Loading...
HomeMy WebLinkAbout20160989 Ver 2_401 Application_20161216UNITED STATES MARINE CORPS MARINE CORPS INSTALLATIONS EAST -MARINE CORPS BASE PSC BOX 20005 CAMP LEJBUNE NC 28542-0005 IN REPLY REFER T0: 50ryry90.12 m zrfiv uEL 15 2016 From: Commanding General, Marine Corks Installations East - marine Corps ,ease Camp Lejeune To: Commanding Officer, United SLaues Army Corps of Engineers, Wilmington Distrizt 69 Darlington AVEnuc, wiimington. NC .&e40.5 Attn: brad Sna.er Subj: APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT FOR THE RE- DESIGN OF CULVERTS AND HEADWALL AT BLDG 1.854 ON MARINE Cartes CVxrS t3K�z =t' LzJr�U1VZ Encl: (1) Pre -Construction Notification Form (NWP 3) for Re - Design of Culverts and Headwall at Bldg 1854 on marine Carps rnsuallauions rasu-marine Corps case. Camp Lejeune (MCIEAST-MCB CAMLEJ) I. •rne encloses application to ate-vesign Cul„erts and a headwall au nuilding lszq on lrCizitz.L-mCm C..."1uz is provided for review. L. Camp Lejeune proposes uo insLall a cusverL junction vox ana headwall au Lhe ouu all of Lwo sLormwauer drains in a tributary of Cogdel Creek. This work is required to maintain an adjacent hea,,, e.,.irment access road. .3. she point of conuacu for Lhis project is ins. aessi maker, Environmental Conservation Branch, G -F at telephone (910)451- 4542 ur zmail j,-zib¢)ur@usmc . i3_ . Sincerely, HN R. TOWNSON Director, Environmental Management by direction ox the Commanding General Cary tc.: vcur5Att, liw�, 401 secuion, auun: a. zurQette ivCDmNR, DWQ, WRO, aLLn: R. inairs Ornce use Only Cors action ID no Dvvu proje�L no - Form valaloi-i 1.4 Janaa.r ZU09 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Q Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWA) number: 3 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps?�]x Yes ❑ No 1d. Type(s) of approval sought from the DWG (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit 21401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: 0 Yes, ❑ No For the record only for Corps Permit: ❑ Yes ❑x No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. Yes ❑ No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes Q No 2. Project Information 2a. Name of project: Re -Design Culvert & Install Headwalls, Bldg 1854 2b. County: Onslow 2c. Nearest municipality 1 town: Marine Corps Base Camp Lejeune 2d. Subdivision name: NIA 2e. NCDOT only, T.I.P. or state project no: NIA 3. Owner Information 3a. Name(s) on Recorded Deed: Commanding Officer 3b. Deed Book and Page No. MIM 3c. Responsible Party (for LLC if applicable): Commanding Officer 3d. Street address: 1005 Michael Road 3e. City, state, zip: Camp Lejeune, NC 28547 3f. Telephone no.: (910)451-3238 x 3285 3g. Fax no.: 3h. Email address: thomas.bradshaw@usmc.mil Page 1 of 10 PClq Form — version 1.4 Janua, 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent Q Other, specify: Federal Government 4b. Name: Commanding Officer 4c. Business name (if applicable): Marine Corps Base 4d. Street address: 1095 Michael Road 4e. City, state, zip: Camp Lejeune, NC 28547 4f. Telephone no.: (910)451-3238 x3285 4g. Fax no.: 4h. Email address: themas.bradshaw@usmc.mil S. AgentlConsultant Information (if applicable) 5a. Name: Joseph C. Avolis, PE 5b. Business name (if applicable): Avolis Engineering, PA 5c. Street address: 5405 Morton Road (PO Box 15564) 5d. City, state, zip: New Bern, NC 28562 (28561) 5e. Telephone no.: 252-633-0068 5f. Fax no.: 5g. Email address: avolisengineering@embargmail.com Page /- or I S. Projeci Information anti Prior Project rdstory 1. Property luendacation ia. Property identification no. (tax PIN or parcel ID): MIA B. site coortlinates (in 'uecimal'uegrees): I EatiMie. 