Loading...
HomeMy WebLinkAboutFacility Interim Monitoring Plans Networks and Sampling Requirements_20161221Water Resources ENVIRONMENTAL QUALITY PAT MCCRORY Go.or DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director December 21, 2016 Harry K. Sideris Senior Vice President Environmental, Health & Safety Duke Energy 526 South Church Street Mail Code EC3XP Charlotte, North Carolina 28202 Subject: Facility Interim Monitoring Plans Networks and Sampling Requirements Dear Mr. Sideris: The purpose of this letter is to provide clarification for the facility interim monitoring plan networks and sampling requirements for each of the 14 Duke Energy coal ash facilities in North Carolina. This technical direction is given to refine the scope of work related to the interim monitoring plans proposed in the Corrective Action Plans for each facility and expound on instruction detailed in the September 13, 2016 letter from the North Carolina Department of Environmental Quality (DEQ) concerning implementation of the before -mentioned plans. The objective of the interim monitoring plans is to collect data to facilitate completion of the Groundwater Comprehensive Site Assessments and Corrective Action Plans so that remediation goals can be established for the 14 Duke Energy coal ash facilities. After reviewing available site assessment data, additional monitoring network sample locations have been identified and provided in attached files for each respective facility. The revised facility interim monitoring plans shall be conducted on a quarterly basis commencing the second quarter of calendar year 2017 until Corrective Action Plans are accepted for the individual facilities or as directed otherwise by DEQ. The quarterly sampling events will be conducted in conjunction with planned compliance monitoring sampling events for three quarters during the calendar year, supplemented with an additional sampling event conducted at each facility in order to provide four rounds of monitoring data to evaluate seasonal fluctuations during a year-long timeframe. The interim monitoring plan shall be conducted in the same manner as previous CAMA corrective action groundwater and surface water monitoring events. The analyte list and analytical methods for groundwater and surface water for the interim monitoring plans will reflect what has been implemented during the Groundwater Comprehensive Site Assessments and the Corrective Action Plans. Sampling for radionuclides at a limited number of monitoring locations upgradient, immediately downgradient of the impoundments, and further downgradient of source areas in areas that exhibit elevated concentrations of constituents of interest shall continue as part of the interim monitoring program following direction given as comments related to the Groundwater Comprehensive Site Assessments. Surface water sampling locations will be situated adjacent to State of North Carolina I Environmental Quality I Water Resources; 1617 Mail