Loading...
HomeMy WebLinkAbout20070173 Ver 5_SW Calculations_20161221Comprehensive Stormwater Pollution Prevention Plan (C-SWPPP) For Construction Activities: Project/Site Name: Novo Nordisk DAPI - US Project Address/Location: Powhatan Road Clayton, NC 27527 SWPPP Preparer: Donovan Norris, PE EFDEE Engineering Professional Corporation 100 Fluor Daniel Drive Greenville, SC 29607 Phone: 864-281-6008 Primary Permittee: Novo Nordisk Pharmaceutical Industries, Inc. Permittee/Owner Contact: Gary Lohr 3612 Powhatan Road Clayton, NC 27527 919-457-7167 Day -to -Day Operator: Gary Lohr 3612 Powhatan Road Clayton, NC 27527 919-457-7167 C-SWPPP Preparation Date: 03/22/2016 Revision 3 nig/11 i GP,Rot/ti'%�. z a 1a2�3 '• FNG\ Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 1 of 202 REV. 003, 28 -Mar -16 Table of Contents Section I PROJECT OVERVIEW 1.1 Narrative..................................................................................................................3 1.2 Stormwater Management and Sediment Control.....................................................7 Pre -Construction Conferences...............................................................................16 1.3 Sequence of Construction........................................................................................9 Inspection Requirements........................................................................................16 1.4 Non -Numeric Effluent Limits..................................................................................9 Maintenance Policies.....................................................:......................................16 1.5 Certification Statement..........................................................................................13 Record Keeping....................................................................................................16 Section 2 SITE FEATURES AND SENSITIVE AREAS 2.1 Sources of Pollution...............................................................................................14 2.2 Surface Waters.......................................................................................................15 2.3 Impairments And TMDLs......................................................................................15 2.4 Critical Areas.........................................................................................................15 Section 3 COMPLIANCE REQUIREMENTS 3.1 SWPPP Availability.............................................................................................16 3.2 Pre -Construction Conferences...............................................................................16 3.3 Inspection Requirements........................................................................................16 3.4 Maintenance Policies.....................................................:......................................16 3.5 Record Keeping....................................................................................................16 3.6 Final Stabilization..................................................................................................16 Appendices REFERENCE MATERIAL AppendixA - Site Maps...............................................................................................17 Appendix,B - Drainage Maps.......................................................................................27 Appendix C - Hydrology Report (C-SWPPP* Only)...................................................30 Appendix D - Inspection Log and Reports (OS-SWPPP** Only) .............................187 Appendix E - Rainfall Records (OS-SWPPP** Only)...............................................190 Appendix F - Additional Site Logs and Records (OS-SWPPP** Only)....................193 Appendix G - Construction General Permit (CGP) - ..................................................202 *C-SWPPP is acronym for Comprehensive Storm Water Pollution Prevention Plan * *OS-SWPPP is acronym for On -Site Storm Water Pollution Prevention Plan Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 2 of 202 REV. 003, 28 -Mar -16 Section 1 PROJECT OVERVIEW 1.1 Narrative Construction Activities and BMP Summary The project encapsulated within this Storm Water Pollution Prevention Plan is the new construction of the Novo Nordisk Diabetes API -US (DAPI) facility in Johnston County, near Clayton NC. The site is located at coordinates N35°36'58.71" and W78°24'11.6". The DAPI project will include construction vehicle parking, construction trailers and material laydown areas, 16 new buildings (Central Utility Building 1&2, Fermentation 1 & 2, 2 Guardhouses, Purification 1-3, Recovery 1&2, Sampling Building, GMP Archive, Spine, Warehouse, and Drug Production), utility corridor, new electrical sub -station, employee parking lots, underground utilities, and ancillary paved roads around the facility. A layout of the planned facility is shown on the Site Master Plan, drawing CL XX DAPI -US 3 10 00 01 001 Study Area The study area covers approximately 178.01 acres. The site is located along Powhatan Road south east of Clayton, NC, approximately 'h mile from the intersection of U.S. Highway Business 70. The site is east of the existing Novo Nordisk facility and north of the Southern Railroad. The property boundary and existing conditions can be found on McKim and Creed Survey drawings R.1.3.0.0407 (Sheets 1&2)& R.1.3.0.0408 (Sheets 1 & 2) Pre -Development Conditions The site is divided into four drainage areas see Drainage Maps in Appendix B. The first • drainage area flows via sheet flow towards a wetlands area in the center of the site and discharges along the eastern property line. This drainage area is 123.15 acres. The drainage area consisting of primarily canopy trees within a wetland area (40.83 ac.), and agricultural row crops (82.32 ac.), and the weighted Cn for the watershed is 83. The second drainage area is 26.94 acres consisting of primarily canopy trees within a wetland area (2.18 ac.) and agricultural row crops (24.76 ac.), flows via sheet flow west to be collected within the wetland area and slowly flows into a 24" pipe culvert underneath Powhatan Road into an existing stormwater retention pond on the existing Novo Nordisk site. The weighted Cn number for drainage area #2 is 79. The third drainage area consists of 20.27 acres consisting of primarily canopy trees within a wetland area (2.71 ac.) and agricultural row crops (17.88 ac.) flows via sheet flow south to be collected within the wetland area and slowly flows into a culvert underneath the Southern Railroad where it continues south off of the property. The weighted Cn number for drainage area #3 is 80. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 3 of 202 REV. 003, 28 -Mar -16 The fourth drainage area consists of 7.58 acres consisting of primarily agricultural row crops (7.58 ac.) flows via sheet flow southeast off of the property. The weighted Cn number for drainage area #3 is 78. You can find the weight runoff calculations in the Hydrology report in Appendix D Post -Development Conditions Proposed site improvements will be as follows 16 new buildings (Central Utility Building 1&2, Fermentation 1 & 2, 2 Guardhouses, Purification 1-3, Recovery 1&2, Sampling Building, GMP Archive, Spine, Warehouse, and Drug Production), utility corridor to service the facility, new electrical substation, employee parking lots, underground utilities, and ancillary paved roads surrounding the site. The site will continue to be divided into four drainage areas, see Drainage Maps in Appendix B more details. The first drainage area consists of 136.86 acres. This drainage area consists of wetlands (40.83 acres), construction laid down and temporary facilities, and new facility. Part of the drainage area will flow via sheet flow towards the wetlands (39.62 acres) and then off-site along the eastern property line. Other portions of the drainage area will flow via underground piping to different detention basins. The outflow from the detention basins will enter the wetlands and flow over land towards the same discharge point along the eastern property line. The weighted Cn number for the analysis is 91 to incorporate fixture buildout to the site. The second drainage area is 39.83 acres consisting of primarily of construction area. The final condition of the site will and clear to buildings which will be constructed during the phase 2 sequence of the site. Storm water, during construction, will flow via sheet flow to diversion ditches and then flow underground pipes towards Storm Water Management Basin #1. The flow from the basin will exit the outflow structure into the pipe under Powhatan Road and will discharge into the existing stormwater pond on the Novo Nordisk property west of Powhatan Road. The weighted Cn number for the analysis is 98 to incorporate future buildout to the site. The third drainage area is 5.56 acres consisting of primarily construction area. Tine final condition the site will include approximately four structures along with parking and ancillary roadways. The drainage area will also include 1.61 acres of wetlands. Storm water flow from this drainage area will be collected within drainage ditches during construction which will discharge into sediment basins. Storm water post -construction will sheet flow into the wetlands, or sheet flow into a drainage ditch and discharge into the wetlands. Storm water will continue through the wetlands into a 36" advert under the Southern Railroad easement. The weighted Cn number for the analysis 93. The fourth drainage area consists of 5.40 acres consisting of pervious maintained areas (5.40 ac.) flows via sheet flow southeast off of the property. The weighted Cn number for drainage area #3 is 61. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 4 of 202 REV. 003, 28 -Mar -16 The improved site was evaluated to analyze the effect of the change in land use upon stormwater runoff rates. Per Johnston County regulations, post -development discharge rates shall not exceed pre -development discharge rates for the 2, 10, and 100 -yr frequency 24-hour duration storm events. Peak runoff rates were calculated for pre - development and post -development conditions. The SCS 24 hour storm was used to develop the hydrology model and predict runoff rates for storms with average return frequencies of 1, 2, 10, 25, and 100 years for pre- and post -development conditions. After analyzing the study area, it shows that post -development flows are below above pre -development rates. Please refer to the summary table below, and the Appendices for detailed information. Table #1 - Peak Runoff Rates Pre Construction: Table #2 - Peak Runoff Rates Post Construction (Pre Detention): DA (acres) �N 1 -Year (cfs) 2 -Year (cfs) 10 -Year (cfs) 100 -Year (cfs) Pre to DA#1 123.15 83 78.5 108.81 200.05 355.25 Pre to WS #2 26.94 79 26.24 37.8 73.73 136.41 Pre to WS #3 20.27 80 28.69 40.67 77.29 140.21 Pre to WS #4 7.58 78 7.45 10.83 21.52 40.3 Table #2 - Peak Runoff Rates Post Construction (Pre Detention): Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 5 of 202 REV. 003. 28 -Mar -16 DA 1 -Year 2 -Year 10 -Year 100 -Year (acres) CN (cfs) (cfs) (cfs) (cfs) Post to DA #1 183.67 222.96 336.34 522.58 136.86 91 Increase/(Decrease) 105.17 114.15 136.29 167.33 Un -detained Flow Post to WS #2 69.4 84.22 127.01 197.31 39.83 98 Increase/(Decrease) 43.16 46.42 53.28 60.9 Un -detained Flow Post to WS #3 5.56 93 16.33 20.42 32.14 51.2 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 5 of 202 REV. 003. 28 -Mar -16 Increase/(Decrease) Un -detained Flow Storage 1 -Year (12.36) (20.25) (45.15) (89.01) Post to WS #4 (cfs) (cfs) 2.27 4.896 14.95 35.51 43.76 5.40 61 202.65 Outflow 2a3 Increase/(Decrease) (34.74) Increase/(Decrease) Un -detained Flow (96,U) (152.60) (5.18) (5.93) (6.57) (4.79) Table #3 - Peak Runoff Rates Post Construction (Post Detention): Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 6 of 202 REV. 003, 28 -Mar -16 Storage 1 -Year 2 -Year 10 -Year 100 - Year Pond (cfs) (cfs) (cfs) (cfs) Post DA#1 Detention 43.76 58.74 103.43 202.65 Outflow 2a3 Increase/(Decrease) (34.74) (50.07) (96,U) (152.60) Detained Flow Change to DA #1 -44.25% -46.02% -48.30% -42.96% Pre vs Post Post DA#2 Detention 13.84 30.83 57.23 81.83 Outflow 1 Increase/(Decrease) (12.40) (6.97) (16.50) (54.58) Detained Flow Change to DA #2 -43.22% -17.14% -21.35% -38.93% Pre vs Post Post DA#3 Detention 16.33 20.42 32.14 51.2 Outflow None Increase/(Decrease) (12.36) (20.25) (45.15) (i39,01 Detained Flow Change to DA #3 -43.08% -49.79% -58.42% Pre vs Post Post DA#4 Detention 2.27 4.896 14.95 35.51 Outflow None Increase/(Decrease) (5. 18) (5.93) (6.57) (4.79) Detained Flow Change to DA #4 r-69.53% -54.79% -30.53% -11.89% Pre vs Post Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 6 of 202 REV. 003, 28 -Mar -16 Refer to Appendix B for land use and watershed maps. Refer to Appendix D for Hydrology Report and all stormwater calculations. Flooding Issues The proposed project is not located in a FEMA flood zone. Refer to Appendix A for further information. 1.2 Stormwater Management and Sediment Control Erosion Prevention BMPs As the existing site is cleared, grubbed and graded to the proposed contours shown on the construction site plans, erosion prevention BMPs shall be placed throughout the construction site to aid in the prevention of sediment -laden stormwater runoff. These BMPs shall be focused in areas with high potential of erosion, areas preceding infiltration practices. Each erosion prevention measure shall be selected on a site-specific basis and details have been provided on the construction site plans. The plans identify all proposed Erosion Prevention BMPs and the recommended installation, maintenance, and inspection procedures. In order to minimize soil erosion, a phased construction approach is being implemented in order to install sediment controls prior to any major land disturbance. Refer to drawing CL -XX -DAPI -US -3-15-00-800 for construction schedule. Sediment Control BMPs Sediment Control BMPs are designed to remove some of the sediment accumulated within stormwater runoff, to the best extent practicable. These BMPs help prevent sediment impacts to adjacent properties and water bodies from stormwater discharges originating from construction sites. Typically these BMPs are placed near each of the site's outfalls and are installed prior to clearing and grubbing of the site (before large areas of soil are exposed). However, these BMPs can also be located throughout the construction site and, in these circumstances, are installed after roadway grading has occurred. Placement, sizing and modifications of Sediment Control BMPs should be left to the SWPPP preparer and/or the Site Engineer. Contractors must consult the SWPPP Preparer as listed at the front of this SWPPP before making any significant changes to these BMPs. Sediment control BMP's to be utilized onsite are, but not limited to silt fence, sediment traps, inlet protection and sediment basins. Structural Control BMPs Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 7 of 202 REV. 003, 28 -Mar -16 This site-specific SWPPP utilizes the following structural control BMPs: sediment silt fence and dry detention basin with a skimmer. These practices have been designed to either divert flows from exposed soils, to retain/detain flows, and to otherwise limit the runoff and the discharge of pollutants from disturbed areas of the construction site. Throughout the lifespan of the construction project these BN/[Ps will be installed and maintained, as required by the SWPPP and the construction site plans, until final stabilization has been achieved for the areas draining to each BMP. Upon final stabilization, each structural control BMP must be modified to the post -construction conditions shown within the approved construction site plans or removed, if the structural BMP was a temporary structure. Silt fence will encompass the perimeter of the project in order to prevent sediment from entering the wetlands or off site. The silt fence which is solely being used for sediment control has been designed to handle '/4 acre per 100 feet of silt fence. A double row of silt fence has been incorporated within the site along the wetland boarders. The double row of silt fence provides an 86% trapping rate which is greater than the 54% provided by a 75' filter strip. Construction Entrances and Dust Control All access areas into and out of the limits of disturbance, as shown on the construction site plans, require the installation of a construction entrances and wheel washes. Any tracked sediment, along with any attached pollutants, deposited on impervious areas could be washed downstream during the next rain event. Each construction entrance must be installed as shown in the details section of the construction site plans. If a new entrance or exit is required, that is not shown on the plans, install the construction entrance as noted by the construction entrance detail, mark the location on the plans and make a record of this minor modification in the SWPPP's modification log, which is Jocated within one of the appendices of the On-site SWPPP. Each stabilized construction enhance should be used in conjunction with Street Sweeping measures if it becomes apparent that sediment is still being tracked onto adjacent impervious areas, even with the use of the construction entrance. During extremely dry conditions, drought, and/or excessive winds, the construction site should be treated for dust control to prevent the suspension of fine sediment particles into the air, being carried offsite, and deposited on adjacent properties or surface waters. This practice may not be directly called out for on the construction site plans. A water tanker used to spray the soil down may be an effective way to prevent excessive dust at a construction site. During construction water quality will be controlled with the following measures: sediment and detention basins, sediment traps, concrete washouts, and construction entrances. Should construction require maintenance facilities, berms and additional Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 8 of 202 REV. 003, 28 -Mar -16 hazardous material storage and containment measures shall be constructed to prevent runoff into the drainage system. Post -Construction Water Quality No post construction water quality is required for this project. The nitrogen export from the site is under the limit of 10 lbs/year requirement. See calculation in Appendix II of the Hydrology report. Wet detention ponds have been incorporated into the design of the site in order to remove total suspended solids. The three wet detention ponds will remove 90% TSS Undetained areas draining into existing wetlands will be treated with infiltration bio- swales prior to discharging to a wetlands. This will treat the first flush and remove any contaminants prior to entering a wetland area. Other Stormwater Management Procedures This section is not required. 1.3 Sequence of Construction This project will be phased in order to minimize the soil erosion impact from the site. 1.4 Non Numeric Effluent Limits Stormwater Volume and Velocity Control During the implementation of construction activities, all parties performing work at this construction site whose work may affect the implementation of the SWPPP must be informed of and directed on how to comply with this Non -Numeric Effluent Limit, which requires the management of stormwater runoff within the construction site and at each outfall. The purpose of this requirement is to control the stormwater volume and velocity at these locations to minimize erosion. Specifically, each responsible party should be made aware of the practices that have been or should be implemented at the construction site to accomplish these particular stormwater management practices. Below is a list of practices that may be utilized within the disturbed area and at each outfall at construction sites to control stormwater volume and velocity: Volume Control • Limiting the amount of disturbed area and exposed soils • Staging and/or Phasing of the Construction Sequence; • Sediment Basins and Excavated Inlets • Diverting off-site flow around the construction site; • Controlling the Drainage Patterns within the Construction Site; • Temporary Stabilization of Disturbed Areas. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 9 of 202 REV. 003. 