Loading...
HomeMy WebLinkAboutNC0000396_Asheville Interim Monitoring Letter Correction Draft Final V3_20170110Environmental Quality January 11, 2017 Paul Draovitch Senior Vice President Environmental, Health & Safety Duke Energy 526 South Church Street Mail Code EC3XP Charlotte, North Carolina 28202 ROY COOPER Governor Subject: Correction to the Facility Interim Monitoring Plans Networks and Sampling Requirements Asheville Steam Electric Plant NPDES Permit NC0000396 — Buncombe County Dear Mr. Draovitch: On December 21, 2016, the North Carolina Department of Environmental Quality (DEQ) sent a letter to Harry Sideris, Senior Vice President, concerning Interim Monitoring Plans that included the subject facility. Attached to this letter is the correct version of the Interim Monitoring Plan for the Asheville Steam Electric Plant that shall supersede the related attachment regarding the facility dated December 21, 2016. If you have any questions, please feel free to contact Steve Lanter at (919) 807-6444. Sincerely, S. erman, P.G., Director Division of Water Resources Attachments: Revised Interim Monitoring Plan for Asheville Steam Electric Plant cc: WQROS Asheville Regional Office Supervisor WQROS Central File Copy Nothing Compares State of North Carolina I Environmental Quality 217 West Jones Street 11601 Mail Service Center I Raleigh. North Carolina 27699-1601 9197078600 Revised Asheville Steam Electric Plant Interim Monitoring Plan (January 4 2017) Wells to be Sampled GW-ID MW-13D MW-11 MW-20A GW-4 MW-8BR P-103 GW-1BR MW-13BR MW-15A MW-22D GW-5 B-1 MW-19BR GW-2 MW-14BR MW-15D MW-24S PZ-17S B-1-A AMW-IB CB-8BR MW-23DU MW-15BR MW-9S PZ-17D B-2 APZ-30 MW-ID MW-23DL MW-16A MW-91) PZ-19 MW-7BR AMW-2A MW-IBR MW-23BR MW-16BR MW-9BR CB-8D PZ-17S AMW-213 MW-31) ABMW-11BR MW-17A MW-6S CB-8BR PZ-17D CB -ID MW-3BR AMW-03A MW-18BR MW-6D CB-9SL PZ-16 CB-lBR MW-51) AMW-03B MW-18BRL MW-6BR CB-9BR PZ-26 CB-lBRL MW-5BR MW-10 MW-18D GW-3 MW-8S P-102 Surface Water and Seep Locations to be Sampled Surface water locations are pending and will be based on NPDES Permit effluent channel decisions. All seeps should be sampled during Interim Monitoring unless they are addressed by permitted sampling. If a seep is combined with other seeps for purposes of permitted sampling, please contact ARO to discuss sample needs.