service Center I Raleigh, North Carolina 27699-1617 919 707 9000 the bank of the surface water body where potential discharge of contaminated groundwater may enter as base flow. If sampling an individual groundwater or surface water location is problematic, please call the Regional Office to discuss. Any changes to interim monitoring network and sampling requirements must be initiated by official correspondence from either the DEQ Central Office or Regional Offices. Document the results of the four quarters of sampling and analysis during the calendar year as an annual interim monitoring plan report for each subject coal ash facility submitted by April 30' of the following year. The respective annual monitoring reports shall include figures, tables, cross- sections, maps, and time -series plots in a manner that provides an integrated, comprehensive interpretation of site conditions and plume status. Reports submitted in a data summary format will not be approved as an acceptable documentation of the monitoring program. The DEQ is open to consider optimization of the interim monitoring plan program following a qualitative and quantitative review of site-specific data. A thorough analysis of spatial and temporal trends related to contaminant distribution that include determination of background conditions and identification of areas impacted by coal ash residuals must be provided as a decision framework to support improvements to long-term monitoring programs. If you have any questions, please feel free to contact Steve Lanter at (919) 807-6444. Sincerely, e S. Jay Zien:, P.G., Director Division of Water Resources Attachments: Interim Monitoring Plans for the 14 coal ash facilities cc: WQROS Regional Offices WQROS Central File Copy Allen Steam Station Interim Monitoring Plan Wells to be Sampled AB -1R AB -13D AB-25BR* AB -32D BG -ID GWA-3S GWA-15D GWA-24S AB -2 AB -13S AB-25BRU* AB -32S BG -1S GWA-4D GWA-15S GWA-24D AB -21) AB-14BR AB -25S AB -33D BG-2BR GWA-4S GWA-16D GWA-24BR AB -413R AB -14D AB-25SL AB -33S BG -2D GWA-5BR GWA-16S GWA-26S AB -41) AB -20D AB -26D AB -34D BG -2S GWA-51) GWA-17D GWA-26D AB -4S AB -20S AB -26S AB -34S BG -3D GWA-5S GWA-17S AB -5 AB-21BR AB -27D AB-35BR BG -3S GWA-6BR GWA-18D AB -6A AB -21D* AB -27S AB -35D BG-4BR GWA-6DA GWA-18S AB -6R AB -21S AB -28D AB -35S BG -4D GWA-6S GWA-19D AB -8 AB -21 SL AB -28S AB -36D BG -4S GWA-7D GWA-19S AB -91) AB -22D AB -29D AB -36S GWA-IBR GWA-7S GWA-21S AB -9S AB -22S AB -29S AB -37D GWA-ID GWA-8D GWA-21D AB -101) AB-23BRU AB-29SL AB -37S GWA-IS GWA-8S GWA-21BR AB-IOS AB -23S AB -30D AB -38D GWA-2D GWA-91) GWA-22S AB -111) AB -24D AB -30S AB -38S GWA-2S GWA-9S GWA-22D 13- 122-24S AB -31D* AB -39D GWA-3BR* GWA-14D* GWA-23S AB -12S AB-24SL AB -31S AB -39S GWA-3D GWA-14S GWA-23D Wells slated for installation/reinstallation that need to be added to monitoring plan once installed *BG -1D (needs to be reinstalled due to water quality issues - grout contamination) *BG-2BR (needs to be