Loading...
HomeMy WebLinkAbout20161188 Ver 1_Stream impact_20170109C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑X Wetlands ❑X Streams —tributaries ❑X Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Fill Bottomland Hardwood Forest Yes Corps 16,105 W2 T Erosion Control Bottomland Hardwood Forest Yes Corps 476 W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 16,581 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert UT Sycamore Creek PER Corps 6 149 S2 P Stabilization UT Sycamore Creek PER Corps 6 36 S3 - Choose one - S4 - Choose one - - S5 - Choose one - S6 - Choose one - 3h. Total stream and tributary impacts 185 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009