34.6597 Eongiwue: 77.2009 10. Pfoperty size: 0.1 acres �. Surface Waturs Z.. Rama OT 0v0y vT T-10 To pNFVZ 0 pro;=et: Cogdel's Creek 2b. Water Quality Classification of nearest receiving water: aC; R,-jvv zc. Riper Basin: vvllite Oars 3. Project Description ja. GescriBe the existing con0itions on file site an0 die generai land use in file vicinity oT the projeM at the time OT this application: Pwj.ct is lacateo in . ral.ti►ely dccp I avine adjacent to a grad sarffacea access road -ay that is used daily for hea..y con,atruclivn Eyoipment a.ed in a u aining funMion by Marines. The bank adjacent ,o ,he road is near ve'ical and approximakely o Beet nigh. 111s conailion creates a 1lazam .or the roa'u. �y ]q J5. 031 VB. 1.031 int, 101.1 VZlim-WO-ore..l ge of .1l e,.tlny •.WEI.MU. art die property: 0.1 3c. List the total estimated linear feet of all existing steams (intermittent and perennial) on the property: .500 3d. Explain the purpose of the proposed project: In Omer Iv R�cp lne .aeez: resa epe- dna to pre :nt elbsian i-.tv tfM etearn, a jwnatiwn Be- dna N -d-11 or. meow., -.-y dee to Me- steep s1.1,CZ 3e. Deso -'ne tMe oaereil project in detail, ieoleairig tRe type of cgaipmn mt to be used: Dcmolitl.,n of the a"isti, G anderei'ea head --.all. Construct . new junction ban to a hlyher Jcvotlon of the cAstin-y two culvert outlets and new headwrall 4. uurisalctional aJetenninations 4a. Have jurisdictional wetland or stream determinations by the Corp or State Been re'yae3t.0 or vDiri.vo Tor Iniz property 1 project inclu"oin all prior Mases in Me astr res Q Ro ❑ DnRno-n Comments: Cei+ent�DcpirBa�lt6 4b. If the Corps made the jurisdictional determination, what type oT tletermination was matle r ❑ PrGli,�,in.,—, ® Final IT,oz. .-.ifo Oalh,o.100 Name (if known): 05 uovemment Other: 4d. If yes, list the dates of the Corps jurisditrttional determinations or State determinations and attach documentation. Ficpiretian 3115 5. Project History 5a, Have Permits or certifications been requested or obtained for this project (including all prior phases) in the r,ast? ❑ Yes ®No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans Ca. is dlis a pRaseB projectr ❑ res no 615. IT yen, enplain. Page 3 of 10 PCN Folin —Version 1.4 Januar yy 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): Q Wetlands Ox Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b, 2c. 2d. Ze. 2f. Wetland impact i,pe or impart i ype or wedana Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWO (401, other) (acres) Temporary W1 P Culvert Headwater Wetland Yes Corps 0.007 W2 - Choose one Choose one YesJNo - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one YeslNo- 2g. Total Wetland Impacts: 0.007 2h. Comments: ' ' Installation of junction boxldrop inlet in ravine area to allow sloped surface away from access road to training area used by military. Work corrects safety concern associated with near vertical side slopes adjacent to the access road. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 P Culvert Cogdel's Creek INT Corps 6 16 S2 - Choose one - - S3 - Choose one - - S4 - Choose one - - S5 - Choose one _ - S6 Choose one - - 3h. Total stream and tributary impacts 16 31. Comments: Stream currently receives runoff from three culverts. Junction boxidrop Inlet and pipe extension allow the sloping of the ground surface away from roadway down to the stream feature at a safe angle. I Paye 4 of 10 PCN Form — Version 1.4 Januarp 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivii ually list all open water impacts below. a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c, Type of impact 4d, Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose O2 - Choose one Choose 03 - Choose one Choose O4 - Choose one Choose 4f. Total open water impacts v 4-y. Comments: NA S. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. 5e. Stream Impacts (feet) Upland (acres) Flooded Filled Excavated Flooded. Filled Excavated P1 Choose one P2 Choose one 5f. Total: 0 5g. Oommenrs: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): I 5k. Method of construction: MIA i 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then -you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑x Neuse ❑ Tar -Pamlico Catawba ❑ Randleman ❑ Other: Buffer Impact number- Permanent (P) or Temporary c. Reason for impact 5d_ Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B7 - Yes/No B2 - Yes/No B3 Yes/No B4 Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 0 0 "oi, Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1— bpeeinaally ac.e-lloe mazzures taRan to a:oia or ;—..inirnLa tMe prvposea irnpocts in designing project. i ne propose'o worR uses lRe minimum Tootprint necessary to allow Me construction o► a sale slope a'ajacent to tRe existing Reavy equipment access roat]. The new slope is capable o► safely suppoMng trie heavy toat]s associates wilR the training equipment i Re mot]iTicauon to the ..beam channel Is Ilmiletl to tyre minimum necessary Tor trie repair ant] reriat]lidation or tRe roaaway to a sane condition 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. F Fie use of a junction Do►at]rop InFet reduces Me ne2t]et] Footprint necessary to aMleve sale roadway side slopes. stip rap will not M placet] In trie stream since the exisitng two pipes that will flow Into the junction vox ao not nave rip rap an's per brm satis►actonly Rip rap will Be use's Tor a separate existing pipe vowing In trom the slt]e, out trie Rp rap unit Be Rept out or trie stream. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the StdtU 2a. Does the project require Compensatory Mitigation for impacts to vvaters or Me U.a. or vvaters or iMe stater ❑ Yes 0 No 413. It yes, mitigation is requires By (cMecK all that apply): ❑ QYYC1 ❑ Corps 2c. If yes, which mitigation option will be used for this proaecCr ' ❑ Mitigation DanR ❑ Payment to in -lieu fee program ❑ Permittees R,.„pensiole IGlitiyation a. Complete Ir Using a Miu at:ion BanR aa. Name of Mitigation Bank: so. Craait, rezvFiaaea (ah.cFi rceeipt dna letter) Type: C;Moose one I Fre: Choose one i ype: Choose one Quantity: Quantity: uuandty: 3c. Comments: 4. Com lata it WiRirig s Pa mant to In -lime t -cu Program 4a. Mpproval letter From in -lieu tee program is attacrietl. ❑ r es 4b. Stream mitigation requested: linear feet mac. h using stream mitigation, stream temperature: Choose one Q. Better ntiGgation rroyetstea (17WQ only): square feet ;+e. Riparian wetland mitigation requested: acres 4t. Non -riparian watlana ,i.itiyatiorr reyaeatea: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4I11. Ven+nmentz: 5. Complete It using a Permiaee Responslaie Miugarion Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PClq Form — version 1.4 jzmaFm y d]Oa 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) —required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes Q No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. fie. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 4 fah_ Comments: Page f or 10 E. Storm.,ot�r Management and Diffuse Flow Plan lreyuired by DWQ) 't. Dirroom Fla.: Plan -i a. Does tfle project incluBe or is it alljacent to protectetl riparian Burrers iBentinet] ❑ res leo within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. SLormwaLer Mana emenL Plan 2a. What is the overall percent imperviousness of this project? 