reinstalled due to water quality issues - grout contamination) *AB -21D (needs to be reinstalled due to water quality issues - grout contamination) *AB-25BRU (needs to be reinstalled due to water quality issues - grout contamination) *AB-25BR (needs to be reinstalled due to water quality issues - grout contamination) *AB -31D (needs to be reinstalled due to water quality issues - grout contamination) *GWA-3BR (needs to be reinstalled due to water quality issues - grout contamination) *GWA-14D (needs to be reinstalled due to water quality issues - grout contamination) AB-21BRL (vertical delineation - proposed by Duke/HDR) AB-22BR (vertical delineation - proposed by Duke/HDR) AB-24BR (vertical delineation - proposed by Duke/HDR) AB-27BR (vertical delineation - proposed by Duke/HDR) AB-38BR (vertical delineation - proposed by Duke/HDR) GWA-4BR (vertical delineation - proposed by Duke/HDR) GWA-9BR (vertical delineation - proposed by Duke/HDR) Surface Water Locations to be Sampled SW -1 SW -2 SW -3 SW -4 SW -5 SW -6 SW -7 Seep Locations to be Sampled S-1 ANW WO04 ANW WOOL Page 1 of 1 Asheville Steam Electric Plant Interim Monitoring Plan Wells to be Sampled ABMW-04D APD -7 CB -1 GW-01BR MW -11D MW -20A P-103 PZ -24 ABMW-05BR AS -11 CB -1D GW-OID MW -12D MW -21D P-104 PZ -26 ABMW-05S AS -13 CB -2 GW -1 MW-13BR MW-22BR P-105 PZ -27 ABMW-07S AS -14 CB -3 GW -2 MW -13D MW -22D POT -I PZ -8 ABMW-08 AS -15 CB -3R GW -3 MW-14BR MW-23DL POT -2 ABMW-11BR AS -16 CB -4 GW -4 MW -15A MW-23DU POT -3 ABMW-2 AS -17 CB -4B GW -5 MW -15D MW -24S PZ -12 ABMW-2S AS -20 CB -5 MW-06BR MW -16A MW-2BR PZ -16 ABMW-4 AS -3 CB -6 MW -06D MW-16BR MW -3D PZ -17D ABMW-5D AS4 CB -7 MW -06S MW -17A MW4D PZ -17S AMW-1B AS -5 CB -8 MW-09BR MW-18BR MW-5BR PZ -19 AMW-2A AS -6 CB-8BR MW -09D MW-18BRL MW -5D PZ -1D AMW-3A AS -9 CB -9 MW -09S MW -18D MW -8S PZ -1S AMW-3B CB-09BR DP -I MW -10 MW -IBR P-100 PZ -22 APD -1 CB-09SL DW -6 MW -11 MW -1D P-101 PZ -23 Surface Water and Seep Locations to be Sampled SW -06 SW -07 N-01 F-03 64E 1 64E 2 64E 3 82E 1 82E 2 Belews Creek Steam Station Interim Monitoring Plan Wells to be Sampled AB -IBR AB-6SL BG -1D GWA-17D GWA-21S GWA-31D GWA-8S MW-203BR AB -1D AB -7D BG -1S GWA-17S GWA-22D GWA-31S GWA-9BR MW -203D AB -1S AB -7S BG-2BR GWA-18D GWA-22S GWA-32D GWA-9D MW -203S AB -2D AB -8D BG -2D GWA-18S GWA-23D GWA-32S GWA-9S MW -204D AB -2S AB -SS BG -2S GWA-18SA GWA-23S GWA-2D MW -102D MW -2045 AB -3D AB-8SL BG -3D GWA-19BR GWA-24BR GWA-2S MW -102S MW -3 AB -3S AB-9BR BG -3S GWA-19D GWA-24D GWA-3D MW-104BR AB4BR AB-9BRD GWA-10D GWA-19S GWA-24S GWA-3S MW -104D AB-4BRD AB -9D GWA-IOS GWA-19SA GWA-25BR GWA-4D MW -1045 AB -4D AB -9S GWA-11D GWA-IBR GWA-26BR GWA-5BR2 MW-200BR AB4S BC -23A GWA-11S GWA-1D GWA-26D GWA-5D MW -200D AB-4SL BC -28 GWA-12BR GWA-IS GWA-26S GWA-5S MW -2005 AB -5D BCSW-007 GWA-12D GWA-20BR GWA-27BR GWA-6D MW-201BR AB -5S BCSW-008 GWA-12S GWA-20D GWA-27D GWA-6S MW -201D AB-5SL BCSW-018A GWA-16BR GWA-20S GWA-27S GWA-7D MW-202BR AB -6D