Loading...
HomeMy WebLinkAbout20150692 Ver 2_Stormwater Approval_20170110Ellis Road Phase 2 STORM WATER IMPACT ANALYSIS Ellis Road Durham, North Carolina Horvath Associates Project Number: 1404 December 9, 2014 Revised March 31, 2015 Revised July 14, 2015 Revised January 26, 2016 r 4 3 70 I r4 alae NCBELS NO. C-0676 Prepared by: Horvath Associates, P.A. Engineers - Planners - Landscape Architects 16 Consultant Place, Suite 201 Durham, North Carolina 27707 ( 919) 490-4990 Table of Contents City of Durham Stormwater Site Plan Checklist Narrative Summary of Results Peak Runoff Calculations Pre -Development Post -Development without Detention Post -Development with Detention Reach Cross Sections BMP Sizing Calculations Nutrient Loading Calculations City of Durham Stream Buffer Determination Required Maps and Information City of Durham Stormwater Site Plan Checklist DURHAM IN 1869 CRY ❑i MEMCIM CITY OF DURHAM —STORMWATER SERVICES SITE PLAN SUBMITTAL CHECKLIST Department of Public Works 101 City Hall Plaza I Durham, NC 27701 919.560.4326 1 F 919.560.4316 Date: 01/26/2016 www.durhamnc.gov Project Name: Ellis Road - Phase 2 Phase: 2 Previous Project Name(s): N/A PIN(s): Contact Person: Matt Jones, PE Company: Planning Case Number: TBD Phone: (919) 490-4990 Horvath Associates, PA Fax: Email Address: matt.jones@horvathassociates.com For each review submittal, including re -submittals, the entire Stormwater Impact Analysis (SIA) and submittal checklist shall be submitted. Partial SIA and checklist will result in notification of an incomplete submittal with no review performed. Contact Stormwater Services regarding redevelopment or expansion projects for modified requirements. The following checklist outlines submittal requirements. Initial in the space provided to indicate the following submittal requirements have been met and supporting documentation is attached. Initials MJ (Check One) F INSIDE F OUTSIDE Watershed Protection Overlay (WPO). Indicate the WPO(s) where the project is located: (Check all that apply) _ F/J-A _ F/J-B _ E-A _ E -B _ M/LR-A _ M/LR-B If inside WPO, notation of WPO Standards is required on plans. MJ (Check all that apply) ✓ Jordan Basin _ Falls Basin _ Lower Neuse Basin MJ A legible copy of the United States Geological Survey 7.5 Minute Quadrangle map is provided, including map reference, with site boundary clearly shown and labeled. The map clearly shows all streams. MJ A legible copy of the published Durham County Soil Survey is provided, including map reference, with the site boundary clearly shown and labeled. The map clearly shows all streams, soil types and soil type boundaries. MJ Tops of banks for the streams are shown on the plan. [Contact the North Carolina Department of Environment and Natural Resources for stream identifications in the Neuse River Basin (Falls and Lower Neuse Basins). Stream determinations in the Jordan Basin shall be submitted per the Letter to Industry found on Stormwater Development Reviews' web site at New Stream Buffer Requirements [First Revision to LTI 07-03-081 (25Auqust2011)l. MJ All Watershed Protection Overlay, Neuse River Basin, Jordan Basin, and City riparian buffers, measured from the tops of the stream banks, are shown on the plan. Page 1 of 6 MJ The 10 -foot no build setback, measured from all riparian buffers, is shown on the plan. MJ Diffuse flow is achieved into riparian buffers. MJ (Check One) Yes IT No Regulated floodplain located on site. MJ A legible copy of the effective Federal Emergency Management Agency National Flood Insurance Program Flood Insurance Rate Map is provided. Map number, map date, and site boundary are clearly shown and labeled. [This map is required regardless of whether floodplain is located on the site.] The effective and/or future FEMA 100 -year floodplain, with base flood elevations (if applicable), are shown on the plan. MJ All applicable notes, per the Standard Notes section of the Reference Guide for Development, have been added to the plan. MJ Stormwater Impact Analysis (SIA) sealed and signed by a registered North Carolina Professional Engineer (NCPE) is provided, including narrative report and drainage calculations. Note: If a site is exempt from stormwater requirements then a narrative advising of the exemption can be submitted by any designer. Initials MJ An introductory narrative describing pre- and post -development site conditions and site improvement changes, is provided. Note: The baseline conditions for the 1 -year event varies based upon the regulatory basin in which the project is located. MJ Drainage area maps (one map for pre -development and one map for post -development) are provided with the following items: MJ Scale and north arrow (Note: Except in the instance of site -to -drainage area maps, the scale of each drainage area map shall not exceed 1" = 30'). MJ Sub -basin area(s) delineated with area(s) in acres indicated. MJ Analysis points clearly identified and labeled. MJ Segmented TR -55 time of concentration flow paths showing and labeling each segment. MJ Methodologies and procedures are fully described. MJ A site plan with contour lines or grading plan identifying pre- and post -development drainage patterns is provided. MJ Pre- and post -development times of concentration, calculated by TR -55 segmented approach, are provided. MJ Calculations for the pre- and post -development peak discharge rates are provided for the 1-, 2-, 10-, and 100 -year, 24-hour storm using TR -55, TR -20, HEC -HMS, HEC -1 or Rational Method as applicable. Note: The Rational Method is not accepted for the 1 -year analysis, areas that drain more than 50 acres, or watersheds that are not homogeneous. Page 2 of 6 MJ A Summary of Results is provided in the following format: Site Analysis Point # Site Condition Storm Event (cfs) 1 -year (cfs) 2 -year (cfs) 10 -year (cfs) 100 -year (cfs) -year (cfs) Pre -Development Post -Development without Detention Post -Development with Detention MJ Conclusions providing detailed findings are provided. MJ Stormwater control measure(s) (SCM[s]) are provided (indicate number of each type of SCM): 3 Level Spreader w/ Vegetative Filter Strip Stormwater Wetland 3 Wet Detention Basin Sand Filter Bioretention Grassed Swale Restored Riparian Buffer Dry Extended Detention Basin Permeable Pavement Green Roof Disconnected Impervious Surface Rainwater Harvesting System Proprietary Systems or Other Not required (provide explanation): N/A The SCM(s) indicated above are required to control the following peak discharge rates: 1 -year 2 -year 10 -year 100 -year Other N/A A downstream analysis in accordance with the Reference Guide for Development is provided with findings, or is Not required (provide explanation): Post -development peak flow < Pre -development for all analysis points Initials N/A The project is exempt based upon cumulative land disturbance as of the applicable baseline date. MJ The proposed project is X >_ 16% impervious (Falls and Jordan Basins) / >_ 24% impervious (Lower Neuse Basin), 85% Total Suspended Solids (TSS) removal is provided for this project, and all the impervious area as reasonably practical is treated by an SCM. OR The proposed project is <16% impervious (Falls and Jordan Basins) / <24% impervious (Lower Neuse Basin), 85% Total Suspended Solids (TSS) removal for all runoff from non -vegetated conveyances is provided for this project, and all the impervious area as reasonably practical is treated by an SCM. N/A The project is low density without non -vegetated conveyances, thus TSS removal is not required. Page 3 of 6 MJ MJ SCMs for TSS removal are provided (indicate number of each type of SCM): Note: Not all of the SCMs listed below provide 85% TSS removal as a stand-alone SCM and must be used in series with other SCMs to achieve the minimum TSS removal of 85%. 3 Level Spreader w/ Vegetative Filter Strip Stormwater Wetland 3 Wet Detention Basin Sand Filter Bioretention Grassed Swale Restored Riparian Buffer Dry Extended Detention Basin Permeable Pavement Green Roof Disconnected Impervious Surface Rainwater Harvesting System Proprietary Systems or Other Not required (provide explanation): Both hard copies, and Excel -format electronic copies on a DVD or compact disc, of the following: • Pre- and post -development nutrient calculations using the Jordan/Falls Lake Stormwater Nutrient Load Accounting Tool found at : http://Portal.ncdenr.org/web/mordanlake/implementation-guidance-archive or http://durhamnc.gov/ich/op/pwd/storm/Pages/SWDevReview.aspx Note: Nutrient calculations are always required regardless if the project is exempt from treatment requirements. • The Nutrient Reporting Form (including the Compliance Worksheet tab) per the 3/7/2013 Letter to Industry http://durhamnc.gov/ich/op/pwd/storm/Pages/LTI-SWDevReview.aspx MJ Pre- and post -development land use area maps that correspond to the categories used in the Jordan/Falls Lake Stormwater Nutrient Load Accounting Tool for the nutrient calculations, to scale no smaller than 1 inch = 100 feet. The maps shall show the map scale, north arrow, and are to have the different land uses either hatched or shaded with areas indicated in a legend on the maps. Note: The land use area maps are always required regardless if the project is exempt from treatment requirements. Page 4 of 6 MJ SCMs for nutrient control are provided (indicate number of each type of SCM): 3 Level Spreader w/ Vegetative Filter Strip Stormwater Wetland 3 Wet Detention Basin Sand Filter Bioretention Grassed Swale Restored Riparian Buffer Dry Extended Detention Basin Permeable Pavement Green Roof Disconnected Impervious Surface Rainwater Harvesting System Proprietary Systems or Other Not required (provide explanation): MJ After meeting the minimum on-site treatment requirements, additional treatment and/or offsite credit purchases, if needed, is provided by: Additional SCMs Nutrient Offset Payment to the North Carolina Ecosystem Enhancement Program X Nutrient Offset Payment to an Approved Nutrient Bank Land Bank Credit Transfer (Commitments shall be made prior to October 1, 2015) MJ The project site is located in an area subject to a state -approved Total Maximum Daily Load (TMDL) for bacteria. (As of April 2014, only Northeast Creek has a TMDL for bacteria). MJ SCMs rated as medium or high for bacterial removal are provided (indicate number of each type of SCM): Bioretention Area Stormwater Wetlands 3 Wet Detention Basin Sand Filter 3 Level Spreader w/ Vegetative Filter Strip Restored Riparian Buffer Dry Extended Detention Basin Permeable Pavement Other (specify) Not required (provide explanation): Page 5 of 6 Initials N/A 85% Total Suspended Solids (TSS) removal is required for this project, and 100% of the impervious area will be treated by an SCM. Note: Not all of the SCMs listed below provide 85% TSS removal as a stand-alone SCM and must be used in series with other SCMs to achieve the minimum TSS removal of 85%. N/A SCM for TSS removal are provided (indicate number of each type of SCM): ,Level Spreader w/ Vegetative Filter Strip Stormwater Wetland Wet Detention Basin Sand Filter Bioretention Grassed Swale .Restored Riparian Buffer Dry Extended Detention Basin Permeable Pavement Rooftop Runoff Management Disconnected Impervious Surface Rainwater Harvesting System Proprietary Systems or Other Not required (provide explanation): Page 6 of 6 Narrative Ellis Road Phase 2 STORM WATER IMPACT ANALYSIS 3/31/2015 Revisions • The SIA was updated to reflect changes to the plans based on comments from the City of Durham. • Exhibits were added showing how the reach geometry was established for the peak runoff analysis. 7/14/2015 Revisions • The SIA was updated to reflect changes in the geometry of the collector road 1/26/2016 Revisions • The SIA was revised to reflect changes in the townhome area layout and the removal of a cu -de -sac near the northeast corner of the site. General Description Ellis Road Phase 2 is a proposed residential community located north of Ellis Road and east of the Durham Freeway. In the pre -development condition the site cover is mostly a mixture of wooded and open space with some impervious from roofs, driveways, and streets. The proposed development will consist of 215 single family lots as well as 125 townhome units. The site is located in the Jordan stormwater regulatory basin and is not in a watershed protection district. Water Quality Per section, 70-739 of the City of Durham Stormwater Ordinance the project is located in the Jordan Basin, is part of a Common plan of development, and disturbs more than 1 acre; therefore, the project is subject to the requirements for stormwater pollutants found in sections 70-740 and 70-741 of the City of Durham Stormwater Ordinance. Required Reductions for Nutrients Sec. 70-740. Required reductions for nutrients and TSS; alternatives; calculations. Nutrient loading rate limits. Development not exempt under subsection 70-739 shall construct and implement SCMs so as to limit the post construction loading rate of nitrogen and phosphorus from the project area to the limits set forth in Table 2 below, or shall comply with an allowed alternative as set forth in subsections (b) through (d) below. A portion of the reduction requirements for nitrogen and phosphorus may be met through off site measures or payments as set forth in section 70-741. Table 2 Nutrient Export Loading Rate Limits Project Location Export Limit lbs/acre/year Nitrogen Phosphorus Jordan Basin 2.2 0.82 Falls Basin 2.2 0.33 Lower Neuse Basin 3.6 not required The project will utilize BMP's to provide on-site nitrogen and phosphorous reduction. Any remaining loading above the required nitrogen and phosphorous targets for the Jordan Basin of 2.2 lbs/ac/yr and 0.82 lbs/ac/yr respectively will be reduced by making offset payments as required by NC state regulations. The boundary for the "Total Development Area" utilized in the nutrient export calculations includes the property boundary of all parcels included in the development, as well as offsite areas that drain to the onsite BMP's, per the instructions for the "Jordan/Falls Lake Stormwater Nutrient Load Accounting Tool." On-site Treatment Requirements Sec. 70-741. On-site treatment requirements; offsite purchase and credit options; bacteria control. (a) On site nutrient treatment requirements. Nitrogen and phosphorus reduction requirements may be met, in part, through offsite management measures or the purchase of nutrient credits. At a minimum, however, in the Jordan and Falls Basins a percentage of the required nitrogen and phosphorus reductions must be achieved through onsite treatment, in the amount shown in Table 4 below. In addition to meeting the percentage reductions below, in the Jordan and Lower Neuse Basins, nitrogen export loading rates from the site must not exceed six pounds per acre per year for limited residential, and ten pounds per acre per year for multifamily and other (Note: offsite credit purchases do not meet TSS removal requirements which must be met onsite). Project Location Jordan - General Falls - General Falls and Jordan within Downtown Area Falls and Jordan exceeding thresholds but with less than 1 acre land disturbance Table 4 Onsite Nutrient Treatment Requirements Minimum Onsite Nutrient Treatment Nitrogen I Phosphorus *40% of required reduction *50% of required reduction *30% of required reduction *30% of required reduction *40% of required reduction *50% of required reduction *30% of required reduction *30% of required reduction No Percentage reductions No Percentage reductions Lower Neuse apply, but the 6/10 apply, but the 6/10 nitrogen nitrogen export limit export limit described in described in paragraph (a) paragraph (a) above must be above must be met met The "required reduction" is the difference between the post development loading in pounds per acre per year multiplied by the site area in acres before treatment minus the loading target, in pounds per acre per year multiplied by the acres. The percentage shown in the chart above is applied to that difference and the resulting number is the amount in pounds/year of nutrient reduction that must be achieved onsite. (b)Offset payments to state approved nutrient mitigation banks. Development and redevelopment shall have the option of purchasing nutrient credits from state -approved nutrient banks to partially offset nitrogen and/or phosphorus loads as allowed by state law and regulation, including but not limited to 15A NCAC 02B.0235, 15A NCAC 02B.0282, and 15A NCAC 02B.0240, as they may be amended from time to time. In the Jordan Basin, calculation of credits required shall reflect state approved delivery factors. The number of pounds for which credits are purchased shall be increased by five percent if the nutrient bank is not located in the city. The following additional requirements shall apply: (])Location of nutrient banks. Development in the Falls Basin must use nutrient banks located in the upper Falls portion of the Falls Basin—the portion that is north and/or west of Highway 50. Development in the Jordan Basin must use nutrient banks located in the Upper New Hope arm of such basin, as defined in state regulations. (2) Certification of nutrient bank provider. Offset credits may only be obtained from nutrient banks certified by the state. (3)Utilization of NC Ecosystem Enhancement Program. Credits may also be obtained from the NC Ecosystem Enhancement Program if such credits are available, and if applicable state requirements regarding utilization of private nutrient banks are first met. (4)Certification of credits. Credits purchased pursuant to this subsection (b) shall be verified by the state and proof of such verification that meets city requirements shall be presented prior to approval of a final plat, or if no plat is required, prior to issuance of the first building permit within the project, or such earlier deadline as may be required by city stormwater standards. The project is located in the Jordan Basin; therefore, 40% of the required nitrogen and phosphorous reduction must be provided onsite. BMP's will be installed to achieve the required reduction. Any remaining nitrogen and phosphorus reduction required will be provided by purchasing offsets from a nutrient bank, such that the total post- development nitrogen and phosphorous loading from the site does not exceed 2.2 lbs/ac/yr and 0.82 lbs/ac/y respectively. Bacteria Control Sec. 70-741. On-site treatment requirements; offsite purchase and credit options; bacteria control. (d)Bacteria removal; control of other identified stormwater pollutants. All development which constructs stormwater control measures in order to comply with this article and which is located in an area that is subject to a state approved total maximum daily load for bacteria shall be required to have at least one SCM for each stormwater discharge that is rated as medium or high for its ability to remove bacteria from stormwater. Ratings shall be those that appear in the most recent version of the NCDENR Stormwater SCM manual or as determined or approved by the director. In addition, SCMs required to be constructed under this article must also treat any other pollutant for which a total maximum daily load has been identified for the area within which the SCM is located. This project is located within the Northeast Creek watershed which has a TMDL for Fecal Coliform. At least one BMP will be provided at each stormwater outfall which is rated medium or high for fecal removal ability. TSS Reduction Sec. 70-740. Required reductions for nutrients and TSS; alternatives; calculations (e)TSS reduction. When the impervious percentage of a development that increases impervious area equals or exceeds 16 percent in the Falls or Jordan Basins, or 24 percent in the Lower Neuse Basin, TSS removal is required as further described in this subsection (e). All impervious surfaces, as reasonably practical, must drain to an SCM that is designed to provide a minimum of 85 percent TSS removal and is sized to capture runoff from the first one inch of rainfall from all surfaces that drain to the SCM. These requirements are expanded, and/or modified as follows: (] )Piped areas in low density projects. Projects that do not require construction of SCMs because their impervious percentage is less than that described in the paragraph above must treat TSS from stormwater runoff that is conveyed in non- vegetated conveyances, such as stormwater pipes, but excluding road and driveway crossings. (2)Overtreatment to address untreatable areas. Where treatment for TSS is not reasonably practicable, as determined by the department, such as when impervious areas include offsite transportation improvements or small noncontiguous areas at the edge of a project, additional reductions of TSS may be required in treatable areas, such as overtreatment in other project areas or treatment of offsite runon. (f)Calculations for nutrient loading and TSS removal. Pollutant loading calculations shall be made using city stormwater standards. All increases in impervious surfaces shall be included, including but not limited internal and off site transportation improvements. Approved methodologies for calculating pollutant loading shall be maintained in writing by the public works department, and shall include those methodologies and calculations required to be used by the division of water quality or DWQ-approved alternate methodologies. (g)Submittals. An applicant shall submit pollutant loading calculations for the pre- and post -development conditions as part of its application for approval of a subdivision or site plan, utility permit, or construction drawings for a street or utility. This project is subject to TSS removal requirements. 85% TSS removal will be provided for all on-site impervious surfaces. Overtreatment in the on-site BMP's will be provided to address any untreatable areas such as noncontiguous areas at the edge of the project. Peak Flow Control Sec. 70-738. Peak runoff control requirements. (a)Purpose. The purpose of this section is to ensure that the increases in volume, velocity, and peak flow of stormwater discharges from development are addressed, in order to mitigate the impacts on downstream properties and receiving waters. All development, including development that may be exempt from pollutant reduction requirements set forth in remaining sections of this article, is subject to the requirements of this section unless exempted in subsection (b) below. (b)Applicability, calculation of prior impervious area. This section 70-738 applies to the following development, assessed in comparison to pre -development prior impervious conditions as defined in subsections (1) and (2) below: (i) relocation of existing impervious area on a multifamily and other lot; (ii) increase in impervious area on any lot subject to limitations on impervious area in an approved plat or plan for reasons such as watershed protection or stormwater control measure requirements; (iii) increase of more than 200 square feet in impervious area on a multifamily and other lot; (iv) increase of more than 2,000 square feet of impervious area on a limited residential lot. For purposes of calculating these thresholds, subject development that is part of a common plan of development shall be assessed with other portions of such common plan that have not previously complied with peak flow requirements. (] )For purposes of applying peak flow requirements for the two- and ten-year storms, the land cover (including type and location) existing as of April 23, 1997 shall be considered the "pre -development conditions"; (2)For purposes of applying the peak flow requirement for the one-year storm, the land cover (including type and location) that existed as of March 9, 2001 for land in the Falls Basin and Lower Neuse Basin, and as of March 17, 2009 for land in the Jordan Basin shall be considered the "pre -development conditions'; (c) Requirements. (1)Stormwater impact analysis. Development that is not exempt under subsection (b) above shall submit a stormwater impact analysis or approved alternative to such analysis that complies with city stormwater standards as part of the application for site plan or subdivision plat approval, or if such is not required, as part of submittals for construction drawings or utility permit approval. Calculations shall be made in conformance with city stormwater standards. No subdivision plats, site plans, utility permits, or construction drawings shall be approved in the absence of a determination by the stormwater division that required submissions have been made and approved. (2)One-year storm. Development that increases the peak runoff rate from the one- year storm from pre -development conditions shall provide stormwater management facilities in accordance with city stormwater standards such that there is no net increase in peak runoff rate. (3)Two- and ten-year storms. Development that increases the peak runoff rate from either the two-year or the ten-year storm from predevelopment conditions may be required to provide stormwater management facilities to address the impact, as determined in accordance with city stormwater standards. (4)Other design storms. Development that increases the peak runoff from other design storms such as the 100 -year storm may be required to install stormwater management facilities to address the impact, as determined in accordance with city stormwater standards. Runoff Analysis An analysis was performed for 4 points (DP# 1, DP#2, DP#3, and DP#4) where concentrated runoff leaves the property. A fifth location where concentrated runoff leaves the property, DP#5, was not analyzed because the channel it discharges to re- enters the property approximately 350' downstream of the discharge point and there are no structures near the channel; furthermore, the majority of the contributing drainage area that discharges to this point in pre -development is redirected to a BMP in post -development. The post -development runoff analysis without detention demonstrates that there will be a decrease in peak flow at all analysis points when compared to pre -development for the 1-, 2-, and 10 -year rainfall events, as described in further detail below. The main analysis point for the site, DP# 1, is located where Northeast Creek crosses the western project boundary near the Durham Freeway. The overall drainage area to DP# 1 in pre -development is approximately 525 acres and the watershed is elongated, resulting in a time of concentration at the analysis point of approximately 45 minutes. All the development associated with the project is proposed at the bottom of the watershed, with the concentrated discharge points being close to the analysis point. In the post -development condition the time of concentration will be much shorter for the developed areas than the overall watershed. The result of this is that the peak runoff rate from the developed areas occurs before the main peak runoff rate from the overall watershed. This serves to reduce the peak flow rate at the analysis point in the post -development condition when compared to pre -development for the 1-, 2-, and 10 -year rainfall events; therefore, no peak flow detention is required for DP# 1. It is noted that an analysis will be required at the construction drawing submittal that demonstrates that the post -development peak flow rate, factoring in any lag effect resulting from the proposed BMP's, remains below the pre -development rate at the analysis point for the 1-, 2-, and 10 -year rainfall events. An analysis, based on preliminary BMP sizing calculations, for the post -development condition with detention accounted for has been provided with this report. Two reaches were utilized in the analysis to route flows through a drainage area. Reach 1 conveys runoff from DP# 1 A through the watershed that drains to the main analysis point, DP# 1. Reach 2 conveys runoff from the culvert under the railroad east of the project through the watershed that drains to DP# 1. The reach geometry was established using a mixture of field surveyed topo of the stream channel and city of Durham topo. The channel cross sections were cut across surveyed topo at locations that provided a good representation of the channel geometry throughout the reach. City of Durham topo was utilized to establish slopes that represented the average floodplain geometry throughout each reach. The slope of the reach was calculated utilizing the total length of the reach and the inverts of the channel at each end. Two other analysis points, DP#2 and DP#3, are located along the right of way on the western boundary. A fourth analysis point, DP#4, is located off of the property, near the intersection of Ellis Road and the Durham Freeway, but has been included because the collector road that feeds the site runs through its drainage boundary. The analysis demonstrates that the peak runoff at each of these points of interest is less in the post - development condition than in pre -development. Diffuse Flow Diffuse flow of runoff by dispersing concentrated flow prior to its entry into stream buffers is required pursuant to 15A NCAC 02B .0267 "Jordan Water Supply Nutrient Strategy: Protection of Existing Riparian Buffers" section 8. Diffuse flow will be maintained into all buffers onsite except where deemed "Allowable" by the "Table of Uses" found in Section 9. All stormwater outfalls will receive peak flow and nutrient reduction prior to entering the stream buffer. Runoff from BMP's that does not flow over an engineered filter strip will be directed to an existing channel, or the flow will be reduced to non- erosive velocity before entering the buffer. Conclusion The project is located in the Jordan Basin; therefore, 40% of the required nitrogen and phosphorous reduction must be provided onsite. BMP's will be installed to achieve the required reduction. Any remaining nitrogen and phosphorus reduction required will be provided by purchasing offsets from a nutrient bank, such that the total post - development nitrogen and phosphorous loading from the site does not exceed 2.2 lbs/ac/yr and 0.82 lbs/ac/y respectively. This project is located within the Northeast Creek watershed, which has a TMDL for Fecal Coliform. At least one BMP will be provided at each stormwater outfall which is rated medium or high for fecal removal ability. This project is subject to TSS removal requirements. 