HomeMy WebLinkAbout20160989 Ver 2_401 Application_20161216UNITED STATES MARINE CORPS
MARINE CORPS INSTALLATIONS EAST -MARINE CORPS BASE
PSC BOX 20005
CAMP LEJBUNE NC 28542-0005
IN REPLY REFER T0:
50ryry90.12
m zrfiv
uEL 15 2016
From: Commanding General, Marine Corks Installations East -
marine Corps ,ease Camp Lejeune
To: Commanding Officer, United SLaues Army Corps of
Engineers, Wilmington Distrizt 69 Darlington AVEnuc,
wiimington. NC .&e40.5 Attn: brad Sna.er
Subj: APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT FOR THE RE-
DESIGN OF CULVERTS AND HEADWALL AT BLDG 1.854 ON MARINE
Cartes CVxrS t3K�z =t' LzJr�U1VZ
Encl: (1) Pre -Construction Notification Form (NWP 3) for Re -
Design of Culverts and Headwall at Bldg 1854 on
marine Carps rnsuallauions rasu-marine Corps case.
Camp Lejeune (MCIEAST-MCB CAMLEJ)
I. •rne encloses application to ate-vesign Cul„erts and a
headwall au nuilding lszq on lrCizitz.L-mCm C..."1uz is provided for
review.
L. Camp Lejeune proposes uo insLall a cusverL junction vox ana
headwall au Lhe ouu all of Lwo sLormwauer drains in a tributary
of Cogdel Creek. This work is required to maintain an adjacent
hea,,, e.,.irment access road.
.3. she point of conuacu for Lhis project is ins. aessi maker,
Environmental Conservation Branch, G -F at telephone (910)451-
4542 ur zmail j,-zib¢)ur@usmc . i3_ .
Sincerely,
HN R. TOWNSON
Director, Environmental Management
by direction ox the
Commanding General
Cary tc.:
vcur5Att, liw�, 401 secuion, auun: a. zurQette
ivCDmNR, DWQ, WRO, aLLn: R. inairs
Ornce use Only
Cors action ID no
Dvvu proje�L no -
Form valaloi-i 1.4 Janaa.r ZU09
Pre -Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1a. Type(s) of approval sought from the Corps: Q Section 404 Permit ❑ Section 10 Permit
1b. Specify Nationwide Permit (NWA) number: 3 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps?�]x Yes ❑ No
1d. Type(s) of approval sought from the DWG (check all that apply):
❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
21401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
0 Yes, ❑ No
For the record only for Corps Permit:
❑ Yes ❑x No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below.
Yes ❑ No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes Q No
2. Project Information
2a. Name of project: Re -Design Culvert & Install Headwalls, Bldg 1854
2b. County: Onslow
2c. Nearest municipality 1 town: Marine Corps Base Camp Lejeune
2d. Subdivision name: NIA
2e. NCDOT only, T.I.P. or state project no:
NIA
3. Owner Information
3a. Name(s) on Recorded Deed:
Commanding Officer
3b. Deed Book and Page No.
