HomeMy WebLinkAbout20070173 Ver 5_Stormwater Approval_20161207Burdette, Jennifer a
From: WYB (Wendy Bailey) <WYB@novonordisk.com>
Sent: Wednesday, December 07, 2016 10:13 AM
To: Burdette, Jennifer a
Cc: beth.reed@kimley-horn.com
Subject: DAPI US -SMP Approval Letter
Attachments: SMP Approval Johnston County 02 Dec 2016.pdf
Good morning -
Please find attached a copy of the SMP approval letter from Carlos Bagley at Johnston County -Public
Utilities for the DAPI -US project in Clayton. If additional information is needed, please don't hesitate to
contact me.
Respectfully -
Wendy Bailey
Sr. Environmental Professional
Novo Nordisk Pharmaceutical Industries, Inc.
3612 Powhatan Road
Clayton, NC 27527-9217
USA
+1 919-550-2200 (phone)
919-750-6047 (mobile)
WYB@novonordisk.com
This e-mail (including any attachments) is intended for the addressee(s) stated above only and may contain confidential information
protected by law. You are hereby notified that any unauthorized reading, disclosure, copying or distribution of this e-mail or use of
information contained herein is strictly prohibited and may violate rights to proprietary information. If you are not an intended recipient,
please return this e-mail to the sender and delete it immediately hereafter. Thank you.
6"""" V"'(/4
DEPARTMENT OF PUBLIC UTILITIES
POST OFFICE BOX 2263
SMITHFIELD, N.C. 27577
(919) 989-5075
December 2, 2016
Novo Nordisk Pharmaceuticals
Attn: Gary Lohr
3612 Powhatan Road
Clayton, NC 27527
Re: Novo Nordisk DAPI -US — Phase 1
Stormwater Management Statement and Plan
Dear Mr. Lohr:
We have reviewed the revised Stormwater Management Statement, Plan and calculations
submitted for the Novo Nordisk DAPI -US. Based upon the information submitted, the
Stormwater Management Plan has been approved with the following stipulations:
I . The proposed impervious area for Phase 1 build out will be below 3.6 lb/ac/yr, therefore,
mitigation will not be required at this time. Once Phase 2 plans are finalized, we will
determine if nitrogen mitigation will be required.
2. Prior to recordation of the Final Plat, please provide a signed, notarized, and recorded
operation and maintenance agreement for each structural BMP. An inspection report for
each BMP shall be provided to the Johnston County Public Utilities Department on a
annual basis beginning one calendar year after receipt of the stormwater certification
statement.
3. Prior to recordation of the Final Plat, please provide a stormwater certification stating that
all stormwater facilities were constructed in accordance with the approved stormwater
management plan.
4. Please indicate all drainage easements, riparian buffers, jurisdictional wetlands, and flood
hazard areas on the Final Plat.
A copy of this letter will be forwarded to the Planning Office for their files. If you have any
questions or need additional information, please contact me at (919) 209-8333 or by email at
carlos.bagley2wiohnstonnc.com.
Sincerely,
C4-�2-�
Carlos S. Bagley, PE
Environmental Manager
Cc: Jonathan Heald, PE — FLUOR via email