Loading...
HomeMy WebLinkAbout19990974 Ver 1_Staff Comments_20080627Repairs to TC Roberson Stream B banks Subject: Repairs to TC Roberson Stream B banks From: "Barbara Wiggins" <bswiggins@bellsouth. net> Date: Fri, 27 Jun 2008 11:48:14 -0400 qq901 iJ To: "'Fish and Wildlife Associates"' <fwa@dnet.net>, "Tim Fierle" <tim.fierle@bcsemail.org>, "Rob Weinkle" <robyn.weinkle@bcsemail.org> CC: "'Eric Kulz"' <eric. kulz@ncmail. net>, <Kevin.Barnett@ncmail.net>, "'Beckwith, Loretta A SAW"' <Loretta.A.Beckwith@saw02.usace.army. mil> We have tentatively scheduled to do the stream bank stabilization and repair work at TC Roberson Stream Mitigation site on July 8, 2008. We may arrange for the contractor to drop off the backhoe on Monday July 7 and leave it in the field next to Stream B. There will be three staff from FWA and two staff from Backwoods Landscapes and Excavation on site during the repair work. Weather permitting, the repair work with the backhoe should be complete within the same day, along with the matting and live stake work. The school system will then install a permanent fence system (cables and posts) to delineate the buffer boundaries. Replanting of trees and shrubs in the disturbed buffer will be scheduled for late fall (Nov-Dec) of this year to ensure survival of the new plants. Rain date for the work - possibly July 10 or 11 of the same week. Barbara Wiggins, CLM Fish and Wildlife Associates PO Box 241 Whittier, NC 28789 828-497-6505 fwa@dnet.net Asheville Office: 828-254-5644 Cell phone 828-215-7334 bswiggins(a-),bel I south. net 1 of 1 6/27/2008 12:51 PM