MIM
3c. Responsible Party (for LLC if
applicable):
Commanding Officer
3d. Street address:
1005 Michael Road
3e. City, state, zip:
Camp Lejeune, NC 28547
3f. Telephone no.:
(910)451-3238 x 3285
3g. Fax no.:
3h. Email address:
thomas.bradshaw@usmc.mil
Page 1 of 10
PClq Form — version 1.4 Janua, 2009
4. Applicant Information (if different from owner)
4a. Applicant is:
❑ Agent Q Other, specify: Federal Government
4b. Name:
Commanding Officer
4c. Business name
(if applicable):
Marine Corps Base
4d. Street address:
1095 Michael Road
4e. City, state, zip:
Camp Lejeune, NC 28547
4f. Telephone no.:
(910)451-3238 x3285
4g. Fax no.:
4h. Email address:
themas.bradshaw@usmc.mil
S. AgentlConsultant Information (if applicable)
5a. Name:
Joseph C. Avolis, PE
5b. Business name
(if applicable):
Avolis Engineering, PA
5c. Street address:
5405 Morton Road (PO Box 15564)
5d. City, state, zip:
New Bern, NC 28562 (28561)
5e. Telephone no.:
252-633-0068
5f. Fax no.:
5g. Email address:
avolisengineering@embargmail.com
Page /- or I
S. Projeci Information anti Prior Project rdstory
1. Property luendacation
ia. Property identification no. (tax PIN or parcel ID):
MIA
B. site coortlinates (in 'uecimal'uegrees): I EatiMie. 34.6597 Eongiwue: 77.2009
10. Pfoperty size:
0.1 acres
�. Surface Waturs
Z.. Rama OT 0v0y vT T-10 To pNFVZ 0 pro;=et:
Cogdel's Creek
2b. Water Quality Classification of nearest receiving water:
aC; R,-jvv
zc. Riper Basin:
vvllite Oars
3. Project Description
ja. GescriBe the existing con0itions on file site an0 die generai land use in file vicinity oT the projeM at the time OT this
application:
Pwj.ct is lacateo in . ral.ti►ely dccp I avine adjacent to a grad sarffacea access road -ay that is used daily for hea..y con,atruclivn Eyoipment a.ed in
a u aining funMion by Marines. The bank adjacent ,o ,he road is near ve'ical and approximakely o Beet nigh. 111s conailion creates a 1lazam .or
the roa'u.
�y ]q
J5. 031
VB. 1.031 int, 101.1 VZlim-WO-ore..l
ge of .1l e,.tlny •.WEI.MU. art die property: 0.1
3c. List the total estimated linear feet of all existing steams (intermittent and perennial) on the property: .500
3d. Explain the purpose of the proposed project:
In Omer Iv R�cp lne .aeez: resa epe- dna to pre :nt elbsian i-.tv tfM etearn, a jwnatiwn Be- dna N -d-11 or. meow., -.-y dee to Me- steep s1.1,CZ
3e. Deso -'ne tMe oaereil project in detail, ieoleairig tRe type of cgaipmn mt to be used:
Dcmolitl.,n of the a"isti, G anderei'ea head --.all. Construct . new junction ban to a hlyher Jcvotlon of the cAstin-y two culvert outlets and new headwrall
4. uurisalctional aJetenninations
4a. Have jurisdictional wetland or stream determinations by the
Corp or State Been re'yae3t.0 or vDiri.vo Tor Iniz property 1
project inclu"oin all prior Mases in Me astr
res Q Ro ❑ DnRno-n
Comments: Cei+ent�DcpirBa�lt6
4b. If the Corps made the jurisdictional determination, what type
oT tletermination was matle r
❑ PrGli,�,in.,—, ® Final
IT,oz. .-.ifo Oalh,o.100
Name (if known):
05 uovemment
Other:
4d. If yes, list the dates of the Corps jurisditrttional determinations or State determinations and attach documentation.
Ficpiretian 3115
5. Project History
5a, Have Permits or certifications been requested or obtained for
this project (including all prior phases) in the r,ast?
❑ Yes ®No ❑ Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
Ca. is dlis a pRaseB projectr
❑ res no
615. IT yen, enplain.
Page 3 of 10
PCN Folin —Version 1.4 Januar yy 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
Q Wetlands Ox Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
2b,
2c.
2d.
Ze.
2f.
Wetland impact
i,pe or impart
i ype or wedana
Forested
Type of jurisdiction
Area of
number
Corps (404,10) or
impact
Permanent (P) or
DWO (401, other)
(acres)
Temporary
W1 P
Culvert
Headwater Wetland
Yes
Corps
0.007
W2 -
Choose one
Choose one
YesJNo
-
W3 -
Choose one
Choose one
Yes/No
-
W4 -
Choose one
Choose one
Yes/No
-
W5 -
Choose one
Choose one
Yes/No
-
W6 -
Choose one
Choose one
YeslNo-
2g. Total Wetland Impacts:
0.007
2h. Comments: ' '
Installation of junction boxldrop inlet in ravine area to allow sloped surface away from access road to training area used by military. Work corrects
safety concern associated with near vertical side slopes adjacent to the access road.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b.
