December 21, 2016 p L9 � [2 a 2
D
TO: Karen Higgins DEC 3 - 2016
401 & Buffer Permitting Unit
DWRMater QualityPermittin -WATER RESOURCES
9 4 1 8 BUFFER PER MITTIN
FROM: Heather Coats, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilm., NC 28405 heather.coats@ncdenr.gov
Fax: 395-3964 (Courier 04-16-33)
SUBJECT: CAMA Application Review
Applicant: Cherry Holdings, LLC
Project Location: 5 Sandy Point (Figure 8), adjacent to Banks Channel / Middle Sound
in Wilmington, New Hanover County
Proposed Project: to remove an existing docking facility and replace in a different
location and configuration
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Heather Coats at the address above by January 14, 2017. If you have any
questions regarding the proposed project, contact Jason Dail at (910) 796-7221 when appropriate
in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached'"
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED DATED
State of North Carolina I Environmental Quality I Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
910-796-7215
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Cherry Holdings, LLC (c/o Southeastern Coastal Construction — Stephen
Conway)
2. LOCATION OF PROJECT SITE: Site is located at 5 Sandy Point adjacent to Banks Channel
and Middle Sound on Figure Eight Island, New Hanover County.
Photo Index — 2006: 24-7408, L -M/21
State Plane Coordinates - Lat: 34°15'51.92" N Long: 77°45'03.90" W
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit —12/16/16
Was Applicant Present — No
PROCESSING PROCEDURE: Application Received —12/06/2016 (completed)
Office — Wilmington
6. SITE DESCRIPTION:
(A)
Local Land Use Plan— Wilmington/New Hanover County
Land Classification From LUP — Residential, Conservation
(B)
AEC(s) Involved: PT, EW
(C)
Water Dependent: Yes
(D)
Intended Use: Private
(E)
Wastewater Treatment: Existing- Septic
Planned- N/A
(F) Type of Structures: Existing- Single-family residence (under construction), private
docking facility and timber bulkhead
Planned- Relocate/re-configure docking facility
(G) Estimated Annual Rate of Erosion: N/A
7. HABITAT DESCRIPTION:
[AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
IL
(B) Non -Vegetated Wetlands (Open Water)
977 sq. ft.
(incorporated)
(C) Other - Highground disturbance
(D) Total Area Disturbed: 977 sq. ft. (0.022 acres)
(E) Primary Nursery Area: No
(F) Water Classification: SA-ORW Open: Yes
8. PROJECT SUMMARY: The applicant proposes to remove an existing docking facility and
replace in a different location and configuration.
Cherry Holdings, LLC
Page 2
9. PROJECT DESCRIPTION
The project site is located at 5 Sandy Point on Figure "8" Island, adjacent to Banks Channel and Middle
Sound, in New Hanover County. The island is accessed from the mainland at the end of Edgewater Club
Road (SR 1402), by private bridge over the Atlantic Intracoastal Waterway (AIWW) and an earthen
causeway, which traverses Middle Sound. Heading east on the causeway, turn right on Beach Road South
and travel south approximately 0.5 miles until you reach Sandy Point, which will be located on the right
hand side. Turn right onto Sandy Point and the property of interest will be located on the left hand side of
the road at address No. 5.
Existing structures on the property includes a single-family residence (under construction), a timber
bulkhead and a private docking facility. The project site is approximately 0.49 acres and is vegetated
primarily with maintained lawn grass and ornamental landscaping. The project site has approximately 103
linear feet of shoreline frontage along Banks Channel. Located waterward of the bulkhead is an area of
coastal wetlands consisting primarily of Smooth Cordgrass (Spartina alterniora) and Salt Meadow Grass
(Spartina patens), which measures approximately 50' in width. The applicant's property is adjacent to
residential properties with existing private docking facilities.
