Loading...
HomeMy WebLinkAbout20161000 Ver 1_More Info Received - Email_20161214wl� RECEIVEDINCDENRIDWR DEC - 1 2016 WQRCS WORESVILLE REGIONAL OFFICE Consulting November 29, 2016 F,ngineers and Project 1515570 Scientists Via e-mail: alan.johnson@ncdenr.gov Mr. Alan Johnson Senior Environmental Specialist NCDENR Division of Water Resources 610 East Center Ave., Suite 301 Mooresville, North Carolina 28115 FAIRRI GLI Consultants Re: Additional Information Request - Eco -Energy Charlotte Intermodal Facility Project Dear Mr. Johnson, Thank you for taking the time to meet with us earlier this month. This letter provides the information you requested onsite, including stream and pipe measurements and additional details on the project development. Also, enclosed for your review please find the full site plan set. Stream Measurements Eastern stream: • pipe length to be replaced: 60 feet • length between the Transflo culvert (to the north) and the existing culvert onsite: 89 feet • length between the Transflo culvert and the proposed culvert onsite: 59 feet Western stream pipe length to be removed: 60 feet Culvert Design Sheet CD3.0 of the enclosed site plan set provides the detail for the proposed culvert structure. The box culvert design is based on the City of Charlotte's Land Development Standards. This design, which is specific to the proposed project, has been discussed with the City of Charlotte's Stormwater and Erosion Control Reviewers. The concrete wingwall with splash pad replaces the need for riprap placement within the stream channel because it provides up -gradient protection. Proiect Purpose The overall intent of the project is to provide a more efficient transport system for government - mandated alternative fuels that is safer for the general public and local environment. The proposed project will streamline the supply chain for alternative fuels into the City of Charlotte and replace single manifest trucks to tank farm with a direct pipeline. A delivery rate of 1 unit train of ethanol per week will reduce single 8,000 -gallon tractor trailer traffic by 18,000 trips per www.eeiconsultants.com GEI Consultants, Inc., P.C. 110 Walt Whitman Road, Suite 204 Huntington Station, NY 11746 631.760.9300; fax 631.760.9301 1 2 3 4 6. . - or OMMAL NQ= 2.' - - 1. A 41001i'AIF i' OFa ■N 1/r RAoa lNALL !E RE(xU(® N M CONCRETE L �• •., �" 9KrA((( AT r _. OE 1/2' OPANSaNiJaR�L E�� EaiaWD AT 45 - 1 �_ _.. .t:.. .. v.. ' ., WAO L 1/r RPAMSa JEIR (iaMF EQNlADOM f1 :I .- I fMl o0M a tlM DIE _AC(M[tE fiP RIRRYRxi 11NOIg1 �,y'._°'ll K u�c AK +01T.W1BRAL R[ ILA(>E - AAL NOtEs• - _ �y00MS f RO1R® � ppE' f. YaiM ANI 910111D E SENSM 7rAt "YD 6/0' NICK. E IRW &na[ MmoA D q. (gNR Qry1 E 1 ALL QOMtl[E Y9�pE�J00y0A�03�! dq/'E[ 7RpIRR •�,,p�� / - "•mak ,�:.s. ^^`J'� ^' ,. . . ..~ N1� Ap0.� W *SiR ww"m E1PAtISSi/tpMalllCllpM CRONY • j CMorlio\orl (��( gA1E0 f//�2` DPANSON JOIST rwL K Eg1R0 SaE itE .. . ... KMYIKT.IONS AM+f-LOGO SIRDOIINL ♦ - t S Ma 1i1NN WIBf rMW oaWl Owl[MYL mE >� SBIIRAIA IOAm 1011 CIRdMY! NFM (0!' IONR iD�±� A - A _ - - ' 0. r p1�0 XelG 1 T -r N ORPM AMLL K �Rpglp MM Napa RqR( . !: =M AT PRIME Y-EMi0N1[!S 10 K r ltlaL ��'• .. 3.. ig1N.OF' SNUG/B01111I�pSE1EOI10E7NN0O(RAN(,(BIF f A MINIMUM r . SMITH SOT. . pRY(�YYa 1R�.'�.�'RE� " KYM'F"RNIRAT(aa A10 oo � air - ods !wi E 11 AQOW. WN Sg 30.11 . S - COMORM NOUN Wr CRE USM N (N OF NAND COMMON -CLAY -MRx. CPARLDTIMNO .. �y ' • . • 4 MCRpiN SRELYAtMl ON N011-1(IgIQIQFML S1 t awx K a TWIOAL Fa sA011 iNa pRWQ AIR FK1E fMM a AROD am" UL t FNlFfim. SIN![T >i�lli INRN OF. V. SIDS" 10 09 PO4RRD.70 60 a (4A9 AT 11iESECTNO S TNOPOin 1(IRS AIR EMmWmWWFMu 8 : ty orMIRgI AM '/Y SWANSON Off - 4. •r NwxmMII SMALL K TRI{ a tut PDR r -r N (Boli a Lac r aµ{ Rat N (R�a} ISE,r - rNLL m r_O• FROM mV -0F: om ' C IRI(1. 1lRI ilE NYAINW r-0'. •. '1 GROOVE JOINT IN SIDEWALK nanE adwEs a((EINSN su(L K Iwo P! N m DAYS 0. nO1S16 COIRITION3 WTUEE AON719NAL YADIII Sa7EWNM5 Miaa1 9NALL - Sf{'0.7mE lll� n 511081. RVALLTB y to . ALar(Nc arFRmac} : Tr Q TeR f i 0. FSa AFARpyA� N IDDIRWO.NY COOT a GNAW - Ir a ALL EVOMI JON10 MILL E OOMCAYE mOlf0. 0. ALL PIF[ M flay OMAN SMALL E a7Nlaf EVWI IRa1 /1[ NSE D ' 7.. JNC11011 SOISS ANO. VAJTT al(AlL (If NON-�{tl AS Swan dM a. JOINT NATIONALS STILL Isar STSlN/51fR1 m POST OOIIS7nIDt1oN NSTALLATIa i/r_ RAaR . _ ; _ M�ILti N A ItARlII,aA.� fEOY RIIRL 11M A. �-+ A,. ", - "" " Rr$aM. STMT M4 71RNL - �. L .A•D FOR NO NO W aeRON FSS APPAMUM SCOL MIOIIOt SHALL MOT 0E� 10 MY40 N UVIt81 tYM 1• SRIAIr ` :. -- t1Alt. OROInED NO:9RISW. EIWO'N.,. 10.' Mt!'p HOLES SMLL K PLACED N SAM WALL AIN MM FASB . a $T1MS a BACK 30L t1. M6 uIOI MSI 5 NDf m K NIRM PUNT OF MY - - - - 1N� aR1gT IMrii o>IOIIE APIWOYEp W air aE!!R D . . RfPMla mom" OOIWMRIOMSI ter la 1/41 - - � ' f 1Jla I van ANiMr MNN YFRM ALL OPIpIpE 10 K JaW SAL. CMrNCN L - I " . Os VtaD .: ALU OW! AIR Sam AIR SDRMMMS ME. .. � TO Ka RIWMo m tE M MEMIT Ja(r REmno B - - 0!F]ISf1ME 01 RKIFORpNO OOYER BOX AMWE OM4MgtpN • -. M�[MI'pyOa�eLIRIFRaI OR CUT Nay A sAr wn g,� PPE FpAN MD1N - x - v K pR lr _ r 1 /JNR. - 1[Y or#) N JOINT '- Jell' FULII 1:a0s MAYS - - 1p LMa LVT a OIC E IfNRO14(F�R m mK' :. A pg10C(L - ND cmUL or cr*ia 0N' - - : :: - _r yLJ - iA• Q NOR Q ,^ Y 11 Ir . 0 A' R N Q , 1s• i• -r -T 2 - T- • 7 •-r 2!- -1 1r 4'. r-8. 4•_n• z . a_ - 5-t• i] lC-a 4•-0• sf' 4'-0• �" r_a• x -r -a -P a •-4 4' . Jr e -W Y•d Y-11• 2 4•-r t 3T s••• •-70• ' I/rYEIPAT �i6N$VER EXPANSION rrrr . aNW tRrtaNt 11F[gWWtT - 1YSN W1MY L• •II •A• �1Mp. ►-. (-IliNVR0 .S•-1• - Jr 4'-0. 7-r ate• 2 Y -Y ! 5-1' 37 S 4. -1r 4r 4'-W S.e' a-tr : s- -t 37 -4 _10r - IN SIDEWALK rRgD® a• aaa1ETE SQWNR »[Maa>aRMN A LoomicaMOa 1r s _ . , -.., _ r -: A - - 30 - 4r a'-!' 4•-0' S- 2 5-1• to 5-r 4D 5- !'-4• - - = DETAILS ROWING EXPANSION JOINTS IN CONCRETE SIDEWALK CRR-IMLYm t on� Nt SENORJ7`10-0 a INT` °" n g NOT TO SCALE NOT TO SCALE x -x SEI�OPL_ • an lA CBARiAm "COMMERCIAL TYPE it AND RESIDENTIAL TYPE 1 1rff of OBA1mom SLAB TYPE CATCH BASIN gg ggg 11,011) DRIRGOP "AUDI CONCRETE SIDEWALKS Ie11DDRPBUDPYe7[ SG[mAM I DROP CURB DRIVEWAY NTH SIDEWALK ABUTTING . DRVRWFAQRA9`orma RDR 10.22 3 CK"Rorm fame®iaunma m CURB (2'-6" CURB AND GUTTER) 10:24A 3 cHAMO e > m � 15" THRU 48" PIPE 0.05A 7 �Eyq C • Cp1aETE MNDRALL A •. / LL • ,A� • l TEE p 1 wall a NO LSIF 1 :� c O �1 S o MINIMUM WEIGHT. A' /r NND !6 183 L tDx I • aILWJIi� • 'iir - C COYvt. K 185L. ! j B T a-+ - - IUM o I ' PLAN - i A A C�t-- -- - -L-- --t-; 'LGENERAL N07M, E NATURAL GRACE l $� L EE FORIR( NLOOT rfAWMD 310.01 MR OE'fAOS. r COASTrA1101�10--a . - OWN - - CONCRETE. MINGWALL AND aAVERT INVERT 12' 80JOW FOUNDATION BELOW GRADE e J L 1 OMFORCEMO T SHALL OOKaN TO INE AENaDIQaS < OF IM1iORCED CONCRETE PPC OF LAE DLVACM PER .'. j < - - EOSTNO GRADE- SHOW DASHED AASH) m70. TANS z TWL a.. 7 b �S Iltt A 3r 711M NO APRON, f10 IIFOT FNnwAI �.. E-cyAnON - b. S 'NL ODIpEE m eE JNEI ►CSCR COIAF.SSIE EDEIMOIII. - Y -Y qA PLAN NEW F1L REAP 1ORa M NAmL NM. AND 057 SIdECONCRETE 1.. e i.�. C PROM TAMIL OR WON DONT AT MET FND.SECUM. 0. 1w0\S6 GROOMS OR SELL ANT AT OUTLET 00 9EO710M. a 3 �i S-Ih• S/a• EEE STV. 20.27 AID 20.24 E 0. M W DUBO FOR CTD SfCR= 9441194411BASTANUALLY ADM r J/1 COSTING GRADE Ex14IM10 TOP (eE_) .. c • OF BAN( RP NAP AP". FML RIP - WN 11E TASL MMa VARIATION! MLL E PFNRTIFD BASO a THE MNRD FONTS AM STANDAFONND TEMPLAWL 7. NOT ro K I= N WDOT M KTNIED SNT OF WY. ti: p �• RAP VMS NATM• SOL AIA 7STONEw 7l d °i Pi K RAW$ Z. SECTION A -A SYKNI 5 B �� NOT TO SCALE a • \� Cfff OF CBARWM ILM DRMONI IT STARDARDS MANHOLE RING AND COVER CeY OF ceAworaa FLARED END SECTION it THM RP RAP ttwaMRM aumarEs FOR SLAB TYPE CATCH BASIN 5 SECTION A -A_ CIL% WT. Fu RP RAP vacs SIN NATIVE 90L AND RI7 STixE ADD um DVffX = STANDIWI6• 12" THRU 72" PIPE lawam 0.058 BOX rrrJL r j�GWAL L AND APRON DETAIL SILL PLATES AT 10 D.C. �DT� � CNN= QJ 20.22 1 L GAFF R NRLW R V W W MW MRN. Mm AND 0" or NIIOI . � POST Dp�IEMgI:' - \iP A aOVOW n llE Oq®L - 1. 4-S AIa uIROr ND4x]).. aOMIWa F+IBFYIBIT POai -... P 111Illlr �N CAR S. momm 1D DE wNN WMV�LENOR ArTw ntlol mol /REMORA F1p1M SOL R AC�BQiOm ON uaaw. Mar NW. rcE P{ANWiOS AAE a01IRMO (!E - p1SW 1P Mp SO VFTOM /MISS, E O IE R•N•A•[ ap�ANAIpg�Rf A1TplQERa�W COIR OIRFC AT A M YI�Q OS v 21 AAD IRNfNpMDq I�QLBBMMI Il0 x PR WI[1a ALL a SOPEM ro E X PPw� N Er. SCAR® WN SPAIN. OWN OVLET SIONCRUE ®1p L r 4 M R`NQLR Im/MF OIM"ENIMSMf tAI O al�•�M}NFR� M[ NR IMRMI W[ Wr1tL O la Sm! MA ML 1[ A1p11NNt MNt A NIOIT 0t NOR IML AT K MRWMWIY Gp_O!20 AD= EAMONDIN 1 : WR DF WT ADa>• IDAO 1 W� 1 N� ]WL NATE MM. 1Y 21 10[ _• i SMSM® WOM MAX ICON. . a • N�M"LVFf ��.D�F rt IS, W S, " M91® NIIRI '•^'^^' OYM g ff o Rv M• al OPRLl�Y iN F• _ T I •'�I_ A 01( pO q 1[ MOPgy tr M6IMNFM CK OF a*/0.Mf1AM Bp�Y 00 F••OMf 11[ ®RNSO IARR ISD NaMN DW56 11 L l ML NWfItAR WI lRMTK A R OlA•/CIR A FFaR BEAR T ilr aORMp S[ r^ �.,:,..-�-�' PRNNort roa. •♦•. _ IRADVIL ISM14M AI'FDR r IK •••�T rOEi WOSACIIOM - , �. 1.Y1 \\•••``. rlllll)11 \\ 011156IIIML IIDT EE AUOPE a caPACIW M - MSAIeI ,T NL � rM1Fx:Sa PON�NOIf POOL •AQt SAGYOf•M • 4WRBFaR M M MaLOOM IYIWfBIT Q M AIIRI � :. Cl 1 1 • RTW F/�C COWL M MFTAIID N 4pIACm 1NNIDE NWOI 10 NAasoTT OF W/fa ♦' .�' . SCR[ •SR IR IITIRAt ROt UP W. N IDN N V MAOI A IRMi OW56 �- Aa MMEETT PPWKE .. y.._ 1� • A MSM ay�b..:_ • 1�YIR Marr tNRIAA t1 pWar® I FMOIIIIMRI YT PTAH �4R N ApW � SAR v � �SLOSUL MON� �O PWI9AY .p - YR INIA NODMMM NRI MG SUFDNC AM I DMIN MAWRL R C MILITNI I MWR MOWN MW Iiil INAIIAY. NO OSOEI GTA f+' N} lNN M N / FpIaM�[T1IA� IGG'Op M ORI NIQ MA pl'•E YAN WD R 4 AL1 MLIL (ONAE Ny - U t� K N NRR Y W -a •! M R^ FA Nr V Nr Nr N AY - app NRpMIIQ F{'ay� '�\ Y ROE OYM[F MD L9Gg ENS YKi OPF W. LL JJ - �PAMM M V 1u Ar COST E FaRD AT WE ILI p W_D IF A M 1V NJ NLt N P ST V MVO ILr M I� • IN IT V ISM Rf N > 1811 1R ADS EASIIONT - Y' N �ES. L14L.. L H 1101 UYBI p 111DSM0 SOl q AFCOA608 M MIF AIWA NBR NIYNM AK WWIIP® (8 Rr mN YMAIALi - A C CRR tIFNNMNIN\. •N,••� EMNp RM{MN pI PLAN VIEW tA„AII IP11FEaNE•,E1N -� • s(..Nw MM Ie M.FNN M..MN(MLOLNiMIL• NOT TO SCALE NOT TO SCALE • RIPRAP APRON AT PIPE OUTFALLS OTHER THAN AT SWIM • l� CRY CBARiD17E US MRFRr,OF>�rrr ylr WETPOND PLAN SMP FTG 4.2.2 • CIfY OF CBAATIB'R IUID DIVnO I STI�� WETPOND PROFILE 111P+% DRUM ee 20.23 7 ceAtauna amore � 21.05 2 (a4alur>d � (anima in 4.22 21.06 5 CDMA 2 3 4 5 Mr. Alan Johnson -2- November 29, 2016 year. The proposed project will provide a safer process for transporting ethanol by introducing a fully contained operation which in turn would; reduce truck traffic in the Charlotte-Mecklenberg area improving roadway safety, limit handling of the product thereby reducing the potential for spills, provide increased safety for workers, and decrease the environmental effects from trucking ethanol into Charlotte. As Charlotte grows and the demand for ethanol increases, the facility would allow for increased volume without added ecological and environmental impacts. Project Planning — Constraints and Efforts to Avoid/Minimize/Mitigate Impacts Following a real estate search based on the project site requirements located within the greater Charlotte area, no feasible alternative properties were identified. The project site must be zoned for Industrial use and have a pathway to an existing rail line and tank farm. The proposed project site is zoned Industrial and the proposed rail yard will connect to the existing CSX spur track adjacent to an existing Transflo rail yard to the northwest and to the Kinder Morgan tank farm by pipeline. The rail yard must be configured and angled as proposed to connect with the existing railway to the north. A rail yard receiving a unit train of 96 cars requires an area approximately 1,200 feet long by 300 feet wide. The available space on the property allows the proposed rail yard to be configured on the project site to minimize environmental impacts to the maximum extent practicable while maintaining the required alignment to the adjoining rail facility. The project site has three (3) stream segments transecting the property. The project layout has been designed to minimize direct stream impacts and buffer disturbance while accounting for the required rail geometry. The proposed project disturbance is focused along a section of one of the streams that is already piped. Additionally, the project footprint is adjacent to the industrially developed area to the north leaving a wooded buffer to the south. The proposed project design includes approved storm water Best Management Practices (BMPs) to reduce surface flow volume and improve water quality. The constructed wet pond will store and treat run off from the proposed rail yard. The proposed project will also include the application of a combination of City of Charlotte Buffer Restoration and Buffer Preservation, as well as Stream Restoration and NC DMS Stream Mitigation Credits. The proposed mitigation techniques and storm water BMPs are measures that will help contribute to the protection of the water quality downstream of the project site. Western Stream Restoration We understand the western stream restoration will require grading of streambanks and buffer plantings after the section of pipe is removed. A stream restoration plan is being developed and will be submitted for your review. If you have any additional questions, please do not hesitate contact me at 631479-3509; ebrosnan(&geiconsultants.com. Sincerely, GEI CONSULTANTS, INC. Erin Brosnan Ecologist/Restoration Specialist EB:kmh Enclosures c: S. Chambers (CEPA) J. Stynchula, MB Billerman (GEI) I:4Admin\PmjectsT"1ogy\Chambers Paw Creek Charlotte NC\Permit ApplicationTro Energy Charlotte - DEQ Respo� Letter.do" SITE DEVELOPMENT PLANS for INTERMODAL ETHANOL TRANSFER FACILITY CHARLOTTE, NC CSX INTERMODAL YARD mene �v FUELING SOLUTIO ECO ENERGY DISTRIBUTION 6100 Tower Circle, Ste 500 Franklin, TN 37067 September, 2016 Proj. No. 2015945 RECEIVEDINCDENRIDWR DEC, - 1 2016 I� chambers rt ....... engineering pa l fi8S''...','��'' 129 Nath First Street WQROS MOORESVILIE REGIONAL OFFICE 1794-3L abentene, NC 213001 7on.ssa.'427 ph www.ce-pa.can GENERAL ALL WORK AND MATERIALS PROVIDED AND INSTALLED TO BE IN ACCORDANCE WITH CSX SPECIFICATIONS. (STANDARD GUIDELINES AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF PRIVATE SIDE TRACKS) 2. THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR, TOOLS AND EQUIPMENT FOR ALL WORK INCLUDED IN THIS PLAN SET AND THE SPECIFICATIONS. 3. ALL PROPOSED TURNOUTS CONSTRUCTED BY THE CONTRACTOR SHALL INCLUDE D SWITCH POINT GUARDS. REFER TO CSX STANDARD DRAWINGS 2224 AND 2225. 4. REFER TO THE CSXT STANDARD SPCIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF PRIVATE SIDE TRACKS, DRAWING SS500 FOR BONDING ARRANGEMENTS ON TRACKS USED FOR LOADING OR UNLOADING COMBUSTIBLE AND FLAMMABLE LIQUIDS OR FLAMMABLE GASSES. 5. REFER TO THE CSXT STANDARD SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF PRIVATE SIDETRACKS, DRAWING 2225 FOR NUMBER 10 OFFSET AND LAYOUT DIAGRAMS WITH RAILBOUND MANGANESE FROG FOR 115RE, 122CB, 132RE, AND 136RE RAIL 6. REFER TO RAILROAD VALUATION MAP NUMBERS V3344 k V33443. 