3c.
3d.
3e.
3f.
3g.
Stream impact Type of impact
Stream name
Perennial (PER) or
Type of
Average
Impact
number
intermittent (INT)?
jurisdiction
stream
length
Permanent (P) or
width
(linear
Temporary (T)
(feet)
feet)
S1 P Culvert
Cogdel's Creek
INT
Corps
6
16
S2 - Choose one
-
-
S3 - Choose one
-
-
S4 - Choose one
-
-
S5 - Choose one
_
-
S6 Choose one
-
-
3h. Total stream and tributary impacts
16
31. Comments:
Stream currently receives runoff from three culverts. Junction boxidrop Inlet and pipe extension allow the sloping of the ground surface away from
roadway down to the stream feature at a safe angle.
I
Paye 4 of 10
PCN Form — Version 1.4 Januarp 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then indivii ually list all open water impacts below.
a.
Open water
impact number
Permanent (P) or
Temporary
4b.
Name of waterbody
(if applicable)
4c,
Type of impact
4d,
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
O2 -
Choose one
Choose
03 -
Choose one
Choose
O4 - Choose one Choose
4f. Total open water impacts
v
4-y. Comments: NA
S. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
purpose of pond
5c.
Wetland Impacts (acres)
5d. 5e.
Stream Impacts (feet) Upland
(acres)
Flooded Filled Excavated
Flooded. Filled Excavated
P1
Choose one
P2
Choose one
5f. Total:
0
5g. Oommenrs:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
I
5k. Method of construction:
MIA i
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then -you MUST fill out Section D of this form.
6a. Project is in which protected basin?
❑x Neuse ❑ Tar -Pamlico Catawba ❑ Randleman ❑ Other:
Buffer Impact
number-
Permanent (P) or
Temporary
c.
Reason for impact
5d_
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
impact
(square
feet)
6g.
Zone 2
impact
(square
feet
B7 -
Yes/No
B2 -
Yes/No
B3
Yes/No
B4
Yes/No
B5 -
Yes/No
B6 -
Yes/No
6h. Total Buffer Impacts:
0
0
"oi, Comments:
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1— bpeeinaally ac.e-lloe mazzures taRan to a:oia or ;—..inirnLa tMe prvposea irnpocts in designing project.
i ne propose'o worR uses lRe minimum Tootprint necessary to allow Me construction o► a sale slope a'ajacent to tRe existing Reavy equipment access
roat]. The new slope is capable o► safely suppoMng trie heavy toat]s associates wilR the training equipment i Re mot]iTicauon to the ..beam channel
Is Ilmiletl to tyre minimum necessary Tor trie repair ant] reriat]lidation or tRe roaaway to a sane condition
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
F Fie use of a junction Do►at]rop InFet reduces Me ne2t]et] Footprint necessary to aMleve sale roadway side slopes. stip rap will not M placet] In trie
stream since the exisitng two pipes that will flow Into the junction vox ao not nave rip rap an's per brm satis►actonly Rip rap will Be use's Tor a separate
existing pipe vowing In trom the slt]e, out trie Rp rap unit Be Rept out or trie stream.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the StdtU
2a. Does the project require Compensatory Mitigation for
impacts to vvaters or Me U.a. or vvaters or iMe stater
❑ Yes 0 No
413. It yes, mitigation is requires By (cMecK all that apply):
❑ QYYC1 ❑ Corps
2c. If yes, which mitigation option will be used for this
proaecCr
'
❑ Mitigation DanR
❑ Payment to in -lieu fee program
❑ Permittees R,.„pensiole IGlitiyation
a. Complete Ir Using a Miu at:ion BanR
aa. Name of Mitigation Bank:
so. Craait, rezvFiaaea (ah.cFi rceeipt dna letter)
Type: C;Moose one
I Fre: Choose one
i ype: Choose one
Quantity:
Quantity:
uuandty:
3c. Comments:
4. Com lata it WiRirig s Pa mant to In -lime t -cu Program
4a. Mpproval letter From in -lieu tee program is attacrietl.