90 2b. Does this project require a Stormwater Management Plan? ❑ Yes No Le. IT 021J pro,.et DOES MO I rcgaire a zm m..ater Mamagarrient Plan, e„pi.in ..Fly. Maintenance associate, vat, , an existing roa0way. INIsting Impervious areas Eeing improveB an'u minor slue slope yra'aing. 2d. If this protect DOES require a Stormwater Management Pian, then provide a brief, narrative description of the plan: ,de. vvno will Be responsiBle tor the review or Me stormwater Management Plan r 3. Certified Local Governmen. S►ormwatur Review 3a. In which localgovernment's jurisdiction is thisproject? NIA - Fvd�,J ❑ Phase 11 ❑ lgsvv A. vvtiicll of Me following locally-implementeB stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Omer; 3c. Has the approved Stormwater Management Plan with proof of approval been []Yes ❑ No attacnetl r 4. DWQ Stormwater Program Review ❑Coastal counties ❑ FIQVv 4a. vvnicfl or the iohowing state-impiemente'a stormwater management programs apply vRvv (check all that apply): HSession Law 2006-246 ❑011ier: 4. Mas rile approved 5tormwarer Management Pian witn proof or approvai Been ❑ r es Q no attached? 5. DWQ 401 Unit Stormwater Review oa. Duet; tilts mvrrm-.tc R_m;-.yG,..ent PI.T-, Teet the .ppTvpri_t. ftyainumants- a LJ Yes ❑ No ao. Rave all or Me 40 i Unit su0mival requirements Been metr ❑ Yes ❑ no Page 8 of 10 PCN Form —Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑x Yes ❑ No use of puDlic (ret]eralrstate) land r A. It you answered "yes" to the adove, Ooes toe project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes N Mo (RortM Carolin..) Err iromm ...to1 rolivr Art (IatPAISEPA)-r ic. It you answered "yes" to the aBove, Mas tRe document review Been nmauzad By MU state Clearing Rouser (If so, auacll a copy of the ABPm or uITM renal approval ❑ Yes ❑ No letter.) Comments: L. vioiadons t13vvQ Requirementt ca. Is the site in violation of Ovvu vvetlanit Rules (e5m MCmC cA .Uuaa), Isolates Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, []Yes ®No or Kipanan Butter Rules t-ioH ICAC YB .O/ -Uv) r cA, Is this an aver-the-radl permit application r ❑ res Ao ec. If you answered "yes" to one or 5otl1 of tRe adove questions, provide an expianation oi tMe violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes U No avOldonal Oeveiopment, wRicll coul0 impact nearly downstream water quality 3d. It you answereaa "yes" to the adove, suomit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. if you answered "no," provide a short narrative description_ 4. Sewage Disposal (DWQ Requirement) 4.. Cleafly detail Ow 01123r ate ttCutrri.r t niCtnvUs dna 0iapo3ition (non-aiscnarye or discMare) of wastewater generated from Me proposed project, or availaole capacity or the sudjeM racility. N/A - Nrainage siruciure construction only, Paye 9 of 10 PCN Form — Version 1.4 January 2009 s. EnOangeretl 5peeies anO DeslgnateO Critical Ralitat (Cosa Re.,almmentj Sa. vvill tRis project occur in or near an area witR TeOerally proiecte0 species or ❑ r es Q no habitat? Sb. Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts r 5c. It yes, inOicate the 05Fvv5 riela Druce you Rave contaMeO. Raleigh o'u. vvt,at Oata sources WO you use to Oetermine wRetRer your site woulO impact Entlangere0 Species or Designates Cridcai Habitat? eaze -1®rTe U. Essential FISR riaoitat jCorps Requlrementi Ea. vvill tRis project occur in or near an area 'uesignate'u as essential TisR RaOitat r ❑ r as 0 no fib. What data sources did you use to determine whether your site would impact Essential FisR Mauitatr 03 RIsM an'u vvil'ulhe wellsite i. RlstolIc or vrelilstofl� Cultural Re=.arca (Cosa Rcyei.