Loading...
HomeMy WebLinkAboutNC0004961_RBSS_SARP_Rev0_Appx A_20161219Amec Foster Wheeler Environment & Infrastructure, Inc. December 2016 Duke Energy Coal Combustion Residuals Management Program Riverbend Steam Station Site Analysis and Removal Plan Revision 0 APPENDIX A: RIVERBEND STEAM STATION ASH INVENTORY Ash Inventory Ash Basin Closure Duke Energy – Riverbend Steam Station Revision 0 Amec Foster Wheeler Project No. 7810-15-0384 1 of 4 11/13/2015 Calculation Title: Riverbend Steam Station – Ash Inventory Summary: Based on the assumptions described in this calculation, the quantity of ash on the Riverbend Steam Station property was estimated to be approximately 4,316,000 cubic yards (5.2 million wet tons). Note that these estimates may be updated as new information becomes available. Notes: Revision Log: No. Description Originator Verifier Technical Reviewer 0 Initial Submittal 11/13/15 Chris Jordan 11/13/15 Chad Brown 11/13/15 Ken Daly 11/13/15 Ash Inventory Ash Basin Closure Duke Energy – Riverbend Steam Station Revision 0 Amec Foster Wheeler Project No. 7810-15-0384 2 of 4 11/13/2015 OBJECTIVE: The objective of this calculation is to estimate the quantity of coal combustion residuals (CCR) located on Riverbend Steam Station property. This estimate includes the ash basins, ash stack and cinder pit storage area as shown on the attached Figure 1. ASSUMPTIONS: The following assumptions are noted.  Based on data gathered from several coal burning plants, the following typical CCR properties are assumed: Material Dry Unit Weight (tons/cy) Moisture Content (%) Moist Unit Weight (tons/cy) CCR in Ash Basins 0.8 50% 1.2 CCR in Ash Fills 1.0 20% 1.2 CALCULATIONS: Quantity of Material within the Ash Ponds (See attached Figure 1.1 through 1.5) The quantity of CCR within the ash basins was estimated using AutoCAD Civil 3D. The approximate pre-fill topography was digitized from three available data sources (Duke Energy Drawing RB-3010-A (Rev. 8/27/90), a digital scan of USGS Map “Mountain Island Lake (1969), and twelve borings). The quality of the historic Duke Energy drawing and the USGS Map were poor and the contours shown were illegible in many areas. Of the twelve borings, eleven were along the crest of the dams and only one boring was performed within the ash basin. Also the three data sources conflicted with one another. To account for the discrepancies and gaps in the source data, a combination of the historic Duke Energy drawing, USGS Map, and borings, along with engineering judgment were used to estimate the pre-fill topography. Note that to compensate for the poor quality of historic information, the pre-fill topography was adjusted to yield results consistent with or close to ash volumes provided by Duke. The typical cross-section that was used in the volume calculation of the intermediate dike was taken from Section AA-AA on Duke DWG NO. RB 3011-C. One half of the total intermediate dam volume was subtracted from the gross volume to calculate the net ash volume for each basin. The pre-fill grades were compared to recent topography (dated April 2014 by LDSI) and bathymetric survey dated July 2014 by ESP. The AutoCAD Civil 3D estimated quantity is provided below in Table 1. Quantity of Material within