HomeMy WebLinkAbout20170033 Ver 1_CAMA Application_20161230PAT MCCRORY DONALD R, VAN DER VAART Secre,tYary ' Coastalmanagement BRAXTON DAVIS ; EMIROMMEMTAL QUALITY Dure[ar December 19, 2016 L 0 1 7 p Q 3 MEMORANDUM: TO: Karen Higgins Division of Water Resources FROM: DougHu ett Fri � .! l gg t�Major Permits Processing'Coordinator 3 ( X016 SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Southern Salt Seafood Company Project Location: Carteret County, at 701 Evans Street, in Morehead City, along the Morehead City waterfront area. Proposed Project: Proposes fixed platform additions (2 roofed), floating platforms, 10 new slip areas and maintenance excavation within the slips areas. Please indicate below your agency's position or viewpoint on the proposed project and return this form by January 8, 2017. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808-2808. Ext. 216. When appropriate, in-depth comments with supporting data is requested. REPLY: - This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Avenue I Morehead City, NC 28557 252-808-28081252-247-3330 (fax) DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Southern Salt Seafood Company (Captain Bills) C/O Arendell Engineers 2. LOCATION OF PROJECT SITE: 701 Evans Street in Morehead City along the Morehead City Waterfront area. Photo Index - 2006: 42-6410 grid (S-4) Longitude: 76°42'41.49 Latitude: 34'43'12.00 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 5/21/16, 11/30/16 Was Applicant Present — Yes, No 5. PROCESSING PROCEDURE: Application Received — 4/18/2016 Application Complete- 11/22/16 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Morehead City dated 2007 Land Classification from LUP — Downtown Mixed Use/Conservation (B) AEC(s) Involved: EW, PTA (C) Water Dependent: (yes) (D) Intended Use: public/government (E) Wastewater Treatment: Existing — Municipal sewer Planned - None (F) Type of Structures: Existing — existing building with a fixed 2,586 sf timber platform on the south side, a 1, 049 sf fixed timber platform to the east and a 144 sf fixed timber platform along the west side and existing bulkhead. Planned — 2 new timber platforms, roof over one new platform and 1 existing platform, four floating docks with 10 boat slips and excavation. (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Open Water (docks) N/A N/A 7,125Ft2 Incorp. 1,604Ft2 Shaded (B) Shallow Bottom 5,720 Fe N/A N/A (D) Total Area Disturbed: 12,845ft2 (E) Primary Nursery Area: No (F) Water Classification: SC Open: No 8. PROJECT SUMMARY: The proposed project is located at the former Captain Bills Restaurant, which is currently the Southern Salt Seafood Company (701 Evans St). There is an existing building with a 2,586 sf fixed timber platform along the south side, a 1,049 sf fixed timber platform along the east side and a 144 sf fixed timber platform along Field Investigative Report Southern Salt Seafood company Page 2 of 3 the west side of the existing building. The site does not currently have any slips. The current proposal is for fixed platform additions (2 roofed), floating platforms, 10 new slip areas and maintenance excavation within the slip areas. There is no high ground work proposed through this proposal. 9. Narrative Description The Southern Salt Seafood Company project is located along the Morehead City waterfront (designated as urban waterfront area) within the Morehead City Harbor area of Bogue Sound at 701 Evans Street. The tract is bordered by the Town of Morehead City "Jibb Landing" to the West and privately owned boat docks to the east (Geer Family). The Southern Salt property is 18,557 square feet (.42 acres) in its entirety, has a shoreline length of 117.75' and is an average of 4' above NHW. Presently there is an existing bulkhead, restaurant and fixed timber decks on and along this tract. There are no coastal wetlands or high ground vegetation on this tract. The Morehead City Land Use Plan classifies this property as Downtown Mixed Use, with all AEC's classified Conservation. This section of the Bogue Sound (Morehead City Harbor) is not designated as Primary Nursery Area, is closed to the taking of shellfish and carries a water classification of SC. The historic riparian corridors were determined through an original permit # 97-05 issued to the adjacent property for the Town of Morehead city (western riparian corridor) and shall pertain to the Southern Salt proposal and meet all required setbacks. Substrate in the Morehead City Harbor is mostly sand and silt. No SAV's or shellfish beds were observed within the proposal project area. There is a USACOE federal within the project vicinity (app. 385' from existing bulkhead). 