85% TSS removal will be provided for all on-site impervious surfaces. Overtreatment in the on-site BMP's will be provided to address any untreatable areas such as noncontiguous areas at the edge of the project. A runoff analysis was performed for the project and demonstrates that the peak flow at each point where concentrated runoff crosses the property line will not increase in the post -development condition as compared to pre -development. No peak flow detention is required in association with this project; however, an analysis will be provided at the construction drawing submittal that demonstrates that the post - development peak flow rate, factoring in any lag effect resulting from the proposed BMP's, remains below the pre -development rate at the analysis point for the 1-, 2-, and 10 -year rainfall events. Summary of Results 1404 SIA - SUMMARY OF RESULTS.xls Summary of Results Matt Jones, PE 1/24/2016 1404 - Ellis Road Phase 2 Runoff Analysis - Summary of Results Site Analyis Point - DP#1 Site Analyis Point - DP#2 Storm Event Site Condition 1 -year (cfs) 2 -year (cfs) 10 -year (cfs) 100 -year (cfs) Pre -Development 405.01 546.90 1054.67 1821.56 Post -Development without Detention 380.90 509.38 962.10 1643.34 Post -Development with Detention 400.01 543.01 1039.72 1787.75 Site Analyis Point - DP#2 Site Analyis Point - DP#3 Storm Event 1 -year (cfs) 2 -year (cfs) 10 -year (cfs) 100 -year (cfs) Site Condition Pre -Development 9.60 14.05 30.37 56.77 Post -Development 2.25 3.32 7.31 13.80 without Detention 4.32 6.85 16.79 33.67 Post -Development N/A N/A N/A N/A with Detention N/A N/A N/A N/A Site Analyis Point - DP#3 Site Analyis Point - DP#4 Storm Event Site Condition 1 -year (cfs) 2 -year (cfs) 10 -year (cfs) 100 -year (cfs) Pre -Development 12.05 19.66 49.34 100.00 Post -Development 15.13 20.12 37.20 62.96 without Detention 4.32 6.85 16.79 33.67 Post -Development N/A N/A N/A N/A with Detention N/A N/A N/A N/A with Detention Site Analyis Point - DP#4 Storm Event 1 -year (cfs) 2 -year (cfs) 10 -year (cfs) 100 -year (cfs) Site Condition Pre -Development 16.24 21.79 40.96 70.09 Post -Development 15.13 20.12 37.20 62.96 without Detention Post -Development N/A N/A N/A N/A with Detention 1404 SIA - SUMMARY OF RESULTS.xIs Total Site TSS Removal 1404 - Ellis Road Phase 2 Water Quality - Summary of Results 85% TSS Removal from Impervious Surface Summary Matt Jones, PE 1/24/2016 Overtreatment provided by BMP's in series provides 86% TSS removal for total site impervious area. Primary BMP TSS BMP in Series TSS TSS Remaining TSS Remaining Total TSS Impervious Area Removal Removal after BMP in after Primary BMP Removal Efficiency Efficiency Series (1 sf = 1 Unit TSS) WQ#1 708272 85% 106241 40% 63744 91% WQ#2 404728 85% 60709 40% 36426 91% W#3 54003 85% 8100 0% 8100 85% WQ#4 329744 85% 49462 40% 29677 91% Untreated Area 74532 0% 74532 0% 74532 0% Total Site 1571279 212479 86% Overtreatment provided by BMP's in series provides 86% TSS removal for total site impervious area. Peak Runoff Calculations Pre -Development Post -Development without Detention Post -Development with Detention Reach Cross Sections TO DP#3 4S (3S 2S TO DP#2 TO DP#1 /TO DP#1A 2L Q� DP#1 TO DP#4 Subcat Reach on Link 1R Q� 2R Reach 1 Reach 2 TO RR Culvert Pre -Development 1404 -Phase 2 -SIA -Pre -Development Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here) Page 2 HvdroCAD® 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Time span=0.00-25.00 hrs, dt=0.05 hrs, 501 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: TO RR Culvert RunoffArea=216.200 ac Runoff Depth>1.31" Flow Length=4,444' Tc=36.9 min CN=81 Runoff=209.45 cfs 23.657 of Subcatchment 2S: TO DP#1A Runoff Area=261.580 ac Runoff Depth>1.13" Flow Length=3,477' Tc=27.2 min CN=78 Runoff=262.00 cfs 24.606 of Subcatchment 3S: TO DP#1 Runoff Area=45.680 ac Runoff Depth>0.81" Flow Length=2,581' Tc=20.7 min CN=72 Runoff=36.28 cfs 3.076 of Subcatchment 4S: TO DP#2 Runoff Area=11.490 ac Runoff Depth=0.76" Flow Length=1,334' Tc=16.8 min CN=71 Runoff=9.60 cfs 0.728 of Subcatchment 5S: TO DP#3 Runoff Area=19.990 ac Runoff Depth=0.51" Flow Length=1,582' Tc=11.0 min CN=65 Runoff=12.05 cfs 0.843 of Subcatchment 6S: TO DP#4 Runoff Area=11.030 ac Runoff Depth=1.13" Flow Length=824' Tc=14.0 min CN=78 Runoff=16.24 cfs 1.038 of Reach 1R: Reach 1 Peak Depth=5.80' Max Vel=6.0 fps Inflow=400.41 cfs 48.235 of n=0.040 L=1,453.0' S=0.0069'/' Capacity= 12,151.76 cfs Outflow=389.83 cfs 48.166 of Reach 2R: Reach 2 Peak Depth=2.71' Max Vel=5.3 fps Inflow=209.45 cfs 23.657 of n=0.040 L=1,330.0' S=0.0075'/' Capacity=2,846.17 cfs Outflow=202.98 cfs 23.629 of Link 2L: DP#1 Inflow=405.01 cfs 51.243 of Primary=405.01 cfs 51.243 of Total Runoff Area = 565.970 ac Runoff Volume = 53.948 of Average Runoff Depth = 1.14" Pre -Development 1404_Phase 2 -SIA -Pre -Development Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 3 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Subcatchment 1S: TO RR Culvert Runoff = 209.45 cfs @ 12.34 hrs, Volume= 23.657 af, Depth> 1.31" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 28.720 98 Impervious 8.490 70 Woods, Good, HSG C 76.200 77 Woods, Good, HSG D 2.420 74 >75% Grass cover, Good, HSG C 100.370 80 >75% Grass cover, Good, HSG D 216.200 81 Weighted Average Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 14.5 75 0.0267 0.1 77 Sheet Flow, 1.440 61 >75% Grass cover, Good, HSG B 3.960 74 Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 259 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.8 2,068 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 12.3 2,042 0.0070 2.8 27.68 Channel Flow, D=2'; B=3'; SS=2:1 Area= 10.0 sf Perim= 11.9' r= 0.84' n= 0.040 36.9 4,444 Total Subcatchment 2S: TO DP#1A Runoff = 262.00 cfs @ 12.22 hrs, Volume= 24.606 af, Depth> 1.13" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Descriation 6.640 98 Impervious 7.170 55 Woods, Good, HSG B 0.040 70 Woods, Good, HSG C 144.080 77 Woods, Good, HSG D 1.440 61 >75% Grass cover, Good, HSG B 3.960 74 >75% Grass cover, Good, HSG C 98.250 80 >75% Grass cover, Good, HSG D 261.580 78 Weighted Average Pre -Development 1404 -Phase 2 -SIA -Pre -Development Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here) Page 4 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 7.3 1,332 0.0360 3.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.9 2,070 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 27.2 3,477 Total Subcatchment 3S: TO DP#1 Runoff = 36.28 cfs @ 12.16 hrs, Volume= 3.076 af, Depth> 0.81" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN D 0.440 98 Impervious 8.470 55 Woods, Good, HSG B 24.630 77 Woods, Good, HSG D 4.240 61 >75% Grass cover, Good, HSG B 7.900 80 >75% Grass cover, Good, HSG D 45.680 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 1,200 0.0620 4.0 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 1,306 0.0069 6.6 767.89 Channel Flow, Reach 1 Properties Area= 116.6 sf Perim= 37.4' r= 3.12' n= 0.040 20.7 2,581 Total Subcatchment 4S: TO DP#2 Runoff = 9.60 cfs @ 12.11 hrs, Volume= 0.728 af, Depth= 0.76" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.430 98 Impervious 0.450 55 Woods, Good, HSG B 1.610 77 Woods, Good, HSG D 5.260 61 >75% Grass cover, Good, HSG B 3.740 80 >75% Grass cover, Good, HSG D 11.490 71 Weighted Average Pre -Development 1404_Phase 2 -SIA -Pre -Development Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 5 HvdroCAD® 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, 0.0670 0.3 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 5.8 1,259 0.0510 3.6 Shallow Concentrated Flow, 3.7 749 0.0440 Unpaved Kv= 16.1 fps 16.8 1,334 Total Subcatchment 5S: TO DP#3 Runoff = 12.05 cfs @ 12.05 hrs, Volume= 0.843 af, Depth= 0.51" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.970 98 Impervious 4.310 55 Woods, Good, HSG B 0.690 77 Woods, Good, HSG D 11.390 61 >75% Grass cover, Good, HSG B 2.630 80 >75% Grass cover, Good, HSG D 19.990 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.6 75 0.0670 0.3 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 749 0.0440 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.7 758 0.0310 4.7 18.93 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 11.0 1,582 Total Subcatchment 6S: TO DP#4 Runoff = 16.24 cfs @ 12.07 hrs, Volume= 1.038 af, Depth= 1.13" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.480 98 Impervious 9.270 77 Woods, Good, HSG D 1.280 80 >75% Grass cover, Good, HSG D 11.030 78 Weighted Average Pre -Development 1404 -Phase 2 -SIA -Pre -Development Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here) Page 6 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, 0.90 5.0 9.1 7,265 Woods: Light underbrush n= 0.400 P2= 3.50" 1.4 366 0.0770 4.5 Shallow Concentrated Flow, 4.90 45.2 18.9 65,676 Unpaved Kv= 16.1 fps 1.6 383 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 18.20 1,169.2 188.8 1,698,848 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 14.0 824 Total Reach 1 R: Reach 1 Inflow Area = 477.780 ac, Inflow Depth > 1.21" for 1 -Year event Inflow = 400.41 cfs @ 12.32 hrs, Volume= 48.235 of Outflow = 389.83 cfs @ 12.45 hrs, Volume= 48.166 af, Atten= 3%, Lag= 7.8 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 6.0 fps, Min. Travel Time= 4.0 min Avg. Velocity = 3.1 fps, Avg. Travel Time= 7.9 min Peak Depth= 5.80'@ 12.38 hrs Capacity at bank full= 12,151.76 cfs Inlet Invert= 316.00', Outlet Invert= 306.00' Custom cross-section table, n= 0.040 Length= 1,453.0' Slope= 0.0069T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.90 5.0 9.1 7,265 10.34 4.10 35.7 15.9 51,872 188.66 4.90 45.2 18.9 65,676 249.12 8.20 116.6 37.4 169,420 766.91 18.20 1,169.2 188.8 1,698,848 12,151.76 Reach 2R: Reach 2 Inflow Area = 216.200 ac, Inflow Depth > 1.31" for 1 -Year event Inflow = 209.45 cfs @ 12.34 hrs, Volume= 23.657 of Outflow = 202.98 cfs @ 12.47 hrs, Volume= 23.629 af, Atten= 3%, Lag= 7.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 5.3 fps, Min. Travel Time= 4.2 min Avg. Velocity = 2.5 fps, Avg. Travel Time= 9.0 min 1404—Phase 2—SIA—Pre-Development Prepared by {enter your company name here) HvdroCAD® 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LL Peak Depth= 2.71'@ 12.40 hrs Capacity at bank full= 2,846.17 cfs Inlet Invert= 338.00', Outlet Invert= 328.00' Custom cross-section table, n= 0.040 Length= 1,330.0' Slope= 0.0075T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.70 3.1 7.9 4,123 5.35 2.50 19.6 12.8 26,068 83.88 7.40 457.0 170.0 607,810 2,846.17 Link 2L: DP#1 Pre -Development Type 1124 -hr 1 -Year Rainfall=3.00" Page 7 C 12/8/2014 Inflow Area = 523.460 ac, Inflow Depth > 1.17" for 1 -Year event Inflow = 405.01 cfs @ 12.44 hrs, Volume= 51.243 of Primary = 405.01 cfs @ 12.44 hrs, Volume= 51.243 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Pre -Development 1404 -Phase 2 -SIA -Pre -Development Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here) Page 8 HvdroCAD® 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Time span=0.00-25.00 hrs, dt=0.05 hrs, 501 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: TO RR Culvert RunoffArea=216.200 ac Runoff Depth>1.71" Flow Length=4,444' Tc=36.9 min CN=81 Runoff=275.73 cfs 30.774 of Subcatchment 2S: TO DP#1A Runoff Area=261.580 ac Runoff Depth>1.50" Flow Length=3,477' Tc=27.2 min CN=78 Runoff=354.01 cfs 32.639 of Subcatchment 3S: TO DP#1 Runoff Area=45.680 ac Runoff Depth>1.12" Flow Length=2,581' Tc=20.7 min CN=72 Runoff=52.48 cfs 4.267 of Subcatchment 4S: TO DP#2 Runoff Area=11.490 ac Runoff Depth=1.06" Flow Length=1,334' Tc=16.8 min CN=71 Runoff=14.05 cfs 1.019 of Subcatchment 5S: TO DP#3 Runoff Area=19.990 ac Runoff Depth=0.75" Flow Length= 1,582' Tc=11.0 min CN=65 Runoff=19.66 cfs 1.253 of Subcatchment 6S: TO DP#4 Runoff Area=11.030 ac Runoff Depth=1.50" Flow Length=824' Tc=14.0 min CN=78 Runoff=21.79 cfs 1.376 of Reach 1R: Reach 1 Peak Depth=6.67' Max Vel=6.3 fps Inflow=538.32 cfs 63.379 of n=0.040 L=1,453.0' S=0.0069'/' Capacity=12,151.76 cfs Outflow=524.31 cfs 63.301 of Reach 2R: Reach 2 Peak Depth=2.83' Max Vel=5.5 fps Inflow=275.73 cfs 30.774 of n=0.040 L=1,330.0' S=0.0075'/' Capacity=2,846.17 cfs Outflow=267.35 cfs 30.740 of Link 2L: DP#1 Inflow=546.90 cfs 67.568 of Primary=546.90 cfs 67.568 of Total Runoff Area = 565.970 ac Runoff Volume = 71.327 of Average Runoff Depth = 1.51" Pre -Development 1404_Phase 2 -SIA -Pre -Development Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 9 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Subcatchment 1S: TO RR Culvert Runoff = 275.73 cfs @ 12.34 hrs, Volume= 30.774 af, Depth> 1.71" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 28.720 98 Impervious 8.490 70 Woods, Good, HSG C 76.200 77 Woods, Good, HSG D 2.420 74 >75% Grass cover, Good, HSG C 100.370 80 >75% Grass cover, Good, HSG D 216.200 81 Weighted Average Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 14.5 75 0.0267 0.1 77 Sheet Flow, 1.440 61 >75% Grass cover, Good, HSG B 3.960 74 Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 259 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.8 2,068 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 12.3 2,042 0.0070 2.8 27.68 Channel Flow, D=2'; B=3'; SS=2:1 Area= 10.0 sf Perim= 11.9' r= 0.84' n= 0.040 36.9 4,444 Total Subcatchment 2S: TO DP#1A Runoff = 354.01 cfs @ 12.22 hrs, Volume= 32.639 af, Depth> 1.50" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Descriation 6.640 98 Impervious 7.170 55 Woods, Good, HSG B 0.040 70 Woods, Good, HSG C 144.080 77 Woods, Good, HSG D 1.440 61 >75% Grass cover, Good, HSG B 3.960 74 >75% Grass cover, Good, HSG C 98.250 80 >75% Grass cover, Good, HSG D 261.580 78 Weighted Average Pre -Development 1404 -Phase 2 -SIA -Pre -Development Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here) Page 10 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 7.3 1,332 0.0360 3.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.9 2,070 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 27.2 3,477 Total Subcatchment 3S: TO DP#1 Runoff = 52.48 cfs @ 12.15 hrs, Volume= 4.267 af, Depth> 1.12" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN D 0.440 98 Impervious 8.470 55 Woods, Good, HSG B 24.630 77 Woods, Good, HSG D 4.240 61 >75% Grass cover, Good, HSG B 7.900 80 >75% Grass cover, Good, HSG D 45.680 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 1,200 0.0620 4.0 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 1,306 0.0069 6.6 767.89 Channel Flow, Reach 1 Properties Area= 116.6 sf Perim= 37.4' r= 3.12' n= 0.040 20.7 2,581 Total Subcatchment 4S: TO DP#2 Runoff = 14.05 cfs @ 12.11 hrs, Volume= 1.019 af, Depth= 1.06" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 0.430 98 Impervious 0.450 55 Woods, Good, HSG B 1.610 77 Woods, Good, HSG D 5.260 61 >75% Grass cover, Good, HSG B 3.740 80 >75% Grass cover, Good, HSG D 11.490 71 Weighted Average Pre -Development 1404_Phase 2 -SIA -Pre -Development Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 11 HvdroCAD® 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, 0.0670 0.3 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 5.8 1,259 0.0510 3.6 Shallow Concentrated Flow, 3.7 749 0.0440 Unpaved Kv= 16.1 fps 16.8 1,334 Total Subcatchment 5S: TO DP#3 Runoff = 19.66 cfs @ 12.05 hrs, Volume= 1.253 af, Depth= 0.75" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 0.970 98 Impervious 4.310 55 Woods, Good, HSG B 0.690 77 Woods, Good, HSG D 11.390 61 >75% Grass cover, Good, HSG B 2.630 80 >75% Grass cover, Good, HSG D 19.990 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.6 75 0.0670 0.3 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 749 0.0440 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.7 758 0.0310 4.7 18.93 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 11.0 1,582 Total Subcatchment 6S: TO DP#4 Runoff = 21.79 cfs @ 12.06 hrs, Volume= 1.376 af, Depth= 1.50" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 0.480 98 Impervious 9.270 77 Woods, Good, HSG D 1.280 80 >75% Grass cover, Good, HSG D 11.030 78 Weighted Average Pre -Development 1404 -Phase 2 -SIA -Pre -Development Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here) Page 12 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, 0.90 5.0 9.1 7,265 Woods: Light underbrush n= 0.400 P2= 3.50" 1.4 366 0.0770 4.5 Shallow Concentrated Flow, 4.90 45.2 18.9 65,676 Unpaved Kv= 16.1 fps 1.6 383 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 18.20 1,169.2 188.8 1,698,848 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 14.0 824 Total Reach 1 R: Reach 1 Inflow Area = 477.780 ac, Inflow Depth > 1.59" for 2 -Year event Inflow = 538.32 cfs @ 12.31 hrs, Volume= 63.379 of Outflow = 524.31 cfs @ 12.43 hrs, Volume= 63.301 af, Atten= 3%, Lag= 7.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 6.3 fps, Min. Travel Time= 3.8 min Avg. Velocity = 3.3 fps, Avg. Travel Time= 7.4 min Peak Depth= 6.67'@ 12.37 hrs Capacity at bank full= 12,151.76 cfs Inlet Invert= 316.00', Outlet Invert= 306.00' Custom cross-section table, n= 0.040 Length= 1,453.0' Slope= 0.0069T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.90 5.0 9.1 7,265 10.34 4.10 35.7 15.9 51,872 188.66 4.90 45.2 18.9 65,676 249.12 8.20 116.6 37.4 169,420 766.91 18.20 1,169.2 188.8 1,698,848 12,151.76 Reach 2R: Reach 2 Inflow Area = 216.200 ac, Inflow Depth > 1.71" for 2 -Year event Inflow = 275.73 cfs @ 12.34 hrs, Volume= 30.774 of Outflow = 267.35 cfs @ 12.47 hrs, Volume= 30.740 af, Atten= 3%, Lag= 7.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 5.5 fps, Min. Travel Time= 4.0 min Avg. Velocity = 2.6 fps, Avg. Travel Time= 8.4 min 1404—Phase 2—SIA—Pre-Development Prepared by {enter your company name here) HvdroCAD® 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LL Peak Depth= 2.83'@ 12.40 hrs Capacity at bank full= 2,846.17 cfs Inlet Invert= 338.00', Outlet Invert= 328.00' Custom cross-section table, n= 0.040 Length= 1,330.0' Slope= 0.0075T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.70 3.1 7.9 4,123 5.35 2.50 19.6 12.8 26,068 83.88 7.40 457.0 170.0 607,810 2,846.17 Link 2L: DP#1 Pre -Development Type 1124 -hr 2 -Year Rainfall=3.50" Page 13 C 12/8/2014 Inflow Area = 523.460 ac, Inflow Depth > 1.55" for 2 -Year event Inflow = 546.90 cfs @ 12.42 hrs, Volume= 67.568 of Primary = 546.90 cfs @ 12.42 hrs, Volume= 67.568 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Pre -Development 1404 -Phase 2 -SIA -Pre -Development Type 1124 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here) Page 14 HvdroCAD® 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Time span=0.00-25.00 hrs, dt=0.05 hrs, 501 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: TO RR Culvert RunoffArea=216.200 ac Runoff Depth>3.07" Flow Length=4,444' Tc=36.9 min CN=81 Runoff=501.34 cfs 55.366 of Subcatchment 2S: TO DP#1A Runoff Area=261.580 ac Runoff Depth>2.80" Flow Length=3,477' Tc=27.2 min CN=78 Runoff=673.93 cfs 60.963 of Subcatchment 3S: TO DP#1 Runoff Area=45.680 ac Runoff Depth>2.28" Flow Length=2,581' Tc=20.7 min CN=72 Runoff=111.63 cfs 8.661 of Subcatchment 4S: TO DP#2 Runoff Area=11.490 ac Runoff Depth=2.19" Flow Length=1,334' Tc=16.8 min CN=71 Runoff=30.37 cfs 2.099 of Subcatchment 5S: TO DP#3 Runoff Area=19.990 ac Runoff Depth=1.72" Flow Length=1,582' Tc=11.0 min CN=65 Runoff=49.34 cfs 2.866 of Subcatchment 6S: TO DP#4 Runoff Area=11.030 ac Runoff Depth=2.80" Flow Length=824' Tc=14.0 min CN=78 Runoff=40.96 cfs 2.571 of Reach 1R: Reach 1 Peak Depth=8.41' Max Vel=7.2 fps Inflow=1,014.06 cfs 116.282 of n=0.040 L=1,453.0' S=0.0069'/' Capacity=12,151.76 cfs Outflow= 1,001.29 cfs 116.180 of Reach 2R: Reach 2 Peak Depth=3.22' Max Vel=5.8 fps Inflow=501.34 cfs 55.366 of n=0.040 L=1,330.0' S=0.0075'/' Capacity=2,846.17 cfs Outflow=486.45 cfs 55.319 of Link 2L: DP#1 Inflow=1,054.67 cfs 124.841 of Primary= 1,054.67 cfs 124.841 of Total Runoff Area = 565.970 ac Runoff Volume = 132.526 of Average Runoff Depth = 2.81" Pre -Development 1404_Phase 2 -SIA -Pre -Development Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 15 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Subcatchment 1S: TO RR Culvert Runoff = 501.34 cfs @ 12.33 hrs, Volume= 55.366 af, Depth> 3.07" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 28.720 98 Impervious 8.490 70 Woods, Good, HSG C 76.200 77 Woods, Good, HSG D 2.420 74 >75% Grass cover, Good, HSG C 100.370 80 >75% Grass cover, Good, HSG D 216.200 81 Weighted Average Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity (cfs) Description 14.5 75 0.0267 0.1 77 Sheet Flow, 1.440 61 >75% Grass cover, Good, HSG B 3.960 74 Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 259 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.8 2,068 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 12.3 2,042 0.0070 2.8 27.68 Channel Flow, D=2'; B=3'; SS=2:1 Area= 10.0 sf Perim= 11.9' r= 0.84' n= 0.040 36.9 4,444 Total Subcatchment 2S: TO DP#1A Runoff = 673.93 cfs @ 12.21 hrs, Volume= 60.963 af, Depth> 2.80" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Descriation 6.640 98 Impervious 7.170 55 Woods, Good, HSG B 0.040 70 Woods, Good, HSG C 144.080 77 Woods, Good, HSG D 1.440 61 >75% Grass cover, Good, HSG B 3.960 74 >75% Grass cover, Good, HSG C 98.250 80 >75% Grass cover, Good, HSG D 261.580 78 Weighted Average Pre -Development 1404 -Phase 2 -SIA -Pre -Development Type 1124 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here) Page 16 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 7.3 1,332 0.0360 3.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.9 2,070 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 27.2 3,477 Total Subcatchment 3S: TO DP#1 Runoff = 111.63 cfs @ 12.14 hrs, Volume= 8.661 af, Depth> 2.28" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN D 0.440 98 Impervious 8.470 55 Woods, Good, HSG B 24.630 77 Woods, Good, HSG D 4.240 61 >75% Grass cover, Good, HSG B 7.900 80 >75% Grass cover, Good, HSG D 45.680 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 1,200 0.0620 4.0 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 1,306 0.0069 6.6 767.89 Channel Flow, Reach 1 Properties Area= 116.6 sf Perim= 37.4' r= 3.12' n= 0.040 20.7 2,581 Total Subcatchment 4S: TO DP#2 Runoff = 30.37 cfs @ 12.10 hrs, Volume= 2.099 af, Depth= 2.19" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 0.430 98 Impervious 0.450 55 Woods, Good, HSG B 1.610 77 Woods, Good, HSG D 5.260 61 >75% Grass cover, Good, HSG B 3.740 80 >75% Grass cover, Good, HSG D 11.490 71 Weighted Average Pre -Development 1404_Phase 2 -SIA -Pre -Development Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 17 HvdroCAD® 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, 0.0670 0.3 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 5.8 1,259 0.0510 3.6 Shallow Concentrated Flow, 3.7 749 0.0440 Unpaved Kv= 16.1 fps 16.8 1,334 Total Subcatchment 5S: TO DP#3 Runoff = 49.34 cfs @ 12.04 hrs, Volume= 2.866 af, Depth= 1.72" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 0.970 98 Impervious 4.310 55 Woods, Good, HSG B 0.690 77 Woods, Good, HSG D 11.390 61 >75% Grass cover, Good, HSG B 2.630 80 >75% Grass cover, Good, HSG D 19.990 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.6 75 0.0670 0.3 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 749 0.0440 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.7 758 0.0310 4.7 18.93 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 11.0 1,582 Total Subcatchment 6S: TO DP#4 Runoff = 40.96 cfs @ 12.06 hrs, Volume= 2.571 af, Depth= 2.80" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 0.480 98 Impervious 9.270 77 Woods, Good, HSG D 1.280 80 >75% Grass cover, Good, HSG D 11.030 78 Weighted Average Pre -Development 1404 -Phase 2 -SIA -Pre -Development Type 1124 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here) Page 18 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.4 366 0.0770 4.