Loading...
HomeMy WebLinkAbout20050101 Ver 1_More Info Received_20060723nt r _ ?? ? 1.? tssvā‚¬ d , . ?? WAKE , COUNTY NORTH CAROU NA r COUNT'S OF WAKE ?Z: RALEIGH, NORTH CAROLINA . ` `1111a.ke County Planning Subdivision Administration Telephone (919) 856-6219 f Subd.iuision Construction Plan Report ^?/ 4 To: Torres & Cnvssen Engineering. Fax 387-3315 i Sut j+?ct: r4eaclowoad (S-27-04) h xX Approved with the following conditions or modifications on May 6, 2t?51 By .Andrtew .Meaditiell - Tfre frllowi q issues mrst all be J, resolved prior to tcdrd plat approval: M Proliact is shown es..being 2 phases, and have reviewed as so. l ]f co nstruction plan is approVed as presented( ownertdeveloper will need to have both. phases recorded prior to..T-23,os). ¦ AKA ac?tfjtivn , . ?ott?.to?tt???arlte?+ Cartt?rt?et y , tq. tte _ Currently the Rt?t1f extends "ta this property but the road ends short of the buffer to the east. Wft ?1 eed ?ta?'olt'xst ., #??. if If constructl[6 of the road Is not -possible written documentation must be a bmltte.d from ,D11 Cj denying the crossing or ,a fee. In lieu may be paid to cover the cast of the crossing, A change to. the street from a stub tti a cukde-sac would require modification to the preliminary plan.: ¦ DVVQ approval is required. for actlvity within buffer areas and wetland areas., please provide. Al Verify with Parks and Recreation the location and label. area of conservation greenway easement. This needs to be labeled on all subsequent plains, ?! Please ensure the following requirements are met: f t t Make County community water systems shall meet the following minllt ums over and alcove state Requirements. bi a s .".ice } . r ar ii4e except for the last four hpndred (r?QQ) feet of a +GUl-de=sac, in which cases the water main shall be four (4) inches in diameter or larger. Lines shall be made ??f NS:F approved ? s nd ? 't nd t .0900 AVVW.A plastic pipa of duo#afe iron. A11 mans shall have at least thirty-s.ix . (36) inches of cover over them. All water main valves shall be. cast iron bronze fitted AlNWA G600-71 or. equal and shall have a; cast iron valve box extending to the surface. All services shall be at least` a/a Inc. single :service or 1=inch if a double service.. Service Ones sh* 11 be type K 'copp+ar, cts,. polyethylene, or equal made specifically for.this service. All services shalFbe connected to the main .lay.e corporation cock threaded into the pipe if ductile or cast iron or by saddle if other pipe .is used. Each service skull have a curb s#op, meter and meter box. All fittings sha11 be :caist or ductile iron; no glued fittings or pipe will be allowed on mains or services. "`t?llrri _ . ' w q ddcpb ¦ Make sure MC DWNR is In the process of approving water system.. s : Make `sure that NCDOT hassevieWed plans as noon as possible to prevent any delays or redesigns that they may require. 0 :.Sediment and erosion control approval Is required and impervious-surface requirements will be .met per Erosion, Flood.and Stormwater reviewer's standards. Note., An approved construction plan remains valid for a period of twenty- f6u.rmonths during which the subdivider may begin to .i.nstatl.the roads, utilities and other Improvements in accordance with the approved construction plan and requirements of other. State and local laws,111 t 1 l7:-j A, tWelveRmontl extension of the preliminary .plat's approval.rrmay be granted If requested in Writing prior`to the end of the two-year approval period; Plan Will expire July 23, 2006. Review of constructions plan does not mOn that subdivision I name o roam* ave bean reviewed for approval. Please submit applications for these reviews to the appropriate, groups. SubdiVision no