HomeMy WebLinkAbout20052146 Ver 5_Time Ext Request_20161116Coastal Amenities Unlimited, LLC
131 Ocean Boulevard West
Holden Beach, NC 28462 NOV
Liz Hair 2016
Department of the Amy 4 1 T -_-TER -R
Wilmington District, Corps of Engineers Bupper� �, S0(Tr?—C
69 Darlington Avenue
Wilmington, NC 28403
Re: USACE Individual Permit, Action ID: SAW 2005-00777
SeaWatch at Sunset Harbor Subdivision & Marina
Brunswick County, North Carolina
Dear Liz:
On behalf of Coastal Amenities Unlimited LLC, I am requesting an extension of USACE
Individual Permit, Action ID: SAW 2005-00777, for the construction of the SeaWatch at Sunset
Harbor (Yellow Banks) Subdivision and Marina. The permit was issued on October 27, 2011
and expires on December 15, 2016. When the permit was issued, all impacts for build out of the
Project were required to be Permitted with the understanding that development of the
approximately 1300 acre project was estimated to take several decades to develop. The
recession resulted in a delay in beginning construction. In accordance with General Condition 6,
which states "Extensions. General condition I establishes a time limit for the completion ofthe
activity authorized by this permit, unless there are circumstances rth
completion of the authorized activity or a reevaluation of the public
either a prompt
ic interest decision, the Corps
will normally give favorable consideration to a request for an extension of this time limit," the
Permittee is requesting a minimum of a five year extension.
The CAMA Major Permit 06-10 was renewed on January 5, 2016. A copy of the renewal is
enclosed.
The Permit includes a phased mitigation plan. Mitigation credits for Phase I non -riparian
impacts were Purchased from the Stone Farm Mitigation Bank in March of 2010. A copy of the
receipt can be found in your file. At the time the permit w issued, it was e Corps preference
that the Stone Farm Mitigation Bank be used; as th
however, Stone Farm did not have riparian
wetland and stream credits available. Credits are available now. Please see the enclosed
mitigation request form and email from Nancy Strickland. She will provide an acceptance letter
if needed, but the mitigation will be requested and purchased prior to each Phase as originally
proposed.
No construction Or wetland and stream impacts authorized by the USACE Individual Permit
have taken place. We are in the process of securing the final permits for construction of Pha
13A within the subject subdivision. There are no impacts to w tlands or streams within s
phase, and no construction is proposed within the AF -C. There are no proposed changes at th,
time to the project as permitted. C. thi ri
1
It is our understanding that the JD remains valid for the project as long as the permit is vali
Please let me know if there is anything that I need to do concerning the JD. I
If you have any questions concerning this request, please call me at (910) 470-1940 or email me
at Please copy me on all written correspondence. My mailing address i i
119 Scotch Bonnet Drive, Holden Beach, NC 2 8462.
•' vouL#'r
Sincerely,
fa4z4 •
Noelle Lutheran, Project Manager
Enclosures: LAMA Major 6-10
Stone Farm Mitigation Request Form & Emails
C c: Jennifer Burdette, NCDEQ 40 1 /Buffer Coordinator
for
Major Development in an Area of Environmental Concern
pursuant to NCGS I I 3A- 118
_X_ Excavation and/or filling pursuant to NCGS 113 -229
Permit Number
06-10
Issued to Coastal Communities Inc , 131 Ocean Blvd Ocean Isle each NC 28462
Authorizing development in Brunswick County at adjacent to the AIWW near Lockwoods
FoilEiver�earuiv as requested in the permittee's application dated letter dated received at
CM forehead City 12/9/15.
This permit, issued on
with the permit), all applicabl is subject to compliance with the ap . plication (where consistent
e regulations, special conditions and notes set forth below. An
, III IIIII IIIII IIII IIIIIIIIIII
and copies of all documents shall be readily available on site when a Division representative in
This renewal shall be attached to Permit No. 06-10, which was issued to the Permittee on 1/22/10,
the project for compliance. ins
2) All conditions and stipulations of the active Permit remain in force under this renewal.
NLO _TE, A Permit renewal application processing fee of $100 was received by DCM for this project.
This Permit action may be appealed by the permittee or Signed by the authority of the Secretary
other qualified persons within twenty (20) days of the issuing
date. Chairman of the Coastal Resources Commissof DEQ and the
This Permit must be accessible on-site to Department
Personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires f=her Division approval.
All work must cease wk&ii I F
December3l. 2017
In issuing this permit, the State of North Carolina agrees
that Your project is consistent with the North CaroMmolnM
Management Program.
Braxton C. Davis, Director
-.7 Division of Coastal Management
This permit and its conditi,#,T,.,—, W
STONE FARM MITIGATION CREDIT REQUEST FORM
I (Updated October 2011 )
Print this form, fill in requested information, sign and date, and either
mail to: Stone Farm Mitigation Bank or email to: nancy@dwenterprises,net
Attn: Nancy McKain Strickland
2618 New Village Way
Wilmington, NC 28405
i. Fwnlumber
E -Mail Address A (optional) nILitheran@gmail.com
i'ROJECT INFORMATION
Project Nam
-,.f'} 111 at Sunset Harbor
(Jak Island ETJ and Bolivia
0. Lat-Long Coordinates (optional)
......................
4_:Pr_0j_ectCou'nty
2. River Basin
L uwmn er
PAbIll N _F6RkA_h &__
61
T
Stream Impact: Warm only
M
Amount of C
Requested
0 -0i1 --•
Signature of Applicant or Agent:
Date:
Note I:- For help in determining the Cataloging Unit, go to ePA's "Surf Your Watershed"
web page:
Note 2: Please contact Nancy McKain Strickland v0th questions at (910) 251-8543 or nancyQdwenterprises. net
Note that the USAC,E Individual Permit approves a phased mitigation Dian.
&WAI AM
I 100MR4101
NQ MA&IM, M a
11/1012016 Gntail - Stone Ferro Mitigation Credit Request Form
Stone Farm Mitigation Credit Request Form
ilancy <nancy@dwenterprises.net>
To., Noelle Lutheran <nlutheran@grnail.corn>
Noelle — Stone Farm does have the credits available. They are still available at.17
2M
From: Noelle Lutheran fmaflto:,,�
Sent: Thursday, November 03, 2016 10:34 AM
To: Nancy
Subject: Re: Stone
[Quoted text hidden)
ht'p""me".900gie-comlmaillulol?ui=2&ik=0262707827&view--Pt&q=nancy%40dwenten)iises.net&qs=tme&search=query&mrg=1582aa8add8f3355&siml=1582ae8add8r3355
H
11/10/2016
Gmail - Stone Farm Mitigation Credit Request Form
Noelle Lutheran <nlutheran@gmall.corn>
Stone Farm Mitigation Credit Request Form
Noelle Lutheran <nlutheran@grnail.com>
To: Nancy <nancy@dwenterprises. net> Thu, Nov 3, 2016 at 10:33 AM
On Fri, Oct 28, 2016 at 1:57 PM, Nancy <
[Quoted text hidden] > wrote:
ht'psl'rna""Oog'e-co"Vma"IU'01?ui=2&ik=0262707a27&view--Pt&q=nancy%40dwenterpHses.net&qs=trIJe&search=cluery&msg=1582agc43f6baO2d&siml=15828gr43f6baO2d
UA