HomeMy WebLinkAbout20161188 Ver 1_Stream impact_20170109C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑X Wetlands ❑X Streams —tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary T
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f.
Area of
impact
(acres)
W1 P
Fill
Bottomland Hardwood Forest
Yes
Corps
16,105
W2 T
Erosion Control
Bottomland Hardwood Forest
Yes
Corps
476
W3 -
Choose one
Choose one
Yes/No
W4 -
Choose one
Choose one
Yes/No
W5 -
Choose one
Choose one
Yes/No
W6 -
Choose one
Choose one
Yes/No
2g. Total Wetland Impacts:
16,581
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary (T)
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g.
Impact
length
(linear
feet)
S1 P
Culvert
UT Sycamore Creek
PER
Corps
6
149
S2 P
Stabilization
UT Sycamore Creek
PER
Corps
6
36
S3 -
Choose one
-
S4 -
Choose one
-
-
S5 -
Choose one
-
S6 -
Choose one
-
3h. Total stream and tributary impacts
185
3i. Comments:
Page 4 of 10
PCN Form — Version 1.4 January 2009