28 -Mar -16 Velocity Control • Surface Roughening and/or other Slope Stabilization Practices; • Level Spreaders, Riprap Plunge Pools and/or other Velocity Dissipation BMPS located at the Construction Site's and Sediment Basin Outfalls. • Use of Rock Checks, Sediment Tubes, Etc. in Temporary Diversions Swales and Ditches. • Use of Erosion Control Blankets, Turf Reinforcement Mats, and other Non - Vegetative BMPs that can be used to Quickly Stabilize Disturbed Areas. The SWPPP Preparer/Engineer should approve any modifications (Additional BMPs or Changes to Existing BMPs) to address the management of stormwater volume and velocity prior to implementation. All approved SWPPPs that were issued coverage under the CGP should include ample BMPs and other control measures to address this specific Non -Numeric Effluent Limit. Throughout construction activities, the amount of soil exposed during construction should be kept to a minimum. This may be accomplished by minimizing the amount the disturbed area within the permitted Limits of Disturbance (shown on the approved construction site plans) to only that which is necessary to complete the proposed work. For areas that have already been disturbed and where construction activities will not begin for a period of 14 days or more, temporary stabilization techniques must be implemented. Prior to implementation of any major grading activities, topsoil is to be preserved by placing it in areas designated for stockpiling until final grades are reached. Each stockpile must be equipped with proper sediment and erosion controls to preserve the topsoil and protect adjacent areas from impacts. Once final grades have been reached, the preserved topsoil should be utilized to apply to areas identified for stabilization. Topsoil contains nutrients and organisms that aid in the growth of vegetation. The Compaction of Soil should also be minimized to the degree practicable during grading activities. This is especially important during the replacement of topsoil to aid in a quick establishment of vegetative cover. Compaction of soil may also reduce rainfall's ability to infiltrate into the soil, increasing the amount of stormwater runoff. Soil Stabilization Throughout construction activities, soil stabilization techniques are to be initiated as soon as practicable whenever any clearing, grading, excavating, or other Land -disturbing activities have permanently or temporarily ceased on any portion of the construction site and will not resume for a period exceeding 14 calendar days. For areas where initiating stabilization measures is infeasible, (e.g., where snow cover, frozen ground, or drought conditions preclude stabilization), initiate vegetative or non -vegetative stabilization measures as soon as practicable. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 10 of 202 REV. 003, 28 -Mar -16 All disturbed steep slopes (30% grade, —3H:1 V, or greater), and steep slopes to be created through grading activities must be managed in a fashion that limits the potential of erosion along the slopes. All parties whose work is/was responsible for the creation/disturbance of steep slopes must comply with the following items: • Minimize the Disturbance of all steep slopes, when possible. • Divert Concentrated or Channelized Flows of stormwater away from and around steep slope disturbances. • Use Specialized BMP Controls including temporary and permanent seeding with soil binders, erosion control blankets, surface roughening, reducing continuous slope length with terracing or diversions, gradient terraces, interceptor dikes and swales, grass -lined channels, pipe slope drains, subsurface drains, level spreaders, check dams, seep berms, and triangular silt dikes to minimize erosion. • Initiate Stabilization Measures as soon as practicable on any disturbed steep slope areas where construction activities have permanently or temporarily ceased, and will not resume for a period exceeding 7 calendar days. • A Vegetative and/or Non -Vegetative Cover must be established within 3 working days from the time that stabilization measures were initiated. Stabilization of steep slopes should be a priority for those performing work at the construction site. At the very least, runoff control BMPs should be implemented to transport stormwater runoff from the top of the slope to the toe of the slope. An example of this is to install diversion swales along the top of slope and direct the runoff towards pipe slopes drains to transports the runoff to the toe of the slope. All pipe slope drain outlets are to be equipped with proper outlet protection. Sediment Discharge Minimization Permittees, Contractors, and all other parties responsible for conducting land -disturbing activities are required to install and maintain all erosion and sediment BMPs that are identified on the approved construction site plans. These BMPs have been designed and approved to address such factors as the amount, frequency, intensity and duration of precipitation, the nature of resulting stormwater runoff, and soil characteristics, including the range of soils particle sizes expected to be present on the construction site. Proper installation, inspection, and maintenance will allow these BMPs to operate at maximum efficiencies in order to minimize sediment discharges to the maximum extent practical. Pollutant Discharge Minimization Permittees, Contractors, and all other parties responsible for conducting land -disturbing activities are required to install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants. At a minimum, the following items must be implemented: • Minimize the discharge of pollutants from dewatering trenches and excavations by managing runoff with the appropriate controls. Otherwise these discharges are prohibited; • Minimize the discharge of pollutants from equipment and vehicle washing, wheel Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 11 of 202 REV. 003, 28 -Mar -16 wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge; Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste and other materials present on the site to precipitation and to stormwater; and Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures. Prohibited Discharges Permittees, Contractors, and all other responsible parties for conducting land -disturbing activities are prohibited to discharges, from the construction site, the following items: • Wastewater from washout of concrete, unless managed by an appropriate control; • Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds and other construction materials; • Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and • Soaps or solvents used in vehicle and equipment washing. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 12 of 202 REV. 003, 28 -Mar -16 1.5 Certification Statement "I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all attachments were developed and implemented under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information gathered is, to the best of my knowledge and belief, true, accurate and complete. I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP has been fully implemented at this facility location in accordance with the terms and conditions of the stormwater discharge permit. I am aware that there are significant penalties for falsifying information, including the possibility of fines and imprisgnment for knowing violations." 4 i SS10/V . 9 z' a 5epN _ .,. FNG,N�••. Ih(r i e and Seal) Name DOKOM4� /J ^ Title i tiI j_�(,f0'j1 kr Date C/'✓ AM-, Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 13 of 202 REV. 003, 28 -Mar -16 Section 2 SITE FEATURES AND SENSITIVE AREAS 2.1 Sources of Pollution Throughout construction activities, each permittee, contractor, and person responsible for conducting work will need to ensure that sources of pollution are managed to prevent their discharge from the construction site. Expected pollution sources during construction have been identified in Table 2.1-A, but due to the nature of construction activities, it is often tough to predict all pollution sources that may appear throughout the life of a construction project. For that reason, the following table has also been provided to help all those performing work at this construction site identify possible sources of pollution Stormwater runoff subjected to the identified pollution sources must be treated by the appropriate BMPs as directed by this SWPPP. In the event that any additional sources of pollution are identified during construction, the person(s) with day-to-day operational control at the site is to add the new source(s) to Table 2.1-A and consult with the SWPPP Preparer to properly address this source and to prevent the discharge of it's pollutant through stormwater runoff. CL -XX -DAPI -US -3- 15-00-004 Table 2.1-A: Potential Sources of Pollution Source Material or Location* Appropriate Control Measures Chemical Loose soil exposed/disturbed All areas within As directed by the construction Plans. during clearing, Sediment the Limits of This includes Silt Fence, sediment grubbing and Disturbance tubes, sediment basins, and sediment gradingactivities traps. Areas where Located construction Heavy Metals adjacent to Concrete Washout Basin as shown on equipment are & pH each sheet CL -XX -DAPI -US -3-15-00-801 cleaned, a.k.a. construction of the plans. concrete washout entrance Water encountered Nutrients & In and around Direct water into impoundments such during trenching Sediment any trenching as basins or traps to allow for the activities. sedimentation of the listed pollutants. Sediment & All areas to be Paving Operations Trash paved. Inlet protection. Nutrients, pH, Material Delivery Sediment, All areas used Silt fence and/or sediment dikes and Storage Areas Heavy Metals, as storage areas oils & grease Equipment fueling Metals, Areas Provide secondary containments, and maintenance hydrocarbons, surrounding locate in upland areas. Repair leaking areas oils and greases fuel tanks and broken hoses. *Area where material/chemical is used on site. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 14 of 202 REV. 003, 28 -Mar -16 2.2 Surface Waters There are no rivers or open bodies of water on the site. 2.3 Impairments and TMDLs This site is within the Neuse River watershed. A special water resource plan has been implemented to protect this watershed. The Neuse River is included on the current North Carolina 303D list. The proposed construction site needs to consider the nitrogen export and reduce it below the allowable 10 pounds per year limit set for industrial sites. The site in its final configuration produced just less than 10 pounds per year, and will not require any additional water quality in order to meet the set targets. The calculations for the site are shown in Appendix II of the Hydrology Report. 2.4 Critical Areas The site has wetlands located on it, but the wetlands are not considered critical areas as defined by the North Carolina Department of Environmental Quality. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 15 of 202 REV. 003, 28 -Mar -16 Section 3 Compliance Requirements 3.1 SWPPP Availability The On -Site SWPPP (OS-SWPPP) will be located onsite during construction. 3.2 Pre -Construction Conferences A pre -construction conference will be held on-site prior to starting land disturbing activity. The Primary/Secondary Permittee or SWPPP Preparer are responsible for notifying the appropriate parties and holding the pre -construction conference. Each contractor, subcontractor, blanket utility provider, etc., who will work at the site is to attend the pre -construction meeting in person. 3.3 Inspection Requirements Site to be inspected weekly until final stabilization has been reached. Upon final stabilization the inspections may be reduced to once a month until the Notice of Termination has been submitted. Inspector to be the SWPPP Preparer, an individual directly under the SWPPP Preparer's authority, or an individual with a registration equivalent to the SWPPP Preparer. Inspection reports are to be kept onsite with the OS- SWPPP. Refer to Appendix E for forms. Inspector to install and maintain a rain gauge and rainfall log during construction. Refer to Appendix F for rainfall log. 3.4 Maintenance Requirements Contractor to maintain silt fence, construction entrance, and other temporary BMP's, as shown on the site plans, during construction. A detention pond maintenance agreement for the permanent ponds will be provided. 3.5 Record Keeping Appendix E, F, and G are to be utilized by all parties working onsite to track site related issues, were applicable, and document site changes as they occur. All records to remain with the OS-SWPPP at all times during construction. 3.6 Final Stabilization Final stabilization to be addressed per the site plans through the use of landscaping, grassing, and the track surface. Once final stabilization has been reached on all disturbed areas, the Notice of Termination is to be submitted. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 16 of 202 REV. 003, 28 -Mar -16 Appendix A Site Maps Location Map USGS Map County GIS Map Soils Map FEMA FIRM 17 18 19 20-22 23 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 17 of 202 REV. 003, 28 -Mar -16 Location Map Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 18 of 202 REV. 003, 28 -Mar -16 -�� ? � •�� ����`�t�`� r • L.. � J l�J��J�� °' » � '� � �.�'t �\ / ( � t\ ~ \moi `I �, i) � j `) _ 'u �.(/ � ,'•�Sr, i �:"�`��?/10� (%l)�� z r�J. '� �� �1 � v{� `�/ °� � �i �' �)`I /L�' f � / •u' '.1. 1-- i- Ij �7 ,� _ ✓\1 \( �..I �I I(l���i ct �l(�.J� t t `` %(J � �(. - , - -- ; f �,'— - � � o � �� .� t �j _J { J +✓ ���)� , �' \ 1, �� r� \ 4 � � � r�t ���j • � \ /''mss« ✓' (` � � ,1. �'/• e C� ` � � � ( � , ti \ � ) �/ it i� yw,` a l� ,A•,� r�"��_1 r • �. ,�'`" /^' � \ , ' .t ��\jr � �� q� •��l r v )1 S �� � ���r�v�� ��\moi � j�l ( ��`=���I V). ✓' /f,trt� 1!�17i.,�1� i ;��. � 't•�/�/�� `— -'�� Z'� � \ �/��\'� _(��/1'7-7 �H ) 1. a, \ �� • !\' �� ` „� \�'�"`l/`1�� /C�tv(C'/`'� r` . n _ �%j/} 4/-- C�st1r\� ` � "� "--` ,\ fes\ �_ mY –/.e 0 \ jrr\(��.^.aa\ (: • �` �'�`t�r:� _ �j ��\�J `� o, ;i :�'. � lin •�'�� \;� --� VA / r� j{ it '� ggivJ t� ` f ikI \ �•� }; \� Sx1ITH FIELD G� l - til•. �:.� •F� 1 y.° \ o fi .\.,�L a 1 . u: I e� � .7-�/`.-1•�--`-�v� t � O^Il.. "t\t�.: )�_�UI -, i��7����` \ � ^\ � � t' ° 21 zmaarzn ~2a 2! n1 71 m 2] nt .� 'b nG mmE z.na.w hedcae t/ zn. unt.e sots cwbyic.l so:vry SCALE 1:24 OW p"c POIVHATAN, NC o,] xoeee �owus xutows hs. tsami U.S.DRTAICOLHEIOR D OR „TYoUSGS U� NPOOYn ATTANQ UADRAM at� J.5 WNUIESW6 -�� ? � •�� ����`�t�`� r • L.. � J l�J��J�� °' » � '� � �.�'t �\ / ( � t\ ~ \moi `I �, i) � j `) _ 'u �.(/ � ,'•�Sr, i �:"�`��?/10� (%l)�� z r�J. '� �� �1 � v{� `�/ °� � �i �' �)`I /L�' f � / •u' '.1. 1-- i- Ij �7 ,� _ ✓\1 \( �..I �I I(l���i ct �l(�.J� t t `` %(J � �(. - , - -- ; f �,'— - � � o � �� .� t �j _J { J +✓ ���)� , �' \ 1, �� r� \ 4 � � � r�t ���j • � \ /''mss« ✓' (` � � ,1. �'/• e C� ` � � � ( � , ti \ � ) �/ it i� yw,` a l� ,A•,� r�"��_1 r • �. ,�'`" /^' � \ , ' .t ��\jr � �� q� •��l r v )1 S �� � ���r�v�� ��\moi � j�l ( ��`=���I V). ✓' /f,trt� 1!�17i.,�1� i ;��. � 't•�/�/�� `— -'�� Z'� � \ �/��\'� _(��/1'7-7 �H ) 1. a, \ �� • !\' �� ` „� \�'�"`l/`1�� /C�tv(C'/`'� r` . n _ �%j/} 4/-- C�st1r\� ` � "� "--` ,\ fes\ �_ mY –/.e 0 \ jrr\(��.^.aa\ (: • �` �'�`t�r:� _ �j ��\�J `� o, ;i :�'. � lin •�'�� \;� --� VA / r� j{ it '� ggivJ t� ` f ikI \ �•� }; \� Sx1ITH FIELD G� l - til•. �:.� •F� 1 y.° \ o fi .\.,�L a 1 . u: I e� � .7-�/`.-1•�--`-�v� t � O^Il.. "t\t�.: )�_�UI -, i��7����` \ � ^\ � � t' ° 21 zmaarzn ~2a 2! n1 71 m 2] nt .� 'b nG mmE z.na.w hedcae t/ zn. unt.e sots cwbyic.l so:vry SCALE 1:24 OW p"c POIVHATAN, NC o,] xoeee �owus xutows hs. tsami N O N w O O N N O) m CL m 0 0 0 IL gCC) CL `" C) LL o Z � W U) CL 0 Y Vl "O O Z 0 0 Z oozs« _ze a !!z - _« _ _ _. m_ _ _« e{\ mze * CDf & �([ e CL a ) Cl) 2 2 Q—= /j \\ � Q\§§ j(CL $$2\) }$ ƒ0 a / c , ) f J \ z / § � § # \\ } ; co • y \S 5 $ _ § } / { ! \ R 8\ a} eA \\m = c� —(} k)) zQ / m=z « \ ` 0 \ m ,c O m U L C O Z z O LL O LLz a 0 z LU w J IL a a) C m N N N o f T O U —O N a m UN aJ C U (a 76 D- ° N E m w NE (m 'a m fJ (6 Y @ (n E3 m m a) ° O c a) — N o a 'w0 -U) N c a O a) T �Ya a) E m 0 m m E mEca 0-0L° O C m I 7 to a) N 0 o) Ewa) S ,-0 E E l0 7 ((D N D) ,N (D wEa(°n O O O m L j m cn U 0 tcn l6N m g O L a7,L] !n m O E E in. m°NE c O `(j N.a D U O a) L >c? c O'F a)m = U (9 LO N L (D a) (7 O L O a) N N L o a) Z L paz Ltf N CL L)m -0 a)° E @mo•� zNO (n O 10n L (n n O N a) (D U 3 @ Y 0 L 07 [n cN-- (D c m 3 U of O a)a� L=o°a) Eo cc (N a' 9 7 (n 0 'p (D `O D ° O U N L >N fn O O O. O a 'n ch c N > — L O 0 a)O a) .0 L a) (6 (0J :n N n C 0 m N > N O a) Z� E >� a� U @ c— _ a7 0c mLcp 0)Lmmo ,(nm Q❑ T O a) 3 C 7 C 7 -c T N E E C m m O 0 ,0 a) N O 4-- 0 C O O U O. O` L Q N N (n N C`? a N (n N a) N 0 m 0 N O n .0 U N a) 0 L a E w U :2n 'G Q v IL— Y (n U) M 0) C D1 N U a N 3 c `0 o N = C a). 2m cy c E 3 L � — Y a) N L � O m ° d N W Y y .... L � E U N (D t o -C 3Na)i C ❑ U U Q 1!1 U) � C 'l0 N (� 'N'� G Of S 7 2 J O ma Q() 0 E T m a a)mEa m O O N @ 3 n 0 E a) q N L c N O0 N 0 N m E o•mSa o -°mo (6 L C 0_ a m a m cu m s 0 U a C m N L n m °= a) ( E 0 E o O civ H u .E 0 M O T O Z o ) O T '0 N Zcn Z� 00 U) .y acv @ c') co C) - L o o z> o a (D Q Z m ca mm o C U 3 L � T r n m CD N m0 0 O O n E C) L a ❑ U U ❑ z 1!1 U) � C 'l0 N (� 'N'� G Of S 7 2 J ,o Q C ❑©®o� a m r� � � m 0 m a m cu m s m a m tu m 0 C O0)w o 0 T o (n d 0 d) m 0) v o IL a m m U�❑ z coa. a am❑ m ❑Z o ama a m ' N N N Q (n M O T O Z o ) O T '0 N Zcn Z� 00 U) .y acv @ c') co C) - L o o z> o a (D Q Z Hydrologic Soil Group -Johnston County, North Carolina Hydrologic Soil Group DAPI Soil Map Hydrologic Soil Group— Summary by Map Unit -Johnston County, North Carolina (NC101) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI AmB Appling-Marlboro B 1.2 0.3% complex, 1 to 6 percent slopes Bb Bibb sandy loam, 0 to 2 A/D 0.2 0.1% percent slopes, frequently flooded CoB Cowarts loamy sand, 2 to C 8.4 1.9% 6 percent slopes FaB Faceville sandy loam, 2 B 1.8 0.4% to 6 percent slopes GeB Gilead sandy loam, 2 to 8 C 8.3 1.9% percent slopes GoA Goldsboro sandy loam, 0 B 14.4 3.2% to 2 percent slopes MaB Marlboro sandy loam, 2 B 10.8 2.4% to 8 percent slopes McB Marlboro -Cecil complex, B 4.0 0.9% 2 to 8 percent slopes NoA Norfolk loamy sand, 0 to A 97.4 21.6% 2 percent slopes NoB Norfolk loamy sand, 2 to A 11.8 2.6% 6 percent slopes PaE Pacolet loam, 15 to 25 B 3.1 0.7% percent slopes Ra Rains sandy loam, 0 to 2 A/D 155.2 34.5% percent slopes Tn Toisnot loam, 0 to 2 C/D 25.6 5.7% percent slopes VrA Varina loamy sand, 0 to 2 C 99.7 22.1% percent slopes VrB Varina loamy sand, 2 to 6 C 8.2 1.8% percent slopes Totals for Area of Interest 450.2 100.0% USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 REV. 003, 28 -Mar -16 1/5/2016 Page 3 of 4 Page 23 of 202 Hydrologic Soil Group—Johnston County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff., None Specified Tie-break Rule: Higher USDA Natural Resources Conservation Service Novo Nordisk DAPI -US Web Soil Survey National Cooperative Soil Survey DAP I -U S -I N FR -P LAN-XX010-003 REV. 003, 28 -Mar -16 DAPI Soil Map 1/5/2016 Page 4 of 4 Page 24 of 202 MI I H it' I H I 1 11 i I 11 1 f i i i Aw a U ;111 s I i ell 1 -RIM s 21 1 ill OD'i Him !x!P9 a1 1 1 1 'Hi RN 1401911fig ZIMN 2z H. HPI T...'I a , - 'Ig ' w I o a 6 ' 1A M�- g mi?am MUH11 I ON B 19 RN ARIAMSHEMOM W -M -311T. HE RN 1401911fig ZIMN 2z H. HPI T...'I a , - 'Ig ' w I o a 6 ' 1A M�- g mi?am MUH11 I "III I il 1G, H 1 11 111 1 ]1 1 3 all H 11 1 n I - - p In HUI HUI HBO,'jq MI H H1"d MII 'I 3£° c - D 1 1 11 Pull I Appendix B Drainage Maps Pre Development Watershed Map Post Development Watershed Map Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 27 of 202 REV. 003. 28 -Mar -16 eZ I Nip ttk.\ FIE -1 �:►, • •tee �► . Z�'�! ��' ��� ` - -"; �� IN • � � 5x91 _ k ��-,. i _ '� �� I 1 I �', � • III .. t i Appendix C Engineering Reports Hydrology Report Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 30 of 202 REV. 003, 28 -Mar -16 HYDROLOGY REPORT for Diabetes API Project for Novo Nordisk Powhatan Road Clayton, NC Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 31 of 202 REV. 003,28 -Mar -16 Novo Nordisk Clayton, NC TABLE OF CONTENTS Project Narrative Soil Information FEMA Waters of the State Hydrological Analysis Detention Analysis As -built Detention Waiver Permanent Water Quality Sedimentology Navigable Waters 3-7 7 7 7 7-9 9 9 9 9 10 10 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 32 of 202 REV. 003, 28 -Mar -16 Novo Nordisk Clayton, NC Stormwater Hydrographs Appendix I Existing Conditions Hydraflow Table of Contents Watershed Model Schematic 1 1 -Year Hyrdrographs 2-10 2 -Year Hydrographs 11-15 10 -Year Hydrographs 16-20 25- Year Hydrographs 21-25 100- Year Hydrographs 26-30 Proposed Condition Pre Detention Hydraflow Table of Contents Watershed Model Schematic 1 1 -Year Hydrographs 2-10 2 -Year Hydrographs 11-15 10 -Year Hydrographs 16-20 25- Year Hydrographs 21-25 100 -Year Hydrographs 26-30 Proposed Condition Post Detention Hydraflow Table of Contents Watershed Model Schematic 1 1 -Year Hydrographs 2-21 2 -Year Hydrographs 22-32 10 -Year Hydrographs 33-43 25- Year Hydrographs 44-54 100 -Year Hydrographs 55-65 Nitrogen Calculations Appendix II Pipe and Swale Calculations Appendix III Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 33 of 202 REV. 003. 