HomeMy WebLinkAbout20170033 Ver 1_CAMA Application_20161230PAT MCCRORY
DONALD R, VAN DER VAART
Secre,tYary '
Coastalmanagement BRAXTON DAVIS ;
EMIROMMEMTAL QUALITY Dure[ar
December 19, 2016 L 0 1 7 p Q 3
MEMORANDUM:
TO: Karen Higgins
Division of Water Resources
FROM: DougHu ett
Fri
� .! l gg t�Major Permits Processing'Coordinator 3 ( X016
SUBJECT: CAMA/DREDGE & FILL Permit Application Review
Applicant: Southern Salt Seafood Company
Project Location: Carteret County, at 701 Evans Street, in Morehead City, along the Morehead
City waterfront area.
Proposed Project: Proposes fixed platform additions (2 roofed), floating platforms, 10 new slip
areas and maintenance excavation within the slips areas.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
January 8, 2017. If you have any questions regarding the proposed project, please contact Heather Styron,
Permit officer at (252) 808-2808. Ext. 216. When appropriate, in-depth comments with supporting data is
requested.
REPLY: - This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE
State of North Carolina I Environmental Quality I Coastal Management
400 Commerce Avenue I Morehead City, NC 28557
252-808-28081252-247-3330 (fax)
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME: Southern Salt Seafood Company (Captain Bills) C/O
Arendell Engineers
2. LOCATION OF PROJECT SITE: 701 Evans Street in Morehead City along the
Morehead City Waterfront area.
Photo Index - 2006: 42-6410 grid (S-4)
Longitude: 76°42'41.49 Latitude: 34'43'12.00
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 5/21/16, 11/30/16
Was Applicant Present — Yes, No
5. PROCESSING PROCEDURE: Application Received — 4/18/2016
Application Complete- 11/22/16
Office — Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Morehead City dated 2007
Land Classification from LUP — Downtown Mixed Use/Conservation
(B) AEC(s) Involved: EW, PTA
(C) Water Dependent: (yes)
(D) Intended Use: public/government
(E) Wastewater Treatment: Existing — Municipal sewer
Planned - None
(F) Type of Structures: Existing — existing building with a fixed 2,586 sf timber
platform on the south side, a 1, 049 sf fixed timber platform
to the east and a 144 sf fixed timber platform along the
west side and existing bulkhead.
Planned — 2 new timber platforms, roof over one new
platform and 1 existing platform, four floating docks with
10 boat slips and excavation.
(G) Estimated Annual Rate of Erosion: N/A
Source — N/A
7. HABITAT DESCRIPTION:
DREDGED FILLED OTHER
(A) Open Water (docks)
N/A
N/A
7,125Ft2 Incorp.
1,604Ft2 Shaded
(B) Shallow Bottom
5,720 Fe
N/A
N/A
(D) Total Area Disturbed: 12,845ft2
(E) Primary Nursery Area: No
(F) Water Classification: SC Open: No
8. PROJECT SUMMARY: The proposed project is located at the former Captain Bills
Restaurant, which is currently the Southern Salt Seafood Company (701 Evans St). There
is an existing building with a 2,586 sf fixed timber platform along the south side, a 1,049
sf fixed timber platform along the east side and a 144 sf fixed timber platform along
Field Investigative Report
Southern Salt Seafood company
Page 2 of 3
the west side of the existing building. The site does not currently have any slips. The
current proposal is for fixed platform additions (2 roofed), floating platforms, 10 new slip
areas and maintenance excavation within the slip areas. There is no high ground work
proposed through this proposal.
9. Narrative Description
The Southern Salt Seafood Company project is located along the Morehead City
waterfront (designated as urban waterfront area) within the Morehead City Harbor area of
Bogue Sound at 701 Evans Street. The tract is bordered by the Town of Morehead City
"Jibb Landing" to the West and privately owned boat docks to the east (Geer Family).
The Southern Salt property is 18,557 square feet (.42 acres) in its entirety, has a shoreline
length of 117.75' and is an average of 4' above NHW. Presently there is an existing
bulkhead, restaurant and fixed timber decks on and along this tract. There are no coastal
wetlands or high ground vegetation on this tract.
The Morehead City Land Use Plan classifies this property as Downtown Mixed Use, with
all AEC's classified Conservation. This section of the Bogue Sound (Morehead City
Harbor) is not designated as Primary Nursery Area, is closed to the taking of shellfish and
carries a water classification of SC. The historic riparian corridors were determined
through an original permit # 97-05 issued to the adjacent property for the Town of
Morehead city (western riparian corridor) and shall pertain to the Southern Salt proposal
and meet all required setbacks. Substrate in the Morehead City Harbor is mostly sand and
silt. No SAV's or shellfish beds were observed within the proposal project area. There is a
USACOE federal within the project vicinity (app. 385' from existing bulkhead).
10. Proiect Description:
The applicant's current proposal is to add a roof (unenclosed) to the existing timber
platforms to the south and east, maintenance excavate, add 10 new slips, add floating
platforms and add two new fixed landing areas with one of the landings covered.
The applicant is proposing to maintenance excavate within the proposed slip areas. The
dredge footprint would be 52' x 110', has an average depth of -2' nlw and would have a
final depth of -6' nlw. The connecting depths within this area are -8' nlw. A total of 465
cubic yards of sandy/silt material would be removed and trucked or barged to a pre -
approved disposal area. The disposal area would be determined by the marine contractor.
The second portion of the project is the addition of two fixed platform areas. The proposed
fixed platform to the west would be 9.5' x 16.4' and is proposed to be roofed. This area is
an extension of the existing platform and per the applicant would enhance safety within
this area. This new non -water dependent structure would be more than 20' from nhw,
therefore would be inconsistent with the Coastal Resource Commission rules; 15A NCAC
07H .0209 (g)(4)(B)(IV). The second proposed fixed platform is located to the south east
of the existing fixed platform/restaurant and north of the proposed docking facility. The
dimensions would be 16.8' x 21.8' and would be used for a public observation as well as
possible seafood unloading area. This portion of platform would be intended for water
Field Investigation Report
Southern Salt Seafood Company (Capt. Bills)
Page 3 of 3
dependent use and would not be roofed (would meet 15A NCAC 07H.0208 (b)(5)(D)).