BCSW-019 GWA-16D GWA-20SA GWA-30D GWA-7S MW -202D AB -6S BCWW-002 GWA-16S GWA-21D GWA-30S GWA-8D MW -202S Surface Water Locations to be Sampled SW -BL -D SW -BL -UD SW -BL -U S W -DR -D S W -DR -U S W-DR-UU Seep Locations to be Sampled U Buck Combined Cycle Station Interim Monitoring Plan Wells to be Sampled AB -1D AB-6BRU AS -31) GWA-2S GWA-9BR GWA-15D MW -31) MW -9D AB -213R AB-7BRU AS -3S GWA-3BR GWA-91) GWA-15S MW -3S MW -9S AB -21) AB -7S BG -IBR* GWA-3BRU GWA-9S GWA-17S MW -4D MW -10D AB -2S AB-7SL BG -1D* GWA-3S GWA-IOD GWA-18D MW -4S MW -IID AB-2SL AB -81) BG -IS GWA-41) GWA-IOS GWA-18S MW -5D MW -IIS AB -31) AB -8S BG-2BR* GWA-4S GWA-111) GWA-19D MW -5S MW -12S AB -3S AB-9BR BG -2D GWA-513RU GWA-IIS GWA-19S MW-6BR MW -12D AB-4BR AB-9D(BRU?) BG -2S GWA-5S GWA-12D(BRU?) GWA-20D MW -6D MW -13D AB-413RU AB -9S BG-3D(BRU?) GWA-6BR GWA-12S GWA-20S MW -6S AB -4S AB -101) BG -3S GWA-613RU GWA-13D GWA-22D MW -71) AB-4SL AB -10S GWA-1D GWA-6S GWA-13SR MW -1S MW -7S AB-5BRU AS -1D GWA-1S GWA-71) GWA-14BR MW -1D MW-8BR AB -5S* AS -1S GWA-2BR GWA-7S GWA-14D MW -2S MW -81) Wells slated for installation/reinstallation that need to be added to monitoring plan once installed GWA-16S (data gap well) GWA-16D (data gap well) *BG -1D (needs to be reinstalled due to water quality issues -grout contamination) *BG -IBR (needs to be reinstalled due to water quality issues - grout contamination) *BG-2BR (needs to be reinstalled due to water quality issues - grout contamination) AB-4BRL (vertical delineation - proposed by Duke/HDR) AB-10BR -4BRL (vertical delineation - proposed by Duke/HDR) MW -I IBR (vertical delineation - proposed by Duke/HDR) Surface Water Locations to be Sampled SW -ABI SW -AB -2 SW-AB3 SW-AB4 SW-AB7 SW -1 SW -2 Add the four proposed sampling locations (as communicated by Duke on 9/16/16) on the attached map. Seep Locations to be Sampled S-1 S-7 S-2 S-8 S-3 S-9 S-4 S-10 S-5 BSSWOOIAA S-6 cu L Q Ir 1 (C) i _ r (C) i (C) Cape Fear Steam Electric Plant Interim Monitoring Plan Wells to be Sampled ABMW-1 ABMW-4S *CMW-5 MW-IOBRL MW-16BR MW-21SL MW -9 PZ -7 ABMW-lBR ABMW-5BR CMW-6 MW -IOD MW -16S MW-21SU MW-9BR PZ -8 ABMW-IS ABMW-5S CMW-7 MW -11 MW-17BR MW-22BR *PZ -1 ABMW-2SL BGMW4 CMW-8 MW -12 MW-17SL MW -22S PZ -10 ABMW-2SU BGTMW-4 CTMW-1 MW-12BR MW-17SU *MW-23BR PZ -2 ABMW-3 CP -2 CTMW-2 MW -13 MW -18S *MW -23D PZ -3D ABMW-3BR CHATH-79- P100 CTMW-7 MW -14 MW -19S *MW -23S PZ -3S ABMW-3S CMW-1 CTMW-8 MW-15BR MW-20BR MW-5BR PZ -4 ABMW-3SR CMW-2 MW -10 MW-15SL MW -20S MW-5BRR PZ -5 ABMW-4 CMW-3 MW-IOBR MW-15SU MW-21BR MW-6BR PZ -6 *Notes: • Piezometer "PZ -1" will be used as a piezometer, used to measure liquid pressure measuring water level height, only. • "CMW-5" — DWR and Duke Energy agreed that this well has turbidity issues and is required to be replaced. • An additional well set is also necessary east of the MW -23 well set. The siting location (shallow and intermediate) is expected to be in the vicinity of the facility's property line. (The MW -23 well set is expected to continue to be monitored). Surface Water and Seep Locations to be Sampled SW -HAW SW-DEEPR SW -SBD -REF SW-BAI SW -BBI SW-CFDG SW-SHD-Plant, SW-SHD56 SW-UNTA S-1 S-6 Additional Surface Water and Seep Locations to be Sampled Southeast side of 1985 Ash Basin - Approximate location latitude 35 35 13 and longitude 79 02 15 (DMS) Branch A at crossing of Railroad spur James E. Rogers Energy Complex Interim Monitoring Plan Wells to be Sampled AB -11) AS -7S GWA-23D GWA-37D MW -20D MW -8S CLP -2 AB -IS BG -1D GWA-24BR GWA-37S MW-20DR U54D GWA-21D AB -2D BG -1S GWA-24D GWA-38D MW-21BR U5 -1S GWA-22D AB -2S BG -2D GWA-24S GWA-39S MW -21D U5-2BR CLMW-5D AB -3I CCP-MW1D GWA-25D GWA-3D MW-22BR U5-21) GWA-46S AB -3S CCP-MW1S GWA-25S GWA-42S MW-22DR U5 -2S -SL -A GWA-47S AB-3SL CLMW-1 GWA-26S GWA-43D MW -23D U5 -3D GWA-13BRU AB-4BR CLMW-2 GWA-27D GWA-43S MW-23DR U5 -3S -A U5 -2S AB -4D CLMW-3D GWA-27D-A GWA-44BR MW -23S U54BR AB -4S CLMW-3S GWA-28BR GWA-44D MW -24D U54D A13 4SL CLMW-4 GWA-28BRU GWA44S MW-24DR U54S AB-5BR CLMW-5S GWA-28S GWA-45D MW-25DR U5 -5D AB-5BRU CLMW-6 GWA-29D GWA-45S MW-2DA U5-61) AB -5S GWA-11) GWA-29S GWA-47D MW -30D U5 -6S AB-6BR GWA-101) GWA-213RU GWA-48BR MW -30S U5 -7D AB -6D GWA-IOS GWA-2S GWA-4D MW-32BR U5 -7S AB -6S GWA-11BRU GWA-30BR GWA-4S MW -32D U5-7SL AB-7BR GWA-11S GWA-30BRU GWA-5BRU MW -32S U5-8BR AS -113 GWA-12BRU GWA-30S GWA-5S MW-34BRU U5-81) AS-1SB GWA-12S GWA-3IBR-A GWA-61) MW -34D U5 -8S AS -213 GWA-13BR GWA-31D GWA-6S MW -34S GWA-20BR AS -2S GWA-14D GWA-32BR IB -1D MW-36BRU GWA-27BR AS-3BRU GWA-14S GWA-32D IB -IS MW -36S GWA-2BR AS -413 GWA-1BRU GWA-33BR IB-2S/SL MW -38D GWA-38S AS4S GWA-20D GWA-33D IB -3D MW -38S GWA-46B AS-5BRU GWA-20S GWA-33S IB -3S MW-40BRU GWA-48S AS -5S GWA-21BR GWA-34S IB4S/SL MW -40S MW -2D AS -613 GWA-21BRU GWA-35D MW -IOD MW -42D MW -2D -A AS -6S GWA-21S GWA-35S MW -10S MW -42S MW-38BR AS-7BRL GWA-22BRU GWA-36D MW -11D MW -41) U5-5BR AS -713 GWA-22S GWA-36S MW -11S MW -8D CLP -I Well GWA-13BR —Missing from master spreadsheet. Please add with historical data. Well GWA-20BR — Missing from master spreadsheet. Please add with historical data. Well GWA-27BR — Missing from master spreadsheet. Please add with historical data. Well GWA-2BR — Missing from master spreadsheet. Please add with historical data. Well GWA-30BRU — Missing from master spreadsheet. Please add with historical data. Well GWA-38S — Missing from master spreadsheet. Please add with historical data. Well GWA-46B — Missing from master spreadsheet. Please add with historical data. Well GWA-48BR — Missing from master spreadsheet. Please add with historical data. Well GWA-48S — Missing from master spreadsheet. Please add with historical data. Well IB -2S -SL — Missing from master spreadsheet. Please add with historical data. Well IB -4S -SL — Missing from master spreadsheet. Please add with historical data. Well MW -21) — Missing from master spreadsheet. Please add with historical data. Well MW -2D -A — Missing from master spreadsheet. Please add with historical data. Well MW-38BR — Missing from master spreadsheet. Please add with historical data. Well U5-5BR — Missing from master spreadsheet. Please add with historical data. Well GWA-29S — Missing from master spreadsheet. Please add with historical data. Well CLP -1 —Missing from master spreadsheet. Please add with historical data. Well CLP -2 — Missing from master spreadsheet. Please add with historical data. Well GWA-21D — Missing from master spreadsheet. Please add with historical data. Pagel of 2 James E. Rogers Energy Complex Interim Monitoring Plan Well GWA-22D — Missing from master spreadsheet. Please add with historical data. Well CLMW-5D — Missing from master spreadsheet. Please add with historical data. Well MW-23BR—Missing from master spreadsheet. Please add with historical data. Well GWA46S —Missing from master spreadsheet. Please add with historical data. Well GWA47S — Missing from master spreadsheet. Please add with historical data. Well GWA-13BRU - Missing from master spreadsheet. Please add with historical data. Well GWA-29S — Missing from master spreadsheet. Please add with historical data. Well U5 -2S — Missing from master spreadsheet. Please add with historical data. Well GWA-11) — Missing from master spreadsheet. Please add with historical data. Surface Water Locations to be Sampled SW -2 SW -3 SW -4 SW -8 SW -9 SW-l0A SW -1013 SW -10C Seep Locations to be Sampled S-1 S-13 S-24 CLFSP058 S-2 S-14 S-26 CLFSP059 S-3 S-15 S-27 CLFSP061 S-4 S-16 S-28 CLFTDO04 S-5 S-17 S-29 CLFTDO05 S-6 S-18 S-30 CLFTDO52 S-7 S-19 S-31 CLFSTRO53 S-8 S -19A S-32 CLFSP060 S-9 S-20 S-34 CLFSTR064 S-10 S-21 CLFWW57 CLFSTR065 S -I1 S-22 CLFSD063 SW -I S-12 S-23 CLFSP051 Page 2 of Dan River Combined Cycle Steam Station Interim Monitorint= Plan Wells to be Sampled AB -IOD AB-35BR BG -1D GWA-16S GWA-6S MW -11 MW -23D MW -9D AB-1OS AB -5D BG -5D GWA-17D GWA-7D MW -11D MW-308BR OW -308D AB-10SL AB -5S BG -5S GWA-18D GWA-7S MW -12 MW-310BR OW -310D A13 -15S AS -12S GWA-IOD GWA-20D GWA-8BR MW -12D MW-311BR AB-25BR AS -2D GWA-12D GWA-20S GWA-8D MW -21D MW-314BR AB -25D AS-8BR GWA-12S GWA-4D GWA-8S MW -21S MW-315BR AB -25S AS -8D GWA-14D GWA-4S GWA-9D MW-22BR MW-317BR AB-30BR BG-IOBR GWA-14S GWA-5BR GWA-9S MW -22D MW-317BRL AB -30D BG -IOD GWA-15D GWA-SBRD MW -10 MW -22S MW -318D AB -30S BG-IOS GWA-16D GWA-6D MW -10D MW-23BR MW -9 Surface Water Locations to be Sampled SW -1 SW -2 SW -4 SW -5 SW -6 SW -7 SW -8 SW -9 SW -10 SW -11 SW -13 SW Dan River at Well cluster MW - Seep Locations to be Sampled S-1 H. F. Lee Energy Complex Interim Monitoring Plan Wells to be Sampled ABMW-1 AMW-14S BGMW-9 CW -2 IABMW-3S LLMW-2 AMW-18BC ABMW-1S AMW-15BC BW -1 CW -3 IMW-IBC LLMW-2S IMW-04BC AMW-TIBC AMW-15S CCR -1005 CW -4 IMW-1S LLMW-3 IMW-05BC AMW-11S AMW-16BC CMW-10 DMW-1 IMW-2BC MW -1 AMW-12BC AMW-17S CMW-5 DMW-2 IMW-3BC MW -2 AMW-12S AMW-18S CMW-6R DMW-3 IMW-3S MW -3 AMW-13BC AMW-4BC CMW-7 IABMW-1 IMW-4S SMW-3 AMW-13S