HomeMy WebLinkAbout20140704 Ver 0_Transfer Certificate Buffalo Branch DWR (Cleveland Sewer) 011817_20170118res
Mitigation Credit Transfer Certificate
Prepared by
EBX-NE USE I, LLC
January 18, 2017
Chandra C. Coats
Director of Utilities
Johnston County Public Utility Department
309 E. Market Street
Smithfield, NC 27577
Buffalo Branch Bank Parcel ID: DWR Project # 2014-0704v2
Riparian Buffer Credits Purchased: 10,068.00 (ftz)
8 digit -AUC — 03020201
Neuse River Basin
Project Name: Cleveland Connector Sewer (DWR Project #11-0608v2)
You have elected to fulfill your permitted buffer mitigation requirements for the Cleveland Connector Sewer
project by paying into the Neuse Riparian Buffer and Nutrient Bank (Buffalo Branch Site).
The Bank has received full payment for buffer mitigation for the above referenced project for a total of 10,068.00
buffer credits. Riparian buffer impacts occurred in the Neuse River Basin. The amount of buffer mitigation
required is specified and verified by DWR in project #11-0608v2 and is 10,068.00 ft2.
You must also comply with any other state, federal or local government permits or authorization associated with
this activity including SL 2009-337, An Act to Promote Compensatory Mitigation Banks. This payment into the
Bank is not transferable. If you have any questions or need additional information, please contact Cara Conder at
919-209-1052 or cconder@res.us.
Sincerely,
ti 1
Cara S. Conder
Credit Sales Coordinator
Resource Environmental Solutions, LLC
cc: DWR - Katie Merritt, Nutrient Offset Bank Coordinator
Johnston County Public Utilities — Kim Rineer and Carolos Bagley
Resource Environmental Solutions, LLC • 302 Jefferson Street, Suite 110 . Raleigh, NC 27605