The applicant is also proposing the placement of floating platforms for the addition of 10
slip areas (transient in nature). The property currently does not have any designated slip
areas. A gangway would extend from the existing fixed timber platform to the west in a
southerly direction and would intercept a 6' x 38.3' floating finger pier. This would
intercept a second floating finger pier (extends to the east) and would be 6' x 45'. The
third proposed floating finger pier would extend from of # 2 in a southern direction and
would be 6' x 26.5'. The final proposed 6' x 73' floating platform would be shore parallel
and would be located approximately l' landward of the USACOE channel setback. There
would be six side -too parallel slips located inside of the floating platforms with the final
four located on the most southern side of the 73' floating platform. The outer four slips
would be oriented as parallel as well. All portions of the floating platforms (water
dependent) would meet the 27 sf rule (15A NCAC 07H .0208 (b)(5)(D). All portions of
the docking facility would meet the minimum 15' setback from the riparian access lines.
The average existing water depths within the slip areas is an average of -2' at normal low
water. The tidal amplitude within this area is 3'. The total length of the shoreline is
117.8'. The width of the Morehead City Harbor is approximately 535' in this area. The
proposed pier would extend a maximum of 165' waterward of nhw within a 535' wide
waterbody, however there are longer piers adjacent to this site (to the east and west),
therefore the 1/3 distance can be used. The proposed pier would also remain within the
establish pier head length. According to the applicant, the typical boat would be 12' — 23'
with a mixed use open runabout design. The marina policy would prohibit overboard
discharge, no fueling and no overnight or live aboard dockage.
Note:
Any of the proposed roof areas would not cause any impervious surface impacts due to
the project is entirely over estuarine waters.
11. Anticipated Impacts:
The proposed pier and platform would shade 1,604 ftz and incorporate 7,125ft2 of open
waters. The setting of pilings would cause temporary turbidity. There would be no
hindrance to navigation due to the fact that the docking facility would be located a distance
of 1' landward of the USACOE channel setback. The total pier length, which includes the
platform, would be a distance of 165'within a 535' wide waterbody, however there are
longer adjacent piers, therefore the 1/3 distance may be utilized. The proposed docking
facility would also remain within the existing pier head length within this area. All roofed
areas would remain over existing and proposed platform addition, therefore no new
shading impacts would exist. This project has the potential to improve public benefit by
adding additional public access as well as 10 new transient slip areas. The proposed
western covered area is not consistent with the CRC rules [15A NCAC 07H .0209
(g)(4)(B) ff )] because it extends more than 20' waterward of nhw (approximately 80'),
therefore, staff recommends this portion of the project be removed to prevent the entire
project from being denied.
Name: Heather Styron Date: 12/19/16 Morehead City
FIXED TIMBER PLATFORM & FLOATING DOCK
SOUTHERN SALT SEAFOOD COMPANY
MOREHEAD CITY, CARTERET COUNTY, NORTH CAROLINA
PROJECT NARRATIVE
November 17, 2016
INTRODUCTION
The project site is an approximately 0.426 acre site located in of the Town of Morehead City's
corporate limits and is adjacent to the Morehead Harbor Channel. The property currently has
one restaurant located on it, Southern Salt Seafood Company and the property is owned by
Captain Bills Inc. The property currently has three (3) fixed timber platforms on the west, south,
and east sides of the structure. There are currently no dock slips on the property. The
Southern Salt Seafood Company Fixed Timber Platform & Floating Dock project includes the
installation of approximately 574 square feet of fixed timber platform and 1,100 square feet of
floating dock. There are three (4) 6' wide floating docks in lengths of 38'4", 45', 26'6", and 73'.
Ten (10) boat slips are being proposed as part of this project.
EXISTING CONDITIONS
Southern Salt Seafood Company currently has an approximately 2,586 square foot fixed timber
platform on the southern side of the structure. This platform is attached to the structure and to
the approximately 1,049 square foot fixed timber platform on the east side of the structure. An
approximately 144 square foot fixed timber platform is on the west side of the structure adjacent
to the Town of Morehead City fixed timber platform.
PROJECT DESCRIPTION
The existing timber platform that surrounds the structure on the east and south portions is at
approximately 5.0' NAVD88. There are two (2) proposed timber platform additions to this
structure. The first addition is approximately 16'10" x 21'10" and will be located on the south
face of the existing timber platform extending waterward. The second addition will be along the
western portion of the platform and will be approximately 9'5" x 164". Both of these timber
platforms will be at the same elevation as the existing platform and constructed of similar
materials.
RECEIVE
Fixed Timber Platform & Floating Dock November 17, 2016
Major CAMA Permit Application — Narrative NOV 2 2 2016 Page 1 of 3
�� - MHD 01
A roof is proposed over the existing fixed timber platform and the proposed 9'5" x 16'4" fixed
.. timber platform. The roof will follow the existing-building-foof slope -and will not extend beyond
the fixed platform area.
The four (4) floating docks will provide ten (10) boat slips for transient boats. No overnight
dockage will be allowed. All four (4) floating docks will be six (6) feet wide.
Demolition and Removal — The only demolition and removal proposed in this project is the
removal of the existing handrail once construction of the entire platform is constructed.
Excavation — Excavation will be completed within the proposed floating docks location.
Dredging will excavate the existing bottom elevation to approximately -6 feet NAVD88. An
estimated 465 cubic yards will be removed.
Upland Development — There is no Upland Development planned as part of this project.
Stormwater Management — No upland improvements, pavements, walkways or other
impervious surfaces will be constructed as part of the project. No stormwater management or
additional stormwater measures are required for this project.
NAVIGATION CONDITIONS
The federal channel boundary and channel setback run along the entire southern margin of the
project site. The federal channel is 200 feet wide. The channel and setback lines shown on the
drawings were obtained from the Navigation Section, U.S. Army Corps of Engineers,
Wilmington District.
METHODS OF CONSTRUCTION
Construction of the timber platform and floating docks will be by conventional marine
construction equipment including barges and cranes. Excavation will likely be completed by a
barge mounted excavator and disposed of at an upland site determined by the licensed marine
contractor performing the work. The equipment will be onsite only a sufficient time to complete
the excavation, pile driving, platform installation, and floating dock work.