AMW-6RBC CMW-8 IABMW-1S IMW-5S SMW-4 AMW-13S AMW-9BC CTMW-1 IABMW-2S LLMW-1 SMW-5 AMW-14BC BGMW-10 CW -1 IABMW-3 LLMW-IS AMW-17BC Surface Water and Seep Locations to be Sampled ASW -BG S-03 S -03A S-5 S-10 S-20 S-14 S-15 S-16 ISW-HMBREF Marshall Steam Station Interim Monitoring Plan Wells to be Sampled AL -1S AB -4D AB -11S AB -18S GWA-2D* GWA-11D MW -IOD OB -1 (Dry Ash Basin) AL -11) AB -5S AB -111) AB -18D GWA-3S GWA-12S MW -11S OB -1 (DryAsh LF) AL -2S AB -5D AB -12S AB -20S GWA-3D GWA-12D MW -11D MW -1 AL -21) AB-5BR AB-12SL AB -20D GWA-4S GWA-12BR MW -12S MW -2 AL-2BR AB -6S AB -12D AB -21S GWA-41D GWA-13S MW -12D MW -3 AL -3S AB -6D AB -13S AB -21D GWA-5S GWA-13D MW -13S MW -5 AL -3D AB-6BR AB -13D BG -1S GWA-5D MW -4 MW -13D MW -7 AL -41) AB -7S AB -14S BG -1D GWA-6S MW -4D MW -14S AB -1S AB -7D AB -14D BG -2S GWA-6D MW -6S MW -14D AB -11) AB -8S AB -15S BG-2BR GWA-7S MW -6D MW-14BR AB -IBR AB -81) AB-15SL BG -3S GWA-7D MW -7S MS -8 AB -2S AB -9S AB -15D BG -3D GWA-8S MW -7D MS -10 AB -2D AB -9D AB-15BR BG-3BR GWA-8D MW -8S MS -11 AB -3S AB-9BR AB -16S GWAAS GWA-9BR MW -8D MS -12 AB -31) AB-IOS AB -16D GWA-ID GWA-IOS MW -9S MS -14 AB -4S AB -IDSL AB -17S GW -MR GWA-IOD MW -9D MS -15 AB-4SL AB -IOD AB -17D GWA-2S GWA-11S MW-lOS MS -16 Wells slated for installation/reinstallation that need to be added to monitoring plan once installed: GWA-14S (data gap well - will be installed once property access is granted) GWA-14D (data gap well - will be installed once property access is granted) *GWA-2D (needs to be reinstalled due to water quality issues - grout contamination) AB-6BR (needs to be reinstalled due to water quality issues - grout contamination) AB-IOBR (vertical delineation - proposed by Duke/IIDR) AB-12BR (vertical delineation - proposed by Duke/HDR) AL-lBR (vertical delineation - proposed by Duke/HDR) AL-2BRL (vertical delineation - proposed by Duke/HDR) AL-3BR (vertical delineation - proposed by Duke/HDR) AL-4BR (vertical delineation - proposed by Duke/IIDR) Surface Water Locations to be Sampled SW -1 SW -3 SW -4 SW -5 SW -7 SW -8 SW -9 SW -10 SW -11 Mayo Steam Electric Plant Interim Monitoring Plan Wells to be Sampled ABMW-1 ABMW-3S BG -2 CW -3 MW-11BR MW-15BR MW -3 MW -71) ABMW-2 ABMW-4 CW -1 CW4 MW -12D MW-16BR MW-3BR MW-8BR ABMW-2BR ABMW-4BR CW -11) CW -5 MW -12S MW -16D MW -4 *MW-9BR ABMW-2BRL ABMW-4D CW -2 CW -6 MW-13BR MW -16S MW-5BR ABMW-3 BG -1 CW -2D MW-IOBR MW-14BR MW -2 MW-7BR *Note: • MW-9BR has turbidity issues and is to be replaced. • MW-9BR will be retained as a piezometer used to measure liquid pressure measuring water level height, only. Surface Water and Seep Locations to be Sampled SW -REFI SW-CB2 S W -CBT 1 Riverbend Steam Station Interim Monitoring Plan Wells to be Sampled AB -1D AB -81) BG -4D GWA-15S GWA-23S GWA-7S MW -2D MW-9BR AB -IS AB -8S BG -4S GWA-15D GWA-2BR GWA-81) MW-2S/MW-2S-A MW -9D AB -2D AS -ID BG-5BR GWA-1BRU GWA-2BRU GWA-8S MW -31) AB -2S AS -1S BG -5D GWA-ID GWA-2S GWA-9BR MW -3S AB-3BR AS -2D