10. Proiect Description: The applicant's current proposal is to add a roof (unenclosed) to the existing timber platforms to the south and east, maintenance excavate, add 10 new slips, add floating platforms and add two new fixed landing areas with one of the landings covered. The applicant is proposing to maintenance excavate within the proposed slip areas. The dredge footprint would be 52' x 110', has an average depth of -2' nlw and would have a final depth of -6' nlw. The connecting depths within this area are -8' nlw. A total of 465 cubic yards of sandy/silt material would be removed and trucked or barged to a pre - approved disposal area. The disposal area would be determined by the marine contractor. The second portion of the project is the addition of two fixed platform areas. The proposed fixed platform to the west would be 9.5' x 16.4' and is proposed to be roofed. This area is an extension of the existing platform and per the applicant would enhance safety within this area. This new non -water dependent structure would be more than 20' from nhw, therefore would be inconsistent with the Coastal Resource Commission rules; 15A NCAC 07H .0209 (g)(4)(B)(IV). The second proposed fixed platform is located to the south east of the existing fixed platform/restaurant and north of the proposed docking facility. The dimensions would be 16.8' x 21.8' and would be used for a public observation as well as possible seafood unloading area. This portion of platform would be intended for water Field Investigation Report Southern Salt Seafood Company (Capt. Bills) Page 3 of 3 dependent use and would not be roofed (would meet 15A NCAC 07H.0208 (b)(5)(D)). The applicant is also proposing the placement of floating platforms for the addition of 10 slip areas (transient in nature). The property currently does not have any designated slip areas. A gangway would extend from the existing fixed timber platform to the west in a southerly direction and would intercept a 6' x 38.3' floating finger pier. This would intercept a second floating finger pier (extends to the east) and would be 6' x 45'. The third proposed floating finger pier would extend from of # 2 in a southern direction and would be 6' x 26.5'. The final proposed 6' x 73' floating platform would be shore parallel and would be located approximately l' landward of the USACOE channel setback. There would be six side -too parallel slips located inside of the floating platforms with the final four located on the most southern side of the 73' floating platform. The outer four slips would be oriented as parallel as well. All portions of the floating platforms (water dependent) would meet the 27 sf rule (15A NCAC 07H .0208 (b)(5)(D). All portions of the docking facility would meet the minimum 15' setback from the riparian access lines. The average existing water depths within the slip areas is an average of -2' at normal low water. The tidal amplitude within this area is 3'. The total length of the shoreline is 117.8'. The width of the Morehead City Harbor is approximately 535' in this area. The proposed pier would extend a maximum of 165' waterward of nhw within a 535' wide waterbody, however there are longer piers adjacent to this site (to the east and west), therefore the 1/3 distance can be used. The proposed pier would also remain within the establish pier head length. According to the applicant, the typical boat would be 12' — 23' with a mixed use open runabout design. The marina policy would prohibit overboard discharge, no fueling and no overnight or live aboard dockage. Note: Any of the proposed roof areas would not cause any impervious surface impacts due to the project is entirely over estuarine waters. 11. Anticipated Impacts: The proposed pier and platform would shade 1,604 ftz and incorporate 7,125ft2 of open waters. The setting of pilings would cause temporary turbidity. There would be no hindrance to navigation due to the fact that the docking facility would be located a distance of 1' landward of the USACOE channel setback. The total pier length, which includes the platform, would be a distance of 165'within a 535' wide waterbody, however there are longer adjacent piers, therefore the 1/3 distance may be utilized. The proposed docking facility would also remain within the existing pier head length within this area. All roofed areas would remain over existing and proposed platform addition, therefore no new shading impacts would exist. This project has the potential to improve public benefit by adding additional public access as well as 10 new transient slip areas. The proposed western covered area is not consistent with the CRC rules [15A NCAC 07H .0209 (g)(4)(B) ff )] because it extends more than 20' waterward of nhw (approximately 80'), therefore, staff recommends this portion of the project be removed to prevent the entire project from being denied. Name: Heather Styron Date: 12/19/16 Morehead City FIXED TIMBER PLATFORM & FLOATING DOCK SOUTHERN SALT SEAFOOD COMPANY MOREHEAD CITY, CARTERET COUNTY, NORTH CAROLINA PROJECT NARRATIVE November 17, 2016 INTRODUCTION The project site is an approximately 0.426 acre site located in of the Town of Morehead City's corporate limits and is adjacent to the Morehead Harbor Channel. The property currently has one restaurant located on it, Southern Salt Seafood Company and the property is owned by Captain Bills Inc. The property currently has three (3) fixed timber platforms on the west, south, and east sides of the structure. There are currently no dock slips on the property. The Southern Salt Seafood Company Fixed Timber Platform & Floating Dock project includes the installation of approximately 574 square feet of fixed timber platform and 1,100 square feet of floating dock. There are three (4) 6' wide floating docks in lengths of 38'4", 45', 26'6", and 73'. Ten (10) boat slips are being proposed as part of this project. EXISTING CONDITIONS Southern Salt Seafood Company currently has an approximately 2,586 square foot fixed timber platform on the southern side of the structure. This platform is attached to the structure and to the approximately 1,049 square foot fixed timber platform on the east side of the structure. An approximately 144 square foot fixed timber platform is on the west side of the structure adjacent to the Town of Morehead City fixed timber platform. PROJECT DESCRIPTION The existing timber platform that surrounds the structure on the east and south portions is at approximately 5.0' NAVD88. There are two (2) proposed timber platform additions to this structure. The first addition is approximately 16'10" x 21'10" and will be located on the south face of the existing timber platform extending waterward. The second addition will be along the western portion of the platform and will be approximately 9'5" x 164". Both of these timber platforms will be at the same elevation as the existing platform and constructed of similar materials. RECEIVE Fixed Timber Platform & Floating Dock November 17, 2016 Major CAMA Permit Application — Narrative NOV 2 2 2016 Page 1 of 3 �� - MHD 01 A roof is proposed over the existing fixed timber platform and the proposed 9'5" x 16'4" fixed .. timber platform. The roof will follow the existing-building-foof slope -and will not extend beyond the fixed platform area. The four (4) floating docks will provide ten (10) boat slips for transient boats. No overnight dockage will be allowed. All four (4) floating docks will be six (6) feet wide. Demolition and Removal — The only demolition and removal proposed in this project is the removal of the existing handrail once construction of the entire platform is constructed. Excavation — Excavation will be completed within the proposed floating docks location. Dredging will excavate the existing bottom elevation to approximately -6 feet NAVD88. An estimated 465 cubic yards will be removed. Upland Development — There is no Upland Development planned as part of this project. Stormwater Management — No upland improvements, pavements, walkways or other impervious surfaces will be constructed as part of the project. No stormwater management or additional stormwater measures are required for this project. NAVIGATION CONDITIONS The federal channel boundary and channel setback run along the entire southern margin of the project site. The federal channel is 200 feet wide. The channel and setback lines shown on the drawings were obtained from the Navigation Section, U.S. Army Corps of Engineers, Wilmington District. METHODS OF CONSTRUCTION Construction of the timber platform and floating docks will be by conventional marine construction equipment including barges and cranes. Excavation will likely be completed by a barge mounted excavator and disposed of at an upland site determined by the licensed marine contractor performing the work. The equipment will be onsite only a sufficient time to complete the excavation, pile driving, platform installation, and floating dock work. NAV� 2n,c Fixed Timber Platform & Floating Dock November 17, 2016 Major CAMA Permit Application — Narrative _ Page 2 of 3 PROJECT SCHEDULE After the required CAMA Major permit is obtained, excavation and construction of the dock relocation and fixed timber platforms will begin immediately. COMPLIANCE WITH THE N. C. ENVIRONMENTAL POLICY ACT The work proposed as part of this application is private development and does not involve expenditure of public funds. The Regulatory Reform Act of 2011 (SB 781) was passed by North Carolina Legislature in July 2011. This bill eliminates the requirement for an environmental assessment (EA) for any project requiring a Major CAMA permit. Therefore, the proposed project is not subject to N. C. Environmental Policy Act review. ADJACENT RIPARIAN PROPERTY OWNERS (See Sheet 08) The Geer Family, LLC Town of Morehead City 105B South 7th Street 706 Arendell Street Morehead City, NC 28557 Morehead City, NC 28557 NOV 2 2 2016 Fixed Timber Platform & Floating Dock November 17, 2016 Major CAMA Permit Application — Narrative Page 3 of 3 ARENDELL - ENGINEERS 'r _ ��2 CIVIL - COASTAL • ENVIRONMENTAL 105 North 10th Street Morehead City, North Carolina 28557 (252) 622-4338 N. C. Certification No. C-1509 November 22, 2016 Ms. Heather Styron N. C. Division of Coastal Management 400 Commerce Avenue Morehead City, North Carolina 28557 Re: Southern Salt Fixed Timber Platform & Floating Dock Major CAMA Permit Morehead City, North Carolina Dear Heather: On behalf of Sammy Boyd, Owner & Operator of Southern Salt Seafood Company and Captain Bill's Inc., property owner, the attached Major CAMA Permit Application for the above referenced project is submitted for your review and approval. This submittal has been revised since the original submittal on March 29, 2016. Thank you very much for your help on this project. Please give me a call if you have questions or need additional information. Sincerely, ARENDELL ENGINEERS John J. Wade, P.E. Vice President Cc: Captain Bill's Inc. Sammy Boyd RECEIVED NOV 2 2 2016 DCIV- MHD CITY Major CAMA Permit Application Southern Salt Seafood Company Fixed Timber