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.6 383 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 14.0 824 Total Reach 1 R: Reach 1 Inflow Area = 477.780 ac, Inflow Depth > 2.92" for 10 -Year event Inflow = 1,014.06 cfs @ 12.29 hrs, Volume= 116.282 of Outflow = 1,001.29 cfs @ 12.39 hrs, Volume= 116.180 af, Atten= 1 %, Lag= 5.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 7.2 fps, Min. Travel Time= 3.3 min Avg. Velocity = 3.7 fps, Avg. Travel Time= 6.5 min Peak Depth= 8.41'@ 12.33 hrs Capacity at bank full= 12,151.76 cfs Inlet Invert= 316.00', Outlet Invert= 306.00' Custom cross-section table, n= 0.040 Length= 1,453.0' Slope= 0.0069T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.90 5.0 9.1 7,265 10.34 4.10 35.7 15.9 51,872 188.66 4.90 45.2 18.9 65,676 249.12 8.20 116.6 37.4 169,420 766.91 18.20 1,169.2 188.8 1,698,848 12,151.76 Reach 2R: Reach 2 Inflow Area = 216.200 ac, Inflow Depth > 3.07" for 10 -Year event Inflow = 501.34 cfs @ 12.33 hrs, Volume= 55.366 of Outflow = 486.45 cfs @ 12.45 hrs, Volume= 55.319 af, Atten= 3%, Lag= 7.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 5.8 fps, Min. Travel Time= 3.8 min Avg. Velocity = 3.0 fps, Avg. Travel Time= 7.3 min Pre -Development 1404—Phase 2—SIA—Pre-Development Type 1124 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here) Page 19 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Peak Depth= 3.22'@ 12.39 hrs Capacity at bank full= 2,846.17 cfs Inlet Invert= 338.00', Outlet Invert= 328.00' Custom cross-section table, n= 0.040 Length= 1,330.0' Slope= 0.0075T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.70 3.1 7.9 4,123 5.35 2.50 19.6 12.8 26,068 83.88 7.40 457.0 170.0 607,810 2,846.17 Link 2L: DP#1 Inflow Area = 523.460 ac, Inflow Depth > 2.86" for 10 -Year event Inflow = 1,054.67 cfs @ 12.37 hrs, Volume= 124.841 of Primary = 1,054.67 cfs @ 12.37 hrs, Volume= 124.841 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Pre -Development 1404 -Phase 2 -SIA -Pre -Development Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here) Page 20 HvdroCAD® 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Time span=0.00-25.00 hrs, dt=0.05 hrs, 501 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: TO RR Culvert RunoffArea=216.200 ac Runoff Depth>5.18" Flow Length=4,444' Tc=36.9 min CN=81 Runoff=839.96 cfs 93.274 of Subcatchment 2S: TO DP#1A Runoff Area=261.580 ac Runoff Depth>4.84" Flow Length=3,477' Tc=27.2 min CN=78 Runoff=1,163.66 cfs 105.483 of Subcatchment 3S: TO DP#1 Runoff Area=45.680 ac Runoff Depth=4.17" Flow Length=2,581' Tc=20.7 min CN=72 Runoff=206.75 cfs 15.882 of Subcatchment 4S: TO DP#2 Runoff Area=11.490 ac Runoff Depth=4.06" Flow Length=1,334' Tc=16.8 min CN=71 Runoff=56.77 cfs 3.890 of Subcatchment 5S: TO DP#3 Runoff Area= 19.990 ac Runoff Depth=3.41" Flow Length=1,582' Tc=11.0 min CN=65 Runoff=100.00 cfs 5.689 of Subcatchment 6S: TO DP#4 Runoff Area=11.030 ac Runoff Depth=4.84" Flow Length=824' Tc=14.0 min CN=78 Runoff=70.09 cfs 4.448 of Reach 1R: Reach 1 Peak Depth=9.04' Max Vel=8.4 fps Inflow=1,738.16 cfs 198.694 of n=0.040 L=1,453.0' S=0.0069'/' Capacity=12,151.76 cfs Outflow= 1,720.50 cfs 198.569 of Reach 2R: Reach 2 Peak Depth=3.80' Max Vel=6.0 fps Inflow=839.96 cfs 93.274 of n=0.040 L=1,330.0' S=0.0075'/' Capacity=2,846.17 cfs Outflow=815.08 cfs 93.210 of Link 2L: DP#1 Inflow=1,821.56 cfs 214.451 of Primary=1,821.56 cfs 214.451 of Total Runoff Area = 565.970 ac Runoff Volume = 228.666 of Average Runoff Depth = 4.85" Pre -Development 1404_Phase 2—SIA—Pre-Development Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 21 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Subcatchment 1S: TO RR Culvert Runoff = 839.96 cfs @ 12.32 hrs, Volume= 93.274 af, Depth> 5.18" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 28.720 98 Impervious 8.490 70 Woods, Good, HSG C 76.200 77 Woods, Good, HSG D 2.420 74 >75% Grass cover, Good, HSG C 100.370 80 >75% Grass cover, Good, HSG D 216.200 81 Weighted Average Tc Length Slope Velocity min) (feet) (ft/ft) (ft/sec) 14.5 75 0.0267 0.1 Capacity Description (cfs) 1.3 259 0.0460 3.5 8.8 2,068 0.0210 3.9 15.58 12.3 2,042 0.0070 2.8 27.68 36.9 4,444 Total Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" Shallow Concentrated Flow, Unpaved Kv= 16.1 fps Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides Channel Flow, D=2'; B=3'; SS=2:1 Area= 10.0 sf Perim= 11.9' r= 0.84' n= 0.040 Subcatchment 2S: TO DP#1A Runoff = 1,163.66 cfs @ 12.21 hrs, Volume= 105.483 af, Depth> 4.84" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Descriation 6.640 98 Impervious 7.170 55 Woods, Good, HSG B 0.040 70 Woods, Good, HSG C 144.080 77 Woods, Good, HSG D 1.440 61 >75% Grass cover, Good, HSG B 3.960 74 >75% Grass cover, Good, HSG C 98.250 80 >75% Grass cover, Good, HSG D 261.580 78 Weighted Average Pre -Development 1404 -Phase 2 -SIA -Pre -Development Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here) Page 22 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 7.3 1,332 0.0360 3.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.9 2,070 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 27.2 3,477 Total Subcatchment 3S: TO DP#1 Runoff = 206.75 cfs @ 12.14 hrs, Volume= 15.882 af, Depth= 4.17" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN D 0.440 98 Impervious 8.470 55 Woods, Good, HSG B 24.630 77 Woods, Good, HSG D 4.240 61 >75% Grass cover, Good, HSG B 7.900 80 >75% Grass cover, Good, HSG D 45.680 72 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 1,200 0.0620 4.0 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 1,306 0.0069 6.6 767.89 Channel Flow, Reach 1 Properties Area= 116.6 sf Perim= 37.4' r= 3.12' n= 0.040 20.7 2,581 Total Subcatchment 4S: TO DP#2 Runoff = 56.77 cfs @ 12.09 hrs, Volume= 3.890 af, Depth= 4.06" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 0.430 98 Impervious 0.450 55 Woods, Good, HSG B 1.610 77 Woods, Good, HSG D 5.260 61 >75% Grass cover, Good, HSG B 3.740 80 >75% Grass cover, Good, HSG D 11.490 71 Weighted Average Pre -Development 1404_Phase 2 -SIA -Pre -Development Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 23 HvdroCAD® 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, 0.0670 0.3 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 5.8 1,259 0.0510 3.6 Shallow Concentrated Flow, 3.7 749 0.0440 Unpaved Kv= 16.1 fps 16.8 1,334 Total Subcatchment 5S: TO DP#3 Runoff = 100.00 cfs @ 12.03 hrs, Volume= 5.689 af, Depth= 3.41" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 0.970 98 Impervious 4.310 55 Woods, Good, HSG B 0.690 77 Woods, Good, HSG D 11.390 61 >75% Grass cover, Good, HSG B 2.630 80 >75% Grass cover, Good, HSG D 19.990 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.6 75 0.0670 0.3 Sheet Flow, Grass: Short n= 0.150 P2= 3.50" 3.7 749 0.0440 3.4 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.7 758 0.0310 4.7 18.93 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 11.0 1,582 Total Subcatchment 6S: TO DP#4 Runoff = 70.09 cfs @ 12.06 hrs, Volume= 4.448 af, Depth= 4.84" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 0.480 98 Impervious 9.270 77 Woods, Good, HSG D 1.280 80 >75% Grass cover, Good, HSG D 11.030 78 Weighted Average Pre -Development 1404 -Phase 2 -SIA -Pre -Development Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here) Page 24 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.4 366 0.0770 4.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.6 383 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 14.0 824 Total Reach 1 R: Reach 1 Inflow Area = 477.780 ac, Inflow Depth > 4.99" for 100 -Year event Inflow = 1,738.16 cfs @ 12.28 hrs, Volume= 198.694 of Outflow = 1,720.50 cfs @ 12.37 hrs, Volume= 198.569 af, Atten= 1 %, Lag= 5.3 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 8.4 fps, Min. Travel Time= 2.9 min Avg. Velocity = 4.1 fps, Avg. Travel Time= 5.8 min Peak Depth= 9.04'@ 12.32 hrs Capacity at bank full= 12,151.76 cfs Inlet Invert= 316.00', Outlet Invert= 306.00' Custom cross-section table, n= 0.040 Length= 1,453.0' Slope= 0.0069'/' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.90 5.0 9.1 7,265 10.34 4.10 35.7 15.9 51,872 188.66 4.90 45.2 18.9 65,676 249.12 8.20 116.6 37.4 169,420 766.91 18.20 1,169.2 188.8 1,698,848 12,151.76 Reach 2R: Reach 2 Inflow Area = 216.200 ac, Inflow Depth > 5.18" for 100 -Year event Inflow = 839.96 cfs @ 12.32 hrs, Volume= 93.274 of Outflow = 815.08 cfs @ 12.44 hrs, Volume= 93.21Oaf, Atten= 3%, Lag= 7.3 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 6.0 fps, Min. Travel Time= 3.7 min Avg. Velocity = 3.4 fps, Avg. Travel Time= 6.6 min Pre -Development 1404—Phase 2—SIA—Pre-Development Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here) Page 25 HvdroCADO 7.10 s/n 003899 © 2005 HvdroCAD Software Solutions LLC 12/8/2014 Peak Depth= 3.80'@ 12.38 hrs Capacity at bank full= 2,846.17 cfs Inlet Invert= 338.00', Outlet Invert= 328.00' Custom cross-section table, n= 0.040 Length= 1,330.0' Slope= 0.0075T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.70 3.1 7.9 4,123 5.35 2.50 19.6 12.8 26,068 83.88 7.40 457.0 170.0 607,810 2,846.17 Link 2L: DP#1 Inflow Area = 523.460 ac, Inflow Depth > 4.92" for 100 -Year event Inflow = 1,821.56 cfs @ 12.35 hrs, Volume= 214.451 of Primary = 1,821.56 cfs @ 12.35 hrs, Volume= 214.451 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs 2S T DP#1A 8S 9S T WQ#1 7S TO Q#2 TO W#3 1 �S TO WQ#4 2L 1 R '' 2R DP#1 Reach 1 Reach 2 TO RR Culvert Subcat Reach on Link F Diagram for 1404Phase 2SIAPost-Development_DP#1 Without Detentio ared by {enter your company name here} 3/30/2015 AD® 7.10 s/n 003899 ©2005 HydroCAD Software Solutions LLC 1404 -Phase 2_SIA_Post-Development_DP#1 Without Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 2 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Time span=0.00-25.00 hrs, dt=0.05 hrs, 501 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: TO RR Culvert Runoff Area=216.200 ac Runoff Depth>1.31" Flow Length=4,444' Tc=36.9 min CN=81 Runoff=209.45 cfs 23.657 of Subcatchment 2S: TO DP#1A Runoff Area=222.700 ac Runoff Depth>1.13" Flow Length=3,477' Tc=27.2 min CN=78 Runoff=223.06 cfs 20.948 of Subcatchment 7S: TO W#3 Runoff Area=2.770 ac Runoff Depth=1.74" Tc=5.0 min CN=87 Runoff=8.57 cfs 0.401 of Subcatchment 8S: TO WQ#1 Runoff Area=41.720 ac Runoff Depth=1.45" Tc=5.0 min CN=83 Runoff=108.67 cfs 5.029 of Subcatchment 9S: TO WQ#2 Runoff Area=19.970 ac Runoff Depth=1.74" Tc=5.0 min CN=87 Runoff=61.81 cfs 2.894 of Subcatchment 10S: TO WQ#4 Runoff Area=16.040 ac Runoff Depth=1.82" Tc=5.0 min CN=88 Runoff=51.65 cfs 2.430 of Reach 1 R: Reach 1 Peak Depth=5.68' Max Vel=6.0 fps Inflow=379.10 cfs 50.303 of n=0.040 L=1,453.0' S=0.0069'/' Capacity= 12,151.76 cfs Outflow=370.57 cfs 50.236 of Reach 2R: Reach 2 Peak Depth=2.71' Max Vel=5.3 fps Inflow=209.45 cfs 23.657 of n=0.040 L=1,330.0' S=0.0075'/' Capacity=2,846.17 cfs Outflow=202.98 cfs 23.629 of Link 2L: DP#1 Inflow=380.90 cfs 55.266 of Primary=380.90 cfs 55.266 of Total Runoff Area = 519.400 ac Runoff Volume = 55.361 of Average Runoff Depth = 1.28" 1404 -Phase 2_SIA_Post-Development_13P#1 Without Type 11 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 3 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Subcatchment 1S: TO RR Culvert Runoff = 209.45 cfs @ 12.34 hrs, Volume= 23.657 af, Depth> 1.31" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 28.720 98 Impervious 8.490 70 Woods, Good, HSG C 76.200 77 Woods, Good, HSG D 2.420 74 >75% Grass cover, Good, HSG C 100.370 80 >75% Grass cover, Good, HSG D 216.200 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Woods, Good, HSG D 14.5 75 0.0267 0.1 74 Sheet Flow, 92.990 80 >75% Grass cover, Good, HSG D Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 259 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.8 2,068 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 12.3 2,042 0.0070 2.8 27.68 Channel Flow, D=2'; B=3'; SS=2:1 Area= 10.0 sf Perim= 11.9' r= 0.84' n= 0.040 36.9 4,444 Total Subcatchment 2S: TO DP#1A Runoff = 223.06 cfs @ 12.22 hrs, Volume= 20.948 af, Depth> 1.13" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN DescriDtion 7.850 98 Impervious 4.040 55 Woods, Good, HSG B 0.040 70 Woods, Good, HSG C 111.740 77 Woods, Good, HSG D 2.120 61 >75% Grass cover, Good, HSG B 3.920 74 >75% Grass cover, Good, HSG C 92.990 80 >75% Grass cover, Good, HSG D 222.700 78 Weighted Average 1404—Phase 2_SIA_Post-Development_DP#1 Without Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 4 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 7.3 1,332 0.0360 3.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.9 2,070 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 27.2 3,477 Total Subcatchment 7S: TO W#3 Runoff = 8.57 cfs @ 11.96 hrs, Volume= 0.401 af, Depth= 1.74" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 1.180 98 Impervious 0.080 61 >75% Grass cover, Good, HSG B 1.510 80 >75% Grass cover, Good, HSG D 2.770 87 Weighted Average Tc Length Slope Velocity Capacity Description iin) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: TO WQ#1 Runoff = 108.67 cfs @ 11.96 hrs, Volume= 5.029 af, Depth= 1.45" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 16.960 98 Impervious 0.820 55 Woods, Good, HSG B 0.530 77 Woods, Good, HSG D 8.510 61 >75% Grass cover, Good, HSG B 14.900 80 >75% Grass cover, Good, HSG D 41.720 83 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 1404—Phase 2_SIA_Post-Deve1opment_DP#1 Without Type 11 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 5 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Subcatchment 9S: TO WQ#2 Runoff = 61.81 cfs @ 11.96 hrs, Volume= 2.894 af, Depth= 1.74" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 8.380 98 Impervious 0.520 77 Woods, Good, HSG D 0.800 61 >75% Grass cover, Good, HSG B 10.270 80 >75% Grass cover, Good, HSG D 19.970 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: TO WQ#4 Runoff = 51.65 cfs @ 11.96 hrs, Volume= 2.430 af, Depth= 1.82" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 7.530 98 Impervious 8.510 80 >75% Grass cover, Good, HSG D 16.040 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Reach 1 R: Reach 1 Inflow Area = 477.680 ac, Inflow Depth > 1.26" for 1 -Year event Inflow = 379.10 cfs @ 12.33 hrs, Volume= 50.303 of Outflow = 370.57 cfs @ 12.46 hrs, Volume= 50.236 af, Atten= 2%, Lag= 7.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 6.0 fps, Min. Travel Time= 4.0 min Avg. Velocity = 2.9 fps, Avg. Travel Time= 8.3 min Peak Depth= 5.68' @ 12.39 hrs Capacity at bank full= 12,151.76 cfs Inlet Invert= 316.00', Outlet Invert= 306.00' Custom cross-section table, n= 0.040 Length= 1,453.0' Slope= 0.00697' 1404 -Phase 2_SIA_Post-Deve1opment_DP#1 Without Type 11 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 6 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.90 5.0 9.1 7,265 10.34 4.10 35.7 15.9 51,872 188.66 4.90 45.2 18.9 65,676 249.12 8.20 116.6 37.4 169,420 766.91 18.20 1,169.2 188.8 1,698,848 12,151.76 Reach 2R: Reach 2 Inflow Area = 216.200 ac, Inflow Depth > 1.31" for 1 -Year event Inflow = 209.45 cfs @ 12.34 hrs, Volume= 23.657 of Outflow = 202.98 cfs @ 12.47 hrs, Volume= 23.629 af, Atten= 3%, Lag= 7.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 5.3 fps, Min. Travel Time= 4.2 min Avg. Velocity = 2.5 fps, Avg. Travel Time= 9.0 min Peak Depth= 2.71' @ 12.40 hrs Capacity at bank full= 2,846.17 cfs Inlet Invert= 338.00', Outlet Invert= 328.00' Custom cross-section table, n= 0.040 Length= 1,330.0' Slope= 0.0075 T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.70 3.1 7.9 4,123 5.35 2.50 19.6 12.8 26,068 83.88 7.40 457.0 170.0 607,810 2,846.17 Link 2L: DP#1 Inflow Area = 519.400 ac, Inflow Depth > 1.28" for 1 -Year event Inflow = 380.90 cfs @ 12.45 hrs, Volume= 55.266 of Primary = 380.90 cfs @ 12.45 hrs, Volume= 55.266 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs 1404 -Phase 2_SIA_Post-Development_DP#1 Without Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 7 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Time span=0.00-25.00 hrs, dt=0.05 hrs, 501 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: TO RR Culvert Runoff Area=216.200 ac Runoff Depth>1.71" Flow Length=4,444' Tc=36.9 min CN=81 Runoff=275.73 cfs 30.774 of Subcatchment 2S: TO DP#1A Runoff Area=222.700 ac Runoff Depth>1.50" Flow Length=3,477' Tc=27.2 min CN=78 Runoff=301.39 cfs 27.788 of Subcatchment 7S: TO W#3 Runoff Area=2.770 ac Runoff Depth=2.18" Tc=5.0 min CN=87 Runoff=10.67 cfs 0.504 of Subcatchment 8S: TO WQ#1 Runoff Area=41.720 ac Runoff Depth=1.86" Tc=5.0 min CN=83 Runoff=139.00 cfs 6.462 of Subcatchment 9S: TO WQ#2 Runoff Area=19.970 ac Runoff Depth=2.18" Tc=5.0 min CN=87 Runoff=76.90 cfs 3.632 of Subcatchment 10S: TO WQ#4 Runoff Area=16.040 ac Runoff Depth=2.27" Tc=5.0 min CN=88 Runoff=63.83 cfs 3.032 of Reach 1 R: Reach 1 Peak Depth=6.49' Max Vel=6.3 fps Inflow=507.84 cfs 65.696 of n=0.040 L=1,453.0' S=0.0069'/' Capacity= 12,151.76 cfs Outflow=496.14 cfs 65.619 of Reach 2R: Reach 2 Peak Depth=2.83' Max Vel=5.5 fps Inflow=275.73 cfs 30.774 of n=0.040 L=1,330.0' S=0.0075'/' Capacity=2,846.17 cfs Outflow=267.35 cfs 30.740 of Link 2L: DP#1 Inflow=509.38 cfs 72.081 of Primary=509.38 cfs 72.081 of Total Runoff Area = 519.400 ac Runoff Volume = 72.191 of Average Runoff Depth = 1.67" 1404 -Phase 2_SIA_Post-Development_13P#1 Without Type 11 24 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 8 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Subcatchment 1S: TO RR Culvert Runoff = 275.73 cfs @ 12.34 hrs, Volume= 30.774 af, Depth> 1.71" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 28.720 98 Impervious 8.490 70 Woods, Good, HSG C 76.200 77 Woods, Good, HSG D 2.420 74 >75% Grass cover, Good, HSG C 100.370 80 >75% Grass cover, Good, HSG D 216.200 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Woods, Good, HSG D 14.5 75 0.0267 0.1 74 Sheet Flow, 92.990 80 >75% Grass cover, Good, HSG D Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 259 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.8 2,068 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 12.3 2,042 0.0070 2.8 27.68 Channel Flow, D=2'; B=3'; SS=2:1 Area= 10.0 sf Perim= 11.9' r= 0.84' n= 0.040 36.9 4,444 Total Subcatchment 2S: TO DP#1A Runoff = 301.39 cfs @ 12.22 hrs, Volume= 27.788 af, Depth> 1.50" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN DescriDtion 7.850 98 Impervious 4.040 55 Woods, Good, HSG B 0.040 70 Woods, Good, HSG C 111.740 77 Woods, Good, HSG D 2.120 61 >75% Grass cover, Good, HSG B 3.920 74 >75% Grass cover, Good, HSG C 92.990 80 >75% Grass cover, Good, HSG D 222.700 78 Weighted Average 1404—Phase 2_SIA_Post-Development_DP#1 Without Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 9 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 7.3 1,332 0.0360 3.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.9 2,070 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 27.2 3,477 Total Subcatchment 7S: TO W#3 Runoff = 10.67 cfs @ 11.96 hrs, Volume= 0.504 af, Depth= 2.18" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 1.180 98 Impervious 0.080 61 >75% Grass cover, Good, HSG B 1.510 80 >75% Grass cover, Good, HSG D 2.770 87 Weighted Average Tc Length Slope Velocity Capacity Description iin) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: TO WQ#1 Runoff = 139.00 cfs @ 11.96 hrs, Volume= 6.462 af, Depth= 1.86" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 16.960 98 Impervious 0.820 55 Woods, Good, HSG B 0.530 77 Woods, Good, HSG D 8.510 61 >75% Grass cover, Good, HSG B 14.900 80 >75% Grass cover, Good, HSG D 41.720 83 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 1404—Phase 2_SIA_Post-Deve1opment_DP#1 Without Type 11 24 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 10 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Subcatchment 9S: TO WQ#2 Runoff = 76.90 cfs @ 11.96 hrs, Volume= 3.632 af, Depth= 2.18" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 8.380 98 Impervious 0.520 77 Woods, Good, HSG D 0.800 61 >75% Grass cover, Good, HSG B 10.270 80 >75% Grass cover, Good, HSG D 19.970 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: TO WQ#4 Runoff = 63.83 cfs @ 11.95 hrs, Volume= 3.032 af, Depth= 2.27" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 7.530 98 Impervious 8.510 80 >75% Grass cover, Good, HSG D 16.040 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Reach 1 R: Reach 1 Inflow Area = 477.680 ac, Inflow Depth > 1.65" for 2 -Year event Inflow = 507.84 cfs @ 12.32 hrs, Volume= 65.696 of Outflow = 496.14 cfs @ 12.44 hrs, Volume= 65.619 af, Atten= 2%, Lag= 7.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 6.3 fps, Min. Travel Time= 3.9 min Avg. Velocity = 3.1 fps, Avg. Travel Time= 7.8 min Peak Depth= 6.49' @ 12.37 hrs Capacity at bank full= 12,151.76 cfs Inlet Invert= 316.00', Outlet Invert= 306.00' Custom cross-section table, n= 0.040 Length= 1,453.0' Slope= 0.00697' 1404 -Phase 2_SIA_Post-Deve1opment_DP#1 Without Type 11 24 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here) Page 11 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.90 5.0 9.1 7,265 10.34 4.10 35.7 15.9 51,872 188.66 4.90 45.2 18.9 65,676 249.12 8.20 116.6 37.4 169,420 766.91 18.20 1,169.2 188.8 1,698,848 12,151.76 Reach 2R: Reach 2 Inflow Area = 216.200 ac, Inflow Depth > 1.71" for 2 -Year event Inflow = 275.73 cfs @ 12.34 hrs, Volume= 30.774 of Outflow = 267.35 cfs @ 12.47 hrs, Volume= 30.740 af, Atten= 3%, Lag= 7.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 5.5 fps, Min. Travel Time= 4.0 min Avg. Velocity = 2.6 fps, Avg. Travel Time= 8.4 min Peak Depth= 2.83'@ 12.40 hrs Capacity at bank full= 2,846.17 cfs Inlet Invert= 338.00', Outlet Invert= 328.00' Custom cross-section table, n= 0.040 Length= 1,330.0' Slope= 0.0075T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.70 3.1 7.9 4,123 5.35 2.50 19.6 12.8 26,068 83.88 7.40 457.0 170.0 607,810 2,846.17 Link 2L: DP#1 Inflow Area = 519.400 ac, Inflow Depth > 1.67" for 2 -Year event Inflow = 509.38 cfs @ 12.44 hrs, Volume= 72.081 of Primary = 509.38 cfs @ 12.44 hrs, Volume= 72.081 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs 1404 -Phase 2_SIA_Post-Development_DP#1 WithoutType 11 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 12 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Time span=0.00-25.00 hrs, dt=0.05 hrs, 501 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: TO RR Culvert Runoff Area=216.200 ac Runoff Depth>3.07" Flow Length=4,444' Tc=36.9 min CN=81 Runoff=501.34 cfs 55.366 of Subcatchment 2S: TO DP#1A Runoff Area=222.700 ac Runoff Depth>2.80" Flow Length=3,477' Tc=27.2 min CN=78 Runoff=573.76 cfs 51.902 of Subcatchment 7S: TO W#3 Runoff Area=2.770 ac Runoff Depth=3.66" Tc=5.0 min CN=87 Runoff=17.43 cfs 0.845 of Subcatchment 8S: TO WQ#1 Runoff Area=41.720 ac Runoff Depth=3.26" Tc=5.0 min CN=83 Runoff=239.38 cfs 11.350 of Subcatchment 9S: TO WQ#2 Runoff Area=19.970 ac Runoff Depth=3.66" Tc=5.0 min CN=87 Runoff=125.64 cfs 6.093 of Subcatchment 10S: TO WQ#4 Runoff Area=16.040 ac Runoff Depth=3.76" Tc=5.0 min CN=88 Runoff=103.00 cfs 5.031 of Reach 1 R: Reach 1 Peak Depth=8.35' Max Vel=7.1 fps Inflow=949.70 cfs 119.191 of n=0.040 L=1,453.0' S=0.0069'/' Capacity= 12,151.76 cfs Outflow=938.70 cfs 119.090 of Reach 2R: Reach 2 Peak Depth=3.22' Max Vel=5.8 fps Inflow=501.34 cfs 55.366 of n=0.040 L=1,330.0' S=0.0075'/' Capacity=2,846.17 cfs Outflow=486.45 cfs 55.319 of Link 2L: DP#1 Inflow=962.10 cfs 130.440 of Primary=962.10 cfs 130.440 of Total Runoff Area = 519.400 ac Runoff Volume = 130.589 of Average Runoff Depth = 3.02" 1404 -Phase 2_SIA_Post-Development_13P#1 WithoutType 11 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 13 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Subcatchment 1S: TO RR Culvert Runoff = 501.34 cfs @ 12.33 hrs, Volume= 55.366 af, Depth> 3.07" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 28.720 98 Impervious 8.490 70 Woods, Good, HSG C 76.200 77 Woods, Good, HSG D 2.420 74 >75% Grass cover, Good, HSG C 100.370 80 >75% Grass cover, Good, HSG D 216.200 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Woods, Good, HSG D 14.5 75 0.0267 0.1 74 Sheet Flow, 92.990 80 >75% Grass cover, Good, HSG D Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 259 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.8 2,068 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 12.3 2,042 0.0070 2.8 27.68 Channel Flow, D=2'; B=3'; SS=2:1 Area= 10.0 sf Perim= 11.9' r= 0.84' n= 0.040 36.9 4,444 Total Subcatchment 2S: TO DP#1A Runoff = 573.76 cfs @ 12.21 hrs, Volume= 51.902 af, Depth> 2.80" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN DescriDtion 7.850 98 Impervious 4.040 55 Woods, Good, HSG B 0.040 70 Woods, Good, HSG C 111.740 77 Woods, Good, HSG D 2.120 61 >75% Grass cover, Good, HSG B 3.920 74 >75% Grass cover, Good, HSG C 92.990 80 >75% Grass cover, Good, HSG D 222.700 78 Weighted Average 1404—Phase 2_SIA_Post-Development_DP#1 WithoutType 11 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 14 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 7.3 1,332 0.0360 3.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.9 2,070 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 27.2 3,477 Total Subcatchment 7S: TO W#3 Runoff = 17.43 cfs @ 11.95 hrs, Volume= 0.845 af, Depth= 3.66" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 1.180 98 Impervious 0.080 61 >75% Grass cover, Good, HSG B 1.510 80 >75% Grass cover, Good, HSG D 2.770 87 Weighted Average Tc Length Slope Velocity Capacity Description iin) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: TO WQ#1 Runoff = 239.38 cfs @ 11.95 hrs, Volume= 11.350 af, Depth= 3.26" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 16.960 98 Impervious 0.820 55 Woods, Good, HSG B 0.530 77 Woods, Good, HSG D 8.510 61 >75% Grass cover, Good, HSG B 14.900 80 >75% Grass cover, Good, HSG D 41.720 83 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 1404—Phase 2_SIA_Post-Deve1opment_DP#1 WithoutType 11 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 15 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Subcatchment 9S: TO WQ#2 Runoff = 125.64 cfs @ 11.95 hrs, Volume= 6.093 af, Depth= 3.66" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 8.380 98 Impervious 0.520 77 Woods, Good, HSG D 0.800 61 >75% Grass cover, Good, HSG B 10.270 80 >75% Grass cover, Good, HSG D 19.970 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: TO WQ#4 Runoff = 103.00 cfs @ 11.95 hrs, Volume= 5.031 af, Depth= 3.76" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 7.530 98 Impervious 8.510 80 >75% Grass cover, Good, HSG D 16.040 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Reach 1 R: Reach 1 Inflow Area = 477.680 ac, Inflow Depth > 2.99" for 10 -Year event Inflow = 949.70 cfs @ 12.30 hrs, Volume= 119.191 of Outflow = 938.70 cfs @ 12.40 hrs, Volume= 119.090 af, Atten= 1%, Lag= 5.