NAV� 2n,c
Fixed Timber Platform & Floating Dock November 17, 2016
Major CAMA Permit Application — Narrative _ Page 2 of 3
PROJECT SCHEDULE
After the required CAMA Major permit is obtained, excavation and construction of the dock
relocation and fixed timber platforms will begin immediately.
COMPLIANCE WITH THE N. C. ENVIRONMENTAL POLICY ACT
The work proposed as part of this application is private development and does not involve
expenditure of public funds. The Regulatory Reform Act of 2011 (SB 781) was passed by North
Carolina Legislature in July 2011. This bill eliminates the requirement for an environmental
assessment (EA) for any project requiring a Major CAMA permit. Therefore, the proposed
project is not subject to N. C. Environmental Policy Act review.
ADJACENT RIPARIAN PROPERTY OWNERS (See Sheet 08)
The Geer Family, LLC Town of Morehead City
105B South 7th Street 706 Arendell Street
Morehead City, NC 28557 Morehead City, NC 28557
NOV 2 2 2016
Fixed Timber Platform & Floating Dock November 17, 2016
Major CAMA Permit Application — Narrative Page 3 of 3
ARENDELL
-
ENGINEERS
'r
_ ��2 CIVIL - COASTAL • ENVIRONMENTAL
105 North 10th Street
Morehead City, North Carolina 28557
(252) 622-4338
N. C. Certification No. C-1509
November 22, 2016
Ms. Heather Styron
N. C. Division of Coastal Management
400 Commerce Avenue
Morehead City, North Carolina 28557
Re: Southern Salt Fixed Timber Platform & Floating Dock
Major CAMA Permit
Morehead City, North Carolina
Dear Heather:
On behalf of Sammy Boyd, Owner & Operator of Southern Salt Seafood Company and Captain Bill's
Inc., property owner, the attached Major CAMA Permit Application for the above referenced project is
submitted for your review and approval. This submittal has been revised since the original submittal on
March 29, 2016.
Thank you very much for your help on this project. Please give me a call if you have questions or need
additional information.
Sincerely,
ARENDELL ENGINEERS
John J. Wade, P.E.
Vice President
Cc: Captain Bill's Inc.
Sammy Boyd
RECEIVED
NOV 2 2 2016
DCIV- MHD CITY
Major CAMA Permit Application
Southern Salt Seafood Company
Fixed Timber Platform & Floating Dock
Town of Morehead City, North Carolina
November 17, 2016
Applicant:
Sammy Boyd
Southern Salt Seafood Company
701 Evans Street
Morehead City, NC 28557
Prepared For:
North Carolina Department of Environmental Quality
Division of Coastal Management
400 Commerce Avenue
Morehead City, NC 28557
Prepared By:
ARENDELL ENGINEERS
105 North 10th Street, Suite 4
Morehead City, North Carolina 28557
(252) 622-4338
NC Certification No. C-1509
NOV 2 2 2016
MAJOR CAMA PERMIT APPLICATION
SOUTHERN SALT SEAFOOD RESTAURANT FIXED TIMBER PLATFORM & FLOATING DOCK
MOREHEAD CITY, CARTERET COUNTY, NORTH CAROLINA
Table of Contents
DCM MP —1 Application for Major Development Permit
DCM MP — 2 Excavation and Fil
DCM MP — 4 Structures
PROJECT NARRATIVE
INTRODUCTION
EXISTING CONDITIONS
PROJECT DESCRIPTION
Demolition and Removal
Excavation
Upland Development
Stormwater Management
NAVIGATION CONDITIONS
METHOD OF CONSTRUCTION
PROJECT SCHEDULE
COMPLIANCE WITH N. C. ENVIRONMENTAL POLICY ACT
ADJACENT RIPARIAN PROPERTY OWNERS
Application Drawings
Sheet 1 —Vicinity Map
Sheet 2 — Existing Conditions
Sheet 3 — Proposed Site Plan
Sheet 4 — Dimension Plan
Sheet 5 — Proposed Dredging Plan
Sheet 6 — Proposed Roof Plan
Sheet 7 — Sections
Sheet 8 — Riparian Property Owners
Deed
Adjacent Property Owner Notification Letters
Property Owner Letter of Approval for Project
Authorized Agent Letter
"VE D
NOV 2 2 2016
DCM- MHD CIS
IN NP -1
NFLICATION for
Major Development pormn
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicantl Landowner Information
Business Name
Southern Salt Seafood Company
Project Name (if applicable)
Fixed Timber Platform & Floating Dock
Applicant 1: First Name
Sammy
Mi
Last Name
Boyd
Applicant 2: First Name
M1
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
701 Evans Street
PO Box
City
Morehead City
State
NIC
ZIP
28557
Country
Phone No.
252 - 342 - 0705 ext.
FAX No.
Street Address (if different from above)
City
State
ZIP
Email
2. AgentlContractor Information
Business Name
Arendell Engineers
Agent/ Contractor 1: First Name
M1
Last Name
John
J
Wade
Agent/ Contractor 2: First Name
Ml
Last Name
Mailing Address
PO Box
City
State
105 North 10th Street, Suite 4
Morehead City
NC
ZIP
Phone No. 1
Phone No. 2
28557
252 - 622 - 4338
ext.
ext.
FAX No.
Contractor #
252 622 4505
C-1509
Street Address (if different from above)
City
State
ZIP
Email
john@arendellengineers.com
R E (U` ED -
<Form continues on back>
NOV 2 2 2015
252-808-2808 :.- 1-888-4RCOAST :: www-ncCoastairnanageme"t.net
Form DCM MP -1 (Page 2 of 5)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple)
Street Address
State Rd. #
Carteret
701 Evans Street
d. Approximate elevation of tract above NHW (normal high water) or
Subdivision Name
City
State
Zip
N/A
Morehead City
NC
28557 -
Phone No.
Lot No. (s) (if many, attach additional page with list)
252 - 342 - 0705 ext.
