Loading...
HomeMy WebLinkAbout20060711 Ver 1_Email_20161118Burdette, Jennifer a From: Higgins, Karen Sent: Friday, November 18, 2016 4:13 PM To: callen@allencm.com Cc: Burdette, Jennifer a; Larsen, Cory Subject: Holly Point Attachments: FW: Holly Point Mr. Allen - Jennifer Burdette passed along the attached information for me to review regarding your project and stormwater regulations. As I understand the emails between you, Mr. Randy Miller and Jennifer, this is a phased subdivision. The next phase involves a road crossing, which the U.S. Army Corps of Engineers has determined requires a NW29. The corresponding 401 certification from the state is GC3890. As Jennifer indicated to you in previous correspondence, GC3890 has a requirement for stormwater management. This requirement comes from our regulations, which states that DWR cannot approve a project unless it "provides for the protection of downstream water quality standards through the use of on-site stormwater control measures;" When a local government requires a stormwater management plan (e.g. through NPDES Phase 11), that can satisfy the state requirement and allow DWR to issue a 401 certification without having to review the same stormwater management plan. While I understand that the Town of Holly Springs has grandfathered your project from their local requirements, this does not grandfather your project from the state requirements that have been in effect since 1996. If your project requires a NW29, the project will need to comply with Condition #12 of GC3890, which requires stormwater management for low or high- density projects. I was able to find some information related to this ro ect in our database from 2006-2007, where we sent correspondence to Holly Pointe, LLC asking about stormwater requirements and this road crossing. While that project was only for the sewer crossings at the time and was withdrawn by the applicant in 2007, we did discuss the possibility of stormwater management being required for this entire project with the previous owner. I understand this is not the email you were hoping for and that this site has both topographic and planning constraints. We would be happy to sit down with you and discuss options moving forward. Please contact Jennifer or our stormwater engineer, Cory Larsen, to schedule a meeting. Thanks - Karen Karen Higgins 401 & Buffer Permitting Branch Supervisor Division of Water Resources Department of Environmental Quality 919 807-6360 office karen.higginsQncdenr.gov 512 N. Salisbury Street, Suite 942-E, Raleigh, NC 27604 1617 Mail Service Center, Raleigh, NC 27699-1617 Email corresponclence to and fi`om thio; addresso; sut-yect to t1he Atotill-I Carolina Public Records 'Law and may be disclosed to thloird padfes,