HomeMy WebLinkAboutNC0000396_Asheville Interim Monitoring Letter Correction Draft Final V3_20170110Environmental
Quality
January 11, 2017
Paul Draovitch
Senior Vice President
Environmental, Health & Safety
Duke Energy
526 South Church Street
Mail Code EC3XP
Charlotte, North Carolina 28202
ROY COOPER
Governor
Subject: Correction to the Facility Interim Monitoring Plans Networks and Sampling
Requirements
Asheville Steam Electric Plant
NPDES Permit NC0000396 — Buncombe County
Dear Mr. Draovitch:
On December 21, 2016, the North Carolina Department of Environmental Quality (DEQ) sent a
letter to Harry Sideris, Senior Vice President, concerning Interim Monitoring Plans that included
the subject facility. Attached to this letter is the correct version of the Interim Monitoring Plan for
the Asheville Steam Electric Plant that shall supersede the related attachment regarding the facility
dated December 21, 2016.
If you have any questions, please feel free to contact Steve Lanter at (919) 807-6444.
Sincerely,
S. erman, P.G., Director
Division of Water Resources
Attachments: Revised Interim Monitoring Plan for Asheville Steam Electric Plant
cc: WQROS Asheville Regional Office Supervisor
WQROS Central File Copy
Nothing Compares
State of North Carolina I Environmental Quality
217 West Jones Street 11601 Mail Service Center I Raleigh. North Carolina 27699-1601
9197078600
Revised Asheville Steam Electric Plant Interim Monitoring Plan (January 4 2017)
Wells to be Sampled
GW-ID
MW-13D
MW-11
MW-20A
GW-4
MW-8BR
P-103
GW-1BR
MW-13BR
MW-15A
MW-22D
GW-5
B-1
MW-19BR
GW-2
MW-14BR
MW-15D
MW-24S
PZ-17S
B-1-A
AMW-IB
CB-8BR
MW-23DU
MW-15BR
MW-9S
PZ-17D
B-2
APZ-30
MW-ID
MW-23DL
MW-16A
MW-91)
PZ-19
MW-7BR
AMW-2A
MW-IBR
MW-23BR
MW-16BR
MW-9BR
CB-8D
PZ-17S
AMW-213
MW-31)
ABMW-11BR
MW-17A
MW-6S
CB-8BR
PZ-17D
CB -ID
MW-3BR
AMW-03A
MW-18BR
MW-6D
CB-9SL
PZ-16
CB-lBR
MW-51)
AMW-03B
MW-18BRL
MW-6BR
CB-9BR
PZ-26
CB-lBRL
MW-5BR
MW-10
MW-18D
GW-3
MW-8S
P-102
Surface Water and Seep Locations to be Sampled
Surface water locations are pending and will be based on NPDES Permit effluent channel decisions.
All seeps should be sampled during Interim Monitoring unless they are addressed by permitted sampling. If a seep is
combined with other seeps for purposes of permitted sampling, please contact ARO to discuss sample needs.