701, 1 1 ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
White Oak
Morehead Harbor Channel
c. Is the water body identified in (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade ❑Unknown
Bogue Sound
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city limit the proposed
®Yes []No
work falls within.
If yes, by whom?
Town of Morehead City
4. Site Description
a. Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft.)
117.75
18,556.56
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
N/A, I I
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
4' ®NHW or ❑NWL
e. Vegetation on tract
N/A
f. Man-made features and uses now on tract
There is one structure on the tract that extends from a concrete bulkhead beyond Normal High Water. The structure has a
timber deck on the east and west portion of the building and a timber deck on the south face extending channelward. The
structure is currently used as a restaurant.
g. Identify and describe the existing land uses adiacent to the proposed project site.
The two (2) properties adjacent to the property site on the west side is owned by the Town of Morehead City and has a
large timber deck extending waterward from the bulkhead with floating docks channelward of the deck. The property
directly to the east is the 7th Street Extension and may be claimed by the Geer Family Trust and has two boat slips. The
property east of that parcel is owned by the Geer Family, LLC and has three commercial boat slips, a floating dock for
refueling, and small store waterward of the concrete bulkhead.
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
Downtown Business
(Attach zoning compliance certificate, if applicable)
®Yes []No [INA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ®No ❑NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ®No [INA
National Register listed or eligible property?
NPqM
<Form continues on next page>
NOV 2 2 2016
252-808-2808 .. 1-888-4RCAAST :. www.nccoastalmand- t MJA D C Ij
Form DCM MP -1 (Page 3 of 5)
APPLICATION for
Major Development Permit
m. (i) Are there wetlandson the site? ❑Yes ®No
(ii) Are there coastal wetlands on the site?
[]Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ❑No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
Wastewater from the structure on the property is connected to the Town of Morehead City's sewer collection system.
o. Describe existing drinking water supply source.
The structure is served by the Town of Morehead City Water System.
p. Describe existing storm water management or treatment systems.
There is no stormwater management or treatment system on the project site.
5. Activities` and Impacts
a. Will the project be for commercial, public, or private use? ®Commercial ❑Public/Government
❑Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
This project will expand the existing fixed platform used by the restaurant and provide approximately ten (10) boat slips using
floating docks. The boat slips will be transient in nature only.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Proposed construction will be of standard marine construction including barges and cranes. Dredging will likely be
completed by a barge mounted excavator. The equipment will be onsite only a sufficient time to complete the pile driving,
fixed deck installation, and floating dock work.
d. List all development activities you propose.
Project includes installing two (2) fixed timber platforms connected to the existing timber platforms. The first timber platform
is approximately 422 square feet located along the south face of the existing platform and extending waterward. The second
platform is approximately 152 square feet and is located on the western end of the existing fixed timber platform. Four (4)
floating docks are proposed as part of this request, all of which are 6 foot in width. The first floating dock will be
approximately 38'4" in length and connect to the existing timber platform. The second floating dock will be approximately 45
feet in length and run parallel to the existing timber platform. The third floating dock will be approximately 26' 6" and extend
south towards the channel setback line. The final floating dock will be constructed parallel to the channel setback line and
will be approximately 73 feet in length. No piles will be installed within the setback.
e. Are the proposed activities maintenance of an existing project, new work, or both? New Work
f. What is the approximate total disturbed land area resulting from the proposed project? N/A Project is entirely waterward of
NHW ❑Sq.Ft or []Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ®Yes ❑No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
Proposed Discharges - No new discharges will result from this project. NOV 2 2 2016
t,
i. Will wastewater or stormwater be discharged into a wetland? ❑Yes A
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ❑NA
252-808-2808 .. 1-888-4RCOAST ., www. nccoastaImanagement. net
Form DCM MP -1 (Page 4 of 5) APPLICATION for
Major Development Permit
j. Is there any mitigation proposed? ❑Yes ®No [INA
If yes, attach a mitigation proposal.
<Form continues on back>
6.. Additional Information
In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application
package to be complete. "Items (6) — (t) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name The Geer Family, LLC.,Phone No.
Address 105B South711 Street, Morehead City, NC 28557
Name Town of Morehead City Phone No.
Address 706 Arendell Street, Morehead City, NC 28557
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further
certify that the%i ff rmation provided in this application is truthful to the best of my knowledge.
Date [ � � �� / t/ Print Name Sammy Bo
ECEIVED
Signature
NOV 2 2 2016
Please indicate application attachments pertaining to your proposed project.
®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts M H D C IT
252-808-2808 .. 1-888-4RCOASY :: www. nccoasta[management.net
Form DCM MP -1 (Page 5 of 5)
❑DCM MP -3 Upland Development
SDCM MP -4 Structures Information
APPLICATION for
Major Development Permit
NOV 2 2 2016
WON, w
252-808-2808 :: 1-888-4RCOAST :: www-nccoasta Imanagernent. net
Form DCM MP -2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access
EXCAVATION
0, This section not applicable
a.
Amount of material to be excavated from below NHW or NWL in
Other
Type of material to be excavated.
Channel
Canal
Boat Basin
Boat Ramp
Rock Groin
Rock
(excluding
(NLW or
(i) Does the area to be excavated include coastal wetlands/marsh
d.
High -ground excavation in cubic yards.
Breakwater
shoreline
0
NWL)
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
stabilization)
❑CW ❑SAV ❑SB
OWL ®None
Length
(ii) Describe the purpose of the excavation in these areas:
—52'
To create a continuous boat basin.
Width
2.
—110'
❑This section not applicable
a.
Location of disposal area.
Avg. Existing
Dimensions of disposal area.
-2 ft
NA
NA
(i) Do you claim title to disposal area?
Depth
(i) Will a disposal area be available for future maintenance?
❑Yes []No ®NA
❑Yes ®No [INA
(ii) If no, attach a letter granting permission from the owner.
Final Project
(ii) If yes, where?
e.
(i) Does the disposal area include any coastal wetlands/marsh
f.
(i) Does the disposal include any area in the water?
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
Depth
❑Yes ❑No ®NA
-6 ft
NA
NA
number of square feet affected.
1.
EXCAVATION
0, This section not applicable
a.
Amount of material to be excavated from below NHW or NWL in
b.
Type of material to be excavated.
cubic yards.