the Ash Stack (See attached Figure 2.1 through 2.5) The quantity of CCR within the ash stack was estimated using AutoCAD Civil 3D. The approximate pre-fill topography was digitized from Duke Energy Drawing RB-3010 (5/6/57), Duke Energy Drawing RB-3010-A (Rev. 8/27/90), Duke Energy Drawing V-3.1 (7/21/2015), USGS Map Ash Inventory Ash Basin Closure Duke Energy – Riverbend Steam Station Revision 0 Amec Foster Wheeler Project No. 7810-15-0384 3 of 4 11/13/2015 NI 17.2 (1960), and a digital scan of USGS Map “Mountain Island Lake, N.C.” as well as borings that were performed in the footprint. The pre-fill grades were compared to recent topography (dated April 2014 by LDSI). The AutoCAD Civil 3D estimated quantity is provided below in Table 1. Quantity of Material within the Cinder Pit (See attached Figure 3.1 through 3.5) The quantity of CCR within the cinder pit storage area was estimated using AutoCAD Civil 3D. The approximate pre-fill topography was digitized from Duke Energy Drawing RB-3010 (5/6/57), Duke Energy Drawing RB-3010-A (Rev. 8/27/90), Duke Energy Drawing V-3.1 (7/21/2015), USGS Map NI 17.2 (1960), and a digital scan of USGS Map “Mountain Island Lake, N.C.” as well as borings that were performed in the footprint. The pre-fill grades were compared to recent topography (dated April 2014 by LDSI). The AutoCAD Civil 3D estimated quantity is provided below in Table 1. Table 1: Estimated Volume and Weight of CCRs in Ash Basins and Fills  Description  Estimated  CCR  Volume  (cy)  Estimated  Dry Unit  Weight   (ton/cy)  Estimated  Dry Weight (tons)  Estimated  Moisture  Content   (%)  Estimated  Moist Unit  Weight   (ton/cy)  Estimated   Moist  Weight  (tons)  Primary Basin 2,182,795 0.8 1,746,236 50% 1.2 2,619,354  Secondary Basin 829,490 0.8 663,592 50% 1.2 995,388  Intermediate Dike* (126,000) N/A  Ash Stack 1,134,497 1 1,134,497 20% 1.2 1,361,396  Cinder Pit 168,885 1 168,885 20% 1.2 202,662  Totals 4,315,667 ‐ 3,713,210 ‐  ‐ 5,178,800  Notes: * - One half of the total intermediate dam volume was subtracted from the gross volume to calculate the net ash volume for each basin. Data Limitations The following data limitations, which are potential sources of inaccuracies in the calculated volumes, have been identified. The accuracy of historical topography is less than that of recent topography and may not reflect the actual bottom of CCR in the ash basins, ash stack and cinder pit storage area. CONCLUSIONS: Based on the assumptions described in this calculation, the quantity of ash on the Riverbend Steam Station property was estimated to be approximately 4,316,000 cubic yards (3.71 million dry tons). The estimated moist weight of ash is also reported in Table 1 because it is a more Ash Inventory Ash Basin Closure Duke Energy – Riverbend Steam Station Revision 0 Amec Foster Wheeler Project No. 7810-15-0384 4 of 4 11/13/2015 realistic representation of the mass of material to be handled during removal and construction activities. Moist weight is calculated based on the assumed dry unit weights and moisture contents noted herein. No vertical datum conversions were performed to account for the differences between the topography digitized from the historic information and the more recent topography. Based on