The applicant currently maintains an existing private docking facility within Banks Channel. An existing
access pier, measuring approximately 88' in length by 6' in width extends in a southwesterly direction into
Banks Channel. The pier terminates onto an uncovered platform, measuring approximately 16' in length
by 10' in width, creating a "T-shaped" configuration towards the west. An access ramps leads from the
terminal end of the fixed platform to a floating dock that measures approximately 20' in length by 8' in
width. The existing docking facility, which originates from a timber bulkhead, appears to accommodate
two vessels within waters with depths of approximately -6' through -10' @ normal low water (NLW). The
applicant is relocating and reconfiguring the existing docking facility to make the use more user friendly.
Currently, the existing floating dock extends into the riparian corridor setback of the southern neighbor and
the new proposal would place the entire facility within the applicant's area of riparian access.
The Wilmington -New Hanover County 2006 Land Use Plan classifies adjacent waters and high ground
portion of the property as Conservation. The waters of Banks Channel and Middle Sound are classified SA-
ORW by the Division of Water Resources. They are NOT designated as a Primary Nursery Area (PNA)
by the N.C. Division of Marine Fisheries and they are OPEN to the harvest of shellfish.
PROPOSED PROJECT
The applicant proposes to remove an existing docking facility and replace in a different location and
configuration. As designed, a new 6' in width by 54' in length fixed access pier would originate from the
existing bulkhead and span in a westerly direction before terminating into a 16' in length by 22' in width
fixed platform. As designed, the proposed platform would be located just beyond the outer edge of the
existing Coastal Wetlands bordering the property. Along the southern edge of the platform, a gangway
would be installed and would provide access to a new 6' in width by 60' in length section of floating dock.
The southern side of the proposed floating dock would comprise two of the four slips proposed with the
other two slips being accounted for on the northern side of the floating dock. According to the application
package, a new 6' in width by 16' in length floating finger pier would originate along the interior portion
of the main floating dock spine and would extend toward the north, and a new 13' in width by 13' in length
boatlift would be constructed along the outer portion of the floating dock spine. The application states that
the proposed re -configuration would provide two additional docking spaces at this existing facility for a
total of four (4) vessels within existing water depth of approximately -6' to -10' at NLW. (See sheet 2 of 3)
Cherry Holdings, LLC
Page 3
10. ANTICIPATED IMPACTS
The proposed reconfiguration and expansion of the existing docking facility would incorporate
approximately 977 sq. ft. of Estuarine Waters and Pubic 'gust Area. The proposed structures would extend
approximately 132 ft. into a waterbody, which measures approximately 560 ft. in width. This distance
would conform to both the 1/4 width rule and the established pier lengths. The proposed relocation and
expansion of the existing docking would provide two additional docking spaces for a total of four, (4)
vessels. The proposed structures would not encroach into the channel or the adjacent 15' Riparian Corridor
Setback Area requirement. Minor increases in turbidity should be expected during construction.
Submitted by: Jason Dail Date: December 21, 2016 .. Office: Wilmington
Southeastern Coastal Construction Company, Inc.
DBA Southeastern Marine Contractors
Stephen B. Conway, Owner -Unlimited Contractors License & Fully Insured
910.538.9737 6252 Towles Rd., Wilmington, NC 28409
December 6, 2016
Narrative for 5 Sandy Point, Figure Eight Island
Owner: Copeland Cherry
The Cherry family at 5 Sandy Point on Figure Eight Island would like to rebuild their pier due to
the condition of their existing pier. They would like to bring their new pier into compliance
relative to their 15 ft. setbacks. Their new pier will consist of a 60 ft. floating dock with a 6 ft. X
16 ft. finger pier to the North and a boat lift to the North all accessed from a 16 ft. X 22 ft.mm
sitting area and a 54 ft. X 6 ft. walkway. The new dock will increase the slip count from 2 to 4
and would be within the pier headline.
Thank you,
Stephen Conway, Owner
Southeastern Coastal Construction Company, Inc.