C-1BRU GWA-1S GWA-3BR GWA-9D MW4D AB -3D AS -2S C -IS GWA-20BR GWA-31) GWA-9S MW -4S AB -3S AS -31) C -2D GWA-20D GWA-3SA MW -10 MW -51) AB -41) AS -3S C -2S GWA-20S GWA-3S-A MW-11DR MW -5S AB -4S AS-3SA GWA-10BRU GWA-21BR GWA-4BR MW-I1SR MW -6D AB -513 BG -1D GWA-IOD GWA-21D GWA4D MW -12 MW -6S AB -5S BG -1S GWA-IOS GWA-21S GWA4S MW -13 MW-7BR AB-5SL BG-2BR GWA-11D GWA-22BR GWA-51) MW 14 9W -7D AB-6BRU BG -2D GWA-IIS GWA-22BR-A GWA-5S MW -15 MW-7SR AB -6S BG -2S GWA-12D GWA-22D GWA-6D MW-15BR MW -81) AB -71) BG -3D GWA-12S GWA-22S GWA-6S MW -15D MW -8I AB -7I BG -3S GWA-14D GWA-23BR GWA-7BR MW -11) MW -8S AB -7S BG-4BR GWA-14S GWA-23D GWA-71) MW -1S MW -9 Surface Water Locations to be Sampled RBSW002 SW -3 In addition, WSRO suggests the Catawba River to be sampled at three locations: near S -1&S-2, S-4/GWA-10, and 5-10 to 5-12. Roxboro Steam Electric Plant Interim Monitoring Plan Well Locations to be Sampled ABMW-1 ABMW-5 CW -1 GMW-6 MW-14BR MW -2 MW-2BR MW-8BR ABMW-lBR ABMW-5D CW -2 GMW-7 MW-15BR MW-20BRL MW-3BR MW-9BR ABMW-2 ABMW-6 CW -2D GMW-8 MW -15D MW-21BRL MW-4BR ABMW-2BR ABMW-6BR CW -3 GMW-9 MW-16BR MW-22BR MW4BRL ABMW-3 ABMW-7 CW -313 MW -1 MW-17BR 4W -22D MW-5BR ABMW-3BR ABMW-7BR CW4 MW-IOBR MW-18BR *MW-23BR MW -513 ABMW-3BRL ABMW-7BRL CW -5 MW-llBR MW -18D MW-24BR MW-6BR ABMW-4 BG -1 GMW-10 MW-12BR MW-19BRL MW-25BR MW -6D ABMW4BR BG-lBR GMW-I1 MW-13BR *MW-IBRL MW-26BR MW-7BR Note: • For wells MW-1BRL and MW-23BR it was agreed that the wells have pH and/or turbidity issues and would be required to be replaced. (If these wells do not stabilize with pH or turbidity within acceptable ranges, the data from them may not be used for statistical analyses and they may need to be replaced.) • Well MW-22BRL will be retained as a piezometer, used to measure liquid pressure measuring water level height, only. Surface Water and Seep Locations to be Sampled SW -01 SW -02 SW -03 S-14 L. V. Sutton Energv Complex interim Monitoring Plan Wells to be Sampled MW -2C MW -13D MW -23E MW-37CD MW -39C SMW-3C AW -2D AW -7D MW -05C MW -14 MW -27C MW -37D MW -39D SMW4C AW -3C AW -8C MW-05CD MW -16 MW -31C MW -37E MW40B SMW-5C AW -4C AW -9C MW -05D MW -16D MW -35C MW -38B MW40C SMW-6C AW -5C AW -9D MW -05E MW -20 MW -36C MW -38C MW40D SMW-6D AW -5D MW -6C MW -20D MW -37B MW -38D SMW-1C AW -1C AW -6D MW -12 MW -23D MW -37C MW -39B SMW-2C AW -2C AW -6E Surface Water and Seep Locations to be Sampled SW -OIC SW -004 W. H. Weathersuoon Power Plant Interim Monitoring Plan Wells to be Sampled ABMW-01 AW -03D BW -03D MW -01 MW -08D MW -41I MW -52 PZ -01 AW -01D AW -03I BW -03I MW -02 MW -08I MW44D MW -53D PZ -02 AW -01I AW -03S BW -03S MW -03 MW -08S (OW -8) MW44I MW -53I PZ -03 AW-OIS BW -01 CCR -101 -BG CAMA MW -04 MW -33D MW -44S MW -54D AW -02D BW -02D CW -01 MW -05 MW -331 MW-44SA MW -55D AW -02I BW -02I CW -02 MW -06 MW -33S MW -49D MW -55I AW -02S BW -02S CW -03 MW -07 MW41D MW -49I PW -1 (DEP 2) Surface Water and Seep Locations to be Sampled 5-15 5-16 S-17 5-20