Loading...
HomeMy WebLinkAbout20141138 Ver 3_Request for Withdrawal_20161221 Strickland, Bev From:Brian Rubino <brubino@quible.com> Sent:Wednesday, December 21, 2016 10:20 AM To:Renaldi, Ronald Cc:Huggett, Doug; Scarbraugh, Anthony; Pelletier, Josh R SAW; Tankard, Robert Subject:Kitty Hawk Landing Attachments:DCM-DWR-USACE Letter 12-20-2016.pdf Ron and All, Please see attached memo related to the 2 kitty Hawk Landing Permits. In summary: 1.Kitty Hawk Landing Association would like to withdraw the jetty rock placement alignment modification request at this time 2.The Association is ready and funded to do the South Entrance Channel Dredging at this time and it is important to receive the CAMA Permit soon to be able to complete this season (due to dredging moratorium dates and availability of funds) Thanks for your assistance with these projects, Brian Brian D. Rubino, P.G. Vice President Quible & Associates, P.C. 8466 Caratoke Highway, Bldg 400 Powells Point, NC 27966 P.O. Drawer 870 Kitty Hawk, NC 27949 t 252.491.8147 f 252.491.8146 www.quible.com LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer. 1 Quible Quible & Associates, P.C. EIwIIGEERIICG • EICv1RvICICIEIC1r[aCIEICCEs • PITMFNG • 3urMTIRG aIIGCE 1v3s To: Ron Renaldi, 19UDL;M Douy Ruygett, I4c, OUP71 Josh Pelletier. USAGE uC: Petcr Collins, KHLA From: Brian Ru6inu, UU01e & A55uuiates, P.L;. Uecember 20, 2016 Robert I anKard, 19UDW R Al ltnUny Sc;arbrauggh, NCDW R RE: Kitty RawR Eanding Association; GAIVIA Major 03-15 Minor Muditication Request Tor Additiunal InTurmation- Rccuntiyuratiun UT rouR permitted fur jetty w3115 P.v. Drawer a,i, My Hawk NC 27949 PlSone: LJL-4Y 1-f114y Fax: 252-491-81ziv web: -yuible.com The primary purpose at this correspondence is to inturm State and Federal Permit Ayenuies that Kitty RawR Candiny Association would like to withdraw the request for a CAMA modification associated with the rode jetty alignments at this time. The reason tar the re -alignment muditicatiun request was to provide the maximum available channel widtM Tor safety and ease of navigation. However, I have been informed that the Association now favors the original (already permitted) alignment due to the unsightly and tragmented nature ut the existing dilapidated sheetplle betties. I Murefure, tfiC current plan fol this winter is to remove the existing broken walls at the outer ends; and maintain the permitted concept at rocRing both sides at the wall out towards the end. I Fie inside jetty rocR width will ve,y IiRcly not ini�l'udc the Tull 13 Tt. Idu purtiun of the jetties will encroach into areas outside the permitted alignment. i he seuunaaly purpose UT tnis curresyondelluv is to rGspund to the NCDWR request for additional information related to the above referenced project. The reason to address this even though request has been withdrawn is to auc-ument everytniny appropriately in case tnere is ever a future modification for the same thing or something similar: Impact justiTiucAt iun (Avuidal we al ld Plinimizatiun): The Minor Modification request (withdrawn) was to recontigure the rock permitted along the existing jetties walls. As depicted un the plan that you have ►cviewca, Me reuuntiyuratiun would have plac;ed the 2e feet of rock only on the outside of the jetty walls as opposed to 13 feet on the inside and 13 teat on the outside that was previously permitted. I here is no net increase in the area uT bottom impauts assuuiatcd with this request. This would preserve the full width of the existing entrance channel, allow tar safer boating to and tram Avery Pond; and allow tar maintenance or removal ut the existiny sheet piling jetty system iT they choose to do su in Me Tuture. Navlgatlunal safety was the primary reason for the modification request. Related to SAv resources, the modification would nut have impacted (directly or indirectly) any beds of SAV. Based on current (Summer 2016) and past SAV evaluations (documented in prior GAIOIA permit requests), SAV in this area ut the sound dues nut persist in water yreater than 3.5 Tt and there have nut been any SAV resources in close proximity to the south side jetty. Related to the subject jetties, there is no permit action requested at this time. Rowever, plCase nute Mat we are alsu wurRiny un the Majur Mud tur UAMA Permit 153-U9 tur dredging associated with the South Entrance Channel. We have received the 4u1 Certification for that project (DwR 2014-1188 ver.2). 1 He Association Has a auntractor lined up to 6eyin this wurR in Carly januaiy (as luny as tnC UAMA mud issues). Dou to Me spurt winauw tur in-watCr wurR due to permit conditions and availability of Lands tar this winter; it is extremely important that this Hermit issues as suun as pussible. Please let me Knuw it there are any yuestiuns related to these matters or if there is anything I can supply to assist with issuance of the South EntrancC GFiannel permit muditicatiun issuance. ThanR Brian Rubino