28 -Mar -16 Novo Nordisk Clayton, NC Proiect Narrative: The project on this site is to construct a new pharmaceutical facility for Novo Nordisk to manufacture an oral table to treat type 2 diabetes. The main facility will include four buildings attached within the main plant (Purification, Recovery, Fermentation, and Office). Associated buildingson the site will include a Warehouse, Central Utility Building and a Sampling building. Additional improvements to the site include a utility corridor as well as a new electrical substation, and a wastewater treatment facility for process waste. Site Description: Pre The site is divided into four drainage areas see Drainage Maps in Appendix B, which is approximately 178.01 acres. The first drainage area flows via sheet flow towards a wetlands area in the center of the site and discharges along the eastern property line. This drainage area is 123.15 acres. The drainage area consisting of primarily canopy trees within a wetland area (40.83 ac.), and agricultural row crops (82.32 ac.), and the weighted Cn for the watershed is 83. The second drainage area is 26.94 acres consisting of primarily canopy trees within a wetland area (2.18 ac.) and agricultural row crops (24.76 ac.), flows via sheet flow west to be collected within the wetland area and slowly flows into a culvert underneath Powhatan Road into an existing pond on the existing Novo Nordisk site. The weighted Cn number for drainage area #2 is 79. The third drainage area consists of 20.27 acres consisting of primarily canopy trees within a wetland area (2.71 ac.) and agricultural row crops (17.88 ac.) flows via sheet flow south to be collected within the wetland area and slowly flows into a culvert underneath the Southern Railroad where it continues south off of the property. The weighted Cn number for drainage area #3 is 80. The fourth drainage area consists of 7.58 acres consisting of primarily agricultural row crops (7.58 ac.) flows via sheet flow southeast off of the property. The weighted Cn number for drainage area #3 is 78. The entire property is comprised of farmland and wooded wetlands. Site Description: Post Proposed site improvements will be as follows 16 new buildings (Central Utility Building 1&2, Fermentation 1 & 2, 2 Guardhouses, Purification 1-3, Recovery 1&2, Sampling Building, GMP Archive, Spine, Warehouse, and Drug Production), utility corridor to service the facility, new electrical substation, wastewater treatment facility, employee parking lots, underground utilities, and ancillary paved roads surrounding the site. The site will continue to be divided into four drainage areas, see Drainage Maps in Appendix B more details. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 34 of 202 REV. 003, 28 -Mar -16 Novo Nordisk Clayton, NC The first drainage area consists of 136.86 acres. This drainage area consists of wetlands (40.83 acres), construction laid down and temporary facilities, and new facility. Part of the drainage area will flow via sheet flow towards the wetlands (39.62 acres) and then off-site along the eastern property line. Other portions of the drainage area will flow via underground piping to different detention basins. The outflow from the detention basins will enter the wetlands and flow over land towards the same discharge point along the eastern property line. The weighted Cn number for the analysis is 98 to incorporate future buildout to the site. The second drainage area is 39.83 acres consisting of primarily of construction area. The final condition of the site will and clear to buildings which will be constructed during the phase 2 sequence of the site. Storm water, during construction, will flow via sheet flow to diversion ditches and then flow underground pipes towards Storm Water Management Basin #1. The flow from the basin will exit the outflow structure into the pipe under Powhatan Road and will discharge into the existing stormwater pond on the Novo Nordisk property west of Powhatan Road. The weighted Cn number for the analysis is 98 to incorporate future buildout to the site. The third drainage area is 5.56 acres consisting of primarily construction area. The final condition the site will include approximately four structures along with parking and ancillary roadways. The drainage area will also include 1.61 acres of wetlands. Storm water flow from this drainage area will be collected within drainage ditches during construction which will discharge into sediment basins. Storm water post -construction will sheet flow into the wetlands, or sheet flow into a drainage ditch and discharge into the wetlands. Storm water will continue through the wetlands into a 36" culvert under the Southern Railroad easement. The weighted Cn number for the analysis 93. The fourth drainage area consists of 5.40 acres consisting of pervious maintained areas (5.40 ac.) flows via sheet flow southeast off of the property. The weighted Cn number for drainage area #3 is 61. The improved site was evaluated to analyze the effect of the change in land use upon stormwater runoff rates. Per Johnston County regulations, post -development discharge rates shall not exceed pre -development discharge rates for the 1, 2, 10, and 100 -yr frequency 24-hour duration storm events. Peale runoff rates were calculated for pre - development and post -development conditions. The SCS 24 hour storm was used to develop the hydrology model and predict runoff rates for storms with average return frequencies of 1, 2, 10, 25, and 100 years for pre- and post -development conditions. After analyzing the study area, it shows that post -development flows are below above pre -development rates. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 35 of 202 REV. 003, 28 -Mar -16 Novo Nordisk Clayton, NC See the summary table below. See the Appendices for detailed information The pipes have been designed to handle the runoff from a 10 year storm. Tile swales also have been designed to handle the 10 year storm. The largest area contributing to a swale is 17 acres. Calculations showing the pipe and swale analyses are shown in Appendix 11I. Table #1 - Peak Runoff Rates Pre Construction: Table #2 - Peak Runoff Rates Post Construction (Pre Detention DA (acres) CN 1 -Year (cfs) 2 -Year (cfs) 10 -Year (cfs) 100 -Year (cfs) Pre to DA#1 123.15 83 78.5 108.81 200.05 355.25 Pre to WS #2 26.94 79 26.24 37.8 73.73 136.41 Pre to WS #3 20.27 80 28.69 40.67 77.29 140.21 Pre to WS #4 7.58 78 7.45 10.83 21.52 40.3 Table #2 - Peak Runoff Rates Post Construction (Pre Detention Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 36 of 202 REV. 003, 28 -Mar -16 DA 1 -Year 2 -Year 10 -Year 100 -Year (acres) CN (cfs) (cfs) (cfs) (cfs) Post to DA #1 183.67 222.96 336.34 522.58 136.86 91 Increase/(Decrease) 105.17 114.15 136.29 167.33 Un -detained Flow Post to WS #2 69.4 84.22 127.01 197.31 39.83 98 Increase/(Decrease) Un -detained Flow 43.16 46.42 53.28 60.9 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 36 of 202 REV. 003, 28 -Mar -16 Novo Nordisk Clayton, NC Post to WS #3 Storage 1 -Year 16.33 20.42 32.14 51.2 Pond 5.56 93 (cfs) (cfs) Post DA#1 Detention 43.76 58.74 103.43 202.65 Outflow Increase/(Decrease) (12.36) (20.25) (45.15) (89.01) Un -detained Flow (96.62) (152.60) Detained Flow Post to WS #4 % Change to DA #1 2.27 4.896 14.95 35.51 Pre vs Post 5.40 61 Post DA#2 Detention 13.84 30.83 57.23 81.83 Increase/(Decrease) 1 (5.18) (5.93) (6.57) (4.79) Un -detained Flow (6.97) (16.50) (54.58) Detained Flow Table #3 - Peak Runoff Rates Post Construction (Post Detention): Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 37 of 202 REV. 003, 28 -Mar -16 Storage 1 -Year 2 -Year 10 -Year 100 -Year Pond (cfs) (cfs) (cfs) (cfs) Post DA#1 Detention 43.76 58.74 103.43 202.65 Outflow 2&3 Increase/(Decrease) (34.74) (50.07) (96.62) (152.60) Detained Flow % Change to DA #1 -44.25% -46.02% -48.30% -42.96% Pre vs Post Post DA#2 Detention 13.84 30.83 57.23 81.83 Outflow 1 Increase/(Decrease) (12.40) (6.97) (16.50) (54.58) Detained Flow % Change to DA #2 -43.22% -17.14% -21.35% -38.93% Pre vs Post Post DA#3 Detention 16.33 20.42 32.14 51.2 Outflow None Increase/(Decrease) (12.36) (20.25) (45.15) (89.01) Detained Flow % Change to DA #3 -43.08% -49.79% -58.42% 63.48% Pre vs Post Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 37 of 202 REV. 003, 28 -Mar -16 Novo Nordisk Clayton, NC Post DA#4 Detention 2.27 4.896 14.95 35.51 Outflow None Increase/(Decrease) (5.18) (5.93) (6.57) (4.79) Detained Flow % Change to DA #4 -69.53% -54.79% -30.53% -11.89% Pre vs Post Soils Information: Soils for the project watershed area as follows: Goldsboro Sandy loam, 0-2% slopes, Classification B Marlboro Sandy loam, 2-8%, Classification B Marlboro -Cecil Sandy loam, 2-8%, Classification B Norfolk Loamy Sand, 0-2% slopes, Classification A Norfolk Loamy Sand, 2-6% slopes, Classification A Rains Sandy Loam, 0-2% slopes, Classification A/D Toisnot Loam, 0-2% slopes, Classification C/D Varina Loamy Sand, 0-2% slopes, Classification C Varina Loamy Sand, 2-6% slopes, Classification C . Refer to Appendix of the C-SWPPP for further information. FEMA: The proposed disturbance from the project is located in Zone X, a non -flooding area. Refer to Appendix A of the C-SWPPP for FEMA maps. Waters of the State: There are wetlands located upon the site. A permit has been filed with the US Army Corps of Engineers, refer to permit # SAW -2015-02127. Hydrological Analysis: Proposed development conditions will drain to the same 4 drainage areas, although the sizes of the drainage areas may change slightly. An SCS 24-hour storm analysis was performed using Hydraflow 2014 modeling software. Refer to Appendix I for hydrographs. Following is a summary of the data input. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 38 of 202 REV. 003,28 -Mar -16 Novo Nordisk Clayton, NC Soils: Agricultural Soils (Soils group A), Wetlands (Soils group D) Curve Numbers 1: 93 Wetlands 78 Agricultural 98 Pavement & Buildings 85 Gravel 61 Grass (Good condition) Rainfall Data: 1 Year = 2.90 inches (Clayton, NC) 2 Year = 3.50 inches 10 Year = 5.24 inches 25 Year = 6.32 inches 100 Year = 8.11 inches Pre Area to DA # 1: Total Area: 123.15 Ac. Wetland 40.83 Ac. Agricultural 82.32 Ac. Curve Number: 83 Post Area to DA #1: Total Area: 136.86 Ac. Impervious 48.24 Ac. Pervious 49.00 Ac. Wetlands 39.62 Curve Number: 91 Pre Area to DA #2: Total Area: 26.94 acres Wetland 2.18 Ac. Agricultural 24.76 Ac. Curve Number: 79 Post Area to DA #2: Total Area: 28.73 acres Impervious 33.09 Ac. Pervious 6.74 Ac. Curve Number: 98 Pre Area to DA #3: Total Area: 20.27 acres ' Refer to Hydrographs in Appendix I for Cn calculations (Phase 1 Buildout) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 39 of 202 REV. 003, 28 -Mar -16 Novo Nordisk Clayton, NC Wetland 2.71 Ac. Agricultural 17.88 Ac. Curve Number: 80 Post Area to DA #3: Total Area: 5.56 acres Impervious 1.97 Ac. Pervious 1.98 Ac. Wetlands 1.61 Curve Number: 93 Pre Area to DA #4: Total Area: 7.58 acres Wetland 0 Ac. Agricultural 7.58 Ac. Curve Number: 78 Post Area to DA #4: Total Area: 5.40 acres Impervious 0.00 Ac. Pervious 5.40 Ac. Curve Number: 61 Detention Analysis: There are 3 detention basins on the property for two of the drainage areas. Each of the detention basins will be wet basins to provide peak runoff attenuation. Refer to Appendix I for the hydrographs showing the peak runoff attenuation. The ponds have been designed to handle a 10 year storm with a foot of freeboard. The ponds have been routed for the 100 year storm and all ponds contain the 100 year storm with at least %z' of freeboard. Detention Waiver: The site does not qualify for a detention waiver as the final constructed condition will have a higher peak runoff versus existing conditions, and four detention basins have been proposed to reduce peak runoff and volume. Permanent Water Quality: The overall project will be under the required 10 lb/year per industrial requirement for nitrogen export. The actual site in final conditions will export 9.79 lbs/year of nitrogen. See Appendix II for Nitrogen calculations. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 40 of 202 REV. 003, 28 -Mar -16 Novo Nordisk Clayton, NC Wet detention ponds have been incorporated into the design of the site in order to remove total suspended solids. The three wet detention ponds will remove 90% TSS. Undetained areas draining into existing wetlands will be treated with infiltration bio- swales prior to discharging to a wetlands. This will treat the first flush and remove any contaminants prior to entering a wetland area. Sedimentolo Silt fence will encompass the perimeter of the project in order to prevent sediment from entering the wetlands or off site. The silt fence which is solely being used for sediment control has been designed to handle Y4 acre per 100 feet of silt fence. A double row of silt fence has been incorporated within the site along the wetland boarders. The double row of silt fence provides an 86% trapping rate which is greater than the 54% provided by a 75' filter strip. In addition to the silt fence, the site has been designed with 3 wet detention basins which will double as sediment basins during construction. Four sediment traps have been designed for use on the site as well, with each area trapping 5 acres of runoff and designed to hold 3,600 cu/ft of sediment per acre. The requirements for a sediment basin, per the NC DENR BMP Manual, are the basin needs to store 1,800 cu -ft of sediment per contributing acre. Stormwater management basin 41 has a contributing area of 39.83 acres and has a volume of 561,224 cu -ft of sediment storage, which is greater than the required 71,694 cu -ft. Stormwater management basin #2 has a contributing area of 14.54 acres and has a volume of 395,934 cu -ft of sediment, which is greater than the required 26,172 cu -ft. Stormwater management basin 43 has a contributing area of 44.74 acres and has a volume of 1,085,439 cu -ft of sediment, which is greater than the required 80,532 cu -ft. Navigable Waters: There are no navigable waters on the property. Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 41 of 202 REV. 003. 28 -Mar -16 Novo Nordisk Clayton, NC Appendix 1 Hydrographs Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 42 of 202 REV. 003, 28 -Mar -16 Novo Nordisk Clayton, NC Existing Conditions Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 43 of 202 REV. 003, 28 -Mar -16 Hydraflow Table of Contents Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Novo Nordisk Existing.gpw Tuesday, 03 / 22 / 2016 Watershed Model Schematic..................................................................................... 1 1 - Year SummaryReport......................................................................................................................... HydrographReports................................................................................................................... Hydrograph No. 1, SCS Runoff, Existing Watershed#1.......................................................... TR -55 Tc Worksheet........................................................................................................... Hydrograph No. 2, SCS Runoff, Existing Watershed#2.......................................................... TR -55 Tc Worksheet........................................................................................................... Hydrograph No. 3, SCS Runoff, Existing Watershed#3.......................................................... TR -55 Tc Worksheet........................................................................................................... Hydrograph No. 4, SCS Runoff, Existing Watershed#4.......................................................... TR -55 Tc Worksheet.......................................................................................................... 2 - Year SummaryReport....................................................................................................................... HydrographReports................................................................................................................. Hydrograph No. 1, SCS Runoff, Existing Watershed#1........................................................ Hydrograph No. 2, SCS Runoff, Existing Watershed#2........................................................ Hydrograph No. 3, SCS Runoff, Existing Watershed#3........................................................ Hydrograph No. 4, SCS Runoff, Existing Watershed#4........................................................ 10 -Year 2 3 3 4 5 6 7 8 9 10 11 12 12 13 14 15 SummaryReport....................................................................................................................... 16 HydrographReports................................................................................................................. 17 Hydrograph No. 1, SCS Runoff, Existing Watershed#1........................................................ 17 Hydrograph No. 2, SCS Runoff, Existing Watershed#2........................................................ 18 Hydrograph No. 3, SCS Runoff, Existing Watershed#3........................................................ 19 Hydrograph No. 4, SCS Runoff, Existing Watershed#4........................................................ 20 25 - Year SummaryReport....................................................................................................................... 21 HydrographReports................................................................................................................. 22 Hydrograph No. 1, SCS Runoff, Existing Watershed#1........................................................ 22 Hydrograph No. 2, SCS Runoff, Existing Watershed#2........................................................ 23 Hydrograph No. 3, SCS Runoff, Existing Watershed#3........................................................ 24 Hydrograph No. 4, SCS Runoff, Existing Watershed#4........................................................ 25 100 - Year SummaryReport....................................................................................................................... 26 HydrographReports................................................................................................................. 27 Hydrograph No. 1, SCS Runoff, Existing Watershed#1........................................................ 27 Hydrograph No. 2, SCS Runoff, Existing Watershed#2........................................................ 28 Hydrograph No. 3, SCS Runoff, Existing Watershed#3........................................................ 29 Hydrograph No. 4, SCS Runoff, Existing Watershed#4........................................................ 30 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 44 of 202 REV. 003,28 -Mar -16 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD®Civil 3D® 2014 by Autodesk, Inc. v10.3 Legend Hvd. Origin Description 1 SCS Runoff Existing Watershed #1 2 SCS Runoff Existing Watershed #2 3 SCS Runoff Existing Watershed #3 4 SCS Runoff Existing Watershed #4 Project: Novo Nordisk Existing.gpw Tuesday, 03 / 22 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 45 of 202 REV. 003, 28 -Mar -16 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 78.50 1 759 607,311 ------ ------ ------ Existing Watershed #1 2 SCS Runoff 26.24 1 732 108,421 ------ ------ ------ Existing Watershed #2 3 SCS Runoff 28.69 1 724 86,315 ------ ------ ------ Existing Watershed #3 4 SCS Runoff 7.450 2 730 28,472 ------ ------ ------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 1 Year Tuesday, 03 / 22 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 46 of 202 REV. 003, 28 -Mar -16 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 78.50 cfs Storm frequency = 1 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 607,311 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5% Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)1/ 123.150 Existing Watershed #1 Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 - 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 _ 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 -- Hyd No. 1 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 47 of 202 REV. 003, 28 -Mar -16 4 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. 1 Existing Watershed #1 Description A B C Totals Sheet Flow Manning's n -value = 0.170 0.240 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 43.42 + 0.00 + 0.00 = 43.42 Shallow Concentrated Flow Flow length (ft) = 2176.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) =1.14 0.00 0.00 Travel Time (min) = 31.79 + 0.00 + 0.00 = 31.79 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. = 0.00 75.20 min Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 48 of 202 REV. 003, 28 -Mar -16 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 26.24 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 108,421 cult Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6% Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] 126.940 Q (cfs) 28.00 24.00 16.00 12.00 ie 4.00 Existing Watershed #2 Hyd. No. 2 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 VE 4.00 0.00 I '-- �.