7. SIDETRACK CROSS -TIES SHALL BE SIZE 3 (6' x 8" x 8'-6' LONG, MINIMUM 7' FACE). B. TIE SPACING SHALL BE 20' O.C. ALONG SIDETRACK EXCEPT IN TURNOUTS, ROAD CROSSINGS AND SPECIAL TRACKWORK. 9. A MINIMUM OF 11ORE CONTROLLED COOLED RAIL SHALL BE USED INCLUDING DOUBLE SHOULDER TIE PLATES WITH AN 8 -HOLE PUNCH COMPATIBLE WITH THE APPROVED RAIL SECTION AND SHALL BE USED ON ALL TIES, EXCEPT IN TURNOUTS AND TRACK CROSSINGS WHERE SPECIAL PLATES ARE REQUIRED. GEOTECHNICAL i. REFER TO REPORT OF GEOTECHNICAL EXPLORATION FOR RECOMMENDATIONS. CONTRACTOR RESPONSU31LMES CONTRACTOR SHALL COORDINATE ALL WORK WITH CSX. 2. ANY EXISTING CONDITIONS FOUND TO BE A VARIANCE WITH THESE DRAWINGS SHALL C BE IMMEDIATELY REPORTED TO THE ENGINEER. THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION IN SUCH A MANNER AS TO PROTECT STRUCTURES WITHIN PROJECT LIMITS, ADJACENT EXISTING STRUCTURES AND OTHER SITE ELEMENTS WHICH ARE TO REMAIN IN SERVICE. 4 CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL ACCESS TO CSX PROPERTY, CSX ROW AND ALL OTHER LANDS NECESSARY FOR THE PERFORMANCE OF THE WORK. SAID RESPONSIBILITY SHALL INCLUDE, BUT NOT BE LIMITED TO, OBTAINING ALL NECESSARY CERTIFICATIONS, PERMITS, ETC. AS REQUIRED BY CSX. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES ASSOCIATED WITH CSX ACCESS INCLUDING CSX FLAGGING FORCES, ETC. IA UTILITIES 1 IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL UTILITIES WHETHER SHOWN ON THE PIANS OR NOT. INFORMATION SHOWN ON THESE PLANS CONCERNING TYPE AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING THE NECESSARY UTILITY COORDINATION AND MAKING A DETERMINATION AS TO TYPE AND LOCATION OF UNDERGROUND UTILITIES AS NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL VERIFY LOCATION OF UNDERGROUND PIPELINES, CONDUITS, STRUCTURES AND OTHER FACILITIES BY CONTACTING THE OWNERS AND PROTECTING IN ADVANCE OF ANY OPERATIONS THAT MAY IMPACT UTILITIES WITHIN THE PROJECT LIMITS. EROSION CONTROL 1. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN SUCH A MANNER AS TO CONTROL EROSION AND PREVENT SEDIMENTATION FROM LEAVING THE SITE 2. EROSION CONTROL MEASURES AND PRACTICES SHALL BE INSTALLED PRIOR TO LAND -DISTURBING ACTIVITIES. EROSION AND SEDIMENT CONTROL DEVICES SHALL BE IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL ENVIRONMENTAL RULES AND MSDS REGULATONS. DESIGN CRITERIA 1. CSXT STANDARD SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF PRIVATE SIDE TRACKS. THE CURRENT EDITION OF THE AMERICAN RAILWAY ENGINEERING AND MAINTENANCE OF WAY ASSOCIATION (AREMA) MANUAL FOR RAILWAY ENGINEERING. 2, DESIGN SPEED: 10 MPH SAFETY I . CONTRACTOR IS FULLY RESPONSIBLE FOR THE SAFETY OF ALL ITS EMPLOYEES AND SUB -CONTRACTORS AND WILL PERFORM ITS WORK IN SUCH A MANNER THAT WILL ENSURE THE SAFETY OF EMPLOYEES AS WELL AS RAILROAD PERSONNEL AND TRAIN OPERATIONS IN THE DESIGNATED PROJECT AREA. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH RULES, REGULATIONS, PROCEDURES AND SAFE PRACTICES OF CSX, OSHA, THE FRA AND ALL OTHER GOVERNMENT AGENCIES HAVING JURISDICTION OVER THE PROJECT. N SHEET INDEX SHEET NUMBER DESCRIPTION GOO Cover Sheet GOA General Notes -Sheet Index CO.0 Existing Conditions C7.0 Demolition Overview - Sheet 1 of 4 C1.1 Demolition Plan - Sheet 2 of 4 C.2 Demdition Plan - Sheet 3 of 4 C1.3 Demolition Plan - Sheet 4 of 4 C2.0 Site Layout Overview - Sheet 1 of 4 C2.1 Site Layout Plan - Sheet 2 of 4 C2.2 Site Layout Plan - Sheet 3 of 4 C2.3 Site Layout Plan - Sheet 4 of 4 C3'0 Grading Overview Plan - Sheet 1 of 4 C3.1 Grading Plan - Sheet 2 of 4 C3.2 Grading Plan - Sheet 3 of 4 C3.3 Grodng Plan - Sheet 4 of 4 C4.0 Utilities Overview - Sheet 1 of 4 C4A Utilities Plan - Sheol 2 of 4 C4.2 Utilities Plan - Sheet 3 of 4 C4.3 Utilities Plan - Sheet 4 of 4 C5.0 Erosion ControlOverview Pian - Sheet 1 of 4 C5.1 Erosion Control Plan - Sheet 2 of 4 C5.2 Erosion Control Plan - Sheet 3 o1 4 C5.3 Erosion Control Plan - Sheet 4 of 4 C6.0 Landscaping Overview Pim CDI.0 Details CD2.0 Details CD3 *0 Details CD4 'D Details CD5.0 Details CD6.0 Detoile D7 C.0 Details CDB.O Details 2 3 s U8. DEPARL'YRNI'OFTRE [NT6RIOR Y10lINTAOi R;IAND IAxi. QUADRANGLE c.sosoLocicu DevLv USTopo sw.ua l.x: r,.r�'w�uw.e s.w.o.aerx+I.w - suU l:laam 0__ �o MOUNTAIN .IAND IAKF. NC 4 D C B ece-energy ECO ENEMY CHARLOTTE, RO 17943 1] Z. t O J Q =LLrc Ind w W sow 0z Ooz z A��w Wj 0It z W Y U' !N![T NUM!!R G0.7 '- ec:-energy KINDER MORGAN SOUTHEAST TERMINALS LLC / DB. 181PG. I40 / I 057-257-2 12-03 / / CITY OF CHARLOTTE j HTRANS HOLDINGS INC. W.11630 PG 340 - _ OB. 8603 PG. 215 OS7-212-OB t 057-212-02 ECO EKY CHARLOTTE NC - � D BLANCHARD TERMINAL COMPANY LLC 08. 280°2 PG. 285 057-243-02 - PURE GL COMPANY GEL 1256 PG {81 CTTY OF 1CH G- 3Q057-21 04 IG8. 3419 51 j / • ". 1.,y�1` „_ -� THE ATLANTIC LAND MEL IMPROVEMENT COMPANY TRACT 6. YB. 24 PG. 924 �/ I '" 111111 ffll ' J THE ATLANTIC LAND AND' '*' ; DB.�)B 81 01�t / 4 �� C \J!—�!/` TRACT 6. 118. . /A`. DB. 3378 / % �' / C t / I , / J ' J ' ��- �) J ,( \` - ATLANTIC LAND AND NIPROYEYENI COMPANY 1 4 TRACT 6, MB. N PG. 924 08, 3378 PG. 291 I OS] -161-01 I 1 ` J � s.. .._ � / /, Vii. � �l/JJII 111' 111 ``, . •� __�__ ._J 1C ./�4 I --- _ r `' _ __ __ �� � � � z . ------------- `I i 1' 1 I / 1\�,\\`I \ \ un AC�'AND ILpROVFfiA 4 Yi I 'iJi ` 1 I\ / i� � I J r �,•� ___ ,y`%r 1 t 1 , _ _ I 1 1�J JI J,'1R CTaB. p4 Pc ,94\ \\ 1'I'/r ./'' , I, I I 1 1 / 1 1 05]1181-03 , \, \ ♦ \\ \ ! f/ , I I / / r 1 J 11 , , I 1 \ ` \ /I1. I, r, SII 1111 r•' / , \\ \ \ \ \ n/l //, 1 i I ' „ \ ' 1 1 , i \ 1 I R 1 /7111111111 111( \iil rJ %/\ ; '\I1� II111t1111 1\11 BI nil Jll, I �1 \\ \ 1/ \I ,i 1 ! � 1`\\ 1�' ii'•git.i%, THE ATLANTIC LAND AND IMPROVEMENT COMPANY IJJ 11//il llfl/// f `I ` i!I/ t11i 1\1\\tl\\,1JI !Illi _-� ,tj I� 1i \\1 ♦1 '\ �\ `/L I TRACT 1, MB. 24 PG. 924 \ \ ,\ /1///JI '/ J i \/ ! \' Il 11 \\\11111 \ i //irr /� I i 11 \\\\ ``\\\�\` 1.�`` %' ./ j \\ 1\ •� iY �6 �gJ < \�� ! �'I1 u f , , I I \ \ , , t , _ DB. 33]6 Pc. zs, ,;/, /, :11h J'rJ / ---. I I r ' \ , p 1,'r \ I • 1e ' 057 -Tet -03 I i(1 / ' JJJ / \` /iii/ � 1 111 J I JI /r,• f,,f J7JJ 1/J ,' I \ \ \ `\I i J�11 t t 1 \ / � �r �, I 'i �/�' , % ��(IIN J /� \ -_� J ^tel/ J� � P,( /,'r J/i' �// l! ; J I '+\ \, I I •. ( / \ 1 y � 4� E cl ,-.- D .'- t\ \TNF/.A'fLNJTC LAND AN' > if�Il Itll III I ` _ ```II 1 `1 1 b.'- ;,may 11,1 .Ilia\ 1;.. ,w:\\i. \ - - \\\\---TID[Ci 4, J'!4��/,� ----- ""- N\ - ire.-_ ` ` `----' J /�`\ 108+ - ----'---"" •. I tl 'll 1 i !11 : \ , i \ _-- / Y anE for. \�\\ _� I-- VERNON S HOISE IJ _ ' Ill \`\� �\` --- I GLORIA M, i1GSEY anC _ _ t i •..... �r L WRTS .1, SR, B. 13073 D )-13,-09 7 1 '' ------ BARBARA J. WALK I� 05 —�: THE ATLANTIC J COW IIS y� I llil ` I" '✓ / - 77813 / 1 _ 26853 PG. 211 TRA -t{ _ ^••' _�' __' r4ii y1 l l/l / I -' `\ \ \1•\t \ �' 057-17h%� 20158 PROPERTY \ 08.: / �i i �- '�� '- __-- / 1 IJ / r ' I .' ) 'i'/jiii' I _ ____ _ YA 5. RUSSELL o`�I D8. 2%85 P '-1 \1 �. lrlll 1\\\\` 32 PG 51,YIA GRAND —C .HS _ 057-131- - 1 \ /r `-- �� ��' , %l i'i/'' /�•:!`// ' J -' 1 1 DB. 11578 PG 74B / KEE1 YOU' •�• , 1 �___ - _�__ _ _ _ -_ l I DB. 1JJ15 PG. 232 t __- , � G \ —_ OS] -131-% ~y~ \` \'1.�. \\1 ` Imo. (� CAPITAL , � I COS , M8. 50 UPG 41B ! I !%i Illi I_� _ _ i �',I// ll• J' r 1 \------_ \ y �1 i I, � 1) ROBERT J. FALLS 287]4 PG. 3 /�' I \ /J, ! / JJJ(//, ___ - f l7F ' j 1: ¢f 11 f Iii, `4!i __"V\;\\\ 7N[,A, DB. 15476 PG. 791 \�\--- 037-131-10 / 1157-/222� 2�\ `1 `\ _ bv' / `,i: \ 2]112 PG. 294 l"Z C 1 1 \\ / OMt'' • \` l\ 17-39 � o ��.��Q\ \� qN TAWANDA BLAKE I ____� /// /J/ /,B JSJJ J ✓ risl,iJ 1\\1 II 1\\ /4i' i.'.. ; OB.WAND PG. BB2 MONIOIIE A. R0�f,� b iCI 057-131-2J •I1J ` LDT 3B, MB. 34 PG WqLg L O�' 11111111 111 J 11641 PG 606 • FW 1� N Z O�IA Q J p It11 / r9 4+4+ J PHETSAMONE BOUROMMAVONG I ,11 \1 \\ `. V4 - CJI , - -- % 57-1]4-38 1 4+ "'PPP �_ -m PHOUKHANH BWROMYA DOYLE MEAL 1 \. \\ \\\ -� .,///i .'A F /.-. / 5' OB. 6363 PG. 517 \\ 7 „ i % J/, \ SHANNRICA Y. SMITH `� p 3^,� OB. 28155 PG. 31 i JiJ /1 LOT 37• M8. 34 PG. 33 PV , 1} 037-131-11 SANDRA Y. J01[5 057-221-21 J \ \� /'/ . a m O p j U p O O ,r 057�77hJ77/ / X057 31223„ 1= _ A FZ IY 1' U = W YI ALGDES FLORES md A•8e, jljf 11'\`\ _-� KATRENA F. REDFF/IfM { Z X W a W 1'88 pB. 83 PG. 100 / F PG.PC/54 N1WE LEE Mtl.E00 anC wii0.- 05]-131-25 1 \ GORDON NITONS. J!. / `� is B5 SPG 0188 I /UWREN(Y r DB. LOT 3. MB. 1186 PG. 453 I 057-131-26 DB. 270857- PG. 843 ESON 057-221-211 / \ / JANESON p1ARLES ! DJ PG. B4B MECNLENBURG COUNTY ANY. BARBER 057-131-12 MB. 22 PC. 931 C4' LOT 2, MB. 45 PG. 606 _ DB. O72%11PG�53J �. 23361 PG 316 6 � wLe^.r.�• ��s R.� OS] -13t-35 -- BMBBT NUMBER ifo 0 I 1 2 3 4 5 1 2 3 4 5 �` eco -enemy KINDER NDIRDAN SWTHEAST TERMINALS LLC / D8. 18180 PG. 440 i 057-212-03EGO ' ENERGY CITY OF CHARLOTTE OB. 11630 PG. 340 .- HTRANS HOLDINGS INC. DB. 8803 PG. 215 CHARLOTTE, NC 057-212-D8 - - - _ 057-212-02 D / ��`` D BLANCHARD TERMINAL COMPANY LLC M. 28042 PG. 285 D57-243-02 - ----- I -------'�--- /-`------ -- r THE PURE aL COMPANY �- - _ .y-- '. - �' -- ._- _ --_� i D8. I256 PS. 461 , ' / /, 05]-211-t5 .-^---.-. _ - - y�'t- _ • ,.,, APPROaAyM7E '-^�vRl� r - - - - -/ ' _ .^" � _ WIL, , �--- Acro,.... - 2cTTE �ffb -- DB, 116W 057-21 04 785 NUKE POWER OHIPAN�/ SS _ rx.��•• ---- ---_---_ / / OB 3419 .PG. 5 4 w` "1 i -_- _ _ Ds7,Ye,-oz/ y c - - r - ._--~ THE ATLANTIC LAND AND IMPROVEMENT COMPANY- // / ` C ..._ TRACT 8. 24 PG. 924 // •� •/ DB. 3All78 3378 PG. 291 '7/ f C - THE ATLANTIC LAND AND IMPROVEMENT COMPANY ~ 057-181-01 p f 1 - - TRACT 6. 78 21 PG. 924 DB. 3JJ8 PG. 291 `' •'4• $.4`}' // TME ATLANTIC LAND AND IMPROVEMENT TRACT 6. AND S. IM PG. EN COMPANY 24 057 -tat -01 ♦ lK ,/ ; _> DB. 3378 PG. 291 I $NT C - .3 - ---- - _ g o y i _ Q 1 \ CA LL I°• THE ATLANTIC LANG AND IM OVEMENT COMPANY a </f TRACT t, , o / /.�778B1P TRACT 4, M8. 24 PG.1 924 29 irr 05 ea e 1T�p R tt i'2 THE ATLANTIC UNO AND IMPROVEMENT COMPANY I TRACT 4, WEE 24 PG. 924 OR 3378 PG. 291 I �� 05J-iB1-03 DEt�BdLOF]IOLlD9N11DIE5: � 3' � � �; B Fl. INFORMATION INCLUDED WITHIN THIS MOM WAS SUPPLIED FROM A SURVEY PROVI DED BY CESL 45 SPRING STREET SW CONCORD. NC 28025. THIS SURVEY IS INCLUDED N THE ,. `.` + .1 B 13y C '1 CONTRACT DOCUMENTS AS EKSTING CONDITIONS' (SHEET C -0.D). THE CONTRACTOR SMALL REVIEW THE INFORMATION CONTAINED HEREIN AND NSR THE SITE TO VERIFY ITS / _ _ I o .� IDCURIGY IN Alk(NMWCE MATIN THE CUNEM CONORIONS. NEITHER THE ARCHITECT OR ENGINEER ASSUME Y RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS OF DATA AN 11 *• INCLUDED WITHIN THIS SURVEY. % \R I �, 2. CONTRACTOR SWILL REMOVE ALL DUSTING RAIL., WALKS, DRIVES. CONCRETE, PAVING, \! BUILDINGS. TREES. SHRUBS, SPOILS. AND OTHER STRUCTURES WITHIN THE OWNER'S PROPERTY RDKYDLD AS SHOWN ON THE DRAWINGS OR AS REQUIRED TO REH 1 SHE FOR THE NEW CONSTRUCTION. CONTRACTOR SMALLITTHE SITE TPO FPAREAMLNRTIZEE • /I 1 `; I HIMSEIE WITH ALL ON-SITE CONDITIONS WHETTER SPECNiCNLY INOMATED ON '�/� DEMOLITION DRAWING OR NOT. �� `��•(MTIR//, NDND 6 UN 3. UNDERGROUND LMUTWITH KNOWN LOCATIONS MAY DUST ON THE SITE CONTRACTOR THE ATLAITIC NO AND IMPROVEMENT U TRACT 4. MB. 24 PG. 924 __-_- l,\\ SMALL HAVE ALL UNDERGROUND UTILITIES NCWOING. BAIT NOT UNITED TO GAS. POWER.� WATER AND SEWER LO TELECOMMUNICATIONS, COED. 1 PG. DB. 3378PG. 29I - ALL DRhEWAY REY(NAIB // 057-181-03 V£RNON S HaSEY GLORIA M. HOLSEY 4. COORORUTE ANO SDEWNJK/-AT REPIM4]ENT WITH OWNER. PRONOE BARRIlS1DE5 AND SIOEYNNI( CLOSURE SMM/Afl AT ALLFIKCAVATIONS TO ! / I ap . CURTIS HOLSEY, SR. andPROVIDE FOR SAFE PEDESTRIAN MOVEMENT SCHEIKILE WORK TO &#POMZE TRAFFIC ff,, / / j / �•('nArtBARA J. WALKER / DEL 13073 PC. 967 .V� I It1TEMUPT)ON AND CONSTRUCTION WARRING SCNIGE BARRICADES ANTIC LANG AND IMPROVEMENT COMPAN ,�,; /` LOT 44, MB. 32 PG G- 05]-131-09 %�- 'i'CN (;, CYTP"t�V`� I TRAFFIC CONTROL SHALL BE 1N ACCORDANCE WITH THE - WTCO' AND ANY OTHER APPLICABLE AUTHORITY IID CODES. TRACT 4, MB. 24 PG. 924 DB. 3378 PG 291 , /;' 555 be. 26853 PG 11 - IA 1 I I -- _ - - �.1 20158 PROPERTY 01NER 1 Il �]-181-03 - _ , RUSSELL and 1, 057-174- - /' ANGELA 8. ROSEBORO 13F��r. DB 29865 PG. 594 1 SMALL PROTECT 11`-(y}. -24 5. CONTRACTOR IIIIIiIY POLES. UNDERGROUND U7ILIIIES, MANHOLES. VALVE I BOLES. FUMPS. WALKS AND C HM ITEMS TO REMAIN FROM DAMAGE. CONTRACTOR //, /; // / 1101` 4J. MB. J2 P4 555 \ / I YIA CHANC and .:ft - XEE MOUA SHA REPAR. REPLACE AND PAY FOR ANY DAMAGES CAUSED BY I 7/! / / / DB. 11578 PG. 749 / I `- -057-174-43 1 ' G8. 13315 PG 232 DEMOLITION/CONSIIRUCIION WORN. II /1 / G Z � \ 1- 6. CONIR/CIOR SHALL COORCMATE ALL WOR( WRIMI RCHT-0F-NAYS WARN LOCAL/STATE DOT. PROTECT ALL EIOSING PUBLIC UTILITIES WDtlN RIGHT-OF-WAYS FROM DAMAGE ' a\\ ROBERT J. FALLS ' ---- ]91 : I DB. 154-1 W a WRING DEMOLITION WORK. T • %/ / SCAN OEVELOPYETNT\ C mtm 39. MB. 32 PG. 5 �o . (1 'OBS 27112 PG. I -1 -- �_ ! 05]-131-10 .+x((33 I-- J F u) V I ]. CONTRACTOR SMALL COORDINATE REMOVAL OF WATER METERS, LIGHT POLES, GAS METERS, SEWER LINES. ELECTRICAL UNFS AND OTHER UTILITIES PREVIOUSLY SERVING THE SITE. y / .�� / / 294 OW -17 -39 \ mSQo c,aQ �� i+ _ TAWANDA EILAKE I ---- DB. 23N36 PG. 8821 % I Q Q 5 PLAN. CML DRAWINGS AND ELECTRICAL SITE PIAN FOR URJ316 TO SERVE NEW --\ //pp/% \ MKNIWE A. ROYSiR- �m�4�1�$�yP' o�0' - i�I 057-131-23BUILDINGS LL m Q ` T / N PG. 33 DB. 11641 PG 606 i 1Y �`(.y �. - - - - _ / 1 PHETSAMONE BOUROMMAVONG -d ► O Q W 8. SEE EROSION CONTROL DRANWIGS FOR ADDITIONAL WORK. COORDINATE ALL WORK A I SHOWN ON DEMOLITION DRAWING WITH THAT SHOWN ON EROSION CONTROL DRAWINGS. DoriE HEAL / � � �' / I \ _ ' \ - o5Z t�a_sa - _ ; c �.,SJ.'. •p'��.' - - _ PNOUKHANH BOURaAMAYUNG - - _ 3 � 08. 28155 PG. 319 C � Z F W 1 BACKFU DEPRESSIONS LEFT BY REMOVAL OF BUILDING FOOTINGS, UNDERGROUND DB. 6363 PG. 517 / /r I / •1 � / \ SH AMNPoCA Y. SHIM 37, MB. 34 PG. 33 '�_ _ '�F 057-131-I1 '4 N C U = 0 O1 I UTILITIES AND LARGE TREES WITH SUITABLE COMPACTED EARTH ACCORDING TO GRADING PIAN. 057-221-21 / / /\ \LOT i // 19472 PG. 728 �J: ' YTsp ,,� OS SANI _ _ 55]6 PJG Jl l WMIT / \DB. OS] -174-37 GN 057-131-22 -_ p O of o W WA/TRENA F. REDFEA� --`_ ,Fj� ALgD�AOR FLORES Nite, _ D8. 16386 AMMONS. T - , / LAT 66, MB, 23 PG 482 j DB. 30280 PG. 1154 -- I PG- 100 - -- J K- 057 -131 - LOTCORDON LOT 3. MB. 1166 PG. 45J / / - - / \ 057-RILL-48� VALUE _ LEE MCLEOD 08. 05]B221P20843 / / and Bila. COLA Mj O ICJ 'il •NElT NUMO!!E I) / / :. \\ / DB. 0569531 P 6 188 J ; t f MECKLENBURG COUNTY J ESON CHARLES. De�Tnu7 Pr ala 2. ---_ I MB. 22 PG. 931 .. TIFFANY C. BARBER '� jL_ SCALE i' = TOO' Ci.O 1 2 3 4 5 2 3 4 5 — CHARLOTTE �.. � � eco -energy � ECO ENERGY GRED ALEXANDER BLVD PUBLIC RICHT-- OF -WAY, N10 TH MB PCS. 2J11 & A: 732 232 ]940} 56 .. ... 82'p IN W =RIM =]6292 7 CONCRETE .]6' - INV. A 1867 T'- LA OUT - 792.75' 989.49' 1 — j/„ / .Iw O 786.91' MONUMENT./ / r o CONCRETE-=_ - / � -- -- CONCRETE / MONUMENT / LOWER I _i o ' ONCREIE ...-._' 'P:1 _,�A� -!L•- _ '".--_" , C _ ,:� CFS' P �--_� '-A� "/'• Z%�°'�"...�-. GyEa i� •� — _ CONTROL PfXNT y4 -' . _.