Mostly Sand
465 CY below NHW
c.
(i) Does the area to be excavated include coastal wetlands/marsh
d.
High -ground excavation in cubic yards.
(CW) submerged aquatic vegetation (SAV), shell bottom (SB),
0
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(ii) Describe the purpose of the excavation in these areas:
To create a continuous boat basin.
2.
DISPOSAL OF EXCAVATED MATERIAL
❑This section not applicable
a.
Location of disposal area.
b.
Dimensions of disposal area.
To be determined by the licensed marine contractor.
To be determined by the licensed marine contractor.
c.
(i) Do you claim title to disposal area?
d.
(i) Will a disposal area be available for future maintenance?
❑Yes []No ®NA
❑Yes ®No [INA
(ii) If no, attach a letter granting permission from the owner.
(ii) If yes, where?
e.
(i) Does the disposal area include any coastal wetlands/marsh
f.
(i) Does the disposal include any area in the water?
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
❑Yes ❑No ®NA
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
(ii) If yes, how much water area is affected?
❑CW ❑SAV ❑SB
RECEIVED
❑WL ®None
(ii) Describe the purpose of disposal in these areas:
NOV 2 2 2016
HD CITY
252-808-2808 :: 1-888-4RCOAST :a www.nccoastaimanagement.net revised: 12/26/06
Form DCM MP -2 (Excavation and Fill, Page 2 of 2)
3. SHORELINE STABILIZATION ®This section not applicable
(If development is a wood groin, use MP -4 — Structures)
a. 1 yNo Ui anUicmic sidowcduon. D. . Lengtn:
❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other:
Width:
c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL:
e. Type of stabilization material:
g. Number of square feet of fill to be placed below water level
Bulkhead backfill Riprap
Breakwater/Sill Other
i. Source of fill material.
f. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes ❑No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
4. OTHER FILL ACTIVITIES ®This section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? ❑Yes ❑No ❑NA b. (i) Will fill material be Dlaced in coastal wetland -,/marsh rMnn
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL ❑None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
To be determined by the licensed marine contractor. To be determined by the licensed marine contractor.
c. (i) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
d. (i) Will wetlands be crossed in transporting equipment to project
site? ❑Yes ®No ❑NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
V
252-808-2808 :: 1-BSS-4RCO ST :: vvvvvu.nccoastalrnanagernent.net revised: 12/26/06
Form DCM MP -4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA.CHARACTERISTICS 0This section not applicable
a. (i) Is the docking facility/marina:
®Commercial ❑Public/Government ❑Private/Community
c. (i) Dock(s) and/or pier(s)
(ii) Number 4
(iii) Length (1) 38'4". (2) 45' (3) 26'6". (4) 73'
(iv) Width1( 4) 6'
(v) Floating ®Yes []No
e. (i) Are Platforms included? ®Yes []No
If yes:
(ii) Number 2
(iii) Length (1) 164", (2) 21' 10"
(iv) Width (1) 9'5". (2) 16' 10"
(v) Floating ❑Yes ®No
Note: Roofed areas are calculated from dripline dimensions.
g. (i) Number of slips proposed
10
(ii) Number of slips existing
0
i. Check the proposed type of siting:
❑ Land cut and access channel
®Open water; dredging for basin and/or channel
❑Open water; no dredging required
❑Other; please describe:
k• Typical boat length: 12'- 23'
m. (i) Will the facility have tie pilings?
❑Yes ®No
(ii) If yes number of tie pilings?
b. (i) Will the facility be open to the general public?
®Yes []No
d. (i) Are Finger Piers included? ❑Yes ®No
If yes:
(ii) Number
(iii) Length
(iv) Width
(v) Floating []Yes ❑No
f. (i) Are Boatlifts included? []Yes ®No
If yes:
(ii) Number
(iii) Length
(iv) Width
h. Check all the types of services to be provided.
❑ Full service, including travel lift and/or rail, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
® Dockage ("wet slips") only, number of slips: 10
❑ Dry storage; number of boats:
❑ Boat ramp(s); number of boat ramps:
® Other, please describe:
Transient slips, no overnight dockage
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
Mixed types
I. (i) Will the facility be open to the general public?
®Yes [:]No
RECEIVED
NOV 2 2 2016
DCM- MHD CITY
252-808-2808 :: 1-888-4RC®AST :: www.nccoastaimanagement.net revised: 12/27/06
2. DOCKING FACILITYIMARINA OPERATIONS 0 This section not app�iqable
a. Check each of the following sanitary facilities that will be included in the proposed project.
OOffice Toilets
LJToilets for patrons; Number: ____; Location: N/A
El Showers
UBoatholding tankpumpout; Give type and location: N/A
u. Describe treatment type and disposal location for all sanitary wastewater.
There will be no sanitary wastewater disposal allowed.
u Describe the disposal ofsolid waste, fish offal and trash.
Trash receptacles will be located onthe existing fixed timber platform for solid waste and trash only. There will be no disposal
of fish offal allowed. '
d. How will overboard discharge ofsewage from boats becontrolled?
Overboard discharge cfsewage will not beallowed.
o. (i) Give the location and number of"No Sewage Discharge" signs proposed.
N/A
(ii)Give the location and number of^PumpoutAvailable" signs proposed.
N/A
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
N/A
o. Where will residue from vessel maintenance uodisposed of?
NIA
». Give the number ofchannel markers and "No Wake" signs proposed. N/8
i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
N/A
j. What will bethe marina policy onovernight and live -aboard dockage?
The slips proposed will bntransient innature only. Noovernight orlive-aboard docking will bepermitted.
— --------'"''-------`'—^~'~^~~~~~`~~~^'^~~^^'y'
mx~
1. If this project is an expansion of an existing marina, what types of services are currently provided? R���K����
�� Q���O�U�0���NOV 2 2 201
0CM~ MHD CFFY
252-808-2808::1-888-4RCOAST:: www.nccoastaimana-gement.net revised: 12127/06
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
[]Yes ®No
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
❑Yes ®No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
p. Is the proposed marinaldocking facility located within or within close proximity to any shellfish leases? ❑Yes ®No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3, BOATHOUSE (including covered lifts)
This section not applicable
a. (i) Is the boathouse structure(s):
❑Commercial ❑Public/Government ❑Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) This section not applicable
a• (i) Number
(ii) Length
(iii) Width
5, BREAKWATER (e.g. wood, sheetpile, etc..) 0This section not applicable
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS0 This section not applicable
a. Is the structure(s): b. Number
❑Commercial ❑Public/Government ❑Private/Community
C. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.)