-. � --_. I--- I I I I I I I' 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 49 of 202 REV. 003, 28 -Mar -16 TR55 Tc Worksheet Hyd. No. 2 Existing Watershed #2 L Hydraflow Hydrographs Extension for AutoCADO Civil 3D@2014 by Autodesk, Inc. v10.3 Description A B C Totals Sheet Flow Manning's n -value = 0.060 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 18.87 + 0.00 + 0.00 = 18.87 Shallow Concentrated Flow Flow length (ft) = 863.00 0.00 0.00 Watercourse slope (%) = 0.60 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.25 0.00 0.00 Travel Time (min) = 11.51 + 0.00 + 0.00 = 11.51 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 Total Travel Time, Tc.............................................................................. 0.00 30.40 min Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 50 of 202 REV. 003, 28 -Mar -16 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. 00.3 Tuesday, 03 / 22 / 2016 Hyd. No. 3 Existing Watershed #3 Hydrograph type = SCS Runoff Peak discharge = 28.69 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 86,315 cuft Drainage area = 20.590 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.590 Existing Watershed #3 Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0 00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 51 of 202 REV. 003, 28 -Mar -16 1.1 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc, 00.3 Hyd. No. 3 Existing Watershed #3 Description A B C Totals Sheet Flow Manning's n -value = 0.060 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 1.10 0.00 0.00 Travel Time (min) = 13.77 + 0.00 + 0.00 = 13.77 Shallow Concentrated Flow Flow length (ft) = 468.00 0.00 0.00 Watercourse slope (%) = 1.10 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.69 0.00 0.00 Travel Time (min) = 4.61 + 0.00 + 0.00 = 4.61 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. 0.00 18.40 m i n Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 52 of 202 REV. 003, 28 -Mar -16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 7.580 ac Curve number Basin Slope = 0.8% Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 2.89 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(15.330 x 74) + (15.330 x 61)] / 7.580 Q (cfs) 8.00 LOSE 4.00 0.00 0 120 240 - Hyd No. 4 Novo Nordisk DAPI -US Existing Watershed #4 Hyd. No. 4 -- 1 Year 9 Tuesday, 03 / 22 / 2016 = 7.450 cfs = 730 min = 28,472 cuft = 78* = 1065 ft = 24.50 min = Type II = 484 360 480 600 720 840 Q (cfs) 8.00 . IX 4.00 2.00 0.00 960 1080 1200 1320 1440 1560 Time (min) DAPI-US-INFR-PLAN-XX010-003 Page 53 of 202 REV. 003,28 -Mar -16 10 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Hyd. No. 4 Existing Watershed #4 Description A B C Sheet Flow Manning's n -value = 0.060 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.80 0.00 0.00 Travel Time (min) = 15.64 + 0.00 + 0.00 Shallow Concentrated Flow Flow length (ft) = 765.00 0.00 0.00 Watercourse slope (%) = 0.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.44 0.00 0.00 Travel Time (min) = 8.84 + 0.00 + 0.00 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 Total Travel Time, Tc.............................................................................. Totals 15.64 8.84 0.00 24.50 min Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 54 of 202 REV. 003, 28 -Mar -16 11 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 108.80 1 759 830,842 ------ ------ ------ Existing Watershed #1 2 SCS Runoff 37.80 1 732 153,141 ------ ------ ------ Existing Watershed #2 3 SCS Runoff 40.67 1 724 120,915 ------ ------ ------ Existing Watershed #3 4 SCS Runoff 10.83 2 730 40,557 ------ ------ ------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 2 Year Tuesday, 03 / 22 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 55 of 202 REV. 003, 28 -Mar -16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 123.150 ac Curve number Basin Slope = 0.5% Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 3.50 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 Q (cfs; 120.00 100.00 -1 I1 40.00 12 Tuesday, 03 / 22 / 2016 = 108.80 cfs = 759 min = 830,842 cuft = 83* = 2258 ft = 75.20 min = Type II = 484 Q (cfs) 120.00 100.00 40.00 20.00 0.00 i_ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 56 of 202 REV. 003, 28 -Mar -16 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 37.80 cfs Storm frequency = 2 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 153,141 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6% Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)j / 26.940 Q (cfs) 40.00 10.00 Existing Watershed #2 Hyd. No. 2 -- 2 Year Q (cfs) 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 57 of 202 REV. 003, 28 -Mar -16 . Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.590 Q (cfs) 50.00 40.00 30.00 20.00 10.00 fMTl1 Existing Watershed #3 Hyd. No. 3 -- 2 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 58 of 202 REV. 003, 28 -Mar -16 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 122 / 2016 Hyd. No. 3 Existing Watershed #3 Hydrograph type = SCS Runoff Peak discharge = 40.67 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 120,915 cuft Drainage area = 20.590 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 . Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.590 Q (cfs) 50.00 40.00 30.00 20.00 10.00 fMTl1 Existing Watershed #3 Hyd. No. 3 -- 2 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 58 of 202 REV. 003, 28 -Mar -16 15 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 122 / 2016 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 10.83 cfs Storm frequency = 2 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 40,557 cuft Drainage area = 7.580 ac Curve number = 78* Basin Slope = 0.8% Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(15.330 x 74) + (15.330 x 61)] / 7.580 Existing Watershed #4 Q (cfs) Hyd. No. 4 -- 2 Year Q (cfs) 12.00 10.00 8.00 6.00 4.00 2.00 0 00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 59 of 202 REV. 003, 28 -Mar -16 16 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 200.05 1 759 1,516,362 ------ ------ ------ Existing Watershed #1 2 SCS Runoff 73.73 1 731 294,291 ------ ------ ------ Existing Watershed #2 3 SCS Runoff 77.29 1 724 229,307 ------ ------ ------ Existing Watershed #3 4 SCS Runoff 21.52 2 728 78,997 ------ ------ ------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 10 Year Tuesday, 03 / 22 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PIAN-XX010-003 Page 60 of 202 REV. 003, 28 -Mar -16 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 200.05 cfs Storm frequency = 10 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 1,516,362 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5% Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 Q (cfs) 210.00 180.00 150.00 120.00 •W II .I I1 30.00 Q (Cfs) 210.00 180.00 150.00 120.00 30.00 0.00 ' I I I I I I I I 1 `I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 61 of 202 REV. 003, 28 -Mar -16 18 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 73.73 cfs Storm frequency = 10 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 294,291 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6% Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(2.180 x 93) + (24.760 x 78)] / 26.940 Existing Watershed #2 Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 000 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 62 of 202 REV. 003,28 -Mar -16 19 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 3 Existing Watershed #3 Hydrograph type = SCS Runoff Peak discharge = 77.29 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 229,307 cuft Drainage area = 20.590 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.590 Existing Watershed #3 Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 80.00 80.00 70.00 - 70.00 60.00 60.00 50.00 50.00 40.00 � - 40.00 30.00 - — _- - 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 63 of 202 REV. 003, 28 -Mar -16 Hydrograph Report FKq Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 21.52 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 78,997 cuft Drainage area = 7.580 ac Curve number = 78* Basin Slope = 0.8% Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(15.330 x 74) + (15.330 x 61)117.580 Q (cfs; 24.00 20.00 16.00 12.00 M "I Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 0.00 1 1 11_ �_ �— 1 1 1 i 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 64 of 202 REV. 003, 28 -Mar -16 21 Hydrograph Summary ReportHydraflowHydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 259.79 1 759 1,974,688 ------ ------ ------ Existing Watershed #1 2 SCS Runoff 97.74 1 731 390,556 ------ ------ ------ Existing Watershed #2 3 SCS Runoff 101.48 1 724 302,848 ------ ------ ------ Existing Watershed #3 4 SCS Runoff 28.70 2 728 105,355 ------ ------ ------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 25 Year Tuesday, 03 / 22 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 65 of 202 REV. 003, 28 -Mar -16 22 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D0 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 259.79 cfs Storm frequency = 25 yrs Time to peak = 759 min Time interval = 1 min Hyd. volume = 1,974,688 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5% Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 6.35 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 Q (cfs; 280.00 240.00 200.00 160.00 120.00 40.00 Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 i i i i i I I 1_L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 66 of 202 REV. 003, 28 -Mar -16 23 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 97.74 cfs Storm frequency = 25 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 390,556 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6% Hydraulic length = 1163 ft Tc method = TR55 Time of conc. (Tc) = 30.40 min Total precip. = 6.35 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(2.180 x 93) + (24.760 x 78)] / 26.940 Existing Watershed #2 Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 67 of 202 REV, 003, 28 -Mar -16 REV. 003, 28 -Mar -16 24 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 3 Existing Watershed #3 Hydrograph type = SCS Runoff Peak discharge = 101.48 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 302,848 cuft Drainage area = 20.590 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 6.35 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(2.710 x 93) + (17.880 x 78)] / 20.590 Existing Watershed #3 Q (cfs) Hyd. No. 3 -- 25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 1 140.00 20.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 68 of 202 REV. 003, 28 -Mar -16 25 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge = 28.70 cfs Storm frequency = 25 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 105,355 cuft Drainage area = 7.580 ac Curve number = 78* Basin Slope = 0.8% Hydraulic length = 1065 ft Tc method = TR55 Time of conc. (Tc) = 24.50 min Total precip. = 6.35 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(15.330 x 74) + (15.330 x 61)] / 7.580 Q (cfs) 30.00 25.00 20.00 15.00 10.00 1M Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' -' �,�� �. --- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 69 of 202 REV. 003, 28 -Mar -16 26 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 355.25 1 758 2,719,086 ------ ------ ------ Existing Watershed #1 2 SCS Runoff 136.41 1 731 548,654 ------ ------ ------ Existing Watershed #2 3 SCS Runoff 140.21 1 724 423,270 ------ ------ ------ Existing Watershed #3 4 SCS Runoff 40.30 2 728 148,775 ------ ------ ------ Existing Watershed #4 Novo Nordisk Existing.gpw Return Period: 100 Year Tuesday, 03 / 22 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PIAN-XX010-003 Page 70 of 202 REV. 003, 28 -Mar -16 27 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 1 Existing Watershed #1 Hydrograph type = SCS Runoff Peak discharge = 355.25 cfs Storm frequency = 100 yrs Time to peak = 758 min Time interval = 1 min Hyd. volume = 2,719,086 cuft Drainage area = 123.150 ac Curve number = 83* Basin Slope = 0.5% Hydraulic length = 2258 ft Tc method = TR55 Time of conc. (Tc) = 75.20 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(40.830 x 93) + (82.320 x 78)] / 123.150 Existing Watershed #1 Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0 00 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 1 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 71 of 202 REV. 003, 28 -Mar -16 Hydrograph Report 28 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 2 Existing Watershed #2 Hydrograph type = SCS Runoff Peak discharge = 136.41 cfs Storm frequency = 100 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 548,654 cuft Drainage area = 26.940 ac Curve number = 79* Basin Slope = 0.6% Hydraulic length = 1163 ft Tc method = TR55 Time of cone. (Tc) = 30.40 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(2.180 x 93) + (24.760 x 78)] / 26.940 Q (Cfs" 140.00 120.00 100.00 40.00 20.00 Q (Cfs) 140.00 120.00 100.00 40.00 20.00 0.00 -1 _— 1 1 1 1 1 i 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 72 of 202 REV. 003, 28 -Mar -16 29 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 3 Existing Watershed #3 Hydrograph type = SCS Runoff Peak discharge = 140.21 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 423,270 cuft Drainage area = 20.590 ac Curve number = 80* Basin Slope = 1.1 % Hydraulic length = 768 ft Tc method = TR55 Time of conc. (Tc) = 18.40 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(2.710 x 93) + (17.880 x 78)] / 20.590 Existing Watershed #3 Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 - 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 73 of 202 REV. 003, 28 -Mar -16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. 4 Existing Watershed #4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 7.580 ac Curve number Basin Slope = 0.8% Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 8.11 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(15.330 x 74) + (15.330 x 61)] / 7.580 Q (cfs; 50.00 40.00 30.00 20.00 10.00 30 Tuesday, 03 / 22 / 2016 = 40.30 cfs = 728 min = 148,775 cuft = 78* = 1065 ft = 24.50 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 1 1 1 , - 1 1 1 i - i 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 74 of 202 REV. 003, 28 -Mar -16 Novo Nordisk Clayton, NC Proposed Conditions Pre -Detention Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 75 of 202 REV. 003, 28 -Mar -16 Hydraflow Table of Contents Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Novo Nordisk Proposed1.gpw Tuesday, 03 / 22 / 2016 Watershed Model Schematic..................................................................................... 1 Year SummaryReport......................................................................................................................... 2 HydrographReports................................................................................................................... 3 Hydrograph No. 1, SCS Runoff, Proposed DA#1..................................................................... 3 TR -55 Tc Worksheet............................................................................................................ 4 Hydrograph No. 2, SCS Runoff, Proposed DA#2..................................................................... 5 TR -55 Tc Worksheet............................................................................................................ 6 Hydrograph No. 3, SCS Runoff, Proposed DA#3..................................................................... 7 TR -55 Tc Worksheet............................................................................................................ 8 Hydrograph No. 4, SCS Runoff, Proposed DA#4..................................................................... 9 TR -55 Tc Worksheet.......................................................................................................... 10 2 - Year SummaryReport....................................................................................................................... 11 HydrographReports................................................................................................................. 12 Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 12 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 13 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 14 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 15 10 -Year SummaryReport....................................................................................................................... 16 HydrographReports................................................................................................................. 17 Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 17 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 18 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 19 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 20 25 - Year SummaryReport....................................................................................................................... 21 HydrographReports................................................................................................................. 22 Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 22 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 23 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 24 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 25 100 - Year SummaryReport....................................................................................................................... 26 HydrographReports................................................................................................................. 27 Hydrograph No. 1, SCS Runoff, Proposed DA#1................................................................... 27 Hydrograph No. 2, SCS Runoff, Proposed DA#2................................................................... 28 Hydrograph No. 3, SCS Runoff, Proposed DA#3................................................................... 29 Hydrograph No. 4, SCS Runoff, Proposed DA#4................................................................... 30 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 76 of 202 REV. 003, 28 -Mar -16 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD®Civil 3D@2014 by Autodesk, Inc. v10.3 CD CD Legend Hvd. Origin Description 1 SCS Runoff Proposed DA#1 2 SCS Runoff Proposed DA#2 3 SCS Runoff Proposed DA#3 4 SCS Runoff Proposed DA#4 Project: Novo Nordisk Proposed1.gpw Tuesday, 03 / 22 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 77 of 202 REV. 003, 28 -Mar -16 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 183.67 1 751 1,321,455 ------ ------ ------ Proposed DA#1 2 SCS Runoff 69.40 1 739 383,993 ------ ------ ------ Proposed DA#2 3 SCS Runoff 16.33 1 721 42,885 ------ ------ ---- Proposed DA#3 4 SCS Runoff 2.270 1 720 6,628 ------ ------ ------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 1 Year Tuesday, 03 / 22 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 78 of 202 REV. 003, 28 -Mar -16 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D@2014 by Autodesk, Inc. 00.3 Tuesday, 03 / 22 / 2016 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 183.67 cfs Storm frequency = 1 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 1,321,455 cuft Drainage area = 136.860 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(33.950 x 98) + (39.620 x 92) + (49.000 x 85)1/ 136.860 Q (cfs) 210.00 180.00 150.00 120.00 S 1 11 .1 1/ it 11 Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 ' ` —' ' ' ' ' ' ' ' ' ' ' -' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 79 of 202 REV. 003, 28 -Mar -16 4 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. 1 Proposed DA#1 Description A B C Totals Sheet Flow Manning's n -value = 0.011 0.150 0.011 Flow length (ft) = 300.0 300.0 0.0 Two-year 24 -hr precip. (in) = 4.10 4.10 0.00 Land slope (%) = 0.50 0.50 0.00 Travel Time (min) = 4.49 + 36.29 + 0.00 = 40.78 Shallow Concentrated Flow Flow length (ft) = 700.00 1000.00 0.00 Watercourse slope (%) = 0.50 0.50 0.00 Surface description = Paved Unpaved Paved Average velocity (ft/s) =1.44 1.14 0.00 Travel Time (min) = 8.12 + 14.61 + 0.00 = 22.72 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 Total Travel Time, Tc.............................................................................. 0.00 63.50 min Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 80 of 202 REV. 003, 28 -Mar -16 A Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 69.40 cfs Storm frequency = 1 yrs Time to peak = 739 min Time interval = 1 min Hyd. volume = 383,993 cuft Drainage area = 39.830 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.990 x 98) + (6.740 x 61)] / 39.830 Proposed DA#2 Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 81 of 202 REV. 003, 28 -Mar -16 TR55 Tc Worksheet Hyd. No. 2 Proposed DA#2 6 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Description A B C Totals Sheet Flow Manning's n -value = 0.130 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 35.03 + 0.00 + 0.00 = 35.03 Shallow Concentrated Flow Flow length (ft) = 726.