Loading...
HomeMy WebLinkAbout20070173 Ver 5_Stormwater Approval_20161207Burdette, Jennifer a From: WYB (Wendy Bailey) <WYB@novonordisk.com> Sent: Wednesday, December 07, 2016 10:13 AM To: Burdette, Jennifer a Cc: beth.reed@kimley-horn.com Subject: DAPI US -SMP Approval Letter Attachments: SMP Approval Johnston County 02 Dec 2016.pdf Good morning - Please find attached a copy of the SMP approval letter from Carlos Bagley at Johnston County -Public Utilities for the DAPI -US project in Clayton. If additional information is needed, please don't hesitate to contact me. Respectfully - Wendy Bailey Sr. Environmental Professional Novo Nordisk Pharmaceutical Industries, Inc. 3612 Powhatan Road Clayton, NC 27527-9217 USA +1 919-550-2200 (phone) 919-750-6047 (mobile) WYB@novonordisk.com This e-mail (including any attachments) is intended for the addressee(s) stated above only and may contain confidential information protected by law. You are hereby notified that any unauthorized reading, disclosure, copying or distribution of this e-mail or use of information contained herein is strictly prohibited and may violate rights to proprietary information. If you are not an intended recipient, please return this e-mail to the sender and delete it immediately hereafter. Thank you. 6"""" V"'(/4 DEPARTMENT OF PUBLIC UTILITIES POST OFFICE BOX 2263 SMITHFIELD, N.C. 27577 (919) 989-5075 December 2, 2016 Novo Nordisk Pharmaceuticals Attn: Gary Lohr 3612 Powhatan Road Clayton, NC 27527 Re: Novo Nordisk DAPI -US — Phase 1 Stormwater Management Statement and Plan Dear Mr. Lohr: We have reviewed the revised Stormwater Management Statement, Plan and calculations submitted for the Novo Nordisk DAPI -US. Based upon the information submitted, the Stormwater Management Plan has been approved with the following stipulations: I . The proposed impervious area for Phase 1 build out will be below 3.6 lb/ac/yr, therefore, mitigation will not be required at this time. Once Phase 2 plans are finalized, we will determine if nitrogen mitigation will be required. 2. Prior to recordation of the Final Plat, please provide a signed, notarized, and recorded operation and maintenance agreement for each structural BMP. An inspection report for each BMP shall be provided to the Johnston County Public Utilities Department on a annual basis beginning one calendar year after receipt of the stormwater certification statement. 3. Prior to recordation of the Final Plat, please provide a stormwater certification stating that all stormwater facilities were constructed in accordance with the approved stormwater management plan. 4. Please indicate all drainage easements, riparian buffers, jurisdictional wetlands, and flood hazard areas on the Final Plat. A copy of this letter will be forwarded to the Planning Office for their files. If you have any questions or need additional information, please contact me at (919) 209-8333 or by email at carlos.bagley2wiohnstonnc.com. Sincerely, C4-�2-� Carlos S. Bagley, PE Environmental Manager Cc: Jonathan Heald, PE — FLUOR via email Printed on recycled paper L