❑ r es
4b. Stream mitigation requested:
linear feet
mac. h using stream mitigation, stream temperature:
Choose one
Q. Better ntiGgation rroyetstea (17WQ only):
square feet
;+e. Riparian wetland mitigation requested:
acres
4t. Non -riparian watlana ,i.itiyatiorr reyaeatea:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4I11. Ven+nmentz:
5. Complete It using a Permiaee Responslaie Miugarion Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PClq Form — version 1.4 jzmaFm y d]Oa
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) —required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
Yes Q No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c.
6d.
fie.
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
4
fah_ Comments:
Page f or 10
E. Storm.,ot�r Management and Diffuse Flow Plan lreyuired by DWQ)
't. Dirroom Fla.: Plan
-i a. Does tfle project incluBe or is it alljacent to protectetl riparian Burrers iBentinet]
❑ res leo
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
2. SLormwaLer Mana emenL Plan
2a. What is the overall percent imperviousness of this project?
90
2b. Does this project require a Stormwater Management Plan?
❑ Yes No
Le. IT 021J pro,.et DOES MO I rcgaire a zm m..ater Mamagarrient Plan, e„pi.in ..Fly.
Maintenance associate, vat, , an existing roa0way. INIsting Impervious areas Eeing improveB an'u minor slue slope yra'aing.
2d. If this protect DOES require a Stormwater Management Pian, then provide a brief, narrative description of the plan:
,de. vvno will Be responsiBle tor the review or Me stormwater Management Plan r
3. Certified Local Governmen. S►ormwatur Review
3a. In which localgovernment's jurisdiction is thisproject?
NIA - Fvd�,J
❑ Phase 11
❑ lgsvv
A. vvtiicll of Me following locally-implementeB stormwater management programs
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
❑ Omer;
3c. Has the approved Stormwater Management Plan with proof of approval been
[]Yes ❑ No
attacnetl r
4. DWQ Stormwater Program Review
❑Coastal counties
❑ FIQVv
4a. vvnicfl or the iohowing state-impiemente'a stormwater management programs apply
vRvv
(check all that apply):
HSession Law 2006-246
❑011ier:
4. Mas rile approved 5tormwarer Management Pian witn proof or approvai Been
❑ r es Q no
attached?
5. DWQ 401 Unit Stormwater Review
oa. Duet; tilts mvrrm-.tc R_m;-.yG,..ent PI.T-, Teet the .ppTvpri_t. ftyainumants- a
LJ Yes ❑ No
ao. Rave all or Me 40 i Unit su0mival requirements Been metr
❑ Yes ❑ no
Page 8 of 10
PCN Form —Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the
❑x Yes ❑ No
use of puDlic (ret]eralrstate) land r
A. It you answered "yes" to the adove, Ooes toe project require preparation of an
environmental document pursuant to the requirements of the National or State
❑Yes N Mo
(RortM Carolin..) Err iromm ...to1 rolivr Art (IatPAISEPA)-r
ic. It you answered "yes" to the aBove, Mas tRe document review Been nmauzad By MU
state Clearing Rouser (If so, auacll a copy of the ABPm or uITM renal approval
❑ Yes ❑ No
letter.)