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =1.44 0.00 0.00 Travel Time (min) = 8.42 + 0.00 + 0.00 = 8.42 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 Total Travel Time, Tc.............................................................................. 0.00 43.50 min Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 82 of 202 REV. 003, 28 -Mar -16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 122 / 2016 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 16.33 cfs Storm frequency = 1 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 42,885 cuft Drainage area = 5.560 ac Curve number = 93* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(14.730 x 98) + (4.240 x 61) + (1.610 x 93)] / 5.560 Proposed DA#3 Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 18.00 15.00 12.00 9.00 6.00 3.00 0 00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 83 of 202 REV. 003, 28 -Mar -16 8 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Hyd. No. 3 Proposed DA#3 Description A B C Totals Sheet Flow Manning's n -value = 0.013 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 5.55 + 0.00 + 0.00 = 5.55 Shallow Concentrated Flow Flow length (ft) = 500.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.14 0.00 0.00 Travel Time (min) = 7.30 + 0.00 + 0.00 = 7.30 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 Total Travel Time, Tc.............................................................................. 0.00 12.90 min Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 84 of 202 REV. 003, 28 -Mar -16 9 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 2.270 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 6,628 cuft Drainage area = 5.400 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.60 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 3.00 2.00 1.00 5172211 Proposed DA#4 Hyd. No. 4 -- 1 Year IJ�J� Q (cfs) 3.00 2.00 1.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 85 of 202 REV. 003, 28 -Mar -16 TR55 Tc Worksheet Hyd. No. 4 Proposed DA#4 10 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Description A B C Totals Sheet Flow Manning's n -value = 0.016 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 6.56 + 0.00 + 0.00 = 6.56 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. = 0.00 6.60 min Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 86 of 202 REV. 003, 28 -Mar -16 11 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 222.96 1 751 1,617,451 ------ ------ ------ Proposed DA#1 2 SCS Runoff 84.22 1 739 470,006 ------ ------ ------ Proposed DA#2 3 SCS Runoff 20.42 1 721 54,335 ------ ------ ------ Proposed DA#3 4 SCS Runoff 4.896 1 719 11,578 ------ ------ ------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 2 Year Tuesday, 03 / 22 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 87 of 202 REV. 003. 28 -Mar -16 Hydrograph Report 12 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 222.96 cfs Storm frequency = 2 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 1,617,451 cuft Drainage area = 136.860 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(33.950 x 98) + (39.620 x 92) + (49.000 x 85)] / 136.860 Proposed DA#1 Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-)(X010-003 Page 88 of 202 REV. 003, 28 -Mar -16 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 84.22 cfs Storm frequency = 2 yrs Time to peak = 739 min Time interval = 1 min Hyd. volume = 470,006 cuft Drainage area = 39.830 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(21.990 x 98) + (6.740 x 61)] / 39.830 Proposed DA#2 Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 89 of 202 REV. 003, 28 -Mar -16 " Composite (Area/CN) = [(14.730 x 98) + (4.240 x 61) + (1.610 x 93)1/ 5.560 Q (cfs) 21.00 18.00 15.00 12.00 �1 . I1 3.00 Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 ' 1- — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 90 of 202 REV. 003, 28 -Mar -16 14 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 20.42 cfs Storm frequency = 2 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 54,335 cuft Drainage area = 5.560 ac Curve number = 93* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 " Composite (Area/CN) = [(14.730 x 98) + (4.240 x 61) + (1.610 x 93)1/ 5.560 Q (cfs) 21.00 18.00 15.00 12.00 �1 . I1 3.00 Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 ' 1- — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 90 of 202 REV. 003, 28 -Mar -16 15 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 4.896 cfs Storm frequency = 2 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 11,578 cuft Drainage area = 5.400 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.60 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 d�� Proposed DA#4 Hyd. No. 4 -- 2 Year Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 91 of 202 REV. 003, 28 -Mar -16 16 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 336.34 1 751 2,477,232 ------ ------ ------ Proposed DA#1 2 SCS Runoff 127.01 1 738 719,843 ------ ------ ------ Proposed DA#2 3 SCS Runoff 32.14 1 721 88,087 ------ ------ ------ Proposed DA#3 4 SCS Runoff 14.95 1 718 30,634 ------ ------ ------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 10 Year Tuesday, 03 / 22 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 92 of 202 REV. 003, 28 -Mar -16 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 336.34 cfs Storm frequency = 10 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 2,477,232 cuft Drainage area = 136.860 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(33.950 x 98) + (39.620 x 92) + (49.000 x 85)] / 136.860 Proposed DA#1 Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0 00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 93 of 202 REV. 003, 28 -Mar -16 18 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 127.01 cfs Storm frequency = 10 yrs Time to peak = 738 min Time interval = 1 min Hyd. volume = 719,843 cuft Drainage area = 39.830 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(21.990 x 98) + (6.740 x 61)1/ 39.830 Q (cfs) 140.00 120.00 100.00 40.00 20.00 WITI Proposed DA#2 Hyd. No. 2 -- 10 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 94 of 202 REV. 003, 28 -Mar -16 19 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 32.14 cfs Storm frequency = 10 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 88,087 cuft Drainage area = 5.560 ac Curve number = 93* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(14.730 x 98) + (4.240 x 61) + (1.610 x 93)1/ 5.560 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 3 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 95 of 202 REV. 003, 28 -Mar -16 20 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 14.95 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 30,634 cuft Drainage area = 5.400 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.60 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 15.00 12.00 . ld 3.00 AYAT Proposed DA#4 Hyd. No. 4 -- 10 Year Q (cfs) 15.00 12.00 3.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 96 of 202 REV. 003, 28 -Mar -16 21 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. 00.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 406.49 1 751 3,011,379 ------ ------ ------ Proposed DA#1 2 SCS Runoff 153.49 1 738 875,057 ------ ------ ------ Proposed DA#2 3 SCS Runoff 39.35 1 721 109,244 ------ ------ ------ Proposed DA#3 4 SCS Runoff 22.29 1 718 44,929 ------ ------ ------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 25 Year Tuesday, 03 / 22 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 97 of 202 REV. 003, 28 -Mar -16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 406.49 cfs Storm frequency = 25 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 3,011,379 cuft Drainage area = 136.860 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(33.950 x 98) + (39.620 x 92) + (49.000 x 85)] / 136.860 Proposed DA#1 Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 420.00 360.00 300.00 240.00 180.00 120.00 60.00 0 00 420.00 360.00 300.00 240.00 180.00 120.00 60.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 98 of 202 REV. 003, 28 -Mar -16 23 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 153.49 cfs Storm frequency = 25 yrs Time to peak = 738 min Time interval = 1 min Hyd. volume = 875,057 cuft Drainage area = 39.830 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(21.990 x 98) + (6.740 x 61)] / 39.830 Proposed DA#2 Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 99 of 202 REV. 003, 28 -Mar -16 24 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Tuesday, 03 122 / 2016 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 39.35 cfs Storm frequency = 25 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 109,244 cult Drainage area = 5.560 ac Curve number = 93* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(14.730 x 98) + (4.240 x 61) + (1.610 x 93)] / 5.560 Q (cfs) 40.00 20.00 10.00 STs Proposed DA#3 Hyd. No. 3 -- 25 Year Q (cfs) 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 3 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 100 of 202 REV. 003, 28 -Mar -16 25 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 22.29 cfs Storm frequency = 25 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 44,929 cuft Drainage area = 5.400 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.60 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 24.00 16.00 12.00 IT 4.00 Q (cfs) 24.00 20.00 16.00 12.00 M 4.00 0.00 ' 'I I I I' ' ' ' I ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 101 of 202 REV. 003,28 -Mar -16 26 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 522.58 1 751 3,897,035 ------ ------ ------ Proposed DA#1 2 SCS Runoff 197.31 1 738 1,132,416 ------ ------ ------ Proposed DA#2 3 SCS Runoff 51.20 1 721 144,472 ------ ------ ------ Proposed DA#3 4 SCS Runoff 35.51 1 718 71,332 ------ ------ ------ Proposed DA#4 Novo Nordisk Proposed1.gpw Return Period: 100 Year Tuesday, 03 / 22 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 102 of 202 REV. 003, 28 -Mar -16 27 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 1 Proposed DA#1 Hydrograph type = SCS Runoff Peak discharge = 522.58 cfs Storm frequency = 100 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 3,897,035 cuft Drainage area = 136.860 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 63.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(33.950 x 98) + (39.620 x 92) + (49.000 x 85)] / 136.860 Proposed DA#1 Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 560.00 480.00 400.00 320.00 240.00 160.00 80.00 0 00 560.00 480.00 400.00 320.00 240.00 160.00 80.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 103 of 202 REV. 003, 28 -Mar -16 28 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 2 Proposed DA#2 Hydrograph type = SCS Runoff Peak discharge = 197.31 cfs Storm frequency = 100 yrs Time to peak = 738 min Time interval = 1 min Hyd. volume = 1,132,416 cuft Drainage area = 39.830 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 43.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(21.990 x 98) + (6.740 x 61)] / 39.830 Proposed DA#2 Q (cfs) Hyd. No. 2 --100 Year Q (cfs) 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0 00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 2 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 104 of 202 REV. 003, 28 -Mar -16 29 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 3 Proposed DA#3 Hydrograph type = SCS Runoff Peak discharge = 51.20 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 144,472 cuft Drainage area = 5.560 ac Curve number = 93* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 12.90 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) _ [(14.730 x 98) + (4.240 x 61) + (1.610 x 93)] / 5.560 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 3 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 105 of 202 REV. 003, 28 -Mar -16 W11 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 03 / 22 / 2016 Hyd. No. 4 Proposed DA#4 Hydrograph type = SCS Runoff Peak discharge = 35.51 cfs Storm frequency = 100 yrs Time to peak = 718 min Time interval = 1 min Hyd. volume = 71,332 cuft Drainage area = 5.400 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.60 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 40.00 30.00 20.00 10.00 5WIT21111 Proposed DA#4 Hyd. No. 4 -- 100 Year Q (cfs) 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 106 of 202 REV. 003, 28 -Mar -16 Novo Nordisk Clayton, NC Proposed Conditions Post -Detention Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 107 of 202 REV. 003, 28 -Mar -16 Hydraflow Table of Contents Novo Nordisk Proposed wbasins Rev 1.gpw Hydraflow Hydrographs Extension for AutoCAD® Civil 31D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 WatershedModel Schematic..................................................................................... 1 1 -Year SummaryReport......................................................................................................................... 2 HydrographReports................................................................................................................... 3 Hydrograph No. 1, SCS Runoff, DA#4..................................................................................... 3 TR -55 Tc Worksheet............................................................................................................ 4 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin#1............................................................... 5 TR -55 Tc Worksheet............................................................................................................ 6 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin#2............................................................... 7 TR -55 Tc Worksheet............................................................................................................ 8 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin#3............................................................... 9 TR -55 Tc Worksheet.......................................................................................................... 10 Hydrograph No. 5, Reservoir, SWMB#3................................................................................ 11 PondReport - SWMB#3.................................................................................................... 12 Hydrograph No. 6, Reservoir, SWMB#2................................................................................ 13 PondReport - SWMB#2.................................................................................................... 14 Hydrograph No. 7, Combine, Proposed DA#1...................................................................... 15 Hydrograph No. 8, SCS Runoff, Proposed Drainage Area#2............................................... 16 TR -55 Tc Worksheet.......................................................................................................... 17 Hydrograph No. 9, Reservoir, SWMB#1................................................................................ 18 PondReport - SWMB#1.................................................................................................... 19 Hydrograph No. 10, SCS Runoff, DA#3................................................................................. 20 TR -55 Tc Worksheet.......................................................................................................... 21 2 - Year SummaryReport....................................................................................................................... 22 HydrographReports................................................................................................................. 23 Hydrograph No. 1, SCS Runoff, DA#4.................................................................................... 23 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin#1............................................................. 24 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin#2............................................................. 25 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin#3............................................................. 26 Hydrograph No. 5, Reservoir, SWMB#3................................................................................ 27 Hydrograph No. 6, Reservoir, SWMB#2................................................................................ 28 Hydrograph No. 7, Combine, Proposed DA#1...................................................................... 29 Hydrograph No. 8, SCS Runoff, Proposed Drainage Area#2............................................... 30 Hydrograph No. 9, Reservoir, SWMB#1................................................................................31 Hydrograph No. 10, SCS Runoff, DA#3................................................................................. 32 10 -Year SummaryReport....................................................................................................................... 33 HydrographReports................................................................................................................. 34 Hydrograph No. 1, SCS Runoff, DA#4................................................................................... 34 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin#1............................................................. 35 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin#2............................................................. 36 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin#3............................................................. 37 Hydrograph No. 5, Reservoir, SWMB#3................................................................................ 38 Hydrograph No. 6, Reservoir, SWMB#2................................................................................ 39 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 108 of 202 REV. 003, 28 -Mar -16 Contents continued... Novo Nordisk Proposed wbasins Rev 1.gpw Hydrograph No. 7, Combine, Proposed DA#1...................................................................... 40 Hydrograph No. 8, SCS Runoff, Proposed Drainage Area#2............................................... 41 Hydrograph No. 9, Reservoir, SWMB#1................................................................................ 42 Hydrograph No. 10, SCS Runoff, DA#3................................................................................. 43 25 - Year SummaryReport....................................................................................................................... 44 HydrographReports................................................................................................................. 45 Hydrograph No. 1, SCS Runoff, DA#4................................................................................... 45 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin#1............................................................. 46 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin#2............................................................. 47 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin#3............................................................. 48 Hydrograph No. 5, Reservoir, SWMB#3................................................................................ 49 Hydrograph No. 6, Reservoir, SWMB#2................................................................................ 50 Hydrograph No. 7, Combine, Proposed DA#1...................................................................... 51 Hydrograph No. 8, SCS Runoff, Proposed Drainage Area#2............................................... 52 Hydrograph No. 9, Reservoir, SWMB#1................................................................................ 53 Hydrograph No. 10, SCS Runoff, DA#3................................................................................. 54 100 - Year SummaryReport....................................................................................................................... 55 HydrographReports.............................................:................................................................... 56 Hydrograph No. 1, SCS Runoff, DA#4................................................................................... 56 Hydrograph No. 2, SCS Runoff, DA#1 Sub Basin#1............................................................. 57 Hydrograph No. 3, SCS Runoff, DA#1 Sub Basin#2............................................................. 58 Hydrograph No. 4, SCS Runoff, DA#1 Sub Basin#3............................................................. 59 Hydrograph No. 5, Reservoir, SWMB#3................................................................................ 60 Hydrograph No. 6, Reservoir, SWMB#2................................................................................ 61 Hydrograph No. 7, Combine, Proposed DA#1...................................................................... 62 Hydrograph No. 8, SCS Runoff, Proposed Drainage Area#2............................................... 63 Hydrograph No. 9, Reservoir, SWMB#1................................................................................ 