910.538.9737/sconway@ec.rr.com
RECEIVED
DCM WILMINGTON, NO
ICN UP4
AppUCUIONfor
Major Development Permit
(last revised 12127106)
North Carolina DIVISION OF COASTAL MANAGEMENT
9. Primary Applicant/ Landowner Information
Project Name (if applicable)
Business Name rr
C�er ���Gto� CLG � r..
�� •�'
Applicant 1: first Name
MI Last Name
� tom' '�✓^
" J ..
Applicant 2: First Name
MI Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
PO Box
City
chelo
State
/V. L
L-iJ Zb IkC IN
FAX No.
ZIP
®
Country
U
Phone No.
r�u
/ ! 37ezt.
2�a A .
City State
ZIP
Street Address (if different from above)
_
Email
2. Agent/Contractor Information
Business Name
S r4
MI Last Name
Agent/ Contractor 1: First Name C^6 01 k) 4L4
a? k
Agent/ Contractor 2: First Name MI Last Name
PO Box City
Mailing Address 8�1 B e
f /i�"ir n
State
C,
Phone No. 2
Phone No. 1 C� 7
ZIP.21" -S3 � 1 ! 73/ext.
ext.
(`o
Contractor #�
FAX No.
City State
Street Address (if different from above)
ZIP
Email RECEIVED
DCN[ WILMINGTON, NC
<Form continues on back>
Form DCM MP -1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3.. Project Location
County (can be multiple) Street Address
State Rd. #
t -
Subdivision Name ity
State Zip
A)
2W1Phone
„n �'
No.
o.many, attach additional page with list)
Lot (l (if
-vo - Ofj
737 ext.
vj
a. In which NC -river basin is the project located?
b. Name of body of water nearest to proposed project
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site. .
latural b9anmade ❑Unknown
t .� ® Qom„
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
❑Yes �1Vo
work falls within.
4. Site Description
a. Total length of shoreline on the tract (ft.)
c. Size of individual lot(s)
(if many .lot sizes, phepge attach additional.page with alist)
e. Vegetation on tract
f. Man-made features and uses now on tract
v�s C 0 ri I , a ®W.
b. Size of entire tract (sq.ft.)
tv ae U-4
d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
j�, 1 WNHW or ❑NWL .
g. Identify and describe the existing land uses adjacent to the proposed project site.
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
(Attach zoning compliance certificate, if applicable).
Xes ❑No ❑NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes No
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No VQNA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ❑No A
National Register listed or eligible property?
DCM WILMINGTON, INC
<Form continues on next page>
Form DCM MP -1 (Page 3 of 4) APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? OYes pi�p
(H) Are there coastal wetlands on the site? SffYes []No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted.? 12yes ONo
fAttach documentation, if available)
n. Describe
scribe existing wastewater treatment facilities.
ep4y-
o. Describe existing drinking water supply source.
z W
p. Describef existing storm water management or treatment systems.
ktAJA C -W
5. Activities and Impacts
a. Will the project be for commercial., public, or private use? (:]Commercial oPublic/Government
Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
ek Pleai &-r-e-
c. Qescribe the proposed construction methodology, types of construction equipment to be used. during construction, 1he. number of each type.
of equipment and where it is to be stored.
plrtw- q
d. List all development activities you propose.
0-4k t
e. Are the proposed activities maintenance of an existing project, new work, or both?
f. What is the approximate total &distur land area resulting from the proposed project? CISQ.Ft or ClAcres
I ; . .
g. Will the proposed project encroqfh on any public easement, public accessway or other area (_-]Ye
that the public has established rise of?
h. Describe location and type of existing and proposed discharges to waters of the state.
4A. -V— L'
L Will wastewater or storm . water be discharged into a wetland? 0Yes go C]NA
If yes, will this discharged water be of the same salinity as the receiving water? C]Yes []No C:1NA
j. Is there any mitigation proposed? 0Yes No CINA
If yes, attach a mitigation proposal.
