Loading...
HomeMy WebLinkAbout20181440_final signed PJD tearsheet_20170113U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2015-02055 County: Onslow U.S.G.S. Quad: NC-SNEADS FERRY NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Applicant: NCDOT-Division 3 Agent: SEPI attn.: Mr. Mason Herndon attn.: Mr. Christopher Dustin Address: 5501 Barbados Blvd. 5030 New Centre Drive Suite B Castle Havne, NC 28429 Wilmin�ton, NC 28403 Size (miles) +/- 3 Nearest Waterway New River USGS HUC 03020302 Nearest Town Sneads Ferrv River Basin Onslow Bav Coordinates Latitude:34.5584603011032 Longitude: -77.4113648433234 Location description: The proiect area stretches approximatelv 3 miles down Hwy 172 startin� at Hwy 172 and NC 210 and heading east toward the New River terminating iust before the high rise bridge, Sneads Ferrv, Onslow Countv. Indicate Which of the Following Apply: A. Preliminary Determination X There are waters, including wetlands, on the above described project area, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands, have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. Therefore this preliminary jurisdiction determination may be used in the pernut evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. _ There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands, have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary deternunation is merely an effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands, at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination _ There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon far a period not to exceed five years from the date of this notification. _ There are waters of the U.S., including wetlands, on the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law ar our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. Page 1 of 2 SAW-2015-02055 _ The waters of the U.S., including wetlands, on your project area have been delineated and the delineation has been verified by the Corps. If you wish to have the delineation surveyed, the Corps can review and verify the survey upon completion. Once verified, this survey will provide an accurate depiction of all areas subject to CWA and/or RHA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. The waters of the U.S., including wetlands, have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on . Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead Ciry, NC, at (252) 808-2808 to determine their requirements. Placement of dredged ar fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Deparhnent of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Brad Shaver at (910) 251-4611 or Brad.E.Shaver(u�usace.armv.mil. C. Basis For Determination: The subject area contains both wetlands, as described in the 1987 Corps Delineation Manual and the appropriate Regional Supplemen,t and tributary features that possess an ordinary high water mark. D. Remarks: The site was originally visited in September of 2015. SHAVER.BRAD.�. DN'c=lUS,o=U.S.GovernmenR,o�uEDoD,601756 ou=PKl, ou=USA, 1276601756 �n=SHAVER.BRAD.E.1276601756 Corps RegulatOry Off1c1a1: oace:zoizoi.is io:i9:se-os�oo� Date: Januarv 13, 2017 Expiration Date: None PJD The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at http://corpsmapu.usace.army.miUcm_ape�f?p=136:4:0. Page 2 of 2 NOTIFICATION OF ADMINISTRATNE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: NCDOT Attached is: E File Nuinber: SAW-2015-02055 � Date: Januarv 13, 2017 INITIAL PROFFERED PERMIT (Standard Permit or Letter of pernlissi PROFFERED PERMIT (Standard Permit or Letter of permission) PERMIT DENIAL APPROVED JURISDICTIONAL DETERMINATION PRELIMINARY JURISDICTIONAL DETERMINATiON See Section below � C � 0 0 SECTION I- The following identifies yoLu- rights and options regarding an adininistrative appeal of the above decision. Additional informatioi� may be found at htt�p://www.us�ce.army.miUMissions/CivilWoilcs/RegiilatoryPro�ran�andPermits.aspx or Coros re�ulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. ACCEPT: If you received a Standard Pennit, you may sign the permit doctnnent and return it to the district eugiueer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your worlc is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the pennit in its eutirety, and waive all rights to appeal the �ennit, including its tei7ns and conditions, and approved jurisdictional detenuinations associated with the permit. OBJECT: lf you object to the permit (Standard or LOP) because of certain tenns and conditions therein, you may request that the peimit be moditied accordingly. You must complete Section II of this form and rettu-n the fornl to the dist�ict engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your ri�ht to appeal the permit in the fiiture. Upon receipt of your letter, the district e»gineer will evaluate your objections and may: (a) modify the perinit to address all of your concenis, (b) modify the perinit to address some of your objections, or (c) not modify the permit having determined that the pennit should be issued as previously written. After evahiating your objections, the disTrict engineer will send you a proffered perinit for yotiir reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the pern7it • ACCEPT: If you received a Standard Peimit, you may sign the permit docuinent and return it to the district engineer for final authorization. lf you received a Letter of Perniission (LOP), you may accept the LOP and yoLir wark is authorized. Yotu signature on tl�e Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jiuisdictional detertninations associated with the per-mit. • APPEAL: If you choose to decline tl�e proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under Che Coips of Lngineers Administrative Appeal Process by completing Section II of this form and sending the fornl to the division engineer. This fonn must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Adminisri�ative Appeal Process by completing Sectiou II of this fonn and sendulg the form to the division engi�7eer. This form irnist be received by the division engu7eer within 60 days of the date of tlus notice. D: APPROVED JURISDICTIONAL D�TERMINATION: You may accept or appeal the approved JD or provide new infonnation. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps witllin 60 days of the date of this notice, means that you accept the approved JD in its entirery, and waive all rights to appeal the approved JD. APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Coips of Engineers Administrative Appeal Process by completiug Section II of this form and sending the fornl to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. Page 3 of 2 SA W-2015-02055 E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliniinary JD is not appealable. If you wish, you may request a�n approved JD (which may be appealed), by contacting the Coips district for fur�ther iilstrucrion. Also you may provide new infoi-�nation for further consideration by the Corps to reevaluate the JD. SECTiON Ii - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe yol�r reasons for appealing the decision or your objections to an initial proffered permit in clear concise statenzeuts. You nlay attacl� additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is lunited to a review of tl��e administrative record, the Coips memorandLun for the record of the appeal conference ar meeting, and any supplemental information that the review officer has deteimined is needed to clarify the adininistrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of infonnation that is al�eady in the administrative record. PO1NT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the [f you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Mr. Jason Steele, Adininishative Appeal Review Officer Attn: Brad Shaver CESAD-PDO 69 Darlington Ave U.S. Anny Corps of Engineers, South Atlantic Division Wilmingt�on, NC 28403 60 Forsyth St�eet, Room 1OM15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 R1GHT OF ENTRY: Your signature below grants the right of enriy to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and w�ill have tl�e opporhiniry to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Brad Shaver, 69 Darlington Ave Wihnington, NC 28403 For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Att»: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 Page 4 of 2