Platform & Floating Dock Town of Morehead City, North Carolina November 17, 2016 Applicant: Sammy Boyd Southern Salt Seafood Company 701 Evans Street Morehead City, NC 28557 Prepared For: North Carolina Department of Environmental Quality Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 Prepared By: ARENDELL ENGINEERS 105 North 10th Street, Suite 4 Morehead City, North Carolina 28557 (252) 622-4338 NC Certification No. C-1509 NOV 2 2 2016 MAJOR CAMA PERMIT APPLICATION SOUTHERN SALT SEAFOOD RESTAURANT FIXED TIMBER PLATFORM & FLOATING DOCK MOREHEAD CITY, CARTERET COUNTY, NORTH CAROLINA Table of Contents DCM MP —1 Application for Major Development Permit DCM MP — 2 Excavation and Fil DCM MP — 4 Structures PROJECT NARRATIVE INTRODUCTION EXISTING CONDITIONS PROJECT DESCRIPTION Demolition and Removal Excavation Upland Development Stormwater Management NAVIGATION CONDITIONS METHOD OF CONSTRUCTION PROJECT SCHEDULE COMPLIANCE WITH N. C. ENVIRONMENTAL POLICY ACT ADJACENT RIPARIAN PROPERTY OWNERS Application Drawings Sheet 1 —Vicinity Map Sheet 2 — Existing Conditions Sheet 3 — Proposed Site Plan Sheet 4 — Dimension Plan Sheet 5 — Proposed Dredging Plan Sheet 6 — Proposed Roof Plan Sheet 7 — Sections Sheet 8 — Riparian Property Owners Deed Adjacent Property Owner Notification Letters Property Owner Letter of Approval for Project Authorized Agent Letter "VE D NOV 2 2 2016 DCM- MHD CIS IN NP -1 NFLICATION for Major Development pormn (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicantl Landowner Information Business Name Southern Salt Seafood Company Project Name (if applicable) Fixed Timber Platform & Floating Dock Applicant 1: First Name Sammy Mi Last Name Boyd Applicant 2: First Name M1 Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 701 Evans Street PO Box City Morehead City State NIC ZIP 28557 Country Phone No. 252 - 342 - 0705 ext. FAX No. Street Address (if different from above) City State ZIP Email 2. AgentlContractor Information Business Name Arendell Engineers Agent/ Contractor 1: First Name M1 Last Name John J Wade Agent/ Contractor 2: First Name Ml Last Name Mailing Address PO Box City State 105 North 10th Street, Suite 4 Morehead City NC ZIP Phone No. 1 Phone No. 2 28557 252 - 622 - 4338 ext. ext. FAX No. Contractor # 252 622 4505 C-1509 Street Address (if different from above) City State ZIP Email john@arendellengineers.com R E (U` ED - <Form continues on back> NOV 2 2 2015 252-808-2808 :.- 1-888-4RCOAST :: www-ncCoastairnanageme"t.net Form DCM MP -1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Carteret 701 Evans Street d. Approximate elevation of tract above NHW (normal high water) or Subdivision Name City State Zip N/A Morehead City NC 28557 - Phone No. Lot No. (s) (if many, attach additional page with list) 252 - 342 - 0705 ext. 701, 1 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project White Oak Morehead Harbor Channel c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Bogue Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. If yes, by whom? Town of Morehead City 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 117.75 18,556.56 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or N/A, I I NWL (normal water level) (If many lot sizes, please attach additional page with a list) 4' ®NHW or ❑NWL e. Vegetation on tract N/A f. Man-made features and uses now on tract There is one structure on the tract that extends from a concrete bulkhead beyond Normal High Water. The structure has a timber deck on the east and west portion of the building and a timber deck on the south face extending channelward. The structure is currently used as a restaurant. g. Identify and describe the existing land uses adiacent to the proposed project site. The two (2) properties adjacent to the property site on the west side is owned by the Town of Morehead City and has a large timber deck extending waterward from the bulkhead with floating docks channelward of the deck. The property directly to the east is the 7th Street Extension and may be claimed by the Geer Family Trust and has two boat slips. The property east of that parcel is owned by the Geer Family, LLC and has three commercial boat slips, a floating dock for refueling, and small store waterward of the concrete bulkhead. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Downtown Business (Attach zoning compliance certificate, if applicable) ®Yes []No [INA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No [INA National Register listed or eligible property? NPqM <Form continues on next page> NOV 2 2 2016 252-808-2808 .. 1-888-4RCAAST :. www.nccoastalmand- t MJA D C Ij Form DCM MP -1 (Page 3 of 5) APPLICATION for Major Development Permit m. (i) Are there wetlandson the site? ❑Yes ®No (ii) Are there coastal wetlands on the site? []Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ❑No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Wastewater from the structure on the property is connected to the Town of Morehead City's sewer collection system. o. Describe existing drinking water supply source. The structure is served by the Town of Morehead City Water System. p. Describe existing storm water management or treatment systems. There is no stormwater management or treatment system on the project site. 5. Activities` and Impacts a. Will the project be for commercial, public, or private use? ®Commercial ❑Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. This project will expand the existing fixed platform used by the restaurant and provide approximately ten (10) boat slips using floating docks. The boat slips will be transient in nature only. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Proposed construction will be of standard marine construction including barges and cranes. Dredging will likely be completed by a barge mounted excavator. The equipment will be onsite only a sufficient time to complete the pile driving, fixed deck installation, and floating dock work. d. List all development activities you propose. Project includes installing two (2) fixed timber platforms connected to the existing timber platforms. The first timber platform is approximately 422 square feet located along the south face of the existing platform and extending waterward. The second platform is approximately 152 square feet and is located on the western end of the existing fixed timber platform. Four (4) floating docks are proposed as part of this request, all of which are 6 foot in width. The first floating dock will be approximately 38'4" in length and connect to the existing timber platform. The second floating dock will be approximately 45 feet in length and run parallel to the existing timber platform. The third floating dock will be approximately 26' 6" and extend south towards the channel setback line. The final floating dock will be constructed parallel to the channel setback line and will be approximately 73 feet in length. No piles will be installed within the setback. e. Are the proposed activities maintenance of an existing project, new work, or both? New Work f. What is the approximate total disturbed land area resulting from the proposed project? N/A Project is entirely waterward of NHW ❑Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Proposed Discharges - No new discharges will result from this project. NOV 2 2 2016 t, i. Will wastewater or stormwater be discharged into a wetland? ❑Yes A If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ❑NA 252-808-2808 .. 1-888-4RCOAST ., www. nccoastaImanagement. net Form DCM MP -1 (Page 4 of 5) APPLICATION for Major Development Permit j. Is there any mitigation proposed? ❑Yes ®No [INA If yes, attach a mitigation proposal. <Form continues on back> 6.. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. "Items (6) — (t) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name The Geer Family, LLC.,Phone No. Address 105B South711 Street, Morehead City, NC 28557 Name Town of Morehead City Phone No. Address 706 Arendell Street, Morehead City, NC 28557 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the%i ff rmation provided in this application is truthful to the best of my knowledge. Date [ � � �� / t/ Print Name Sammy Bo ECEIVED Signature NOV 2 2 2016 Please indicate application attachments pertaining to your proposed project. ®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts M H D C IT 252-808-2808 .. 1-888-4RCOASY :: www. nccoasta[management.net Form DCM MP -1 (Page 5 of 5) ❑DCM MP -3 Upland Development SDCM MP -4 Structures Information APPLICATION for Major Development Permit NOV 2 2 2016 WON, w 252-808-2808 :: 1-888-4RCOAST :: www-nccoasta Imanagernent. net Form DCM MP -2 EXCAVATION and FILL (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access EXCAVATION 0, This section not applicable a. Amount of material to be excavated from below NHW or NWL in Other Type of material to be excavated. Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. Breakwater shoreline 0 NWL) or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. stabilization) ❑CW ❑SAV ❑SB OWL ®None Length (ii) Describe the purpose of the excavation in these areas: —52' To create a continuous boat basin. Width 2. —110' ❑This section not applicable a. Location of disposal area. Avg. Existing Dimensions of disposal area. -2 ft NA NA (i) Do you claim title to disposal area? Depth (i) Will a disposal area be available for future maintenance? ❑Yes []No ®NA ❑Yes ®No [INA (ii) If no, attach a letter granting permission from the owner. Final Project (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), Depth ❑Yes ❑No ®NA -6 ft NA NA number of square feet affected. 1. EXCAVATION 0, This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Mostly Sand 465 CY below NHW c. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW) submerged aquatic vegetation (SAV), shell bottom (SB), 0 or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii) Describe the purpose of the excavation in these areas: To create a continuous boat basin. 2. DISPOSAL OF EXCAVATED MATERIAL ❑This section not applicable a. Location of disposal area. b. Dimensions of disposal area. To be determined by the licensed marine contractor. To be determined by the licensed marine contractor. c. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes []No ®NA ❑Yes ®No [INA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), ❑Yes ❑No ®NA or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. (ii) If yes, how much water area is affected? ❑CW ❑SAV ❑SB RECEIVED ❑WL ®None (ii) Describe the purpose of disposal in these areas: NOV 2 2 2016 HD CITY 252-808-2808 :: 1-888-4RCOAST :a www.nccoastaimanagement.net revised: 12/26/06 Form DCM MP -2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ®This section not applicable (If development is a wood groin, use MP -4 — Structures) a. 1 yNo Ui anUicmic sidowcduon. D. . Lengtn: ❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: g. Number of square feet of fill to be placed below water level Bulkhead backfill Riprap Breakwater/Sill Other i. Source of fill material. f. (i) Has there been shoreline erosion during preceding 12 months? ❑Yes ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. h. Type of fill material. 4. OTHER FILL ACTIVITIES ®This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be Dlaced in coastal wetland -,/marsh rMnn If yes, (ii) Amount of material to be placed in the water (iii) Dimensions of fill area (iv) Purpose of fill submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ❑None (ii) Describe the purpose of the fill in these areas: 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? To be determined by the licensed marine contractor. To be determined by the licensed marine contractor. c. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No ❑NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. V 252-808-2808 :: 1-BSS-4RCO ST :: vvvvvu.nccoastalrnanagernent.net revised: 12/26/06 Form DCM MP -4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA.CHARACTERISTICS 0This section not applicable a. (i) Is the docking facility/marina: ®Commercial ❑Public/Government ❑Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number 4 (iii) Length (1) 38'4". (2) 45' (3) 26'6". (4) 73' (iv) Width1( 4) 6' (v) Floating ®Yes []No e. (i) Are Platforms included? ®Yes []No If yes: (ii) Number 2 (iii) Length (1) 164", (2) 21' 10" (iv) Width (1) 9'5". (2) 16' 10" (v) Floating ❑Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 10 (ii) Number of slips existing 0 i. Check the proposed type of siting: ❑ Land cut and access channel ®Open water; dredging for basin and/or channel ❑Open water; no dredging required ❑Other; please describe: k• Typical boat length: 12'- 23' m. (i) Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? b. (i) Will the facility be open to the general public? ®Yes []No d. (i) Are Finger Piers included? ❑Yes ®No If yes: (ii) Number (iii) Length (iv) Width (v) Floating []Yes ❑No f. (i) Are Boatlifts included? []Yes ®No If yes: (ii) Number (iii) Length (iv) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 10 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ® Other, please describe: Transient slips, no overnight dockage j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Mixed types I. (i) Will the facility be open to the general public? ®Yes [:]No RECEIVED NOV 2 2 2016 DCM- MHD CITY 252-808-2808 :: 1-888-4RC®AST :: www.nccoastaimanagement.net revised: 12/27/06 2. DOCKING FACILITYIMARINA OPERATIONS 0 This section not app�iqable a. Check each of the following sanitary facilities that will be included in the proposed project. OOffice Toilets LJToilets for patrons; Number: ____; Location: N/A El Showers UBoatholding tankpumpout; Give type and location: N/A u. Describe treatment type and disposal location for all sanitary wastewater. There will be no sanitary wastewater disposal allowed. u Describe the disposal ofsolid waste, fish offal and trash. Trash receptacles will be located onthe existing fixed timber platform for solid waste and trash only. There will be no disposal of fish offal allowed. ' d. How will overboard discharge ofsewage from boats becontrolled? Overboard discharge cfsewage will not beallowed. o. (i) Give the location and number of"No Sewage Discharge" signs proposed. N/A (ii)Give the location and number of^PumpoutAvailable" signs proposed. N/A f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. N/A o. Where will residue from vessel maintenance uodisposed of? NIA ». Give the number ofchannel markers and "No Wake" signs proposed. N/8 i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. N/A j. What will bethe marina policy onovernight and live -aboard dockage? The slips proposed will bntransient innature only. Noovernight orlive-aboard docking will bepermitted. — --------'"''-------`'—^~'~^~~~~~`~~~^'^~~^^'y' mx~ 1. If this project is an expansion of an existing marina, what types of services are currently provided? R���K���� �� Q���O�U�0���NOV 2 2 201 0CM~ MHD CFFY 252-808-2808::1-888-4RCOAST:: www.nccoastaimana-gement.net revised: 12127/06 m. Is the marina/docking facility proposed within a primary or secondary nursery area? []Yes ®No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ®No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? ❑Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3, BOATHOUSE (including covered lifts) This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) This section not applicable a• (i) Number (ii) Length (iii) Width 5, BREAKWATER (e.g. wood, sheetpile, etc..) 0This section not applicable a. Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS0 This section not applicable a. Is the structure(s): b. Number ❑Commercial ❑Public/Government ❑Private/Community C. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. e. Arc of the swing I t 7. GENERAL NOV-2,22016 DCM- MHD I .v 252-808-2808 :: 1-888-4RC®ASY :: wrww.necoastalmanagement.net revised: 12/27/06 a. Proximity of structure(s) to adjacent riparian property lines There will be no construction within the 15' riparian setback on either side of the property. Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 535.6' e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No [INA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. Proposed 16'10"x21'10" fixed timber platform will extend from the existing fixed timber platform on the east side of the structure and will not be located within the 15' riparian setback. The proposed 9'5"' x 16'4" fixed timber platform will be located on the west side of the existing platform and will not be located within the 15' riparian setback. See Sheet 03 for clarification. d. Water depth at waterward end of structure at NLW or NWL -8' NAVD88 t. OTHER ❑This section not applca a. Give complete description: The Fixed Timber Platform and Floating Dock project includes the installation of approximately 574 square feet of fixed timber platforms which will be an extension of the current fixed timber platforms. Also included as part of this project is the installation of four (4) floating docks set behind the channel setback line. Ten boat slips are proposed as part of this project. These slips will be transient in nature and no overnight dockage will be allowed. ;ant Signature( l NOV 2 2 2016 252-808-2808 :: 7-888-4RCOAST :: www.necoastalmanagement.net revised: 72/27/08 Date Fixed Timber Platform & Floating Dock Project Name Sammy Boyd Applicant Name ;ant Signature( l NOV 2 2 2016 252-808-2808 :: 7-888-4RCOAST :: www.necoastalmanagement.net revised: 72/27/08 LENOIR r- r CRAVEN DUPLIN PENDER �"O rr--, HIGHWAY 70 JONES ONSLOW PAMLICO CARTERET COUNTY AREA OF INTEREST RECEIVED NOV 2 2 2016 NEWPORT a - C h ,-�_ RIVER . _ �� s s a ' TOBEAU FORT `. Spi s r Chi ney ao g A an Caole — ! Towers Yf' PROJECT LOCATION • ,TRACoAsort Terminal rA� tseacona ?� I ..,fir l' I RADIO o Beacon MIS o light WATER �J light 1. ¢.. ISLAND \ai WAY 0-0* %' Ism eIf iiadfa., Dolph' s 0 U E BOGUE SOUND N,C, STATE PORT l� �9G '` f3 T ' ' s i coW w I � � I � I .—• � I I � i- —i EVANS STREET NHW/NLW AT (— ——•—._._._ BULKHEAD I j T• •—•_.-� -� I T� I , I j �•L• t I ; � • � g��QP � ; 4 � T L N/F ' —I TOWN OF ; I MOREHEAD" —i I CITY I I u �,�,,I•. I I I �I I II I II � II L... _... EX. BULKHEAD WITH CONCRETE CAP 30.0' -- F�- ', t "I SES , HARBOR CHANNEL BOGUE SOUND FEDERAL CHANNEL LINE ( CD =------------ ----- EX. TIMBER EX. FLOATING PLATFORM DOCK \ 200.0' 535.6' DECEIVED NOV 2 2 2016 SUGARLOAF ISLAND ARENDELL PROJECTTITLE.- PREPARED FOR: DRAWING TITLE SCALE r=loo SHEET#. 'TAIN o THE GEER I I S INC. FAMILY LLC.- .evT6tW s,.,..nn611fg — 105 NORTH 10th STREET, SUITE 4 MOREHEAD CITY, NC 2855/ PHONE: wUgl ,t I EXISTING CONDITIONS � w � U)LL- t : ; y. (252)622338701 SEAFOOD COMPANY 30.0' -- F�- ', t "I SES , HARBOR CHANNEL BOGUE SOUND FEDERAL CHANNEL LINE ( CD =------------ ----- EX. TIMBER EX. FLOATING PLATFORM DOCK \ 200.0' 535.6' DECEIVED NOV 2 2 2016 SUGARLOAF ISLAND ARENDELL PROJECTTITLE.- PREPARED FOR: DRAWING TITLE SCALE r=loo SHEET#. ENGINEERS .evT6tW s,.,..nn611fg — 105 NORTH 10th STREET, SUITE 4 MOREHEAD CITY, NC 2855/ PHONE: SOUTHERN SALT SAMMY BOYD EVANS STREET EXISTING CONDITIONS DATE: 11/17116 DRAWN BY: L 0 w (252)622338701 SEAFOOD COMPANY djw FAX (252)622-0505 MOREHEAD CITY, NC 28557 wxw.erendeGengineers.com N.C. CertUi llon No. C-1509 PROJECT tE 15103 �I EX. TIMBER I PLATFORM I I I II . I I I I TOWN OF I I I MOREHEAD I �I CITY DECK i I i -- N/F GANGWAY TOWN OF MOREHEAD r,- OI CITY \ � I \ 15' RIPARIAN SETBACK I CONCRETE BULKHEAD NHW/NLW AT FACE OF BULKHEAD F --B I EX. FLOATING I I DOCK I I 3J 15' RIPARIAN / SETBACK 10 FEDERAL CHANNEL q SETBACK LINE FEDERAL CHANNEL LINE r TOWN OF MOREHEAD CITY FLOATING DOCK PROPOSED PLATFORM O SLIP NUMBER NOV 2 2 2016 NOTE: CONTOUR ELEVATIONS RELATIVE TO NAVD88 DATUM. ARENDELL PROJECT TITLE: PREPARED FOR: DRAWING TITLE: 1._40' SHEET" ENGINEERS .nw. tn...•......xos.v.,.. DATE: 105 NORTH 10th STREET, SUITE4 SAMMY BOYD 11117116 O V ww MOREHM CITY, NC 28551 SOUTHERN SALT PROPOSED 3 PHONE: (252)622-338 SEAFOOD COMPANY Jew FAX: (252)622-4505 MOREHEAD CITY, 701 EVANS STREET NC 28557 SITE PLAN DRAYMDY: wmndebngine m=PROJECTN N.C, Cer8fica8on No. CA509 15103 I i z I g Zm� w I W�� I W U d LL I N/F LL = } w CAPTAIN u I zLu BILL'S INC. / I I N/F I� EX. TIMBER THE GEER FAMILY LLC PLATFORM I I I • F --B I EX. FLOATING I I DOCK I I 3J 15' RIPARIAN / SETBACK 10 FEDERAL CHANNEL q SETBACK LINE FEDERAL CHANNEL LINE r TOWN OF MOREHEAD CITY FLOATING DOCK PROPOSED PLATFORM O SLIP NUMBER NOV 2 2 2016 NOTE: CONTOUR ELEVATIONS RELATIVE TO NAVD88 DATUM. ARENDELL PROJECT TITLE: PREPARED FOR: DRAWING TITLE: 1._40' SHEET" ENGINEERS .nw. tn...