DCM WILMINGTON, NO
<Form continues on back>
Form DCM MP -1 (Page 4 of 4) APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form. (AiP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application
instruction booklet on how to property prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
ist ol Ifie names and complete addresses-receipts-as-preokhet-su
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management. 1
Name 'r° ti. . Phone No.
Address ( t'
I-tA`'4.
Name ry LAG t 'r;ry K f ; Phone No. ll
Address .) ;+ r� t , * trr ( , .,. t r (f !.. CbH'
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, a d issuing dates.
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance vriih the N.C. Environmental Policy Act (N.C.G.S..113A 1.10), it necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described In the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best ofnowledge.
Date / 2 "� t Print Namej�P LOUGL1
%r) Jignature
c, Gti�rh�
Please indicate application attachments pertaining to your proposed project.
❑DCM MP -2 Excavation and Fill Information QDCM MP -5 Bridges and Culverts
QDCM MP -3 Upland Development
❑DCM MP -4 Structures Information RECEIVED
0CM WILMINGTON, NC
Form DCM MP -4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a. (i) Is the docking facilitylmadna:
❑Commercial ❑Public/Govemment (XPrivate/Community
c. (i) Dock(s) and/or pier(s)
(ii) Number
(iii) Length
(iv) Width
LG'
(v) Floating
XYes ❑No
❑This section not applicable
b. (i) Will the facility be open to the general public?
❑Yes �lo
d. (i) Are Finger Piers included? 6(yes ❑No
If yes:
s 1 (ii) Number
(iii) Length
(iv) Width
(v) Floating Yes ❑No
e. (i) Are Platforms included? leYes []No
If yes:
(ii) Number
(iii) Length'
(iv) Width.
(v) Floating ❑Yes �fo
Note: Roofed areas are calculated from dripline'dimensions.
g. (i) ,umber of slips proposed
(ii) Number of slips existing
i. Check the proposed type of siting:
❑ Land cut and access channel
❑Open water; dredging for basin and/or channel
"Kbpen water, no dredging required
❑Other; please describe:
k. Typical boat length: -ZI-f 41- 3 2-
m. (i) Will the facility have tie pilings?
❑Yes No
(ii) If yes number of tie pilings?
f. (i) Are Boadifts included? �'es ❑No
If yes:
(ii) Number
(iii) Length
(iv) Width 1
h. Check all the types of services to be provided.
❑ Full service, including travel lift and/or rail, repair o7
maintenance service
❑ Dockage, fuel, and marine supplies
JZbockage ("wet slips") only, number of slips: aL
WDry storage: number of boats: I_
❑ Boat ramp(s): number of boat ramps:
❑ Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
1. (i) Will the fa'lit be open to the general public?
❑Yes Vo
RECEIVED
DCM WILMINGTON, NC
Forte ;D�'IM ;.'1-44 (S-T-uc_..res, _ 2 of 4`
Z DOCKING FACILITY/MARINA OPERATIONS Whis section not applicable
a. Check each of the following sanitary facilities that will be included in the proposed project. s \
❑ Office Toilets
Q Toilets for patrons; Number: Location:
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater
c. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
u. Give the location.and number of "Rumpout Available' signs proposed.:.
L Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and "No Wake" signs proposed.
L Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live -aboard dockage?
k. Describe design measures that promote boat basin flushing?
RECEIVED
I. If this project is an expansion of an existing marina, what types of services are currently provided?
DCM-WILMINGTON, NC
f-
. ^rrt-: DC'ji v1
.7y-4 (JtvuctUres, Pzi £ 3 of )
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
❑Yes -❑No
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes ❑No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV OSB.