--_ 011i _% � �] y CTY OF _ NAND 88 ELEY. - ]91.30` —ARIL= '78945'-u-- j6 0. CONCRETE _ - }` — _ CHARLOTTE ]8].15' __. pNCRETE-�ylySN f .0 DUT - 786.98,-/'O� - - mOF *AIN - ]6551' "_ 14 CHARLOTTE - POLE HARLOTTE DISK- CONCRETE-- ---- NCRETE WALL_ / j UCHI POLE ON BRIDGE FENCE BRIDGE - — APPROXIMATEO 789 WALL INV. - 763.70' i/ 1NV. - 753.02' ,. _ 'T_NER 5" / � 's CWCRETE TOP OF HEADWALL 767.00 RAP ; /" — 68 -ORE OMPANY / 12 RCP — CF -WAY AND GATE - RAILROAD SWITCH DG. 343 UNDER BRI- .TONER 0 - --_ / ,/ - AERIAL ROADWAY FASE4EM THESE URS AND BRI RALL &-7' --. - __ _ _ I CITYOF CNARIOTTE -- DB. 25210 PC. 132 / "� SPOT ATIONS ARE _ "_ _ _-�� 9N- 'BRIDGE /C N UNK PENCE -,c am _ "PC INV. _ ]52.60' DB. 015630 2PG. 310 / —04 PERMANENT PIER EME� DB. 25210 PG. �� _ _ — o� 114 Vi E RNL AN 7' CHAIN UNK FENCE CHD _'^`�--„-'. _ INV - ]50.� • BIBLE �,/ ON B CREr� ` UNDERGROU �r C TH E CONTOURSARE \H R'cFEL 't JUNCTION ! �y�•..-� =T INV a 7.{7,02•�. APPROXIMATE 100' /THE BRIDGE SURFACE qtt OF �� T Al�� _�__—.-�ym.,��-'CT RAILROAD RIGHT-OF-WAY SWITCH ASPHALT �__. �� �� RAILROAD y�r'r'�a��-'�• _-���— �—..�_ \+\� _ -� i CHARLOTTE / / ONIROL POIM�S /LA 88 ElEV_ _ ]83.03' �� = i , / Cm ` RW - 750.58' \\\ GRAVEL \= ASPHALT Rry_ INACCESSIBLE • -- _ \ _ �` -_ -. RIM 750.18' —�— �• INV. INACCESSIBLE OF ~.\ \'V(q0 —— 78' CHARLOTTE 05K/ P RANA� .\.\ \ 'Ip CEME%I�LE RNIRAILROAD \ `Ap _ _ _-- • ,�\ t'ARAVEL WITCH ' �` _ — �_� • LII GRAVEL -� — ��EASIMENI FOR STREET / D UTiLFY PURPOSES / _ A 25240 PG. 32 N TOP _ CONTROL POIN—BELEELEV, y 952 \ \ EXIST. FENCE 70 .PFIMIN \� \ IB'RAIL=O= RAILROAD BROKEN ASPHALT PILE SAND • ) {\ ,\ Tqt H CRAB` \ SAN • �_ 1 g' / \ GRAVEL v� \ ` j !GRAVEL PILEEN \RNIA9AQ `e"ANl RAlLRoAG•• ASPHALTCONTRACTOR / CITY OF CHARLOTTE / DISK } ' SHAU DISPOSE OF EXIST. fE1MF (TTP \\ ?ITCH ': ... ♦\ \ Q € yWg 41 ASPHALT ASPHALT le NEI # ATLANTIC LAND AND MIPROVEMENT COMPANY W78 P. 291DG. 924 $ ••.\ RWLRO • AVEC b 'Ml \ ICENTERINIE 'y-._. _ Y EE4{ g f � f9 �5 A\• A; RMI - 769.43' _,_ _ _ -. •" i OUT - 765.J1' : s• �4 l TOP RAIL EXIST. ) • RIM - 750.29' `Y'(NIC'ARQ A7j THE ATLANTIC LAND AND TRACT 6. MB. W. 3378 IMPROVEMENT COMPANY INV. INACCESSIBIF 24 PG 921 PG. 291 F 057-181-Ot • `\ r 739. • - 4� R1M = 750.17' INV. INACCESSIBLE _ $E&� _ 17M _ EXIST. STREAM TO BE • .. y i .• i AX�I�V uriLrir —_--- POST 6 TE 7 Y LL W 0 A / .82' R) A Z �oF �� -' • U Lu V) W _ Cm OF CHARLOTTE DISK — _ N G EX A AS G Z W a IM U V. - 32.5 OF ) 9.95240 I � _ PG. 132 C7.1 7 2 3 4 5 2 3 4 5 - AD PALROAD ;b4t �, GRAVEL —.� i� — _- i e ect-enem.,.. q y ACO BB EIEY. = 152.46 - -_ �� � AP s♦ RAILROAD ___ , GRAVEL [PILE 17- j •--GRAVEL -- —_ -_ r4 _ r ECO ENERGY NIC \CIMRLOTTE. PILE RAIAILilO,y] `'IAROAp RAILRpAgpE P ♦ i ASPHALT - \ ASPHALT \' -, �ASPHALT b' \Aye\ 1 t \ %CENfERLRIE , • • \ 4.TCN � THE ATLANTIC LAND AND IMPROVEMENT COMPANY TRACT 6. MB. 24 PG 924 .,EO DB. 3378 PG. 29t 057-181-01 / b , TOP RAL 6 / a ,, I411, F •// ,644 (� � R POTION Oi amt. p r \ ro 13E REMOVED ) !� `>` �-..: 1 L / i , F / ,4* �i- Tz R' te• ��. 6 POSTT� CONCRETE POST,,_, r • r'. E%IST. STORM PIPE ro EXIg a a,- 8 'g gry yI I 9.in 'd • B � ) EXERT. SAN. SMP R. PE / / � ro RETAIN (M) g I� �E �: R A AS 718.1 I/ S �; N. c IMPROVEMENT COMPANY 1 TION . 21 PG. 924 B PG. 29 181-03QL,4. 3 an L _ SEA,Lp py "'u oP . sT1tErM TO PROP R U O. LL iz n OO A ' / � name 121 -~-N w V W N 90 ����1-1 Am- a ° �. (` / / ^i 2• s E - sxsar C1.21.2 1 1 2 3 4 5 1 2 3 4 5 _-_.-. ` - -.-_ -.. \• PoM - 750.35 CATt'Y VE r W. INACCESSIBLE I 1 ,1�.-. _� - - _ _-_. --,pp-= ��,; , rv� _•._ t— y �— — —� \ �� : RIM = ]50.}6' HV. IWICCESSIBiE \ � �_ �,�� �� u/ /BUILDING EGO ENERGY INV. - ]H.82 ...� __CLwCRE1E r% ^._ _. .-_ �_-� � ��---��__-- '4, Y E ]5354' CHAINLINK TM DIESEL TANK GHARLOTIE. NC BARBED —_ TlS'-_ _._-_•--_.-". _P--- -------- -- --- OS7—f;� f' f 7 �SLMEtl — 719.77' - - •/.• I _ r il£' _ ��_' c____a__ ____•. ___,_ CONTRACTOR SHALL REMOVE h _.' - _ - SIM 751.23 ]46.10' I� - __ - ., _ - ]4598 YARD I q�p INV OUT /•' _ _ c____-_ '— __ _ DISPOSE Oi E%ISf. FENCE (1YP) •_.- _ _.__ _ f -_�,i•� TOP ]5�]9' _ = CONTRACTOR SIMLL PROTECT DOST- _ - — -- �- �- __�_-_---= - --JNH. - Z ��� i a=15 IAN. ]46.50' - -- j POWER LINE Tn REMAW (rn) - - - __—=--�_ -�_ ----`- - . �s>- J -f ���y.� ____c_ I ..�.-t`y. J' ROD IN/ -�`�POSTlE 1f-_- T .. i WOODEN .. _ c._-_ / DECK HOW i HO1 TM1i/'ALERT c....+ SO WATERLINE MAY 8E PVC IN SOME n`L i AREAS: UTILNY L.OUA'[9R HAD ) VERS BEAK SIGNAL; PIECED -,1 1 C TRACT D8. MS IN AS BEST E POSSIBLE WATER METER EASEMENT DB_ 6922. PG.TBN ]5]` ' 1 .TOP RR SPIKE ']m=lUVD LEV. _ ]SJ.OS' II` __ WRKER vOST I 1:\\,,, PoM = ]52.]5' /9 V C11G CABLE MARKER POST ' C GRUB 1ST. GEf ` � p ' ' I u REBAb 1 Y APPROXIMATE LOGTgN OF 15' PUBLIC STORM ti! I DRAINAGE EASEMENT AS 7 SCALED FROM MB, 24 PG, 924 I o b itu 1 G TOP OF HEADWALL = 751.45' 2 " t INv. OUT - 7a.3 ' o q IN ]55.59' 18 5.99' 24• _ ]15.59' j INV. OUT - 745.39' ✓t n Ip�> TOP OF HEAI)BALL - ]4].6]' B INV. � ]43.53'�I/ \ A`�`` B C4 THE ATLANTIC _ �c TRACT I, 7681 DB. 33]8 PG. 291 OS]-181-pT APPROXIMATE LOCATION OF 15' SAS SCALED LIC STORMFR DRAINAGE 91244 ' U4 PIPE -„_.- . a JNµ_ \ -____--__e_-3e-- P PSE WOODEN 1 6N"� I PUBLICRIbI wA lE� ,ref f VERNON S. HOLSEY and 'r” •.. _ Mg�LE W1D 21 _ 17943 - ��,�` / I GLORIA R HOLSEY and %pouse. Cp�.�CRETE I '±� CURTIS HOLSEY, SR. I I - DB. 130 ]3 PG. DRIVE PG' 92 ��. '. '�� 96] 7 057-131-09 "'nn1 u1a1 }• PWCHED�/t _ �_ .. �oNCRETE _ __ ' DRIVE \ BARBARA J. WALKER PIPEw LOT K, MS. 32 PG. 555 //''� M. 26853 PG. 211 \ OS] -1]4-4{ ' o :,/ „� / I r 20158 PROPERTYONNER LLC DB. 29885 PG. s94 W > CONCRETE / A/R^' TANYA S. RUSSELL 05]-131-24 F_ MONUMENT / e yK AMCEU 8. ROSEBORO ,_ I- I �� _ a o p LOT 43, MB. 32 PC. 555 D8. 115]8 PG. ]49 \ / I 1" PI`.. --_.II L. _.` SMALL HEADWALL F// Z Y LL W 0 0 \ 05]-1]4-43 / 'APES f ; O = O W A REBAR �' \ / I, YIA CHANG and wile. ONCRE--.l! Ill'T %EE MOUA C DRIVE -.._- I I ALi �- DB. 13315 PC. 232 I _ -� A 1Z- W 2 i« 1" _ \ II 05]-131-08 ly ` W o U 0 GO = W MI F4 REBAR�' \ I . POSSIBLE BURIED DRNEWAY CULVERT _ W= a W - U) Y O. U) m�7pJ.�A' 'q ,- Qi - q \ 4+'FF` �iN I I 'I� ROBERT J. FA� DB 15{]6 PG. CONCRETE�� � \ J \ SHRET NE1Y� it IAia`i�e.5•ii'I "j SIGNATURE DEVELOPMENT. LLC LOT 39, MB. 32 PG. 555 w1,o5' c� m \ SDR ��� � 1' Ila INJ. - 751.58' 0 1' 2• �l�i w�� le,\ DB. 2]112 PG, 294 \ o G 05]-1]¢-39 +`n a��,?' 1. 7 II II. !J_ PIPES SCALE 1' 40' C1.3 1 2 3 4 5 1 2 3 4 5 PLCO BW SUMWRY TOTAL ON SDE eC*7e•!�yA ` EX. MMPERVIOUS AREA 0.00 AC "GER MORGAN SOUTHEAST TERMINALS LLC i' D8. 18180 Pc. 440 IMPERVIOUS AREA ADDED IMPERVIOUS AREA TOTAL 5.78 AC 5.78 AC /' CITY OF / o57-z1x-m INC. TOTAL AREA 53.80 AC Eco f71EgGr CHARLOTTE. NO CHARLOTTE OR, 11630 PG. 340 / i _ _ _ _�_.—___-_ HTRANS HOLDINGS De. e803 PC. 215 TOTAL AREA. LESS FRED ALEXANDER BLVD AREA 51.03 AC - _ 057-212-08 �— _ - — _ _ 057-212-02 BUA 8 11.33X p BLANCH D& 28042 P COMPANY LLC 08. 28042 PG. 285 057-243-02 / �F-------- THE PURE OIL COMPANr _ // ,� DOME PG. 481 I 057-231-15 / ' / � - _ /efl• AOAIMATE - C DUNE - - - - -J— - _ / _ _ _ _� r ' - - -- - - - - _ / / Po TP -*Ay MPANY 1 PG. 34J $HT /' L--^ /-------_�-� �- — DB. 11630 6.0340 057-21 04 BUKE POWER COMPANY 1 • ------«wwyr _ - ,/ I / DB. 3419 PG. 50.}• . - - _ _-----_ _ J. 057-181-02/ ---r THE ATLANTO LAND AND 24 PQ II24 COMPANY TRACT 6, 24 PG p24 - C, ,` 3MB,78 /% DB. 33]8 PG. Zot / , 057-181-01 I C / THE ATLANTIC LAND AND 24 PQ L924 COMPANY TRACT fi, M9. 2{ PG 924 /, I I DB. 37- -0 291 J 0.57-181-01 L / �� THE ATLANTIC LAND AND IMPROVEMENT COMPANY RACT 6. 7 24 PG. 92a OB. 33]B PG. 291 I __---- 77 057-181-Ot I _ n n e h o ------ - S C-2.3 HT 4vCALEJ ' �t^ THE ATLANTIC LANA AND IM OVEMENT COMPANY \ -\ .`. - `' ,'�� I TRACT 1, I DB. ry TRACT K, MB. 24 PC. 924 �� _ - -- - 24 OS t o _ 057-10. 5291 \ ��•� �._ i ` `"�_ 4 `v` ` w n 3 X' d``Z i t THE ATLANTIC LAND AND IMPROVEMENT COMPANY TRACT 4, NO, 24 PG. 924 OB. 3378 PG. 291 0.5378 -OJ 44 u V t I 11Hnp! °S'ASIN"''yam ' THE ATLANTIC LAND AND iWPROVEMENT COMPANY_ TRACT 4. W0. 24 PG. 924 _ - DB. 3378 PG. 291 057 -1e1 -o3 _ _ VERNON a HasEr IIou BES 77943 �• % // I GLORIA M. S LSEYHOLS mtl M. awns HGIsr, sR. V ARBARA J. WALKER/ I OB. 13073 PG 967 \ !THE ATLANTIC LAND AND IMPROVEMENT CO/PAN TRACT 4, MB. 24 PG. 924 // ! \LOT 44, MB. 32 PG 057-131-09 r---- I ` DB. 33]8 PG. 291 / - " - - / ,e1` 28853 PG. 11 I - - _ - I -__ I ( 20158 PROPERTY OWNER 'O•�`` 057-181-03 j�,,/'' - YA S. RUSSELL -d 057-174-/ ANGELA B. ROSEBORO \ TI I I DB. 86531 P�+594 `LOT 4J, Me. 32 Po. S. \ 11578 PC. // MA CHANG and NTN. / I IEE NOVA F_ -- I-\ I 749 1 \ N1sZ-114-43 _ '537'11 PG. I OB. 13315 PG. 232 I I I I (EOiAM CAPITAL L�1{C COS x3, YB. 50 PG. N6�� x.18 2677a PG. 31D-�� 057-222/L2- / _ \ \ q. SIf9! OEKLOPYENT, y1C �O �� �d - _ I --� J _ - _ I ROBERT J. FALLS D57-131 0 �1 3 qyr N 5 r��\ `Y �\ , /�� / ' 1 / '09-27112 PG. 29455 tI"9�\'� IA]ct`4-38 1 ?I yS%> S p q �i TAWANDA BLAKE 1 DB. 23906 PG. 9112 I_ _-- JR 0:v V 5' IL LL G Q /' j \ MONIQUE A. ROYSTTR- � � � o 1^ 057-131-23 I _ V m O _ ` TAT\` / OT J0. MB. K PG. 33 'F w �4"'E. -__ I PHETSAMONE BOURONIAAVONG and PHWKHANH BOUROYMAVONG a ~ H ► O 7 a,0Z A I i DOYLE NEAL I / DB. 6363 PC. 517 /\-05Z17{�JA--'- /; % \ / SMAWNRIG - Y. SMITH �' I -4 OB. 28155 PG. 319 A 0W C } F _ 057-221-21 / / �� �r ! / \\LOT 3], MB. 34 PC. 33 �' GT `Sw SN 19472 PG. ]28 Yi 4c 057-1]a-37 SANDRA Y. JOSS L-- O8. 15576 PG 311 057-131-11 ' - _ _ W () Q y Z W J Z iL G 057-131-22 _ VJ / WATRENA F. REDFEA N AUDDES _ - _ - I I Q' FLORES —i wiN,. SONIA L FLORES IN /LAWRENCE GORDON AMMDNS. JR/ ` / �� LAT K, M8. 23 PG 462 (DB. 30280 PC. 951 _ -_-- I -J L-- DB. 16386 PG. 100 057-131-25 LOT 3. MB. 1166 PG 453 / OB. 27019 PG. 843 / / / �� / \ 057-171-46/ \ / WllllE LEE McLEOD and wife. COLA YCLPG I �F1�iML 057-221-20 5 . 1B8 I / / I \ / OB. 2289PC 057-131-26 I I DB J SON CHMLE awa Sa oL 2• MECKLENBURG COUNTY -'� - _ / // _11..12 PG. 1,11, TIFFANY FC. BARBER f L _ _ SCALE 1' 100' C'j.Q 2 3 4 5 2 3 4 5 / 'ITT , , „lLAS — — eco energy / � � ECO ENERGY CHARLOTIE.NC FRED D. ALEXANDER BLVD, PUBLIC RIGHT-OF-WAY, VARIABLE WIDTH MB 56 PCS 231 & 232 CONCRETE - / ' CONCRETE CgACREIE 'M� _CONCRETE -'- --- MONUMENT _ CONTROL POkfT /4 /�l/ _ lOfiETE__�--.�"_-- NAVD 86 E1tY. -791�CITY OF - - CHARLOTTE T UyK_ - / CITY OF 1 CHARLOTTE DISK m m / -- '- -- / -- /�? CONCRETE __ - '�-`a�� '- C(fVQF CHARLOTTE DISK / BRIDGE - __ W.'-1lJ'. �a - CONCRETE WALL RAPRIGHT AND GATE J RNLROAD SWRCH R 'PPRO%IMAIE KE �-WAa1PANY -�� ARE UNDER BTE -_ ' THESE OURS AND AERIAL ROADWAY EASEMENT SPOT IONS ARE BRI RAIL & "--- .--..-.--�_ - _.-.__ -. _� �. _ OB 25240 PG. 132 / ION C LINK FENS -'�^�- --- - - --' - - - DB. CITY CHARLOTTE 11616 30 SRI I -0 % PERMIREIR BBRRIDGE PIER F/B--- - �.. _- Y" / D8. 25240 PG. 132- E RNL AND]' LIWC FENCE # Y-+.".iYY yERpAp �CqN C 6/E/�C6F6WG/N /HE BDGE SURFACE 1/l}. •r,V Vy-.t.,�,.Y ,_, APPROXIMATE -- �- -_ / ..-G,.RAVEL -..�• ._r C.t _-FlA / \ ASPHALT RAILROAD RMT-OF-WAYRMAI `Yt CHARLOTTE 0� BROGE OL POINT kS ... / `\ ASPHALT NAII / /"eN.AYD 88 ELEV. - 763.03' /' / \� \ �`� •'_'-�.�„� C171' OF CHARLOTTE DISK / 143RA Eb GRAVEL T• CONTROL POINT �\ \ \� IIAG NAIL ELEV. - 752.46 ��� ��/�FASEXIEM FOR STREET k UTILITY PURPOSES\\ RAKR DAD H D8. 25240 PG. 132 SAND > ��GRAM! PILE \ `^ �CRAVEL PILE GRAVELnE5 `V m CITY OF` CHARLOTTE / SWfCHRAILROAD ~���.._ `R=,tp RAILROAD ASPHALT \ CONTRICTOR SHALL" \ -- �" m Q z / CONNECT TO EXIST.\ . \ �` CHAIN LINK FENCE k \, \ -'..--_ m }p ASPHALT \R \\ ASPHALT ATLANTIC LAND AND IMPROVEMENT COMPANY / �\ \\\ 3378 PG. 29 iPC. 924 B -161 a / \� \ \AVE, \ \\ SVA �ceNrERUNE B •[ g C s' \� v TOP RAIL THE ATLANTIC LAND AND IMPROVEMENT COMPANY TRACT 6. MB. 24 PG. 924 / 08. 3378 PG. 291 057-101-01 $�L ;W. 17943 - ------ 11 / __ — -- -- - POST� TE CRETE FWF Q PROP. CENIF%�E RAIL (TV) tQW A C FENCE ) SEE DETAILS_ REF TRACK DWGS- PROP. ASPHALT PAN - REF. o T O W(P)- gQ C= E ihW ,-( CITY OF CHARLOTTE DISK TRACK OWGS. FOR REQUIREMENTS W � .�� PROP. Tf-TNNMAZO' � PERIMETER STONE ACCESS DRIVE '� � W 2 O N d W 2 \\ ENEET NUMBER ~--R"--- � " a EXIST. STREM, (TYP) �� o i• 2• ••�9F�.95240 PG. 132 � �""�,�`�� SCAL = 40' (•'$,� 0 U 'a vo 3m 0 5NV 3,' �saua-iia co 6 d0 E 133HS G.,.z al -pZ 0310N SV Wfy1lO �tl3B3xOLd :31y0101d :3TYJ8101E NVId.LnOA`dl MIS xxxxxx 6e ON lOylllNpp :A903LLWBn8 -- .1 -- QTY Ei . �i S66-staz u3ev4nN 103roUd I � I I I I I I N V m �� g� crack E % 6 d0 E 133HS e NVId.LnOA`dl MIS QTY Ei . �i S66-staz u3ev4nN 103roUd I � I I I I I I N V A1IIIOVd IVOOMOINI a.WIVVHO- ADUMN3077 Q M© °i \ °8k� � � S it I � I I I I I I °i \ °8k� � � S it 1 2 3 4 5 CATE VALVE --�--- WOODEN DECK RAAROAO __-_ - -- -- — --_ a ---- _ `----_-� �-_-_ TANK _ gESEL - -.__._ -____ .--.. .UTOTT--_.- _F -tJ ECO ENERGY CHARLOTTE, NC _ —_ E%IBf. FENCE (lYP OPOST { S - - - �� CONTRACTOR -_--- ----CONTRACTORO DX co FENCE r RDD IN I -� ' Y Y'r,'l' Yl'"� %^.� �.. _ CRETE -r-=r-ma=r: DEat ,r I __ -MOBILC \ -1 HpME TANK ALERT EXIST, SAN. SWR. ESMT. (PYP)" (; ACCESS ROAD. SCONE EXIST. TREFUNE It 1 ! CROSSING (TPP) } CALL URB. EF. TRACK BO DWGS. REME TR TS CA o a n RACI 1 -� TRACK CENTERLWE P) 1 GO. m o f r -BALLAST & FILL IN BALLAST 60' TANNER (ttP) I i O RR SPIK - - HEADER SUPPTXTf WITH LIGHT. 1 \ PAVEM -N a� FIRE EXT.. GROUND VERIFICATION PROP. CHAIN � OENAVD - AILS753.03. °. _ 1 I \ ' ...1 EYE WASH/ SHOWER STATION) PARKER POST IP SPORf P/�R,O�P. CONC. SWIX OYP. t ) ' S l 0 1 PROP. UTILITY BLDG. - \ ` 3 1 REF MECHANICAL DWGS.. ICL j FOR REOUIRElEN15 CABLE MARKER POST PROP. HCP & I N AISLE (TPP) SEE LS C \ .,is ,n \\,.:. CURB BEN 7 T I / -_ "'a '�., �- GUTTER (TPP) -SEE DETNlS R®AN T f REBAFt PROP ASPIAIi PAVING I- DETAILSPROP. IOIDING I IZI MAX 1 .: I- e -s 754 o, ,yy. __ 39'E T A PROP. 30' IC NUALCATS DBL r ,01807__—' :. NlJ' n -- -�' IDGY(/�BLEF W/ Iu� 2 - TAPER CURB TO v Z -9I GUTTER itYP) CENTER POST �S 4g, 33�y N161 10* I PROP. SIORMWATER BLP EASEMENT (TYP) 179.9". SJ'[ I PROP. 6' THICK $ 1 o . o NJ _ GRAVEL ACCESS ROAD (fl REIMIR / / THE ATLANRC LAND AN PANY 9 L-51 6. R-33.000 IS y TRACT A, MB. 2< G. 92 YA -9APPROXID LOCATION OF 0B 15' \ 3378 PG. 291 $ PUBLIC STORM DRAINAGE EASEMENT 057-181-03 PROP8' THICK, 20' AS SCALED FROM NB 21 PG 924 II . PERIMETER STONE ACCESS tr20. R-13.000 DRIVE (TPP) MA LINK N •E / PROP(TYP) SEEE PIPE AILS O ��✓` r� PUBS WAy M♦�Po�CNr_oE_ /j VERNON S. HDL- Y a d }µ _ MB. zW H2 GLORIA M. 5 HOLS d q.ouse, CCC000NNNCREII CURBS HOISEY. SR. (SIVE _ . - $17943 e F"�3 P DB. IM 3 PG. 967 / / I 057-131-09 1111°" 2C" OAN �- � I\.,, �' BARBARA J. WAIKER I 4-` I PIP LOT 44, MB. 32 PG. SSS _ OB. 26853 PG. 211 / ?" TWh IPUH 20158 PROPERTY OWNER LLC MM[ DB 29885 PC. 594 057-131-24 / I O) � Z F Q CONCRETE i}.TANYA S RUSSELL RG MONUMENT ANGELA B. ROSES. D_ 5 LOT 43. M8. 32 PG. 555 \ / I 1 �. 11578 PG. 719 1' P r 057-171-43/ W Z LL t1 m 0 Q Q IpPE \ EBB\ I Y1A CHANG mE rif.. CRE� j- —f �T MMA 1 '��"^'-` 1.-a0 F Z } W V' OXCE W W U /R�M-� DB. 13315 PG. 232 057-131-08 (n \ �o / I l I I I \ G 0 N R£BAR� g, . I I IM a IROBERT J. FALLS D8. 15476 PG057-13 . 7 ENEET NUMBER CONCRETE =NCC -.,'I I' % 4 '. 2 Y��IaNWEN SCI DEVELOPMENT, LLC LOT 39. M8. 32 PG. 555 a 1• / \ \ d PIPE • 5 0� D8. 27112 PG ze4 \ Z���'� SCALE 1 - 40' 057-17-39 G2.3 1 2 3 4 5 1 2 4 5 / ec*-energy ! / KINDER MORGAN SOUTHEAST TERMINALS LLC / / t M 18180 PG. 440 -- 057-212-03 ECO ENERGY DELY CHARLOTTE 1 i HIRANS HOLDINGS INC. D8. 16 PG.340 -' DB. 8803 PG 215 057-257-2 12-O-0 B /� � - � 057-212-02 GNARLOTTE, NO BLANCHARD TERMINAL COMPANY LLC DB. 28042 285057-2� -0 THE PIME OIL COMPANY ' DB. 1256 PG. 481 tx APPROX- C - I 057-231-15 - . IMATECt9.