•......xos.v.,.. DATE: 105 NORTH 10th STREET, SUITE4 SAMMY BOYD 11117116 O V ww MOREHM CITY, NC 28551 SOUTHERN SALT PROPOSED 3 PHONE: (252)622-338 SEAFOOD COMPANY Jew FAX: (252)622-4505 MOREHEAD CITY, 701 EVANS STREET NC 28557 SITE PLAN DRAYMDY: wmndebngine m=PROJECTN N.C, Cer8fica8on No. CA509 15103 / /A NIF r II CAPTAIN I I BILL'S INC. I • I I I I II I 91'5111 I I � I -F 16'4" NIF I TOWN OF �'� 38r 4n -7- � i MOREHEAD I 16' 10" ---f CITY -` L 6.0'I 45.0' I I I z I 0 z I I Lu 10 wu� WJE Ili I Lu lQ Lu ILu zL I I II NIF THE GEER I FAMILY LLC I� EX. FIXED TIMBER PLATFORM I I , I I 115' RIPARIAN I SETBACK _ 1 I 21'10" \\\ 15' RIPARIAN 26'6" \ \� ,-SETBACK I 6.0 \\ \ 1 73 AA R E N D E LL PROJECT TITLE: PREPARED FOR: DRAWING TITLE: ENGINEERS 105 NORTH 10th STREET, i'61W * SAMMY BOYD MOREHEAD CITY, NC 28557 SOUTHERN SALT PHONE: (252)622338 701 EVANS STREET DIMENSION PLAN FAX: (252)62&4505 SEAFOOD COMPANY MOREHEAD CITY, NC 28557 www.arem d.nglm.m Som N.C. Car60cation No. C -15M RECEIVEDMll "t PROPOSED PLATFORM NOV 2 2 2016 MHDj R SCALESHEET# 1^=40' 04 DATE 11,17I16 DRAWN BY: JJW PROJECT #. 15103 I I ' I I I , NIF TOWN OF MOREHEAD CITY DREDGING AREA DREDGE TO -6' NAVD88 2 DATUM CONVERSION GRAPH BEAUFORT DATUM 3.25' NOV 2 2 2016 2.07' NOTE: CONTOUR ELEVATIONS 0' 40' 80, RELATIVE TO NAVD88 DATUM. 0.00' 1.18' MHW 0.00' NAVD88 -2.07' MLLW ARENDELL PROJECT TITLE: PREPARED FOR: DRAWING TIME. SCALE 1. SKEET# ENGINEERS ,Nu <wr.,a. E ,.ne,,,,,.. DATE: 105 NORTH 70th STREET, SUffE 4 SAMMY BOYO 11117/16 G MOREHEAD CITY, NC 2857 SOUTHERN SALT 701 EVANS STREET PROPOSED DRAwN6Y: OJ PHONE: (252)622-M SEAFOOD COMPANY DREDGING PLAN ij' FAX (252)62&4505 MOREHEAD CITY, NC 28557 w ..m ndolkrgimers.wm PROJECT# N.C. CeN(MatloA No. C-7509 15103 I z o I Wm_ NI Loy� W U P�wLL I NIF i gym•- w CAPTAIN u- I z C BILL'S INC. NIF I THE GEER FAMILY LLC I I I I I I . I� EXISTING FIXED TIMBER DECK PROPOSED FIXED TIMBER DECK _PROPOSED FLOATING DOCK DATUM CONVERSION GRAPH BEAUFORT DATUM 3.25' NOV 2 2 2016 2.07' NOTE: CONTOUR ELEVATIONS 0' 40' 80, RELATIVE TO NAVD88 DATUM. 0.00' 1.18' MHW 0.00' NAVD88 -2.07' MLLW ARENDELL PROJECT TITLE: PREPARED FOR: DRAWING TIME. SCALE 1. SKEET# ENGINEERS ,Nu <wr.,a. E ,.ne,,,,,.. DATE: 105 NORTH 70th STREET, SUffE 4 SAMMY BOYO 11117/16 G MOREHEAD CITY, NC 2857 SOUTHERN SALT 701 EVANS STREET PROPOSED DRAwN6Y: OJ PHONE: (252)622-M SEAFOOD COMPANY DREDGING PLAN ij' FAX (252)62&4505 MOREHEAD CITY, NC 28557 w ..m ndolkrgimers.wm PROJECT# N.C. CeN(MatloA No. C-7509 15103 I I I I II I I I I N/F I i II TOWN OF MOREHEAD CITY I \ I I - -r N/F CAPTAIN BILL'S INC. ® PROPOSED ROOF AREA r------- - IN/F THE GEER EX. TIMBER FAMILY LLC PLATFORM I FEDERAL CHANNEL SETBACK LINE FEDERAL CHANNEL LINE f�a NOV 2 2 2016 NOTE: ROOFED AREAS WILL NOT EXTEND BEYOND THE FIXED PLATFORM AREA. AA R E N D E L L PROJECT TITLE PREPARED FOR: DRAWING TITLE: SCALE:1'=40' SKEF a ENGINEE€2S 105NORTHionsi 18UrrE41 SAMMYBOYD DAT 11/17/16 c MOREHEAD CITY, NC28V SOUTHERN SALT 701 EVANS STREET PROPOSED OV PHONE: (252) 622-338 DRAWN BY. FAX: (252)622-0505 SEAFOOD COMPANY ROOF PLAN iiw MOREHEAD CITY, NC 28557 www.arerMeNenglrreers.com RaoaECTn 15103 N.C. Car86oa0on No. C-1509 PROPOSED 6'X 45' FLOATING DOCK EXISTING PILES, __Zit DEPTH UNKNOWN PROPOSED PILES, TYPICAL PROPOSED 6'X 83' FLOATING DOCK L PROPOSED 6'X 26'6" FLOATING DOCK SECTION A -A SCALE: 1" = 20' ROOF STRUCTURE TO PROP. 9'5" X 16'4" MATCH EX. ROOF FIXED TIMBER I OF BUILDING PLATFORM EXISTING FIXED BUILDING TIMBER PLATFORM EXTERIOR PROPOSED 6'X 46' K. FLOATING ACCESS DOCK EXISTING FIXED PR OSE TIMBER PLATFORM GAI GWAY EXISTING PILES, PROPOSED 6'X 38'4" DEPTH UNKNOWN FLOATING ACESS DOCK SECTION B -B SCALE: 1" = 20' m /ym q m w' 34 -jw wz o� UJ wz z w ROOF STRUCTURE TO (7 O z z J Q J w MATCH EX. ROOF z PROPOSED a z OF BUILDING a Lu af 16'10" X 21'10" FIXED w Q z 00 mTIMBER PLATFORM "' EXISTING FIXED ~ TIMBER PLATFORM n n n PROPOSED 6'X 45' FLOATING DOCK EXISTING PILES, __Zit DEPTH UNKNOWN PROPOSED PILES, TYPICAL PROPOSED 6'X 83' FLOATING DOCK L PROPOSED 6'X 26'6" FLOATING DOCK SECTION A -A SCALE: 1" = 20' ROOF STRUCTURE TO PROP. 9'5" X 16'4" MATCH EX. ROOF FIXED TIMBER I OF BUILDING PLATFORM EXISTING FIXED BUILDING TIMBER PLATFORM EXTERIOR PROPOSED 6'X 46' K. FLOATING ACCESS DOCK EXISTING FIXED PR OSE TIMBER PLATFORM GAI GWAY EXISTING PILES, PROPOSED 6'X 38'4" DEPTH UNKNOWN FLOATING ACESS DOCK SECTION B -B SCALE: 1" = 20' m /ym q m w' 34 -jw wz w z Z < J J U w = U z H w = U U PROPOSED 6' X 73' FLOATING DOCK PROPOSED 6'X 26'6" FLOATING ACCESS DOCK ...oO. 01 :IT 124 I T - --��-• � I /I/ f" I L / / N/F I I t -------- - I . — • — . ------ L- ------ II--------r------i Z O 'T---- _ u (( I--- N/F j IF TOWN OF I II MOREHEAD CITY w a i FAMILYLLCI I F5mLj I - ------- I . j = f– —•—.J jco `) II I II i � II i l l II j1 j I —• ---.—•—i L. I I I I I JL. EVANS STREET I II I T - --��-• � I /I/ f" I L / / N/F I I t -------- - I . — • — . ------ L- ------ II--------r------i Z O 'T---- _ u (( z >. I- - 'L m n I N/F j IF TOWN OF SIN� w THE GEER ' I MOREHEAD CITY w a i FAMILYLLCI I F5mLj I - ------- >- 2E SII " - ; TOWN OF I z ^ w I ' MOREHEAD =f f -t --- ------ � •r CITY ------------ 1� - N/F NOAH, FRANCIS SWANSON cNPNN0), FE��RP K�\N� i FENPNN���\N HARBOR CHANNEL BOGUE SOUND FEDERAL CHANNEL LINE NOV 2 2 2016 D- MHD1 A ARENDELL PROJECT TITLE: PREPARED FOR: DRAWING TITLE: SCALE. 1, =100' SHEET# ENGINEER 105 NORTH 10th STREET SURE 4DATE: MOREHEAD CIN, NC 26557 SOUTHERN SALT SAMMY BOYD 11117/16 RIPARIAN PROPERTY A PHONE: (252) 622-338 701 EVANS STREET DRAWN 61": PAX: (252)622-4505 SEAFOOD COMPANY OWNERS JJW www.a daffMgiaeeracwn MOREHEAD CITY, NC 28557 PROJECT# N.C. Certification No. C-1509 15103