OWL ❑None
p. Is the proposed madna/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE (including covered lifts) 'his section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑Public/Government ❑Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, -Excavation and Fill.) PLThis section not applicable
..... .........- ........
a.. (i) Number -
(ii) Length
(iii) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) This section not applicable I
a. Length
c. Maximum distance beyond NHW, NWL or wetlands
b. Average distance from NHW, NWL, or wetlands
6. MOORING PILINGS and BUOYS XThis section not applicable
a. Is the structure(s):
❑Commercial ❑Public/Government ❑Private/Community
C. Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
RECEIVED
C)CM WILMING rOK N,
:t,�i .LiL.7f is •'. t'.r...._... ,... ta..
7. GENERAL
a. Proximity of structure(s) to adjacent riparian property lines
-' 4,6 L ) ' 4-0 N 113 (iK
Note: For buoy or mooring piling, use arc of swing including length
of vessel
c. Width of wter body
t 4;
e. (i) Will naviational aids be required as a result of the project?
❑yes �to ❑NA
(ii) If yes, explain what type and how they will be implemented.
8. OTHER
a. Give complete description:
Date
b. Proximity of structure(s) to adjacent docking facilities.
d. Water de� at waterward end of structure at NLW or NWL
Project Name j
C 'e.1% rr it1 i t
Applicant Name J
i
v-
Applt ant Signal �J
�d��a C. Ctitrt^
❑This section not applicable
RECEIVED
DCM WILMINGTON, Ne
I, PATRICK C. BRISTOW, CERTIFY THAT THI5 PROPERTY WAS SURVEYED AND MAP DRAWN UNDER MY SUPERVISION:
DESCRIPTION AS SHOWN ON THE FACE OF THIS PLAT; RATIO OF PRECISION AS CALCULATED BY COMPUTER
15 1:10,000+; THAT THE BOUNDARIES NOT SURVEYED ARE SHOWN BY BROKEN LINES PLOTTED FROM
INFORMATION REFERENCED; THAT THIS PIAT WAS PREPARED IN ACCORDANCE MTH'THE STANDARDS OF
PRACTICE FOR LAND 5URVNNG IN NORTH CAROLINR'(21 NCAC 5G. 1604); WITNESS MY ORIGINAL SIGNATURE,
LICENSURE NUMBER AND SEAL TH15 )00(0 DAY OF )000000( A.D. 2015.
PRELIMINARY
PATRICK C. BRI5TOW
N.C. PLS No. L-4148
NOTES
I . ALL WATERFRONT IMPROVEMENT5 SHOWN WERE FIELD LOCATED.
2. THIS LOT 15 SUBJECT TO ALL UTILITY EASEMENTS, RE5TRICTION5,
OR COVENANTS OF RECORD.
3. NORMAL HIGH WATER UNE MARKED BY CHRISTINE BOUFFARD WITH NHC CAMA.
4. THI5 LOT 15 LOCATED IN ZONE AE (14) A5 PER FIRM COMMUNITY # 370168,
MAP # 37203 1 6800 - J. DATED: APRIL 3, 2006.