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 7.1 fps, Min. Travel Time= 3.4 min Avg. Velocity = 3.6 fps, Avg. Travel Time= 6.8 min Peak Depth= 8.35' @ 12.34 hrs Capacity at bank full= 12,151.76 cfs Inlet Invert= 316.00', Outlet Invert= 306.00' Custom cross-section table, n= 0.040 Length= 1,453.0' Slope= 0.00697' 1404 -Phase 2_SIA_Post-Deve1opment_DP#1 WithoutType 11 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here) Page 16 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.90 5.0 9.1 7,265 10.34 4.10 35.7 15.9 51,872 188.66 4.90 45.2 18.9 65,676 249.12 8.20 116.6 37.4 169,420 766.91 18.20 1,169.2 188.8 1,698,848 12,151.76 Reach 2R: Reach 2 Inflow Area = 216.200 ac, Inflow Depth > 3.07" for 10 -Year event Inflow = 501.34 cfs @ 12.33 hrs, Volume= 55.366 of Outflow = 486.45 cfs @ 12.45 hrs, Volume= 55.319 af, Atten= 3%, Lag= 7.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 5.8 fps, Min. Travel Time= 3.8 min Avg. Velocity = 3.0 fps, Avg. Travel Time= 7.3 min Peak Depth= 3.22'@ 12.39 hrs Capacity at bank full= 2,846.17 cfs Inlet Invert= 338.00', Outlet Invert= 328.00' Custom cross-section table, n= 0.040 Length= 1,330.0' Slope= 0.0075T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.70 3.1 7.9 4,123 5.35 2.50 19.6 12.8 26,068 83.88 7.40 457.0 170.0 607,810 2,846.17 Link 2L: DP#1 Inflow Area = 519.400 ac, Inflow Depth > 3.01" for 10 -Year event Inflow = 962.10 cfs @ 12.39 hrs, Volume= 130.440 of Primary = 962.10 cfs @ 12.39 hrs, Volume= 130.440 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs 1404 -Phase 2_SIA_Post-Development_DP#1 WithouType 1124 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 17 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Time span=0.00-25.00 hrs, dt=0.05 hrs, 501 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: TO RR Culvert Runoff Area=216.200 ac Runoff Depth>5.18" Flow Length=4,444' Tc=36.9 min CN=81 Runoff=839.96 cfs 93.274 of Subcatchment 2S: TO DP#1A Runoff Area=222.700 ac Runoff Depth>4.84" Flow Length=3,477' Tc=27.2 min CN=78 Runoff=990.70 cfs 89.805 of Subcatchment 7S: TO W#3 Runoff Area=2.770 ac Runoff Depth=5.87" Tc=5.0 min CN=87 Runoff=27.11 cfs 1.354 of Subcatchment 8S: TO WQ#1 Runoff Area=41.720 ac Runoff Depth=5.41" Tc=5.0 min CN=83 Runoff=385.84 cfs 18.796 of Subcatchment 9S: TO WQ#2 Runoff Area=19.970 ac Runoff Depth=5.87" Tc=5.0 min CN=87 Runoff=195.43 cfs 9.763 of Subcatchment 10S: TO WQ#4 Runoff Area=16.040 ac Runoff Depth=5.98" Tc=5.0 min CN=88 Runoff=158.90 cfs 7.997 of Reach 1 R: Reach 1 Peak Depth=8.94' Max Vel=8.3 fps Inflow=1,620.50 cfs 202.129 of n=0.040 L=1,453.0' S=0.0069'/' Capacity=12,151.76 cfs Outflow=1,604.46 cfs 202.006 of Reach 2R: Reach 2 Peak Depth=3.80' Max Vel=6.0 fps Inflow=839.96 cfs 93.274 of n=0.040 L=1,330.0' S=0.0075'/' Capacity=2,846.17 cfs Outflow=815.08 cfs 93.210 of Link 2L: DP#1 Inflow=1,643.34 cfs 220.802 of Primary=1,643.34 cfs 220.802 of Total Runoff Area = 519.400 ac Runoff Volume = 220.989 of Average Runoff Depth = 5.11" 1404 -Phase 2_SIA_Post-Development_13P#1 WithouType 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 18 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Subcatchment 1S: TO RR Culvert Runoff = 839.96 cfs @ 12.32 hrs, Volume= 93.274 af, Depth> 5.18" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 28.720 98 Impervious 8.490 70 Woods, Good, HSG C 76.200 77 Woods, Good, HSG D 2.420 74 >75% Grass cover, Good, HSG C 100.370 80 >75% Grass cover, Good, HSG D 216.200 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Woods, Good, HSG D 14.5 75 0.0267 0.1 74 Sheet Flow, 92.990 80 >75% Grass cover, Good, HSG D Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 259 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.8 2,068 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 12.3 2,042 0.0070 2.8 27.68 Channel Flow, D=2'; B=3'; SS=2:1 Area= 10.0 sf Perim= 11.9' r= 0.84' n= 0.040 36.9 4,444 Total Subcatchment 2S: TO DP#1A Runoff = 990.70 cfs @ 12.21 hrs, Volume= 89.805 af, Depth> 4.84" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN DescriDtion 7.850 98 Impervious 4.040 55 Woods, Good, HSG B 0.040 70 Woods, Good, HSG C 111.740 77 Woods, Good, HSG D 2.120 61 >75% Grass cover, Good, HSG B 3.920 74 >75% Grass cover, Good, HSG C 92.990 80 >75% Grass cover, Good, HSG D 222.700 78 Weighted Average 1404—Phase 2_SIA_Post-Development_DP#1 WithouType 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 19 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 7.3 1,332 0.0360 3.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.9 2,070 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 27.2 3,477 Total Subcatchment 7S: TO W#3 Runoff = 27.11 cfs @ 11.95 hrs, Volume= 1.354 af, Depth= 5.87" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 1.180 98 Impervious 0.080 61 >75% Grass cover, Good, HSG B 1.510 80 >75% Grass cover, Good, HSG D 2.770 87 Weighted Average Tc Length Slope Velocity Capacity Description iin) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: TO WQ#1 Runoff = 385.84 cfs @ 11.95 hrs, Volume= 18.796 af, Depth= 5.41" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 16.960 98 Impervious 0.820 55 Woods, Good, HSG B 0.530 77 Woods, Good, HSG D 8.510 61 >75% Grass cover, Good, HSG B 14.900 80 >75% Grass cover, Good, HSG D 41.720 83 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 1404—Phase 2_SIA_Post-Deve1opment_DP#1 WithouType 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 20 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Subcatchment 9S: TO WQ#2 Runoff = 195.43 cfs @ 11.95 hrs, Volume= 9.763 af, Depth= 5.87" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 8.380 98 Impervious 0.520 77 Woods, Good, HSG D 0.800 61 >75% Grass cover, Good, HSG B 10.270 80 >75% Grass cover, Good, HSG D 19.970 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 10S: TO WQ#4 Runoff = 158.90 cfs @ 11.95 hrs, Volume= 7.997 af, Depth= 5.98" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 7.530 98 Impervious 8.510 80 >75% Grass cover, Good, HSG D 16.040 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Reach 1 R: Reach 1 Inflow Area = 477.680 ac, Inflow Depth > 5.08" for 100 -Year event Inflow = 1,620.50 cfs @ 12.29 hrs, Volume= 202.129 of Outflow = 1,604.46 cfs @ 12.38 hrs, Volume= 202.006 af, Atten= 1 %, Lag= 5.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 8.3 fps, Min. Travel Time= 2.9 min Avg. Velocity = 4.0 fps, Avg. Travel Time= 6.1 min Peak Depth= 8.94' @ 12.33 hrs Capacity at bank full= 12,151.76 cfs Inlet Invert= 316.00', Outlet Invert= 306.00' Custom cross-section table, n= 0.040 Length= 1,453.0' Slope= 0.00697' 1404 -Phase 2_SIA_Post-Deve1opment_DP#1 WithouType 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 21 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 3/30/2015 Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.90 5.0 9.1 7,265 10.34 4.10 35.7 15.9 51,872 188.66 4.90 45.2 18.9 65,676 249.12 8.20 116.6 37.4 169,420 766.91 18.20 1,169.2 188.8 1,698,848 12,151.76 Reach 2R: Reach 2 Inflow Area = 216.200 ac, Inflow Depth > 5.18" for 100 -Year event Inflow = 839.96 cfs @ 12.32 hrs, Volume= 93.274 of Outflow = 815.08 cfs @ 12.44 hrs, Volume= 93.21Oaf, Atten= 3%, Lag= 7.3 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 6.0 fps, Min. Travel Time= 3.7 min Avg. Velocity = 3.4 fps, Avg. Travel Time= 6.6 min Peak Depth= 3.80' @ 12.38 hrs Capacity at bank full= 2,846.17 cfs Inlet Invert= 338.00', Outlet Invert= 328.00' Custom cross-section table, n= 0.040 Length= 1,330.0' Slope= 0.0075 T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.70 3.1 7.9 4,123 5.35 2.50 19.6 12.8 26,068 83.88 7.40 457.0 170.0 607,810 2,846.17 Link 2L: DP#1 Inflow Area = 519.400 ac, Inflow Depth > 5.10" for 100 -Year event Inflow = 1,643.34 cfs @ 12.37 hrs, Volume= 220.802 of Primary = 1,643.34 cfs @ 12.37 hrs, Volume= 220.802 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs 5S TO DP#3 4S TO DP#2 W #1 Flow Splitter 2L DP#1 3S TO DP#1 TO DP#4 9S TO O#2 2S T DP#1A 7S 2P O W#3 WC�#2 bl 10S CB 2FS PP �TO wo#4 4P WO#2 Flov� Sp tter W#3 �7 WO#4 F1 R O Reach 1 Subcat Reach on Link Reach 2 TO RR Culvert 1404 -SIA Ammended Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 2 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Time span=0.00-25.00 hrs, dt=0.05 hrs, 501 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: TO RR Culvert Runoff Area=216.200 ac Runoff Depth>1.31" Flow Length=4,444' Tc=36.9 min CN=81 Runoff=209.45 cfs 23.657 of Subcatchment 2S: TO DP#1A Runoff Area=229.320 ac Runoff Depth>1.13" Flow Length=3,477' Tc=27.2 min CN=78 Runoff=229.69 cfs 21.571 of Subcatchment 3S: TO DP#1 Runoff Area=28.610 ac Runoff Depth>0.67" Flow Length=2,581' Tc=20.7 min CN=69 Runoff=17.69 cfs 1.597 of Subcatchment 4S: TO DP#2 Runoff Area=2.000 ac Runoff Depth=0.67" Tc=5.0 min CN=69 Runoff=2.25 cfs 0.112 of Subcatchment 5S: TO DP#3 Runoff Area=5.470 ac Runoff Depth=0.51" Tc=5.0 min CN=65 Runoff=4.32 cfs 0.231 of Subcatchment 6S: TO DP#4 Runoff Area=9.710 ac Runoff Depth=1.19" Flow Length=824' Tc=14.0 min CN=79 Runoff=15.13 cfs 0.962 of Subcatchment 7S: TO W#3 Runoff Area=2.560 ac Runoff Depth=1.82" Tc=5.0 min CN=88 Runoff=8.24 cfs 0.388 of Subcatchment 8S: TO WQ#1 Runoff Area=35.900 ac Runoff Depth=1.45" Tc=5.0 min CN=83 Runoff=93.51 cfs 4.328 of Subcatchment 9S: TO WQ#2 Runoff Area=20.390 ac Runoff Depth=1.74" Tc=5.0 min CN=87 Runoff=63.11 cfs 2.955 of Subcatchment 10S: TO WQ#4 Runoff Area=16.040 ac Runoff Depth=1.82" Tc=5.0 min CN=88 Runoff=51.65 cfs 2.430 of Reach 1 R: Reach 1 Peak Depth=5.75' Max Vel=6.0 fps Inflow=390.16 cfs 49.169 of n=0.040 L=1,453.0' S=0.0069 T Capacity=12,151.76 cfs Outflow=380.78 cfs 49.087 of Reach 2R: Reach 2 Peak Depth=2.71' Max Vel=5.3 fps Inflow=209.45 cfs 23.657 of n=0.040 L=1,330.0' S=0.0075'/' Capacity=2,846.17 cfs Outflow=202.98 cfs 23.629 of Pond 1 FS: WQ#1 Flow Splitter Peak Elev=315.51' Inflow=12.03 cfs 2.887 of 0utflow=12.03 cfs 2.887 of Pond 1 P: WQ#1 Peak EIev=320.32' Storage=87.821 cf Inflow=93.51 cfs 4.328 of 0utflow=12.03 cfs 2.887 of Pond 2FS: WQ#2 Flow Splitter Peak EIev=331.08' Inflow=7.59 cfs 2.059 of Outflow=7.59 cfs 2.059 of 1404—SIA Ammended Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 3 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Pond 2P: WQ#2 Peak Elev=335.13' Storage=64,229 cf Inflow=63.11 cfs 2.955 of Outflow=7.59 cfs 2.059 of Pond 3P: W#3 Peak EIev=330.62' Storage=8,383 cf Inflow=8.24 cfs 0.388 of Outflow=1.34 cfs 0.254 of Pond 4P: WQ#4 Peak EIev=329.71' Storage=49,600 cf Inflow=51.65 cfs 2.430 of Outflow=14.24 cfs 1.656 of Link 2L: DP#1 Inflow=400.01 cfs 53.571 of Primary=400.01 cfs 53.571 of Total Runoff Area = 566.200 ac Runoff Volume = 58.230 of Average Runoff Depth = 1.23" 1404 -SIA Ammended Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 4 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Subcatchment 1S: TO RR Culvert Runoff = 209.45 cfs @ 12.34 hrs, Volume= 23.657 af, Depth> 1.31" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 28.720 98 Impervious 8.490 70 Woods, Good, HSG C 76.200 77 Woods, Good, HSG D 2.420 74 >75% Grass cover, Good, HSG C 100.370 80 >75% Grass cover, Good, HSG D 216.200 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Woods, Good, HSG D 14.5 75 0.0267 0.1 74 Sheet Flow, 93.290 80 >75% Grass cover, Good, HSG D Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 259 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.8 2,068 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 12.3 2,042 0.0070 2.8 27.68 Channel Flow, D=2'; B=3'; SS=2:1 Area= 10.0 sf Perim= 11.9' r= 0.84' n= 0.040 36.9 4,444 Total Subcatchment 2S: TO DP#1A Runoff = 229.69 cfs @ 12.22 hrs, Volume= 21.571 af, Depth> 1.13" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN DescriDtion 7.710 98 Impervious 4.040 55 Woods, Good, HSG B 0.040 70 Woods, Good, HSG C 117.410 77 Woods, Good, HSG D 2.900 61 >75% Grass cover, Good, HSG B 3.930 74 >75% Grass cover, Good, HSG C 93.290 80 >75% Grass cover, Good, HSG D 229.320 78 Weighted Average 1404 -SIA Ammended Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 5 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, 0.080 80 >75% Grass cover, Good, HSG D 2.000 Woods: Light underbrush n= 0.400 P2= 3.50" 7.3 1,332 0.0360 3.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.9 2,070 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 27.2 3,477 Total Subcatchment 3S: TO DP#1 Runoff = 17.69 cfs @ 12.16 hrs, Volume= 1.597 af, Depth> 0.67" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.390 98 Impervious 7.840 55 Woods, Good, HSG B 10.910 77 Woods, Good, HSG D 4.220 61 >75% Grass cover, Good, HSG B 5.250 80 >75% Grass cover, Good, HSG D 28.610 69 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 1,200 0.0620 4.0 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 1,306 0.0069 6.6 767.89 Channel Flow, Reach 1 Properties Area= 116.6 sf Perim= 37.4' r= 3.12' n= 0.040 20.7 2,581 Total Subcatchment 4S: TO DP#2 Runoff = 2.25 cfs @ 11.97 hrs, Volume= 0.112 af, Depth= 0.67" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.450 98 Impervious 0.390 55 Woods, Good, HSG B 0.040 77 Woods, Good, HSG D 1.040 61 >75% Grass cover, Good, HSG B 0.080 80 >75% Grass cover, Good, HSG D 2.000 69 Weighted Average 1404 -SIA Ammended Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 6 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: TO DP#3 Runoff = 4.32 cfs @ 11.98 hrs, Volume= 0.231 af, Depth= 0.51" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.970 98 Impervious 2.520 55 Woods, Good, HSG B 1.980 61 >75% Grass cover, Good, HSG B 5.470 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 6S: TO DP#4 Runoff = 15.13 cfs @ 12.07 hrs, Volume= 0.962 af, Depth= 1.19" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.770 98 Paved parking & roofs 8.050 77 Woods, Good, HSG D 0.890 80 >75% Grass cover, Good, HSG D 9.710 79 Weighted Average Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.4 366 0.0770 4.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.6 383 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 14.0 824 Total Subcatchment 7S: TO W#3 cfs @ 11.96 hrs, Volume= 0.388 af, Depth= 1.82" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 1 -Year Rainfall=3.00" 1404—SIA Ammended Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 7 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Area (ac) CN Description 1.240 98 Impervious 0.050 61 >75% Grass cover, Good, HSG B 1.270 80 >75% Grass cover, Good, HSG D 2.560 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: TO WQ#1 Runoff = 93.51 cfs @ 11.96 hrs, Volume= 4.328 af, Depth= 1.45" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 16.260 98 Impervious 0.820 55 Woods, Good, HSG B 0.530 77 Woods, Good, HSG D 8.000 61 >75% Grass cover, Good, HSG B 10.290 80 >75% Grass cover, Good, HSG D 35.900 83 Weighted Average Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: TO WQ#2 Runoff = 63.11 cfs @ 11.96 hrs, Volume= 2.955 af, Depth= 1.74" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 9.290 98 Impervious 1.400 77 Woods, Good, HSG D 0.770 61 >75% Grass cover, Good, HSG B 8.870 80 >75% Grass cover, Good, HSG D 0.060 55 Woods, Good, HSG B 20.390 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 1404 -SIA Ammended Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 8 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Subcatchment 10S: TO WQ#4 Runoff = 51.65 cfs @ 11.96 hrs, Volume= 2.430 af, Depth= 1.82" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 7.570 98 Impervious 8.470 80 >75% Grass cover, Good, HSG D 16.040 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Reach 1 R: Reach 1 Inflow Area = 484.510 ac, Inflow Depth > 1.22" for 1 -Year event Inflow = 390.16 cfs @ 12.32 hrs, Volume= 49.169 of Outflow = 380.78 cfs @ 12.46 hrs, Volume= 49.087 af, Atten= 2%, Lag= 7.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 6.0 fps, Min. Travel Time= 4.0 min Avg. Velocity = 2.9 fps, Avg. Travel Time= 8.2 min Peak Depth= 5.75' @ 12.39 hrs Capacity at bank full= 12,151.76 cfs Inlet Invert= 316.00', Outlet Invert= 306.00' Custom cross-section table, n= 0.040 Length= 1,453.0' Slope= 0.0069T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.90 5.0 9.1 7,265 10.34 4.10 35.7 15.9 51,872 188.66 4.90 45.2 18.9 65,676 249.12 8.20 116.6 37.4 169,420 766.91 18.20 1,169.2 188.8 1,698,848 12,151.76 Reach 2R: Reach 2 Inflow Area = 216.200 ac, Inflow Depth > 1.31" for 1 -Year event Inflow = 209.45 cfs @ 12.34 hrs, Volume= 23.657 of Outflow = 202.98 cfs @ 12.47 hrs, Volume= 23.629 af, Atten= 3%, Lag= 7.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 5.3 fps, Min. Travel Time= 4.2 min Avg. Velocity = 2.5 fps, Avg. Travel Time= 9.0 min 1404 -SIA Ammended Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here) Page 9 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Peak Depth= 2.71'@ 12.40 hrs Capacity at bank full= 2,846.17 cfs Inlet Invert= 338.00', Outlet Invert= 328.00' Custom cross-section table, n= 0.040 Length= 1,330.0' Slope= 0.0075T Depth End Area Perim. Storage Discharge Inflow Area = (feet) (sq -ft) (feet) (cubic -feet) (cfs) Inflow = 0.00 0.0 0.0 0 0.00 Outflow = 0.70 3.1 7.9 4,123 5.35 Primary = 2.50 19.6 12.8 26,068 83.88 7.40 457.0 170.0 607,810 2,846.17 Pond 1 FS: WQ#1 Flow Splitter Inflow Area = 35.900 ac, Inflow Depth > 0.97" for 1 -Year event Inflow = 12.03 cfs @ 12.27 hrs, Volume= 2.887 of Outflow = 12.03 cfs @ 12.27 hrs, Volume= 2.887 af, Atten= 0%, Lag= 0.0 min Primary = 12.03 cfs @ 12.27 hrs, Volume= 2.887 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 315.51' @ 12.27 hrs Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= (not calculated: outflow precedes inflow) Device Routing Invert Outlet Devices #1 Primary 313.80' 6.0" x 40.0' long Culvert RCP, sq.cut end projecting, Ke= 0.500 Outlet Invert= 313.60' S= 0.0050 T Cc= 0.900 n= 0.013 #2 Primary 314.60' 4.00'W x 4.00' H Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=12.02 cfs @ 12.27 hrs HW=315.51' (Free Discharge) �__1=Culvert (Barrel Controls 0.87 cfs @ 4.4 fps) 2=Orifice/Grate (Orifice Controls 11.15 cfs @ 3.1 fps) Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 320.32' @ 12.27 hrs Surf.Area= 41,272 sf Storage= 87,821 cf Plug -Flow detention time= 215.0 min calculated for 2.881 of (67% of inflow) Center -of -Mass det. time= 106.0 min ( 937.9 - 831.9 ) Volume Invert Avail.Storage Storage Description #1 318.00' 488,336 cf Custom Stage Data (Prismatic)Listed below (Recalc) Pond 1 P: WQ#1 Inflow Area = 35.900 ac, Inflow Depth= 1.45" for 1 -Year event Inflow = 93.51 cfs @ 11.96 hrs, Volume= 4.328 of Outflow = 12.03 cfs @ 12.27 hrs, Volume= 2.887 af, Atten= 87%, Lag= 18.4 min Primary = 12.03 cfs @ 12.27 hrs, Volume= 2.887 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 320.32' @ 12.27 hrs Surf.Area= 41,272 sf Storage= 87,821 cf Plug -Flow detention time= 215.0 min calculated for 2.881 of (67% of inflow) Center -of -Mass det. time= 106.0 min ( 937.9 - 831.9 ) Volume Invert Avail.Storage Storage Description #1 318.00' 488,336 cf Custom Stage Data (Prismatic)Listed below (Recalc) 1404 -SIA Ammended Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 10 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 318.00 32,252 0 0 318.50 36,473 17,181 17,181 320.00 40,407 57,660 74,841 322.00 45,849 86,256 161,097 324.00 51,517 97,366 258,463 326.00 57,412 108,929 367,392 328.00 63,532 120,944 488,336 Device Routing Invert Outlet Devices #1 Primary 314.40' 36.0" x 66.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 314.00' S= 0.0061 T Cc= 0.900 n= 0.013 #2 Device 1 318.00' 4.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 319.70' 4.00'W x 0.50' H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 323.10' 5.00' x 5.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Primary 323.90' 40.0' long x 20.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=12.04 cfs @ 12.27 hrs HW=320.32' (Free Discharge) 1=Culvert (Passes 12.04 cfs of 71.53 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.62 cfs @ 7.1 fps) 3=Orifice/Grate (Orifice Controls 11.42 cfs @ 2.9 fps) 4=Orifice/Grate ( Controls 0.00 cfs) 5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond 2FS: WQ#2 Flow Splitter Inflow Area = 20.390 ac, Inflow Depth > 1.21" for 1 -Year event Inflow = 7.59 cfs @ 12.28 hrs, Volume= 2.059 of Outflow = 7.59 cfs @ 12.28 hrs, Volume= 2.059 af, Atten= 0%, Lag= 0.0 min Primary = 7.59 cfs @ 12.28 hrs, Volume= 2.059 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 331.08' @ 12.28 hrs Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= (not calculated: outflow precedes inflow) Device Routing Invert Outlet Devices #1 Primary 329.70' 4.0" x 13.0' long Culvert RCP, sq.cut end projecting, Ke= 0.500 Outlet Invert= 329.50' S=0.0154'/' Cc= 0.900 n=0.013 #2 Primary 330.40' 4.00'W x 2.00' H Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=7.59 cfs @ 12.28 hrs HW=331.08' (Free Discharge) �__1=Culvert (Barrel Controls 0.43 cfs @ 5.0 fps) 2=Orifice/Grate (Orifice Controls 7.16 cfs @ 2.6 fps) 1404 -SIA Ammended Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here) Page 11 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 335.13' @ 12.28 hrs Surf.Area= 32,798 sf Storage= 64,229 cf Plug -Flow detention time= 209.5 min calculated for 2.055 of (70% of inflow) Center -of -Mass det. time= 108.8 min ( 926.4 - 817.6 ) Volume Invert Avail.Storage Storage Description Pond 2P: WQ#2 Inflow Area = 20.390 ac, Inflow Depth= 1.74" for 1 -Year event Inflow = 63.11 cfs @ 11.96 hrs, Volume= 2.955 of Outflow = 7.59 cfs @ 12.28 hrs, Volume= 2.059 af, Atten= 88%, Lag= 19.4 min Primary = 7.59 cfs @ 12.28 hrs, Volume= 2.059 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 335.13' @ 12.28 hrs Surf.Area= 32,798 sf Storage= 64,229 cf Plug -Flow detention time= 209.5 min calculated for 2.055 of (70% of inflow) Center -of -Mass det. time= 108.8 min ( 926.4 - 817.6 ) Volume Invert Avail.Storage Storage Description #1 333.00' 298,026 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 333.00 26,876 0 0 333.50 29,012 13,972 13,972 334.00 30,101 14,778 28,750 341.00 46,835 269,276 298,026 Device Routing Invert Outlet Devices #1 Primary 330.10' 18.0" x 64.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 329.70' S=0.0063'/' Cc= 0.900 n=0.013 #2 Device 1 333.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 334.30' 2.00' W x 0.50' H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 337.50' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Primary 338.50' 150.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=7.59 cfs @ 12.28 hrs HW=335.13' (Free Discharge) 1=Culvert (Passes 7.59 cfs of 17.20 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.33 cfs @ 6.8 fps) 3=Orifice/Grate (Orifice Controls 7.26 cfs @ 3.6 fps) =Orifice/Grate ( Controls 0.00 cfs) 5= B road -C rested Rectangular Weir( Controls 0.00 cfs) Pond 3P: W#3 Inflow Area = 2.560 ac, Inflow Depth= 1.82" for 1 -Year event Inflow = 8.24 cfs @ 11.96 hrs, Volume= 0.388 of Outflow = 1.34 cfs @ 12.16 hrs, Volume= 0.254 af, Atten= 84%, Lag= 12.2 min Primary = 1.34 cfs @ 12.16 hrs, Volume= 0.254 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 330.62' @ 12.16 hrs Surf.Area= 6,397 sf Storage= 8,383 cf Plug -Flow detention time= 211.4 min calculated for 0.253 of (65% of inflow) Center -of -Mass det. time= 106.9 min ( 920.6 - 813.7 ) 1404 -SIA Ammended Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 12 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Volume Invert Avail.Storage Storage Description #1 329.00' 47,194 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 329.00 3,762 0 0 330.00 5,612 4,687 4,687 331.00 6,888 6,250 10,937 332.00 7,927 7,408 18,345 333.00 9,021 8,474 26,819 334.00 10,174 9,598 36,416 335.00 11,382 10,778 47,194 Device Routing Invert Outlet Devices #1 Primary 328.00' 15.0" x 20.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 326.00' S=0.1000'/' Cc= 0.900 n=0.013 #2 Device 1 329.00' 1.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 330.20' 1.50'W x 0.50' H Vert. Orifice/Grate C= 0.600 #4 Device 1 332.00' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Primary 333.00' 55.0' long x 15.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=1.33 cfs @ 12.16 hrs HW=330.61' (Free Discharge) 1=Culvert (Passes 1.33 cfs of 8.33 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.05 cfs @ 6.0 fps) 3=Orifice/Grate (Orifice Controls 1.29 cfs @ 2.1 fps) 4=Orifice/Grate ( Controls 0.00 cfs) 5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 329.71' @ 12.10 hrs Surf.Area= 31,985 sf Storage= 49,600 cf Plug -Flow detention time= 190.0 min calculated for 1.652 of (68% of inflow) Center -of -Mass det. time= 88.4 min ( 902.1 - 813.7 ) Volume Invert Avail.Storage Storage Description #1 328.00' 172,719 cf Custom Stage Data (Prismatic)Listed below (Recalc) Pond 4P: WQ#4 Inflow Area = 16.040 ac, Inflow Depth = 1.82" for 1 -Year event Inflow = 51.65 cfs @ 11.96 hrs, Volume= 2.430 of Outflow = 14.24 cfs @ 12.10 hrs, Volume= 1.656 af, Atten= 72%, Lag= 8.7 min Primary = 14.24 cfs @ 12.10 hrs, Volume= 1.656 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 329.71' @ 12.10 hrs Surf.Area= 31,985 sf Storage= 49,600 cf Plug -Flow detention time= 190.0 min calculated for 1.652 of (68% of inflow) Center -of -Mass det. time= 88.4 min ( 902.1 - 813.7 ) Volume Invert Avail.Storage Storage Description #1 328.00' 172,719 cf Custom Stage Data (Prismatic)Listed below (Recalc) 1404 -SIA Ammended Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 13 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 328.00 24,952 0 0 328.50 28,098 13,263 13,263 329.00 29,692 14,448 27,710 330.00 32,923 31,308 59,018 331.00 36,210 34,567 93,584 332.00 39,553 37,882 131,466 333.00 42,953 41,253 172,719 Device Routinq Invert Outlet Devices #1 Primary 325.20' 30.0" x 40.0' long PSP RCP, square edge headwall, Ke= 0.500 Outlet Invert= 325.00' S=0.0050'/' Cc= 0.900 n=0.013 #2 Device 1 329.20' 4.00'W x 0.80'H Vert. RISER ORIFICE X 3.00 C= 0.600 #3 Device 1 330.00' 4.00' x 4.00' Horiz. RISER CREST Limited to weir flow C=0.600 #4 Primary 328.00' 2.5" Horiz. LOW FLOW ORIFICE Limited to weir flow C=0.600 #5 Primary 331.00' 225.0' long x 20.