�� p__-_ - .: :. _ 22, 343 OB. 11630/ G 340 X7.2, 04 � ------ = 1 RUNE POWER PANY / --_-' I / DB. 3419 . 54�/ "Y, \.'\ •,,,,, _ -__'_--_ _-_____ 4r �! OS] 1- / I„ -_- _ THE ATLANTIC LAND AND IMPROVEMENT COMPANY / J /.L' 1RACDB J378 2PG 291 824 %' ! 057-181-01 i C THE ATLANTIC LAND AND IMPROVEMENT ` TRACT 6, MB 24 PG. 924 t, tt`r '•- ;/ DB. 3378 PC THE ATLANTIC LAND AND IMPROVEMENT COMPANY ' _ Y OS]-181-Ot "' 1 4 924 t 3378 PG. t , SNT C-3.3 r EO iY" '� `/ !i'� �A�i'r%'•"1��- \\-'l.-rte. ! }, 1 - -�� � $ i�`�° - a+"",y y*s '..7' 1 ♦ � r r „ ✓'v p � ;t+rl'�(t11/,•�:�_ _—...f{•sg;� t �. '---- _' '''o-�'-- .. --- - ,. _ \ ' 7 , 0� gR lJ _.,.nn]40� _:• ��t` -�' V'y` _-�-.`- !- `_'�-.- 1 ,t,f \ 11 ��7.. {(�li:;t "�i'^._.M1'.� "'//i/ `f /�`J'!) .� F /�` y THE ATUWnC 91JY J , �'J45 "' 1 i t ♦{\^\- J TRACT 1, r �� I `\ OR, 205 q TRACT 1 �!' %�.`\ Y y� 1 ,'� '��.. ~" � 0 .I• i,r r,',. I ,�•., �\~� 4 �w� �1'i �� Y 1w # ` THE ATLANTIC LAND AND IMPROVEMENT COMPANY r/ 1RV {�.,1tt' \ I f)7{ J / J ! i :. ", yt `� TRACT 4, M8, 24 PG. 924 ,. •�. '. I - \..,,,, ♦ �`�'_._�. ' DB. 3378 PG. 291 057-I81-03 i B J/%a nY - �/: / , /j i / -� f �/ t`' I t • 0 `..� 4 ''1. ,rel / I Qj g ygj y� i; i II Ip! r yc" - c♦�f�tHtC��rb�''.. %r�/ � j�i?�7 � -- %!'�// � i�� ?�nJ ��'\�r/ 4 t 1{' 73s-., - �"�-_ -' _-"'"\��P�\ �\. _," il' 11+� HE -LAND e s< 1 --rts✓ _-_- -��- �`ry',li+l \ //� �%%% %f;' 1 rij R i -`? _/ VERNON S. HOLSEY an �� ``��.-- f ��-`- o Fe 179 'e t%'' fi?'JI'= ;�'��.�-;;i _/`s° /'//• ^i��p f , i / \ -t! .- ,-, - cLORlcuansaHasEY�sa'°. !" !' f { \l J �{y ,/y /;"-'- t 1 \ ARBARA J.WALNER DB. 139/3 PG. 967 J 1rTHE ATIANnC L ' LjW COMP t '•� %/ % ;,�r%//--� /' \ \ ���\ tom: •,. -. do--: / I �---_- 057-131-09 !7� •� 1 �� \ TRACT t 9 4 / _ 1i \;��\\`� - LOT 44. MB. 32 PG \ ` t DB.; �- '1 �/; / ter- . % '��-� _ >/" fey ' % _��'/ �'i \ , ` ` •,�`��.\.. 7� \ 555 _ n`I 20158 PROPERTY O MER d B.� 534PG. / ` \�` i / •'' \ ...� 4,� I -- _ 1 OB. 29865 PG. 394 -` _iD♦♦♦♦♦ P'- �y\ .3" ,. ANGEIA B. ROSEBORO _ \ 05]-131-24 /.. , PG 555 \ / 1 NA CHANG d rNa. JJ•: i =,� 11/f - { > DB 11578 PS. 749 / 1 NEE NWA ( -\ ( \ 1 /f/N �72D '/.�-'„ !t Yj/ / PROP SYOR A /.'_mss-' „_` .�� t \ `--J152:17x-43- 1 i DB. ' / `� J G C// ` ! - �_ \ \ - - 1 0571531-X232 1 GEOYAM CAPITAL 1� _ I I COS .1,83.50 PG _\ Ji' If; t /� ttff J,l_�_ "�JY�,rNS. ✓ .. :T�i rf �^ \ �- J ,„\'\ \` _ -_ ! 1 \ Z I 05774 PG. -jp-�� �`\ t I ? 1 ♦ -. „ - fT/! __ lJ�. l ROBERT J. FALLS \ \ li OB. 15476 PG. 791 / 5 DEVF1oPMEHT. c f f 057-131-10 1y.1 F qy+ a �J'" 73) t fip, \\�.. --��-��""� "- •/ Y \ \ 39. MB. 32 PG. o C b8,27112 PG. 29. o v: \ /?' �_-.-, j• rr /� 037-174-39 L m5a �i+.o TAWANDA BLAKE ^'s �// r 1i(f�J /h�' �y - rf o vv m'�> w. z}9os PG eaz ( !+ /` f ,. MOWWE A. ROYSWiR- �o P �. c&4' 057-131-23 / 1 -"\ 4 1 f J t /' S J//f - I�t, !✓,. 1 `/� ' !/ / {/ $' o OT 36. �Ijll to z > o W m A ` ', � •. � '" � % M8. 34 PC. 33� u 1 / X1';1� ! l/'/�,/ .J- yr ✓ �/% '� _- - ,l PHEISAMONE BWRONMAVONG and 1 ooYLE NEAL , , j `\\,/ / / / \ f �• \ - d5 n4- `�' - _ _ J PMOIE BOU BOUROMMAWNC :\��'„t '\ l': %J 1'b'�1�fl� /% �_. �_,%' /n f l --?H._-- 'C'i+oig - 1'_ y 08- 28153 PG. 318 I t OR. 8383 PG. 517 %'' \ �� t r �`” % / t �trl' 7 f I / '/%� / \ SHANNRICA Y. SMITH �. pM - - / \/ -`{; +) �,`f n' \ r+' G� 057-131-11 057-221-21 / \\' ,�\ \-" //// ' 3� N SANDRA Y. JONES r / \ �-:� / 1 ,1 ' >! ! f • l� / \LO�Sf. 7 PG. 728 �' DB. 15576 PG. 311 h�Q��•\\`Y~`1L",�--:: •\� \ 1,��Il�.j�?�`��-.� sem..'..--/��f/ J `lT'c� ----_ `.) A a� F t�9 o z O W K WK W ? h 2_ 1 \ - J J /� T'\ �;1�I 057-174-/7 �cN 057-131-22 O 4 cr 1 / J / '�•^C j'' �lt; Jt n,'; i Ii�Y \\�� "-----_ i / AIR— F. RECIFE _ - _ _ - _ V h.J ALgDES BORES and rlfS „ SONIA I. FLORES \ T 66, MB. 23 PG. 162 ` - W (D >-� DB. 16366 PG 100 /LA LOT 3,: CORDON AMMONS, JR / r - ,t' it �\ f�0� (DB. 30280 PG X54 _ _ 057-13 / LOT 3, MB. 1166 PG. 453 / /'�•.. \ 057-171-4y J CB. 27089 PG. 843 / f , • �. �. ✓ \ / 1M11EI-EE COLA EODMd.E-d "i" _ I J 057-221-20 / \ / D8. 22695 PG 188 3 057-131-267 1 MESON CMA$E'S 2- , DB. or. o1a MECNLENBURG COUNTYtlY• Mli.B. 22 PG 931 nFFANY G. BARBFF - �� SCALE 1' = 100' OHMTNu mm C3.0 1 2 3 4 5 __ I 2 3 4 1 0rty of � 1 5 i - - -- / 'r % ecq-energy ENERGY GOO FRED D. ALEXANDER BLVD PVBLIC RIGHT-OF-WAY, VARIABLE WIDTH D Is ^ - _ MB. 56 M. 231 8 232 � CONCRETE MONUIENT. / - - '''•^-------- CCt I/ r^ CRETE A ♦p011� "' � CAN� _ _ + 'sem"._:'=_._-- -- CONCRETE / / TOMER 1 ---- -- '- - _ -- _ �< J8_s- - = -- ^ "e -'ice MONUMENT / / ;•---0 -_0--_,u_ O F IF <� / _/ ____ -�--- -- = tlTr of / - NAIL -"- '-.�•^- o v_ E - ..'...+rte - - CNITY OF WALL l / ...•�- �gY J - _ SAL ,w � � / ,/ / -' '•— ,_ r,,..-� _ - ___� _ C P� _ _ _ /� / a// / / ," : _. -- __ –79n - _ .- _ 'D _ _ –.•�gO _ —n,W C ARLOTE DISK —. _..._._ ____._--_• — — / --0--,---''- _ .,._/��.�"`"'ss � - - -_- _- 1 BRIDGE --` � � Jf p - -- e8 ONBIATE CME /LX.YRT POLE ON BRIDGE •- P WACOMp TOMER � FENCE AND CATS �-� •-.- �_ / ,' ARE UNDER BPoDG- --� .__" -_ a �. ° AERVIL ROADWAY _ EASEMENT THESE RS AND "�I 'RML-.M-� __. �i - �'6 � CITY OF g1ARL0TTE DB. 23240 PG. 132 / SPOT ATIOMS-AfIP" C-__ _ __A4 DB. 11630 PG, 310 - - I -- __-.-_ 733--._-'_'_'---.._�-- 7 ! / I 03J-212-04 PERMANEM 8R1� O8. 25240 PG. 5 RAIL AND 7' CFWN 11NK FENCE e� _ L -=_'mac" ..L.. -_ THRS ARE / - ..,�/ - w__ - _�_ __. �£,`\tT LYS=�_5_Y's"5 y-, ..j1:. .. I {p(�- _"� .-� -- C /THE BRIDGE SURFACE --- _ 740----. u --" " � j?"�\ / _�']� RAILROAD RMT -OF -WA Y ASPHALT / CITY 783 -",-•-_"l " .R - =--� .- _- '�. -� - ��- ./ CHARLOTTE a5K OMROL POIM /5 ASPHALT % eB ELEV. 783.O3'� /NA1q a IE CRAVFL 'Tis MAIL e6,ELty. _ 752.W_ _ - ---------- / ,//�EASEMEM Fat OSEEET UTILITY dx U2524 PURPOSEB '' / %J . " �\ Y S7W0 ^ DB. 23210 PC. 132``\ 1`~ �` GRAVEL I lil RL'e:i t 1 w ` v if x r GRAVEL PLC \\ RALLROAD ASPHALT �� / �� \ \ •� 71 CITY OF / – \\ ` CHARLOTTE g�^ ASPHALT I � e\ -_ ASPHALT ATLANTIC LAND AND IMPROVEMENT COMPANY CT 6. MB. 24 PG. 924 / -_--- ` 3378 PG. 291 �_'-- B B c XI EXIsrMA.c�ONrauas f / THE ATLANTIC LAMD AND IMPROVEMENT COMPANY / TRACT 6, MS. 24 PG. 921 / 08. 3378 PG. 291 `/ / 057-1 1-01 f f f i 17943 tMPrf ^r.•.�.. .. ..,QI �/ rJ f/P� ODO* �, - - - f 1 q �' `t / 1 i/ i i -fittl t U7ART° .. i �1 �. EXTEND PIPE PROP. 11,8 0 6',�. TE --- -_ ------------------ -750 `\\\lj 1511,111JS0 F Z V l \ =�W to CrlwnV�i,cPISK �\ \_- --_ / � `t .. -_-_ _ - --_ - `\-.70= 10 = ti I 748 - w� /t w w / ! / SHEET NUMBER macnmro.. m.n, i•.. w�°"um.m®mw f ! r ' " / / /�..ww ______.___ w / w / 5 .m.40 5240 PG. 132 ' 1 r / -' /l/' :''-'^ --- . �. ,/ /, w.• / 'r/, / 'I 'r f f� �\ .,'3� `` -- _ -- ----- �, c3.1 2 3 4 5 2 3 4 5 •���'�.+-- �- `- -'� ;Aa N\\ ':. ,_ `moo 7 ------ _ ` _ ...Q c T c _ __--_ -- ----- - OP RNl ENTER ect -"'_"_. - 1 __--_`--_----_ _-'-==-- -- - ---_ - -- 7 _ - v+�.674'N_ - -- OO ENERGY j,EADRAIL T2/30' 740 4-- r i/�:'�/',_til !lJhf!//Ql! 1 )11, OHS SHOWN ARE � \ __ _ _ __ _�_ _-_- :• !'(---- ,,• ., ,�'1'p' ,if �' t I I I '\\���. - __---� ' 1 f �\ a - r3 SIWL WTCNYAgs`,�\ 7W ]3].84 M 73 23 r! 1 / .T. _ ]}320�.�`\"/ l' 7 N 73082 f , i f SIM TASM SHEET ___ __ - i ONPMY 1 �`I I ! t, ' tI / . ! 11 \ r \ \ 1 r r` 1 � r }I l If TW 7 7.18 715.54 - , �` ^•`.`� t! 1 ( t r Itl IR TW )k1i19.eB 2 r ! ! l l !' ! 1 J ( I !/J _ ___'----`�1l � / + (,r ,r /''J. , t Iii rJrl/!r J �l iM• � q"� �,� 750—_ J/,' i ' .• rr I t , ,! % I i I i /, , 1 `, / £ /f' a.9r '\ /// r J/. I I \ 1 , I / ! / Y . •. NOTE: �, WALL ELEVAIMS SHORN ARE 4\,\ � _� 6' OYN FROM Pyw PIT 32_' S€ � dKwUg J d w GROUND EIEVAMNS. FOOTING - NB9' O9'39•W - -_ o __---_- - MATCH CULVERT EAkR15 � -^, 302.5_89• r, / d 7 al i 8 1 `I 11111 1\1`r\\1I -moi ^ay 7 , 1 _- -� 1 1 1 I / i i `\\' \11`1\ \11' II ; '\ % \ \ \ \\ \ \ -_. `�\ ] a 5J• B _ _ � F_ �Y 735 E IL-_ ----- I -lr' ' ' �. `J , ! ,i l l +• i f/� " RIP Roi._aEF.--"___ DET�REGUIRENENIS •\ \ \ ` , ,,U III,,,,,, , �\ \``, iI , �\ �- -____------✓ r' ' (//, \ - l�J 7 \ I ' 11, 1-236 _ - E S1r t1 --------_. _ J _ 11 / 1 i I ! i' !/ t I'\ `I t`- \ '•( l 1 { ii 1 - _ _ - _ `�"�N• l -- ,: III+ __ __ /•l1w )! I ---- / / f I / I � l ' J!! i r J 1,•1 r�1IJJ ' / •/ reoRRG11 .� ! i r � !l j 1 I ___ J r ! - ' /' t f r/% i , � , !'t' t. r / J r /,7� 71 �/ ii. ` li' / --- - •/ i,✓ i / r ! / / 1 J t ' / / r / Il Iil r r �ii I IF I � � _ �\ ` \\ \ r •_- \ '\ ... -- �♦ \ \ lip 17M �p ;` a '�� '/ _ _ ' / ) - /" / /J�•f i it/' _ 11,71//1 + i J'J \ i e ♦ i \ 1 I / _ ____ � '\ \\ � i. ,j . , / /' � A / - � / ! /' �' ___-� _ ii ��' -' -' I / �•�i / Jhh / 1 ! :7 / / f `. . •• � `.\ .,--" _ rLIIII' � _ - _ \`t t �'%� ', � s'. � r r i' , 1 / r \ \ _ _- -'.� '___'u liP _ _ - _- ��i i �'i?i/,ri'/•'�/J ,�-_ ? ' ':/%'� ! / r ri' ,\ PROPTER ~1 1 \ -REF DETAILS \ \ \5 1 1 BNPP R F l FOR. liEO1RREAETTiS \ 1 i _ \i 1 `i •\ __ - !/�' '?Q \ •', 1 , \ ,\ \ / •\ Z at j o � Z_ F rt //'wry i,/'�� J J "t '•'/f '''J/! 1 / r �'.i/�'ri' / ` ___- -' 1 A 11 '\ � •'I \ Z �w ��W �U) //. r/, j/r � _� __ � fi 1 Ylf' � -_- '-' �/.//rl�,''� / •�s%J!''-;''r','' /!, /" - �'-�t�'. ----- � / - _� /'I� //`r .� ,lll -__ - -__-- _ / i � - �', '��//�i 1i //rll�g'!� �tr�/�� i ; � ;,tr' !'/ `` '•\ ___ __-� � -_ � , .' i 1`�%;;� 1 r r/f ' 111,1"..I/J/), / ( 1 1 I \'\ \ N 1 _� _ \\\ .\., i 11 j i..` ,; •\ 1 1 NUM BER __.___ SCALtnT' C3.2 2 3 4 5 W O - mE TABLE SRRIICiI 2 PIPE IM - 750.11' --_ - pro INV. INACCES518LE MWIt RN NIB N -NPO OLIE_ NNE PJI NRS N - J pm am.. Ir�c It11a.LN1Cl11. SLOK MKMM. � ."AM ON NAM. UP JUNff. NI AMR. �Rw-]aee� ec*-energy -. - 1 ro n SF74YM rrE n x w rF7>2ea n. ei RrE n. r w.7aN NA Daeelri x . . , RIM 730.43' In >Hn- LIE ouuotr, K w -71-n Ex w--1vsc E1, e .w r -)u.. wL ¢ r w.>...w r.e n.� a sono...- zms .. rolc «. , 7 9 1.1 M. INACCESSIBLE LIR YH4.a IOE pLVW) K w F),4m IW.)44e ¢ a' w Iwo O. tY wn4sal - - ._ _ - ■ Aa IIIM>IIR- He A0. I6' w Ih>4xH P![ A4. 1 !R a Ram V 5 _.... —.. n, r w.xaa !P[ .� t R am nzM I w. s � _M r ECO ENERGY TOP .►m.H n r2� h. r w u w Prt r>. r IM•)x4I He M a4a lore n2 I ,o /:. RAIL NV INACCESSIBLE_.w__ RIM � 750.16 a M NF)MS PP[ M r ,I 1R n r � 4O4C n n Rxn ase HF ¢ ' evc K n, ,Y IM.)lia CIMRLOTTE. HC '� 'I - -- 1 a p IW>•TaDIi wE M Ir w w•7lazs oR p, x' u,u-)an r dl NM-,aelt�— - IR N r 4op K-' _ w, __- �o i° - H4 4 lY w IR•)1AM RPE Ct, r III-7aa � � NAdRQWD --._ --.. moi' y a p Rw>w. He M K w I,.>aa R[ M x _ _ _ _ W000EN OE�R30-i_ •_ _ _ _ ___ �- _ _ _ _. _ es[ M r w n.W.! A[ M ]a, A p u 6l v.0 e. r w w,aaB --.. _ _ _ __ _ _ _ -. c.L ,.•Y Hrlata G _ _=' Mxw.mAR - ____ ---==r==--_�'' =�' - '----- ��._ ,--- •.r u--�-�-�� r. Rw_,w4iu r _ Rom lu Ru,- 1RR ,2 > fPE NA 4 M,�NaH He e�3 H-xpas ,il�. au p r NFT4Aa -__ __---_•-Y74S2'.____, �`n -_ ]aso x .r[mxrTstm _ __ .._ wen 'r -., __WM wPt rrl rte— zms ,ore ]« ee-�nm np w_w .. _, r n. ze'xr w]nn 'nrtw.xw->ux u Rw-] i> Hem _r.e __ __ _--- -_ F Ea a ww)u _, -- — -- ---= _ -- •s;rii NM. Ir rN�->uo HeM KN.>am wl:arw)«.w ]•e. •. a N I - ''. ♦��Him .--- ' �-----`------ ---- ----"__._� -�-aa - _ -_--- ---- - - r,— �� ♦7�1+--moi', -==_-'-_ `-----_�-'-__--:=_-_ _ '___-' - - '-- - - - --_-___-=--.-9--�� -' w ,a.•>w w.>s.a R. w-,v,e wr>.u, n.rrw-ie.H r A pR .. 3•'a..' Y aieR - -___ - >a5. .«w ¢ � .. ...����•;,-�--.."`tom._ _'- ___'_� _'-'_�..�-__ - _____^__ "'_. __�' >'//"' \ ��,� �'N= -____ �-__ __--_"�:_.. _ ___ _ -v. _.__ __ ���,_,�_ew aw,aR tr .n•H->a4� s a le w,a09] 'M IIY•HY) I—j"I »lA� r i RdOf IR[ w nr2 .\\\\ •_-----•/,/J \ \ ••____ -_�T �_ __ ___-_-�_ ____.__-__- _-_"- - r_ ____ ==` � _ ,scH t w,w]a. -_ ... (rP[af.rwN•xaa _ o Y BwY•.a.aP! IqE - ,. _-_ %( __r_ �i \. \..`___4 \ __ __ '. .: He .0 Y w H-n3)Y 1[ x_.- le...•,«„a MMt .A e. _ 1---__ � 147 - 40 _ _ - _ l/ r J a ' -, _ 724.021 --_-�� _ -,_ _ _ ` �_ --- - ] ]xa Aro -)-/ YY 1 _ 730.62 , Iso A r i �� ♦ ,.._ ` / "' J l`ti _. /Y 1 w re M►>Iln A1. 1rw.F)41 ne 1� ' l YY^V..Y�:' HeM eam \\\ ,,..�_. �. �ry /+ '^ �He '+ . ;�'• I � ' ! �� �_ n a S►>a91 ].zAe BECK R w lore ._/` ♦____ `\ J� _ _ `\/ .r ,HeK x w•T4v1 . I MOBILE rR c, IERc ,a4 a.e � r a !�\______ \ \ / ``l'�` ` ! % ! —NCH-rL�aT.x J / _f as nn, _ '\ ` �1 3 > >/`'. / _ \\ \\ , 1 / ! no al.Twtl�n r w•744w eR.r «w Hcn r� R 1 " ! J` i' - Ht n.r HIa `-� _. _--_ �� �� r I .mt•. z.00a lac «w ., R. ♦ ^ /-------------- TI _1He p, r v. rT44n IR a r w wwa - rR a H• w.TaDs i ' _ _ _ - ! rR w r aw ->m -_ ,o.o) >.R- . H> R. Aga rPc n r 1 aM >a PETER EASEMENT Aft. > tl57' ' - _ • _ I � I I ! / \ I 1 A100 ./ OB 6922 t IEe O tY Ha' rm w >azAx < ��M 1Rn r lOt WA rorc ,an >xM AH Aw T ar fa - _._; wRr aea 7aa al..._ _ .... LEY - T53.o3' - Hi l. Tti I. +. :... �_-i \) i 1 1 I // ' l 1 If \I 1 I \\ ��� 1 ✓ IRa 1rt1Ae ,4WE >4aed Z" CONTOURS tn?) , I / JJJ 'i 1 1 �•fy 1 W$)NER POST 1RM r ]0.N WH ]s,,M b ` J 1 � ISI � I ` // 1 l /• 1 1111 (il�I •,� / _ I f0M 762.75' � �1 OUT )� 7 �Y. I f2 ^., • yL �.� I I f � J J 1 / IIt He I¢ i Y __ ISE I lsa.N xw n n AID } 752. II��I I�CABLf;MM1D:RR PO ! i - r ! 9 SO F/ E Ei \-� �``� - �'� •, \\ 1 / 10'PR0XlMATE LOGTION OF '�} ' ('UBLIL STORY I . •. TO 7¢2.65 \ \ 1 \ 1� DRAI11/LE FASEMOJi AS Q� �R 9O I _ :ROM MB. 24 PC. �� .:. �ti 753 �� � \ 73467 TC � 1 4e �. �'' 9S2C4lED ] 7 p'n _ a ip ---\ , ".-�.,,, ^ ....� \ TOP OF HEAOWAE{ - 731.45. \ 73 32 _ _ O�� \ �. i M .,_,, _ . ,'. \ IN)/ OUT: 747. Il \` .. a JR` , _.G... t „ rt, ... �T"� 749 .94 6 149. ' `` v ,, ._� ___-`_ \�. \�. ♦ + IINaj(Arf TgS.jg/r B ilaF > J 746.77 _ __ B9 __ .,3. 1 .�"vim!!/-735.]9 �. 749.8. JeNn-�. -:. k'� �f.��.. /; 747.6e 49 f!r_-\ ,\\ \\♦` .\ \ I J Al TQF 0_F 747 67' \ 4353 ♦ \\ \ I \-`,` 743� \ 11111, __-_-' \ \ \TN('\ATL�NT�LAt ANO IMP VENETIT CpAPANY `♦ ��f I /+ !/ !/ /! LSt R33000 -- I \ � RO ' `___ --__TRACT 4.MB.'4 PO.♦ 924` I '' -'� ; \`_� �.`\OB. 3375 PQ.2n�i/',_APPRO%IN1E LOG�IBN�OP �(S <�- � ` \ \ \7- -OS. \ l / / I `�� _WI9YC-SIORG ORNIµCP p�S(y 1 _ u ` ------ \`\ \ \ \ \ ♦ \, \ . �\ `.\ !!��` AS SCALED iRPW 1N pC.'42l �1'g \ \\ �s— 17Q4$ . _ `� ._-_ -1 ��` ♦\ \ \ \` \\ ♦\ \` \'� \" _/�\\\__ / f 1 I 1 /l l /r ____ _- T:3O 20.R�1S.003-- 740\�"9111C" \ i/ /� .__-__________ _ ______ �\ \ \\ \\\♦\ ��\ \4�'\\ / I ` "��C'NNN.. p,...... ___ /�l \ ` j lj \ \ \e 1 \\ \♦\ \\ \\ //,� \ ! tr / I 1 - _ lei` 1 RPE 6' WOODEN \ _ _ sz N• \\ \\ \\ .\ \ __ \T !/ 11 1 ! /m,mr,1 �__ - amu Z'­ ` y G /ll / /� i I i I I ! ' „�J� � .. �� -"pUBVC �Fr AY -------------v/yl '�--- ll /l/l _If, f •" i✓" VERNON S. HOISEY and -' '�� MB.R/4 M1Bili OPoA M. Z ♦\ \\\\ LSEYMOLS and a - PG g2 ~N F 0 $j 7 CUPTS NOLSEY SN .... \ \\ \ \\ S W. _, r /11 !�^ �___.___ I ; I DB -13073 PG%7 057-131-M A ��� J \ l \ \I \ 1 \ -- _HN �v./a \ BARBARA S WALKER /! LDT 44, M. 32 PG. 555 \ 1 \`,.\ A 0.0 Z g ? Q W \ p DB. 26853 PG 211�2�\;,j I V ! JJ 1p,\ 057-174-44im 20158 PROPERTY OWNER LLC NKU K= Z W W N O yam' CONaitr-W�r TANYA S. RUSSELL / ( �. 1 D8. 2986531-2JI \ 4 and YUMENTIY� 0 ANGELA B. ROSEBORO I I ..-.� fes!, 1 �\ LOT 43. 118. 32 G. 555 / ♦\ \ \ \\� .. \ O8. 11578 PG.. 749p II 1• pI 4 SMALL f1EADWALL 1 4-4 , \ \ 057-173-/ 1 `\}H \ / r' ,, EBAR VIA •' SHEET NUMBER \_--I _ , 1 .