Note: This should be measured from marsh edge, if present.
e. Arc of the swing I t
7. GENERAL NOV-2,22016
DCM- MHD I .v
252-808-2808 :: 1-888-4RC®ASY :: wrww.necoastalmanagement.net revised: 12/27/06
a. Proximity of structure(s) to adjacent riparian property lines
There will be no construction within the 15' riparian setback
on either side of the property.
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body
535.6'
e. (i) Will navigational aids be required as a result of the project?
❑Yes ®No [INA
(ii) If yes, explain what type and how they will be implemented.
b. Proximity of structure(s) to adjacent docking facilities.
Proposed 16'10"x21'10" fixed timber platform will extend
from the existing fixed timber platform on the east side of
the structure and will not be located within the 15' riparian
setback. The proposed 9'5"' x 16'4" fixed timber platform
will be located on the west side of the existing platform and
will not be located within the 15' riparian setback. See
Sheet 03 for clarification.
d. Water depth at waterward end of structure at NLW or NWL
-8' NAVD88
t. OTHER ❑This section not applca
a. Give complete description:
The Fixed Timber Platform and Floating Dock project includes the installation of approximately 574 square feet of fixed timber
platforms which will be an extension of the current fixed timber platforms. Also included as part of this project is the
installation of four (4) floating docks set behind the channel setback line. Ten boat slips are proposed as part of this project.
These slips will be transient in nature and no overnight dockage will be allowed.
;ant Signature( l
NOV 2 2 2016
252-808-2808 :: 7-888-4RCOAST :: www.necoastalmanagement.net revised: 72/27/08
Date
Fixed Timber Platform & Floating Dock
Project Name
Sammy Boyd
Applicant Name
;ant Signature( l
NOV 2 2 2016
252-808-2808 :: 7-888-4RCOAST :: www.necoastalmanagement.net revised: 72/27/08
LENOIR r- r CRAVEN
DUPLIN
PENDER
�"O rr--,
HIGHWAY 70
JONES
ONSLOW
PAMLICO
CARTERET COUNTY
AREA OF INTEREST
RECEIVED
NOV 2 2 2016
NEWPORT a
- C h
,-�_
RIVER
. _ ��
s s a ' TOBEAU FORT `.
Spi s r
Chi ney ao g A an
Caole
—
! Towers Yf'
PROJECT LOCATION
•
,TRACoAsort Terminal
rA� tseacona ?� I ..,fir l' I RADIO
o Beacon
MIS
o light WATER �J light 1. ¢.. ISLAND \ai
WAY 0-0* %' Ism eIf iiadfa.,
Dolph' s 0
U E BOGUE SOUND N,C, STATE PORT l� �9G '` f3
T '
' s
i coW
w
I � � I � I .—• � I I �
i- —i
EVANS STREET
NHW/NLW AT
(— ——•—._._._ BULKHEAD
I j T• •—•_.-� -�
I T�
I ,
I j �•L•
t
I ; � • � g��QP � ; 4
� T
L N/F ' —I
TOWN OF ; I
MOREHEAD" —i I
CITY I
I u �,�,,I•. I
I
I �I
I II
I II
� II
L... _...
EX. BULKHEAD WITH
CONCRETE CAP
30.0'
--
F�-
',
t
"I SES ,
HARBOR CHANNEL
BOGUE SOUND
FEDERAL
CHANNEL LINE
( CD =------------ -----
EX. TIMBER EX. FLOATING
PLATFORM DOCK
\ 200.0'
535.6'
DECEIVED
NOV 2 2 2016
SUGARLOAF ISLAND
ARENDELL
PROJECTTITLE.-
PREPARED FOR:
DRAWING TITLE
SCALE
r=loo
SHEET#.
'TAIN
o
THE GEER I I
S INC.
FAMILY LLC.-
.evT6tW s,.,..nn611fg —
105 NORTH 10th STREET, SUITE 4
MOREHEAD CITY, NC 2855/
PHONE:
wUgl
,t I
EXISTING CONDITIONS
� w �
U)LL-
t
: ; y.
(252)622338701
SEAFOOD COMPANY
30.0'
--
F�-
',
t
"I SES ,
HARBOR CHANNEL
BOGUE SOUND
FEDERAL
CHANNEL LINE
( CD =------------ -----
EX. TIMBER EX. FLOATING
PLATFORM DOCK
\ 200.0'
535.6'
DECEIVED
NOV 2 2 2016
SUGARLOAF ISLAND
ARENDELL
PROJECTTITLE.-
PREPARED FOR:
DRAWING TITLE
SCALE
r=loo
SHEET#.
ENGINEERS
.evT6tW s,.,..nn611fg —
105 NORTH 10th STREET, SUITE 4
MOREHEAD CITY, NC 2855/
PHONE:
SOUTHERN SALT
SAMMY BOYD
EVANS STREET
EXISTING CONDITIONS
DATE:
11/17116
DRAWN BY:
L
0 w
(252)622338701
SEAFOOD COMPANY
djw
FAX (252)622-0505
MOREHEAD CITY, NC 28557
wxw.erendeGengineers.com
N.C. CertUi llon No. C-1509
PROJECT tE
15103
�I
EX. TIMBER I
PLATFORM
I
I I II
. I I
I I
TOWN OF I I I
MOREHEAD I �I
CITY DECK i I
i --
N/F GANGWAY
TOWN OF
MOREHEAD r,-
OI
CITY
\ � I
\ 15' RIPARIAN
SETBACK I
CONCRETE
BULKHEAD NHW/NLW AT FACE
OF BULKHEAD
F --B I EX. FLOATING
I
I DOCK
I
I
3J 15' RIPARIAN /
SETBACK
10 FEDERAL
CHANNEL
q SETBACK LINE
FEDERAL
CHANNEL LINE
r TOWN OF MOREHEAD
CITY FLOATING DOCK
PROPOSED PLATFORM
O SLIP NUMBER
NOV 2 2 2016
NOTE:
CONTOUR ELEVATIONS
RELATIVE TO NAVD88 DATUM.