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=14.22 cfs @ 12.10 hrs HW=329.71' (Free Discharge) 1=PSP (Passes 14.00 cfs of 42.67 cfs potential flow) �_2=RISER ORIFICE (Orifice Controls 14.00 cfs @ 2.3 fps) 3=RISER CREST ( Controls 0.00 cfs) 4=LOW FLOW ORIFICE (Orifice Controls 0.21 cfs @ 6.3 fps) 5=EMERGENCY SPILLWAY ( Controls 0.00 cfs) Link 2L: DP#1 Inflow Area = 549.020 ac, Inflow Depth > 1.17" for 1 -Year event Inflow = 400.01 cfs @ 12.45 hrs, Volume= 53.571 of Primary = 400.01 cfs @ 12.45 hrs, Volume= 53.571 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs 1404 -SIA Ammended Type// 24 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 14 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Time span=0.00-25.00 hrs, dt=0.05 hrs, 501 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: TO RR Culvert Runoff Area=216.200 ac Runoff Depth>1.71" Flow Length=4,444' Tc=36.9 min CN=81 Runoff=275.73 cfs 30.774 of Subcatchment 2S: TO DP#1A Runoff Area=229.320 ac Runoff Depth>1.50" Flow Length=3,477' Tc=27.2 min CN=78 Runoff=310.35 cfs 28.614 of Subcatchment 3S: TO DP#1 Runoff Area=28.610 ac Runoff Depth>0.95" Flow Length=2,581' Tc=20.7 min CN=69 Runoff=26.92 cfs 2.274 of Subcatchment 4S: TO DP#2 Runoff Area=2.000 ac Runoff Depth=0.95" Tc=5.0 min CN=69 Runoff=3.32 cfs 0.159 of Subcatchment 5S: TO DP#3 Runoff Area=5.470 ac Runoff Depth=0.75" Tc=5.0 min CN=65 Runoff=6.85 cfs 0.343 of Subcatchment 6S: TO DP#4 Runoff Area=9.710 ac Runoff Depth=1.57" Flow Length=824' Tc=14.0 min CN=79 Runoff=20.12 cfs 1.267 of Subcatchment 7S: TO W#3 Runoff Area=2.560 ac Runoff Depth=2.27" Tc=5.0 min CN=88 Runoff=10.19 cfs 0.484 of Subcatchment 8S: TO WQ#1 Runoff Area=35.900 ac Runoff Depth=1.86" Tc=5.0 min CN=83 Runoff=119.61 cfs 5.560 of Subcatchment 9S: TO WQ#2 Runoff Area=20.390 ac Runoff Depth=2.18" Tc=5.0 min CN=87 Runoff=78.51 cfs 3.708 of Subcatchment 10S: TO WQ#4 Runoff Area=16.040 ac Runoff Depth=2.27" Tc=5.0 min CN=88 Runoff=63.83 cfs 3.032 of Reach 1 R: Reach 1 Peak Depth=6.60' Max Vel=6.3 fps Inflow=525.62 cfs 64.762 of n=0.040 L=1,453.0' S=0.0069 T Capacity=12,151.76 cfs Outflow=513.29 cfs 64.669 of Reach 2R: Reach 2 Peak Depth=2.83' Max Vel=5.5 fps Inflow=275.73 cfs 30.774 of n=0.040 L=1,330.0' S=0.0075'/' Capacity=2,846.17 cfs Outflow=267.35 cfs 30.740 of Pond 1 FS: WQ#1 Flow Splitter Peak Elev=315.86' Inflow=19.23 cfs 4.108 of 0utflow=19.23 cfs 4.108 of Pond 1 P: WQ#1 Peak EIev=320.88' Storage=111.539 cf Inflow=119.61 cfs 5.560 of 0utflow=19.23 cfs 4.108 of Pond 2FS: WQ#2 Flow Splitter Peak EIev=331.24' Inflow=10.33 cfs 2.804 of 0utflow=10.33 cfs 2.804 of 1404—SIA Ammended Type// 24 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 15 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Pond 2P: WQ#2 Peak Elev=335.62' Storage=80,758 cf Inflow=78.51 cfs 3.708 of Outflow=10.33 cfs 2.804 of Pond 3P: W#3 Peak EIev=330.88' Storage=10,132 cf Inflow=10.19 cfs 0.484 of Outflow=2.39 cfs 0.349 of Pond 4P: WQ#4 Peak EIev=329.98' Storage=58,307 cf Inflow=63.83 cfs 3.032 of Outflow=26.68 cfs 2.255 of Link 2L: DP#1 Inflow=543.01 cfs 71.051 of Primary=543.01 cfs 71.051 of Total Runoff Area = 566.200 ac Runoff Volume = 76.215 of Average Runoff Depth = 1.62" 1404 -SIA Ammended Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 16 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Subcatchment 1S: TO RR Culvert Runoff = 275.73 cfs @ 12.34 hrs, Volume= 30.774 af, Depth> 1.71" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 28.720 98 Impervious 8.490 70 Woods, Good, HSG C 76.200 77 Woods, Good, HSG D 2.420 74 >75% Grass cover, Good, HSG C 100.370 80 >75% Grass cover, Good, HSG D 216.200 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Woods, Good, HSG D 14.5 75 0.0267 0.1 74 Sheet Flow, 93.290 80 >75% Grass cover, Good, HSG D Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 259 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.8 2,068 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 12.3 2,042 0.0070 2.8 27.68 Channel Flow, D=2'; B=3'; SS=2:1 Area= 10.0 sf Perim= 11.9' r= 0.84' n= 0.040 36.9 4,444 Total Subcatchment 2S: TO DP#1A Runoff = 310.35 cfs @ 12.22 hrs, Volume= 28.614 af, Depth> 1.50" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN DescriDtion 7.710 98 Impervious 4.040 55 Woods, Good, HSG B 0.040 70 Woods, Good, HSG C 117.410 77 Woods, Good, HSG D 2.900 61 >75% Grass cover, Good, HSG B 3.930 74 >75% Grass cover, Good, HSG C 93.290 80 >75% Grass cover, Good, HSG D 229.320 78 Weighted Average 1404 -SIA Ammended Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 17 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, 0.080 80 >75% Grass cover, Good, HSG D 2.000 Woods: Light underbrush n= 0.400 P2= 3.50" 7.3 1,332 0.0360 3.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.9 2,070 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 27.2 3,477 Total Subcatchment 3S: TO DP#1 Runoff = 26.92 cfs @ 12.16 hrs, Volume= 2.274 af, Depth> 0.95" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 0.390 98 Impervious 7.840 55 Woods, Good, HSG B 10.910 77 Woods, Good, HSG D 4.220 61 >75% Grass cover, Good, HSG B 5.250 80 >75% Grass cover, Good, HSG D 28.610 69 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 1,200 0.0620 4.0 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 1,306 0.0069 6.6 767.89 Channel Flow, Reach 1 Properties Area= 116.6 sf Perim= 37.4' r= 3.12' n= 0.040 20.7 2,581 Total Subcatchment 4S: TO DP#2 Runoff = 3.32 cfs @ 11.97 hrs, Volume= 0.159 af, Depth= 0.95" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 0.450 98 Impervious 0.390 55 Woods, Good, HSG B 0.040 77 Woods, Good, HSG D 1.040 61 >75% Grass cover, Good, HSG B 0.080 80 >75% Grass cover, Good, HSG D 2.000 69 Weighted Average 1404 -SIA Ammended Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 18 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: TO DP#3 Runoff = 6.85 cfs @ 11.97 hrs, Volume= 0.343 af, Depth= 0.75" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 0.970 98 Impervious 2.520 55 Woods, Good, HSG B 1.980 61 >75% Grass cover, Good, HSG B 5.470 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 6S: TO DP#4 Runoff = 20.12 cfs @ 12.06 hrs, Volume= 1.267 af, Depth= 1.57" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 0.770 98 Paved parking & roofs 8.050 77 Woods, Good, HSG D 0.890 80 >75% Grass cover, Good, HSG D 9.710 79 Weighted Average Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.4 366 0.0770 4.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.6 383 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 14.0 824 Total Subcatchment 7S: TO W#3 cfs @ 11.95 hrs, Volume= 0.484 af, Depth= 2.27" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 2 -Year Rainfall=3.50" 1404—SIA Ammended Type// 24 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 19 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Area (ac) CN Description 1.240 98 Impervious 0.050 61 >75% Grass cover, Good, HSG B 1.270 80 >75% Grass cover, Good, HSG D 2.560 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: TO WQ#1 Runoff = 119.61 cfs @ 11.96 hrs, Volume= 5.560 af, Depth= 1.86" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 16.260 98 Impervious 0.820 55 Woods, Good, HSG B 0.530 77 Woods, Good, HSG D 8.000 61 >75% Grass cover, Good, HSG B 10.290 80 >75% Grass cover, Good, HSG D 35.900 83 Weighted Average Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: TO WQ#2 Runoff = 78.51 cfs @ 11.96 hrs, Volume= 3.708 af, Depth= 2.18" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 9.290 98 Impervious 1.400 77 Woods, Good, HSG D 0.770 61 >75% Grass cover, Good, HSG B 8.870 80 >75% Grass cover, Good, HSG D 0.060 55 Woods, Good, HSG B 20.390 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 1404 -SIA Ammended Type// 24 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 20 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Subcatchment 10S: TO WQ#4 Runoff = 63.83 cfs @ 11.95 hrs, Volume= 3.032 af, Depth= 2.27" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 7.570 98 Impervious 8.470 80 >75% Grass cover, Good, HSG D 16.040 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Reach 1 R: Reach 1 Inflow Area = 484.510 ac, Inflow Depth > 1.60" for 2 -Year event Inflow = 525.62 cfs @ 12.31 hrs, Volume= 64.762 of Outflow = 513.29 cfs @ 12.44 hrs, Volume= 64.669 af, Atten= 2%, Lag= 7.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 6.3 fps, Min. Travel Time= 3.9 min Avg. Velocity = 3.1 fps, Avg. Travel Time= 7.7 min Peak Depth= 6.60' @ 12.37 hrs Capacity at bank full= 12,151.76 cfs Inlet Invert= 316.00', Outlet Invert= 306.00' Custom cross-section table, n= 0.040 Length= 1,453.0' Slope= 0.0069T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.90 5.0 9.1 7,265 10.34 4.10 35.7 15.9 51,872 188.66 4.90 45.2 18.9 65,676 249.12 8.20 116.6 37.4 169,420 766.91 18.20 1,169.2 188.8 1,698,848 12,151.76 Reach 2R: Reach 2 Inflow Area = 216.200 ac, Inflow Depth > 1.71" for 2 -Year event Inflow = 275.73 cfs @ 12.34 hrs, Volume= 30.774 of Outflow = 267.35 cfs @ 12.47 hrs, Volume= 30.740 af, Atten= 3%, Lag= 7.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 5.5 fps, Min. Travel Time= 4.0 min Avg. Velocity = 2.6 fps, Avg. Travel Time= 8.4 min 1404 -SIA Ammended Type// 24 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here) Page 21 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Peak Depth= 2.83'@ 12.40 hrs Capacity at bank full= 2,846.17 cfs Inlet Invert= 338.00', Outlet Invert= 328.00' Custom cross-section table, n= 0.040 Length= 1,330.0' Slope= 0.0075T Depth End Area Perim. Storage Discharge Inflow Area = (feet) (sq -ft) (feet) (cubic -feet) (cfs) Inflow = 0.00 0.0 0.0 0 0.00 Outflow = 0.70 3.1 7.9 4,123 5.35 Primary = 2.50 19.6 12.8 26,068 83.88 7.40 457.0 170.0 607,810 2,846.17 Pond 1 FS: WQ#1 Flow Splitter Inflow Area = 35.900 ac, Inflow Depth > 1.37" for 2 -Year event Inflow = 19.23 cfs @ 12.16 hrs, Volume= 4.108 of Outflow = 19.23 cfs @ 12.16 hrs, Volume= 4.108 af, Atten= 0%, Lag= 0.0 min Primary = 19.23 cfs @ 12.16 hrs, Volume= 4.108 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 315.86' @ 12.16 hrs Plug -Flow detention time= (not calculated: no plugs found) Center -of -Mass det. time= 0.0 min ( 911.1 - 911.1 ) Device Routing Invert Outlet Devices #1 Primary 313.80' 6.0" x 40.0' long Culvert RCP, sq.cut end projecting, Ke= 0.500 Outlet Invert= 313.60' S= 0.0050 T Cc= 0.900 n= 0.013 #2 Primary 314.60' 4.00'W x 4.00' H Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=19.20 cfs @ 12.16 hrs HW=315.86' (Free Discharge) �__1=Culvert (Barrel Controls 0.97 cfs @ 4.9 fps) 2=Orifice/Grate (Orifice Controls 18.23 cfs @ 3.6 fps) Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 320.88' @ 12.16 hrs Surf.Area= 42,807 sf Storage= 111,539 cf Plug -Flow detention time= 182.3 min calculated for 4.100 of (74% of inflow) Center -of -Mass det. time= 86.4 min ( 911.1 - 824.7 ) Volume Invert Avail.Storage Storage Description #1 318.00' 488,336 cf Custom Stage Data (Prismatic)Listed below (Recalc) Pond 1 P: WQ#1 Inflow Area = 35.900 ac, Inflow Depth = 1.86" for 2 -Year event Inflow = 119.61 cfs @ 11.96 hrs, Volume= 5.560 of Outflow = 19.23 cfs @ 12.16 hrs, Volume= 4.108 af, Atten= 84%, Lag= 12.4 min Primary = 19.23 cfs @ 12.16 hrs, Volume= 4.108 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 320.88' @ 12.16 hrs Surf.Area= 42,807 sf Storage= 111,539 cf Plug -Flow detention time= 182.3 min calculated for 4.100 of (74% of inflow) Center -of -Mass det. time= 86.4 min ( 911.1 - 824.7 ) Volume Invert Avail.Storage Storage Description #1 318.00' 488,336 cf Custom Stage Data (Prismatic)Listed below (Recalc) 1404 -SIA Ammended Type// 24 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 22 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Elevation (feet) Surf.Area (sq -ft) Inc.Store (cubic -feet) Cum.Store (cubic -feet) 318.00 32,252 0 0 318.50 36,473 17,181 17,181 320.00 40,407 57,660 74,841 322.00 45,849 86,256 161,097 324.00 51,517 97,366 258,463 326.00 57,412 108,929 367,392 328.00 63,532 120,944 488,336 Device Routing Invert Outlet Devices #1 Primary 314.40' 36.0" x 66.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 314.00' S= 0.0061 T Cc= 0.900 n= 0.013 #2 Device 1 318.00' 4.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 319.70' 4.00'W x 0.50' H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 323.10' 5.00' x 5.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Primary 323.90' 40.0' long x 20.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=19.20 cfs @ 12.16 hrs HW=320.88' (Free Discharge) 1=Culvert (Passes 19.20 cfs of 75.95 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.69 cfs @ 7.9 fps) 3=Orifice/Grate (Orifice Controls 18.51 cfs @ 4.6 fps) 4=Orifice/Grate ( Controls 0.00 cfs) 5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond 2FS: WQ#2 Flow Splitter Inflow Area = 20.390 ac, Inflow Depth > 1.65" for 2 -Year event Inflow = 10.33 cfs @ 12.22 hrs, Volume= 2.804 of Outflow = 10.33 cfs @ 12.22 hrs, Volume= 2.804 af, Atten= 0%, Lag= 0.0 min Primary = 10.33 cfs @ 12.22 hrs, Volume= 2.804 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 331.24' @ 12.22 hrs Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= (not calculated: outflow precedes inflow) Device Routing Invert Outlet Devices #1 Primary 329.70' 4.0" x 13.0' long Culvert RCP, sq.cut end projecting, Ke= 0.500 Outlet Invert= 329.50' S=0.0154'/' Cc= 0.900 n=0.013 #2 Primary 330.40' 4.00'W x 2.00' H Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=10.32 cfs @ 12.22 hrs HW=331.24' (Free Discharge) �__1=Culvert (Barrel Controls 0.46 cfs @ 5.3 fps) 2=Orifice/Grate (Orifice Controls 9.86 cfs @ 2.9 fps) 1404 -SIA Ammended Type// 24 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here) Page 23 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 335.62' @ 12.22 hrs Surf.Area= 33,981 sf Storage= 80,758 cf Plug -Flow detention time= 189.9 min calculated for 2.804 of (76% of inflow) Center -of -Mass det. time= 98.7 min ( 909.8 - 811.1 ) Volume Invert Avail.Storage Storage Description Pond 2P: WQ#2 Inflow Area = 20.390 ac, Inflow Depth = 2.18" for 2 -Year event Inflow = 78.51 cfs @ 11.96 hrs, Volume= 3.708 of Outflow = 10.33 cfs @ 12.22 hrs, Volume= 2.804 af, Atten= 87%, Lag= 15.7 min Primary = 10.33 cfs @ 12.22 hrs, Volume= 2.804 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 335.62' @ 12.22 hrs Surf.Area= 33,981 sf Storage= 80,758 cf Plug -Flow detention time= 189.9 min calculated for 2.804 of (76% of inflow) Center -of -Mass det. time= 98.7 min ( 909.8 - 811.1 ) Volume Invert Avail.Storage Storage Description #1 333.00' 298,026 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 333.00 26,876 0 0 333.50 29,012 13,972 13,972 334.00 30,101 14,778 28,750 341.00 46,835 269,276 298,026 Device Routing Invert Outlet Devices #1 Primary 330.10' 18.0" x 64.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 329.70' S=0.0063'/' Cc= 0.900 n=0.013 #2 Device 1 333.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 334.30' 2.00' W x 0.50' H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 337.50' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Primary 338.50' 150.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=10.32 cfs @ 12.22 hrs HW=335.62' (Free Discharge) 1=Culvert (Passes 10.32 cfs of 18.25 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.37 cfs @ 7.6 fps) 3=Orifice/Grate (Orifice Controls 9.95 cfs @ 5.0 fps) =Orifice/Grate ( Controls 0.00 cfs) 5= B road -C rested Rectangular Weir( Controls 0.00 cfs) Pond 3P: W#3 Inflow Area = 2.560 ac, Inflow Depth = 2.27" for 2 -Year event Inflow = 10.19 cfs @ 11.95 hrs, Volume= 0.484 of Outflow = 2.39 cfs @ 12.11 hrs, Volume= 0.349 af, Atten= 77%, Lag= 9.4 min Primary = 2.39 cfs @ 12.11 hrs, Volume= 0.349 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 330.88' @ 12.11 hrs Surf.Area= 6,737 sf Storage= 10,132 cf Plug -Flow detention time= 183.8 min calculated for 0.349 of (72% of inflow) Center -of -Mass det. time= 87.7 min ( 895.1 - 807.4 ) 1404 -SIA Ammended Type// 24 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 24 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Volume Invert Avail.Storage Storage Description #1 329.00' 47,194 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 329.00 3,762 0 0 330.00 5,612 4,687 4,687 331.00 6,888 6,250 10,937 332.00 7,927 7,408 18,345 333.00 9,021 8,474 26,819 334.00 10,174 9,598 36,416 335.00 11,382 10,778 47,194 Device Routing Invert Outlet Devices #1 Primary 328.00' 15.0" x 20.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 326.00' S=0.1000'/' Cc= 0.900 n=0.013 #2 Device 1 329.00' 1.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 330.20' 1.50'W x 0.50' H Vert. Orifice/Grate C= 0.600 #4 Device 1 332.00' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Primary 333.00' 55.0' long x 15.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=2.38 cfs @ 12.11 hrs HW=330.88' (Free Discharge) 1=Culvert (Passes 2.38 cfs of 8.87 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.05 cfs @ 6.5 fps) 3=Orifice/Grate (Orifice Controls 2.33 cfs @ 3.1 fps) 4=Orifice/Grate ( Controls 0.00 cfs) 5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 329.98' @ 12.07 hrs Surf.Area= 32,853 sf Storage= 58,307 cf Plug -Flow detention time= 164.8 min calculated for 2.255 of (74% of inflow) Center -of -Mass det. time= 72.1 min ( 879.5 - 807.4 ) Volume Invert Avail.Storage Storage Description #1 328.00' 172,719 cf Custom Stage Data (Prismatic)Listed below (Recalc) Pond 4P: WQ#4 Inflow Area = 16.040 ac, Inflow Depth = 2.27" for 2 -Year event Inflow = 63.83 cfs @ 11.95 hrs, Volume= 3.032 of Outflow = 26.68 cfs @ 12.07 hrs, Volume= 2.255 af, Atten= 58%, Lag= 6.7 min Primary = 26.68 cfs @ 12.07 hrs, Volume= 2.255 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 329.98' @ 12.07 hrs Surf.Area= 32,853 sf Storage= 58,307 cf Plug -Flow detention time= 164.8 min calculated for 2.255 of (74% of inflow) Center -of -Mass det. time= 72.1 min ( 879.5 - 807.4 ) Volume Invert Avail.Storage Storage Description #1 328.00' 172,719 cf Custom Stage Data (Prismatic)Listed below (Recalc) 1404 -SIA Ammended Type// 24 -hr 2 -Year Rainfall=3.50" Prepared by {enter your company name here} Page 25 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 328.00 24,952 0 0 328.50 28,098 13,263 13,263 329.00 29,692 14,448 27,710 330.00 32,923 31,308 59,018 331.00 36,210 34,567 93,584 332.00 39,553 37,882 131,466 333.00 42,953 41,253 172,719 Device Routinq Invert Outlet Devices #1 Primary 325.20' 30.0" x 40.0' long PSP RCP, square edge headwall, Ke= 0.500 Outlet Invert= 325.00' S=0.0050'/' Cc= 0.900 n=0.013 #2 Device 1 329.20' 4.00'W x 0.80'H Vert. RISER ORIFICE X 3.00 C= 0.600 #3 Device 1 330.00' 4.00' x 4.00' Horiz. RISER CREST Limited to weir flow C=0.600 #4 Primary 328.00' 2.5" Horiz. LOW FLOW ORIFICE Limited to weir flow C=0.600 #5 Primary 331.00' 225.0' long x 20.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=26.01 cfs @ 12.07 hrs HW=329.97' (Free Discharge) 1=PSP (Passes 25.78 cfs of 44.31 cfs potential flow) �_2=RISER ORIFICE (Orifice Controls 25.78 cfs @ 2.8 fps) 3=RISER CREST ( Controls 0.00 cfs) 4=LOW FLOW ORIFICE (Orifice Controls 0.23 cfs @ 6.7 fps) 5=EMERGENCY SPILLWAY ( Controls 0.00 cfs) Link 2L: DP#1 Inflow Area = 549.020 ac, Inflow Depth > 1.55" for 2 -Year event Inflow = 543.01 cfs @ 12.43 hrs, Volume= 71.051 of Primary = 543.01 cfs @ 12.43 hrs, Volume= 71.051 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs 1404 -SIA Ammended Type 11 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here) Page 26 HydroCAD® 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Time span=0.00-25.00 hrs, dt=0.05 hrs, 501 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: TO RR Culvert RunoffArea=216.200 ac Runoff Depth>3.07" Flow Length=4,444' Tc=36.9 min CN=81 Runoff=501.34 cfs 55.366 of Subcatchment 2S: TO DP#1A Runoff Area=229.320 ac Runoff Depth>2.80" Flow Length=3,477' Tc=27.2 min CN=78 Runoff=590.82 cfs 53.445 of Subcatchment 3S: TO DP#1 Runoff Area=28.610 ac Runoff Depth>2.03" Flow Length=2,581' Tc=20.7 min CN=69 Runoff=61.67 cfs 4.841 of Subcatchment 4S: TO DP#2 Runoff Area=2.000 ac Runoff Depth=2.03" Tc=5.0 min CN=69 Runoff=7.31 cfs 0.338 of Subcatchment 5S: TO DP#3 Runoff Area=5.470 ac Runoff Depth=1.72" Tc=5.0 min CN=65 Runoff=16.79 cfs 0.784 of Subcatchment 6S: TO DP#4 Runoff Area=9.710 ac Runoff Depth=2.89" Flow Length=824' Tc=14.0 min CN=79 Runoff=37.20 cfs 2.337 of Subcatchment 7S: TO W#3 Runoff Area=2.560 ac Runoff Depth=3.76" Tc=5.0 min CN=88 Runoff=16.44 cfs 0.803 of Subcatchment 8S: TO WQ#1 Runoff Area=35.900 ac Runoff Depth=3.26" Tc=5.0 min CN=83 Runoff=205.99 cfs 9.767 of Subcatchment 9S: TO WQ#2 Runoff Area=20.390 ac Runoff Depth=3.66" Tc=5.0 min CN=87 Runoff=128.28 cfs 6.222 of Subcatchment 10S: TO WQ#4 Runoff Area=16.040 ac Runoff Depth=3.76" Tc=5.0 min CN=88 Runoff=103.00 cfs 5.031 of Reach 1R: Reach 1 Peak Depth=8.39' Max Vel=7.2 fps Inflow=988.96 cfs 118.976 of n=0.040 L=1,453.0' S=0.0069'/' Capacity=12,151.76 cfs Outflow=977.89 cfs 118.856 of Reach 2R: Reach 2 Peak Depth=3.22' Max Vel=5.8 fps Inflow=501.34 cfs 55.366 of n=0.040 L=1,330.0' S=0.0075'/' Capacity=2,846.17 cfs Outflow=486.45 cfs 55.319 of Pond 1 FS: WQ#1 Flow Splitter Peak Elev=316.46' Inflow=33.71 cfs 8.293 of Outflow=33.71 cfs 8.293 of Pond 1 P: WQ#1 Peak Elev=322.85' Storage=201.247 cf Inflow=205.99 cfs 9.767 of Outflow=33.71 cfs 8.293 of Pond 2FS: WQ#2 Flow Splitter Peak Elev=331.55' Inflow=16.28 cfs 5.297 of Outflow=16.28 cfs 5.297 of 1404—SIA Ammended Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 27 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Pond 2P: WQ#2 Peak Elev=337.25' Storage=139,029 cf Inflow=128.28 cfs 6.222 of Outflow=16.28 cfs 5.297 of Pond 3P: W#3 Peak Elev=331.74' Storage=16,341 cf Inflow=16.44 cfs 0.803 of Outflow=4.16 cfs 0.666 of Pond 4P: WQ#4 Peak Elev=330.72' Storage=83,419 cf Inflow=103.00 cfs 5.031 of Outflow=49.09 cfs 4.249 of Link 2L: DP#1 Inflow=1,039.72 cfs 131.990 of Primary=1,039.72 cfs 131.990 of Total Runoff Area = 566.200 ac Runoff Volume = 138.934 of Average Runoff Depth = 2.94" 1404 -SIA Ammended Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 28 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Subcatchment 1S: TO RR Culvert Runoff = 501.34 cfs @ 12.33 hrs, Volume= 55.366 af, Depth> 3.07" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 28.720 98 Impervious 8.490 70 Woods, Good, HSG C 76.200 77 Woods, Good, HSG D 2.420 74 >75% Grass cover, Good, HSG C 100.370 80 >75% Grass cover, Good, HSG D 216.200 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Woods, Good, HSG D 14.5 75 0.0267 0.1 74 Sheet Flow, 93.290 80 >75% Grass cover, Good, HSG D Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 259 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.8 2,068 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 12.3 2,042 0.0070 2.8 27.68 Channel Flow, D=2'; B=3'; SS=2:1 Area= 10.0 sf Perim= 11.9' r= 0.84' n= 0.040 36.9 4,444 Total Subcatchment 2S: TO DP#1A Runoff = 590.82 cfs @ 12.21 hrs, Volume= 53.445 af, Depth> 2.80" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN DescriDtion 7.710 98 Impervious 4.040 55 Woods, Good, HSG B 0.040 70 Woods, Good, HSG C 117.410 77 Woods, Good, HSG D 2.900 61 >75% Grass cover, Good, HSG B 3.930 74 >75% Grass cover, Good, HSG C 93.290 80 >75% Grass cover, Good, HSG D 229.320 78 Weighted Average 1404 -SIA Ammended Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 29 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, 0.080 80 >75% Grass cover, Good, HSG D 2.000 Woods: Light underbrush n= 0.400 P2= 3.50" 7.3 1,332 0.0360 3.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.9 2,070 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 27.2 3,477 Total Subcatchment 3S: TO DP#1 Runoff = 61.67 cfs @ 12.14 hrs, Volume= 4.841 af, Depth> 2.03" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 0.390 98 Impervious 7.840 55 Woods, Good, HSG B 10.910 77 Woods, Good, HSG D 4.220 61 >75% Grass cover, Good, HSG B 5.250 80 >75% Grass cover, Good, HSG D 28.610 69 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 1,200 0.0620 4.0 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 1,306 0.0069 6.6 767.89 Channel Flow, Reach 1 Properties Area= 116.6 sf Perim= 37.4' r= 3.12' n= 0.040 20.7 2,581 Total Subcatchment 4S: TO DP#2 Runoff = 7.31 cfs @ 11.96 hrs, Volume= 0.338 af, Depth= 2.03" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 0.450 98 Impervious 0.390 55 Woods, Good, HSG B 0.040 77 Woods, Good, HSG D 1.040 61 >75% Grass cover, Good, HSG B 0.080 80 >75% Grass cover, Good, HSG D 2.000 69 Weighted Average 1404 -SIA Ammended Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 30 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: TO DP#3 Runoff = 16.79 cfs @ 11.96 hrs, Volume= 0.784 af, Depth= 1.72" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 0.970 98 Impervious 2.520 55 Woods, Good, HSG B 1.980 61 >75% Grass cover, Good, HSG B 5.470 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 6S: TO DP#4 Runoff = 37.20 cfs @ 12.06 hrs, Volume= 2.337 af, Depth= 2.89" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 0.770 98 Paved parking & roofs 8.050 77 Woods, Good, HSG D 0.890 80 >75% Grass cover, Good, HSG D 9.710 79 Weighted Average Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.4 366 0.0770 4.