64 Hydrograph No. 10, SCS Runoff, DA#3................................................................................. 65 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 109 of 202 REV. 003, 28 -Mar -16 1 Watershed Model Schematic Hydraflow Hydrographs Extension for AutoCAD®Civil 3D® 2014 by Autodesk, Inc. 00.3 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-)(X010-003 Page 110 of 202 REV. 003, 28 -Mar -16 10 Legend Hvd. Origin Description 1 SCS Runoff DA#4 2 SCS Runoff DA#1 Sub Basin #1 3 SCS Runoff DA#1 Sub Basin #2 4 SCS Runoff DA#1 Sub Basin #3 5 Reservoir SWMB#3 6 Reservoir SWMB#2 7 Combine Proposed DA #1 8 SCS Runoff Proposed Drainage Area #2 9 Reservoir SWMB#1 10 SCS Runoff DA#3 Project: Novo Nordisk Proposed wbasins Rev 1.gpw Monday, 03 / 28 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-)(X010-003 Page 110 of 202 REV. 003, 28 -Mar -16 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 1.093 1 730 6,489 ------ ------ ------ DA#4 2 SCS Runoff 36.82 1 792 423,033 ------ ------ ------ DA#1 Sub Basin #1 3 SCS Runoff 167.14 1 719 433,413 ------ ------ ------ DA#1 Sub Basin #2 4 SCS Runoff 46.52 1 721 140,854 ------ ------ ------ DA#1 Sub Basin #3 5 Reservoir 0.826 1 1446 95,196 3 278.92 401,206 SWMB#3 6 Reservoir 8.144 1 739 139,981 4 283.86 70,536 SWMB#2 7 Combine 43.76 1 791 658,210 2, 5, 6 ------ ------ Proposed DA #1 8 SCS Runoff 111.41 1 724 385,848 ------ ------ ------ Proposed Drainage Area #2 9 Reservoir 13.84 1 756 243,855 8 289.40 236,931 SWMB#1 10 SCS Runoff 20.98 1 717 44,927 ------ ------ ------ DA#3 Novo Nordisk Proposed wbasins Rev 1.gpw Return Period: 1 Year Monday, 03 / 28 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 111 of 202 REV. 003, 28 -Mar -16 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 1 DA#4 Hydrograph type = SCS Runoff Peak discharge = 1.093 cfs Storm frequency = 1 yrs Time to peak = 12.17 hrs Time interval = 1 min Hyd. volume = 6,489 cuft Drainage area = 5.400 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2.00 1.00 DA#4 Hyd. No. 1 -- 1 Year w 2 4 Hyd No. 1 Novo Nordisk DAPI -US 6 8 10 12 14 Q (cfs) 2.00 1.00 0.00 16 18 20 22 24 26 Time (hrs) DAPI-US-INFR-PLAN-XX010-003 Page 112 of 202 REV. 003, 28 -Mar -16 4 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. 00.3 Hyd. No. 1 DA#4 Description A B C Totals Sheet Flow Manning's n -value = 0.060 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.80 0.00 0.00 Travel Time (min) = 15.64 + 0.00 + 0.00 = 15.64 Shallow Concentrated Flow Flow length (ft) = 420.00 0.00 0.00 Watercourse slope (%) = 0.80 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.44 0.00 0.00 Travel Time (min) = 4.85 + 0.00 + 0.00 = 4.85 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Total Travel Time, Tc.............................................................................. 20.50 min Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 113 of 202 REV. 003, 28 -Mar -16 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 36.82 cfs Storm frequency = 1 yrs Time to peak = 13.20 hrs Time interval = 1 min Hyd. volume = 423,033 cuft Drainage area = 77.580 ac Curve number = 85* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(37.960 x 85) + (39.620 x 93)] / 77.580 Q (cfs) 40.00 30.00 10.00 re �ffifi DA#1 Sub Basin #1 Hyd. No. 2 -- 1 Year Q (cfs) 40.00 30.00 20.00 10.00 0.00 0 3 6 9 12 15 18 21 24 27 Hyd No. 2 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 114 of 202 REV. 003, 28 -Mar -16 6 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 31D@2014 by Autodesk, Inc. v10.3 Hyd. No. 2 DA#1 Sub Basin #1 Description A B C Totals Sheet Flow Manning's n -value = 0.400 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.40 0.00 0.00 Travel Time (min) = 94.13 + 0.00 + 0.00 = 94.13 Shallow Concentrated Flow Flow length (ft) = 2200.00 0.00 0.00 Watercourse slope (%) = 0.40 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =1.02 0.00 0.00 Travel Time (min) = 35.93 + 0.00 + 0.00 = 35.93 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. 0.00 130.10 min Novo Nordisk DAPI -US DAPI-US-INFR-PIAN-XX010-003 Page 115 of 202 REV. 003, 28 -Mar -16 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 167.14 cfs Storm frequency = 1 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 433,413 cuft Drainage area = 44.740 ac Curve number = 98 Basin Slope = 0.0% Hydraulic length = Oft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA#1 Sub Basin #2 Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 180.00 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 If 20.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 3 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 116 of 202 REV. 003, 28 -Mar -16 8 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCADO Civil 3D@2014 by Autodesk, Inc. 00.3 Hyd. No. 3 DA#1 Sub Basin #2 Description A B C Totals Sheet Flow Manning's n -value = 0.011 0.011 0.011 Flow length (ft) = 30.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 0.77 + 0.00 + 0.00 = 0.77 Shallow Concentrated Flow Flow length (ft) = 800.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =1.44 0.00 0.00 Travel Time (min) = 9.28 + 0.00 + 0.00 = 9.28 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 Total Travel Time, Tc.............................................................................. 0.00 10.00 min Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 117 of 202 REV. 003,28 -Mar -16 9 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31D® 2014 by Autodesk, Inc, v10.3 Monday, 03 / 28 / 2016 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 46.52 cfs Storm frequency = 1 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 140,854 cuft Drainage area = 14.540 ac Curve number = 98 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 40.00 30.00 10.00 Oftill DA#1 Sub Basin #3 Hyd. No. 4 -- 1 Year Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 118 of 202 REV. 003, 28 -Mar -16 10 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Hyd. No. 4 DA#1 Sub Basin #3 Description A B C Totals Sheet Flow Manning's n -value = 0.011 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 0.00 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Shallow Concentrated Flow Flow length (ft) = 1200.00 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =1.44 0.00 0.00 Travel Time (min) = 13.91 + 0.00 + 0.00 = 13.91 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 Total Travel Time, Tc.............................................................................. = 0.00 13.90 min Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 119 of 202 REV. 003, 28 -Mar -16 Hydrograph Report 11 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 12016 Hyd. No. 5 SWMB#3 180.00 160.00 Hydrograph type = Reservoir Peak discharge = 0.826 cfs Storm frequency = 1 yrs Time to peak = 24.10 hrs Time interval = 1 min Hyd. volume = 95,196 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 278.92 ft Reservoir name = SWMB#3 Max. Storage = 401,206 cuft Storage Indication method used. 160.00 140.00 SWMB#3 Q (cfs) Hyd. No. 5 -- 1 Year Q (cfs) 180.00 180.00 160.00 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 - 80.00 60.00 60.00 40.00 - 40.00 20.00 - 20.00 000 - - n nn 0 5 Hyd No. 5 Novo Nordisk DAPI -US 15 20 25 30 35 40 45 50 v Hyd No. 3 Total storage used = 401,206 cult Time (hrs) DAPI-US-INFR-PLAN-XX010-003 Page 120 of 202 REV. 003, 28 -Mar -16 Pond Report 12 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Pond No. 1 - SWMB#3 Weir Structures Pond Data [A] Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 277.00 ft Stage / Storage Table [B] [C] [D] Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 277.00 203,708 0 0 1.00 278.00 208,600 206,129 206,129 2.00 279.00 214,178 211,362 417,490 3.00 280.00 219,813 216,968 634,458 4.00 281.00 225,505 222,631 857,089 5.00 282.00 231,253 228,350 1,085,439 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 6.00 6.00 48.00 0.00 Crest Len (ft) = 16.00 0.00 0.00 0.00 Span (in) = 6.00 40.00 48.00 0.00 Crest EI. (ft) = 281.50 0.00 0.00 0.00 No. Barrels = 1 4 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert EI. (ft) = 277.90 280.00 277.90 0.00 Weir Type = Rect --- --- --- Length (ft) = 0.00 0.00 57.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.00 0.00 0.00 n/a N -Value = .013 .013 .100 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No Yes No TW Elev. (ft) = 277.90 Note: Culvert/Odfice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for office conditions (ic) and submergence (s). Stage (ft) Stage / Discharge Elev (ft) 5.00 4.00 3.00 2.00 1.00 0 00 282.00 281.00 280.00 279.00 278.00 277.00 0.00 4.00 8.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 40.00 44.00 Total Q Discharge (cfs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 121 of 202 REV. 003, 28 -Mar -16 Hydrograph Report 13 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 6 SWMB#2 Hydrograph type = Reservoir Peak discharge = 8.144 cfs Storm frequency = 1 yrs Time to peak = 12.32 hrs Time interval = 1 min Hyd. volume = 139,981 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 283.86 ft Reservoir name = SWM B#2 Max. Storage = 70,536 cuft Storage Indication method used SWMB#2 Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 30 33 Hyd No. 6 Hyd No. 4 D Total storage used = 70,536 cult Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 122 of 202 REV. 003, 28 -Mar -16 Pond Report 14 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Pond No. 2 - SWMB#2 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 282.90 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 282.90 1,000 0 0 0.10 283.00 69,925 2,643 2,643 5.10 288.00 87,744 393,291 395,934 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 6.00 6.00 48.00 0.00 Crest Len (ft) = 16.00 0.00 0.00 0.00 Span (in) = 6.00 36.00 48.00 0.00 Crest EI. (ft) = 286.00 0.00 0.00 0.00 No. Barrels = 1 4 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert EI. (ft) = 282.90 284.50 282.90 0.00 Weir Type = Rect --- --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.00 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0 00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s) Stage / Discharge Elev (ft) 288.90 287.90 286.90 285.90 284.90 283.90 WiNeAffolill 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 Total Q Discharge (cfs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 123 of 202 REV. 003, 28 -Mar -16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD(@ Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. 7 Proposed DA #1 Hydrograph type = Combine Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyds. = 2, 5, 6 Contrib. drain. area Q (cfs) 50.00 40.00 30.00 20.00 10.00 Proposed DA #1 Hyd. No. 7 -- 1 Year 15 Monday, 03 / 28 / 2016 = 43.76 cfs = 13.18 hrs = 658,210 cuft = 77.580 ac 5 10 15 20 25 30 35 40 45 ® Hyd No. 7 Hyd No. 2 Hyd No. 5 Hyd No. 6 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-)(X010-003 Page 124 of 202 REV. 003, 28 -Mar -16 Q (cfs) 50.00 40.00 30.00 20.00 10.00 1 0.00 50 Time (hrs) Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 39.830 Q (cfs) 120.00 100.00 40.00 ATIT Proposed Drainage Area #2 Hyd. No. 8 -- 1 Year Q (cfs) 120.00 100.00 40.00 20.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 s== Hyd No. 8 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 125 of 202 REV. 003, 28 -Mar -16 16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 8 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 111.41 cfs Storm frequency = 1 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 385,848 cuft Drainage area = 39.830 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 39.830 Q (cfs) 120.00 100.00 40.00 ATIT Proposed Drainage Area #2 Hyd. No. 8 -- 1 Year Q (cfs) 120.00 100.00 40.00 20.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 s== Hyd No. 8 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 125 of 202 REV. 003, 28 -Mar -16 17 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. 00.3 Hyd. No. 8 Proposed Drainage Area #2 Description A B C Totals Sheet Flow Manning's n -value = 0.011 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 4.86 + 0.00 + 0.00 = 4.86 Shallow Concentrated Flow Flow length (ft) = 1136.00 0.00 0.00 Watercourse slope (%) = 0.40 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =1.29 0.00 0.00 Travel Time (min) = 14.73 + 0.00 + 0.00 = 14.73 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 TotalTravel Time, Tc.............................................................................. 0.00 19.60 min Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 126 of 202 REV. 003, 28 -Mar -16 Hydrograph Report 18 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 9 SWMB#1 Hydrograph type = Reservoir Peak discharge = 13.84 cfs Storm frequency = 1 yrs Time to peak = 12.60 hrs Time interval = 1 min Hyd. volume = 243,855 cuft Inflow hyd. No. = 8 - Proposed Drainage Area #/lax. Elevation = 289.40 ft Reservoir name = SWMB#1 Max. Storage = 236,931 cuft Storage Indication method used SWMB#1 Q (cfs) Hyd. No. 9 -- 1 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 30 33 Hyd No. 9 Hyd No. 8 I Total storage used = 236,931 cuft Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 127 of 202 REV. 003, 28 -Mar -16 Pond Report 19 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Pond No. 3 - SWMB#1 [A] Pond Data [C] [PrfRsr] Rise (in) Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 287.00 ft Stage / Storage Table = 6.00 39.00 36.00 Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 287.00 74,697 0 0 1.50 288.00 81,003 116,731 116,731 2.50 289.00 87,434 84,190 200,921 3.50 290.00 93,977 90,677 291,598 4.50 291.00 100,635 97,277 388,875 5.50 292.00 107,405 103,991 492,866 6.50 293.00 114,290 110,819 603,685 Culvert / Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 6.00 8.00 36.00 0.00 Span (in) = 6.00 39.00 36.00 0.00 No. Barrels = 2 4 1 0 Invert EI. (ft) = 287.00 289.00 287.00 0.00 Length (ft) = 0.00 0.00 151.00 0.00 Slope (%) = 0.00 0.00 0.10 n/a N -Value = .013 .013 .010 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Multi -Stage = n/a No Yes No Stage (ft) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 16.00 0.00 0.00 0.00 Crest EI. (ft) = 292.50 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = Rect --- Multi-Stage = Yes No No No Exfil.(in/hr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Discharge Elev (ft) 294.00 293.00 292.00 291.00 290.00 289.00 288.00 0.00 ' ' ' ' ' ' ' ' ' ' 1 1 287.00 0.00 8.00 16.00 24.00 32.00 40.00 48.00 56.00 64.00 72.00 80.00 88.00 Total Q Discharge (cfs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 128 of 202 REV. 003, 28 -Mar -16 20 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 10 DA#3 Hydrograph type = SCS Runoff Peak discharge = 20.98 cfs Storm frequency = 1 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 44,927 cuft Drainage area = 5.560 ac Curve number = 93 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.40 min Total precip. = 2.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 •11 3.00 Q (cfs) 21.00 18.00 15.00 12.00 3.00 0.00 ` 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 10 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 129 of 202 REV. 003. 28 -Mar -16 21 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. 10 DA#3 Description A B C Totals Sheet Flow Manning's n -value = 0.011 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope (%) = 0.25 0.00 0.00 Travel Time (min) = 6.41 + 0.00 + 0.00 = 6.41 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s) =0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n -value = 0.015 0.015 0.015 Velocity (ft/s) =0.00 0.00 0.00 Flow length (ft) ({0})0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 Total Travel Time, Tc.............................................................................. 0.00 6.40 m i n Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 130 of 202 REV. 003, 28 -Mar -16 22 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2.505 1 729 11,335 ------ ------ ------ DA#4 2 SCS Runoff 49.81 1 792 566,922 ------ ------ ------ DA#1 Sub Basin #1 3 SCS Runoff 202.61 1 719 530,495 ------ ------ ------ DA#1 Sub Basin #2 4 SCS Runoff 56.42 1 721 172,405 ------ ------ ------ DA#1 Sub Basin #3 5 Reservoir 1.020 1 1446 121,082 3 279.33 489,346 SWMB#3 6 Reservoir 10.89 1 738 171,510 4 284.04 84,614 SWMB#2 7 Combine 58.74 1 791 859,513 2, 5, 6 ------ ------ Proposed DA #1 8 SCS Runoff 135.15 1 724 472,276 ------ ------ ------ Proposed Drainage Area #2 9 Reservoir 30.83 1 744 330,283 8 289.78 271,603 SWMB#1 10 SCS Runoff 26.19 1 717 56,922 ------ ------ ------ DA#3 Novo Nordisk Proposed wbasins Rev 1.gpw Return Period: 2 Year Monday, 03 / 28 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 131 of 202 REV. 003, 28 -Mar -16 23 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 1 DA#4 Hydrograph type = SCS Runoff Peak discharge = 2.505 cfs Storm frequency = 2 yrs Time to peak = 12.15 hrs Time interval = 1 min Hyd. volume = 11,335 cuft Drainage area = 5.400 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 3.00 1.00 DA#4 Hyd. No. 1 -- 2 Year 2 4 --. Hyd No. 1 Novo Nordisk DAPI -US 6 8 10 12 14 Q (cfs) 3.00 2.00 1.00 0.00 16 18 20 22 24 26 Time (hrs) DAPI-US-INFR-PLAN-XX010-003 Page 132 of 202 REV. 003, 28 -Mar -16 * Composite (Area/CN) = [(37.960 x 85) + (39.620 x 93)] / 77.580 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0 3 Hyd No. 2 Novo Nordisk DAPI -US DA#1 Sub Basin #1 Hyd. No. 2 -- 2 Year 6 9 12 15 18 21 DAPI -US -I N FR-PLAN-XX010-003 REV. 003, 28 -Mar -16 Q (cfs) 50.00 40.00 30.00 20.00 10.00 ' V 0.00 24 27 Time (hrs) Page 133 of 202 24 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 49.81 cfs Storm frequency = 2 yrs Time to peak = 13.20 hrs Time interval = 1 min Hyd. volume = 566,922 cuft Drainage area = 77.580 ac Curve number = 85* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(37.960 x 85) + (39.620 x 93)] / 77.580 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0 3 Hyd No. 2 Novo Nordisk DAPI -US DA#1 Sub Basin #1 Hyd. No. 2 -- 2 Year 6 9 12 15 18 21 DAPI -US -I N FR-PLAN-XX010-003 REV. 003, 28 -Mar -16 Q (cfs) 50.00 40.00 30.00 20.00 10.00 ' V 0.00 24 27 Time (hrs) Page 133 of 202 Hydrograph Report 25 Hydraflow Hydrographs Extension Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 = SCS Runoff Peak discharge = = 2 yrs Time to peak = = 1 min Hyd. volume = = 44.740 ac Curve number = = 0.0% Hydraulic length = = TR55 Time of conc. (Tc) = = 3.50 in Distribution = = 24 hrs Shape factor = Monday, 03 / 28 202.61 cfs 11.98 hrs 530,495 cuft 98 0 ft 10.00 min Type II 484 / 2016 Q (cfs) 210.00 DA#1 Sub Basin #2 Hyd. No. 3 -- 2 Year Q (cfs) 180.00 210.00 150.00 180.00 120.00 150.00 90.00 190.00 120.00 60.00 30.00 60.00 0.00 30.00 0.0 2.0 4.0 6.0 8.0 Hyd No. 3 Novo Nordisk DAPI -US 10.0 12.0 14.0 16.0 18.0 DAPI-US-INFR-PLAN-XX010-003 REV. 003, 28 -Mar -16 20.0 22.0 Time Page 134 of 202 0.00 (hrs) Hydrograph Report 26 Hydraflow Hydrographs Extension for AutoCADO Civil 31DO 2014 by Autodesk, Inc. v10.3 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 14.540 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 3.50 in Distribution Storm duration = 24 hrs Shape factor Monday, 03 / 28 / 2016 = 56.42 cfs = 12.02 hrs = 172,405 cuft = 98 = 0 ft = 13.90 min = Type II = 484 Q (cfs) DA#1 Sub Basin #3 Hyd. No. 4 -- 2 Year Q (cfs) 60.00 60.00 50.00 50.00 140.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 4 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 135 of 202 REV. 003. 28 -Mar -16 Hydrograph Report 27 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. 