Loading...
HomeMy WebLinkAbout20160693 Ver 1_Receipt_20161221U.S. ARMY CORPS OF ENGINEERS Wilmington District ggMpAn8tg[XmIlIgIflon Resragas ns b_II l L i=orm Permittee. t .. OEM 14mg Action irk: SAW-20IS-01484 Project marne: Care Chapel Rd. Form Main and water line bounty* Wake Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation .Services (NCOMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that to the U.S. Army Corps of Engineers (USACE) Project Manager Identified on page two Is in receipt of a signed copy of this form before conducting authorized Impacts, unless otherwise specified below. if more than one mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8 -digit Hydrologic Unit Code (HUp, multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate mitigation Sponsors. Instructions to sponsor. The Sponsor mint verify that the mitigation requirements (credits) shown below are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether or not they have received payment from the Permittee. Once the form Is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USAGE Project Manager, arra the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted ltrptstts and CompenszstM Mitigation Itequlre"Wats: f3raaw'�ikAw�, L-6. *......rtlmaLft s rinn:• kileft.Htle and Basic,-: 03030002. Cape Fear river Basin i 'Ww Stream impacts linear feet Wetland Impacts acres} Warm Coot Cold Riparian Riverine iii areari Pion-Riverine I Non-RiparianCoastal 0.104 "If more than one mitigation sponsor will be used for the permit, onty include impacts to be mitigated by Lnis sponsur. .».ws...r. sANis:Mte..r oru..dMeNtantc, *.dl** Nut and aasln. 030WW2. Carie Fear lover Basin Stream mitigation credits Wetland Mitigation (credits Warm Cool Cold I Riparian Pliverine Riparian Non-Riverine Non.RI araan Coastal Mitigation Site Debited: N DM (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDM,5, If the MCDMS acceptance letter identifies a specific site, also list the specific site to be debited),. Section to be completed by the Mitfptsdon Sponsor Statement of Mitigation Liability AcMptanee. 1, the undersigned, verify that I am authorized to approve mitigation transactions for the (Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for ;providing the mitigation Identified In this document (see the table above), associated with the USACE Permittee and Action 10 number shown. I also verify that released credits (and/or advance credits for NCOMS), as approved by the USACE, are currently available ,at the mitigation site Identified alcove. Further, t understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name. Marne 9_1 ZZ 1 L Date of Signature Page 1 of 2 Form updated 23 November, 2015 USACE Wiimkigtan District Compensatory Mitigation ReSgonsibilitY Transfer Form, Page 2 �V conditions for Transfer of *empensatory Mitigation Credit: rr Once this document has been signed by the Mitigation Sponsor and the USAGE is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the USAGE has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/iLF Instrument. it is the Permittee's responsibility to ensure that the USACE Project Manager (address below) is provided with a signed copy of this form. e if changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the USAGE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina interagency review Team (NCIRT), if approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the USACE administrative records for both the permit and the Bank/ILF instrument. comments/Additional Conditions: the USACE Project Manager and by the Mitigation Sponsor on Page 1. OrK 16 This form is not valid unless signed below by signed, the Sponsor should provide copies of this form oiorag with an updated rank ledger to:.) the Permittee, 2) the USACE Project Manager at the address below, and 3) the Wilmington District Mitigation office, Attn: Todd Toexgwell, z....rotoart..�rcal. Ex.nrr!,.e+n�elife7uscrte.crrmy,r.�i!), Questions regarding this form USACE Project Manager: James Lastinger USACE Field Office: Raleigh Regulatory Field Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Errrafi: jarrses.c.lastir�gercrsace.aC'r1" rnil mate Of $tgnatrarry smentsand Current Wilmington District mitigation guidance, including information on mitigation ratios, functional asses, mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at htto //ribits usacearmv.m'si. Page 2 of 2 .. .. � . , _ ... � ,sa �s �.. .M :la.. ruses. �'as t�t4 vx �nliile�' tontirwQ to d#� so. 1RA�e r►tF;` iha