Comments:
L. vioiadons t13vvQ Requirementt
ca. Is the site in violation of Ovvu vvetlanit Rules (e5m MCmC cA .Uuaa), Isolates
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
[]Yes ®No
or Kipanan Butter Rules t-ioH ICAC YB .O/ -Uv) r
cA, Is this an aver-the-radl permit application r
❑ res Ao
ec. If you answered "yes" to one or 5otl1 of tRe adove questions, provide an expianation oi tMe violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
❑Yes U No
avOldonal Oeveiopment, wRicll coul0 impact nearly downstream water quality
3d. It you answereaa "yes" to the adove, suomit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. if you answered "no," provide a short narrative description_
4. Sewage Disposal (DWQ Requirement)
4.. Cleafly detail Ow 01123r ate ttCutrri.r t niCtnvUs dna 0iapo3ition (non-aiscnarye or discMare) of wastewater generated from
Me proposed project, or availaole capacity or the sudjeM racility.
N/A - Nrainage siruciure construction only,
Paye 9 of 10
PCN Form — Version 1.4 January 2009
s. EnOangeretl 5peeies anO DeslgnateO Critical Ralitat (Cosa Re.,almmentj
Sa. vvill tRis project occur in or near an area witR TeOerally proiecte0 species or
❑ r es Q no
habitat?
Sb. Have you checked with the USFWS concerning Endangered Species Act
® Yes ❑ No
impacts r
5c. It yes, inOicate the 05Fvv5 riela Druce you Rave contaMeO.
Raleigh
o'u. vvt,at Oata sources WO you use to Oetermine wRetRer your site woulO impact Entlangere0 Species or Designates Cridcai
Habitat?
eaze -1®rTe
U. Essential FISR riaoitat jCorps Requlrementi
Ea. vvill tRis project occur in or near an area 'uesignate'u as essential TisR RaOitat r
❑ r as 0 no
fib. What data sources did you use to determine whether your site would impact Essential FisR Mauitatr
03 RIsM an'u vvil'ulhe wellsite
i. RlstolIc or vrelilstofl� Cultural Re=.arca (Cosa Rcyei.—Wnv .q
ra. vvili tRis project occur in or near an area tRat iRe state, teaerai Or id Dal
governments have designated as having historic or cultural preservation
❑ Yes No
status (e.g., National Historic Trust designation or properties significant in
MoRn Carolina Ristory anO arcRaeology) r
r O. vvttat Oata sources WO you use to Oetermine wnetRer your site would impat'l Ristoric or arcReological resources r
Base wcRaeologlcal
IS. I-loci] [one Deai;,;-..tior! (Corpa Reqeire.ment)
aa. vvill tRis proje0l occur in a FEIQIH-aesignateO I O0-,c-P TI%'VUplzin-r
❑ Yo3 ® No
aO. It yes, explain Row project meets Fr-Mm requirements:
5c. vvnat source(s) ORI you ase to n%..Kc tRc tlovUPlain OatarrninatioKe
rl0o'u rviaps
Meal Paul,
Deputy Pu61ic vvorRs Direr for
npplicanvmgenis Printea Rame
plioantl is ,,nature
Date
it geni s slgnaiure Is ir, only If an auUlorizatlo
tetter prom llle llcanl Is rovlOe'u.