NORMAL HIGH WATER LINE TABLE
LINE
LENGTH
BEARING
L 1
18.71
57104 1 '30'w
L2
8.10
57104 1 '30"W
L3
26.85
N 12°38'26"W
L4
16.68
21 °04'46"W
L5
7 5
N °56'3 I "W
L6
j .26
N 19° '20"W
L7
13.82
N 15°50 "W
Lel
20.55
N29°31'26
9
4.56 1
571-41'30W'
L I O
5.26 1
57104 1'30"W
CANAL TO MA50N'5 CHANNEL
MID -POINT OF
PIERHEAD LINE
36.04,
/
FLOATING /I
CORRIDOR DOCK /
ESTABLISHED / RAS
BY PERMIT /
y RAMP
PIER
PROPOSED
/ CORRIDOR /
/N2100 -313011W
am
r�
I LOCATION MAP I
NOT TO SCALE
SURVEY REFERENCE
MAP BOOK 13 PAGE 10
DEED BOOK 985 PAGE 768
Ar
448 1,3
pG 10
3� 4,
FLOATING
DOCK FLOATING
DOCK
w 115.0 -RAMP
PIER
I PROPOSED
I CORRI DOR
� I
100.74' I L I O
/ L3 L4 1.5 L6 L7
1
G
/1 30' CAMA
�0 BUFFER
WF
AGNES BACHMAN G5T EXEMPT TRUST
/ LOT 3 SECTION 3
DB 5642 PG 1340
UPLAND IMPROVEMENTS 0
NOT SHOWN cf)
#5
S 1801 630" E N
16.35' z
WOODEN
-
BULKHEAD
WF
EDWARDS
LOT 7 SECTION 3
DB 1026 PG 862
111111, CH =175.07' I
289 3A I TERMINUS OF CURVE #4
<0'k\)5 - I MAP BOOK 13 PAGE 10
GO TO, tWxl
THI5 MAP AND PIED SURVEY WERE MADE
FOR THE MU5IVE U5E OF THE PER5ON,
PER55ON5. OR ENTITY NAMED IN THE
CERTIFICATION HEREON. SAID CERT MCATION
DOE5 NOT EXTEND ORTRAN5TTRTO ANY
UNNAMED PERSON. PERS01,15, OR ENTITY
WITHOUT AN WRE55ED RE-CEKnRCATION
BY THE SURVEYOR NAMING SAID PER50N.
PERSONS. OR ENTITY.
x\
e0 ep y° PIER AND RIPARIAN SURVEY FOR
33\G��0
/ JAMES CRAIG CHERRY � THERESE OLIVE CHERRY
G"o� LOT 5 SECTION 3 FIGURE EIGHT 15LAND
.10 HARNETT TOWNSHIP NEW HANOVER COUNTY, N.C.
S:LLAND PRDJECWGURE EIGHT &MD SECT 3 Ulf 5 RIPARIANWwg%5 5ANDY POINT PIER 5URVEY.dwg
LEGEND N
DECEMBER 18, 2015 O= EXI5TING IRON PIPE PATRICK C. BRISTOW
40 0 20 40 80 0= CONTROLIMONUMENT LAND SURVEYING, PC
�= SET ION PIPE E 4113-A OLEANDER DRIVE
�= 5URVEY NAIL WUMING3TON, N.C. 28403
I INCH = 40 FEET BENCHMARK (910) 791-1500 X91°) 791-1504 (FAX)
pati@brbtowsurveying.com
PATRICK C. BRI5TOW LAND 5URVMNG, PC DECEMBER 2015 FIRM LICENSURE No. 0 EKED
..tee w �Alll tvAINGTON, NC
I, PATRICK C. BRISTOW, CERTIFY THAT THI5 PROPERTY WAS SURVEYED AND MAP DRAWN UNDER MY 5UPERV1510N:
DESCRIPTION AS SHOWN ON THE FACE OF THI5 PIAT; RATIO OF FMC15ION AS CALCULATED BY COMPUTER
15 1:10,000+; THAT THE BOUNDARIES NOT SURVEYED ARE SHOWN BY BROKEN UNE5 PLOTTED FROM
INFORMATION REFERENCED; THAT THI5 PLAT WAS PREPARED IN ACCORDANCE WITH'fHE STANDARDS OF
PRACTICE FOR LAND SURVEYING IN NORTH CAROUNR (21 NCAC 56.1604); WITNESS MY ORIGINAL SIGNATURE,
LICENSURE NUMBER AND SEAL THIS X)00( DAY OF X)00000( A.D. 2015.
PRELIMINARY
PATRICK C. BRI5TOW
N.C. PL5 No. L-4148
CANAL TO MA50N'5 CHANNEL
NOTES
I. ALL WATERFRONT IMPROVEMENTS SHOWN WERE FIELD LOCATED.
2. THI5 LOT 15 SUBJECT TO ALL UTILITY EA5EMENT5, RESTRICTIONS, 1
OR COVENANT5 OF RECORD.