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.6 383 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 14.0 824 Total Subcatchment 7S: TO W#3 cfs @ 11.95 hrs, Volume= 0.803 af, Depth= 3.76" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 10 -Year Rainfall=5.10" 1404—SIA Ammended Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 31 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Area (ac) CN Description 1.240 98 Impervious 0.050 61 >75% Grass cover, Good, HSG B 1.270 80 >75% Grass cover, Good, HSG D 2.560 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: TO WQ#1 Runoff = 205.99 cfs @ 11.95 hrs, Volume= 9.767 af, Depth= 3.26" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 16.260 98 Impervious 0.820 55 Woods, Good, HSG B 0.530 77 Woods, Good, HSG D 8.000 61 >75% Grass cover, Good, HSG B 10.290 80 >75% Grass cover, Good, HSG D 35.900 83 Weighted Average Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: TO WQ#2 Runoff = 128.28 cfs @ 11.95 hrs, Volume= 6.222 af, Depth= 3.66" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 9.290 98 Impervious 1.400 77 Woods, Good, HSG D 0.770 61 >75% Grass cover, Good, HSG B 8.870 80 >75% Grass cover, Good, HSG D 0.060 55 Woods, Good, HSG B 20.390 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 1404 -SIA Ammended Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 32 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Subcatchment 10S: TO WQ#4 Runoff = 103.00 cfs @ 11.95 hrs, Volume= 5.031 af, Depth= 3.76" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 7.570 98 Impervious 8.470 80 >75% Grass cover, Good, HSG D 16.040 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Reach 1 R: Reach 1 Inflow Area = 484.510 ac, Inflow Depth > 2.95" for 10 -Year event Inflow = 988.96 cfs @ 12.29 hrs, Volume= 118.976 of Outflow = 977.89 cfs @ 12.39 hrs, Volume= 118.856 af, Atten= 1%, Lag= 5.9 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 7.2 fps, Min. Travel Time= 3.4 min Avg. Velocity = 3.6 fps, Avg. Travel Time= 6.8 min Peak Depth= 8.39' @ 12.33 hrs Capacity at bank full= 12,151.76 cfs Inlet Invert= 316.00', Outlet Invert= 306.00' Custom cross-section table, n= 0.040 Length= 1,453.0' Slope= 0.0069T Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.90 5.0 9.1 7,265 10.34 4.10 35.7 15.9 51,872 188.66 4.90 45.2 18.9 65,676 249.12 8.20 116.6 37.4 169,420 766.91 18.20 1,169.2 188.8 1,698,848 12,151.76 Reach 2R: Reach 2 Inflow Area = 216.200 ac, Inflow Depth > 3.07" for 10 -Year event Inflow = 501.34 cfs @ 12.33 hrs, Volume= 55.366 of Outflow = 486.45 cfs @ 12.45 hrs, Volume= 55.319 af, Atten= 3%, Lag= 7.5 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 5.8 fps, Min. Travel Time= 3.8 min Avg. Velocity = 3.0 fps, Avg. Travel Time= 7.3 min 1404 -SIA Ammended Type 11 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here) Page 33 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Peak Depth= 3.22'@ 12.39 hrs Capacity at bank full= 2,846.17 cfs Inlet Invert= 338.00', Outlet Invert= 328.00' Custom cross-section table, n= 0.040 Length= 1,330.0' Slope= 0.0075T Depth (feet) End Area (sq -ft) Perim. (feet) Storage (cubic -feet) Discharge (cfs) 0.00 0.0 0.0 0 0.00 0.70 3.1 7.9 4,123 5.35 2.50 19.6 12.8 26,068 83.88 7.40 457.0 170.0 607,810 2,846.17 Pond 1 FS: WQ#1 Flow Splitter Inflow Area = 35.900 ac, Inflow Depth > 2.77" for 10 -Year event Inflow = 33.71 cfs @ 12.15 hrs, Volume= 8.293 of Outflow = 33.71 cfs @ 12.15 hrs, Volume= 8.293 af, Atten= 0%, Lag= 0.0 min Primary = 33.71 cfs @ 12.15 hrs, Volume= 8.293 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 316.46' @ 12.15 hrs Plug -Flow detention time= 0.0 min calculated for 8.293 of (100% of inflow) Center -of -Mass det. time= 0.0 min ( 884.3 - 884.3 ) Device Routing Invert Outlet Devices #1 Primary 313.80' 6.0" x 40.0' long Culvert RCP, sq.cut end projecting, Ke= 0.500 Outlet Invert= 313.60' S= 0.0050 T Cc= 0.900 n= 0.013 #2 Primary 314.60' 4.00'W x 4.00' H Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=33.70 cfs @ 12.15 hrs HW=316.46' (Free Discharge) �__1=Culvert (Barrel Controls 1.12 cfs @ 5.7 fps) 2=Orifice/Grate (Orifice Controls 32.58 cfs @ 4.4 fps) Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 322.85' @ 12.15 hrs Surf.Area= 48,267 sf Storage= 201,247 cf Plug -Flow detention time= 144.4 min calculated for 8.293 of (85% of inflow) Center -of -Mass det. time= 75.7 min ( 884.3 - 808.6 ) Volume Invert Avail.Storage Storage Description #1 318.00' 488,336 cf Custom Stage Data (Prismatic)Listed below (Recalc) Pond 1 P: WQ#1 Inflow Area = 35.900 ac, Inflow Depth= 3.26" for 10 -Year event Inflow = 205.99 cfs @ 11.95 hrs, Volume= 9.767 of Outflow = 33.71 cfs @ 12.15 hrs, Volume= 8.293 af, Atten= 84%, Lag= 12.0 min Primary = 33.71 cfs @ 12.15 hrs, Volume= 8.293 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 322.85' @ 12.15 hrs Surf.Area= 48,267 sf Storage= 201,247 cf Plug -Flow detention time= 144.4 min calculated for 8.293 of (85% of inflow) Center -of -Mass det. time= 75.7 min ( 884.3 - 808.6 ) Volume Invert Avail.Storage Storage Description #1 318.00' 488,336 cf Custom Stage Data (Prismatic)Listed below (Recalc) 1404 -SIA Ammended Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 34 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Elevation (feet) Surf.Area (sq -ft) Inc.Store (cubic -feet) Cum.Store (cubic -feet) 318.00 32,252 0 0 318.50 36,473 17,181 17,181 320.00 40,407 57,660 74,841 322.00 45,849 86,256 161,097 324.00 51,517 97,366 258,463 326.00 57,412 108,929 367,392 328.00 63,532 120,944 488,336 Device Routing Invert Outlet Devices #1 Primary 314.40' 36.0" x 66.0' long Culvert RCP, square edge headwall, Ke= 0.500 20.390 ac, Inflow Depth > 3.12" for 10 -Year event Outlet Invert= 314.00' S= 0.0061 T Cc= 0.900 n= 0.013 #2 Device 1 318.00' 4.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 319.70' 4.00'W x 0.50' H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 323.10' 5.00' x 5.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Primary 323.90' 40.0' long x 20.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=33.71 cfs @ 12.15 hrs HW=322.85' (Free Discharge) 1=Culvert (Passes 33.71 cfs of 89.74 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.91 cfs @ 10.4 fps) 3=Orifice/Grate (Orifice Controls 32.80 cfs @ 8.2 fps) 4=Orifice/Grate ( Controls 0.00 cfs) 5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 331.55' @ 12.22 hrs Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 0.0 min ( 897.1 - 897.1 ) Device Routing Invert Outlet Devices #1 Primary 329.70' 4.0" x 13.0' long Culvert RCP, sq.cut end projecting, Ke= 0.500 Outlet Invert= 329.50' S=0.0154'/' Cc= 0.900 n=0.013 #2 Primary 330.40' 4.00'W x 2.00' H Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=16.28 cfs @ 12.22 hrs HW=331.55' (Free Discharge) �__1=Culvert (Barrel Controls 0.51 cfs @ 5.8 fps) 2=Orifice/Grate (Orifice Controls 15.77 cfs @ 3.4 fps) Pond 2FS: WQ#2 Flow Splitter Inflow Area = 20.390 ac, Inflow Depth > 3.12" for 10 -Year event Inflow = 16.28 cfs @ 12.22 hrs, Volume= 5.297 of Outflow = 16.28 cfs @ 12.22 hrs, Volume= 5.297 af, Atten= 0%, Lag= 0.0 min Primary = 16.28 cfs @ 12.22 hrs, Volume= 5.297 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 331.55' @ 12.22 hrs Plug -Flow detention time= (not calculated: outflow precedes inflow) Center -of -Mass det. time= 0.0 min ( 897.1 - 897.1 ) Device Routing Invert Outlet Devices #1 Primary 329.70' 4.0" x 13.0' long Culvert RCP, sq.cut end projecting, Ke= 0.500 Outlet Invert= 329.50' S=0.0154'/' Cc= 0.900 n=0.013 #2 Primary 330.40' 4.00'W x 2.00' H Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=16.28 cfs @ 12.22 hrs HW=331.55' (Free Discharge) �__1=Culvert (Barrel Controls 0.51 cfs @ 5.8 fps) 2=Orifice/Grate (Orifice Controls 15.77 cfs @ 3.4 fps) 1404 -SIA Ammended Type 11 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here) Page 35 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 337.25' @ 12.22 hrs Surf.Area= 37,859 sf Storage= 139,029 cf Plug -Flow detention time= 168.2 min calculated for 5.297 of (85% of inflow) Center -of -Mass det. time= 100.7 min ( 897.1 - 796.4 ) Volume Invert Avail.Storage Storage Description Pond 2P: WQ#2 Inflow Area = 20.390 ac, Inflow Depth= 3.66" for 10 -Year event Inflow = 128.28 cfs @ 11.95 hrs, Volume= 6.222 of Outflow = 16.28 cfs @ 12.22 hrs, Volume= 5.297 af, Atten= 87%, Lag= 15.9 min Primary = 16.28 cfs @ 12.22 hrs, Volume= 5.297 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 337.25' @ 12.22 hrs Surf.Area= 37,859 sf Storage= 139,029 cf Plug -Flow detention time= 168.2 min calculated for 5.297 of (85% of inflow) Center -of -Mass det. time= 100.7 min ( 897.1 - 796.4 ) Volume Invert Avail.Storage Storage Description #1 333.00' 298,026 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 333.00 26,876 0 0 333.50 29,012 13,972 13,972 334.00 30,101 14,778 28,750 341.00 46,835 269,276 298,026 Device Routing Invert Outlet Devices #1 Primary 330.10' 18.0" x 64.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 329.70' S=0.0063'/' Cc= 0.900 n=0.013 #2 Device 1 333.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 334.30' 2.00' W x 0.50' H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 337.50' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Primary 338.50' 150.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=16.28 cfs @ 12.22 hrs HW=337.24' (Free Discharge) 1=Culvert (Passes 16.28 cfs of 21.34 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.48 cfs @ 9.8 fps) 3=Orifice/Grate (Orifice Controls 15.80 cfs @ 7.9 fps) =Orifice/Grate ( Controls 0.00 cfs) 5= B road -C rested Rectangular Weir( Controls 0.00 cfs) Pond 3P: W#3 Inflow Area = 2.560 ac, Inflow Depth= 3.76" for 10 -Year event Inflow = 16.44 cfs @ 11.95 hrs, Volume= 0.803 of Outflow = 4.16 cfs @ 12.10 hrs, Volume= 0.666 af, Atten= 75%, Lag= 9.0 min Primary = 4.16 cfs @ 12.10 hrs, Volume= 0.666 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 331.74' @ 12.10 hrs Surf.Area= 7,660 sf Storage= 16,341 cf Plug -Flow detention time= 142.9 min calculated for 0.665 of (83% of inflow) Center -of -Mass det. time= 70.3 min ( 863.4 - 793.1 ) 1404 -SIA Ammended Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 36 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Volume Invert Avail.Storage Storage Description #1 329.00' 47,194 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 329.00 3,762 0 0 330.00 5,612 4,687 4,687 331.00 6,888 6,250 10,937 332.00 7,927 7,408 18,345 333.00 9,021 8,474 26,819 334.00 10,174 9,598 36,416 335.00 11,382 10,778 47,194 Device Routing Invert Outlet Devices #1 Primary 328.00' 15.0" x 20.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 326.00' S=0.1000'/' Cc= 0.900 n=0.013 #2 Device 1 329.00' 1.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 330.20' 1.50'W x 0.50' H Vert. Orifice/Grate C= 0.600 #4 Device 1 332.00' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Primary 333.00' 55.0' long x 15.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=4.16 cfs @ 12.10 hrs HW=331.74' (Free Discharge) 1=Culvert (Passes 4.16 cfs of 10.43 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.06 cfs @ 7.9 fps) 3=Orifice/Grate (Orifice Controls 4.10 cfs @ 5.5 fps) 4=Orifice/Grate ( Controls 0.00 cfs) 5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 330.72' @ 12.05 hrs Surf.Area= 35,275 sf Storage= 83,419 cf Plug -Flow detention time= 123.3 min calculated for 4.249 of (84% of inflow) Center -of -Mass det. time= 53.9 min ( 847.0 - 793.1 ) Volume Invert Avail.Storage Storage Description #1 328.00' 172,719 cf Custom Stage Data (Prismatic)Listed below (Recalc) Pond 4P: WQ#4 Inflow Area = 16.040 ac, Inflow Depth = 3.76" for 10 -Year event Inflow = 103.00 cfs @ 11.95 hrs, Volume= 5.031 of Outflow = 49.09 cfs @ 12.05 hrs, Volume= 4.249 af, Atten= 52%, Lag= 6.0 min Primary = 49.09 cfs @ 12.05 hrs, Volume= 4.249 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 330.72' @ 12.05 hrs Surf.Area= 35,275 sf Storage= 83,419 cf Plug -Flow detention time= 123.3 min calculated for 4.249 of (84% of inflow) Center -of -Mass det. time= 53.9 min ( 847.0 - 793.1 ) Volume Invert Avail.Storage Storage Description #1 328.00' 172,719 cf Custom Stage Data (Prismatic)Listed below (Recalc) 1404 -SIA Ammended Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by {enter your company name here} Page 37 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 328.00 24,952 0 0 328.50 28,098 13,263 13,263 329.00 29,692 14,448 27,710 330.00 32,923 31,308 59,018 331.00 36,210 34,567 93,584 332.00 39,553 37,882 131,466 333.00 42,953 41,253 172,719 Device Routinq Invert Outlet Devices #1 Primary 325.20' 30.0" x 40.0' long PSP RCP, square edge headwall, Ke= 0.500 Outlet Invert= 325.00' S=0.0050'/' Cc= 0.900 n=0.013 #2 Device 1 329.20' 4.00'W x 0.80'H Vert. RISER ORIFICE X 3.00 C= 0.600 #3 Device 1 330.00' 4.00' x 4.00' Horiz. RISER CREST Limited to weir flow C=0.600 #4 Primary 328.00' 2.5" Horiz. LOW FLOW ORIFICE Limited to weir flow C=0.600 #5 Primary 331.00' 225.0' long x 20.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=49.06 cfs @ 12.05 hrs HW=330.71' (Free Discharge) 1=PSP (Inlet Controls 48.79 cfs @ 9.9 fps) �_2=RISER ORIFICE (Passes < 48.44 cfs potential flow) 3=RISER CREST (Passes < 31.33 cfs potential flow) 4=LOW FLOW ORIFICE (Orifice Controls 0.27 cfs @ 7.9 fps) 5=EMERGENCY SPILLWAY ( Controls 0.00 cfs) Link 2L: DP#1 Inflow Area = 549.020 ac, Inflow Depth > 2.88" for 10 -Year event Inflow = 1,039.72 cfs @ 12.38 hrs, Volume= 131.990 of Primary = 1,039.72 cfs @ 12.38 hrs, Volume= 131.990 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs 1404 -SIA Ammended Type 1124 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 38 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Time span=0.00-25.00 hrs, dt=0.05 hrs, 501 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: TO RR Culvert Runoff Area=216.200 ac Runoff Depth>5.18" Flow Length=4,444' Tc=36.9 min CN=81 Runoff=839.96 cfs 93.274 of Subcatchment 2S: TO DP#1A Runoff Area=229.320 ac Runoff Depth>4.84" Flow Length=3,477' Tc=27.2 min CN=78 Runoff=1,020.15 cfs 92.474 of Subcatchment 3S: TO DP#1 Runoff Area=28.610 ac Runoff Depth=3.84" Flow Length=2,581' Tc=20.7 min CN=69 Runoff=119.19 cfs 9.166 of Subcatchment 4S: TO DP#2 Runoff Area=2.000 ac Runoff Depth=3.84" Tc=5.0 min CN=69 Runoff=13.80 cfs 0.641 of Subcatchment 5S: TO DP#3 Runoff Area=5.470 ac Runoff Depth=3.41" Tc=5.0 min CN=65 Runoff=33.67 cfs 1.557 of Subcatchment 6S: TO DP#4 Runoff Area=9.710 ac Runoff Depth=4.95" Flow Length=824' Tc=14.0 min CN=79 Runoff=62.96 cfs 4.007 of Subcatchment 7S: TO W#3 Runoff Area=2.560 ac Runoff Depth=5.98" Tc=5.0 min CN=88 Runoff=25.36 cfs 1.276 of Subcatchment 8S: TO WQ#1 Runoff Area=35.900 ac Runoff Depth=5.41" Tc=5.0 min CN=83 Runoff=332.01 cfs 16.174 of Subcatchment 9S: TO WQ#2 Runoff Area=20.390 ac Runoff Depth=5.87" Tc=5.0 min CN=87 Runoff=199.54 cfs 9.968 of Subcatchment 10S: TO WQ#4 Runoff Area=16.040 ac Runoff Depth=5.98" Tc=5.0 min CN=88 Runoff=158.90 cfs 7.997 of Reach 1R: Reach 1 Peak Depth=8.99' Max Vel=8.3 fps Inflow=1,685.86 cfs 203.054 of n=0.040 L=1,453.0' S=0.0069'/' Capacity=12,151.76 cfs Outflow=1,670.73 cfs 202.909 of Reach 2R: Reach 2 Peak Depth=3.80' Max Vel=6.0 fps Inflow=839.96 cfs 93.274 of n=0.040 L=1,330.0' S=0.0075'/' Capacity=2,846.17 cfs Outflow=815.08 cfs 93.210 of Pond 1 FS: WQ#1 Flow Splitter Peak Elev=321.17' Inflow=165.24 cfs 14.678 of Outflow=165.24 cfs 14.678 of Pond 1 P: WQ#1 Peak Elev=324.62' Storage=290.819 cf Inflow=332.01 cfs 16.174 of Outflow=165.24 cfs 14.678 of Pond 2FS: WQ#2 Flow Splitter Peak Elev=337.47' Inflow=98.55 cfs 9.023 of Outflow=98.55 cfs 9.023 of 1404—SIA Ammended Type 1124 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 39 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Pond 2P: WQ#2 Peak Elev=338.84' Storage=202,645 cf Inflow=199.54 cfs 9.968 of Outflow=98.55 cfs 9.023 of Pond 3P: W#3 Peak Elev=332.52' Storage=22,626 cf Inflow=25.36 cfs 1.276 of Outflow= 11.66 cfs 1.138 of Pond 4P: WQ#4 Peak Elev=331.29' Storage=104,247 cf Inflow=158.90 cfs 7.997 of Outflow=146.62 cfs 7.209 of Link 2L: DP#1 Inflow=1,787.75 cfs 226.753 of Primary=1,787.75 cfs 226.753 of Total Runoff Area = 566.200 ac Runoff Volume = 236.535 of Average Runoff Depth = 5.01" 1404—SIA Ammended Type 1124 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 40 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Subcatchment 1S: TO RR Culvert Runoff = 839.96 cfs @ 12.32 hrs, Volume= 93.274 af, Depth> 5.18" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 28.720 98 Impervious 8.490 70 Woods, Good, HSG C 76.200 77 Woods, Good, HSG D 2.420 74 >75% Grass cover, Good, HSG C 100.370 80 >75% Grass cover, Good, HSG D 216.200 81 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) Woods, Good, HSG D 14.5 75 0.0267 0.1 74 Sheet Flow, 93.290 80 >75% Grass cover, Good, HSG D Woods: Light underbrush n= 0.400 P2= 3.50" 1.3 259 0.0460 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.8 2,068 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 12.3 2,042 0.0070 2.8 27.68 Channel Flow, D=2'; B=3'; SS=2:1 Area= 10.0 sf Perim= 11.9' r= 0.84' n= 0.040 36.9 4,444 Total Subcatchment 2S: TO DP#1A Runoff = 1,020.15 cfs @ 12.21 hrs, Volume= 92.474 af, Depth> 4.84" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN DescriDtion 7.710 98 Impervious 4.040 55 Woods, Good, HSG B 0.040 70 Woods, Good, HSG C 117.410 77 Woods, Good, HSG D 2.900 61 >75% Grass cover, Good, HSG B 3.930 74 >75% Grass cover, Good, HSG C 93.290 80 >75% Grass cover, Good, HSG D 229.320 78 Weighted Average 1404 -SIA Ammended Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 41 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.0 75 0.0530 0.1 Sheet Flow, 0.080 80 >75% Grass cover, Good, HSG D 2.000 Woods: Light underbrush n= 0.400 P2= 3.50" 7.3 1,332 0.0360 3.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 8.9 2,070 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 Earth, cobble bottom, clean sides 27.2 3,477 Total Subcatchment 3S: TO DP#1 Runoff = 119.19 cfs @ 12.14 hrs, Volume= 9.166 af, Depth= 3.84" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 0.390 98 Impervious 7.840 55 Woods, Good, HSG B 10.910 77 Woods, Good, HSG D 4.220 61 >75% Grass cover, Good, HSG B 5.250 80 >75% Grass cover, Good, HSG D 28.610 69 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.4 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 5.0 1,200 0.0620 4.0 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.3 1,306 0.0069 6.6 767.89 Channel Flow, Reach 1 Properties Area= 116.6 sf Perim= 37.4' r= 3.12' n= 0.040 20.7 2,581 Total Subcatchment 4S: TO DP#2 Runoff = 13.80 cfs @ 11.96 hrs, Volume= 0.641 af, Depth= 3.84" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 0.450 98 Impervious 0.390 55 Woods, Good, HSG B 0.040 77 Woods, Good, HSG D 1.040 61 >75% Grass cover, Good, HSG B 0.080 80 >75% Grass cover, Good, HSG D 2.000 69 Weighted Average 1404 -SIA Ammended Type 1124 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 42 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 5S: TO DP#3 Runoff = 33.67 cfs @ 11.96 hrs, Volume= 1.557 af, Depth= 3.41" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 0.970 98 Impervious 2.520 55 Woods, Good, HSG B 1.980 61 >75% Grass cover, Good, HSG B 5.470 65 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 6S: TO DP#4 Runoff = 62.96 cfs @ 12.06 hrs, Volume= 4.007 af, Depth= 4.95" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 0.770 98 Paved parking & roofs 8.050 77 Woods, Good, HSG D 0.890 80 >75% Grass cover, Good, HSG D 9.710 79 Weighted Average Tc (min) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 11.0 75 0.0530 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.4 366 0.0770 4.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.6 383 0.0210 3.9 15.58 Channel Flow, D=1'; B=2'; SS=2:1 Area= 4.0 sf Perim= 6.5' r= 0.62' n= 0.040 14.0 824 Total Subcatchment 7S: TO W#3 cfs @ 11.95 hrs, Volume= 1.276 af, Depth= 5.98" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type 11 24 -hr 100 -Year Rainfall=7.40" 1404—SIA Ammended Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 43 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Area (ac) CN Description 1.240 98 Impervious 0.050 61 >75% Grass cover, Good, HSG B 1.270 80 >75% Grass cover, Good, HSG D 2.560 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 8S: TO WQ#1 Runoff = 332.01 cfs @ 11.95 hrs, Volume= 16.174 af, Depth= 5.41" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 16.260 98 Impervious 0.820 55 Woods, Good, HSG B 0.530 77 Woods, Good, HSG D 8.000 61 >75% Grass cover, Good, HSG B 10.290 80 >75% Grass cover, Good, HSG D 35.900 83 Weighted Average Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 9S: TO WQ#2 Runoff = 199.54 cfs @ 11.95 hrs, Volume= 9.968 af, Depth= 5.87" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 9.290 98 Impervious 1.400 77 Woods, Good, HSG D 0.770 61 >75% Grass cover, Good, HSG B 8.870 80 >75% Grass cover, Good, HSG D 0.060 55 Woods, Good, HSG B 20.390 87 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 1404 -SIA Ammended Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 44 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Subcatchment 10S: TO WQ#4 Runoff = 158.90 cfs @ 11.95 hrs, Volume= 7.997 af, Depth= 5.98" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -Year Rainfall=7.40" Area (ac) CN Description 7.570 98 Impervious 8.470 80 >75% Grass cover, Good, HSG D 16.040 88 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Reach 1 R: Reach 1 Inflow Area = 484.510 ac, Inflow Depth > 5.03" for 100 -Year event Inflow = 1,685.86 cfs @ 12.28 hrs, Volume= 203.054 of Outflow = 1,670.73 cfs @ 12.37 hrs, Volume= 202.909 af, Atten= 1 %, Lag= 5.2 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 8.3 fps, Min. Travel Time= 2.9 min Avg. Velocity = 4.0 fps, Avg. Travel Time= 6.1 min Peak Depth= 8.99' @ 12.32 hrs Capacity at bank full= 12,151.76 cfs Inlet Invert= 316.00', Outlet Invert= 306.00' Custom cross-section table, n= 0.040 Length= 1,453.0' Slope= 0.0069'/' Depth End Area Perim. Storage Discharge (feet) (sq -ft) (feet) (cubic -feet) (cfs) 0.00 0.0 0.0 0 0.00 0.90 5.0 9.1 7,265 10.34 4.10 35.7 15.9 51,872 188.66 4.90 45.2 18.9 65,676 249.12 8.20 116.6 37.4 169,420 766.91 18.20 1,169.2 188.8 1,698,848 12,151.76 Reach 2R: Reach 2 Inflow Area = 216.200 ac, Inflow Depth > 5.18" for 100 -Year event Inflow = 839.96 cfs @ 12.32 hrs, Volume= 93.274 of Outflow = 815.08 cfs @ 12.44 hrs, Volume= 93.210 af, Atten= 3%, Lag= 7.3 min Routing by Stor-Ind+Trans method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Max. Velocity= 6.0 fps, Min. Travel Time= 3.7 min Avg. Velocity = 3.4 fps, Avg. Travel Time= 6.6 min 1404 -SIA Ammended Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here) Page 45 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Peak Depth= 3.80'@ 12.38 hrs Capacity at bank full= 2,846.17 cfs Inlet Invert= 338.00', Outlet Invert= 328.00' Custom cross-section table, n= 0.040 Length= 1,330.0' Slope= 0.0075T Depth (feet) End Area (sq -ft) Perim. (feet) Storage (cubic -feet) Discharge (cfs) 0.00 0.0 0.0 0 0.00 0.70 3.1 7.9 4,123 5.35 2.50 19.6 12.8 26,068 83.88 7.40 457.0 170.0 607,810 2,846.17 Pond 1 FS: WQ#1 Flow Splitter Inflow Area = 35.900 ac, Inflow Depth > 4.91" for 100 -Year event Inflow = 165.24 cfs @ 12.06 hrs, Volume= 14.678 of Outflow = 165.24 cfs @ 12.06 hrs, Volume= 14.678 af, Atten= 0%, Lag= 0.0 min Primary = 165.24 cfs @ 12.06 hrs, Volume= 14.678 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 321.17' @ 12.05 hrs Plug -Flow detention time= 0.0 min calculated for 14.648 of (100% of inflow) Center -of -Mass det. time= 0.0 min ( 859.3 - 859.3 ) Device Routing Invert Outlet Devices #1 Primary 313.80' 6.0" x 40.0' long Culvert RCP, sq.cut end projecting, Ke= 0.500 Outlet Invert= 313.60' S= 0.0050 T Cc= 0.900 n= 0.013 #2 Primary 314.60' 4.00'W x 4.00' H Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=163.18 cfs @ 12.06 hrs HW=321.06' (Free Discharge) �__1=Culvert (Barrel Controls 1.92 cfs @ 9.8 fps) 2=Orifice/Grate (Orifice Controls 161.25 cfs @ 10.1 fps) Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 324.62' @ 12.06 hrs Surf.Area= 53,336 sf Storage= 290,819 cf Plug -Flow detention time= 112.5 min calculated for 14.648 of (91 % of inflow) Center -of -Mass det. time= 65.0 min ( 859.3 - 794.3 ) Volume Invert Avail.Storage Storage Description #1 318.00' 488,336 cf Custom Stage Data (Prismatic)Listed below (Recalc) Pond 1 P: WQ#1 Inflow Area = 35.900 ac, Inflow Depth= 5.41" for 100 -Year event Inflow = 332.01 cfs @ 11.95 hrs, Volume= 16.174 of Outflow = 165.24 cfs @ 12.06 hrs, Volume= 14.678 af, Atten= 50%, Lag= 6.1 min Primary = 165.24 cfs @ 12.06 hrs, Volume= 14.678 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 324.62' @ 12.06 hrs Surf.Area= 53,336 sf Storage= 290,819 cf Plug -Flow detention time= 112.5 min calculated for 14.648 of (91 % of inflow) Center -of -Mass det. time= 65.0 min ( 859.3 - 794.3 ) Volume Invert Avail.Storage Storage Description #1 318.00' 488,336 cf Custom Stage Data (Prismatic)Listed below (Recalc) 1404 -SIA Ammended Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 46 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Elevation (feet) Surf.Area (sq -ft) Inc.Store (cubic -feet) Cum.Store (cubic -feet) 318.00 32,252 0 0 318.50 36,473 17,181 17,181 320.00 40,407 57,660 74,841 322.00 45,849 86,256 161,097 324.00 51,517 97,366 258,463 326.00 57,412 108,929 367,392 328.00 63,532 120,944 488,336 Device Routing Invert Outlet Devices #1 Primary 314.40' 36.0" x 66.0' long Culvert RCP, square edge headwall, Ke= 0.500 20.390 ac, Inflow Depth > 5.31" for 100 -Year event Outlet Invert= 314.00' S= 0.0061 T Cc= 0.900 n= 0.013 #2 Device 1 318.00' 4.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 319.70' 4.00'W x 0.50' H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 323.10' 5.00' x 5.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Primary 323.90' 40.0' long x 20.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=162.97 cfs @ 12.06 hrs HW=324.60' (Free Discharge) 1=Culvert (Inlet Controls 100.39 cfs @ 14.2 fps) 12=Orifice/Grate (Passes < 1.07 cfs potential flow) 3=Orifice/Grate (Passes < 41.53 cfs potential flow) 4=Orifice/Grate (Passes < 120.18 cfs potential flow) 5=Broad-Crested Rectangular Weir (Weir Controls 62.58 cfs @ 2.2 fps) Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 337.47' @ 12.05 hrs Plug -Flow detention time= 0.0 min calculated for 9.005 of (100% of inflow) Center -of -Mass det. time= 0.0 min ( 880.1 - 880.1 ) Device Routing Invert Outlet Devices #1 Primary 329.70' 4.0" x 13.0' long Culvert RCP, sq.cut end projecting, Ke= 0.500 Outlet Invert= 329.50' S=0.0154'/' Cc= 0.900 n=0.013 #2 Primary 330.40' 4.00'W x 2.00' H Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=91.08 cfs @ 12.06 hrs HW=336.88' (Free Discharge) �__1=Culvert (Barrel Controls 1.03 cfs @ 11.8 fps) 2=Orifice/Grate (Orifice Controls 90.05 cfs @ 11.3 fps) Pond 2FS: WQ#2 Flow Splitter Inflow Area = 20.390 ac, Inflow Depth > 5.31" for 100 -Year event Inflow = 98.55 cfs @ 12.06 hrs, Volume= 9.023 of Outflow = 98.55 cfs @ 12.06 hrs, Volume= 9.023 af, Atten= 0%, Lag= 0.0 min Primary = 98.55 cfs @ 12.06 hrs, Volume= 9.023 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 337.47' @ 12.05 hrs Plug -Flow detention time= 0.0 min calculated for 9.005 of (100% of inflow) Center -of -Mass det. time= 0.0 min ( 880.1 - 880.1 ) Device Routing Invert Outlet Devices #1 Primary 329.70' 4.0" x 13.0' long Culvert RCP, sq.cut end projecting, Ke= 0.500 Outlet Invert= 329.50' S=0.0154'/' Cc= 0.900 n=0.013 #2 Primary 330.40' 4.00'W x 2.00' H Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=91.08 cfs @ 12.06 hrs HW=336.88' (Free Discharge) �__1=Culvert (Barrel Controls 1.03 cfs @ 11.8 fps) 2=Orifice/Grate (Orifice Controls 90.05 cfs @ 11.3 fps) 1404 -SIA Ammended Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here) Page 47 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 338.84' @ 12.06 hrs Surf.Area= 41,683 sf Storage= 202,645 cf Plug -Flow detention time= 145.4 min calculated for 9.005 of (90% of inflow) Center -of -Mass det. time= 96.7 min ( 880.1 - 783.3 ) Volume Invert Avail.Storage Storage Description Pond 2P: WQ#2 Inflow Area = 20.390 ac, Inflow Depth= 5.87" for 100 -Year event Inflow = 199.54 cfs @ 11.95 hrs, Volume= 9.968 of Outflow = 98.55 cfs @ 12.06 hrs, Volume= 9.023 af, Atten= 51 %, Lag= 6.6 min Primary = 98.55 cfs @ 12.06 hrs, Volume= 9.023 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 338.84' @ 12.06 hrs Surf.Area= 41,683 sf Storage= 202,645 cf Plug -Flow detention time= 145.4 min calculated for 9.005 of (90% of inflow) Center -of -Mass det. time= 96.7 min ( 880.1 - 783.3 ) Volume Invert Avail.Storage Storage Description #1 333.00' 298,026 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 333.00 26,876 0 0 333.50 29,012 13,972 13,972 334.00 30,101 14,778 28,750 341.00 46,835 269,276 298,026 Device Routing Invert Outlet Devices #1 Primary 330.10' 18.0" x 64.