\' / i IXEE and rIH, CONCRE o°.tea''�>\` ` Oe. 1530PG232 T �Ql �' rlh'1 DRIVEWAY CULVERT SCALE T' • 40' 1, DRNEWAY CULVERT C3.3 2 3 4 5 J 1 2 3 4 5 ect-energy i KINDER MORGAN SOUTHEAST TERMINALS ILC - - DB. 18150 P 440 -� G 057-212-03 i ECD VEMY CHARLOTTE, INC oTY OF CHARLOTTE -- HTRANS HOL0NG5 INC. DB. 11630 PG. 310 / _,-_ _ _ mac_____—__ DB. 8603 PG 215 057-212-08 / \ - - _ - -I 057-212-02 BLANCHARD TERMINAL COMPANY LLC W. 28042 PG. 285 -""- 057-243-02 - THE PURE OIL COMPANY O0. 1258PG. Mi-- // /� - _-ig'- _N AI � 343 CITY -_._.I la5.._ OFA Co340-----� OF 75,_"__ .Tib G. -_-_- 21 W ---- �_ --_-----_ DUKE POWER PANY,/ I / DO 3419 G. 543- J. 057 ,_02r .-.. C 4� v�'�, --- -- --- --- / C lip lii I� �(j{ (r THE ATLANTIC LAND AND IMPROVEMENT COMPANY /,�: �'-.-- TRACT 6'3MS. 24 PG 924 PG , \ . t ,!� .. DB. 3378 291 l 057-181-01 / ! 111E ATLANTIC LAND AND IMPROVFAIENT COL�Q'AMy� - / TRACT 6. M8. 24 PG. 924 '/;Jj,J� , - / ' ` / THE ATLANTIC LANG AND IMPR0I,EICITT COMPANY ✓r DB. 337. PG. 291 ,I';:' , , _ { /{ ./- _ _ _ 057-181-01 ' : - - C \ ,' TRACT 6. 3MS.76 24 PG. 924 OR. 17-1 P / \ ----_ f Ji _ - --_ - 0281 OS] -181-01 $FIT C-4.3 a -.., AM TRACT m Y lHE ATUNIIC LAN D O4EMPNT COMPANY 7RAC #TB Y4. 6 924 ' ..,` 5 .. 7L0 o\ t1 � �. / 05 fqy B o 3 . k JI w. n COMPANY r` THE ATLANTIC TR LAND AND I4 FG, TRACT 4, 3MS.73 24 PC. 924 'Ip r ii r, i / `, I• 1 1 � !f 08. 3378 PG. 291 / / 1 '��-ry 1 �• \,. •. \ 1 \. \ ` l T � I / , I T �- 057-181-03 ' y _ I ty D B wcC� � P rJ , m \ ^-- - d APT,135-- > ._ . /'mss It; 1,, ,O�t. 4�i / �" • f ! 5_, \\ E RTLAN 'LAND ��M7Be8iG 29,9:1 - _—_ _ -- _ _ �- — senl � / ,._ '411 / l / `TH `• •`. vERNON s HOLSEY a.aRIaJMRns ARBARA ^�- !Y = 17943 1 I \ 'THE ATLANTIC LAtyf OpYPIJ� - / - - % %-' j' �/ / TRACT..,. 9$4� �I� /�.' 1 b �, `_---.-! .-� •�5 / %. 1 j , \ ` / t�� �iI"' L WALICER 1 -_ DB. 13073 Pc. 967 _ e\i,l\\�'�--'77L \ \LOT 41. MB. 32 057-131-09 555 �' \ -. ' YA S. RUSSEll D 057 -174 -oar 1 ANGELA B. ROSEBORO \ / 20158 PROPER Tr OWNER _ I DB. 29865 PG. 594 057-131-24 `t. {{•J: \ \ '✓ 1•Jl, - % /J �%� \y {l�j,`0811578 /r � ,F.1 110T 43. MB. 32 PG. PG. 555 / 749 ` / I IDE PG. 232 OB. 157-1 - 1 �r -- 1 i 1 , I GEOYAM CAPITALC��% COS- #3 MB. 50 PG. 41T rl,1 ; ! :,✓ if f .1 1'-•.-. / / //- , 'I /,7/ /' ,, �A6 I8774 PG. 3JD-� 1 O57 4� •Y%= �� / \ ✓ / / %/ f' 1 I 1 l.-_. -...- / �•/. f . "-. \ I \\1l / 730 f % { •^_ •�. \ i i% ': 11 ��•-•� �' r' q { t \\ -✓ 771 '� 1 --`J'j`,I - 057 -13t -OB \ . . \ _ - \ - _ DENELOPMENT. C �,Oo\ -�� M.M8. J2 PG. SS o wC \ �9�2]112 PC. 291 B\' I- TAWANDA BVJ(E �st%•'' I , i r ROBERT J. FALLS 1 pB. ,5178 PG. 791 :l 057 -131 -TO -_ ) t Z Y J R -- { %. t _�� A••`:. / 1 /1 \'`"' / /• /fl / i I �- / r' \ > I �t �� (/ / ����„�” 1 11(I { /�' / \• / Ji'/'�% J I.1 �(\`\ 1 // I// % ��� 1�� 057-174-39 Soo Q, G i+ YONIOUE A. ROY5IEIl� g 19pr•` c 1" oT J.. MB. J4 PG s3� Pw o u DB. 11641 PG. 606 N q 4Yq'{7�W, M. 23906 PG 882 057-131-23 - PHETSAMONE BOIROMMAVONG anA PHOUKHANH 90UROMMAV0NC iz 0= CL Q W w t O (7 O 2 ~ Q i I . ( -�-. �- j %!1 1 DOYIE MEAL / \1 \':� \� ;'�✓✓ 2 /" t� !I // ( 1 � '� / \ SHAIYNRICA Y SMITH - Sip 4" � DB. 6363 PG 517\,\\ "' / 1 / 1' I ` J �/; \ .+' Gy OS] -221-21 / / 1\\c\\ ♦ ` /1I I \ �1 /,/ LOT 37. MB. 34 PG. 33 S w e �/ 7 19472 PG. 728 / / �Q� 1'• / IIS I�.((i i / _ __ DB 15576 PGG 311 OB. 28155 PG. 319 057 -131 -It _ � �' A 6'i r J = W_ R U F- MU N F ~_ O \ \ J y -!%l, \ 5 I •� J- 05]_1]4_31 'ry/ �n�c�ur�[w"��n' NMRF - - Os7-1m-z2 ALGDES FLORES a/M mile. 1 LOTA 86. 2J PG,'482 MWRFNCE GORDON AMMONs. / .h "i • {,'$� \ O� - ( DB. 30280 PG. 951 JR, 'i LOT 3. MB. 1166 PG. 453 / '� /'. st.\ � \ 057-t71�6• DB 27089 PG. 84J ' - - NiLL1E LEE A&EODN`LE ontl viN. COLA YtiPG. D8. ,61388 P iG. 00 057-131-z - JJ - , 057-221-20 / fI \ J OB- 227-1 PG. 188 • awa o�o'i.=�mr."^`" .CY' gym`•' f /• MECKLENBURG COUNTY / /1� 057-1J1-26 7 -- -' _ - - _ I ! J GARBLES. ' �ib"i Ni3M�Q uB. 22 PG. 931 19T'ANY C. BARBER I i _ SCALE 1' = 100' G{.0 2 3 4 1 5 1 2 3I 4 5 OfT40FJI?'L / �g1ARLQTTE:�.%%-_ pC2p ECO EMERFY CHARLOTTE, NC FRED 0. ALEXANDER RLVO. PUfiUC RIa1T-OF-WAY. VARIABLE WIDTH MB. 56 POS. 231 k 232 Pp. _295 as _ CONCRETE • - --YJI Ut / / / — MONUMENT — — �r CON 793.. ' /' �� CONCRETE.- - -- CONCRETE/ TONER — MONUMENTCITY OF CHARLO 3 / —_ —/ /a/ / / � ... _. .- _ 790 � ����i✓ss __ � �./�� CRYfiF /CHMLOTTE - ------ BROGE__--8 APPROiR1ATF u 68 —,. /LIGHT POLE ON _---788- --- --.-___ '- ____��`'' _-- _ .-_-� — DUKE POWER COMP --------- 7M'B081GNT_p jWAANY a TONER ROADWAY PG. 1M ;' ,' 4'RI lLtlL-4-i`--- - _ -' an 16 CHARLOTTE / DB. 25210 PG. 132 / i - - ' . ' C -"^--s em - � _ -. 08. 11630 PC. -0 }IO PETMNNENT PIER FAS'MEM E MEP -- -f-Y DB/. 25240 PG. K-,r�-_- -1' ' -_------ 172----- - .ter __ _ ■.... -' -- RAL AND ]'----------- --. MTOI` J/° /�y^!```"�', C / LINK FENCE // i.: _ T .. _' _ APPROXIMATE 100' o /� \?C�,� RAILROAD_..--.---.----_.`�►� _ 7'{><. RAILROAD RIGHT-OF-WAY J�� \ \\�� SWITCH an a Z. % -les— . CHARLOTTE ! • \ — ♦ \�-\ 78, \\\\\ ♦ ♦ ♦` ♦� ♦ \ \ RAILROAp - y'�-- ' FOR REOOREMFMS / / : \.I� �♦ ♦♦♦♦ ♦ ♦ \�♦ CENTERUNE iWRVIROnD __T �� T —_ ♦\\ARCH _'— T OF P.Q -- � g /////�FASEMEIIi FOR STREET Q UTLn PURPOSES01 06. 25210 PG. 132 / ___ \ \\\ \\`r♦ �\ e\♦ 'yam\`\ �1�� r ft( l• / ,78D� \\\\\�� ♦�\ ♦♦\\\ �.�.� •�\j @\� .RAI LCHARLOTTE CITY OF olsl� / M 52 S�` ATL RTIC AND IMPROVEMENT ♦. LAID COMPANY CT 8, M6. PO. 924 `\ \; \ \ `�\ B n 3376 PC. 291 -------- _ - � A1. ` NI TOP RAL THE ATLANTO LAND AND IMPROVEMENT COMPANY TRACT 6, MB. 21 PO. 924 ! ♦\\\ 1+I / O8. 3378 . 291 %/ / / r / / \-� / 057-181-0tPO / I / / � ♦�`��'\\ ♦� $EAL l / I � /' 1 I t/i / Ill _'`` _ _ _- �1794P - —� , r { t n/irltt I I ♦v /AvI 4 fiy-i, PNELBE arcs. kOR14 �' - - --- - - - ---_, - TE 1 `-- Fi/ l i / / _— __ / 4 I \\ \`4l 4144 II _-=-..�.=,�. `®'.••w _- t \Hly 111 _-__ __ - ..' \\ _ It zz:�ZN I U r 1tt\+. \ 'I ._ \ %\\ - _ 460--__,__.-._ on �j N _---_ = - - _ _ _ __ � alARtAf1E` 3� \ - -_---- --_- � -or y� OIL LM __ Z_ -- _ - - 71,tp O. 04- -- i r / / �`k`,. ♦♦`�♦`-l' _ -_ ! SHEET NUMBER s •��AA.s�a.A AauAw �. �r� // __-i/ !� r,SI tI 1111 1 \ -W 65240 PC.. 132 ---- ___ \ D 1oNEo er: D;9DATE D OATS —+e ECO ENERGY. CHARLOTTE •��� u IIII I' I11� i II i ,� .sw111¢nvm INTERMODAL FACILITY PROJECT NUMBER 2015-945 a.. PLOT sc�j mor mm- 4 NUT✓�R AS NOTEO Sp -16 201305 _T? n ANSI0 BASE CML 3D. pJ UTILITIES PLAN SHEET 3 OF 4 '"nnr Chambre E.@bm— , PA 1oNEo er: D;9DATE D OATS —+e V/lll By 1 C1m By. BOIICITATION NO.: � VI o 11�,illl 1, 1 IIII I' I11� i II i ,� .sw111¢nvm SUBMITTED 9Y: CONTRACT NO.: fgc XXXXV PLOT sc�j mor mm- 4 NUT✓�R AS NOTEO Sp -16 201305 CD n Chambre E.@bm— , PA 1oNEo er: D;9DATE D OATS —+e V/lll By 1 C1m By. BOIICITATION NO.: _w�xo 1. .sw111¢nvm SUBMITTED 9Y: CONTRACT NO.: fgc XXXXV PLOT sc�j mor mm- 4 NUT✓�R AS NOTEO Sp -16 201305 ��••VII ANSI0 BASE CML 3D. O I I I I I i I I I I I A I I i I I I I I I I N I I I I 1 2 3 4 5 = ---_,.�'^ _- ecs-energy ------------------- ---- - „ - -- - ---------_-_ � --- - - — - - -•__- ----. - ------------ -- ---- ^ ___-_ __- t ._ - _ F '. P BUILDING /. -^----•---—'"""_"""""___----=_`--_---_'a=-_- _--- --_- -_ - FTE: 753s1• Tpll _-.____•__ _..�_-�- ._- _...._ _ _ _�__ _ - x -----'-�.-. -- - A v P/✓ Ill tli ll`rlt t / rIfli':l tttf Il ECO ENERGY .. -----_--_ mac_-_-_-__---_ ---------•---- -•----•gin `; r `---_---,; ,-�=____- ___ - -_ -_____==- ---___ ___-__-_ ___-- _--___— ' \w��- __� EAM^ __- - ____ _ ---- "-_- - ____--•__--•___-•____•_________________�-__-'--�'=�_`=�.'� �-L ) I _.-•-J_- �.5 \_ rr elf! f,77� [. `_ _-_- / .=r��___� -__ _______- -_--_ ___•___ , __ ___ ____ __ _--_ r�ty ;:� --. �, _-_.,,�_ ��: `� __ __ ---_750 _ ------ ----- -------- •----___ -_ --_---- ---_-_--- •/ _�`j 3�__':ri � -� � _� ---� _ -�=y� `_'- ', -- -'\ --------- ----•----•----•----^ .__ - ---_--___=__--- -- � I t .�'� � i�nttliii�uj•ii!/ I 72s.tY' f / - -'--- -'_ _-+_---' _-- ��--s----•-_ _ �._ - = _ _ •-y fr �,' J 74 _ - �T`- w - w R�y�w78. -- -�-�- a w w i „ ! I "`--iiir I _w\ _� '\ _-' ww ww 7JBA2 / •."yTi - �_ -t- GtEIE --- J'3 WOODEN) www 'NY.`w !7)&58 �` `- Y Tom, _ f a-_- �•`+-+ x- �P sr- I /- I•-5�/ G•. t DE l�. \-_----=-_- �- Hg1E E?$E161f - -_-- __ _.____ /'- 2' 1 } • J Ill!!'ll( )56.09'- -- -� \\ l ; \\ \ .III \l• / j--'"753-"_\.i i N I I ----------- _---� �'-�\ \ ` I `\ III/J l _-�yF-��y`=� 741Z� / - I` /, � rll/ ` �/I ! \ 1 \ 1 Y --- t✓ WATERLINE MAYBE PJG IN LK/�/" J 1/// J/JJ ICAL ' ` f / Ii 1 TRACT A ARE/5' URLOY LOCATOR /J// / DB. PROP. }. SCFI. 60 ` \J l/ 4 ` • 60 j jj�/>// I FIRE F\f10TECRON MONITORING -y_,-, STAG REF. FlRE PROTECTION I IRAN. LATERAL - OWGS. REOUHiFAIENfs I 1 1 I n4� w ` /, -. llj%8(i' 1 / \ ! /' PVt GLEAM- REP. OEFA85 t 1{ \t , 1 \ttwwV .r 753:0)• \ ; - H �' .YFOR III WYtNER POST GONIIlrW710N t 1 I ` ` .i - ` - i I 1 I ]5 CT IT A.F.F. I UTILITY CONTRACTOR Jl I11 CONTRACTOR TO PROVIDE 8" . BSP FLAnG[ .CABIF YARI(ER s7 - ' -A-- �/ C _,�'WATER EMEIRIEME Iu I' FORR REF. 1' is PROP. IN TYPE •K• COPPER • II WATERLINE. S YIN. COVER ���� PROP. UNDERCRVIDE EOCSHALL- `�``�>SERVICE BY PROVIDER, GC SHALL �>4 OORDINATE PROP. T REDUCED'/.'-Bt �` - / \ BRONNDW OSE48LY M ABOVE r ASSEMBLY x ROUND FROST PROOF ♦ ETAILS. r QKLOSUR( - REF TAILS. E •.,,_ Z• WATER ?ROP, b' x')C TAPPING S.N0.E AND �,+.. .� ! tl a t "t - 1-�NIRMLiOR TO VERIFY E%. \ WATFNLjME SIZE PRIOR TO CDNSTRIICTMIN �� Vie. � -•.�-� `11 � t�5 ��r Aa � � .. 1 i l _ _- � „ ,"+_ - � __ ' 390 / •� t E ` / �. ,� �... r , - \`' '_ l �`• '. \ \ \� .F w�ATERLINE. 3 Y i • H w s �l 6 REDUCED PRE5Sl8tE RMGPAL'E IN CA` O ASSEMBLY -_ ♦ - _ r - �:: J _ DA) DEVICE Df ABOVE GROUND _ JJI ♦ F+1\ 55 y r F�T-PROOF ENCLOSU DUALLS � E 4 _ 0 :' 6'. 7 la i c AI.� 6 _ - /-8•X2 1TEE-4 Gv ♦\ \ t - - c, -- _._-_� `__ _'-716)1`♦ \ 1 `���� ` •w _ SSWR LATERAL PROFILE \\ ♦\ w`w / i PRP / / ` - - w APPRDXIWIE "LOCA�IBN',OF'1S1:-- w �4 - w PUBUC STORY DRANyCC FAQ/. r I www•. ♦w r `l� i� ` _ ]] __ _------T----_. __.. 770. ` I I -- --` -- - AS SCALED FRDW MB G'1524 I\ r ; w w w w .Fo-- ♦wl_ ' '-___-----___ O ww / lilt ' I I I i I _ WE I , I j - ._ ,.---.; - .. , _ /w\♦ r---la��t i i 1 y / -,-- , 'PIPE � _ =_ -_=3�` i �� V ♦.._ ♦ / 1 l 1 1 / /rr- _ II `I' I t i_ `` I I l ial ted. p�H CAR , S.�I_';yFAy� 1/ _PIIBLICMRIwA ,Jll JI I _ -__ _ _-__ I __"_ J JJ \ 71 I i _! / 1 ! i +if 4 VERNONCUR5. LSEY, R. �_ YB- 2 SMD / GLORIA Y. S, HO SEq­. 92 I � _ ---7-- �'w. 760 �_--_ i /// 1� ``__-__-r -� ' . I I i j �� / I W iJ07� % .'� - ' w w..PIN DRIVE LOT H, YB. 32 PC. 555 / D& 26853 PG. 211 1 - "• �t Q _i 057-174-14 / ` / $, RWl - 755.95' w W. OUT - 746.66' 20/58 PROPERTY 0WR1ER LLC w w w ` w w / ♦ I t. DB. 29863 PG. 594 / �yy CDNGRi� TANYA S. RUSSELL mtl \ , \ 057-131-24 W 2 - YUIIENT ANGELA B. ROSEBORO I 7 : - --... 750 LOT 43. YB. 32 PG 555 \ / fj '+ OB. 11578 PG. 718 i 1' PIPET �a�11 • A" R e K LL LL yr L>. PROP. SNI. SWR. CLEAN D57-174-43 OUT AT PROP. BLDG. \ \ / tr t 11 VIA HAN -dwi/4 CdMCREET4._- i] I ALT ? W F J LL=1 XEE NWA DB. 13315 PG. 232 _ ' 057-131-08 r rr A _ W fO yll' __ i PROP. SAN, SFR. LATERAL. APPROX. 10% SLOPE 7 Ij ROBERT J FCPO LCONIELT RP. LATERADB 15476 P TO EXIST. SAN. SWR. PIPE I \ >rr oV1. �i =- os7-1m-•. SII!!. MURHWE w \ DRIr_ tE I 17 I / 1 \v lel � 0 1- 2' 735 t I PIPE_ ��' SCALE 1' = 40' 4 + 1 2 3 4 5 2 3 4 5 ec:-energy i KINDER MORGAN SOUTHEAST TERMINALS LLC_-- B. D18180 PG. 440 i 057-212-03 i' CITY OF CHARLOTTE i' HTRANS INC. OB. 17630 PG 740 ! OB. 90033 PQ PG 215 ECO ENERGY t]IARLDI'IE. NC / _ �_ _ _ __—__ / 057-212-08 �— - - — _ _I 057-212-02 ji— BLANCHARD TERMINI AL COMPANY LLC DB. 28042 PG. 285 057-213-02 —f----_-_ - I 95 / - + THE COMPANY 461 ( 03 - L - -- C /APPOAATE1-15 rt_. -� / 768'. 7 5--.-ter.___ l i-..... CITY OF GI OT1E - ', n .... ------ }�_------ 08. 11630 G 340 oa I!. $ -�R_., ,.,..-------- - r f PNCE POWER S81iPANY / I / DB. 3419 G. I. / .-';s"\' •, •1,�•-..� - - _ - - _ _ _ '• I ----_ - -- \ I _-- ___-_-______ �[ / ' J I / -' THE ATLANTIC LAND AND IMPROVEMENT COMPANY TRACT 8. M8. 21 PC. 924 i C ..� .Iii fI %/l/�I ! ; .'' ' / ' i' 'r/TRACT DB. 3378PG 291 - THE ATLANTIC LAND AND IMPROVEMENT 1RACT 6. MB. 24 PG. 024 \��� - /' THE '•- OB. 3378 vG. 291 /1.;t( / V / ATLANTIC LAND AND NIPRDVEMENT COMPANY TRACT 6, W. ZI PG. 924 3378 PG. 291 II , , \ /' // V♦,,� J50 �� OSJ-Nat-Ol ¢ YID. YA3 , n 4 \, *�'♦. }�k.+,�'41L f • '"•Y_. .. 4P � . ,.-� i i / / r i �1., :�-',`J-�- __ --'—" •.1/./' ) .I J, %h _ _ _ - T IN _ _ - z. -- _ // i � h, 5 T°i G 7 Q / t i bb �,�---� 1 f wit Y \ / f F;� `\ •.` _ �"�, '1J�l� \ ♦ 40 - / _ �i \ � ���� ..- Yt� 1 I x � •^ A'S (I ♦ \.. .��-� � l � _ Pig $J I�I 1 1 _ _ _ O 'W THE ATLANTIC LAN D'f / / AMY/ '� \ �� \� ( _ TRACE ?4, /� ��� / `� \, 7fi0 CALE TRACT 1, n IdR�i .✓'� 'y�/ t/ \\�,3/-I 05 q q x_00 fff� THE ATLANTIC LAND AND IMPROVEMENT COMPANY YY TRACT 4MS. 2924 �' �♦ { / / PG. 3 201 057-181-03 - ♦� 1 :x_'60:. 1 J t N 3 r r r / I T ' r , �.�-74'{1 ZFA ' I •�.. ,,.-, �•_- -/. i / % % X735 ' \ ;.-; ..;;,, 1 \ =!'L�t*�`<.'°o` �V. —'' 41 .i j' %,\+^,1 n�R I I �- �. -JJs_ . . '— ; '!t f a i "' 1 j- r„ .; / � - THE A-LAYTi _ LANG ANO BdP°OeFMENI 7IjACT F. 48.74 G 924 OB.'3J>8 f'O. 91 T •' %fRNDN 5 HasEr -- - � - E E = 17948" - II ��� 1 n �:' 1 \ ti✓.°J (�%� ,i✓_\ I i r'TI1E / / ! .� u+eNtA w2ER/ CB. 13 0LSEY. 5a. t ` I D8. 130]3 PG. 967 -�_ A �P • . ��TTMAAAIG �� \ ATLANTIC LAN M 7 DpMPAN `, \--'' J i/..- TRACT �p 4' - / DB., T, 1_ -- / 7'S 7'` ,' .!-_... l v,� ' !+[,' �,' LLOT K. YB. 32 PG 057-131-09 --� T,' _ yo. 26053 PG 11 I-� I'. 'nJ /'J 20158 PROPERTY OWNER PG 594 D— GN 1 / ,- ,1 1 , - , \� .;(: AIN.iLA 8. ROSEBORO 1 / 057-1J1-24 \LOT U, NB. J2 PG. 555 / TIA CHANG and •vN•, (:' t \ i'-l._.._ / �% (/ j/� ' 23 ter` �✓.� ` // / ` 1 I 1 1 l \ \ ♦ `� `DB. 11578 - QSZ-174-43 PG. ]49 `1 / I )EE Ii GB. 137,5 PG. 232 r r / -- _ Q 1 I ' /J,% / GED\SALI CAPITAL liS; ,C !'I r, /,/ ^� /, / ''= _ ��\ "r ! I ✓ , ,% ('' l i \ -__� �.� ♦ l\ ••, ., \`- S \ -_ _ {_ - 057-134-00 I ' C�2 17451 PC, 4111, ` ( I .'- ! �r i 057-222114- ` ` \ { 1 f4 S i r \ ^: /"�\ .\ y '/ ' 7A, % 730 N 1 11 ` �, •;, �y \ ti5N?1 J9. MB VSOPPGN SfiC •0827,12 PG. 294 p 0 Y''l ( _- %r / J. FALLS PG 791 J. 8i W C ^. •• a, ; , ; ` , , ,•. l '// i'i ) �/ JJ h�� �i /J /' • 1} tt 1 1 11 057-174-39 \ MM k104E A itOYS�ET 34 PG. 33-'A 808 _ SC}a ��oq, T p�� off' TAWA/$IA BLAKE 08.23906 PG. 002^ - 23MGSi-2J - 1 1i �, -- ``-_ PITSWONE BWCtOMYAYONG and PHWKHANH U N aK LL V Q i J r A { �{ \ ��-/', p/ • \11�=PG. DOYLE NEA L /' ` F , 11(4 , / De. 6363 PG. 517 1 _ f/h1 jj��! \- /%� 1, '� / \ 9CANNRICA 057-221-21 / / 37. M. _ p5 -174-3$--� Y. SYIIH 34 PC. 33 S'° $ c S' 4 Sq _ _ o- _�i4. BWRCWMAVONG DB. 29165 PG. S19 05]-151-11 A 00 Cr W 1' 2 F f W K V Z = N I \LOT i / �\ t, Iti ttIt 71 / OB. 19472 PG. 726 1 \\ •L- �, 1 /I„'. �, ii.'�9 \ 057-174-37 $gin be SANDRA Y. J(MES DB. 15576 PG 311 1 _ _ _ _' w U / / \` i /IJ 1jii \ ATRENA P. REDNE / V` 067-131-22 11 _ _ _ M ALGOES ROR6 orb rH•. SOMA L ELORES o Z y Q v/y t/(ttl� L, 00. MB. 23 PC. Iy per' [ Da. 70280 PG Ill -�-_ v - OB_ 18388 PG. 100 057-131-2 a' /LAWRENCE CORDON AMM S. JR/ I •� LOT 31ME. 1 6PG. 843 / //: / , �`��i \\ 067-171-4W _ WILLIE LEE McIEOD and •Ke, - COLA IkiEOD - __� ` W { !f 057-221-20 / 0 91lEC92 \ / 08. 22895PG. 188 131 -26 057- 34 J SON CHARY �T MECKIENBURG COUNTY MB. 22 PG. 931 TIFFANY G BARBER ( jL SCALE 1' 100' 2 3 4 5 - 3 j 4 5 T //T _ O1M aTTE— ' LEGEND -- - .