the poor quality of historic information it was difficult to estimate the pre- fill topography to a level of confidence to support estimating accuracy based on topographic contours (typically one-half of the contour interval), therefore, the vertical accuracy was not estimated. Actual CCR volume may be affected by any earthwork that was performed between the date of historical topography and placement of ash and any earthwork that was performed after recent topography was surveyed. Note that these estimates may be updated as new information becomes available. ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N CINDER PIT ASH STACK ASH BASIN 1 NOTES: 1. ALL BOUNDARIES ARE APPROXIMATE. REFERENCES: 1. AERIAL IMAGERY DATED 2010 WAS OBTAINED FROM SERVICES.NCONEMAP.GOV. ASH AREAS AERIAL IMAGERY SECONDARY BASIN PRIMARY BASIN ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N CINDER PIT ASH STACK 1.1 NOTES: 1. IMAGE SHOWN REFERENCES NGVD29 VERTICAL DATUM. REFERENCES: 1. IMAGE IS PART OF A DIGITAL SCAN OF USGS MAP "MOUNTAIN ISLAND LAKE, N.C.", DATED 1969. ASH BASIN LIMIT (BASED ON DRAWINGS REFERENCED IN FIGURE 1.2 AND RECENT AERIAL IMAGERY) ASH BASIN ORIGINAL TOPOGRAPHY SECONDARY BASIN PRIMARY BASIN B115 B114 B113 B112 B103 B108 B109 B110 B111 B105 B106 B104 0+ 0 0 5+ 0 0 10 + 0 0 1 5 + 0 0 2 0 + 0 0 2 5 + 0 0 2 6 + 5 0 ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N 1.2 NOTES: 1. BOUNDARY SHOWN IS APPROXIMATE. 2. THE SURFACE SHOWN WAS DEVELOPED USING DATA FROM EACH OF THE REFERENCES LISTED BELOW; SIGNIFICANT INTERPRETATION WAS PERFORMED TO ACCOUNT FOR DISCREPANCIES AND GAPS IN THE SOURCE DATA. 3. THIS IS AN APPROXIMATION OF THE BOTTOM OF ASH POND CONTOURS BASED ON THE INFORMATION AVAILABLE TO AMEC FOSTER WHEELER IN OCTOBER 2015. REFERENCES: 1. DIGITAL SCAN OF USGS MAP "MOUNTAIN ISLAND LAKE, N.C.", DATED 1969, VERTICAL DATUM NGVD29. 2. USGS MAP "CHARLOTTE", MAP NI 17-2, DATED 1960. 3. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - ASH STORAGE BASIN - EARTH & ROCK FILL DAM - PLAN, PROFILE & SECTIONS", DWG. No. RB-3010, DRAWN BY D. MOORE & LEE, DATED 5-06-57. 4. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - UNITS #1-#7 - ASH STORAGE BASIN - EARTH DAMS-PLAN", DWG. No. RB-3010-A, DRAWN BY BAILES, DATED 9-09-57, LAST REVISED 8-27-90. 5. DRAWING PREPARED FOR DUKE ENERGY BY AMEC FOSTER WHEELER TITLED, "RIVERBEND STEAM STATION ASH POND CCR REMOVAL GRADING PLAN - BORING LOCATION PLAN", DWG. No. V-3.1, DATED 7-21-2015. 6. BATHYMETRIC SURVEY PERFORMED JULY 2014 BY ESP ASSOCIATES. LOCATION OF BOREHOLE DATA USED IN CONTOUR CREATION (TYP.) (SEE REFERENCE 5) ASH BASIN DIGITIZED BASE CONTOURS ASH BASIN LIMIT (BASED ON DRAWINGS REFERENCED IN FIGURE 1.2 AND RECENT AERIAL IMAGERY) ASH BASIN CROSS SECTION ALIGNMENT (SEE FIGURE 1.5) SECONDARY BASIN PRIMARY BASIN 0+ 0 0 5+ 0 0 10 + 0 0 1 5 + 0 0 2 0 + 0 0 2 5 + 0 0 2 6 + 5 0 ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N 1.3 ASH BASIN RECENT TOPOGRAPHY NOTES: 1. ASH BASIN BOUNDARY SHOWN IS APPROXIMATE. REFERENCES: 1. EXISTING TOPOGRAPHY SHOWN IS FROM AN AERIAL SURVEY PERFORMED APRIL 2014 BY LDSI. 2. BATHYMETRIC SURVEY PERFORMED JULY 2014 BY ESP ASSOCIATES. ASH BASIN LIMIT (BASED ON DRAWINGS REFERENCED IN FIGURE 1.2 AND RECENT AERIAL IMAGERY) BATHYMETRIC