ARENDELL PROJECT TITLE: PREPARED FOR: DRAWING TITLE: 1._40' SHEET"
ENGINEERS
.nw. tn...•......xos.v.,.. DATE:
105 NORTH 10th STREET, SUITE4 SAMMY BOYD 11117116 O V
ww
MOREHM CITY, NC 28551 SOUTHERN SALT PROPOSED 3
PHONE: (252)622-338
SEAFOOD COMPANY Jew
FAX: (252)622-4505 MOREHEAD CITY, 701 EVANS STREET NC 28557 SITE PLAN DRAYMDY:
wmndebngine m=PROJECTN
N.C, Cer8fica8on No. CA509 15103
I
i z
I g
Zm�
w
I W�� I
W U
d LL
I
N/F
LL
= } w
CAPTAIN
u
I zLu
BILL'S INC.
/
I I
N/F
I� EX. TIMBER THE GEER
FAMILY LLC
PLATFORM
I I
I •
F --B I EX. FLOATING
I
I DOCK
I
I
3J 15' RIPARIAN /
SETBACK
10 FEDERAL
CHANNEL
q SETBACK LINE
FEDERAL
CHANNEL LINE
r TOWN OF MOREHEAD
CITY FLOATING DOCK
PROPOSED PLATFORM
O SLIP NUMBER
NOV 2 2 2016
NOTE:
CONTOUR ELEVATIONS
RELATIVE TO NAVD88 DATUM.
ARENDELL PROJECT TITLE: PREPARED FOR: DRAWING TITLE: 1._40' SHEET"
ENGINEERS
.nw. tn...•......xos.v.,.. DATE:
105 NORTH 10th STREET, SUITE4 SAMMY BOYD 11117116 O V
ww
MOREHM CITY, NC 28551 SOUTHERN SALT PROPOSED 3
PHONE: (252)622-338
SEAFOOD COMPANY Jew
FAX: (252)622-4505 MOREHEAD CITY, 701 EVANS STREET NC 28557 SITE PLAN DRAYMDY:
wmndebngine m=PROJECTN
N.C, Cer8fica8on No. CA509 15103
/
/A
NIF
r II CAPTAIN
I I BILL'S INC.
I
• I I
I I II
I 91'5111 I
I � I -F
16'4"
NIF I
TOWN OF
�'� 38r 4n -7-
� i
MOREHEAD I 16' 10" ---f
CITY -` L
6.0'I 45.0'
I I
I z
I 0
z I
I Lu 10
wu�
WJE
Ili I
Lu
lQ
Lu
ILu
zL
I
I II NIF
THE GEER
I FAMILY LLC
I� EX. FIXED
TIMBER PLATFORM
I
I ,
I I
115' RIPARIAN
I SETBACK
_ 1
I
21'10"
\\\ 15' RIPARIAN 26'6"
\ \� ,-SETBACK
I 6.0
\\ \ 1 73
AA R E N D E LL PROJECT TITLE: PREPARED FOR: DRAWING TITLE:
ENGINEERS
105 NORTH 10th STREET, i'61W * SAMMY BOYD
MOREHEAD CITY, NC 28557 SOUTHERN SALT
PHONE: (252)622338 701 EVANS STREET DIMENSION PLAN FAX: (252)62&4505 SEAFOOD COMPANY MOREHEAD CITY, NC 28557
www.arem d.nglm.m Som
N.C. Car60cation No. C -15M
RECEIVEDMll "t
PROPOSED PLATFORM
NOV 2 2 2016
MHDj R
SCALESHEET#
1^=40'
04
DATE
11,17I16
DRAWN BY:
JJW
PROJECT #.
15103
I I
' I I
I ,
NIF
TOWN OF
MOREHEAD
CITY
DREDGING AREA
DREDGE TO -6' NAVD88 2
DATUM CONVERSION GRAPH
BEAUFORT DATUM
3.25'
NOV 2 2 2016 2.07'
NOTE:
CONTOUR ELEVATIONS
0' 40' 80, RELATIVE TO NAVD88 DATUM.
0.00'
1.18' MHW
0.00' NAVD88
-2.07' MLLW
ARENDELL PROJECT TITLE: PREPARED FOR: DRAWING TIME. SCALE 1. SKEET#
ENGINEERS
,Nu <wr.,a. E ,.ne,,,,,.. DATE:
105 NORTH 70th STREET, SUffE 4 SAMMY BOYO 11117/16 G
MOREHEAD CITY, NC 2857 SOUTHERN SALT 701 EVANS STREET PROPOSED DRAwN6Y: OJ
PHONE: (252)622-M SEAFOOD COMPANY DREDGING PLAN ij'
FAX (252)62&4505 MOREHEAD CITY, NC 28557
w ..m ndolkrgimers.wm PROJECT#
N.C. CeN(MatloA No. C-7509
15103
I
z
o
I Wm_
NI
Loy�
W U
P�wLL I
NIF
i gym•- w
CAPTAIN
u-
I z C
BILL'S INC.
NIF
I THE GEER
FAMILY LLC
I I
I
I
I
I .
I� EXISTING FIXED
TIMBER DECK
PROPOSED FIXED
TIMBER DECK
_PROPOSED
FLOATING DOCK
DATUM CONVERSION GRAPH
BEAUFORT DATUM
3.25'
NOV 2 2 2016 2.07'
NOTE:
CONTOUR ELEVATIONS
0' 40' 80, RELATIVE TO NAVD88 DATUM.