00.3 Monday, 03 / 28 / 2016 Hyd. No. 5 SWMB#3 Hydrograph type = Reservoir Peak discharge = 1.020 cfs Storm frequency = 2 yrs Time to peak = 24.10 hrs Time interval = 1 min Hyd. volume = 121,082 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 279.33 ft Reservoir name = SWMB#3 Max. Storage = 489,346 cuft Storage Indication method used SWMB#3 Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 - 90.00 60.00 60.00 30.00 30.00 0.00 - — 0.00 0 5 10 15 20 25 30 35 40 45 50 Hyd No. 5 Hyd No. 3 ITT I Total storage used= 489,346 cult Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 136 of 202 REV. 003, 28 -Mar -16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Hyd. No. 6 SWMB#2 Hydrograph type = Reservoir Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation Reservoir name = SWM B#2 Max. Storage Storage Indication method used. SWMB#2 Monday, 03 / 28 / 2016 = 10.89 cfs = 12.30 hrs = 171,510 cuft = 284.04 ft = 84,614 cuft Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 Nei0.00 0 3 6 9 12 15 18 21 24 27 30 33 Hyd No. 6 Hyd No. 4 F- Total storage used = 84,614 cult Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 137 of 202 REV. 003, 28 -Mar -16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.2 Hyd. No. 7 Proposed DA #1 Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 1 min Inflow hyds. = 2, 5, 6 29 Monday, 03 / 28 / 2016 Peak discharge = 58.74 cfs Time to peak = 13.18 hrs Hyd. volume = 859,513 cuft Contrib. drain. area = 77.580 ac Proposed DA #1 Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 5 10 15 20 25 30 35 40 45 50 Hyd No. 7 Hyd No. 2 Hyd No. 5 Hyd No. 6 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 138 of 202 REV. 003, 28 -Mar -16 30 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 8 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 135.15 cfs Storm frequency = 2 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 472,276 cuft Drainage area = 39.830 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)] / 39.830 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 ' 0 2 4 6 Hyd No. 8 Novo Nordisk DAPI -US Proposed Drainage Area #2 Hyd. No. 8 -- 2 Year Q (cfs) 140.00 120.00 100.00 40.00 20.00 ' ' ' ' ' ' 0.00 8 10 12 14 16 18 20 22 24 26 Time (hrs) DAPI-US-INFR-PLAN-XX010-003 Page 139 of 202 REV. 003, 28 -Mar -16 Hydrograph Report 31 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 9 SWM B#1 Hydrograph type = Reservoir Peak discharge = 30.83 cfs Storm frequency = 2 yrs Time to peak = 12.40 hrs Time interval = 1 min Hyd. volume = 330,283 cuft Inflow hyd. No. = 8 - Proposed Drainage Area #2viax. Elevation = 289.78 ft Reservoir name = SWMB#1 Max. Storage = 271,603 cuft Storage Indication method used Q (cfs; 140.00 120.00 100.00 F-51 11 .M 90 40.00 20.00 Q (cfs) 140.00 120.00 100.00 40.00 20.00 0.00 - ' ' ' 0.00 0 3 6 9 12 15 18 21 24 27 30 33 Hyd No. 9 Hyd No. 8 D Total storage used = 271,603 cuft Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 140 of 202 REV. 003, 28 -Mar -16 32 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 10 DA#3 Hydrograph type = SCS Runoff Peak discharge = 26.19 cfs Storm frequency = 2 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 56,922 cuft Drainage area = 5.560 ac Curve number = 93 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.40 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 IM 4.00 Q (cfs) 28.00 24.00 20.00 16.00 12.00 MI 4.00 0.00 ' 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 10 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 141 of 202 REV. 003. 28 -Mar -16 33 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 8.426 1 727 29,991 --- ------ ------ DA#4 2 SCS Runoff 89.13 1 791 1,009,505 ------ ------ ------ DA#1 Sub Basin #1 3 SCS Runoff 305.08 1 719 812,488 ------ ------ ------ DA#1 Sub Basin #2 4 SCS Runoff 85.01 1 721 264,049 ------ ------ ------ DA#1 Sub Basin #3 5 Reservoir 4.838 1 1027 265,857 3 280.18 674,395 SWMB#3 6 Reservoir 21.56 1 736 263,106 4 284.52 122,556 SWMB#2 7 Combine 103.43 1 790 1,538,468 2, 5, 6 ------ ------ Proposed DA #1 8 SCS Runoff 203.68 1 724 723,320 ------ ------ ------ Proposed Drainage Area #2 9 Reservoir 57.23 1 742 581,328 8 290.98 387,177 SWMB#1 10 SCS Runoff 41.14 1 717 92,282 ------ ------ ------ DA#3 Novo Nordisk Proposed wbasins Rev 1.gpw Return Period: 10 Year Monday, 03 / 28 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 142 of 202 REV. 003, 28 -Mar -16 34 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 1 DA#4 Hydrograph type = SCS Runoff Peak discharge = 8.426 cfs Storm frequency = 10 yrs Time to peak = 12.12 hrs Time interval = 1 min Hyd. volume = 29,991 cuft Drainage area = 5.400 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA#4 Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 10.00 8.00 6.00 4.00 2.00 0 00 10.00 8.00 6.00 4.00 2.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 143 of 202 REV. 003, 28 -Mar -16 35 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 89.13 cfs Storm frequency = 10 yrs Time to peak = 13.18 hrs Time interval = 1 min Hyd. volume = 1,009,505 cuft Drainage area = 77.580 ac Curve number = 85* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(37.960 x 85) + (39.620 x 93)] / 77.580 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 000 0 3 6 Hyd No. 2 Novo Nordisk DAPI -US DA#1 Sub Basin #1 Hyd. No. 2 -- 10 Year 9 12 15 18 21 DAPI -US -I N FR -PLAN -)(X010-003 REV. 003, 28 -Mar -16 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 24 27 Time (hrs) Page 144 of 202 36 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 305.08 cfs Storm frequency = 10 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 812,488 cuft Drainage area = 44.740 ac Curve number = 98 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 40.00 0.00 1' ' ' ' 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 3 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 145 of 202 REV. 003, 28 -Mar -16 37 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 85.01 cfs Storm frequency = 10 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 264,049 cuft Drainage area = 14.540 ac Curve number = 98 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) DA#1 Sub Basin #3 Hyd. No. 4 -- 10 Year Q (cfs) 90.00 UU.UU 80.00 - - 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 000 nnn 0 2 4 6 8 10 12 14 16 18 20 22 24 26 —� Hyd No. 4 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 146 of 202 REV. 003. 28 -Mar -16 Hydrograph Report 38 Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 5 SWMB#3 320.00 280.00 280.00 Hydrograph type = Reservoir Peak discharge = 4.838 cfs Storm frequency = 10 yrs Time to peak = 17.12 hrs Time interval = 1 min Hyd. volume = 265,857 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 280.18 ft Reservoir name = SWMB#3 Max. Storage = 674,395 cuft Storage Indication method used. 200.00 SWMB#3 200.00 Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 320.00 - 320.00 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0 00 n nn 0 5 Hyd No. 5 Novo Nordisk DAPI -US 10 15 20 25 30 35 40 45 50 Hyd No. 3 � Total storage used = 674,395 cult Time (hrs) DAPI-US-INFR-PLAN-XX010-003 Page 147 of 202 REV. 003, 28 -Mar -16 Storage Indication method used. Q (cfs) SWMB#2 Hyd. No. 6 -- 10 Year Q (cfs) 90.00 80.00 39 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 6 70.00 SWMB#2 Hydrograph type = Reservoir Peak discharge = 21.56 cfs Storm frequency = 10 yrs Time to peak = 12.27 hrs Time interval = 1 min Hyd. volume = 263,106 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 284.52 ft Reservoir name = SWM B#2 Max. Storage = 122,556 cuft Storage Indication method used. Q (cfs) SWMB#2 Hyd. No. 6 -- 10 Year Q (cfs) 90.00 80.00 - yU.UU 70.00 80.00 60.00 70.00 50.00 60.00 40.00 50.00 30.00 40.00 20.00 30.00 10.00 20.00 000 10.00 n nn 0 3 6 Hyd No. 6 Novo Nordisk DAPI -US 9 12 15 18 21 24 27 30 33 Hyd No. 4 L� Total storage used = 122,556 cult Time (hrs) DAPI-US-INFR-PLAN-XX010-003 Page 148 of 202 REV. 003, 28 -Mar -16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D@2014 by Autodesk, Inc. 00.; Hyd. No. 7 Proposed DA #1 Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 1 min Inflow hyds. = 2, 5, 6 40 Monday, 03 / 28 / 2016 Peak discharge = 103.43 cfs Time to peak = 13.17 hrs Hyd. volume = 1,538,468 cuft Contrib. drain. area = 77.580 ac Proposed DA #1 Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 5 10 15 20 25 30 35 40 45 50 Hyd No. 7 Hyd No. 2 Hyd No. 5 Hyd No. 6 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 149 of 202 REV. 003,28 -Mar -16 41 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 8 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 203.68 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 723,320 cuft Drainage area = 39.830 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 ' Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)1/ 39.830 Q (cfs) 210.00 180.00 150.00 120.00 30.00 Proposed Drainage Area #2 Hyd. No. 8 -- 10 Year Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 ' ' ' ' ' ' ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 8 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 150 of 202 REV. 003, 28 -Mar -16 Hydrograph Report 42 Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 9 SWMB#1 Hydrograph type = Reservoir Peak discharge = 57.23 cfs Storm frequency = 10 yrs Time to peak = 12.37 hrs Time interval = 1 min Hyd. volume = 581,328 cuft Inflow hyd. No. = 8 - Proposed Drainage Area #adlax. Elevation = 290.98 ft Reservoir name = SWMB#1 Max. Storage = 387,177 cuft Storage Indication method used SWMB#1 Q (cfs) Hyd. No. 9 -- 10 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 1 1 1 160.00 30.00 30.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 30 33 Hyd No. 9 Hyd No. 8 F-1' Total storage used = 387,177 cult Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 151 of 202 REV. 003, 28 -Mar -16 REV. 003, 28 -Mar -16 43 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 10 DA#3 Hydrograph type = SCS Runoff Peak discharge = 41.14 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 92,282 cuft Drainage area = 5.560 ac Curve number = 93 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.40 min Total precip. = 5.24 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA#3 Q (cfs) Hyd. No. 10 -- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 10 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 152 of 202 REV. 003, 28 -Mar -16 44 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 12.87 1 727 43,986 ------ ------ ------ DA#4 2 SCS Runoff 113.99 1 791 1,294,771 ------ ------ ------ DA#1 Sub Basin #1 3 SCS Runoff 368.51 1 719 987,678 ------ ------ ------ DA#1 Sub Basin #2 4 SCS Runoff 102.70 1 721 320,984 ------ ------ ------ DA#1 Sub Basin #3 5 Reservoir 13.39 1 817 439,124 3 280.41 725,990 SWMB#3 6 Reservoir 34.74 1 734 320,017 4 284.77 141,611 SWMB#2 7 Combine 141.97 1 790 2,053,911 2, 5, 6 ------ ------ Proposed DA #1 8 SCS Runoff 246.10 1 724 879,285 ------ ------ ------ Proposed Drainage Area #2 9 Reservoir 68.15 1 742 737,293 8 291.70 461,553 SWMB#1 10 SCS Runoff 50.31 1 717 114,446 ------ ------ ------ DA#3 Novo Nordisk Proposed wbasins Rev 1.gpw Return Period: 25 Year Monday, 03 / 28 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 153 of 202 REV. 003, 28 -Mar -16 DA#4 Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 000 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 154 of 202 REV. 003, 28 -Mar -16 45 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 1 DA#4 Hydrograph type = SCS Runoff Peak discharge = 12.87 cfs Storm frequency = 25 yrs Time to peak = 12.12 hrs Time interval = 1 min Hyd. volume = 43,986 cuft Drainage area = 5.400 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA#4 Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 000 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 154 of 202 REV. 003, 28 -Mar -16 * Composite (Area/CN) = [(37.960 x 85) + (39.620 x 93)] / 77.580 DA#1 Sub Basin #1 Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0 00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 3 6 9 12 15 18 21 24 27 Hyd No. 2 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 155 of 202 REV. 003, 28 -Mar -16 46 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 113.99 cfs Storm frequency = 25 yrs Time to peak = 13.18 hrs Time interval = 1 min Hyd. volume = 1,294,771 cuft Draanage area = 77.580 ac Curve number = 85* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(37.960 x 85) + (39.620 x 93)] / 77.580 DA#1 Sub Basin #1 Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 0 00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 3 6 9 12 15 18 21 24 27 Hyd No. 2 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 155 of 202 REV. 003, 28 -Mar -16 47 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 368.51 cfs Storm frequency = 25 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 987,678 cuft Drainage area = 44.740 ac Curve number = 98 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA#1 Sub Basin #2 Q (cfs) Hyd. No. 3 -- 25 Year Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0 00 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 3 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 156 of 202 REV. 003, 28 -Mar -16 48 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 102.70 cfs Storm frequency = 25 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 320,984 cuft Drainage area = 14.540 ac Curve number = 98 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA#1 Sub Basin #3 Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 1 140.00 40.00 20.00 20.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 4 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 157 of 202 REV. 003, 28 -Mar -16 Hydrograph Report 49 Hydraflow Hydrographs Extension for AutoCADO Civil 3D@)2014 by Autodesk, Inc. 00.3 Monday, 03 / 28 / 2016 Hyd. No. 5 SWMB#3 Hydrograph type = Reservoir Peak discharge = 13.39 cfs Storm frequency = 25 yrs Time to peak = 13.62 hrs Time interval = 1 min Hyd. volume = 439,124 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 280.41 ft Reservoir name = SWM B#3 Max. Storage = 725,990 cuft Storage Indication method used SWMB#3 Q (cfs) Hyd. No. 5 -- 25 Year Q (cfs) Hyd No. 5 Hyd No. 3 TTS Total storage used = 725,990 cult Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 158 of 202 REV. 003, 28 -Mar -16 Hydrograph Report 50 Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 6 SWMB#2 Hydrograph type = Reservoir Peak discharge = 34.74 cfs Storm frequency = 25 yrs Time to peak = 12.23 hrs Time interval = 1 min Hyd. volume = 320,017 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 284.77 ft Reservoir name = SWM B#2 Max. Storage = 141,611 cuft Storage Indication method used SWMB#2 Q (cfs) Hyd. No. 6 -- 25 Year Q (cfs) 120.00 120.00 100.00 100.00 80.00 180.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 30 Hyd No. 6 Hyd No. 4 F—I Total storage used = 141,611 cult Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 159 of 202 REV. 003, 28 -Mar -16 51 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 7 Proposed DA #1 Hydrograph type = Combine Peak discharge = 141.97 cfs Storm frequency = 25 yrs Time to peak = 13.17 hrs Time interval = 1 min Hyd. volume = 2,053,911 cuff Inflow hyds. = 2, 5, 6 Contrib. drain. area = 77.580 ac Proposed DA #1 Q (cfs) Hyd. No. 7 -- 25 Year Q (cfs) 160.00 160.00 140.00 A 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 a 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 30 33 Hyd No. 7 Hyd No. 2 Hyd No. 5 Hyd No. 6 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 160 of 202 REV. 003, 28 -Mar -16 52 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 8 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 246.10 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 879,285 cuft Drainage area = 39.830 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) _ [(29.355 x 98) + (6.760 x 75)] / 39.830 Q (cfs) 280.00 240.00 160.00 120.00 :1 11 40.00 Q (cfs) 280.00 240.00 200.00 160.00 120.00 40.00 0.00 ' ' ' ' ' ' ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 - Hyd No. 8 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 161 of 202 REV. 003, 28 -Mar -16 Hydrograph Report 53 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 9 SWMB#1 Hydrograph type = Reservoir Peak discharge = 68.15 cfs Storm frequency = 25 yrs Time to peak = 12.37 hrs Time interval = 1 min Hyd. volume = 737,293 cuft Inflow hyd. No. = 8 - Proposed Drainage Area #ZAax. Elevation = 291.70 ft Reservoir name = SWMB#1 Max. Storage = 461,553 cuft Storage Indication method used SWMB#1 Q (cfs) Hyd. No. 9 -- 25 Year Q (cfs) 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 30 33 Hyd No. 9 Hyd No. 8 Total storage used = 461,553 cult Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 162 of 202 REV. 003, 28 -Mar -16 REV. 003, 28 -Mar -16 54 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 10 DA#3 Hydrograph type = SCS Runoff Peak discharge = 50.31 cfs Storm frequency = 25 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 114,446 cuft Drainage area = 5.560 ac Curve number = 93 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 6.40 min Total precip. = 6.32 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA#3 Q (cfs) Hyd. No. 10 -- 25 Year Q (cfs) 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 10 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 163 of 202 REV. 003, 28 -Mar -16 55 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph Description 1 SCS Runoff 20.98 1 726 69,836 ------ ------ ------ DA#4 2 SCS Runoff 155.32 1 791 1,776,756 ------ ------ ------ DA#1 Sub Basin #1 3 SCS Runoff 473.53 1 719 1,278,159 ------ ------ ------ DA#1 Sub Basin #2 4 SCS Runoff 131.99 1 721 415,387 ------ ------ ------ DA#1 Sub Basin #3 5 Reservoir 30.22 1 762 727,336 3 281.05 867,521 SWMB#3 6 Reservoir 53.93 1 733 414,386 4 285.13 170,158 SWMB#2 7 Combine 202.65 1 790 2,918,474 2, 5, 6 ------ ------ Proposed DA #1 8 SCS Runoff 316.30 1 724 1,137,887 ------ ------ ------ Proposed Drainage Area #2 9 Reservoir 81.83 1 743 995,894 8 292.78 578,744 SWMB#1 10 SCS Runoff 65.42 1 717 151,352 ------ ------ ------ DA#3 Novo Nordisk Proposed wbasins Rev 1.gpw Return Period: 100 Year Monday, 03 / 28 / 2016 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 164 of 202 REV. 003, 28 -Mar -16 56 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 1 DA#4 Hydrograph type = SCS Runoff Peak discharge = 20.98 cfs Storm frequency = 100 yrs Time to peak = 12.10 hrs Time interval = 1 min Hyd. volume = 69,836 cuft Drainage area = 5.400 ac Curve number = 61 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 20.50 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA#4 Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 1 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 165 of 202 REV. 003, 28 -Mar -16 57 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 2 DA#1 Sub Basin #1 Hydrograph type = SCS Runoff Peak discharge = 155.32 cfs Storm frequency = 100 yrs Time to peak = 13.18 hrs Time interval = 1 min Hyd. volume = 1,776,756 cuft Drainage area = 77.580 ac Curve number = 85* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 130.10 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(37.960 x 85) + (39.620 x 93)] / 77.580 DA#1 Sub Basin #1 Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 160.00 160.00 140.00 140.00 120.00 - 120.00 100.00 - _ 100.00 80.00 - 80.00 60.00 - 60.00 40.00 40.00 20.00 - - 20.00 0.00 0.00 0 3 6 9 12 15 18 21 24 27 Hyd No. 2 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 166 of 202 REV. 003, 28 -Mar -16 58 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 3 DA#1 Sub Basin #2 Hydrograph type = SCS Runoff Peak discharge = 473.53 cfs Storm frequency = 100 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 1,278,159 cuft Drainage area = 44.740 ac Curve number = 98 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 10.00 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 490.00 420.00 350.00 210.00 140.00 70.00 Q (cfs) 490.00 420.00 350.00 280.00 210.00 140.00 70.00 0.00 ' 1 1 1 1 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 3 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 167 of 202 REV. 003, 28 -Mar -16 Hydrograph Report 59 Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 4 DA#1 Sub Basin #3 Hydrograph type = SCS Runoff Peak discharge = 131.99 cfs Storm frequency = 100 yrs Time to peak = 12.02 hrs Time interval = 1 min Hyd. volume = 415,387 cuft Drainage area = 14.540 ac Curve number = 98 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 13.90 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 DA#1 Sub Basin #3 Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 - - - _-- JL 20.00 0.00 - - - - - 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 Hyd No. 4 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 168 of 202 REV. 003, 28 -Mar -16 Hydrograph Report 60 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 5 SWMB#3 Hydrograph type = Reservoir Peak discharge = 30.22 cfs Storm frequency = 100 yrs Time to peak = 12.70 hrs Time interval = 1 min Hyd. volume = 727,336 cuft Inflow hyd. No. = 3 - DA#1 Sub Basin #2 Max. Elevation = 281.05 ft Reservoir name = SWM B#3 Max. Storage = 867,521 cuft Storage Indication method used SWMB#3 Q (cfs) Hyd. No. 5 -- 100 Year Q (cfs) 490.00 490.00 420.00 420.00 350.00 350.00 280.00 280.00 210.00 210.00 140.00 140.00 70.00 70.00 I AM - 0.00 0.00 0 5 10 15 20 25 30 35 40 45 50 Hyd No. 5 Hyd No. 3 FFFFM Total storage used = 867,521 cuft Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 169 of 202 REV. 003,28 -Mar -16 61 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 6 SWMB#2 Hydrograph type = Reservoir Peak discharge = 53.93 cfs Storm frequency = 100 yrs Time to peak = 12.22 hrs Time interval = 1 min Hyd. volume = 414,386 cuft Inflow hyd. No. = 4 - DA#1 Sub Basin #3 Max. Elevation = 285.13 ft Reservoir name = SWM B#2 Max. Storage = 170,158 cuft Storage Indication method used. SWMB#2 Q (cfs) Hyd. No. 6 -- 100 Year Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 000 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 3 6 9 12 15 18 21 24 27 30 Hyd No. 6 Hyd No. 4 i Total storage used = 170,158 cult Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 170 of 202 REV. 003, 28 -Mar -16 62 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 7 Proposed DA #1 Hydrograph type = Combine Peak discharge = 202.65 cfs Storm frequency = 100 yrs Time to peak = 13.17 hrs Time interval = 1 min Hyd. volume = 2,918,474 cuft Inflow hyds. = 2, 5, 6 Contrib. drain. area = 77.580 ac Proposed DA #1 Q (cfs) Hyd. No. 7 -- 100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 �3 0.00 0 3 6 9 12 15 18 21 24 27 30 Hyd No. 7 Hyd No. 2 Hyd No. 5 Hyd No. 6 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 171 of 202 REV. 003, 28 -Mar -16 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)1/ 39.830 Q (cfs; 350.00 300.00 250.00 200.00 150.00 100.00 4/ 11 Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 ' ' ' ' ' ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 8 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 172 of 202 REV. 003, 28 -Mar -16 63 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. 