3. NORMAL HIGH WATER LINE MARKED BY CHRISTINE BOUFFARD WITH NHC CAMA.
4. TH15 LOT 15 LOCATED IN ZONE AE (14) AS PER FIRM COMMUNITY # 370168,
MAP # 37203 1 6800 - J. DATED: APRIL 3, 2006.
MID -POINT OF
NORMAL HIGH WATER LINE TABLE
LINE
LENGTH
BEARING
L 1
18.71
57104 I '30"W
L2
8.10
57104 1'30'W
L.3
26.85
N 12°38'26'W
L4
16.68
21 °04'46'W
L5
7 5
N °56'3 I WW
LG
j ig.2G
N 19 '20"W
L7
13.82
N 15°50 "W
/
20.55
N29°31'26
9
4.56
571 °41'30WW
L I 0
5.26
571041'30WW
Z-4 3
o.
I LOCATION MAP.
NOT TO SCALE
5URVEY REFERENCE
MAP BOOK 13 PAGE 10
DEED BOOK 985 PAGE 768
448�3'
PG �O
F IERHEAD LINE
3G.04'
/le--
.3G.04,
FLOATING
/
CORRIDOR DOCK
, 2
1
'df
E5TABU5HED
BY PERMIT j/
/ .RAMP
�
/ I
115.CY
/
�
•
///
PIER
// ���
i
I PIER
/
/ PROP05ED
CORRIDOR
/
I
// // �r
-' I I►'KhJ
WF
�.. AGNE5 15ACHMAN G5T EXEMPT TRU5T
/ LOT 3 5ECTION 3
DB 5642 PG 1340
2A
1
"I/
FLOATING
DOCK
RAMP
PROP05ED
CORRIDOR
�
J . I WOODEN
O BULKHEAD
f
30 CAMA
BUFFER WF
EDWARD5
LOT 7 5ECTION 3
w DB 1026 PG 862
UPLAND IMPROVEMENT5
NOT SHOWN cn
-
#5
.51801 8'30"E Z
16.35'
Ct1,-175.07'
2a9.3A
Go
TERMINUS OF CURVE #4
I MAP BOOK 13 PAGE 10
h
nils MAP AND Ran sURvEY WERE MADE
FOR THE EXCU151VE.U5E OF THE PERSON,
PERSONS. OR ENTITY NAMED IN THE
CERTIFICATION HEREON. SAID CERTIFICATION
DOES NOT EXTEND OR TRANSFER TO ANY
UNNAMED PERSON. PERSONS. OR ENTITY
WITHOUT AN BIPRP.Ssm RECERTIFICATION
BY THE SURVEYOR, NAMING SAID PERSON,
PERSONS. OR ENTITY.
9�� PIER AND RIPARIAN SURVEY FOR
JAME5 CRAIG CHERRY THERE5E OLIVE CHERRY
/ �Ot LOT 5. SECTION 3 FIGURE EIGHT 15LAND
,gyp GHARNETT TOWN5HIP NEW HANOVER COUNTY, N.C.
SUM =0WGI WE EIGHT ISLAND SECT 3 IAT 5 RIPARINdI Mffi SANDY POINT PIER 5URVE A" LEGEND,
DECEMBER 18, 20 15 C.= EXISTING IRON PIPE
q — CENTERUNE
40 0 20 40 80 El = CONTROL MONUMENT
®= SET IRON PIPE
Q= SURVEY NAIL
I INCH = 40 FEET BENCHMARK
PATRICK C. 5RI5TOW LAND 5URVEYING, PC DECEMBER 2015
PATRICK C. BRISTOW
LAND SURVEYING, PC
4113-A OLEANDER DRIVE
VALItMOTON, N.C. 28403
(910)791-1500 a" . (910) 791-1504 (FAX)
E-MAIL: patQb d40wwm7ing oom
Fmm IICENSUMMNIP 71.