0.00'
1.18' MHW
0.00' NAVD88
-2.07' MLLW
ARENDELL PROJECT TITLE: PREPARED FOR: DRAWING TIME. SCALE 1. SKEET#
ENGINEERS
,Nu <wr.,a. E ,.ne,,,,,.. DATE:
105 NORTH 70th STREET, SUffE 4 SAMMY BOYO 11117/16 G
MOREHEAD CITY, NC 2857 SOUTHERN SALT 701 EVANS STREET PROPOSED DRAwN6Y: OJ
PHONE: (252)622-M SEAFOOD COMPANY DREDGING PLAN ij'
FAX (252)62&4505 MOREHEAD CITY, NC 28557
w ..m ndolkrgimers.wm PROJECT#
N.C. CeN(MatloA No. C-7509
15103
I I
I I II
I I
I I
N/F I i II
TOWN OF
MOREHEAD
CITY
I
\
I I
- -r
N/F
CAPTAIN
BILL'S INC.
® PROPOSED ROOF AREA
r------- -
IN/F
THE GEER
EX. TIMBER FAMILY LLC
PLATFORM I
FEDERAL
CHANNEL
SETBACK LINE
FEDERAL
CHANNEL LINE
f�a
NOV 2 2 2016
NOTE: ROOFED AREAS WILL
NOT EXTEND BEYOND THE
FIXED PLATFORM AREA.
AA R E N D E L L PROJECT TITLE PREPARED FOR: DRAWING TITLE: SCALE:1'=40' SKEF a
ENGINEE€2S
105NORTHionsi 18UrrE41 SAMMYBOYD DAT 11/17/16 c
MOREHEAD CITY, NC28V SOUTHERN SALT 701 EVANS STREET PROPOSED OV
PHONE: (252) 622-338 DRAWN BY.
FAX: (252)622-0505 SEAFOOD COMPANY ROOF PLAN iiw
MOREHEAD CITY, NC 28557
www.arerMeNenglrreers.com RaoaECTn 15103
N.C. Car86oa0on No. C-1509
PROPOSED 6'X 45'
FLOATING DOCK
EXISTING PILES, __Zit
DEPTH UNKNOWN
PROPOSED PILES,
TYPICAL
PROPOSED 6'X 83'
FLOATING DOCK
L PROPOSED 6'X 26'6"
FLOATING DOCK
SECTION A -A
SCALE: 1" = 20'
ROOF STRUCTURE TO PROP. 9'5" X 16'4"
MATCH EX. ROOF FIXED TIMBER
I OF BUILDING PLATFORM
EXISTING FIXED
BUILDING TIMBER PLATFORM
EXTERIOR
PROPOSED 6'X 46'
K. FLOATING ACCESS DOCK
EXISTING FIXED
PR OSE
TIMBER PLATFORM GAI GWAY
EXISTING PILES, PROPOSED 6'X 38'4"
DEPTH UNKNOWN FLOATING ACESS
DOCK
SECTION B -B
SCALE: 1" = 20'
m
/ym q m w' 34
-jw
wz
o�
UJ
wz z
w
ROOF STRUCTURE TO
(7 O
z
z J
Q
J
w
MATCH EX. ROOF
z
PROPOSED a
z
OF BUILDING
a
Lu af
16'10" X 21'10" FIXED w
Q
z
00 mTIMBER
PLATFORM "'
EXISTING FIXED
~
TIMBER PLATFORM
n
n n
PROPOSED 6'X 45'
FLOATING DOCK
EXISTING PILES, __Zit
DEPTH UNKNOWN
PROPOSED PILES,
TYPICAL
PROPOSED 6'X 83'
FLOATING DOCK
L PROPOSED 6'X 26'6"
FLOATING DOCK
SECTION A -A
SCALE: 1" = 20'
ROOF STRUCTURE TO PROP. 9'5" X 16'4"
MATCH EX. ROOF FIXED TIMBER
I OF BUILDING PLATFORM
EXISTING FIXED
BUILDING TIMBER PLATFORM
EXTERIOR
PROPOSED 6'X 46'
K. FLOATING ACCESS DOCK
EXISTING FIXED
PR OSE
TIMBER PLATFORM GAI GWAY
EXISTING PILES, PROPOSED 6'X 38'4"
DEPTH UNKNOWN FLOATING ACESS
DOCK
SECTION B -B
SCALE: 1" = 20'
m
/ym q m w' 34
-jw
wz
w
z
Z
<
J J
U w
=
U
z
H
w =
U U
PROPOSED 6' X 73'
FLOATING DOCK
PROPOSED 6'X 26'6"
FLOATING ACCESS DOCK
...oO. 01
:IT 124
I T - --��-• �
I /I/
f"
I
L / / N/F I I
t
--------
- I
. — • — .
------
L- ------
II--------r------i
Z
O
'T----
_
u ((
I---
N/F j
IF
TOWN OF
I
II
MOREHEAD CITY
w a i
FAMILYLLCI
I
F5mLj
I
- -------
I
.
j =
f– —•—.J
jco
`) II
I
II i
� II i
l l II
j1 j
I
—•
---.—•—i L. I I
I
I I
JL.
EVANS STREET
I II
I T - --��-• �
I /I/
f"
I
L / / N/F I I
t
--------
- I
. — • — .
------
L- ------
II--------r------i
Z
O
'T----
_
u ((
z >. I- -
'L m n I
N/F j
IF
TOWN OF
SIN� w
THE GEER ' I
MOREHEAD CITY
w a i
FAMILYLLCI
I
F5mLj
I
- -------
>- 2E
SII
"
- ; TOWN OF I z ^ w I
' MOREHEAD =f f -t ---
------
� •r
CITY ------------ 1� -
N/F
NOAH, FRANCIS
SWANSON
cNPNN0),
FE��RP K�\N� i FENPNN���\N
HARBOR CHANNEL
BOGUE SOUND
FEDERAL
CHANNEL LINE
NOV 2 2 2016
D- MHD1
A ARENDELL PROJECT TITLE: PREPARED FOR: DRAWING TITLE: SCALE. 1,
=100' SHEET#
ENGINEER
105 NORTH 10th STREET SURE 4DATE:
MOREHEAD CIN, NC 26557 SOUTHERN SALT SAMMY BOYD 11117/16 RIPARIAN PROPERTY
A
PHONE: (252) 622-338 701 EVANS STREET DRAWN 61":
PAX: (252)622-4505 SEAFOOD COMPANY OWNERS JJW
www.a daffMgiaeeracwn MOREHEAD CITY, NC 28557 PROJECT#
N.C. Certification No. C-1509
15103