00.3 Monday, 03 / 28 / 2016 Hyd. No. 8 Proposed Drainage Area #2 Hydrograph type = SCS Runoff Peak discharge = 316.30 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 1,137,887 cuft Drainage area = 39.830 ac Curve number = 98* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 19.60 min Total precip. = 8.11 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(29.355 x 98) + (6.760 x 75)1/ 39.830 Q (cfs; 350.00 300.00 250.00 200.00 150.00 100.00 4/ 11 Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 ' ' ' ' ' ' 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 8 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 172 of 202 REV. 003, 28 -Mar -16 Hydrograph Report 64 Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10.3 Monday, 03 / 28 / 2016 Hyd. No. 9 SWMB#1 Hydrograph type = Reservoir Peak discharge = 81.83 cfs Storm frequency = 100 yrs Time to peak = 12.38 hrs Time interval = 1 min Hyd. volume = 995,894 cuft Inflow hyd. No. = 8 - Proposed Drainage Area #/lax. Elevation = 292.78 ft Reservoir name = SWMB#1 Max. Storage = 578,744 cuft Storage Indication method used Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00'1 1- 0.00 0 3 6 9 12 15 18 21 24 27 30 33 Hyd No. 9 Hyd No. 8 F ---Tl Total storage used = 578,744 cuff Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 173 of 202 REV. 003, 28 -Mar -16 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D@)2014 by Autodesk, Inc. 00.3 Hyd. No. 10 Time to peak DA#3 Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 5.560 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 8.11 in Storm duration = 24 hrs DA#3 65 Monday, 03 / 28 / 2016 Peak discharge = 65.42 cfs Time to peak = 11.95 hrs Hyd. volume = 151,352 cuft Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 6.40 min Distribution = Type II Shape factor = 484 Q (cfs) Hyd. No. 10 -- 100 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 10 Time (hrs) Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 174 of 202 REV. 003, 28 -Mar -16 Novo Nordisk Clayton, NC Appendix II Nitrogen Calculations Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 175 of 202 REV. 003, 28 -Mar -16 3 Sts Giz- 57—C+ Toq s__ IJ i r P -o c.. r --?j _ '7'7® 7 X'- x 2I1 2 16 = is � (4 -7 � -2- 1 t'5/yr _F0--rAt_, Ae_v_-A- — )l b q3" 811 9_'n'?_ft =92-33 A� C� 0 17. A"n- 7816/-yr- "q-p- Xcmr,- 1 -7 q . z AREA CLIENT NT PROJECT ORIGINATED BY -AE -2- ---DATE ENG. COMM. NO. PROJECT NO, CHECKED BY DATE REVISION NUMBER,------- DATE F.- E53-2 (Fl- 1-08) OF Novo Nordisk DAPI -US DAPl-US-lNFR-PLAN-XX010-003 Page 176 of 202 REV. 003, 28 -Mar -16 FLUOR® D13 v b, 0&3 r> -s -2 P"t_v 6,jh,5P�L3 , r* F 4 7 5- r_ -Fs ©. 2s A r- 15 5 -r -r L_ , ,j G o c (-ry vs - l 1 xlb -z 000 + z { APA ¢£a o, � 000031 o G 5i L-,— E.�c / 00 0670 7 Sy % Ldp— -75 ' F/L Ei7_- Ste, P CLIENT DEPARTMENT PROJECT ORIGINATED BY DATE ENG. COMM. NO. PROJECT NO. CHECKED BY DATE AREA REVISION NUMBER DATE SUBJECT REVISED BY Forth E53S2 (R-1-08) Novo Nordisk DAPI -US DAPI -US -I NFR-PLAN-XX010-003 REV. 003. 28 -Mar -16 0ncci yr Page 177 of 202 " ".�RCEV FIGURE B-17 Greenville County M 1� P Storm WaterTRAPP PINN G [ EFFICIENCY OF SILT FENCE ij V EFw7F=E=CTCT1VE DATE7:JANUARYm,2C 13 Management d rll.� 111 Novo Nordisk DAPI -US DAPI-US-1NFR-PLAN-XX010-003 Page 178 of 202 REV. 003, 28 -Mar -16 100 T 10 -------J -- ----- -- 7 IL > --------------- cr 0.1 0.01 - 50 55 60 65 70 75 80 85 90 95 d rll.� 111 Novo Nordisk DAPI -US DAPI-US-1NFR-PLAN-XX010-003 Page 178 of 202 REV. 003, 28 -Mar -16 Vegetated Filter Strip Vegetated Filter Strips Description Vegetated Filter Strips (VFS) are zones of vegetation where pollutant -laden runoff is introduced as sheet flow. VFS may take the form of grass filters, grass filter strips, buffer strips, vegetated buffer zones, riparian vegetated buffer strips, and constructed filter strips. When and Where to Use It Applicable in areas where filters are needed to reduce pollutant impacts to adjacent properties and water bodies. VFS are used to remove pollutants from overland sheet flow but are not effective in removing sediment from concentrated flows. There are two main classifications of VFS: • Constructed filter strias: Constructed and maintained to allow for overland flow through vegetation that consists of grass -like plants with densities approaching that of tall lawn grasses. • Natural vegetative strips: Area where pollutant -laden flow is directed in an overland manner, including riparian vegetation around drainage channels. Vegetation ranges from grass -like plants to brush and trees with ground cover. VFS remove pollutants primarily by three mechanisms: 1. Deposition of bedload material and its attached chemicals as a result of decreased flow velocities and transport capacity. This deposition takes place at the leading edge of the filter strip. 2. Trapping of suspended solids by the vegetation at the soil vegetation interface. When suspended solids settle to the bed, they are trapped by the vegetated litter at the soil surface instead of being re- suspended as would occur in a concentrated flow channel. When the litter becomes inundated with sediment, trapping no longer occurs by this mechanism. 3. Trapping of suspended materials by infiltrating water. This is the primary mechanism by which dispersed clay sized particles are trapped. VFS effectiveness fluctuates considerably depending on vegetation type, vegetation height and density, season of the year, eroded particle characteristics, size of drainage area, and site topography. Design Criteria Select a vegetation type, a ground slope, filter strip width, and strip length. Locate VFS on the contour perpendicular to the general direction of flow. Select vegetation to be dense, turf -forming grass in order to minimize water channelization. Never assume that natural vegetation is adequate for VFS. Design a ponding area at the leading edge of the VFS for bedload deposition. South Carolina DHEC July 31, 2005 Storm Water Management BMP Handbook 149 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 179 of 202 REV. 003, 28 -Mar -16 Vegetated Filter Strip a. Select an applicable area for the VMeral Design Requirements Minimum Ground Slope = 1 percent Maximum Ground Slope = 10 percent b. Select a vegetation type. c. Select the design life and maximum allowable sediment deposition. A design life of 10 years and deposition of 0.5 -feet is recommended. d. Estimate the long-term sediment yield entering the filter strip and a 10 -year 24-hour design single - storm sediment yield, e. Determine desired Trapping Efficiency- 80 percent design removal efficiency goal of the total suspended solids (TSS) in the inflow, f. Estimate the filter length necessary to prevent deposition within the filter greater than 0.5 -feet. (Assume filter width is equal to disturbed area width but no smaller than 15 -feet.) g. Use the filter length to calculate Trapping Efficiency for the design storm. h. Repeat (d) and (e) until the lengths match, Inspection and Maintenance • Maintenance is very important for filter strips, particularly in terms of ensuring that flow does not short circuit the practice. They require similar maintenance to other vegetative practices. • Inspect vegetation for rills and gullies annually and correct. Seed or sod bare areas. • Inspect grass after installation to ensure it has established. If not replace with an alternative species. • Inspect to ensure that grass has established annually. If not, replace with an alternative species. • Mow grass to maintain a height of 3- to 4 -inches. • Remove sediment build-up from the bottom when it has accumulated to 25% of the original capacity. South Carolina DHEC July 31, 2005 Storm Water Management BMP Handbook 150 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 180 of 202 REV. 003, 28 -Mar -16 Average Pollutant Removal Capability 75 feet in length 150 feet in length Average Total Suspended Solids:, 54% TSS: 84% TSS: 70% Lead: 16% Lead: 50% Metals 40%-50% Zinc: 47% Zinc: 47% Total N: 30% Total Phosphorus: -25% Total Phosphorus: -40% Total P: 10% Nitrate Nitrogen: -27% Nitrate Nitrogen: -20% Nitrate Nitrogen: 0% Path ogenslBacteria: NA South Carolina DHEC July 31, 2005 Storm Water Management BMP Handbook 150 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 180 of 202 REV. 003, 28 -Mar -16 Vegetated Filter Strip Roadside Vegetated Filter Strip Summary of Maintenance Requirements Required Maintenance Frequency Mow grass to maintain design height. Regularly (frequently) Remove litter and debris. Regularly (frequently) Inspect for erosion, rills and gullies, and repair. Annual, or as needed Repair sparse vegetation. Annual, or as needed Inspect to ensure that grass has established. If not, replace with an alternativespecies. Annual, or as needed F7Nutrient and pesticide management. Annual, or as needed Aeration of soil. Annual, or as needed South Carolina DHEC July 31, 2005 Storm Water Management BMP Handbook 151 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 181 of 202 REV. 003, 28 -Mar -16 12 Table B1—Specifications related to trap efficiency of slit fences. Typical strength characteristics are also provided. Manufactor and Permittivity Water Float Rate AOS Product Design (sec') (gal min'' ft'I) (L min" m'') (Us sieve) (mm) Agri Drain Biotech 760 0.45 30 1225 20 0.850 NILEX 2130 (Amoco Fabric) 0.05 10 405 30 0.600 910 (SI Industries) 0.20 15 610 20 0.850 915 (SI Industries) 0.40 25 1020 40 0.425 Amoco Style 2130 0.05 10 405 30 0.600 Exxon GTF 1005 NA 125 5095 50-70 .40-,20 ADS ADS 3302WP / 3302WT 0.01 50 2035 20 0.840 TC Mlrafi Silt Fence 0.10 10 405 30 0.600 (stakes attached) 100X 0.10 10 405 30 0.600 LINQ Indust. Fabrics GTF 170 0.05 20 815 20 0.850 GTF 180 0.05 7 285 20 0.850 (GTF 170 and 180 differ in strength) GTF 190 0.07 12 490 30 0.600 GTF 2005 0.07 12 490 50 0.300 Belton Industries (available In 3 different colors) 751 / 894 1897 0.10 15 610 30 0.600 (dimensions differ) 7551890 NA 25 1020 30 0.600 (dimensions differ) 806/810 0.20 20 815 20 0.850 (dimensions differ) DGI Industries P - Series 0.10 10 405 30 0.600 BIG R (Mutual Industries Fabric) Mutual MISF180 NA 30 1225 40 0.425 Typical Burst Strength 160-400 Psi (100-2760 Kpa) Puncture Strength 25-90 lbs (0.11-0.40 kN) Tensile Strength 80-180 lbs (0.35-0.80 kN) USDA Forest Service Gen. Tech. Rep. RMRS-GTR-94 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 182 of 202 REV. 003, 28 -Mar -16 Novo Nordisk Clayton, NC Appendix III Pipe and Swale Calculations Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 183 of 202 REV. 003, 28 -Mar -16 Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 184 of 202 REV. 003, 28 -Mar -16 W W WW W W 3dld j0 3dAl a ❑❑❑ a a a ❑ a ❑ d ❑ 7 ('lj) V O U? M NO m N M ° a3noo =10 1Nnowtl o�2 v o 0 ' o H H Q ('I=I) ON3 m N N m m o W 6 Q Z a3MOl'A3131a3ANI r ro m CO _ ❑ ❑ 0 N N N N N N N F V V N m N U"1 Q ('lj) 0N3 �n m m a v 0 m W a3ddn 'A3131a3ANl N J N N N N N N W ('1 j) o r v m ON3 a3ddn uo rn 0 o 0 r m m m m 1V'A313 ONnoao N N N N N N N 0 1 v ('NIW)3WII-19AVHI V N C W O O O O O O O N G N O O O N O N ('NI) Hld30 IVWHON m m m m m m m m Co J Y ('0351'ld) m N� N ro N m U U N AlIOOl3AlVnlOV of 0 0 0 Z O (03511j) A1I0013n m v v v m y m Q MOId llnj co r r r c6 r co (Sj0)AllOVdVO U MOIj llnj m m m w z_ (ilj) tl3atl N 10 LO Ur cl O IVNOIIO3S SSOHO of N m of � o 0 O U) ('NO) JBAWV1O v z Z L z (%13dOIS N N N N N N N N N N N N N N a Q O O O O O O O ❑ U J Q (a HINT) o 0 0 0 0 0 0 U AlISN31NI NIV'd N ui ui ui N vi Z N ('NIW) 3WI1 MOI � "' L2 Lp V 0 0 W ❑ Z e n m o 3dld NI MOIj 0000 Q Q' ❑ re (SjO) v m N r r r LL tlIO=O 19INI N r a v m v N W a S ('a HrNI) N 0 N 0 N 0 N 0 N 0 N 0 N 0 Ln AlISN31NI Nltla ui vi ui ui ui ui ui W al M_ Il z 0 ('NIW) 3WIl'ONOO LL ~ O LU L)N OXV N N u Q } J N c m m 0 m O F- L) U jp LU 0':13000O JJONna N U7 �fJ N N N Z o 0 0 0 0 0 0 O N N (S3HOV) v - o o r o y o V 'V3atl N m 0 o a U a`N ('lj) H10N3I M u2 Y C � N ry N a a v o C> o o Z Ol 'n o 0 IL o a m 0 a 0 a W Z 0 0 o W WOaj W W U W v 0 0 ' Z d o w 3 W 0 0 tl3atl 3`JVNItlaO N a n i Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 184 of 202 REV. 003, 28 -Mar -16 FLUOR® F -7M. NO. Fpm E512 (RW. 1-0B) Novo Nordisk DAPI -US PROJECT NO DEPARTMENT - ORIGINATED BY - CHECKED BY - REVISION NUMBER DAPI -US -I NFR-PLAN-XX010-003 REV. 003, 28 -Mar -16 DATE DATE DATE SHEET OF Page 185 of 202 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. <Name> Q (cfs) Trapezoidal Area (sqft) Bottom Width (ft) = 10.00 Side Slopes (z:1) = 3.00, 3.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 290.75 Slope (%) = 0.15 N -Value = 0.016 Calculations Compute by: Known Q Known Q (cfs) = 81.07 Elev (ft) 293.00 QW16711 291.50 291.00 Q911114111111 Section Tuesday, Mar 22 2016 Highlighted Depth (ft) = 1.47 Q (cfs) = 81.07 Area (sqft) = 21.18 Velocity (ft/s) = 3.83 Wetted Perim (ft) = 19.30 Crit Depth, Yc (ft) = 1.13 Top Width (ft) = 18.82 EGL (ft) = 1.70 0 5 Novo Nordisk DAPI -US 10 15 20 Reach (ft) DAP I -U S -I N FR -P LAN-XX010-003 REV. 003, 28 -Mar -16 25 30 Depth (ft) 2.25 1.75 1.25 0.75 0.25 -0.25 -0.75 35 Page 186 of 202 Appendix D Inspection Log and Reports Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 187 of 202 REV. 003, 28 -Mar -16 ...Inspectiono, Name of Construction Site Location of Construction Site Date of Inspection Inspector Name Does Inspection Report require maintenance of installed BMPs? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 188 of 202 REV. 003, 28 -Mar -16 SWPPP Inspection Log (Continued)p Date of Inspection Inspector Name Does Inspection Report require maintenance of installed BMPs? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 189 of 202 REV. 003, 28 -Mar -16 Appendix E Rainfall Log and Reports Novo Nordisk DAPI -US DAPI-US-INFR-PIAN-XX010-003 Page 190 of 202 REV. 003, 28 -Mar -16 M m m d CO O O O O �2 X ca Z Jcq Nd N LL O LL O Z ; =) D� �Q. aclcl03 04P4 0-1 M m m d CO O O O O �2 X ca Z Jcq Nd N LL O LL O Z ; =) D� N M —IN IMI'TILnI.0IN MINIMI"TILni�0 �I�I�I�I�I�I�I:°I�I°°I�'ININININININININININI�IMI °°Ia,I1I.-I�Irn .-I�I.-IDI�IcoIo, INININININININININoo ININ �INIMI"TILn I'D Ir, loo la, 101-INI.-I.- Ju, .-I,�oI�Icola, la IN IN IN IN IN IN IN Ico IN Io IMI —IN IMIm-ILnIoINIooIcy, I0I m'lLn NI NINININININI00 NININ IN �IMI.-TILn I'D Ir'.Iwla, 101—INI—I�Jul ulI'D INIc`o la, ININININININININloo INI0I INIMIm-I-IoI^Iooia,111lII�I°I11 11 IIIIINININIINI�-��— NNNNNNMM m O 0 0 X � Z goc. d N O LL O Z ; Lu ry U) a Y Ul a 0 z 0 0 z Appendix F Additional Site Logs and Records Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 193 of 202 REV. 003, 28 -Mar -16 Date a Time I Description/Outline and Name of the Presenter of SWPPP and Site Requirements I Name I Comaanv I Signature I Name I Company I Signature Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 194 of 202 REV. 003, 28 -Mar -16 1.) Name of Construction Site I Location of Construction Site Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 195 of 202 REV. 003, 28 -Mar -16 Start Date: Completion Date: 2.) Start Date: Completion Date: 3.) Start Date: Completion Date: 4.) Start Date: Completion Date: 5.) Start Date: Completion Date: 6.) Start Date: Completion Date: 7.) Start Date: Completion Date: 8.) Start Date: Completion Date: 9.) Start Date: Completion Date: 10.) Et Sub -Contractor Log (Continued) Start Date: Completion Date: SWPPP Contractor 11.) Start Date: Completion Date: 12.) Start Date: Completion Date: 13.) Start Date: Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 196 of 202 REV, 003, 28 -Mar -16 Completion Date: 14.) Start Date: Completion Date: 15.) Start Date: Completion Date: 16.) Start Date: Completion Date: 17.) Start Date: Completion Date: 18.) Start Date: Completion Date: 19.) Start Date: Completion Date: 20.) Start Date: Completion Date: 21.) Start Date: Completion Date: Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 197 of 202 REV. 003, 28 -Mar -16 Completion Date: Reason for Approved/Implemented Modifications: By: Type of Modification..Modification ❑ Major ❑ Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: Type of Modification Description of Modification Location of Modification ❑ Major ❑ Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: Type of ModificationDescription of ModificationModification ❑ Major ❑ Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: SWPPP Modification Log (Continued) Name of Construction Site Location of Construction Site Type of Modification.•Modification ❑ Major ❑ Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: Type of Modification Description of Modification Location of Modification ❑ Major ❑ Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 198 of 202 REV. 003, 28 -Mar -16 Type of Modification Description of ModificationModification ❑ Major ❑ Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: ModificationType of Description of ModificationModification ❑ Major ❑ Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: Type of Modification Description of Modification Location of Modification ❑ Major ❑ Minor Start Date: Completion Date: Reason for Approved/Implemented Modifications: By: Name of Construction Site Location of Construction Site Type of Stabilization Description of Stabilization Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Completion Date: Additional Inspection Frequency for work proposed for Stabilized Area: this area: -1 . *f Stabilization Description of Stabilization lIII­ Location of Stabilization 15[ Final ❑Temporary Initiate Date: Completion Date: Additional Inspection Frequency for work proposed for Stabilized Area: this area: Type of Stabilization Description of Stabilization Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 199 of 202 REV. 003, 28 -Mar -16 Completion Date: Additional work proposed for Inspection Frequency for this area: Stabilized Area: Type of Stabilization Description of Stabilization 11k Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Completion Date: Additional Inspection Frequency for work proposed for this area: Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Completion Date: Additional work proposed for Inspection Frequency for this area: Stabilized Area: SWPPP Soil Stabilization Loj_(Continued)-,_.- Name of Construction Site Location of Construction Site Type of Stabilization Description of Stabilization Location of Stabilization— ❑ Final ❑ Temporary Initiate Date: Completion Date: Additional work proposed for Inspection Frequency for this area: Stabilized Area: of Stabilization DescriptionType ❑ Final ❑ Temporary Initiate Date: Completion Date: Additional work proposed for Inspection Frequency for this area: Stabilized Area: Type of Stabilization Description of Stabilization Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Completion Date: Additional work proposed for Inspection Frequency for this area: Stabilized Area: Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 200 of 202 REV. 003. 28 -Mar -16 Type of Stabilization Description of Stabilization Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Completion Date: Additional Inspection Frequency for work proposed for Stabilized Area: this area: �ype of Stabilization Description of Stabilization 4F. 41p, Location of Stabilization ❑ Final ❑ Temporary Initiate Date: Completion Date: Additional Inspection Frequency for work proposed for Stabilized Area: this area: Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-XX010-003 Page 201 of 202 REV. 003, 28 -Mar -16 Appendix G Construction General Permit A copy of the NPDES General Permit for Stormwater Discharges from Construction Activities can be found at the following address: httn://portal. ncdenr. orzlwebflr/stormwater Novo Nordisk DAPI -US DAPI-US-INFR-PLAN-)(X010-003 Page 202 of 202 REV. 003, 28 -Mar -16 EFDEE EFDEE Engineering Professional Corporation 100 Fluor Daniel Drive Greenville, South Carolina 29607 USA [864-281-4400] tel 30, March 2016 Novo Nordisk Pharmaceutical Industries, Inc. Project Definition: A7ND Carlos S. Bagley, PE Environmental Manager Johnston County Department of Public Utilities PO Box 2263 309 E. Market St. Smithfield, NC 27577 Johnston County Land Disturbance Permit Dear Mr. Bagley: Per our conversation I am submitting a revised set of drawings and a revised C-SWPPP for the work associated with the Land Disturbance Permit for the proposed Novo Nordisk facility in Clayton, North Carolina. The drawing set titled Early Works Package, consisting 43 sheets signed and sealed by Donovan Norris, PE with the latest revision date of 28 MAR 2016 and two reference drawings of the entire site, depicting the pre- and post- construction grading plan. If there are any questions or comments please let me know. Sincerely, Jon an W. Heald, PE enior Civil Engineer JWH:jwh Page 1 of 1