HomeMy WebLinkAbout20160566 Ver 2_Certification of Completion_20161216Burdette, Jennifer a
From:
Sent:
To:
Subject:
Attachments:
Please see attached.
Sincerely,
Kristi Thayer
3200 Glen Royal Rd, Ste 104
Raleigh, NC 27617
www.thayercustomhomes.com
(0) 919-636-4798
Like us on Facebook!
Kristi Thayer <kristi@thayercustomhomes.com>
Friday, December 16, 2016 12:51 PM
Burdette, Jennifer a
Re: 611 N Elizabeth St Durham NC
DOC 121616-12162016133147.pdf
From: "Burdette, Jennifer a" <Jennifer.Burdette@ncdenr.Rov>
Date: Friday, December 16, 2016 at 11:49 AM
To: Kristi Leonard <kristi@thayercustomhomes.com>
Subject: RE: 611 N Elizabeth St Durham NC
Hi Kristi,
I am and hope you are too.
Attached is a certificate of completion that needs to be completed and submitted. You only need to complete
the top section and the applicant's signature block. Inspections for permit compliance are done on a random
basis. This form just lets us know that project is complete. Please make sure that you email me a copy of the
mitigation payment receipt if the mitigation provider doesn't send it to me directly. A copy of the recorded
declaration of compliance also needs to be sent to us (see a copy of condition below).
Prior to sake of the property and in no event later than December 31, 2016, a
declaration of compliance, which indicates the footprint of the rain garden and all
associated conveyances and ensures direct discharges of stormwater runoff
through the buffer do not occur, shall be recorded with the Derham COUnty
Register of Creeds, run with the land and be binding on all future lot owners.
1
Thanks
Jennifer
JenniferBunJette
401/BufferCnnrdinotor
Division nfWater Resources -4U1 & Buffer Permitting Branch
Department nfEnvironmental Quality
Q1Q8U76364office
1617Mail Service Center
Raleigh, NC276QQ-1617
(Physical Address: 512N. Salisbury St, Raleigh, NC278O4-QmFlrArchdale Bldg — Room Q42F)
Email oorrespoclenmeto and f�omthlo; address isout-yect to t1he
NotihCano8na Public Records Lam/and may bedisclosed &oM7irdpadies,
From: KhsdThayer
Sent: Thursday, December I5'20I62:45PM
To: 8urdette'Jennifer a
Subject: 6IINElizabeth StDurham N[
Hi Jennifer,
| hope that you are doing well. |just realized that | never sent you anything about the work being complete. | can't remember
what the process isfor you checking on the work. Can you please verify? Also a check has been sent tothe Mitigation Bank so |
would imagine that you will receive a copy of payment the first part of the week. Thanks for you help!
KhsbThayer
3200G|en Roya| Rd' Ste 104
Raleigh, N[ 27617
vvvvvv.thavercustomhomes.com
(0)919-636-4798
Like us on Facebook|
A
��
A�����
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
DWR Project No:
IlG-OS ��, v2
Donald R. van der Vaart
Secretary
County: DUY-I' om
Applicant: C- r� Su lOh'cyI t 11 C
Project Name: (o 1-,)-Ck e--tn DurV)(k'A N3
401 Water Quality Certification Issued Date:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR
401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, 127699-1650. This form may be
returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's'ertification
I,f (5�cv'L T"(11 1l.c-r hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that,
to the best of my abilities, due care and diligence was used in the observation of the construction such
that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials.
Signature: Date:
Division of Water Resources — 401 & Buffer Permitting Unit
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N Salisbury St, Raleigh, North Carolina 27604
Phone: 919-807-63001 FAX: 919-807-6492
Internet: www.ncwaterqualily.org
An Equal Opportunity 1Affrmabve Acton Employer— Made in part by recycled paper