mebane,North Carolina,27302
USA
November 29, 2016 T 919 563 7224
C 207 376 6368
Michael Roux@ge com
Division of Water Quality
Attention: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
RECEIVED
Re: NDPES Permit No. N crect Q DEC 0 8 1016
GE Mebane Equipment Plant CENTRAL FILES
DWR SECTION
Dear Sir or Madam:
Per our NPDES Stormwater Permit NCG030063, GE Mebane collected the required benchmark samples
from our facility outfalls on November 14, 2016. The following documents are enclosed:
1. Stormwater Discharge Monitoring Report
2. 2nd Copy of Discharge Monitoring Report
3. Lab Results from Sampling (Meritech, Inc.)
4. Qualitative Monitoring Reports (SDOs)- Blue Ridge Geological Services, Inc.
In accordance with our NPDES Stormwater Permit, GE Mebane is notifying the Division of Water Quality
of benchmark value exceedances for copper and zinc. Outfalls 001 - 007 had repeat benchmark
exceedances for copper, and outfalls 001 - 004, 006 had repeat benchmark exceedances for zinc.
We'll continue to conduct monthly sampling.
If you have any questions about this report, please contact me at(919) 563-7224.
Sincerely,
•
Michael A. Roux
Environmental, Health &Safety Manager
Attachments
Appropriate Legal Entity
- Semi-annual Stormwater Dis.iarge Monitoring Report -.
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted !r/Aq/4
CERTIFICATE OF COVERAGE NO. NCCI-03 SAMPLE COLLECTION YEAR AO 16
FACILITY NAME GE -Mebo yu. SAMPLE PERIOD LI Jan-June ❑July-Dec
COUNTY QrgK9e. or ❑X Monthly1 Novtwtber (month)
PERSON COLLECTING SAMPLES ?efr G-e-rloc.k. DISCHARGING TO CLASS EIORW ❑HQW ['Trout ❑PNA
LABORATORY Meri.kcL 1 =Kc. Lab Cert.# ILS ;i ,- ❑Zero-flow ❑Water Supply OSA
Comments on sample collection or analysis: E:CE0 41 ❑Other
Tod wedrri- DEC 08 ul6
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -*
CENTRAL FILES
Part A: Stormwater Benchmarks and Monitoring Results DWR SECTION
❑ No discharge this period?2
Outfall No. Date Sample 24-hour rainfall pH,
Non-Polar O&G/ Total Toxic
Collected' amount, Total Suspended Solids Standard units Copper' Lead Zinc Total Petroleum Organics
(mo/dd/yr) Inches' Hydrocarbons
Benchmarks===> _ - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.033 mg/L 0.067 mg/L 15 mg L 1 mg/L
obT 101//b o.l'{ -S 6.(0 0,00 f a o.0/0 0./53 <,S- --
OOP. 11 18116 0.1y /3 4.7 O .015 <0.010 0. 12.3 4.,5 ---
003 114'016' 0.1'1 3 6.7 0.0 I l < 0.0I0 ' 0. 107 .c 3'
dBY II/Pipe 0.1y <2.s- 4.5" 0.oiI <0.010 0. 10 c5
00C it 101/1‘ 0.l1 <A..r 6.6 p.diy <0.0/0 0.06.5- <5-
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor
manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date:11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012
Page 1 of 3
Serpi-annual Stormwater Dis..miarge Monitoring Report -
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted f//,til/C
CERTIFICATE OF COVERAGE NO. NCGO3 00 ‘ 3 SAMPLE COLLECTION YEAR 8-016
FACILITY NAME G'rE- Mebo ru.. SAMPLE PERIOD ❑Jan-June ❑July-Dec
COUNTY 0rar .,t or ® Monthly) Noyer4 er (month)
PERSON COLLECTING SAMPLES .Tefc GwcrLock DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY Mery-ecll, /inc.. Lab Cert.# 16 s- ❑Zero-flow ❑Water Supply OSA
Comments on sample collection or analysis: ❑Other
-Rain e,vev
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -
Part A: Stormwater Benchmarks and Monitoring Results
n No discharge this period?2
Date Sample 24-hour rainfall pH, Non-Polar O&G/ Total Toxic
Outfall No. Collected1 amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics5
(mo/dd/yr) Inches3 Hydrocarbons
Benchmarks===> _ - 100 mg/L or 50 mg/1.4 6.0—9.0 0.007 mg/L 0.033 mg/L 0.067 mg/L 15 mg/L 1 mg/L
006 rt/ii06 0.Idi 2 7,1 o.oHg <o.ot0 o. "/4' c,s —
007 r1/Nit . 0.14 <Z,.S 1.3 0.01:, <O.O10 0.02.0 < C. .. .........•
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible fora waiver of the rain gauge requirement.
4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor
manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring!
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the Generali
Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics I
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
.. tt
Name (Print name)
Title (P ' title) Ai
(Signa e) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non-detect, ND, or other similar non-numerical
format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
J No discharge this period?2
Outfall No. Date Sample ' 24-hour
rainfall.
Collected) amount, ,Non-polar O&G/TPH by
3 Total Suspended Solids pH
(mo/dd/yr) Inches •.EPA 1664(SGT-HEM)
Benchmarks'===> - , , 15-mg/L 100 mg/L or 50 mg/L* , 6.0-9.0 SU
•
it
Footnotes from Part A also apply to this Part B ,
*See General Permit text,Table 5,identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date:iL/2012-10/31/2017 SWU-245,last revised 10/ 2012
rTh Page 2 of 3
Note: If yot., . port a sample value in excess of the benchmark,you must implei. it Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
® A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
o 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
o TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES g NO❑
REGIONAL OFFICE CONTACT NAME: Mowally "Re e rt" —'bHIci Ce t+rqi Fl t2.5
Mail an original and one copy of this DMR, including all"'No Discharge"reports, within 3D days of receipt of the lab results(or at end of monitoring period
in the case of"No Discharge"reports)to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 276994617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, and complete. I
am awa hat there are sig ificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
2-1---- .
(Signatu a of Permittee) (D te)
II
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3