� � _ -' TenporaY SW'vrwnt Trop �Q Pr IY ry me Propo.ed Pretest is /or ills of o rises l with ect-energy t 1. iion st of od 0.. Temppr.y Sod— Fen- supporting InfmaWctun. This protect le IOcaGd wuthwsl of Fred D. i �lJr �''" %%'�,-"� � ExMtlng Perhxaw Wllyw Uaxander Bhp. in CM1anotte. MeckbnWg County. NC. Total dlslurDed _ — - _ area fon ew -pat : Ie.W aar.e. me agave of .od, mdwee a Conayucaon --rte Eswtm9 —s, In—sation of rwbn control meawrm, peering, grading, raiyard/ EGO ENERGY CN RLOTTE, Nc Temporary ma, Pna c ion P_­Sewer driwwoY construction, site Militias. utility building coral—bon, ant Norm drainage. ► M Stars C1wat Dam P—sa UrWrgrouiN Elecbical gwwd ENoml wder I OlIto[n Obtain ON 50 Prant permits pnor to Dw'nn n9 wont. pkmapprowE �/ y .. 2. Flog the work —ts to Prevent un—wows, cleanrg. 3. Hold o-- nn—mg a bast ora weeA to starting construction. mt Sit- Llellkx9 Vne P,- D / /11 '{j40 ' Notdy NCOEO or Cly of Chadotte 415 hours pew to mptng. ak 1-111 temporary stnaabon -trance. / RI.•2,5 _. _��-"'- 1-* /' N g 5. Install sad m-t tcorap 57-A. S]-B. ant ST-G. 6 Indo silt Is— am stone oabta D 7 Install drversi- Gdches 1,2.3, and 4. ReconeWcl as requires during corretructian. B. Ows, ant grub ores ae ns,-es. CONCRETE ' — l?1 -' `•J 9. crape and sa areae to MONUk�NTr l - pmpases grades .noon. Contractor $hall rat diatur, mora 9 ares thann Install eb n ' C / pevary pw matting as $now on Dlans. Sees slopes ordonce wi0a saedlrag petal. CONCRETE storm drain d p p aprons. (Rema- stom oulbls wwe appliwdw) / TOWER 11 %' ---- ,x3L_,- _Vpt ✓ 12. Prov;de graueWcww on exposed sbpee as rMwatad - the Sol Stabihzabon TaDb CONCRETE / /--_.u1--- 1 P"' -- ---- „_ --�_ - _ shown on the delete sheet. /anon n9 mmpiwti n of any Phase of grodnq -- / �.-_._,��vn,�� 13 Perform f'nreh -�: W. _MONUMENT gradin _ .a; RIM =781 OB a,3 _ ": 14. Remwe all tenporary aermdion and $ innmt antral stroIA res alter two is _ /' COIffROL POPff �4 —.• �Clif ]O]98 estadbned m all detuNad orws wtl Idb. ng NCOEO ar (itY of ChoAotle GIGATMRLO�TTE approwl NAVD EB ELEV. = 791.30• / / "�*"-- -st'" — / soNAJ aft of aft,, oro conatmc— ' i/ _..__ _ -790 - - " - _ _ - _ --"' - , 'g -^'- - C VRLOTIE 0151< Nfo9oxrinq w, C. gnu plan t n be fafia�—ibw , i the son h oomp —int— /��TENAlJCE PLAN: /�_ the Coaracbr shall be nspona Dk for inagction aiW maatanwcs o/ dl eroapn am esdxnsrdron4d a 1 v /LIGHT P0t_E ON BRIUGEL 1 vaAlo mast be kept for Ohm,$h$ don—trig each minfoll event and mesa-- token to nopdr w rpkxa any damaged —st —"I mwwrp All NPDES rule$ shall ppty FENCE AND GATE -_ tlIILI _ _� � _�� _.._ ME UNDER BRIDG _- _ _ ___ _ � - 2 Nl eraion corWd mwsuraa eMll De cneckM for st .fly ant operation /dkrrinq arty rdMUP produdng -aft ant at T'Acs RS ANDP110d st -oe eek all erosron central mwomw ae -- .' AERIAL ROADWAY EASEMENT SPATE ATIOMS--MC r BiH 'RML-h 3' _.. _- --- i.- �.- CITY OF CHARLtrp�pirttainM w peeynW. MY needed repairs shall be mode immwiotey w that - - 25240 PG. 132 / D8. 11870 PG. / tiNIF_� PG —OB. _�_ _. - �x .BRIDGE .y`wA � / Tl N rr. / ]�--_,__- � �___ I _ Z-7S5-rtNP"+r-f5?.fi0 057-21 The wdiment traps Mall De eNanetl oa when the lmd of sed-1, reaches tno mad-papa, pain below the weir PERMANENT ggRIOCE -�+ /• __--'>•+0 �--_ - �fi' ekmtan Wmned atom aM1dl M cbonad w replaced wn- Ne eedment pod no lover drairm popery. PIER EASEMENT - - - _ { All ewdad rws w-ll ae feryl'zes reseeded ono rxecwmry, wa mulches m .acaridonce with lino -sang so alkaam in _ � _ -_� f 1: DB. 25240 PG. - "" " -' Jy'T ; r7 Lam, _ -__�_ "---)$$ --'a' �_ oNsr N maintan o aenx vegetative aaror. 132 /'si= pip_ -' �� -- '�--?. - ---- - -' TPR 75fi 15'-� -' \A-'T`1iR�. 5. Seam-1 dposfs .nal be removed from seam-t fmm after well alarm swot or sedimea f-ce aha,ld be AND 7' ` __\ r _ _ x�.. ___ Ki' •-- Dr PD.aS rJt nDWaed. � `* _ / CIDWG/N IJNK FENCE ter_ L„" t 1 _ -- UNDfRGR' a must W rweroveo -nen de{aei is roan pproa. noel the Mght of tM Dam<r. Ury rdmant tlelarb remdnang in C / a aft. the a 1-1 /-ce b rwnoved shall De dressed to conform to the mslbg grade, prepared ant wswo '" / TTTIIENESEESE CONTOURS ME \ - _'- -_ -- _ /THE BRIDGE SURFACE --fit'`-` � ��yaL� `--Y >$0— � � � �mneepes chock tams wit dwnndw for event Remove a-W. occumubtw Dahil, the ratm n ,- � } hanns4acays,w-go Add /J / �4 + �. '\ +�-��----__._ _ croeB away- IO prawnt dona°ge to channel Add at-es to dame as rasped to mainlaM design Might arW �" \S ASPHALT !` AO �� UTY OF / P 785 - ,_ +\.\ �� / - __ -� - - - — �7. Torpor aroso, ant aetirraloBan control mamurs Nall r.ram u 1 Me eRe hes been MaI,,z l am a v/ CHARLOTTE / / \ • •` \ \ �+` R _ � �� — --- _- rprea-1 five d tM NC DEO m Gly of CMdoMa has pproves thor now—al. ` \\ �.\ \ �l'_-+ ASPHALT � <.-- \\ Nt I t u ,NAyp -- / 7tIJ.0.T'� /• y' � ��.\ \J�\ �`\S+ ♦ \ �\�'9 �\� �r� __ + '(' `\� ♦\\\`\ TR OL F`00�09 ' 7 =A99 1 \ ELEV. 752M'7 k iDUTILITYpMpST5� / DB. 25240 PG. 132�, �i , ,. \ \ : • \ • \\`lr\� - dtMEl >< ..'RAVEL \ \ + I ' �\ GRAVEL. PILE 7 \\\ RA,LROAD _ siqO ULRO ASPHALTGCITY OFTT)E,-----\ASK/ la ASPHALTf l `- ASPHALT \\\ E f ATLANTIC LAND AND 14PRP/l1T COMNYPA flECOMPANY CT. WO, 241PG. 924 / +_----_"--" \\ \ ``� �` B - 181-06 / 13 \ TOP RAL / THE ATLANTIC LAND AND IMPROVEMENT COMPANY6;.ESSOLf. 337E G 291 TRACT 6. MS. 24 PC. 924151 F SAD. OS]-181-01 / -O. $ ( 7791$ / / y // i % I', / // - _ \\ 1111 � �`+\+_ +� •� `_^ -_. v.0 "RiINE�p�ew�-��•' _ PROP. SLOPP M 37j j- 5!1011?! SfYDtD RMF) _\� _ _ - cj'_ �_ RB1101/E &IREP- • 9LTCE N F ~\ /�:m/ _ PPEYIIx �I rill n r \,j 1t _----__ _.- lit \ \ \♦b ` y _ \ tl J `J� - -fir: �, __-_^�_ �- - 74x- _-�_�- - t `\ `_ ++_+ +�N 1 \�\\\ __ __ rte► .__ - -___ - - q.\ r Q m Z N >1j~ 0 Lu 10 G�wtorW DW __-__ _l__ _ ___- __7-__ \ �j _ ON _ \ +--._ __ _ /. -•` `-_-_ �--`_--_/0 ____'_-r 1°rW_.._ PRO�'LMsooZOO,-,Za __- _ \\ y� x _f W W r _ _-_ \ c; i'" SXE[T NUMBER .e was ..��w�� --- __-._______-_-__ i •si9a.95240 PG. 132 I i ! �i �•'� ��.-"- \ 1 \ � l 1/ l ' -_-_- + \ / � -' r' /' ._.. T l /s�l l l /xi 1 1 1 1 1 1 \ \\ \ � \ ---- CrS.� 1 2 3 4 - - - 9 4 £ Z L \I \/ r/• V39MN IRON � r \ � - ,` J /' // \• f / : ,I / I t i O.� N /�! y�/ /r__" /�L' /1; r/ _J ! / m ..\ f ( 'StG-_- l l / !' .•' 'r /' t/f/t1( f aW Nd A33MI13N HLM IWM r' 03Nf1 ONr t'NI 03'fTIJSVIS N 38 \ //' ��/' �i//�i �`7\IY'i`' N G� Ot• \ - 1 .._"-� / /• '�i,''" , ,/�,'/,'/ . / % !i -rtl _ ____�� �' � _______\.�� __ \•; ca .100 Ham H46z<w° AKLL o �y < �,4�\ � � ---- - ---- � J� ' / /:�� % �__=- - tel' �i ��%`•/ ♦�''�i''' /l.Q� �\` ;lir%' --- - - ;n1�i --' -_, -_ - L , / ;'� ; \\ d w1 v _� / r \ e- - - i 3v/araa r, Il •r u l '\ \ 1 11[3f110.i5 OMI NOI 114"Is 13s(/� /� \ \ a3LiV AYM3Ntl0`30tJVN31NIW1 / rJ% _ %'' 'rJ J /j�/, 11 L�� j' �\\ 1 \. ', , \ _._.___' r /JA l%/- `� llr ,/il ar O� ,� )!I1)/llt !'r �-� �� �' �'.' �:J Ckrz911511�,,�l1rNf�d'N018�a3TMN0�d731 -�_-_____ _ J\\ i � � I _ 1 �7 / _ - U -_- 1 I 1 \ "Ill llr 11 lly��`` ` 1�1MLrfirLSM fir_ _ _ _ I I y\ U 1 I r/ i aC M M ICOa - Naha H019Li A ,dKu r3Nl ., � 1`. .: 1 I IItI)� 'l 11 11 ll'4•- % I \ .-, �= �� � \ \ \ � '/ ' i t I------' / �y��-' -'— '----�--__ .94 row \1r /I�„,vyvv`,;,;�� `;, , ,i X41 -- ,'t I', ,-�� _ - ► ;1; ; V�V 11)tVl\V ISI ' l� d� } / 1fj1yrp0 I(� � r\ / r r ,.! � tips 1n130 .L�.. 5 f .6LL :/33MIIDIS �— /-- �-/ 1 /, l ill 1\i 11 fI,U -” / �^ __---_ II I / /!' !t/� // _ _ ___ A�pRm��_ii03101i ri O Is dv*rjglC r e-LS \1r�31NO3s 'br LI ,' `\�3 V! � \ '_,.���- ✓ --' � —� �� � � ^ 1 ' '' _-_ � I'/J� t 1 J t i / t g e� yy , VIrO // / ,! ! ._-_ �\`� 3 / �►�- /,O / sl 4L\ !_�I� / J / ' J / / / _ __- / 11/, / lJl / / J! . ��$555 1! - ' .000 ..:. �, � _.__. ��ti-+. � � "�\ _ J \ \ � i / I i f / / / t I i I Il l a ti� \`�• \ \ ♦ v v _. t r `` \` I I �I I 1 ,l !�!` i // / // I / ! I I � !{ / I I � /335 ^; Ir I 1� � 11 d 1 5 I I �W dOUt ` H111.Mil 1 A TlldsI r r Al d01 LIC rAjl3 ti311 / _ = -h_ �, � - _ \ \�� 1 `\ \ S'afL Ail YIO C 1 / •1 11 1 1 1 � � � II 1 I/� %/1/ ,w Qafrn xp N]L J y` \1 r( tAadr a3nMb_ ' .. ri I _ NI 400 3(rOW3Y13H', V1IMa1S 1 ;41 031If1�0'WI'(ILp �r r I �Ir. SlfI130 335 / v'sam `v i i j;%-� -(� a� .v ,}�dOtid �y / mWims 3 ,LZ'-" � � 3B llrHs Y00 NOLL\Tr15Nl - 03NfV OtII t Nd Nt 03T11'15W l /' � •'� `~ J _ \ ` `�,-. �� �4\ � 1 t 1 i \ \ - \\\ \ 01 :I00 - HOLO / /�Opy1 ko tki SJIrl30- y I � __ _•_ ___ __"- __ _> ��1 ;a _ -F -_ .-.G.i �yY� _- _ __ _ ��--�_- ___ � � `__ ♦� 'X .OB %'140' J --._ o .� _. --_ �� � __ - - - _ - --_--�__--_-___- __ _- _ \�_\i , .—__-- - '- ---- __-•--K -r, - _ _=c-^v��c aor ..yam _ - __ --__ - ` nL1013s aeil --.... avo e - ,-J , --- " 'A YLSOd , ----" _ 1 34 5 - ftlM )50.36 - ., S ¢'Ot'd1A-iY�_ `- RA412pAD = - ----= ----I ec,=-energy ----------------- - - -- -_-- ---- �.. -____---_F BUILDI354 LAWN tWK'nIH _________-_•.-____- _--- �--�- _--_. THIN ECO ENERGY CHN2LOTTE, NC _ _- -- �1�5.== _ -�'._ _'-'�__�_ �_ __ _ _ __�___" �-• ___ _ _ --=�_=_±�.__-'-��-`��__�---730 -�_ ro _-�J2 ��.5'__ - - _ f' �.Y/ jJ- f IIj/f/7N I'll l i \�= " -- __ -x- _ -_- __-_ - - _--_�_______ _.._~ - - _--_ - _-`-=-R'--_'-.`�-__ _ _ l _ 1Q�.>P - _• - ____. ___ "OsI -'-F4 I lill'I (II I'i1111 I T��`_ --__ - I r1Ni 7;li fill !'r/ C y.__�§!�� �� 1io �_'""._-r; _a6`-_�D�.`_=��-��c=='�-- `--_'--'--__—•_----- '----•- _---- ------------ -- '-------=__nr� rr' /7.Nv a5n , - ui I __ _�__ _-_•___-'__ _--�__ ___ pF. �I 1/ D 111+41. E7✓ -r 9+ 726.18" 1 7' = 'T �'.�\ \\ --'-- !_. •__-- `�K.�F ...._ 1 1(I 6 ]S�.TP' 8.03' f_ /` --�'C �.� ' I I) ! ! II / = • 111 T ]50.90 )2 � - � � � yy c� gyp`- -`-__ 748.50• 73• -!- - N \ {!11'1 `' /f I� --r i -_ ,L ljlnaa •• ' ��� , - .r `- - 9/V S 73682 - -` �-•^---- r RDD IN }y -. GEN -- y� �POSI- WODECK �}q I r a / .K ! \,1' 1 i`-�--v - 7r' 1+TM-+'r DECK �'�'•7-' �-__ TEMP DNERSION DITCH - DD4: TO BE��`' �` -_V5 SN7RMc.,aSE�$EMENi �1�,..t i _ _�� \ _-°`__-_ 735uJ NOME �' il)tl'I! I / WSTALLED IN P11 1 AND_Lii@_1L'II1S__ i' \; ,( /--�- -�� w�BB !}�. 7T �. -'Y T^T•'4ERI \ I(I! ` I rr STRAW WRH NET IMMEDIATELY AFTER _ „ /1 r / INSTAl1ARON. REMOVE DD4 W PH.2-___-�' i / . _._-_- '. ♦/rr / I '- 1"Y• ]5609'-`y _ Ilfllr/7!)4; \ � `� . \ \\ C/ ( -I / � `�-�� ♦ � ` �l\;.; ! \ - � _ .,; -OML3 y3B,7� �33 \ \ y,. ;,7- >`., GA JE I1j1/ lll1j• 1 l c : J/If/ / J( I ,.' _ _ \+ 1, WAT"RL NE iMY B ^, ti SCnJt' ////CAL \ \ \ -' \ 1\ -SEE bETAILS / / 1 ! \ \ \ \ NtEAS: Jili1T1 N +J r'.. J.fll//r/ TRACT 08 P��RAO.P�. /C�O,N�STRl110N W" �TYP) •k�fF� f // !/' \r \ • 1 'i \ 1 erlvrn A. `� aY \ z53.o3'�.. /f` ,.� _ � i !!/ '•1� � `\ ~ 1 11 I1: y r MARKER POS1 j/ �j Tdl'II ;{� , ! I r i > � 1 � ^'.'v-. _ ~��-� �, `1� ' 4 i / i I � � -/. 1rT'?;' r,, 731• 1 I 1 r, 1� u F '� - r - r.... _ 1 E \ 1 , MPROWC LOCATION OF �`_r<-.. - ll\', � rt5' RIffI.iC STORM I NAGE EASEMENT AS W .ROM MR. 2. PG. 6 \ 'e E �E.,`�\>v.. `v"b / l_ �'\.'s•. r".� ..T'Y li\� I fi rte/ I y JH D 3 \ '.i._.. L �, _'%732 �S\ \ 8N 1A• 6 +5(9 i o ------ ! VIN OU", \\ 4 \.a / (l { - _ \ 3G�DD3v"�D03\ - �° `� o__ A_' D3 D03 V ° �.1 �..,``"'"` �Vd�' ' d x� "-\ xi\ B D� .. ',.\ bD3 1 !� _ 1 - \ '\ 7HE\tAR�NRq LANK AND WPRgYEMENI COMPANY _ _._- -___�.TRACT 4. y1B 2f PC:. 924` \ \\\♦ 1 1 I !/�� .-_ --_ _ ' /i , 11\J \'\ \ �,q a.... �. \� r_--�7 '^-• \ D8. 3373 PO 291''., \ \\' �\` i ��.. _ - APPRoxIMATE'i0CA110N"."AP 1$}rr r I \ 1 \ '-� v . bj] AL1 r PUSiX STORM DRAIWal E18E ! r , 1 ♦ __ - 4 ---- -- . STQtd CHEd( DMI (1`rA) AEI." . . ^ •. / i ----------------- J � AS SCALED FRO NB PC, 2{ r' -- ENiS 1 PROP. SILT T'ENCC �� .j _- DETNS REOUNiE91 r r ; / ' _ _ / \"\"\ ``�` \ - t\\\ -_ . IiYP) -.'SEE D[TNLS -_. TEMP. STONE IVE ! / {r __ -`` .. TEMP DNER610N. OffOH 903, ' !r %/`\1 `\�._ / , 1 1j11115 Oj CCCISIRUQTO�(T9P) +`J ---___its^ SEF BE7AN5_--J PIPE "r• - TO BE INSTALLED 1N PII.. 1 NID �� / Y \ LMm WTH ,STRAW MRI NET //_\\� ���J 910NE GIECKG�-� J.� A v �'_o- -_a____ -- "� '4WEOMIELY MSTALIRTIDH / 11 / / 1 \` AFTER..__ r .•. 1 DElAL51'OR-----------------_ ' \`` \ r r r �.Jl'A 6vN3 V A'CSX WAV :tr_OF \ r _ _ _ \ \♦ ""--------- I I I I t Y VERNON S. HOLSEY ona 46. K/O ! l I I s GLORIA HOISEY 24 SEALL � 17943 - ana *Pouse, ( P�JI� 92 1 ! / I R `♦ -� 1 /I f14f11, _ ____ I I CURBS HOLSEY, SR. 'I / i 1 O0. 13073 PG. 967 / :/ !/ _ r f / 057-131-08 f `-�V , r ` \\\\ \\ �0�'L ,,'ppyy ,p. O�Aq :F"N Yi: C+INE -': ��ii NG.t�•� 1 \ \l / / `tt1\ \\ ,\ _ pE�y. / ` /�FONO�CRETE ._�' v / le/ \ \\` "`_-F \ BARBARA J. WALKER t ♦-'2 -( LOT u, MB. 32 - �_- \ ` PG. 555 DB. 26651 PG. 211 % l \ 057-IJ4-u / '\'3 /, 1 RIM 755.95' J )��\ t\ 1\ \\\4'\\J\' I -� i(,r /-NN. OUT ]41•.86' 2015B PROPERTY OMIER LLC08. ``+' N Z ' TANYA 5. RUSSELL onC \ / / �"'-I 09855 _G. _' -----•-- PC. 594 \ l ``\ MdANIfl1jT .I,v- ANGELA B. ROS®ORO /) ♦1 ` R J LOT 43, M8. 32 PG. 555 \ ,\, Y DO, 051578 PC. 748 \ 4Y y'�.IAIi HFMWALL \� 057-1]4-43 I i• PI i Ir \' 0 LL Qfx 0 04', / 1 (i I 1 1 \\ '��^+^JR' \ nA OIANG uIM wlf.. CON J" A /'' \ \♦ \\\♦\ XEE NWA ALT DRIVE Co.' U W >`o v� 1 DB. 13315 PG. 232 \\�/` 057 -131 -OB r I _' N Y F O N �}I CA 1 F•'��n4W it I DB. 15476 P qG,L G�RDBERT • '. 057-131-1 ; \ CONCRETE \ V' _ ��AI�fJUMENT SIGNATURE DEVELOPMENT, LLC >• c qo 4Ta \ p�yESHEET 2• LOT 39, MB. 32 PG. 555 F• 1• " \ II INv. iAo''�{-iS+6�a w �.s`, "."jam"• DB. 27112 PG. 294 \ oc �G �n� \ ' I '. 057-174-39 SCALE 1• . 40• NUMBER C5.3 1 2 3 4 5 1 2 1 3 4 5 uNDxAPE NOTES - BEEOING BPECFIOA1101Nt 1. LANDSCAPE WORK SHALL INCLUDE ALL WORK INDICATED ON LANDSCAPE P4H.INGLIDNIO TREES. SHRUBS, AND GROUNDOOVERS. TOTM renyLL 4 1. CONTR IEBETWEEIMGIII KKANDCURB 2 ALLPLANTS ANDFREE INSECTSAND PLANT 9ELEG71HEL SHALLNOTINCLUDELOOSEOt81 RAlrtb OROIHER•MTNE' LAT AREA: _..� ir3V eG %ne THIERBEDENSE.UNIFORM WITH LllOR1 LCONIESGUEGRASSLUOINGPIANTWGB*I AT ROADS WfTH REBEL II OR FKCON FEBCUE GRASS IBB%MINIMUM PUR1R'.85%AMMIAI GERMIRNTKW ). BY GATHERED FROM WOODLAND CONDfiIONS. ALL PLMRS NLL 61M : 7.52 -AC. S EXCEED 1HE MINIAAJM STANDARDS N THE ALB,ICW STANDARD FOR RAFLSERY SEEP BHALL BE FREE OF NOXIOUS WEED SEEDS RET OED DATE9 FOR SEEDWC FESCUE BE APER 7.52-K'. STOCKNATE DED'D: N K. G. ( -WEEN AIN SHOULD 3. SL1 PLANS BY TSALL BEERS- SLOWELEASE THC. WASHRAlER(OG.MTESTEORION) BEIWEENAUGUST I5 THROUGH OCTOBERJI ANO BETWEEN FEBRUARY I6 AND APRIL IS. RYE GRnW TOTAL AREA PROAOED:(2.32-AL. (520 -IL.) TREES FEFIL�RRFAGANP OR AGRNORM ED WTTN A MANUANTURERIBEFERTILIZED WRTHEL LRELEASETYPE PLANTING TABLEIbIgT MISS RECpAMENpED BY THE BEAODEDIFPLANTEDBETWEENNOVEMB lR DFEBRUARYI4ATAMTEOF0.0]LBSJlM$.F. MRLETOR X7.52 -AC. TDTK MANUFACTURER. INCORPORATE INTO TNI SAL MIXTURE AT l..E OF INSTAt1ARON. SUDAN GRASS SHOULD K ADDED M TFE M UN IF SEEDED BETWEEN APRIL 18AND AUGUST 14. RYE 4. ALL TREES SHALL BE STAKED PER STAKWG DETAIL GR L MILLET, AND SUDAN DRAES SHALLBE CONSIDERED TO BE TEMPOgAftV COV61 ANO SHKL BE RED MAPLE (RM) 5 TOPSOIL URE BE USED FOR BACKFILLING KL PLANT PITS URG RANTS. AVERAGE TOPSOIL MI%TURE SHALL CON913f OF 3 PMTS GARDEN SAL, %PART PEAT M035. X RESEEDED DURING THE NEXT SEASON WITH PERMANENT WSIALUTKIN OF FESCUE GRABS. PARCH ALL ARA BONER AND ANDONE FOUND LIVE PED ALL Ram RAPT R 1 ITV TR ORDIt•LeN OD SUMMARY' B. INSTAL ALL MEAS UNDER AND MOUND AIL PLANTS AND ALL OTHER AREAS INDICATED TO RANTWfT11ATlATER OF CLEAN MULCH WRINN2MYSMTER RANTS ARE 2.LM SH BEAPPLIEDTOALLAREASATAMWE WLB3.]1000SF. FERTLLDER SHKLBE SCOTTS INSTALLED. ECO ENEROY ECOcHAENEI NC PFRIYETER TR epERIFNTS ]. LOCATNNC FOR PROPOSED RANI BEDS. TREES AND SHRUBS MAY BE ESTABLISHED USWG SCALED gMENBK]NB TARN FROM WALKS, pgryFS, BUILDINGS, ETC AS PROTURF (20.26-0)AT S LBSJ 1000 &F.OR ST ORCU N (1&2410) AT B LB511000 S.F. IN O THIIRiY CLUB 301 REFERENCES. PRODIN:TS 11}25121 AT S IBS.I 1000 S.F. NU( R10ROUGIILY THE 11AE Np FERTLLI7E0. WTO THE ENTIRE ROOT REOb TREE:ROAD FROMAGE/40• 507•/40. 