SURVEY DATA IN ASH BASIN (SEE REFERENCE 2) ASH BASIN CROSS SECTION ALIGNMENT (SEE FIGURE 1.5) SECONDARY BASIN PRIMARY BASIN 0+ 0 0 5+ 0 0 10 + 0 0 1 5 + 0 0 2 0 + 0 0 2 5 + 0 0 2 6 + 5 0 ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N 1.4 ASH BASIN ISOPACH Volume Summary Name 2D Area (acres) Cut (Cu. Yd.) Fill (Cu. Yd.) Base Comparison Primary Basin 45.19 250 2,246,045 ASH BASIN CROSS SECTION ALIGNMENT (SEE FIGURE 1.5) ASH BASIN LIMIT (BASED ON DRAWINGS REFERENCED IN FIGURE 1.2 AND RECENT AERIAL IMAGERY) MAXIMUM CCR THICKNESS IS APPROXIMATELY 73 FT. NOTES: 1. COAL COMBUSTION RESIDUALS (CCR) VOLUME WAS CALCULATED USING AUTOCAD CIVIL 3D SOFTWARE. 2. RED CONTOURS, IF PRESENT, INDICATE THAT THE BASE SURFACE IS AT HIGHER ELEVATION THAN THE COMPARISON SURFACE. THIS MAY BE DUE TO REGRADING AND/OR LIMITATIONS OF DATA QUALITY. REFERENCES: 1. DIGITAL SCAN OF USGS MAP "MOUNTAIN ISLAND LAKE, N.C.", DATED 1969, VERTICAL DATUM NGVD29. 2. USGS MAP "CHARLOTTE", MAP NI 17-2, DATED 1960. 3. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - ASH STORAGE BASIN - EARTH & ROCK FILL DAM - PLAN, PROFILE & SECTIONS", DWG. No. RB-3010, DRAWN BY D. MOORE & LEE, DATED 5-06-57. 4. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - UNITS #1-#7 - ASH STORAGE BASIN - EARTH DAMS-PLAN", DWG. No. RB-3010-A, DRAWN BY BAILES, DATED 9-09-57, LAST REVISED 8-27-90. 5. DRAWING PREPARED FOR DUKE ENERGY BY AMEC FOSTER WHEELER TITLED, "RIVERBEND STEAM STATION ASH POND CCR REMOVAL GRADING PLAN - BORING LOCATION PLAN", DWG. No. V-3.1, DATED 7-21-2015. 6. AERIAL SURVEY PERFORMED APRIL 2014 BY LDSI. 7. BATHYMETRIC SURVEY PERFORMED JULY 2014 BY ESP ASSOCIATES. References 1~5 References 6~7 LEGEND CONTOUR OF "CUT" THICKNESS (SEE NOTE 2) CONTOUR OF CCR THICKNESS (APPROXIMATE) 31.55 2,998 895,488 References 1~5 References 6~7 76.73 3,248 3,141,533 References 1~5 References 6~7 Secondary Basin Total Ash Basins SECONDARY BASIN PRIMARY BASIN 126,000 cu. yd.Intermediate Dike - volume of soil Gross (Cu. Yd.) Net* (Cu. Yd.) 2,245,795 2,182,795 892,490 829,490 3,138,285 3,012,285 *INTERMEDIATE DIKE TYPICAL CROSS-SECTION USED IN VOLUME CALCULATION TAKEN FROM SECTION AA-AA ON DUKE DWG NO. RB 3011-C. ONE HALF OF THE TOTAL INTERMEDIATE DIKE VOLUME WAS SUBTRACTED FROM THE GROSS VOLUME TO CALCULATE THE NET ASH VOLUME FOR EACH BASIN. EL E V A T I O N ( F T ) EL E V A T I O N ( F T ) ASH BASIN CROSS SECTION 652 655 660 665 670 675 680 685 690 695 700 705 710 715 720 725 730 735 740 745 750 652 655 660 665 670 675 680 685 690 695 700 705 710 715 720 725 730 735 740 745 750 0+ 0 0 0+ 5 0 1+ 0 0 1+ 5 0 2+ 0 0 2+ 5 0 3+ 0 0 3+ 5 0 4+ 0 0 4+ 5 0 5+ 0 0 5+ 5 0 6+ 0 0 6+ 5 0 7+ 0 0 7+ 5 0 8+ 0 0 8+ 5 0 9+ 0 0 9+ 5 0 10 + 0 0 10 + 5 0 11 + 0 0 11 + 5 0 12 + 0 0 12 + 5 0 13 + 0 0 13 + 5 0 14 + 0 0 14 + 5 0 15 + 0 0 15 + 5 0 16 + 0 0 16 + 5 0 17 + 0 0 17 + 5 0 18 + 0 0 18 + 5 0 19 + 0 0 19 + 5 0 20 + 0 0 20 + 5 0 21 + 0 0 21 + 5 0 22 + 0 0 22 + 5 0 23 + 0 0 23 + 5 0 24 + 0 0 24 + 5 0 25 + 0 0 25 + 5 0 26 + 0 0 26 + 5 0 26 + 5 0 ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC 1.5 ASH BASIN CROSS SECTION STATIONS (FT.) RIVERBEND STEAM STATION ASH BASIN NOTES: 1. AT THE DESIGNATED LIMIT OF ASH BASIN, THE ORIGINAL GROUND SURFACE MAY NOT EQUAL THE "EXISTING" GROUND SURFACE ELEVATION DUE TO REGRADING AND/OR LIMITATIONS OF DATA QUALITY. REFERENCES: 1. DIGITAL SCAN OF USGS MAP "MOUNTAIN ISLAND LAKE, N.C.", DATED 1969, VERTICAL DATUM NGVD29. 