—Wnv .q ra. vvili tRis project occur in or near an area tRat iRe state, teaerai Or id Dal governments have designated as having historic or cultural preservation ❑ Yes No status (e.g., National Historic Trust designation or properties significant in MoRn Carolina Ristory anO arcRaeology) r r O. vvttat Oata sources WO you use to Oetermine wnetRer your site would impat'l Ristoric or arcReological resources r Base wcRaeologlcal IS. I-loci] [one Deai;,;-..tior! (Corpa Reqeire.ment) aa. vvill tRis proje0l occur in a FEIQIH-aesignateO I O0-,c-P TI%'VUplzin-r ❑ Yo3 ® No aO. It yes, explain Row project meets Fr-Mm requirements: 5c. vvnat source(s) ORI you ase to n%..Kc tRc tlovUPlain OatarrninatioKe rl0o'u rviaps Meal Paul, Deputy Pu61ic vvorRs Direr for npplicanvmgenis Printea Rame plioantl is ,,nature Date it geni s slgnaiure Is ir, only If an auUlorizatlo tetter prom llle llcanl Is rovlOe'u. It Paye 10 of 10 :I AVOLIS ENGINEERING, P.A. EXHIBrTA-USGSMAP Civil an8 Environmental En-yineeriny REDESIGN CULvcmia is IM5iH1l P.O. BOX 15564 REW c!'RR, RORin ZmmUeRA zeas, RE 13wm--Hi 13MG1W PRCRE: (zoz) 633-0038 FAX: (Z5Z) 833-8507 MARINE CORPS BASE CAMP LEJEUNE 0 n3c no. C-01013 ,_ ,i •y' t�"'' x .oar / PLAN .rte xt+�5 e 5; 5 G� xy t�� a18 1 3x �� fa •g x' y 1 ISTING 0" M Exbj IRG CONCRETE -19'2 REAUWALL 10 BE uEMULISRED EXISTING n►ETLAND (REF. 5MAPE YL 1 1 `�� FILE FOR MATZ REz)u0KCE5 MAP FOR MMB CAMP EEJEURE 5 X 1$ I c COGDELS CREEK 7/9)-RO2 (IMS) 9 yg.5+ 55,c L9• ` ,, \ 5 STI G 48`' CryIP EA151IM-u RIP RAP ,9, � .3� '` ` � � 1.69 U• A;i J. 9� n 1� I� 1B x 1a.A6 X 2c3 x 19n - g x- 6b � 60 -A 1 a. 5 L EDGE OF ExbIIMG x X�gx 13" RL-;r' G1MEC ROAD _\ ,�i r `9 x L9 • I a 19 L X 1y i �•�r911�E�'- � 3 0 AVO 2U a 10 20 40 GRAPHIC SCALE: 1 " = 2T AVOLIS ENGINEERING, P.A. EXHIBIT B - EXISTING CONDITIONS Civil and Environmental Engineering REDESIGN CULvIRi ziIM5iA= F.; -j. wx 1=34 NEn SERIN, RUNin Wi-AINR z3a6i MEADYYHCEAI SCOG IBM PRONE: (252) 833-0068 FAX: (252) 633-6507 MARINE CORPS BASE CAMP LEJEUNE GEENaE NO. C--vi-u'o NEW CONCRETE JUNCTION BOX TO PROVIDE FILL NEW RIP RAP // x L 031 / r 18• 1- r n �� �� 5g�'1�� 2 x 1n•4£+ x XIERb iStX I 5 x 9 {, _ PIPE 00I OF BANK— _ KIP RAP Ou l tiff r183xbIRERM �tRhS Exb i ING 18" RCP% +g '9 - 1°� • 9 x 19 8° L9 isssoul � r � x� AVOLIS ENGINEERING, P.A. Civil and Environmental Enyineeriny F.U. Mix 13384 REIR BERR, Rurcin UAROuRA z355i PRONE: (252) 633-0066 FAX: (252) 633-6507 OCERZE R -u. C--uiun GRAPHIC SCALE: 1; = 20; EXHIBIT C - NEW CONSTRUCTION REDESIGN CULv1!R i z & Ift i ACC RE DwACE A 1 OLDG 1574 MARINE CORPS BASE CAMP LEJEUNE 5 I Ag /v-- 'ty :� i n I ry. NEW RIP RAP x ��.� ,x� v, 9 6 ETCAi�D iIAPR� t AREA -31 Z 5r, 4E 1j.IPE x 5TE C/L LENGTH OF If�PAc�I n 14.L ` x 1a•� > x� x�9• JJ ,r,9� x 1n• x 19.3 x\%%%I 111r,/jj�_\ �, �!! x �%Xl II.M �� IS" RCP' 19. �� x 1y.g Igo EAS. AVOLIS ENGINEERING, P.A. Civil and Environmental En--ylneering 19.0. son =34 NEW BERN, RuRin CM0019A zan61 PHONE: (252) 633-0068 FAX: (z5z) 9JJ-UziV/ EICERaE R0. C-0/06 GRAPHIC SCALE: 1 " = 20' EXHIBIT D - STREAM IMPACT AREA REDESIGM COEvER i s ;s lilts I HCC FIERuriHCE A i BLDG 1854 MARINE CORPS BASE CAMP LEJEUNE ..� A ®ARO��2 Pm -N L = 19uR I 15360 (1� .U;SJ-1 AVOLIS ENGINEERuv G, F.A. Civil anu Enviranmeniai Engineering P.C. Flux =54 NEW BERN, NORiM CARODRA 28361 15nONE: (zziz) 'v33—MUC FAx: (z3z) Um -63u, OCERsE RO. C-0/08 EXHIBIT E - SOILS MAP REDEziIGR =vtR i s N Ills i ALL HEADWALL AT BLDG 4854 MARINE CORPS BASE CAMP LEJEUNE