13 LG, TREES O B.ITDSCAPE COfITRACTOF SHALL LOCATE ALL UTILITIES PRIOR TO RANT INSTALLATION AND SHALL SE RESPONBBLE FOR REAP OF ONIAGES CREATED BY CA OSCAPE ZONE TO A DEPTH CF S'8 SCARLET OAK (SO) PRO ADED TREES: /3 I.G. MATURING TREES OPEMTARE DAMAGED UFLRIES SHKL BE BY APPROPR PAp CONR,ACTpR O MATLD A -IC PURPOSESAND DO NOT S. PLANTS ARE SHOWN AT APPROXIMATELY LJ TO MATURE SIZE FOR GRAPHIC PURPOSES AND CO NOT EDICTS S� OF ATT AT T0.1E OF e15TKLAl10N 3. REMOVE STORES AND FOREIGN INE GR DI D TO ONE (1I WCH M MY OAEN310N FROIA LAWN PPIOR TO RR_ FRNY TREE REOUIRENFNR PLANT AT D 10. ANY DISCROR RC ORBETWEENTHEPL TITIPLI8TD TSWLLLBEBROUCiRTO THE ATTENTKKiOF THE FNONEER PRIOR TO BEEDING .SURFACE FINE GRADED TO WITHIN TSD-TENh1S(1/OFGMDES INDICATEDAHD PALLP G. FOR R D NGPUR: SESNTWMRRIES TOA FIEMFA: 0.10 X IMPERVIOUS 0.10 X 158,581 -SF .39 -AC. EGPURANTE5. THE EINTHEAJl SHKLUTIL�WTTITIESSAFTER AGCEFLA EOF UNIFORMLY GRADED TDAFINE TEXT,AE REG'D ED tt. PLANTS SHALL BE GUMANTEED TO BE IN HEALTHY CONDITION FOR TWO YEARS AFTER OF ALL RIANTYIG, PRONDED ARE]0. LANDSCAPE LANDSCAPE .3B -M. DH t PROJECIORACTOR SMLLSUBANT WRITTEN ER NW 1IONS IF WATERING RING INCLUDING ANO SPRA-BSFIRST TOONNER AFTER I. BEEOSFNLLBEMPLIED ATS TOTIBb.l 10pD S.F. WHEATSTMWOR WTSTRAW MULCH 9RNLL BE APPIED AT REOUE TECHNIQUES INCLUOIE-CE NTS IROEERTILRATSUFFICENT DLA MMN,ENMCEPROCEDURES INSUFFICIENT DURING FIRST YEARS GROWTH- AMTEOF3BKE91 t0005F. TAS%HLT EMULSION SWYL BE U9m 10 TACK ME MIACM ATAMTE OFS RFO•D TREES: IMPERVIOUS/10.000-SF 1188,561-SF/10.00D 16.8 17 PROJECT SHALL NATE PLANTSODFY THOROUGHLY IL WRITWGAWATERID SREQ REQUIRED CONTRACTOR PLANTS THOROUGHLY WHENPLANTEDMIDAS REWIRED UNTILFINK ACCEPTANCEOF PROJECT. GKJ1000SF MATURING TREES .0TWATER 14 BEE SHEETS CdA TO Cd.) AND 0 TOG FOR LOCATION OF GRADER. UTLLRIES AND OTHER SITE FEATURES PROVIDED TREES: 17 LG MATURING TREES S: 17 1♦. WIRE MU T BABKETS MIO S1PAP%NG MUST BE CUT AWAY MD REMOVED FROM TOP 2/3 MD SIDES OF ROOT BKL PR10R TO BA(]EKLNG PR gENOVE TOP t/J OF BURLAP b. CDNTRACTOR SHM1 WATER AND MAINTAIN SEEPED AREAS UNTIL P VIGOROUS, HEALTHY AND UNIFORM! STNO FROM INOTBALL' - OFTURFIG.WATRNVG,.MAFIG,MDCE SHALL WCLUDEW®ARS P6T CONTROL, FERRLIUl10N. TOPSOIL OR gESEE0RIG. WATERWG, MOWBIG, ANDEROSION REPAW. CON1TW.lpt BHALL lI6E AHEAW ABPMKTTACH 15UNC NEW TAN ANENDAS. REMO OF X-ING SOIL TO MESUTOPSIOANOCTIVIG WCOTANDARIS REMONFOR RECOWACTED SOILNTIRE AND AGO AREA PER -)CT AND AMEND TIRE TOP 24 -OF EXI9TNG SOIL TO MEET TOPSO6] PLPITTING MIX STANDARDS FOR TREES IYIRHIN EMIRS MINIMLRA MEA OF 274 SETTLE FEET O0. JUTE MESH AT DITCHES WHICH ARE SUBJECT TO HEAW WATER FLOW. CIXVRtACiIXt $HALL MON TURF TO PER TREES A HEIGHT OF 2 W1 WITH A BOTANY TYPE MOWER UNTIL FI NLAOCEPTANCE 18. LARGE MATURING TREES MUST BE MINRIUM 25 TO 30 FEET FROM OVERHEAD RETRIBUTION OR TRANSMISSION LEES. 6 TREES COMFUGT WITH POWER LINES pt - ""SM.1 to REO MARE ST TRENGINEEgT LRESOBNlE OCATINIS TORE PlMO9IG. MNnssrAnTN 1NFIF.I C4L MlAelln 6ltlistl 1T.ADKISTIEL-AMEND LOCTRICAL.TOAVOID UNDERGR01MD UTILITIES INHERE POSSIBLE. PLANT IS'1D OFF SEWER AND STORM ORNNAOE LII®;10-16'OFF GAS. 6. THEENGWEER SHKLBE THESOLE JUDGE AB IC]VMETNER OR NOT TIE IAVMB MEACCEPTABLF.M p M WAPLkT OM( OlwwasoOnA SUL NOeMI 61CMIMM STAN FEET 3HKLBE DEFINED AS MNNG B5%WVEAK,E WRH ND BARE SPotB GREATER TINN •OM_pyF„•�_p,p� WATER.I£LEPHONEMDELECTH TFIATINES. TWOACCSQUARE ENPRlORDSCAPINGSLK:HTHATPUMS AND LAWN ARE INSTALLED TWO FEET .SEQUENCE AFTER EXTERIOR MARK ON BUILDING HAS STgBIL1ZED Birt SMALL OCpIR ATlF13i TWO MONl115 R60R TO SUBSTTTVL GOAiLET10N. -_�OSJ-212-01 19. OC SINLL MIS-TKL STRAW AT Y N10TH KONG BUILDING pAE1tgFLAFTEH BRM]LCIFANW(ilO PROTECT N FACE RDA MUp gTAWg _ - -. - _ _ _ 785 783 ----'---___--__-__-___-- BUKE POMERMY//// ,/'t` 'i\\%` - ~•_ DB. X19 G - Y _ s - i THE ATLANTIC LAND AND IMPROVEMENT COMPANY / - - I TRACT S. MB. 24 PG 924- // DB. 3378 PG. 291 _ C IJ / %• _. /'/., 057-181-01 THE AIOM TN: LTD AND C /mN, •� / C 161 24 PG. \ 7Z TRACT A. 78O. 24 PG. 924 1 f THE ATLANTIC LAND AND IMPIR ENT COMPANY r DB.o 78 PG. 2Y+ - TRACT6�48 5]-181-Ot �• ��. ,o`, PC, 1824 I ��li , I _ 29 1 - fi �" •�1 "� ., •. \5� ~ ., 2M t � /- , :1I I'. tlf';ilf A" f --•-•��/^� .^ � / ` , ! ~ '� h Iy •• j : '; ~ �_�\ _ _ _ � / ..` � \ _. �--�- �-_� _ - I �'� S w �n m • ;: T.. :S• • :: : CALEAST HAT. LLC THE AIVR TR LAN ••AA�•Y .. SOB. 1241382 PG. 959�..7-;`% f 1 RM (TVP)TRACT A••A 1'057-141-02 la T' T s0 iTR) •f"Y••I.P 't}r THE ATLI171C LTD AND IMPROV70IENT COMPTr TRACT 4, 24 PG 924 ..'L t/'.��. Jy A(q •T' - -_ ` -_ \ , I DB. 337788 PG 291 • / r� r t / os7-lel-o3 � / ::' �•� J4 � 1 ' ,w p !' ,. � - � Ji�'��� � I . /.jhy' ik � jY �� _ )I RM : �"� •,I• Jb /1,,/l'J�ii' 1, �a 150 (TTa) 7■[ i �4 B RM so ] :':•::� ,;yf i .. "f�1`4� ,� lJ, /,i 1 Iu !/ A � �; .,1 - - 'V' - tV" 1 SO E RM (TVP) •:" -''.. _ J !. /�..% -. 111 fl \`.tV,{ ` \ \ � 'FM% 5B .,,'".,� - lr i I •T :.••.• 1 •' t\ w LA A Yt� e��_-z _ .._�•� j.//1 735 I�� - 'r _+•�'I1 \ t j � � V L`t'' ,..�:. I -- _. A '.,,, �;.... .,.; .. :ill %i / •�•+.•a. / "IH CAR'• O' r' _`- ,111`, n�,\ ��'/ / Vit, ` ^ - ,) i' •II��.� -- _i i I ` Id.:;�v ,J' 1 •• .":Y:''.-�'' `::�\ j _Taro - _ �- - \11: l g L ♦ -____ �`= __ _. _ ��,��_ 7� vy 1.I�IIfl1' - _. ._ __ - ff 11 r f" .�.'J'�-L": :'a�:L� t. ! j\ \•C '1��\\^-^�-__ : •�:a',�'1 a .. w. Y 2, • - _ -- _- _. _- 1, , I'--� .. 1¢/!/!A! 11 1�NN �: �:!'� r ; I J.1:.•:' :.'�. F'� i'a:•.Y:.. '.•4': si A VERNON 5. HORSEY �_ -/ I 1 •1�. l II I � _ ■ 'fF _ a•'• GLORIA M. HOLSEY -II WatMs. _ _ :�•'� :+ `��•h( * / ERRS NOLSEY. SR _ %l: �"p 1 �/ � � • 1�- ':: :F 'O y'; - SEILWIV _ _ _ \'I / .s'.�1.�^A11FA •.' CI�.'i-.� z ARBARA J.KWNXFR / I' DB. 11073 PG. 967 1 � !THE ATLANTIC LAR!X _ 1i94.i .- J _ (� � a-..'� L0T 44. TRACT /V' 1\ J f h. /".. a' /l•vli•,1 eP�\ .N; � � ��''.y•-y. . ,a �26851 PG � 1 I - _ 1 - • • ''} \zo,SB PROPERTY ER LLC! ' � \ ,\\`V A t .41y.'.•�� •L'.. .A.. .'%' r• rA S. RUSSELL 1R0 \` 057-174 G. 594 `• ♦T I I DB. 29865 PG. 1. i r• ANGELA B. ROS®ORO 1 r-- \ J I �I / r i• - 057-131-24 -- lY! /' J�1 !il A� •. % 11t!I/ \ - - 'A,i ��/' �'' /1 '• f j��o f: i�' �•".r..LT'I''�'' :.•:'a.. CLOT 43. YB 32 PG. 565 / I NIA XEE ono Mh. !i)-,:��.-~ % �/ = � r "4 � yJf t f ✓f 1. z•�•w •. i:: :+: ::t.S..L: s��; : �..., OB „579 PG 749 \ / I XEE MWA- --\ `��� / f' )1 I `� " /1/ � V% _% ;%E I .;,1//fj' .A • r'f :. .T: rrl av-w.s•. . t r .. d e \--OSZ-174-43 I , DO. ,3315 PG. 232 [,/( ( � � l l �, f :� •'�- / 'i:ll • J �"4 • .-a, ra1''~ r%�' ``t :•: :•" �,»f„y � • = •' •^ `F G ---- _ _ 057 -i3, -OB cEd6AM CARTK l/IR 11 / _ `. - ��J .f t�`•'e"si`••� ;• •4{•%•;::Cay, /�\ _ � '-- CO6•��: •� i •' •' v1 '•!'• "• \ F $t .. P\ ROBERT J. FALLS AA \ * -a;:;•'6'J.:-{: J < V •.V'::L ' p \ -- _ - - _ _ ib' i1 (S I ,1 ,, 1,:� / ` �'Lo �1B' ;_ I , /• Lt.. 4 :•::.: -» :': ": • r' 4. 14 • O8. 154M PG. 791 y.�/y{/1. 'I, 1 _ 1 S S �... ,� �1 L'. • DEVELOPMENT. ,LLC S� ciF� �9 \. -. .. rr 1 SA} . \ - 057-131-10 / • • is 1 ••Sj•,L ,`� : �. MB. 32 PG ^� o I 1 730) 1 r.\-� .-- / / ; �.Ai..i.t '{•1 •T4w• / "a •' ' ��RI C FL / i .. • :. ✓ »L -6827 ,;. _;. OS'Aen4-39 t `b 5 0• ' - \ •). ��::•...•. ��• f e82MONI! '. 5 `•,f / / - /' - :•' ^ ; i :. \ oRiAz390D6A M. I' // -- ^/, 1 �� /�'� __ =/.•� �'i' fiZt'7'.:`i'':` ';Y:: tr'' J • - 4i/• tee' \ oT 3B�M8^J4O PG. `il•rP gp ` os7-u1-z3 ,"%( 1' }1�!'�!J(1 , j\ =i^- ���! �1// I •'{ • y : �..........��syDB. 11641 PG 608 .t � -- ) PHETSPPHOU BWR SOURO NG mtl spouse. �., A�' / _ s,' \-057-174-3$��- s W _ - J PNWKNN81 BWRG1 NG t' a7 e2 DOYLE NEK /' \'.Y' 't-' -_ ).. ; • : ' - 319 ! O8. 6361 PG. 517 %I �� •.. t t \ c o - OB. 28155 PG. 31B ••�{� / SHARNPoCA Y. SMITH t ���• ::L :': 1 /� l J / ✓: , Q T i Q F / `�, ;! \ G 057-131-t1 A 057-221-21 / T\. \ ` LOT 37. MB. 34 PG. 33 - "/ 1 \'•� t • / \ y N SANDRA Y. JONES > - J OB. 19472 PG 728 TTt DB. 15576 PG. 311 _ / / / _�(_ •�= - 1I `\\\I + H IC �4. 1•.''•• • � > / \ OS7-174-37 i �c� 057-131-22 tl �:. ) ' _ _ _ i • �: • A O 2 (0 W i Z W H' 2 = LU W a Go / / /.- J 'X••`A' - / � • /Y l �i's :'V4 V'" iii - l J \ i�t^ - f `Y� ALC106 FLOIES ons •1'7% 1 +1 s_ •• • • • / .`. •' :•' e +� / I( A0 / - - _ _ v SOMA I. FLOIES •IM• •`- / ATRENA F. REDFE 2 O U u _ o .� / _ _ . d / //r; _"f• !If' ,�y ''ia'Y �T•J� L T 86, MS. 23 PG 462 OB. 16388 PG, 100 /LAWRENCE CORDON AMMONS. R/ ,•} y' '�1. ( DB. 30280 PG 9184 -.� -- _ 057-131-25 % / Y 2 g LOT 3, MB. 1186 PG. 453 / \ 057-171-4W VALUE LEE YclEOD aM .He, ` __ DB. PG 643 / �(• :..i.V 'Y,r / \ COLA 'LEOD ) A. 57-2 / 057-221-20 / l� \ / DB. 22895 PG 188 057-131-28 i JAM SON CHARLES SHEET NUM.en DB. 10587 PG. 948 MECKLENBURG COUNTY - - - _ - - - - 1 : I 057-131-12 1, 2, °e •'•�' Lam_ •' N J / //� MB. 22 PG. 931 TIFFTr G BANLEIt DB. 7298 PG. $37 LOT 2, M8. 45 PG. BOB --- _- 057-171-99 W. 23361 PG. 316 / tl I _- SCALE 1 • � 100' . 7- (.•8,0 1 2 3 4 5 - T 2 3 4 5 '� GENERAL NOTES: 1. A GROOVE JOINT 1" DEEP NTH 1 /9" RAO SHALL REOURED W THE CONOEIE .. SIDEWALK AT 5' INTERVALS. ONE 1/2' EXPANSION JOINT WILL BE REg1EED AT 0.5' INTERVALS NOT M EXCEED 50' AND MATCHING EXPANSION/CONSTRUCTION JOINT IN • ADJACENT CURB. A SEALED 1/2 EXPANSION JOINT WILL BE REQUIRED WHERE THE SIDEWALK JOINS ANY MON) STRUCTURE " 2. SIDEWALK AT DRIVEWAY ENTRANCES TO . E 6' TICK •" _ 3. FADTH a SIDEWALK ON MOROIMAFAE STREETS SHALL E A MINIMUM OF 6', WIDTHS • OF SIDEWALKS ME THE CENTRAL BUSNESS DISTRICT WILL E DETERMINED BY THE COOL • '� • .... a. WIDTH OF SIDEWALKS ON NCN-THOROUGHFARE ASTREETS SHALL BE BASED ON TYPICAL STREET SECTION. A MINIMUM OF 5'. SIDEWALK TO E POURED TO END a RADIUS AT INTERSECTING STREETS. GROOVE JOINT IN SIDEWALK 6. coNCRETE FOU VE STRENGTH SHALL E 3600 PS. IN 28 DAYS. 8. ZONING CONDITIONS MAY EOUIRE ADDITIONAL WITH SIDEWALKS WHICH SHALL SUPERSEE THESE STANDARD DIMENSIONS SHOWN. D 7. UDS FOR JUNCTION BOXES AND UTXITY VALLTS SHALL E MON-SKID AS SPECIFIED BY ENGINEER GENERAL NOTE$: xNo rngaw SSRI. Wum� F, DLRIID 1. MORTAR JOINTS SHOULD BE BETWEEN 3/B" AND 5/9' TNXX. c W b rn 2. ALL CONCRETE TO BE 3600 P.Si COMPRESSIVE STRENGTH. ORABL O-T Sm. Ma16) 3. THE 6" OPENING SHOWN MAY BE INCREASED TO a' MAX. IF OEEIIED TO E NECESSARY BY THE ENGINEER. r {. ALL CATCH BASIN OVER 3'�' N DEPTH SHALL E PROVIDED WITH STEPS V-2' ON CENTERS E N CE STEPS SHALL ACCORDANCE WITH STD. 20.12. CONCREHE BRICK MAY E USED N LEU OF HARD COMMON CLAY BRICK. 6. JUMBO, BREI( WE L- PBNRED. 7. FOR F-0' - HEIGHT OR LESS USE r WALL ALL ORT T N REIAR USE tY _ ..:.. WALL TO 6'-0' FROM TOP Kr WALL ANO 6' WALL FOR THE REMAINING 6'-r. 5 ALL EXPOSED JOINTS RILL E CONCAVE TOOLED' b SECTION Y-Y 9. ALL PIPE N STORY DRAIN STRUCTURE SMl1 E STRUCK EVEN WIN 111E NSE WALL. GROUTED AND 91NSED SNOOTM. 10. U£8 HOES SHALL E PLACED IN BAC( WALL WITH FILTER FABRIC Y t-t/6' O MINIMUM WEIGHT a-Tro RING 96 LBS COVER LBS O D .�- nergy ECO ENERGY CHARLOTTE, NC B. JOINT MATEAIAlS SHALL LMR SIRINK/SUELL 50 POST CONSTRUCTION MSTALLATIOI 1/6' RADIUS RESULTS IN A MAXIMUM E FROM t/1' FRFLUSH,OTHERWISEIRME55 OR, STONE ON BACK SBE. il. THIS CATCH IOH BASIN NOTE E USEDWITHINWITHINE Y STREET RICHT OF WAY OTHERWISE APPROVED BY CITY ENGINEER. X A A EXAMPLE soEWMX caNa1R,E1oN DM NSON9 t/r To t/N' 111031, �$� ' f WCC DIMENSIONS OF RERNFORCNG COVER AND PPE pAYam PATTERN SOD NTrA (F RAND MAT O-K Ti 1• B' I I.YW r 1 1.50 •J • 1/2' Em'A11510N JOINT LA " •.• JOINT RLER t.SOX 2.00M YAK) tom. TRAIN V R XPAN ION ROPOSFD GUS • GUTTER • - i OIYENSION PIPE SPAN WDTH HEIGHT BARS - % BMS - Y TALI D A B H NO, LENGTH N0. LENGTH LBS. F G '-P1.0%1 {'-T 26 {'-10 3'- 33 5'-C {'-0' 24' 4'-0' 2'-B' J'-5" 2 S-9' 8 S'-1' SJ 5'-{" 4'-0" �CCOKTE 30" C-0' 3'-8' 5'-11' 2 {'-T 9 5'-1' 37 W-{' '-10' S-6' 4'-6• z a'-T 9 5'-I' 37 5'-I" '-10' 3'-6' a'-11' 2 1 {'-T 9 V-i' 37 5'-1' '-10" 1. 11-5/r' DIA PLAN VIEW I'-It• OIA x-t r 1/r 3/P La` JOINT IN SID WA K r soEWAu {'6' 0.6' 4' O 5'-5'S'-7-5' 5'-1' 10 s'-0.S S'-10 ± DETAILS SHOWING EXPANSION JOINTS IN CONCRETE SIDEWALK SECTION %-X ,•-fo-3/r DIA NOT TO SCALE $ECRON A-A CITY OFMIF WTD DEYSIAP sTANDARDS BICLOD® a6nBi'ts )0.'J CONCRETE SIDEWALKS 10.2223 Al(IEARiAFnE CITY OF CHARMS NT STANDARDS BICEUM CROMM a 0.)'J SLAB TYPE CATCH BASIN 15" THRU 48" PIPE 20.05A 7 �I auwm77G MY Or CHARL#M W� DEVELO tM STANDARDS n+� �� UJ MANHOLE RING AND COVER FOR SLAB TYPE CATCH BASIN 0.058 5 G �+ ALTERNATE WNL 1 - CONFIGURATION D T TAaG w BAHmaM6 W 1 L` >f, • r - Y - • Tao _ 1 f-t z0. 1 y -e--2'-1 BOIEi ,. CAR a ,mPN s0. w IIPIIM AND IONRL EON Aw RIM w APRM r v Eur aori R xm m N TIE eMRMmLOF 2 MFb1 SOW STA' stW tv�WW Of9M NWHa MK - D OIDp VE BOTH sob w TIE ARAM ANN AR- M POST aD1H511NCT1M AMENDED uDF ODRHRgS EA98BNf (PoCE) P ACTINGS ARE S IN (RL a0L PARAIEIFIIS N r RTF '-11 I w lt[ rrE a faaWUrt AT M DMa,MIR WM AT A MANIAC EwE w P uiva lo'ni'" Nor IRI RIN RIND tMAr 0.E FeE pMETR M ALL UQX SlCPES ro E 1F99N MANUAL sTAINIIID NTH MASS • 1- r- Bar 5 _ _ rm N-t - - 7Am M bt - 5 - -! -N BNO txaE auu E r amrtr IaoW WE m w WE AtNN m RIE S BOAR w TR I®r7 aHANn WE NrA m R rAT®M aPRAPrm aru R 1BaoNArt r TINT tR lI1OT w M AFWON fIN1 R AT x =TIE YGDE D1MIN) NN M aAPAR w INE AEmWIO aMIlE1 M 1 R, GXNaxo ALXi55 FI YTBIr �.A�y ro mER BEIPwC J3TyKM� uBBENT m ERIE TRI IB9Hf R 1MY. -1Z ROAo 1 SLOPE F SLOPE RINL NAVE w. 12' 11 LONE IF c4 - ,IW C B T r 6 - {'-{ tam APBM awl HAVE A aITOIF a RIE N11 AT 1K DaWdBWAY Bo. l TIE DEIN w TIE PRM apu E EaJML m TE BOT10M 3 O"JIM O ROM PAIL LONG. OMR IML MAX - - r r - tJBr PDX�Nw M Ioo6nN NYIFu MAtaEr rYa m N1OWP NYInn l I g SL glosssLaPE 3X. ELAH GENERAL NOTES' SF RCIM TO THE REQUIREMENTS RREIIFORCFD CONCRETE PIIS OF LINE DIAMETER PO AASNTD Wm TABLE 2 WNL B. 3, ALL CONCRETE TO E 5600 P.SJ COMPRESSIVE STRENGTC PROVIDE TONGUE O SPIGOT JOINT AT UNMET ElID EC71OL 5. PROVIDE GROOVE OR BELL DINT AT OULET ENI SECTION C SFE SID, 20.23 AID 20.2{n TIE OMFN9O4 FOR ETD ECHOS SHALL SUBSTMTINLY AOEE WILL S PDMBTIED BASED BRN THE TARE. 7M V "AWARD ON TE FpMS AND TRAY. SED s. Au aeWNa rr atNcnAE m R LOIrACIFD m Na a WUTn 7. M NARK w AL. Dtla UNR M ONP-D IN THE ROUNING BE L CRWIrOMFlAaTIRLLWMWLf R rTAUAD (N UVACtfD aIBMIGE PNM m-N,Is N mBT w r IDs. I0. WSf •VIE RYI OO w MIMOM ro IlgVN1 KMNBfL YN umA NNImINN PION MIC moll Am DIoaM cexWa IINPNK a (YAiXDITE IOmDR11C a1aY OTO OEBN YMUw M O®N MTA r-E i r� ELEVATION 4Lr ad Nr n, -- '_� � � PONApR POR • ALL aRZ M EEy . gppE NPPE y AA -.nF ALR: (N �) 'TLp iS A R/► / E PoSIFp AT SK1E•IA NN((OWyyIyy�� \ �" o2Elm t gNPAP i�.x ., ' � 1e A 1P 7. NOT ro E USED N NWpT YMJTAMED R1aHT 0.i WAY. SE IN NOS T MAINTAINED _I I{. >t v.T TOOL' " rXu q .d nd l,• r�� ^ .'