2. USGS MAP "CHARLOTTE", MAP NI 17-2, DATED 1960. 3. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - ASH STORAGE BASIN - EARTH & ROCK FILL DAM - PLAN, PROFILE & SECTIONS", DWG. No. RB-3010, DRAWN BY D. MOORE & LEE, DATED 5-06-57. 4. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - UNITS #1-#7 - ASH STORAGE BASIN - EARTH DAMS-PLAN", DWG. No. RB-3010-A, DRAWN BY BAILES, DATED 9-09-57, LAST REVISED 8-27-90. 5. DRAWING PREPARED FOR DUKE ENERGY BY AMEC FOSTER WHEELER TITLED, "RIVERBEND STEAM STATION ASH POND CCR REMOVAL GRADING PLAN - BORING LOCATION PLAN", DWG. No. V-3.1, DATED 7-21-2015. 6. AERIAL SURVEY PERFORMED APRIL 2014 BY LDSI. 7. BATHYMETRIC SURVEY PERFORMED JULY 2014 BY ESP ASSOCIATES. SEE NOTE 1 EMBANKMENT ASH DEPOSITS (THICKNESS AND EXTENTS ARE APPROXIMATE) EXISTING GROUND SURFACE (REFERENCE 6) ORIGINAL GROUND SURFACE (REFERENCES 1~5) WATER LEVEL ELEV. 711 BATHYMETRIC SURVEY DATA (REFERENCES 7 PRIMARY BASIN SECONDARY BASIN INTERMEDIATE DIKE ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N CINDER PIT ASH STACK ASH STACK ORIGINAL TOPOGRAPHY 2.1 ASH STACK LIMIT (BASED ON DRAWINGS REFERENCED IN FIGURE 2.2 AND RECENT AERIAL IMAGERY) NOTES: 1. IMAGE SHOWN REFERENCES NGVD29 VERTICAL DATUM. REFERENCES: 1. IMAGE IS PART OF A DIGITAL SCAN OF USGS MAP "MOUNTAIN ISLAND LAKE, N.C.", DATED 1969. B117 B102 B116 B118 B119 B101 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+0022+58 ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N 2.2 LOCATION OF BOREHOLE DATA USED IN CONTOUR CREATION (TYP.) (SEE REFERENCE 5) ASH STACK DIGITIZED BASE CONTOURS ASH STACK LIMIT (BASED ON DRAWINGS REFERENCED IN FIGURE 2.2 AND RECENT AERIAL IMAGERY) NOTES: 1. BOUNDARY SHOWN IS APPROXIMATE. 2. THE SURFACE SHOWN WAS DEVELOPED USING DATA FROM EACH OF THE REFERENCES LISTED BELOW; SIGNIFICANT INTERPRETATION WAS PERFORMED TO ACCOUNT FOR DISCREPANCIES AND GAPS IN THE SOURCE DATA. 3. THIS IS AN APPROXIMATION OF THE BOTTOM OF ASH POND CONTOURS BASED ON THE INFORMATION AVAILABLE TO AMEC FOSTER WHEELER IN OCTOBER 2015. REFERENCES: 1. DIGITAL SCAN OF USGS MAP "MOUNTAIN ISLAND LAKE, N.C.", DATED 1969, VERTICAL DATUM NGVD29. 2. USGS MAP "CHARLOTTE", MAP NI 17-2, DATED 1960. 3. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - ASH STORAGE BASIN - EARTH & ROCK FILL DAM - PLAN, PROFILE & SECTIONS", DWG. No. RB-3010, DRAWN BY D. MOORE & LEE, DATED 5-06-57. 4. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - UNITS #1-#7 - ASH STORAGE BASIN - EARTH DAMS-PLAN", DWG. No. RB-3010-A, DRAWN BY BAILES, DATED 9-09-57, LAST REVISED 8-27-90. 5. DRAWING PREPARED FOR DUKE ENERGY BY AMEC FOSTER WHEELER TITLED, "RIVERBEND STEAM STATION ASH POND CCR REMOVAL GRADING PLAN - BORING LOCATION PLAN", DWG. No. V-3.1, DATED 7-21-2015. 