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 329.70' S=0.0063'/' Cc= 0.900 n=0.013 #2 Device 1 333.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 334.30' 2.00' W x 0.50' H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Device 1 337.50' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Primary 338.50' 150.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=89.32 cfs @ 12.06 hrs HW=338.81' (Free Discharge) 1=Culvert (Barrel Controls 23.94 cfs @ 13.5 fps) 2=Orifice/Grate (Passes < 0.56 cfs potential flow) 3=Orifice/Grate (Passes < 19.87 cfs potential flow) =Orifice/Grate (Passes < 78.43 cfs potential flow) 5= B road -C rested Rectangular Weir (Weir Controls 65.38 cfs @ 1.4 fps) Pond 3P: W#3 Inflow Area = 2.560 ac, Inflow Depth= 5.98" for 100 -Year event Inflow = 25.36 cfs @ 11.95 hrs, Volume= 1.276 of Outflow = 11.66 cfs @ 12.06 hrs, Volume= 1.138 af, Atten= 54%, Lag= 6.2 min Primary = 11.66 cfs @ 12.06 hrs, Volume= 1.138 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 332.52' @ 12.06 hrs Surf.Area= 8,497 sf Storage= 22,626 cf Plug -Flow detention time= 116.3 min calculated for 1.138 of (89% of inflow) Center -of -Mass det. time= 62.0 min ( 842.3 - 780.3 ) 1404 -SIA Ammended Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 48 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Volume Invert Avail.Storage Storage Description #1 329.00' 47,194 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 329.00 3,762 0 0 330.00 5,612 4,687 4,687 331.00 6,888 6,250 10,937 332.00 7,927 7,408 18,345 333.00 9,021 8,474 26,819 334.00 10,174 9,598 36,416 335.00 11,382 10,778 47,194 Device Routing Invert Outlet Devices #1 Primary 328.00' 15.0" x 20.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 326.00' S=0.1000'/' Cc= 0.900 n=0.013 #2 Device 1 329.00' 1.2" Vert. Orifice/Grate C= 0.600 #3 Device 1 330.20' 1.50'W x 0.50' H Vert. Orifice/Grate C= 0.600 #4 Device 1 332.00' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C=0.600 #5 Primary 333.00' 55.0' long x 15.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=11.65 cfs @ 12.06 hrs HW=332.51' (Free Discharge) 1=Culvert (Inlet Controls 11.65 cfs @ 9.5 fps) 2=Orifice/Grate (Passes < 0.07 cfs potential flow) 3=Orifice/Grate (Passes < 5.18 cfs potential flow) 4=Orifice/Grate (Passes < 19.25 cfs potential flow) 5=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 331.29' @ 12.01 hrs Surf.Area= 37,181 sf Storage= 104,247 cf Plug -Flow detention time= 96.6 min calculated for 7.195 of (90% of inflow) Center -of -Mass det. time= 46.6 min ( 826.9 - 780.3 ) Volume Invert Avail.Storage Storage Description #1 328.00' 172,719 cf Custom Stage Data (Prismatic)Listed below (Recalc) Pond 4P: WQ#4 Inflow Area = 16.040 ac, Inflow Depth = 5.98" for 100 -Year event Inflow = 158.90 cfs @ 11.95 hrs, Volume= 7.997 of Outflow = 146.62 cfs @ 12.01 hrs, Volume= 7.209 af, Atten= 8%, Lag= 3.3 min Primary = 146.62 cfs @ 12.01 hrs, Volume= 7.209 of Routing by Stor-Ind method, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs Peak Elev= 331.29' @ 12.01 hrs Surf.Area= 37,181 sf Storage= 104,247 cf Plug -Flow detention time= 96.6 min calculated for 7.195 of (90% of inflow) Center -of -Mass det. time= 46.6 min ( 826.9 - 780.3 ) Volume Invert Avail.Storage Storage Description #1 328.00' 172,719 cf Custom Stage Data (Prismatic)Listed below (Recalc) 1404 -SIA Ammended Type 11 24 -hr 100 -Year Rainfall=7.40" Prepared by {enter your company name here} Page 49 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 1/23/2016 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 328.00 24,952 0 0 328.50 28,098 13,263 13,263 329.00 29,692 14,448 27,710 330.00 32,923 31,308 59,018 331.00 36,210 34,567 93,584 332.00 39,553 37,882 131,466 333.00 42,953 41,253 172,719 Device Routinq Invert Outlet Devices #1 Primary 325.20' 30.0" x 40.0' long PSP RCP, square edge headwall, Ke= 0.500 Outlet Invert= 325.00' S=0.0050'/' Cc= 0.900 n=0.013 #2 Device 1 329.20' 4.00'W x 0.80'H Vert. RISER ORIFICE X 3.00 C= 0.600 #3 Device 1 330.00' 4.00' x 4.00' Horiz. RISER CREST Limited to weir flow C=0.600 #4 Primary 328.00' 2.5" Horiz. LOW FLOW ORIFICE Limited to weir flow C=0.600 #5 Primary 331.00' 225.0' long x 20.0' breadth EMERGENCY SPILLWAY Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=139.31 cfs @ 12.01 hrs HW=331.27' (Free Discharge) 1=PSP (Inlet Controls 51.92 cfs @ 10.6 fps) �_2=RISER ORIFICE (Passes < 59.68 cfs potential flow) 3=RISER CREST (Passes < 75.31 cfs potential flow) 4=LOW FLOW ORIFICE (Orifice Controls 0.30 cfs @ 8.7 fps) 5=EMERGENCY SPILLWAY (Weir Controls 87.10 cfs @ 1.4 fps) Link 2L: DP#1 Inflow Area = 549.020 ac, Inflow Depth > 4.96" for 100 -Year event Inflow = 1,787.75 cfs @ 12.35 hrs, Volume= 226.753 of Primary = 1,787.75 cfs @ 12.35 hrs, Volume= 226.753 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-25.00 hrs, dt= 0.05 hrs 315 _ 5 BEGIN SURVEYED — 10 — CROSS SECTION END SURVEYED 1 310 CROSS SECTION '� 305 \ / 300 10+00 10+10 10+20 10+30 10+40 CROSS SECTION C) I 10+00 1 1 10+101I I X10+20 L 10+30 10+40 72 3o�4 `�0`3� 7 `�0 PLAN VIEW 0 3 6 12 SCALE: 1" = 6' .............................................................................. HORVATH REACH 1 CROSS SECTION DRAWN BY: MLJ CHECKED BY: A S S O C I A T E S 16 CONSULTANT PLACE, SUITE 201 DURHAM.4 ORT"CAROLINA 0.8953 °' P 919.490.4990 F 919.490.8953 ELLIS ROAD - PHASE 2 SCALE 1" = 6 537 MARKET STREET. SUITE LL20 CHATTANOOGA, TENNESSEE 37402 ELLIS ROAD DATE 3/26/2015 P 423.266.4990 F 423.266.5700 www.horvathassociates.com DURHAM, NORTH CAROLINA PROJECT NO 1404 340 335 — 12 _ — 1 20 330 � BEGIN SURVEYED—""'----*",- URVEYED END SURVEYED CROSS SECTION ` CROSS SECTION 325- 10+00 10+10 10+20 10+30 10+40 CROSS SECTION Qor 6i 1 � I 10+00 10+10 X x 0+20 10+30 10+40 co I X co c0 �� X M00 O) Qp N � I I \ a, O r0 I I \ PLAN VIEW 0 3 6 12 Z� SCALE: 1" = 6' .............................................................................. HORVATH REACH 2 CROSS SECTION DRAWN BY: MLJ CHECKED BY: A S S O C I A T E S 16 CONSULTANT PLACE, SUITE 201 DURHAM.4 ORT"CAROLINA 0.8953 °' P 919.490.4990 F 919.490.8953 ELLIS ROAD - PHASE 2 SCALE 1" = 6 537 MARKET STREET. SUITE LL20 CHATTANOOGA, TENNESSEE 37402 ELLIS ROAD DATE 3/26/201 S P 423.266.4990 F 423.266.5700 DURHAM, NORTH CAROLINA PROJECT NO www.horvathassociates.com 1404 Preliminary BMP Sizing Calculations 1404 - WQ# l .xls Surface Area Calcs (85% TSS) 1404 - Ellis Road Phase 2 WQ#1 Surface Area Drainage Area to Basin = 30.90 acres Impervious Area to Basin = 16.26 acres Impervious Percentage = 53% Matt Jones, PE 1/23/2016 Avereage Depth (Volume/SA) = 3.56 ft (from Phase 2 CD Submittal) Interpolation to Determine SA/DA Ratio Impervious Lower Boundary 50% Site % impervious 537o Upper Boundary 60% Average Depth (Vol/SA) (ft) 3.0 3.6 4.0 2.06 3.0 1.73 2.15 1.96 1.81 2.40 0.43 2.03 SA/DA = 1.96 Surface Area Required = 26,344 sf Surface Area Provided = 32,252 sf <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1404 - WQ# l .xls WQ Volume 1404 - Ellis Road Phase 2 WQ#1 - Water Quality Volume Runoff Volume Simple Method Drainage Area (A) = 30.90 Acres Impervious Area = 16.26 Acres Impervious Fraction (IA) = 0.53 Rainfall Depth (RD) = 1.00 Inch Rv = 0.52 (Rv = 0.05+0.9*IA) Runoff Volume (V) = 58730 cf (V = 3630*Rp*Rv*A) Normal Pool Elevation = 318.00 Temporary Pool Elevation = 319.70 Matt Jones, PE 1/23/2016 Temporary Pool Volume = 62850 cf (From HydroCAD Report) Temporary Pool Surface Area = 39620 sf (From HydroCAD Report) 1404 - WQ# l .xls Drawdown Orifice Sizing 4 in Ai= Ao= Cd= a= 9= H1=1 39,620 sf sf sf ft/s1 ft 32,252 0.6 0.087 32.2 1.70 1404 - Ellis Road Phase 2 WQ#1 - Drawdown Orifice (Orifice Size) (Area of pond at the beginning of drawdown) (Area of pond at the orifice outlet elevation) (Orifice Coefficient of Discharge) Orifice Area (calculated) Acceleration of Gravity (constant) (Maximum head (t=0)) Matt Jones, PE 1/23/2016 T= 2.49 days (Time for water level to fall from H, to Permanent Pool Elevation) 3.5.2 Orifice Equation 3.5.2.1 Drawdown Time Calculations,for a Pond with an Orffllee Outlet A Stormwater Management Manual For the specific case where A2 = AQ and Hee 0 T_ 1 112+2 iy —Ae 312 Cd*a* 2*g (* * 1 3 Ht )* 1 1404 - WQ#2.xls Surface Area Calcs (85% TSS) 1404 - Ellis Road Phase 2 WQ#2 Surface Area Drainage Area to Basin = 20.39 acres Impervious Area to Basin = 9.29 acres Impervious Percentage = 46% Matt Jones, PE 1/23/2016 Avereage Depth (Volume/SA) = 3.26 ft (From Phase 2 CD Submittal) Interpolation to Determine SA/DA Ratio Impervious Lower Boundary 40% Site % impervious 467o Upper Boundary 50% Average Depth (Vol/SA) (ft) 3.0 3.3 4.0 1.73 3.0 1.43 1.91 1.83 1.60 2.06 0.43 1.73 SA/DA = 1.83 Surface Area Required = 16,273 sf Surface Area Provided = 26,876 sf <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 Permanent Pool Average Depth (ft) 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1404 - Ellis Road Phase 2 WQ#2 - Water Quality Volume Runoff Volume Simple Method Drainage Area (A) = 20.39 Acres Impervious Area = Impervious Fraction (IA) _ Rainfall Depth (RD) _ Rv = 9.29 Acres 0.46 1.00 Inch 0.46 (Rv = 0.05+0.9*IA) Runoff Volume (V) = 34051 cf (V = 3630*Rp*Rv*A) Normal Pool Elevation = 333.00 Temporary Pool Elevation = 334.30 Temporary Pool Volume = 37888 cf (From HydroCAD Report) Temporary Pool Surface Area = 30818 sf (From HydroCAD Report) 3 lin A,= Ao= Cd= a= 9= H1=1 30,818 sf sf sf ft/s,2 Ift 26,876 0.6 0.049 32.2 1.30 1404 - Ellis Road Phase 2 WQ#2 - Drawdown Orifice (Orifice Size) (Area of pond at the beginning of drawdown) (Area of pond at the orifice outlet elevation) (Orifice Coefficient of Discharge) Orifice Area (calculated) Acceleration of Gravity (constant) (Maximum head (t=0)) T= 3.15 days (Time for water level to fall from H1 to Permanent Pool Elevation) 3.5.2 Orifice Equation 3.5.2.1 Drawdown Time Calculations ,For a Fond with an Orifice Outlet A Stormwawr Managcmcnt Manual For the specific ease where A., = Aa and Hz = U T— 1 * [(2 * H11/2 + l 2 A —Av * H, 312 Cd*a* 2*g 3H, 1404 - W#3.xls WQ Volume Hannah Banks, EI 1/23/2016 1404 - Ellis Road Phase 2 W#3 - Water Quality Volume Runoff Volume Simple Method Drainage Area (A) = 2.56 Acres Impervious Area = 1.24 Acres Impervious Fraction (IA) = 0.48 Rainfall Depth (RD) = 1.00 Inch Rv = 0.49 (Rv = 0.05+0.9*IA) Runoff Volume (V) = 4516 cf (V = 3630*Rp*Rv*A) Normal Pool Elevation = 329.00 Temporary Pool Elevation = 330.20 Temporary Pool Volume = 5835 cf (From HydroCAD Report) Temporary Pool Surface Area = 5867 sf (From HydroCAD Report) 1404 - W#3.xls Drawdown Orifice Sizing 1.2 in At= Ao= Cd= a= 9= H1=1 5,867 sf sf sf ft/s1 ft 3,762 0.6 0.008 32.2 1.20 1404 - Ellis Road Phase 2 W#3 - Drawdown Orifice (Orifice Size) (Area of pond at the beginning of drawdown) (Area of pond at the orifice outlet elevation) (Orifice Coefficient of Discharge) Orifice Area (calculated) Acceleration of Gravity (constant) (Maximum head (t=0)) Hannah Banks, EI 1/23/2016 T= 2.99 days (Time for water level to fall from H, to Permanent Pool Elevation) 3,5.2 Orifice Equation 3.5.2.1 Drawdown Time Calculations for a Pond with an Orifice Outlet Stormwater Management Manual For the specific case where A., = A,o and Hz = 0 T =* * [(2 A0 * h1 vz + -�`lt —.4. * o H 312 Cd*a* 2*g3� Ht 1404 - WQ#4.xls Surface Area Calcs 85% TSS 1404 - Ellis Road - Phase 2 WQ#4 - Required Surface Area Drainage Area to Basin = 16.04 acres Impervious Area to Basin = 7.57 acres Impervious Percentage = 470 1/23/2016 Average Depth = 3.24 ft (From Phase 2 CD Submittal) Interpolation to Determine SA/DA Ratio Average Depth (Vol/SA) (ft) Impervious 3.0 Lower Boundary 40% 1.73 <- from table below Site % impervious 47% 1.97 <- interpolated Upper Boundary 507. 2.06 <- from table below SA/DA = 1.97 Surface Area Required = 13,746 sf Total Pond Surface Area = 24,952 sf Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 20071 Percent Impervious Cover 3.0 4.0 Permanent Pool Average Depth (ft) 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 300 1.34 1.08 0.97 0.83 0.70 0.64 0.62 400 1.73 1.43 1.25 1.05 0.90 0.82 0.77 500 2.06 1.73 1.50 1.30 1.09 1.00 0.92 600 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 900 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1404 - WQ#4.xls WQ Volume 1404 - Ellis Road - Phase 2 WQ#4 - Above Normal Pool Volume Runoff Volume Simple Method Drainage Area (A) = 16.04 Acres Impervious Area = 7.57 Acres Impervious Fraction (IA) = 0.47 Rainfall Depth (RD) = 1.00 Inch Rv = 0.47 (Rv = 0.05+0.9*IA) Runoff Volume (V) = 27642 cf (V = 3630*Rp*Rv*A) Normal Pool Elevation = 328.00 Temporary Pool Elevation = 329.20 Temporary Pool Volume = 33713 cf (From HydroCAD Report) Temporary Pool Surface Area = 30338 sf (From HydroCAD Report) 1/23/2016 1404 - WQ#4.xls Drawdown Orifice Sizing 1/23/2016 1404 - Ellis Road - Phase 2 WQ#4 - Drawdown Orifice Sizing 2.5 in A,= Aa= Cd= a= 9= H1=1 30,338 sf sf sf ft/s` ft 24,952 0.6 0.034 32.2 1.20 T=1 4.13 days Q = 1 0.17 ft3/s 35.2 Orifice Equation (Orifice Diameter) (Area of pond at the beginning of drawdown) (Area of pond at the orifice outlet elevation) (Orifice Coefficient of Discharge) Orifice Area (calculated) Acceleration of Gravity (constant) (Maximum head (t=0)) (Time for water level to fall from H, to Permanent Pool Elevation) (Orifice Flow at Maximum Head) 3.5.2.1 Drawdown Time Calculations for a Pond with an Orifice Outlet n Starmwater Management Manual For the specific case where AZ = AA and Hz = 0 }} T C 1 2*g*[(2*Ao*Hinz+2(4—Ao)*H;ai IJ Nutrient Loading Calculations Watershed Characteristics Ver2.0 I Clear All Values t Return to Instructions , L Proceed to BMP Characteristics 1 l Skip to Development Summary Instructions 1. Select your physiographic/geologic region. (see map on 'instructions' page) 2. Enter the area of the entire development in square feet (ft). 3. Select the location that is most representative of the site's precipitation characteristics. (see map on 'instructions' page) 4. For each applicable land use, enter the total area of that land use that lies within the development under pre -development conditions. 5. For each applicable land use, enter the total area of that land use that lies within the development under post -development conditions, before BMP implementation. 6. Ensure that the sum of pre- and post -development areas entered equal the orginal development area. 7. Continue to "BMP Characteristics" tab. Additional Guidelines - For non-residential watersheds, indicate acreages of each land use type in Column 1 for both pre -and post -development conditions. - For residential watersheds, complete the required information in Column 2 for both pre- and. post -development conditions. - If a given land use is not present in the given watershed, leave the cell blank or enter a zero. - Ensure that land use areas entered for both pre- and post -development conditions match the total development area entered in cell 021. - Residential areas may be entered by average lot size (column, part A), or may be separated into individual land uses (column 2, part 8) -- do NOT list out individual land uses within an area already described by lot size. - Unless runoff flowing onto the development from offsite is routed separately around or through the site, the offsite catchment area draining in must be included in the acreage values of the appropriate land use(s) and treated. Physiographic/Geologic Region: Triassic Basin Total Development Area (ft'): 4,910,823 Soil Hydrologic Group D Development Name: Ellis Road Precipitation location: Raleigh Model Prepared By: Matt Jones, PE COLUMN t -- NON-RESIDENTIAL LAND USES COLUMN 2 -- RESIDENTIAL LAND USES TN EMC (mg/L) TP EMC (mg/L) Pre- Development (ft) Post - Development (ft) COMMERCIAL Parking lot 1.44 0.16 Roof 1.08 0.15 Open/Landscaped 2.24 0.44 INDUSTRIAL Parking lot 1.44 0.39 Roof 1.08 0.15 Open/Landscaped 2.24 0.44 TRANSPORTATION High Density (interstate, main) 3.67 0.43 Low Density (secondary, feeder) 1.4 0.52 Rural 1.14 0.47 Sidewalk 1.4. 1.16 PERVIOUS Managed pervious 3.06 0.59 Unmanaged (pasture) 3.61 1.56 - Forest 1.47 0.25 JURISDICTIONAL LANDS* -- - Natural wetland -- - Riparian buffer - -- Open water -- -- LANDTAKEN UP BY BMPs 1.08 0.15 1 -ac lots *Jurisdictional land uses are not included in nutrient/flow calculations. Total Development Area Entered [ft): 4,910,823 Total Pre -Development Calculated Area (ftz): 4,910,823 Total Post -Development Calculated Area (ft): 4,910,823 COLUMN 2 -- RESIDENTIAL LAND USES Custom CLot ustom a (ac) Age (Yrs) TN EMC lmg/L) TP EMC (mL) Pre- Development (ftz) Post- Development (ftz) PART A -ac lots - - - Y.. -ac lots - - - A -ac lots -- - - 1 -ac lots -- - - 2 -ac lots - - - Multi -family -- - - Townhomes - - - Custom Lot Size - - PART B 0.52 _ 11,983 -_�_ 522,086 0.39 4,858 143,750 0.39 46,484 0.15 10,394 658,186 1.16 133,763 Roadway - 1.4 Driveway 1.0 1.44 Parking lot -- 1.44 Roof - 1.08 Sidewalk/Patio -- 1.4 Lawn -- 2.24 0.44 2,066,250 2,375,395 0.59 _ 0.25 2,817,338 939,851 -- _ - 0.15 91,308 Managed pervious - 3.06 Forest - 1.47 Natural wetland* -- Riparian buffer* -- Open water* -- �10 LAND TAKEN UP BY BMPs -- Total Development Area Entered [ft): 4,910,823 Total Pre -Development Calculated Area (ftz): 4,910,823 Total Post -Development Calculated Area (ft): 4,910,823 BMP Characteristics Ver2.0 dIh 2, ..d .11.1 Z1111P, P em pn..d.. I—) an P. l,dl.l lhls In lhe d., d ... menu below <ne aMv type na leave all cells ror lndhldual land uses blank. --d 1, your wpem. 1.1— d..Ili.. (-1111 ..h..I.11 w111 nor be —.—d -only proven volume reeunlons are vane Inputs. _I -1-11—aan az.z mainslaaemP that . sB%smaller mau to 1.1011 -rIl I l 1. — of —.1111 ezkoe ay T Type . IMP: z IMP -.1. design gate mento H4h cemairy I Ill gel P_II Wewl 12 we ods lBvi rez99slewlberots len�lt aver x9951 re 99s1 1 91 9951 e�wlbe! re x9951 ots lBvilt after 19951 es1lNewl re 9951 es lBugt anar x9951Tes lBullt before 1995] nilly lNew) — nilly lBuil[alter 19951 ...... ....... lNewl Ize lBnih atter (9951 cusrom lace size (Built belore v9951 ------ ------ '--- IMP. IMP. P_d IMP —u,t tM1tevoutllow It npaes —d =b".MP blIM=, 136A36 (I -P7 4.5- PAP. Bi C M I N I o I P Develop -m: fill. R -d Prepared By: Matt Jones, PE Date: January 26, 2016 s WATERSHED SUMMARY Ver2.0 BMP VOLUME REDUCTIONS/EFFLUENT CONCENTRATIONS REGION: Triassic Basin ul U __ - evebpmentC il.-DevelapmeM Cantlhlanz evebp-i,/BMP2 Percent lmpervbm O6% 32.5% 32.5% 1%1 Annual RuroX volume 1<.f.l ' Total Nitrogen EMC Img/LI 1.33... lobi Nitrogen Lmdin0 0.99 4.69 3.40 (I AO,) TMal Phpsplwrw EMC 0.33 0.38 g/LI O:SJ (m Thal Phosphorus Loading Portent Difference Between; re4]evelopmentI D. whhouL BMPzI L-oev. vv ou BMP Pom-lapmeM w BMPs Port OevwitM1 BMPs mom 1%1 32% Annual Bumf. MC'( luf.) Tmal Nitrogen EEMC mg/LI TMeI NXm Loading Jib/ac/yrl -2- TMaI phosphorus EMC (mg/LI Tmal PM1osphoms Lpatling 116/ap/yrl 150% %5% 39% Negative percenctl Xerenceva ues ntl case a tlecrease n runoffvolume, Po ubnt con<emraaon or pollucantlwtling. PosicNevalues indicate an incmase. BMP SUMMARY Ver2.O Re[urn TO lnrtruNons R-1. to Watershed Charbcteriztics 1 Return to BMP Charageristics e n[8ummary -� MEMSN 8 BMPI BMP 2 BMP3 BMP I BMP2 BMP3 BMP 3 BMP. BMP3 BMp1 BMP2 BMP3 BMPI BMP. BMP3 IMPS 1M11 IMP Wet Omen evel Spreader, _ Wet oetentian 13pread W¢yand en n vel e - _ - - - - - Ppndtrn 111Icer StNp Pond FlherSnipef Pond ba eFilte,,Stripripr Total Aree Treatetl - lacl 3265 3266 - 19. 1.86 - 2S6 - - 16.02 160 - - - - - - - TobIIMlawVolume 2,]2],836 2,593,109 (Pf) 1664,976 31],]]0 -- - 1,287,191 1,224602 percentvolume RedupM 6% 20% - S% 0% - 15% - - - - - - - - I%) sx zo% Inflow Nmogen EMC 1.33 1.01 hnRl -3 1E Tpbl InRPw NkrpRn Qb/ec/Yrl 4..1 - 6.85. - - 647-- InibwPhlphl-EMC p.439 0.11] hwLl 343 0.116 - p.36a p.352 1,.u6 TabllMlaw PlwsPM 2.19 0.]3 - 1:69 O�fiA. - 1.95 - - 1.T] 0.66 - - - - - - - NkrpgBMP Dudlosv llbs/ac/wl 4.115 4.44. 4,9] - - 0.41 4,52 - - - - - - en _ - W flow BMP 0,]3 0.60 - O.fib 0.5] PhmphervFllbF/a</wl rate 1 Dutflpw NMpgen EMc(.oL) 1.19 119 1.10 - - cabbmem oampw 4.7p 4.9] 4.52 Tmal Nhrpgen (lb/.c/yr) ercent Redupdon in Nkmgen Load (%) 22% 21% 2]% 21% -- - -hment OutNow Pbnsphnrm EMC 0.152 OA52 0.142 0:152 - - (mg/LI Camhment Outibw 0600 0.566 x659 0. STI - - TPbI P-PMms (11,1W rl Percent-dipn in Phosphorus LPad (%) 60% 11% Volume Retlui9lan 061 TN Effluent cpncen.lm11/LI REfflueMCOMen. Im1/U ntlan wlM IWS 35% Bipre[entipnwMout Dry 0menkpn Ppntl sutl 6waN 15% 0% 1.00 1.20 0.12 0:20 0.36 n Raaf 50% 1.06 Level spdi, Fill, 6trlp men[b Sand FlXer 20% W6 5% 1.20 1.41 0.92 0.15 _ 0.39 r Harvest user defined 1.08 0:15 OemrNon Ppntl 5% 1.01 0.11 -.d 15% 1.08 0.12 Re[urn TO lnrtruNons R-1. to Watershed Charbcteriztics 1 Return to BMP Charageristics e n[8ummary -� MEMSN 8 BMPI BMP 2 BMP3 BMP I BMP2 BMP3 BMP 3 BMP. BMP3 BMp1 BMP2 BMP3 BMPI BMP. BMP3 IMPS 1M11 IMP Wet Omen evel Spreader, _ Wet oetentian 13pread W¢yand en n vel e - _ - - - - - Ppndtrn 111Icer StNp Pond FlherSnipef Pond ba eFilte,,Stripripr Total Aree Treatetl - lacl 3265 3266 - 19. 1.86 - 2S6 - - 16.02 160 - - - - - - - TobIIMlawVolume 2,]2],836 2,593,109 (Pf) 1664,976 31],]]0 -- - 1,287,191 1,224602 percentvolume RedupM 6% 20% - S% 0% - 15% - - - - - - - - I%) sx zo% Inflow Nmogen EMC 1.33 1.01 hnRl -3 1E Tpbl InRPw NkrpRn Qb/ec/Yrl 4..1 - 6.85. - - 647-- InibwPhlphl-EMC p.439 0.11] hwLl 343 0.116 - p.36a p.352 1,.u6 TabllMlaw PlwsPM 2.19 0.]3 - 1:69 O�fiA. - 1.95 - - 1.T] 0.66 - - - - - - - NkrpgBMP Dudlosv llbs/ac/wl 4.115 4.44. 4,9] - - 0.41 4,52 - - - - - - en _ - W flow BMP 0,]3 0.60 - O.fib 0.5] PhmphervFllbF/a</wl rate 1 Dutflpw NMpgen EMc(.oL) 1.19 119 1.10 - - cabbmem oampw 4.7p 4.9] 4.52 Tmal Nhrpgen (lb/.c/yr) ercent Redupdon in Nkmgen Load (%) 22% 21% 2]% 21% -- - -hment OutNow Pbnsphnrm EMC 0.152 OA52 0.142 0:152 - - (mg/LI Camhment Outibw 0600 0.566 x659 0. STI - - TPbI P-PMms (11,1W rl Percent-dipn in Phosphorus LPad (%) 60% 11% DURHAM CITY OF DURHAM Neuse, Falls Lake and Jordan Lake Developer Nutrient Reporting Form Please complete and submit the following information to the City of Durham Stormwater Services to 1869 characterize your project and assess the need to purchase nutrient offsets. See the CI" '-" mENCu`aE City Stormwater Performance Standards. For nutrient offset information, see nutrient offset intro PROJECT INFORMATION Applicant Name : Ellis Road Phase 2 Prepared by Matt Jones, PE Project Name (& Previous name, if applicable): Ellis Road Phase 2 Site Plan #: Project Address (if available): Street: City/Town: County: Ellis Road, Durham, Durham Date: (mold/yr) 1/26/2016 Project Locat'n: 11 -at: (dec. degrees) 35.9 Long: (dec. degrees) 178.800000 PIN/PID #s: U/4y-U I -L/-134,54; U04U-U I-LU-LU00; U/4y-U I- Is this Redevelopment? I ❑ Yes 0 No Development Type (Please check all that apply) Impervious Cover (%) Pre -Construction: 0.7 ❑ Commercial ❑ Duplex Residential ❑ Industrial 0 Single -Family Residential ❑ Institutional 0 Multi -Family Residential Mixed Use Impervious Cover (%) Post -Construction: 32.5 WATERSHED INFORMATION (See online map or alternative source for 12 -digit and 6 -digit IDS) ❑ Upper Falls Basin, 12 -digit Watershed ID: ❑ Lower Falls Basin, 12 -digit Watershed ID: ❑ Neuse/Outside of Falls Basin, 03020201 0 Jordan Lake (Upper New Hope) 6 -digit Small 060140 Watershed ID: Jordan Lake Delivery Factors (%) Nitrogen Phosphorus Site: Bank: Site: Bank: 1 85.00 40.00 89.00 19.00 Name of Bank Name of Bank EBX EBX Neuse/Falls Lake Delivery Factors: There are no delivery factors, so the Delivery Factor = 1. DURHAM STORMWATER PERFORMANCE STANDARDS FOR DEVELOPMENT COMPLIANCE ALTERNATIVE Nutrient loading limits and on-site treatment minimum (Sections 70-740(a) and Sections 70-741(a)) Off-site treatment threshold (%): N: 1 40 P: 1 40 Required on-site reduction achieved? N: YES P: YES NUTRIENT OFFSET REQUEST (Must meet the offsite thresholds — see above) Nitrogen Loading / Offset Needs (For the Jordan, Falls, and Neuse/Outside of Falls Watershed areas) (A) (B) (C) (D) (E) (F) (G) (H) (1) (Where Applicable) 0) Untreated Loading Rate (lbs/ac/yr) Treated Loading Rate (lbs/ac/yr) Load Rate Target (lbs/ac/yr) Reduction Needed (lbs/ac/yr) (from Compl. worksheet) Project Size (square feet) Offset Duration (yrs) Site Delivery Factor State Buy Down Amount Delivered (lbs) D * E * F * G Additional 5% if bank not in City limits (lbs) Total Delivered (lbs) H + I 4.69 3.40 2.20 1.20 4,910,823 30 0.85 3449.75 172.49 3622.24 Phosphorus Loading / Offset Needs (For the Jordan and Falls Watershed areas) (A) (B) (C) (D) (E) (F) (G) (H) (1) (Where Applicable) 0) Untreated Loading Rate (lbs/ac/yr) Treated Loading Rate (lbs/ac/yr) Load Rate Target (lbs/ac/yr) Reduction Needed (lbs/ac/yr) (from Compl. worksheet) Project Size (square feet) Offset Duration (yrs) Site Delivery Factor State Buy Down Amount Delivered (lbs) D * E * F * G Additional 5% if bank not in City limits (lbs) Total Delivered (Ibs) H + 1 1.36 0.47 0.82 0.00 4,910,823 30 0.89 0.00 0.00 0.00 Responsible Professional Engineer's Name: I Matt Jones PE #: 39170 Staff Name: I Staff e-mail: I Phone #: July 30, 2014 Version Watershed (Select from Menu) G 2 Falls Lake Basin Jordan Lake Basin Q Lower Neuse Basin COMPLIANCE WORKSHEET Note that if a nutrient bank is used to buy offset credits in order to achieve compliance with the alternative selected below, the bank must be located in the same watershed as the project site. Compliance Alternative (Pick one alternative, see descriptions and calculations below) 1 Nutrient loading limits and on-site treatment minimum (Sections 70-740(a) and Sections 70-741(a)) Q Alternative percentage reduction option for Redevelopment that increases impervious area (Section 70- 0 740(b)) Q Alternative percentage reduction option for Redevelopment that does not increase impervious area 0 (Section 70-740(c)) Q 0 Alternative for low impact development in Falls Basin. Q Exempt from Stormwater Pollutant standards (Section 70-739) Project Area Disturbance (Fill in yellow cell below) 4,910,823 square feet 112.737 acres TABLE 1 THRESHOLDS FOR APPLICATION OF STORMWATER POLLUTANT REQUIREMENTS Project Location Land Disturbance Limited Residential Multifamily & Other Jordan Basin 1 acre 0.5 acres Falls Basin 0.5 acres 12,000 square feet Lower Neuse Basin 1 1 acre 0.5 acres Note: Thresholds are based upon land disturbance since the applicable basin Baseline date. The Project is Located Outside the Downtown Area (select from menu list) Per Section 70-736, Downtown Area means the Downtown Tier, Compact Neighborhoods, and Suburban Transit Zones as shown on the Durham Comprehensive Land Use Plan most recently approved by the Durham City Council. The Project Type is Multifamily and Other (select from menu list) Per Section 70-736, Limited Residential means single family and duplex residential and recreational development. Multifamily and Other Development means development not included in Limited Resdiential, and includes but is not limited to multifamily and townhomes, and office, industrial, institutional (including local government institutional), and commercial development. Other key definitions from Section 70-736: Development means Land Disturbance which increases impervious surface on a property, or alters its location, or results in an increase in runoff from a property or a decrease in infiltration of precipitation into the soil. It includes both existing development and new development. It does not include agriculture, mining, or forestry activities. Redevelopment means Development on a site where structures or impervious surface already exists. It is a category of new development. Version 2 DRAFT, April 5,2013 Nutrient Loading Limits and On -Site Treatment Minimum ORDINANCE REQUIREMENTS Sec. 70-740. (a) Nutrient Loading Rate Limits. Development not exempt under subsection 70-739 shall construct and implement SCMs so as to limit the post construction loading rate of nitrogen and phosphorus from the project area to the limits set forth in Table 2 below, or shall comply with an allowed alternative as set forth in (b) through (d) below. A portion of the reduction requirements for nitrogen and phosphorus may be met through off site measures or payments as set forth in 70-741. TABLE 2 NUTRIENT EXPORT LOADING RATE LIMITS Project Location Export Limit lbs/acre/year Nitrogen Phosphorus Jordan Basin 2.2 0.82 Falls Basin 2.2 0.33 Lower Neuse Basin 3.6 not required Sec. 70-741 (a) On site nutrient treatment requirements. Nitrogen and phosphorus reduction requirements may be met, in part, through offsite management measures or the purchase of nutrient credits. At a minimum, however, in the Jordan and Falls Basins a percentage of the required nitrogen and phosphorus reductions must be achieved through onsite treatment, in the amount shown in Table 4 below. In addition to meeting the percentage reductions below, in the Jordan and Lower Neuse Basins, nitrogen export load from the site must not exceed 6 lbs. per acre per year for Limited Residential, and and 10 lbs per acre per year for Multifamily and Other. (Note: offsite credit purchases do not meet TSS removal requirements, which must be met onsite.) TABLE 4 ONSITE NUTRIENT TREATMENT REQUIREMENTS Minimum Onsite Nutrient Treatment Project Nitrogen Phosphorus Jordan - General *40% of required *40% of required reduction reduction Falls - General *50% of required *50% of required reduction reduction Falls and Jordan within *30% of required *30% of required Downtown Area reduction reduction Version 2 DRAFT, April 5,2013 Falls and Jordan exceeding thresholds but with less than 1 acre land disturbance *30% of required reduction *30% of required reduction Load Rate Target (lbs/ac/yr) No percentage No percentage 3.40 reductions apply, but reductions apply, but Lower Neuse the 6/10 nitrogen the 6/10 nitrogen export limit described export limit described in paragraph (a) in paragraph (a) above must be met I above must be met *The "required reduction" is the difference between the post development loading in pounds per acre per year multiplied by the site area in acres before treatment minus the loading target, in pounds per acre per year multiplied by the acres. The percentage shown in the chart above is applied to that difference and the resulting number is the amount in pounds/year of nutrient reduction that must be achieved onsite. CALCULATIONS - ENTER VALUES IN YELLOW CELLS Nitrogen Post Loading Rate Untreated (lbs/ac/yr) Post Loading Rate Treated (lbs/ac/yr) Load Rate Target (lbs/ac/yr) Reduction Needed (lbs/ac/yr) 4.69 3.40 2.2 1.20 Phosphorus Post Loading Rate Untreated (lbs/ac/yr) Post Loading Rate Treated (lbs/ac/yr) Load Rate Target (lbs/ac/yr) Reduction Needed (lbs/ac/yr) 1.36 0.47 0.82 0.00 ONSITE CALCULATIONS - ENTER VALUE IN YELLOW CELLS BASED ON TABLE 4 Onsite Reduction Required (%) Required Onsite Reduction Achieved? Nitrogen Phosphorus 40 YES YES In the Jordan and Lower Neuse Basins, the nitrogen export loading rate from the site does not exceed 6 Ib/ac/yr for Limited Residential, or 10 Ib/ac/yr for Multifamily TRUE and Other. Version 2 DRAFT, April 5,2013 City of Durham Stream Buffer Determination DURHAM Ellis Road and NC 147 Assemblage PIN CITY OF DURHAM PID Department of Public Works Location/Directions Stormwater Services Sub Stream 101 City Hall Plaza I Durham, NC 27701 Date of Determination 919.560.4326 1 F 919.560.4316 1 8 b 9 www.durhamnc.gov CITY Of MEDICINE September 5, 2014 Steven Ball Soil and Environmental Consultants, PA 8412 Falls of Neuse Road, Suite 104 Raleigh, NC 27615 (919) 846-5400 sball(@sandec.com SUBJECT: Ephemeral/Intermittent/Perennial Determination — Ellis Road and NC 147 Assemblage REFERNCE: COD Jordan # 2014-013 Project Name Ellis Road and NC 147 Assemblage PIN See Table 3 PID See Table 3 Location/Directions Northeast quadrant at intersection of Ellis Road and NC 147 Sub Stream Northeast Creek Date of Determination September 5, 2014 Explanation: The feature(s) listed on the attached Table 1 have been located on the Soil Survey of Durham County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale, or was determined to be subject per section 8.5(B)(4) of the Durham Unified Development Ordinance. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Resources (DWR). This on-site determination shall expire five (5) years from the date of determination in this letter. Landowners or affected parties that dispute a determination made by the City of Durham may request a determination by the N.C. Division of Water Resources. An appeal request must be made within sixty (60) calendar days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the DWR shall be referred to DWR in writing c/o Karen Higgins, Surface Water Protection Section, 1650 Mail Service Center, Raleigh, NC 27699-1650. DWR's determination can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings Stream Determination — Ellis Road and NC 147 Assemblage Page 2 of 5 (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) calendar days. The owner/future owners should notify the City (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity or other City of Durham permit(s). Any inquiries regarding section 404/401 permits should be directed to Division of Water Quality (Central Office) at (919) 807-6300, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919) 554-4884. Durham — Where Great Things Happen Stream Determination — Ellis Road and NC 147 Assemblage Page 3 of 5 Should you have any questions regarding the above determination or need further clarification on any aspect of the above, please do not hesitate to contact me at (919) 560-4326, x 30255 or James.Pflaum@durhamnc.gov. Sincerely, James Pflaum, Senior Water Quality Technician Attachment: Table 1. Stream Feature Determinations Ellis Road and NC 147 Assemblage Table 2. Pond Feature Determinations Ellis Road and NC 147 Assemblage Table 3. PIN and Parcel ID Numbers for Ellis Road and NC 147 Assemblage Stream Determination Map —Exhibit 1 Durham — Where Great Things Happen Stream Determination — Ellis Road and NC 147 Assemblage Page 4 of 5 Table 1. Stream Feature Determinations Ellis Road and NC 147 Assemblage Feature Not Subject Subject Start@ Stop@ Stream Type Soil Survey USGS To o A X Cons uItantFlag S13 S12 Intermittent X A X S12 FeatureExits ReviewArea Ephemeral X B X Consultant Flag S14 Feature Exits Review Area Intermittent X C X Consultant Flag S16 Consultant Flag S15 Intermittent X C* X Consultant Flag S15 Confluence with Feature B Ephemeral X D X Durham Flag S1 Confluence with Feature E Intermittent X E X Consultant Flag S17 Durham Flag S3 Intermittent X X E X Durham Flag S3 Feature Exits Review Area Perennial X X F X N/A N/A Ephemeral G X Consultant Flag S09 Feature Exits Review Area Intermittent X H X Consultant Flag S08 Confluence with FeatureJ Intermittent X I X Consultant Flag S10 Confluencewith FeatureJ Perennial X X J X Feature Starts Outside of Review Area Durham Flag S2 (confluence of Features J and K) Intermittent X X J X Durham Flag S2 Feature Exits ReviewArea Perennial X X K Consultant Flag S11 Durham Flag S2 (confluence of Features J and K) Intermittent X L X N/A N/A Ephemeral X M X Consultant Flag S06 Consultant Flag S07 Intermittent X M X Consultant S07 Confluencewith FeatureJ Ephemeral X N X N/A N/A Ephemeral O X N/A N/A Ephemeral X P X Consultant Flag SO4 Consultant Flag S05 Intermittent X Q X N/A N/A Ephemeral X R X N/A N/A Ephemeral X S X Consultant Flag S03 Consultant Flag S02 Intermittent X X S X Pond 2OutfalI Confluence with Feature Intermittent X X T X N/A N/A Ephemeral X U X Feature Starts Outside of Revi ew Area Confluencewith Pond 1 Perennial X X U X Pond 1 Outfall Confluencewith FeatureJ Perennial X X V X N/A N/A Ephemeral X X X Feature is Outside of Review Area Feature is Outside of Review Area Perennial X X BB X N/A N/A Ephemeral EE X N/A N/A Ephemeral Notes: *Feature C is considered Subject in its entirety because the ephemeral portion between consultant flag S15 and feature B is less than 300 feet (Durham Unified Development Ordinance Article 8 Section 8.5.4 C). Feature label W was not used by the consultant. Durham — Where Great Things Happen Stream Determination — Ellis Road and NC 147 Assemblage Page 5 of 5 Table 2. Pond Feature Determinations Ellis Road and NC 147 Assemblage Not Feature Subject Soil Subject Survey USGS Topo Pond 1 X X X Pond 2 X X X Pond 3 X X Table 3. PIN and Parcel ID Numbers for Ellis Road and NC 147 Assemblage Durham — Where Great Things Happen PIN Parcel ID 0840-03-21-2993 163200 0840-03-00-8278 163367 0840-03-20-3215 163426 0749-01-19-7702 163428 0840-03-20-2161 163427 0749-01-09-9724 163369 0749-01-19-5052 163429 0749-01-19-9044 163433 0749-01-38-2639 163400 0749-01-38-7106 163399 0749-01-47-0432 163389 0749-01-27-0832 163387 0749-01-27-6503 163388 0749-01-27-9965 163453 0749-01-37-2934 163443 0749-01-27-9866 163452 0749-01-37-2831 163442 0749-01-27-9755 163451 0749-01-37-2619 163441 0749-01-27-9654 163450 0749-01-37-2620 163440 0749-01-27-9574 163449 0749-01-37-2520 163439 0749-01-27-9465 163448 0749-01-37-2327 163438 0749-01-27-9375 163447 0749-01-37-2227 163437 0749-01-27-9270 163446 0749-01-37-2127 163436 0749-01-27-9170 163445 0749-01-37-2030 163435 0749-01-26-9988 163444 Durham — Where Great Things Happen Durham Flag S2 11 Pr A!6' 19 1 1 1 47 -A 0 44 L V jVl"' 4 4L 4r ahft F" AL., MI Map prepared by Stormwater & GIS Services, Department of Public Works on September 2014: Information depicted hereon is Perennial Required Maps and Information 78' 5 i 30'" 693 200, Nv 1 4 ISI 78"51`00JOINS PANEL 0840 " 78'50'3' 694 o -7n u GRID NORTH C SCALE 1" = 500' {1 6,000) Aily• �� s� '. ' 0 500 100FEET + W • « ori �, c� 6611.1 L •iJ.���� _ –_ .__` _ ... -- -� —moi a�.,. MW PANEL 0749.1 .. ..... ..... ... ` FIRM �` �•FLOOD INSURANCE RATE MAP . _ l _ r _ NORTH CAROLINA '� 1� � "'"� - a.3=�.f fen .• / -i „ ...r.. •y�r f e . oa T . p —"' ' i /rF• Q i••'y `N4 ?CN" TRIANGLE, C1 MTER SCHOOL � A. +` � � • t .. ! - Imo-. t �'t•r� ' �R�a x�i»�1 • 'i � �' � �'''. 4'v i$G�4 t - , � �• G Z � � �' E 062 EM 8Rp() 4�ty 011' n"l ° �� 1 , MDNEfA WAY LONG ONT D • � r as � "'� ZONE A A. J ' A •� PANEL D7, ISLE LOCATOR DIAGRAM OR MAIC INDEX FOR FIRM PANEL LAYOLM CONTAINS. COMMJNITY Clic No, PANEL SUFFIX DURHAV.CnY OF woom D749 + DURNAN COLIMY 'Nom D149 J NoPm la lJa The Ftp N1Wtr z»awn dhow oN a "0 ,AO, plsOn or4mf iho C*M .itY N4wlwr lhO +orb Pb used cq• ,rnuron.e carnmuri.Y opplico-ix5 Iar IM L EFFECTIVE DATE MAP NUMBER MAY 2 2006 372007490M V Ga-541 State of North Carolina Federal Emergency Management Agency �ow 4117 ' j. t. i 1 �T ISI 78"51`00JOINS PANEL 0840 " 78'50'3' 694 o -7n u GRID NORTH C SCALE 1" = 500' {1 6,000) Aily• �� s� '. ' 0 500 100FEET + W • « ori �, c� 6611.1 L •iJ.���� _ –_ .__` _ ... -- -� —moi a�.,. MW PANEL 0749.1 .. ..... ..... ... ` FIRM �` �•FLOOD INSURANCE RATE MAP . _ l _ r _ NORTH CAROLINA '� 1� � "'"� - a.3=�.f fen .• / -i „ ...r.. •y�r f e . oa T . p —"' ' i /rF• Q i••'y `N4 ?CN" TRIANGLE, C1 MTER SCHOOL � A. +` � � • t .. ! - Imo-. t �'t•r� ' �R�a x�i»�1 • 'i � �' � �'''. 4'v i$G�4 t - , � �• G Z � � �' E 062 EM 8Rp() 4�ty 011' n"l ° �� 1 , MDNEfA WAY LONG ONT D • � r as � "'� ZONE A A. J ' A •� PANEL D7, ISLE LOCATOR DIAGRAM OR MAIC INDEX FOR FIRM PANEL LAYOLM CONTAINS. COMMJNITY Clic No, PANEL SUFFIX DURHAV.CnY OF woom D749 + DURNAN COLIMY 'Nom D149 J NoPm la lJa The Ftp N1Wtr z»awn dhow oN a "0 ,AO, plsOn or4mf iho C*M .itY N4wlwr lhO +orb Pb used cq• ,rnuron.e carnmuri.Y opplico-ix5 Iar IM L EFFECTIVE DATE MAP NUMBER MAY 2 2006 372007490M Ga-541 State of North Carolina Federal Emergency Management Agency This is an official copy of a portion of the above referenced flood map. It �;r - - was extracted usin F -MIT On -Line. Thls map does not reflect changes Dlurhazn .County �, ,r' r' or amendments which may have been made subsequent to the date on the title block. For the latest product information about National Flood Insurance r _ Program flood maps check the FEMA Flood Map Store at vvww-mac-fema.gov AA 01 t°+3 • GRID NORTH MAP SCALE 254 0 _ 1 " 500' (1 6,000) 5017 1000 _FEET 35 57' 30' #its: as � UI11i1C{j. :-t.zOruE' x hl'� ��R Y•�- y 1 r+ � ,,+� ! _ rte' � ^'+� � • H 151 + } '' - i_ ,t EL 061�7r• l� 1 PANEL 0840J _1�._ _ -lJ 61 -r}61 , 6 EL FIRM I I FL000 INSURANCE RATE MAP NORTH CAROLINA f' \vim 500 FEET PANEL OW 3981 006 M • i ISCE LOCATOR OLAGRAM OR MAP INDEX FOR FIRM PANEL LAYOUT} CONTAINS. 1 - ' a �- —_] COMMJNrTY CIO No. PANEL SUFFIX OURKW. C" OF 370€86 OB40 J DURHAM OOUMTr 32GOBS 0&10 J I t' pURHANI . C.DUN YOG _rr CITY DF L7 L R �,. vi '. City of Durham r Nahc. la use- The ftp Nu.a.r s>— �� .,a vAw W hg m* oWary.; tho C....tttty Np.ber shM � ssauttl M' ri _ e oDPI in° Pr's a Y EFFECTIVE DATE •�t� MAP N �c ruluiecY UMBER MAY 2,2006 37200840001 a 37008 '`, cio .srolyP �I '�� it City of �#, - ARI(' �Y Durham s = t D State of North Carolina 374486 Federal Emergency Management Agency 35' 57' 00 — v. KIK , A t _ +► SITE City of_ _ 11w - , .Y y t -- T • fJE RD r� � `- `� 'y urham ' -ll - �]0�JL �/4{},86 - . M 8010 000 FEET FEET 693 °00 M 2 042 500 FEET 694 00o M 78'51'301, 78' 5 1' 00 " This is an official copy of a portion of the above referenced flood map. k was extracted using F -MIT ©n -Line- This map does not reflect changes 2 040 000 JOINS PANEL. 0749 or amendments which may have been made subsequent to the date on the title bkock. For the la#eatproduct information about National Flood Insurance Program flood maps check the FEMA Flood Map Store at www-mse.fema.gov 0 N m 600 1200 SCALE: 1" = 600' .�.................... w HORVATH ASSOCIATES O v 16 CONSULTANT PLACE, SUIE 101 DURHAM, NORTH CAROLINA 17707 P919.490.4990 F919.490,8953 537 MARKET STREET, SUITE LL20 CHATTANOOGA, TENNESSEE 37402 3 P 423.266.4990 F 423.266.5700 www.horvathassociates.com N ......................................................., DRAWN BY: SOILS MAP muCNECICED BY: 57' 1404 - Ellis Road Phase 2 USGS MAP SCALE 1:240000 N / III (� L S rl v �K/\\�\ - PARCEL ID: 163369 PARCEL ID: 163428 PARCEL ID: 208936 PARCEL ID: 163427 PARCEL ID: 163388 PIN: 0749-01-09-9715 PIN: 0749-01-19-5577 PIN: 0749-01-29-1386 PIN: 0840-01-20-2058 PIN: 0749-01-27-6434 PIN: 0749-01- 8-5947 PINRCEL ID: 163429 : 0749-01-18-9979CEL ID: 163433 PIN: 0749-01-38-1675 PARCEL ID: 0PIN: 08 I�� X3236 ■ IIV l/ �� r\�� - �► / 1 III c // -� ° — \ \ \ / r — ♦ 1 s \ / --\ \ \ I ►� III ( -�\\ /// - f�\�—�� I I( / ( •. �� 11 �� rv,/ ��� _ ILri I -J /-"' ' l I �' // \ / /j / — fir 1 \ / I l /G / / / ■ I ISI I II / _� `�380 �/ )�^i 3 < 1� /f f ° I / a \ \ IIII Ilml I I I III � ���� � _ ��/����� � � I � `� �� %� I�� 11 T � \ � \ J I I /�/�� �— / `\ 1 I 1 „--� I �\ �/ I I/ C � \ J ■ 1111 dhI I II�r�JI ��\_—_/ �%/ �/ > I I /� �1 = 1 � � � Q) )J� � /�'� <• �I�' � _^ \ o J _�//� \ �� \ �\, / bl N` \c• v \/ / \ ■ l 11l S - 1 G• \ 1 �� SOL xIII \ \ %�` _ ■ II � � /� � ,%� 1 u J � � � /' � / �� � i /' �I I \ \ \ J � v/ ®1 r-► �. � �> -� .( 11 r I i (� I I� �� �( /i/ ,i ��__/�/ ♦ `"� ��/ / %,Ick 10 �� l 7— Hcriv olv'1- BOUN } \\ G 4 SHEET FLOW l \ C� ���� 3 / �� /�� �/ ` II =.// C \` I — I \ _ ■ _ \ \� \ GTH-7s` // \ `� / / �� I r % �/ \\ I �\ .99 ACT1 l >_ ��\ ��\ r404-�- DRAINAGE /� =3 ' _7% n BOUNDARY \ I I , / I /� � � � � \ ■ \ \\ 1 \ �\�-_ ��,� ?�i l _ ^ 1 //�,) • �/ / / ■ P#3 \A SHALL ` / l N % / �) / / / / — \ p 1 \ \ L LENG -1 / �f� / //j� ALO I / �)1/ / / �j/ / f \ � /� TO DP#2\ \ Z I� / l /�r / (/�6°/j� I /I l// \ — l r . (�� I / //� \— i�� I 1 ^ \l ^ — \ \ ■ /((( �� CN_ \ 71 --2.oc I I / \ /�� I `�i ■ \\� —� �� /� �llll//// ��� /lIf am \ , _,La � _� ��\���\� I \ ( �� �- ■ ol \\X11 AL 2�,2AC\, I \ _\ \\ \` ,. . � \ \ /rte _ _ � � `\ \\ - � � \ � � \ V ■ 71 LAKE VI I�� (FLOW TIME=O MIN \ �� REACH A=523 � \\\ \� \ �/ // ° `\1 �� �' �//��_ LENGTH 1.330 \ \ / I \� � �� 1 �� _' _1�-Zc ` / � I J I I o / \ � ■ ts�� � Y � �ER — \ � > SHALLOW FLOW LENGTH -1.200 ,,: / / I ( /�,.- \�) ` r . 1 \\ 1 \\ \ / � � / � �� 1 I / � `, \ 1 \\ �� l ✓ � / � r 1 � \ °/-\���\1 �\ \ \\ \ 1II(� r_ 1 1�� \\\r • �,J�I'i l \\ / \ \ \ —� ��� s / 1111 \\ 1\�\\\� / F �� ���� \� / / / / r\v\ rl •, 1 \ \ \� / ,I;'�/ \ �� � \ � / �( (� l v,v \/ /, \ \\ \ ( /f � / � � I I I I 1 I ( \� \ I � � \ �'� l i i \ I / � �` `-- r�� �.� I r � ■ o�/� o I I (I L I ( _i� °� 1 \ \ ,\./ 1 I �^\� ,l of (/�o II o - 1 40, fl L fpZo 1 �3 �- � / � I Iv�l� 1� \ \ I 1 \ \ \ r 1( ( \ I l �� \ \ ■ )_> \ . fl \fly l � � \ \ 1\ III �\ �I � ,� IIII �� _ \\ \\ \ -\ �� \ � � I ■ 0 \\ , �� I - � \\ ■ ��/, \ , \�`..f,..r.Gc > ■ ■ PRE -DEVELOPMENT DRAINAGE MAP 150 300 600 SCALE: 1" = 300' SCALE: 1 "=300' N ■ ■ ©COPYRIGHT 2015 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HORVATH ASSOCIATE S 16 CONSULTANT PLACE, SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 www.horvathassociates.com D Q Z Q N o Ow< Q = oe N oe O C WZ W Q De 0 PRE - DEVELOPMENT DRAINAGE MAP NpftY EL�NII P� No1 FUR oN slrftu G®N v DRAWN BY: CHECKED BY: M LJ KAG DATE DECEMBER 9, 2014 SCALE 1 ''=300' PROJECT NO. 1404 SHEET NO. swi <SITE PLAN> Af I' v , l 11 II , �� , ��j/ /i. �, �� , �ti L - J �� / �- - �. �� I i -a�J 1 �� PARCEL ID: 163369 PARCEL ID: 163428 PARCEL ID: 208936 PARCEL ID: 163427 PARCEL ID: 163388 -� f ��� 'Z f /--� � ` (— / % 1 PIN: 0749-01-09-9715 PIN: 0749-01-19-5577 PIN: 0749-01-29-1386 PIN: 0840-01-20-2058 PIN: 0749-01-27-6434 ■ �� \ \ 1 �,�, \� L I / PARCEL ID: 163429 PARCEL ID: 163433 PARCEL ID: 163400 PARCEL ID: 163426 , / \ ' 1 �" /' I /�� PIN: 0749-01-18-5947 PIN: 0749-01-18-9979 PIN: 0749-01-38-1675 PIN: 0840-03-20,3236 VI / /j/, ���� ��� �.�-_ /�/rt\\\ \ �- \ � \\ � JJ -ter �-,/� �((l ///� � � \ �.� �\ � � � I�//� � ,�1���� I �r/ ■ �✓\ \ 1 { � �\ �� � � � �J � � \\ o � `� , �� I � ,1 �, � � , �� � � �, \ \>11 \\.�- i /� \ \ �, \ _ > — ( I �--I }( \ 1 �, \ \ / ..�� m`-7' -i�- � / �� �' \\ � � \\ �►. �3 �,. a \ 5 — �f� -z"g\\�L � \\ iJl/ \ f I c ✓// /\ \ I �o I \ 1/i 11` / /l % ■ .�-- � 1 \ ti 1 � � �/ I IIIII -/? \ f �r / �.- ► �, ��Vi Ile, �\=(�,� 3 , o l -`- �80�/ 1 / \ �) –� � 0 _ � �-- V I I � / • / o r � �Q b �� J� , 11 \ .1 �, � � _ - \ � < I / f �\ ISI II /l -� - 1 1 • \ I I / .,,,� / e 1\ 1 -� X11 I III IIS l ��— — _ /�/ ��� I ( ,/ •�r C� - > 1 > \7a ) J I < / / /i �- �.� I� \ -�\_ �\� J - ,, J � \ 1 \ \ yy)) �!/'^ l�l� �i l - - \ /// L )) > \ I / ��v /I~►=d\J v � I I II I I III \ / ,/� 4 �1 �� �- �, \ 1 �� \\\ _ f G\ 1 I �\c I �� �, -� /�� j� / /) ■ I 1 / �\ I � I I I 1 � `, - , •,� � '- //�i� �\ / In r-- r / //. ■ �/ fir- WE, QA �� -���� o�= — LL � (I �� I\ \, \moi l\ 1 % � �� � \�Z —�� � y \ \.\! / /i ■ as 4op BOON ) i \ / .` -� l — _ I r / / —�./� /C r, \ � \` _ s I I — 4 �� N s i i i DRAINAGE /� \ \ I \ I ) 1 )I �� �.� I / I \ \\ �� � // O // / �-s✓ Z� ) \ \ \ \ ( AKI ED III r Z 1 \ / , / �\� .o- if T ? j� �°j I / '� \ / 1 I r v ) ■ IIJ BOUNDARY / I /� �� ( \ �OW rL ,/ oq \ \� ,� / 11 < ` l/> g �� lei / I 1 /�lJl Ill � � �ii� � o l / �e, AC 5.47 C 5 �� �/ / / 1 ✓/� : 14 \ / \ K � / n / \�\ �c� J_ -�\7'�S I ^�) 1 IIc \ \ f �• \�\\\\D 03 fes►'to f ®� \ \ d 1 \ \ II �� ��\� R.� � �l I JTO DP4 11+ \\ A-2.00 AC \ \\ 1 J ■ \ L \\ \ CN=69 fr J _ Ijr �l \\\ r o ��'- / ��✓ice ����{ �l( ��' 1 I �J %� ��_� �� I�_� I r (/ / /� -�/ . pt All Ic• , I \ \ ■ IA / /\ \ y _ I� // / _\ \\ I ( 11 I\\ .90 AC jr CN -83 )� l LAKE \ ��� / �� �— 0 - l \\ 1 \�Z } •� \ r I I� 81 > \ FLOW TIME=O MIN \, — �� REACH 2 ( / \� _ //- — f Q \ 1 \ ( ) �/ Z \\ ,\ (�� - I I I �) \ \ ■ > �_ / LENGTH=1,330 �' \� / I / \\ 7 -`" ` �I At l / j �� c\\\ l— \\��/,/ /i 111 Z.� L_ J1 U �\ _ ^ OI J , /` \ ■ XS LOCATIO l � ,r I I ��lL� TO DP#1 , 5� s _ I` iJ ��� — \\ I I /� V I \ l� l\ \�ER -- <\ /G l �—J' `// \ v► ■ / 5 � ��! \ �- A-28.6. 'AC l \\ �1\ R CH �- r— /� \\ / /ice I / %�Jh LOCATION I , — \� ■ I 0 111 /i i J 3 I/ i SHALLOW FLOWi 1 LENGTH 1,2W ,: / I I , r . 1 \\ � \\ \ / \/ \\ ( ! � � �� 1 % / / \, \ 1 \\ \ �� \ l ✓ � / I � � I ■ \\ \ _� \�\� \� / / 11 ��\ I tir / �� r / / r\v\ rl �111 \� �� -�- / 1` , / ,� \\ �'�/- y , -)I \ �� 4 I ■ \ / ♦ - SH �i FL \ I \ 1 \\�\� LENGT>i-TS\ / / /( (` 1 1 / \ I ) �`�\\ �\ , J ��"� / '\ �// �� W1 ����� <� J �` \\ \\\ _> 3g lll\ \� 11 „1 �� ���.-_ / � � =��,/ C C<N/ /\\) f � � � � � ���- l I \ �� • �� \ / >� / / �_ llllll`,4\0\ANNEL FLS I / \ %� \ \ / e� C401 � l / I 1 17 ■ \ �1 I I \ \\ ��� I (( \��I ��� �,� \� a �� I \ (�' �> \/\, a 1 '-�, , � - SII I u�\ \ \ \ ,. �/ 1 ( 90 r / 1 I ��1 \ 101 (�o ��I 1 \ �1 �` ,� , 1 / — — ` ul 111'\�\-\�� \ � \ 1► 1111 �� �, � I� � -eS� �o � ,� � \ � _ � ti � � � // �\ � ,.-� v,� — / �/� —�r � • ��n/z A. / 1 / ��_ �/ / I I /// 1 �/ \ / \ \ / I \��,)�/ ���_ ,���/,/ �I� , lJ I. l Kr,,/, • I �, _ -- \ ,%,\�\ „ - , /'p 1 �I I AI 1 \ —\ > \ 4�a _ \ l �I \ �� 111 L , 1 ` I ---- \ I\�� � �j j y .gyp I Zf POST -DEVELOPMENT DRAINAGE MAP SCALE: 1''=300' 0 150 300 600 SCALE: 1" = 300' N I \ \— �\ 71 0 4 1\1 I I 1r1 ©COPYRIGHT 2015 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED ■ HORVATH ASSOCIATE S 16 CONSULTANT PLACE, SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 www.horvathassociates.com 0 w 0 C) Z Q w Q O i p Q QU NO N Jz Lu W� LU 2 QM 0 CL POST - DEVELOPMENT DRAINAGE MAP NARY ELlWII PR OUR FOR ON StRVcTI �o� DRAWN BY: CHECKED BY: M LJ KAG DATE JANUARY 26, 2015 SCALE 1 ''=300' PROJECT NO. 1404 SHEET NO. SW2 <SITE PLAN> v rl G II �i S�� 11 I I I I -----------_----- — \\ 11 1 _ ---— — — — — — — — — — ---_, I 1 \ 1 1 1 1 1 1 1 1 1 PARCEL ID: 163369 PARCEL ID: 163428 PARCEL ID: 208936 PARCEL ID: 163427 PARCEL ID: 163388 ■ PIN: 0749-01-09-9715 PIN: 0749-01-19-5577 PIN: 0749-01-29-1386 PIN: 0840-01-20-2058 PIN: 0749-01-27-6434 • PARCEL ID: 163429 PARCEL ID: 163433 PARCEL ID: 163400 PARCEL ID: 163426 JCL J PIN: 0749-01-18-5947 PIN: 0749-01-18-9979 PIN: 0749-01-38-1675 PIN: 08404)3-20-3236 • De ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ \ \ \ \ FOREST (TYP) -� i �� �� `�-�' i ■ ■ JFJ I■ I PRE -DEVELOPMENT LAND USE MAP SCALE: 1 "=200' 0 100 200 400 SCALE: 1" = 200' N (PCOPYRIGHT 2015 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HORVATH ASSOCIATE S 16 CONSULTANT PLACE, SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 www.horvathassociates.com D a z Q N o 0w oeQ CieV) QU < t/) cle oe O JCL J wz � W Q De PRE - DEVELOPMENT LAND USE MAP NpftY OUINII p� pT Foil pN NS?�uC Jr,cpN DRAWN BY: CHECKED BY: M LJ KAG DATE DECEMBER 9, 2014 SCALE "=200' PROJECT NO. 04 SHEET NO. LM 1 <SITE PLAN> FOREST (TYP) r — � I 1 I / I I `I o I I \ \ \ \ \ \ \ \ 1% -1 A PARKING SIDEWALK/ v vv �� LOT (TYP) PATIO (iYP) v v v v ROOF (TYP) \ \ \ \ BMP \\\\ \\ \ (TYP) I PARCEL ID: 208936 i PARCEL ID: 163388 I 1 I / I I `I o I I \ \ \ \ \ \ \ \ 1% -1 A PARKING SIDEWALK/ v vv �� LOT (TYP) PATIO (iYP) v v v v ROOF (TYP) \ \ \ \ BMP \\\\ \\ \ (TYP) PARCEL ID: 163369 PARCEL ID: 163428 PARCEL ID: 208936 i PARCEL ID: 163388 PIN: 0749-01-09-9715 PIN: 0749-01-19-5577 PIN: 0749-01-29-1386 PIN: 0840-01-20-2058 PIN: 0749-01-27-6434 ■ PARCEL ID: 163429 PARCEL ID: 163433 PARCEL ID: 163400 PARCEL ID: 163426 J PIN: 0749-01-18-5947 PIN: 0749-01-18-9979 PIN: 0749-01-38-1675 PIN: 0840403-20,3236 --------------- — \\ _ - �\o.� ,. O L,rJ II � II ■ rl �I ■ 1 I ■ I it o o ■ // II L ■ L, `JII II Lri II II ���� \I\ ■ � I / � ' p l� \ \� ■ L1 r ■ ■ PARCEL ID: 163369 PARCEL ID: 163428 PARCEL ID: 208936 PARCEL ID: 163427 PARCEL ID: 163388 PIN: 0749-01-09-9715 PIN: 0749-01-19-5577 PIN: 0749-01-29-1386 PIN: 0840-01-20-2058 PIN: 0749-01-27-6434 ■ PARCEL ID: 163429 PARCEL ID: 163433 PARCEL ID: 163400 PARCEL ID: 163426 J PIN: 0749-01-18-5947 PIN: 0749-01-18-9979 PIN: 0749-01-38-1675 PIN: 0840403-20,3236 ■ ■ LEGEND ROADWAY - 522,086 SF DRIVEWAY - 143,750 SF (SEE NOTE 1) ■ ■ PARKING LOT - 46,484 SF ■ ■ ROOF - 658,186 SF ■ ■ SIDEWALK/PATIO - 133,763 SF ■ ■ LAWN - 2,375,395 SF (SEE NOTE 2) ■ FOREST - 939,851 SF BMP - 91,308 SF r ■ ■ ■ � _ I I 1I � —� o c° ■ r — i L LiJ I I ch ■ r _J � � P' / / o � � I �_ � _ � i \v"` o Ngo ■ I / / , � �-________ --may-�-� �■ I ROADWAY I ■ (TYP) I ■ BMP DRAINAGE AREA BOUNDARY (TYP) � 1 I �� 11 P JI_ I � POST -DEVELOPMENT LAND USE MAP SCALE: 1''=200' --------- -- / /7 ����\ \ \� �� I jr II IIII II / N" II r !III � ��/ �Ll 0 100 200 400 SCALE: 1" = 200' qN NOTES: 1. IN POST -DEVELOPMENT EACH SINGLE FAMILY LOT IS ASSIGNED 500 SF OF DRIVEWAY AREA, 250 SF OF SIDEWALK/PATIO AREA, AND 2250 SF OF ROOF AREA. EACH TOWNHOME LOT IS ASSIGNED 290 SF OF DRIVEWAY AREA. 2. ALL AREAS WITHOUT HATCHING, EXCEPT THE AREAS ON SINGLE FAMILY LOTS REFERRED TO IN NOTE 1, ARE CODED AS LAWN ■ 3. DEVELOPMENT AREA BOUNDARY INCLUDES ALL ONSITE AREAS WHERE IMPROVEMENTS ARE PROPOSED. 4. ONLY ONSITE AREAS ARE INCLUDED IN THE CALCULATIONS. AREAS WHERE OFFSITE o RUNON DRAINS TO A SCM ARE NOT INCLUDED IN THE CALCULATIONS. o El r - -� 7 r- ---i II If a G v Q< � 1 I �� 11 P JI_ I � POST -DEVELOPMENT LAND USE MAP SCALE: 1''=200' --------- -- / /7 ����\ \ \� �� I jr II IIII II / N" II r !III � ��/ �Ll 0 100 200 400 SCALE: 1" = 200' qN NOTES: 1. IN POST -DEVELOPMENT EACH SINGLE FAMILY LOT IS ASSIGNED 500 SF OF DRIVEWAY AREA, 250 SF OF SIDEWALK/PATIO AREA, AND 2250 SF OF ROOF AREA. EACH TOWNHOME LOT IS ASSIGNED 290 SF OF DRIVEWAY AREA. 2. ALL AREAS WITHOUT HATCHING, EXCEPT THE AREAS ON SINGLE FAMILY LOTS REFERRED TO IN NOTE 1, ARE CODED AS LAWN ■ 3. DEVELOPMENT AREA BOUNDARY INCLUDES ALL ONSITE AREAS WHERE IMPROVEMENTS ARE PROPOSED. 4. ONLY ONSITE AREAS ARE INCLUDED IN THE CALCULATIONS. AREAS WHERE OFFSITE o RUNON DRAINS TO A SCM ARE NOT INCLUDED IN THE CALCULATIONS. o El r - -� 7 r- ---i II If Q Q< ■ oe ■ L� J W ■ Z� F— -7 ■ De O O � II ■ rl �I ■ 1 I ■ I it o o ■ L ■ L, JrD Lri II II ���� \I\ ■ �7 D Ll ' p l� \ \� ■ 17- LI r ■ ■ ■ ■ ©COPYRIGHT 2015 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HORVATH ASSOCIATE S 16 CONSULTANT PLACE, SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 NORTH CAROLINA BOARD OF EXAMINERS FOR ENGINEERS AND SURVEYORS LICENSE NO.: C-0676 www.horvathassociates.com 0 L Q Q< oe oeU 0 J W Z W Q De O POST - DEVELOPMENT LAND USE MAP NARY ELl�II PR N®T FOR oN tRVcTI C®�S DRAWN BY: CHECKED BY: M LJ KAG DATE DECEMBER 9, 2014 SCALE 1''=200' PROJECT NO. 1404 SHEET NO. LM2 <SITE PLAN>