It
Paye 10 of 10
:I
AVOLIS ENGINEERING, P.A. EXHIBrTA-USGSMAP
Civil an8 Environmental En-yineeriny REDESIGN CULvcmia is IM5iH1l
P.O. BOX 15564 REW c!'RR, RORin ZmmUeRA zeas, RE 13wm--Hi 13MG1W
PRCRE: (zoz) 633-0038 FAX: (Z5Z) 833-8507 MARINE CORPS BASE CAMP LEJEUNE
0 n3c no. C-01013
,_ ,i •y' t�"'' x .oar /
PLAN
.rte xt+�5
e 5;
5
G�
xy t�� a18
1
3x �� fa •g x'
y 1
ISTING 0" M Exbj IRG CONCRETE
-19'2 REAUWALL 10 BE
uEMULISRED
EXISTING n►ETLAND (REF. 5MAPE
YL 1 1 `�� FILE FOR MATZ REz)u0KCE5
MAP FOR MMB CAMP EEJEURE
5 X 1$ I c COGDELS CREEK 7/9)-RO2 (IMS)
9 yg.5+
55,c L9• `
,, \ 5
STI G 48`' CryIP EA151IM-u RIP RAP
,9, � .3� '` ` � � 1.69 U• A;i
J. 9� n 1� I� 1B x 1a.A6 X 2c3 x 19n -
g x- 6b
�
60 -A 1 a. 5
L
EDGE OF ExbIIMG x X�gx 13" RL-;r'
G1MEC ROAD _\ ,�i r `9 x L9 • I a 19
L
X 1y
i �•�r911�E�'- � 3
0 AVO 2U a 10 20 40
GRAPHIC SCALE: 1 " = 2T
AVOLIS ENGINEERING, P.A. EXHIBIT B - EXISTING CONDITIONS
Civil and Environmental Engineering REDESIGN CULvIRi ziIM5iA=
F.; -j. wx 1=34 NEn SERIN, RUNin Wi-AINR z3a6i MEADYYHCEAI SCOG IBM
PRONE: (252) 833-0068 FAX: (252) 633-6507 MARINE CORPS BASE CAMP LEJEUNE
GEENaE NO. C--vi-u'o
NEW CONCRETE JUNCTION
BOX TO PROVIDE FILL
NEW RIP RAP
//
x
L 031
/ r 18• 1-
r n �� �� 5g�'1�� 2 x 1n•4£+ x XIERb iStX I 5
x 9 {, _ PIPE 00I OF BANK—
_ KIP RAP Ou l tiff
r183xbIRERM �tRhS
Exb i ING 18" RCP% +g '9 - 1°� •
9
x 19 8° L9
isssoul � r � x�
AVOLIS ENGINEERING, P.A.
Civil and Environmental Enyineeriny
F.U. Mix 13384 REIR BERR, Rurcin UAROuRA z355i
PRONE: (252) 633-0066 FAX: (252) 633-6507
OCERZE R -u. C--uiun
GRAPHIC SCALE: 1; = 20;
EXHIBIT C - NEW CONSTRUCTION
REDESIGN CULv1!R i z & Ift i ACC
RE DwACE A 1 OLDG 1574
MARINE CORPS BASE CAMP LEJEUNE
5 I Ag /v-- 'ty :�
i
n I
ry. NEW RIP RAP
x
��.� ,x� v, 9 6
ETCAi�D iIAPR�
t AREA -31 Z 5r, 4E 1j.IPE x 5TE
C/L LENGTH OF
If�PAc�I n 14.L ` x 1a•� >
x� x�9• JJ ,r,9� x 1n• x 19.3
x\%%%I 111r,/jj�_\ �, �!! x �%Xl II.M �� IS" RCP' 19.
�� x 1y.g Igo
EAS.
AVOLIS ENGINEERING, P.A.
Civil and Environmental En--ylneering
19.0. son =34 NEW BERN, RuRin CM0019A zan61
PHONE: (252) 633-0068 FAX: (z5z) 9JJ-UziV/
EICERaE R0. C-0/06
GRAPHIC SCALE: 1 " = 20'
EXHIBIT D - STREAM IMPACT AREA
REDESIGM COEvER i s ;s lilts I HCC
FIERuriHCE A i BLDG 1854
MARINE CORPS BASE CAMP LEJEUNE
..� A ®ARO��2
Pm -N
L = 19uR I
15360 (1�
.U;SJ-1
AVOLIS ENGINEERuv G, F.A.
Civil anu Enviranmeniai Engineering
P.C. Flux =54 NEW BERN, NORiM CARODRA 28361
15nONE: (zziz) 'v33—MUC FAx: (z3z) Um -63u,
OCERsE RO. C-0/08
EXHIBIT E - SOILS MAP
REDEziIGR =vtR i s N Ills i ALL
HEADWALL AT BLDG 4854
MARINE CORPS BASE CAMP LEJEUNE