6. AERIAL SURVEY PERFORMED APRIL 2014 BY LDSI. ASH STACK CROSS SECTION ALIGNMENT (SEE FIGURE 2.5) 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+0022+58 ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N 2.3 ASH STACK RECENT TOPOGRAPHY ASH STACK LIMIT (BASED ON DRAWINGS REFERENCED IN FIGURE 2.2 AND RECENT AERIAL IMAGERY) NOTES: 1. ASH STACK BOUNDARY SHOWN IS APPROXIMATE. REFERENCES: 1. EXISTING TOPOGRAPHY SHOWN IS FROM AN AERIAL SURVEY PERFORMED APRIL 2014 BY LDSI. ASH STACK CROSS SECTION ALIGNMENT (SEE FIGURE 2.5) 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+0022+58 ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N 2.4 ASH STACK ISOPACH Volume Summary Name 2D Area (acres) Cut (Cu. Yd.) Fill (Cu. Yd.) Base Comparison Ash Stack 26.06 6,658 1,134,497 NOTES: 1. COAL COMBUSTION RESIDUALS (CCR) VOLUME WAS CALCULATED USING AUTOCAD CIVIL 3D SOFTWARE. 2. RED CONTOURS, IF PRESENT, INDICATE THAT THE BASE SURFACE IS AT HIGHER ELEVATION THAN THE COMPARISON SURFACE. THIS MAY BE DUE TO REGRADING AND/OR LIMITATIONS OF DATA QUALITY. REFERENCES: 1. DIGITAL SCAN OF USGS MAP "MOUNTAIN ISLAND LAKE, N.C.", DATED 1969, VERTICAL DATUM NGVD29. 2. USGS MAP "CHARLOTTE", MAP NI 17-2, DATED 1960. 3. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - ASH STORAGE BASIN - EARTH & ROCK FILL DAM - PLAN, PROFILE & SECTIONS", DWG. No. RB-3010, DRAWN BY D. MOORE & LEE, DATED 5-06-57. 4. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - UNITS #1-#7 - ASH STORAGE BASIN - EARTH DAMS-PLAN", DWG. No. RB-3010-A, DRAWN BY BAILES, DATED 9-09-57, LAST REVISED 8-27-90. 5. DRAWING PREPARED FOR DUKE ENERGY BY AMEC FOSTER WHEELER TITLED, "RIVERBEND STEAM STATION ASH POND CCR REMOVAL GRADING PLAN - BORING LOCATION PLAN", DWG. No. V-3.1, DATED 7-21-2015. 6. AERIAL SURVEY PERFORMED APRIL 2014 BY LDSI.LEGEND CONTOUR OF "CUT" THICKNESS (SEE NOTE 2) CONTOUR OF CCR THICKNESS (APPROXIMATE) References 1~5 Reference 6 MAXIMUM CCR THICKNESS IS APPROXIMATELY 67 FT. ASH STACK LIMIT (BASED ON DRAWINGS REFERENCED IN FIGURE 2.2 AND RECENT AERIAL IMAGERY)ASH STACK CROSS SECTION ALIGNMENT (SEE FIGURE 2.5) EL E V A T I O N ( F T ) EL E V A T I O N ( F T ) ASH STACK CROSS SECTION 662 665 670 675 680 685 690 695 700 705 710 715 720 725 730 735 740 745 750 755 760 765 770 775 780 662 665 670 675 680 685 690 695 700 705 710 715 720 725 730 735 740 745 750 755 760 765 770 775 780 0+ 0 0 0+ 5 0 1+ 0 0 1+ 5 0 2+ 0 0 2+ 5 0 3+ 0 0 3+ 5 0 4+ 0 0 4+ 5 0 5+ 0 0 5+ 5 0 6+ 0 0 6+ 5 0 7+ 0 0 7+ 5 0 8+ 0 0 8+ 5 0 9+ 0 0 9+ 5 0 10 + 0 0 10 + 5 0 11 + 0 0 11 + 5 0 12 + 0 0 12 + 5 0 13 + 0 0 13 + 5 0 14 + 0 0 14 + 5 0 15 + 0 0 15 + 5 0 16 + 0 0 16 + 5 0 17 + 0 0 17 + 5 0 18 + 0 0 18 + 5 0 19 + 0 0 19 + 5 0 20 + 0 0 20 + 3 8 ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N 2.5 ASH STACK CROSS SECTION STATIONS (FT.) RIVERBEND STEAM STATION ASH STACK NOTES: 1. AT THE DESIGNATED LIMIT OF ASH STACK, THE ORIGINAL GROUND SURFACE MAY NOT EQUAL THE "EXISTING" GROUND SURFACE ELEVATION DUE TO REGRADING AND/OR LIMITATIONS OF DATA QUALITY. REFERENCES: 1. DIGITAL SCAN OF USGS MAP "MOUNTAIN ISLAND LAKE, N.C.", DATED 1969, VERTICAL DATUM NGVD29. 2. USGS MAP "CHARLOTTE", MAP NI 17-2, DATED 1960. 3. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - ASH STORAGE BASIN - EARTH & ROCK FILL DAM - PLAN, PROFILE & SECTIONS", DWG. No. RB-3010, DRAWN BY D. MOORE & LEE, DATED 5-06-57. 4. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - UNITS #1-#7 - ASH STORAGE BASIN - EARTH DAMS-PLAN", DWG. No. RB-3010-A, DRAWN BY BAILES, DATED 9-09-57, LAST REVISED 8-27-90. 5. DRAWING PREPARED FOR DUKE ENERGY BY AMEC FOSTER WHEELER TITLED, "RIVERBEND STEAM STATION ASH POND CCR REMOVAL GRADING PLAN - BORING LOCATION PLAN", DWG. No. V-3.1, DATED 7-21-2015. 6. AERIAL SURVEY PERFORMED APRIL 2014 BY LDSI. SEE NOTE 1 ASH DEPOSITS (THICKNESS AND EXTENTS ARE APPROXIMATE) EXISTING GROUND SURFACE (REFERENCE 6) ORIGINAL GROUND SURFACE (REFERENCES 1~5) ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N CINDER PIT ORIGINAL TOPOGRAPHY 3.1 CINDER PIT LIMIT (BASED ON DRAWINGS REFERENCED IN FIGURE 3.2 AND RECENT AERIAL IMAGERY) NOTES: 1. IMAGE SHOWN REFERENCES NGVD29 VERTICAL DATUM. REFERENCES: 1. IMAGE IS PART OF A DIGITAL SCAN OF USGS MAP "MOUNTAIN ISLAND LAKE, N.C.", DATED 1969. CP-38 CP-30 CP-29 CP-52 CP-5 CP-34 CP-35 CP-36 CP-37 CP-4 CP-6 CP-53 CP-27 CP-28 CP-11 CP-25 CP-24CP-1 CP-2 CP-3 CP-10 CP-9 CP-8 CP-7 CP-23 CP-39CP-40 CP-54 CP-42 CP-41 CP-33 CP-43 CP-44 CP-32 CP-45 CP-46 CP-51 CP-31 CP-50 CP-13 CP-12 CP-22 CP-21 CP-20 CP-26 CP-19 CP-14 CP-18 CP-17CP-15 CP-16 CP-47 CP-49 CP-48 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 14+62 ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N 3.2 LOCATION OF BOREHOLE DATA USED IN CONTOUR CREATION (TYP.) (SEE REFERENCE 5) CINDER PIT DIGITIZED BASE CONTOURS CINDER PIT LIMIT (BASED ON DRAWINGS REFERENCED IN FIGURE 3.2 AND RECENT AERIAL IMAGERY) NOTES: 1. BOUNDARY SHOWN IS APPROXIMATE. 2. THE SURFACE SHOWN WAS DEVELOPED USING DATA FROM EACH OF THE REFERENCES LISTED BELOW; SIGNIFICANT INTERPRETATION WAS PERFORMED TO ACCOUNT FOR DISCREPANCIES AND GAPS IN THE SOURCE DATA. 3. THIS IS AN APPROXIMATION OF THE BOTTOM OF ASH POND CONTOURS BASED ON THE INFORMATION AVAILABLE TO AMEC FOSTER WHEELER IN OCTOBER 2015. REFERENCES: 1. DIGITAL SCAN OF USGS MAP "MOUNTAIN ISLAND LAKE, N.C.", DATED 1969, VERTICAL DATUM NGVD29. 2. USGS MAP "CHARLOTTE", MAP NI 17-2, DATED 1960. 3. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - ASH STORAGE BASIN - EARTH & ROCK FILL DAM - PLAN, PROFILE & SECTIONS", DWG. No. RB-3010, DRAWN BY D. MOORE & LEE, DATED 5-06-57. 4. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - UNITS #1-#7 - ASH STORAGE BASIN - EARTH DAMS-PLAN", DWG. No. RB-3010-A, DRAWN BY BAILES, DATED 9-09-57, LAST REVISED 8-27-90. 5. DRAWING PREPARED FOR DUKE ENERGY BY AMEC FOSTER WHEELER TITLED, "RIVERBEND STEAM STATION ASH POND CCR REMOVAL GRADING PLAN - BORING LOCATION PLAN", DWG. No. V-3.1, DATED 7-21-2015. CINDER PIT CROSS SECTION ALIGNMENT (SEE FIGURE 3.5) 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 14+62 ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N 3.3 CINDER PIT RECENT TOPOGRAPHY NOTES: 1. CINDER PIT BOUNDARY SHOWN IS APPROXIMATE. REFERENCES: 1. EXISTING TOPOGRAPHY SHOWN IS FROM AN AERIAL SURVEY PERFORMED IN APRIL 2014 BY LDSI. CINDER PIT LIMIT (BASED ON DRAWINGS REFERENCED IN FIGURE 3.2 AND RECENT AERIAL IMAGERY) CINDER PIT CROSS SECTION ALIGNMENT (SEE FIGURE 3.5) 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 14+62 ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC N 3.4 CINDER PIT ISOPACH Volume Summary Name 2D Area (acres) Cut (Cu. Yd.) Fill (Cu. Yd.) Base Comparison Cinder Pit 13.34 3,703 168,885 MAXIMUM CCR THICKNESS IS APPROXIMATELY 27 FT. NOTES: 1. COAL COMBUSTION RESIDUALS (CCR) VOLUME WAS CALCULATED USING AUTOCAD CIVIL 3D SOFTWARE. 2. RED CONTOURS, IF PRESENT, INDICATE THAT THE BASE SURFACE IS AT HIGHER ELEVATION THAN THE COMPARISON SURFACE. THIS MAY BE DUE TO REGRADING AND/OR LIMITATIONS OF DATA QUALITY. REFERENCES: 1. DIGITAL SCAN OF USGS MAP "MOUNTAIN ISLAND LAKE, N.C.", DATED 1969, VERTICAL DATUM NGVD29. 2. USGS MAP "CHARLOTTE", MAP NI 17-2, DATED 1960. 3. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - ASH STORAGE BASIN - EARTH & ROCK FILL DAM - PLAN, PROFILE & SECTIONS", DWG. No. RB-3010, DRAWN BY D. MOORE & LEE, DATED 5-06-57. 4. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - UNITS #1-#7 - ASH STORAGE BASIN - EARTH DAMS-PLAN", DWG. No. RB-3010-A, DRAWN BY BAILES, DATED 9-09-57, LAST REVISED 8-27-90. 5. DRAWING PREPARED FOR DUKE ENERGY BY AMEC FOSTER WHEELER TITLED, "RIVERBEND STEAM STATION ASH POND CCR REMOVAL GRADING PLAN - BORING LOCATION PLAN", DWG. No. V-3.1, DATED 7-21-2015. 6. AERIAL SURVEY PERFORMED APRIL 2014 BY LDSI.LEGEND CONTOUR OF "CUT" THICKNESS (SEE NOTE 2) CONTOUR OF CCR THICKNESS (APPROXIMATE) References 1~5 Reference 6 CINDER PIT CROSS SECTION ALIGNMENT (SEE FIGURE 3.5) CINDER PIT LIMIT (BASED ON DRAWINGS REFERENCED IN FIGURE 3.2 AND RECENT AERIAL IMAGERY) EL E V A T I O N ( F T ) EL E V A T I O N ( F T ) CINDER PIT CROSS SECTION 652 655 660 665 670 675 680 685 652 655 660 665 670 675 680 685 -0 + 2 5 0+ 0 0 0+ 5 0 1+ 0 0 1+ 5 0 2+ 0 0 2+ 5 0 3+ 0 0 3+ 5 0 4+ 0 0 4+ 5 0 5+ 0 0 5+ 5 0 6+ 0 0 6+ 5 0 7+ 0 0 7+ 5 0 8+ 0 0 8+ 5 0 9+ 0 0 9+ 5 0 10 + 0 0 10 + 5 0 11 + 0 0 11 + 5 0 12 + 0 0 12 + 5 0 13 + 0 0 13 + 5 0 14 + 0 0 14 + 5 0 15 + 0 0 15 + 2 5 ISSUE/REVISION DESCRIPTIONYREV D M ENG. APPR. CLIENT LOGO: REVIEWED BY: SCALE: DATUM: PROJECTION: TITLE: PROJECT: DATE: FIGURE NO. REVISION NO. PROJECT NO.: DRAWN BY: CLIENT: 2801 YORKMONT ROAD, SUITE 100 CHARLOTTE, NC 28208 TEL: (704) 357-8600 FAX: (704) 357-8638 LICENSURE: NC ENG: F-1253 NC GEOLOGY: C-247 Amec Foster Wheeler Environment & Infrastructure, Inc. GASTON COUNTY, NC DUKE ENERGY CB SLS ---- ----WASTE STRATEGY ANALYSIS RIVERBEND - ASH INVENTORY 10/09/2015 0 7810-15-0384 AS NOTED RIVERBEND STEAM STATION, GASTON COUNTY, NC 3.5 CINDER PIT CROSS SECTION STATIONS (FT.) RIVERBEND STEAM STATION CINDER PIT NOTES: 1. AT THE DESIGNATED LIMIT OF CINDER PIT, THE ORIGINAL GROUND SURFACE MAY NOT EQUAL THE "EXISTING" GROUND SURFACE ELEVATION DUE TO REGRADING AND/OR LIMITATIONS OF DATA QUALITY. REFERENCES: 1. DIGITAL SCAN OF USGS MAP "MOUNTAIN ISLAND LAKE, N.C.", DATED 1969, VERTICAL DATUM NGVD29. 2. USGS MAP "CHARLOTTE", MAP NI 17-2, DATED 1960. 3. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - ASH STORAGE BASIN - EARTH & ROCK FILL DAM - PLAN, PROFILE & SECTIONS", DWG. No. RB-3010, DRAWN BY D. MOORE & LEE, DATED 5-06-57. 4. DRAWING PREPARED BY DUKE ENERGY TITLED, "RIVERBEND STEAM STATION - UNITS #1-#7 - ASH STORAGE BASIN - EARTH DAMS-PLAN", DWG. No. RB-3010-A, DRAWN BY BAILES, DATED 9-09-57, LAST REVISED 8-27-90. 5. DRAWING PREPARED FOR DUKE ENERGY BY AMEC FOSTER WHEELER TITLED, "RIVERBEND STEAM STATION ASH POND CCR REMOVAL GRADING PLAN - BORING LOCATION PLAN", DWG. No. V-3.1, DATED 7-21-2015. 6. FIELD SURVEY PERFORMED BY LDSI. CINDER DEPOSITS (THICKNESS AND EXTENTS ARE APPROXIMATE) EXISTING GROUND SURFACE (REFERENCE 6) ORIGINAL GROUND SURFACE (REFERENCES 1~5)