.: )gF OIIONAL'•�'NpITLT STtlUCR6E MAY R DLmMm AS IN, YF , OMa6lg1 N LEU OF RQfoN.Y EAYIBff TO 911MT8'_< Ei T X' ✓L < Q �Eq L E rwOm+r vtasM O Ie' ur nS • ml-; :eWTcaar WW.WBNmwnNNN =+rs 'R1LM0 PIANRNO PLAN VIEW o XR10.,unmA s1Eu ANXIIO PEnBETR END vlEw NOT TO SCALE B •dN�XN.r x•+>^r� s=cnKN a-9 NOT TO SCALE R ' �g • mAewrEs CITY of CHARiO77B IAND DSYSIAPIEV'T STANDARiS BE2Dm ClAism IRI FLARED END SECTION 12" THRU 72" PIPE zo.zz 1 ' CffY OF CdARL011B RIPRAP APRON AT PIPE OUTFALLS • DITTY OF CHARIHM t& ILM DSYSIAPIHINT STANDARDS �% NAND DEVEWPY@IT STANDARDS WETPOND PLAN aE+wnnh oxI= ��� OTHER THAN AT SWIM 20.23 7 auEarEE BNJJN� �D'JEF 60 BMP FIG 4.22 21.05 2 $ r/ , iT:�.N� OUTLET STRUCTURE WITH TRASH RACK 6' YIN. •� m r ABOW IM�N r0. FREEBOARD FROM TEMP. POOL EIEV. LITTORAL SHELF W/ MEWIDTH PLANTINGS. 10' LUN. 1TID1H POPOMCH WIN I m �w Rw1 SRM RTN YD 'r' �F f---i �R flpT RN tS wBmx�IV'y WI aTMAZ � �sm WNH r P PUN lUm r�,,EF,iS tpP6RPaY w0.- eN F11�D-M} _ _ LNNNMOMf N�atT caP 1Ml r 1 wfsTe TRIM -TPm rr>m aarc MVMTED WATER OU TY ORIFICELOCA-6' FREEBOARD rom urmw Wa' SEM E7 TET MS SIDE (SEE DETAIL) SIORYWATER STORA� _� FEMF7� C1 CHEW v TEMPORARY POOL 8 YIN E SECTION AT MAINTENANCEROAD ACCESS AND FOREBAY ENT PERMANENT P00 ' r9D1 IPN,BINIa AVsr r rrY Plurals rs NwNNO wo -� _ _ pt swE MT-SEEP lttttl , `PZH O:oQ..... _ ' 1%BISK= �tV�p qJ w :'�: ppQ' ' ' MJT rR 'l' � 1 IIt1RAl BOF MOMY b9•A 2t 3OC STABLED I m po MolTa A,MOI rA0 OAR w T ,FN W.ts 1TAnttr VAN P(kID _ COLLARS (Y11FI :. - BAC( OF OUTLET STRUCTURE raa LOCATED AT TOE OF 10.1 SLOPE •,N T-FLOTATION PAD CiRE IRON MAINTENANCE mMlr PNWT r WBi NFF'•IR aRrM FF[ p GRAIN SLUICE FIA LC.TO AT IEIII M MAIN Pao raw 1E, vntE (ATEA£ Fxol COPE OIIt1E't Ar LOUT 0.R A NOTES: 0.-a BIN uTu w ARIIom sal 6 NmBB®W r. v TIG Na r1.ulMxr nE IEaMUD (s r ooM MNAwy GOR VALE. FROM OUTLET AND LOCATE SECTION AT STORMWATER OUTFALL VALVE W BERM) (OFF0.5% ROPE MN. STRUCTURE POND PROFILE � r, 0.r v aMIRIInR .Som m r IRI t v eafAtNN stNRRFE PERMANENT POOL , srrw® aoc ry Dm '_0. PDMWNR Pea MAwaw A = LL N tl w s � � w C o m O = w w Y Z O B, a ATER DUALITY CRI CE SECTION AT OUTLET STRUCTURE WATER QUALITY ORIFICE DETAIL NOT TO SCALE NOT TO SCALEI NOT TO SCALE • CITY or CHAEMN Q17 WETPOND PROFILE SUP FIG 0. 2.2 21.06 S �1 (]IARIA7'IE DITTY of CHARLOTTE NAND DEYEIOPYBNT STANDARDS HKLUM (91AIUm &TJ WETPOND CROSS O S S SECTIONS TMP FB. {.23 21.07 2 l� [NARIA77F:. DITTY of CHARLOTTE RAND DE9SLOPI[HVT STANDARDS BECLum cm MOM ITI WETPOND LITTORAL SHELF AND BERM DETAIL RNP FIG ata 21.08 5 CD7.0 1 2 3 4 5 1 2 3 4 5 eco -energy ECO ENERGY CHARLOTTE. NC D 0 Z G C g €xw 7s x iNJ P o ggv B B Cs C', d O o4... 3EAL�E 77943 �'. FNOME¢?p4i�: :,N GI CHP W } = LL W J m O j W A CEF WWF uZa W SHEET NUMBER CD2 -0 1 2 3 4 5 zones PLAN VIEW NOTES: wBBII sEDBBRT BNW ZO!V8J as 4111FIM wNe♦ �1�pI1B t r�ld5�L4w µ BP •'vfYRR�aEBII� °c�Alm m:a�rl 11FFtt a Fsc anxT. ZONE 3 � NO iR86S ON EMBANKMENT y� � a^ � (� b.t�) OOUAIE PEA CLbS ]ul3) NOTES: F.AfBµg1TSFT ��°� •• W. SKWYER SEDIMENT 1. PLµDNGS ZONES µD PLANT SELECTION Lj� 10. BµNS PER THE BMP DESIGN MANUAL CHAPTER RFFFA TO 5m. � D0•1 10 wX N Dm k APPENDICES. - /Jp,1R FOR s¢ED BAFRE •SADIIG tt 0D1N AT 2. ALL PLANTINGS SHALDE EW% is L BE LOCAL NATIVE � �>� «, AND NSTALLAnON _ SPECIES, • SHIMMER 1 SNYY6t NYfliT � pA+ICIFA N) 3. IRRIGATION MAY BE FRONDED FOR INITIAL DENCEMIC•°TI°•ESTABIISITYENT ANODRY SEASONS.EMERGENCY��SPALWAYL(�PG BAFFLES TANS: S16 1 3 S , 3 1 3 1 3 T A 8¢¢D t' FREEBOARD Yh5' YN FX,Oa ro EDOE OE 8" MAX DEPTH OF FLOW ELIBANKIEIiT WFLOW BAFFLES OYER EMERGENCY $P41WA Te1.5' MIN. Z-5' MAX CONSTRUCTION SPECIFICATIONS' DEWATERING H�2�EYERGENCY t. THE RP 6 THE E:Ni1H DIKE OVER THE NIST PBS AND 1NOg I. THE SOIL AROUND µ0 UNDER THE NIST PIPE AND ENTRANCE ZONE SPILLWAY DIKES CARRFNG WATER TO 111E PPE SHALL BE AT LEAST 1.5 FEET SECTION SHALL BE HAND TNNm W 4" ll'r5 TO THE TOP OF FILTER FABRIC HIGHER AT ALL POINTS 1Hµ ME TOP OF THE R1lET PPE THE EARTH DBQ. CLEANWT - - -7n7TX DEPTH H . 1.3 Mn_y�P NOT TO SCALE 2. THE PPE SHALL BE FLEXIBLE NTN WA1ER TIGHT CONIECDNG 5. Fa1DW-UP INSPECTION µD µY MEIDEO MAINTENANCE SHALL - (N/2) SEDMENT BANDS FLEXIBLE PIPE SHOULD FE STAKED LFI OTHER ADE BE PERF01«Im AFTER EACH STORK BY 111E FlNµgNLY RESPON56lE DATA BLOCK STGRAG¢ (YIN. S') �A'• PARTY OR HIS AGENT. J. A RIP RAP APRON SHALL BE PROVIDED AT THE d11lEi, P BASH CRANAa: RIXam �aF/IMIII X i L 9aBfR 9aBIFN EMPTYING INTO A d511/RBED AREA OLfn (TRT) (FEET) (EtSO (E¢n PPE 6. WnET PIPE SHOULD BE TAKEN OVER OR 11Wtd1GH ANY SILT PENCE. � aWC rt. nbt rt. 90 rt. SO rt. TAKING CME NOT TO VOD THE EFFECTIVENESS � THE SILT FENCE. wm x0.1 18.80-a8 10.NB 77,800 4871 4800 B m 25 POND CROSS SECTION B 28J 2N 1ST -b5 14188 t;200 S,lm BAOD 23 5 ,.S 60 2S wr�BA NOT TO SCALE c zd aeB-as 4020 a°oO Sn1 I,sm zs a w 20' 1A• NOT TO SCALE • cITY of caeRiuTTE WETPOND lmj LAND DCSVEIOAPA(ENiC�3TAMNDARDs SKIMMER SEDIMENT BASIN LAND DEYELOPI�1'I' SfANDARDs FLEXIBLE PIPE SLOPE DRAIN LAND DEVEI.OPIH3NT STANDARDS PLANTING PLAN l]EANOEfE ppppgR C9ABJ/R6 gG BMP FlG. 1.2.5 27.09 2 l]WIIJII'il: BJO11DR4 CBABOR6 6EJ 3D.02A 13 IiEAR1JTJTi_ p(T,ppgg EB�,BRg 6TJ 30.04 aEN RE AI NDTFs GENERAL NOTES: ,. INIFOR11Lr GRADE A SHALLOW DEPRESSION APPROACHING THE 1. RIPRAP SIZE TO BE DESIGNED BY ENGINEER. s1m raeT r MAX NLET. >� FOBr Z. DRIVE 5 -FOOT STEEL POSTS 2 FEET 2. CHECK DAMS MAY BE USED IN SLOPING DITCHES NTD THE GROUND SURROUNDING THE OR CHANNELS TO SLOW VELOCITY OR TO CREATE INIET. SPACE POSTS EVENLY .MOUND �/' MAX.-{ SEDIMENT TRAPS. THE PERIMETER OF THE NIST. A fl -GAUGE HARDWARE 'mow rou rAw. TNA< I'1' ' MAXIMUM OF 4 FEET APART. '- -------------- --------- IKE TOP. MIDDLE. ------ - LLonl (j' MESH OPENINGS) 3. ENSURE THAT MAXIMUM $PACING BETWEEN DAMS PLACES THE I�I A s �"'w "°• e. TOE OF THE UPSTREAM DAN AT THE SAME ELEVATION AS THE jL. �JIA' y� 1 SURROUND nE Posis Mlnl WINE __________________� DOWNSTREAM DAN (SEE DIAGRAM BELOW). iJ' MESH HARDWARE CLOTH. SECURE THE WERE Wal+ To 11E sTm_ + w� V BOTTd1ATPUC•G A 2�OOT FLAP rM • � z MAa OF THE WE MESH UNDER THE NCDOT /J OR �3] . � GRAVEL FOR µCNOPoNO IS WA9im S 2 REcoYUENOED q MAXIMUM SPACING B ♦. PUCE CLEAN GRAVEL (NC DOT p ____ - 11 OR MIN Ma aR ►s] sraE) ON A z, SLOPE I ,. NNeN FIIEA FAWK x U.♦m WBu sLr FDI¢ a ro IFWAN Fal A PVIOD a WITH INDHTIEITIWE Tum SMOOTH TO A AND 8 ARE AT EQUAL ELEVATIONS , MaE MN b OAK IW EVEN GRADE. 2' CROSS SECTION ]. STI�QL Po83 RMM E VQ N NDOIT AAW E d M (Df_FAB,D81 NIaT 8161 1 MABIIJF S ONCE TIE CONTRaLAN 8ITNIG DRAINAGE AREA HAS BEEN STAMt1TID. REMOVE MCOOT iR 0R �] J IMN Str EDGE w 8tl4 AT DOS 1. RIfR BANBp6 9M11 E BITECIFD Br ME ENAXaNir K®aLllc ALCLYUTATED SEdLENT, AND WASHED STON s aWAT S4iT' TBICL a R°YIED AT BAIX ?SIT EFM2 Nt)I a1Ag10 a PAR,Y CR MB AaIR BWLDIATELY MLA WI RNIBALL MD AT IFAS! GAIT ESUSUSN MAL diAOB/G aMIE PBaEN® AMPALL ANY AVNs IQt6 BMNL 6 YNIC ELEVATIONS. FILTESED I A4MmR w sr eIWFDLx slrAMs a rtnAlDs (wv m sWN wrrDe BBEDAYmr. DIw�AaWo}iul�ir Q nvF�NEAaa RtYRWD FQt vnA4 DDimCATlaI s 2 RIaAD nE FABAK. a[mlPox al acClE wETRrnW PADA ro TIE EID WA - - - - - - 6. d11PACT R£ AREA PROPERLY AND S. pUS1AQ: NEA CN MOT e[ aEAIFR LIMN 1/1 ACRE PFA 100 FT d FACE. FASI�C Y RV�LWiO�PA�R� BNe� Sat rs tEaSFY, nE STABILIZED IT NIM CROUNDCOVER 0. 414E LVOn6 CN MDT IXCFD) OBIENA SIIFAM M TABU B.OY NMN CAApNA SE4E1H CEPOfiB 91WD BE AFYOWD WETI OV0A18 RFAq ARRaL EA09M NO SELBOIT Ca11RCl NATNIIC ANO OE9W YAMIAL N� IIIE IE,WT d TME BAAIBV. NT $ayEwf pEMRTB NMANIIrr N I a � 11e a.T FENa: a Eaw°vm BxN1 eE PRs.EB TD caFnaM m ® „ Y'%Iw�y, p a a°N wsrN1 ROBOIT Fern AD1BFs snr Aa, aED,a, WAIaWAn a a°m nc oIADl PAErAISB No gym. .d �"aw T �s d mrwnBARO rIDW �'h5 w _ Id,�,E4 Bw�N ,BW_n� NOT TO SCALE NOT TO SCALE NOT TO SCALE • CR'Y OF CHARL07TB • CRY OF CHARLOTTE CITY OF CHARLOTIINLET TE �1 LAND DEVELOPYEN'f STANDARDS TEMPORARY SILT FENCE IdND DEFELOPYENT STANDARDS LAND DEYELOPAo,NT STANDARDS TEMPORARY ROCK CHECK DAM [}IARIA71•IE BJQUB65 CBI®RIfB SfJ 30.06A 4 ❑IMIA7171: Qfpgpg �pAg BfJ 30.09 1 fLABl.f1T'Ei_ BRT.WBR CBAW.OTI7B SfJ 30.10 NiLTTC. FOR LATE WINTER AND saL AIENDMENTS �L 2. FILTERMTYPESNSIN PROJECT LOG HALL BE APPROVEDBYCITY INSPECTOR PRdi EARLY SPRING: FOLLOW RECOYMENOAnONS OF 504 TESTS OR APPLY 2.000 LB/ACRE GROUND AGRICULTURAL LIMESTONE +. A STABILIZED EN1Rµ� PAD 6 R WASHED STONE µD RAILROAD BALL/ST SHALL g LOCATED HERE TO INSTALLATION, AND 7S0 LB/ACRE 10-10-10 FERTILIZER iRAFflC WILL ENTER di LEAVE THE CONSTRUCTION SITE ON10 A PUBLIC STREET. J. FILTER SACS MAY BE REMOVED WHEN SITE IS STABILIZED AT THE Srcaur wm ac. YULGtl 2. FLIER FABRIC OR COMPACTED CRUSHER RIRi STONE SHALL BE USED AS A BASE Edi THE CONSTRUCTION ENTRANCE DIRECTION OF THE ENGINEER RYE ((RNN) - 120 LB/AGE APPLY 1.000 lB/AGE STRAW ANCHOR STRAW BY TACKING NIM ASPHALT, NETTING, OR A MULCH 1. FlL1ER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE ANNUAL LESPEDEZA (KOBE) - 50 L8/ACRE ANCHORING 100E A a5N H1H BLADES SET NEARLY STRAIGHT Cµ BE USED A5 A WYCH µCHORNG J. THE ENTRANCE SMALL BE MAINTAINED N A CONDITION BIBdl !1 PREVENT TMd(►IG OR ROWrKi a $FJWFNT AND/OR CLOSE OUT OF GRADING PERMIT. (OMIT ANNUAL WHEN DURATION TOOL ONTO PUBLIC STREETS OR EXISTING PAVElE11T. 11X5 MAY REWIRE PEAMXIIL TOP DRESSING H1H ADDITIONAL 5. FILTER SAGS SHALL BE CLEANED OR REPLACED ON A REGULAR °F TEMPORARY COYER IS NOT TO EXTEND STONE AS C01811nON5 WARRANT µ0 REPAN OR CLEANWT OF µY YEASIREs USED TO IRM gDNENT. BASIS (NOT BE MORE 1Hµ HALF FULL AT µY TIME). �TCII10 JUNE) REFER�nU�ZE IFIF (itOY/iH 15 NOT FULLY ADEQUATE- RESEED, iERDl12E AND MULCH IMMEDIATELY FOLLOWING ♦. µY SEDIMENT SRLLED, DROPPED. WASMED, OR TRACKED ONTO PUBLIC STREETS MUST BE R6AOVED IABEDIAIELT. 6. FlL1ER BAGS MAY BE NSTALLm IN EXISTING GTT OR NCDOT ROADS <rrw0 DATES EROSION OR OTTER DAMAGE µY AGGREGATE TRAdCED NTO 111E ROADWAY Ml/Sr BE SHPT BAP( ONSITE ON A NIGHTLY BASIS AS LONG AS STORM DRAINAGE IS NOT IMPEDED. JAN. 1 - MAY 1 S BAIFl1 APPROPRIATE. WHEELS YU5i � CLEANED 10 REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. 'MIEN FOR SUMMER: WASHING 6 REWIRED. N SHALL g DONE N µ AREA STABILIZED NM CRUSHED STONE WMNl1 DRAMS INTO M SaI /WFNtMNNTs APPROVED SEDIMENT BASIN SEE STD. W. JO.i1B. aAAII FOLLOW RECd.MENDATKNS OF SOIL 7E515 di APPLY 2,000 to/ACRE GROUND ACPoCULTURAL 11NE5TONE 6. COOT MAY REWIRE A STANDARD COMMERCIAL DRIVEWAY (STD. 70.21 « 10.25) TSEEDING MI O µ0 750 L8/AGE ,0-10-111 FERTILIZER ACCESS ME CONSTRUCTION SITE IF THE DRIVEWAY IS ON A THOROUGHFARE. GERMAN 4111Ei - b LB/ACRE �; (A SMALlow Nw. aw L -STEMMED SUDµGRA55 MAY BE APPLY 4,000 LB/AGE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT. METING, OR A MULCH SUBSnNTEp AT A RALE OF 5D LB/ACRE) µCHORB/G TOOL A DIS,( WITH BLADES SET NEARLY STRNGNT CM BE USED AS A MULCH ANCHORING I' AFBNi FOP PIMIK SIIrET �yIT ADWK ErW TOOL MAY 1 -AUG. 15 YANIERMCE: � D D RRn BN OOEND�IOn � �� al REFEIiDU2E a GROWTH Di NOT PULLY ADEQUATE RES®. FERTILIZE AND MI1Ld1 IMMEDIATELY FOLIw v IM LOWING EROSION OR OTHER DAMAGE a"41D� �N�i NOT coPl`nD.r mIN"1Ocr amTN FOR FALL: FOLLOW RECp111ElY1AlI0N5 OF $al TESTS OR APPLY 2000 LB/AGE 6K)11ND AaBCULn1RAL mI Fur FACM LNmnIO wA WE CVA 01ga WRIRC NO Ya[ INWI a LIMESTONE AND 1,000 LB/ACRE I0-10-10 FERIWZER 28r 6 aeW VMq 5 �1CIED R,E�' NYLG7; (GRAIN) - 120 UB/ACRE APPLY 1,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETIWC, 0R A MULCH A Sr�NG MTFc ANGIORNG 100L. A DISK NTH BLADES SET NEARLY STRAIGHT CM BE USED AS A MULCH ANCHORING � G1LN AUG. 15 -OEC 30 TOOL p V A y� YNNIENANLE: REPAIR AND REFERnUZE bWAdD AREAS IMMEDIATELY. TOPDRE55 H1H 50 lB/AGE (7F NHROd31 IN MARCH, IF IT 15 NECESSARY 1D EXTEND TOPORARY (AVER BEYOND ANE IS. OVERS® NTH 50 IB/ACRE KOBE LESPEOEZA N LATE FEBRUMY OR EARLY MARCH. FOR ADgnONAL INFORM TIM REFER TO NCDENR EROSION NO SEDIMENT CdITROL PLANNING AND DESIGN MANUAL (FSCPDY), gCMIN 6.111. SECTION INSTALLATION FOR PERMANENT gE1XNC SPELIFlLAnONS, INCLUDING SEED BED PREP, SEASONAL LIMITATIONS FOR SEEOMlG OPERATIONS, 111E Kwvs a (RADE$ OF FERDUZERS, THE KINDS OF SEED, µ0 THE RATES OF APPLICATION V UMESTd1E, FERTILIZER. AND SEm, RE:T]2 TO NCDENR ESCPpi gCndi 6.11 AND NOT TO SCALE NOT TO SCALE TME MMLOTIE ll,l®SGTPE CONSTRUCnON STANDARDS SECTION 01200 SEEDING µD SODDING OF NPFGRASS. • CTTY OF CHARLOTTE • CITY OF CBARIATTE • CTTY OF CHARU)TTE s STABILIZED CONSTRUCTION ENTRANCE �% jj"M DE>>EI.oPYBNT srANDARDs CATCH BASIN INLET PROTECTION tm) LdNp DEvgLppbENT STANppRpg TEMPORARY SEEDING SCHEDULE p(pppgq Cy/R10P1g giJ 30.17A t2 ufAl111RTL p((a,BpgS (�g(D� 6fJ 30.15 3 aluunT'EF.. BiCLUD6 CBAYIJ)TfE �'J ;30 17 9 1 I 2 Lr sw.¢ An'AG, 3 KEY/ANCHOR MATERIAL AT 4 5 RKY♦¢„ TOP OF SLOPE. caNGFrE oIEN31M16 6G p en�..e.'.y�,/ M a > GENERAL NO & 24' T STEEL POST AT LEAST y`♦V cV1� �• 2{'0 �a�. �// LFc.....���� 12" MIN. / / ACING TIP.• °•� 1Nc Y4°t/. pA c c N u Ww Z USE STAPLES t' APART NORL ITu1Y AND VERTICNlr / \ TO ATTACH THE FILTER FABRIC GENERAL NOTES: 36• MIN. SPACING TYP.• % 1. LAY BLANKETS LOOSELY AND �• 2B ♦• r t s• ! S 1r 'o• x, r Y W >r m' W r Ir ♦ ! Y D• u- > t 3 m M tY t3 0 ECOERERGY CHARLOTTE. NC V ro THE WRE �. / STAKE 011 STAPLE TO YNNTAN ` / DIRECT CONTACT WITH THE SOIL. \ a MNBILAI BAFFLE SPACNG IS I.% , DO NOT STRETCH. OW 1 FLOOR 6 t �11 FI {. THE OF 11E BA91 IN/ TTE O1TLEr zaE AND mals \ SN IWLD N SEEDED YNNR116 Y S SNOVNRAR _ PRODUCTS MAY NAYS ADC111 �- D / Is CONST�RUCTEED 11E w•aN ' IT�I REOKREMENTS THAT MUST BE 6. VIET.I FRDNT NEW TART({ X s REFER TO IMFSCPDII SECTION XA6S66 TDR ADO1101AL l / 9ERM 6PEGf1ARCNS OVERLAP 3. SLOB SURFACE SHALL BE FREE r / IN SIJCE GR ROCKS. SOL CLODS, NALSTICKS. GRASS. SHALL REINFORCING Y T � 1 1 / / \ HAVE GOOD SOA CONTACT. OD SOL CONT THE DETAIL SIOMN N FOR POPE MATING FOR CHANNEL PIPE o-A mr tom, _ _ x•-Y CA a+s. a REFER ro 2 ♦ ♦ Y r am . r- FF J( fd MAX sAiwN \X / Narriu A1ER TABLE STANDARD RER' AND MANUFACTURER'S #8.17 N DELNES. 3- r• {2• • �] -{ X I Imo/ I f ♦ ♦ ♦ r-7--7W-rr ♦ r-r r2• I rz� .eF FLOW _ r x r weKn § je0• NON-WOVEN GEOTE%TILE FILTER CLOTH FABRIC 4' ABOVE SOURCE WATER. a ♦ ­r • s-r ♦ e'd TOP NEW =':D=�� W N BM tY ac BMS AT IY aN mtrtB •r Bus AT tr a. mlwR _ ¢ II KEY/ANCHOR MATERIAL TO TOE OF SLOPE. SIDE NEW NOT TO SCALE NOT TO SCALE NOT TO SCALE CITY OF CHAR1(MMTE LAND DEVELOPMENT STANDARDS K!h CrFY OF CHARLOTTECIEVEIAP Y OF CHARLOTTE ° BAFFLE INSTALLATION IAND DEVELOPiMT STANDARDS EMBANKMENT MATTING DETAIL �% LARD DHENT STANDARDS CONCRETE WINGWALL WITH SPLASH PAD f]iARlarl�*:. Q(Cwoas c aWM Krr 30.19 1 (�wum'n: BCLpM CRIJILOM SET) 30.20 1 (NABIAnL INCujw Ceemmre uj 2o.1�A 8 - NOTES I. REMOVE "RE AND NYLON TWINE FROM BALL AND CANOPY. 10 10 AeT C 2 SON( ROOT BALL AIA PLANT PIT YMENNAIELY AFTER'"STALLAnON. a -fa & 1 3, STMN/G IS REQUIRED FOR ALL TREES N R_DW. OR UPON PLANTINGS IN STREET RIGHT-OF-WAY PARKING ANGLE 90' 4 S REIIEST OF ARBORIST. s. REMOVE SOIL FROM STE AND DISPOSE OF N A KIND WAY CPUE110H DAY) b I b I a $ 1 Y1 LEGA S RESEED UNMULCED. DISTURBED MEAS. CFMFRA�NGTFC I NOTE&: ' TREE GRATE$ AND AS—TED —GA IIdYSTNMSARE REOINm SAT VARDUS LB NOCARIE ImroRN AREAS TO COMPLY MN THEUPIORH I I I I I I I I I tr-6' w-01 Ir-6' ,rd xJd 1Td IB'd tl'd tY-r i. FOR ACCESSIBLE PARING y♦' WneN awx ,.� rAw WH MN[1p s111EE15CAPE OIRIENIES AND OTHER ZONING REDIxREYExTS. ALL OTHER NS—TIONS O —RI SYSEuS — TME RIGNT-O-WAY OT CITY OR STATE .-TAN. s11EE19 REOIIRE AN DICIIOACHIp1T ApEfYD]i EIEWTED 1MOXi1 COOT OP NCDOT TIE CITY'S ENa1OACNMENT A(AFflERT REMFw/APPROVK PROOF55 MAY HIOLM AOYTNRM RED11RDId5. CG TACT CDOT OR N FOR AOaNIEL NF RVAXON REGNPXI COST. S—IrAL AND UNYITY ISIIR COVFRACE REOIRFYEN$ b o STMDMDS/9GNAGE SEE SIDS. y 10A• B. AND G TTT O�I°Y•lat•[ x. DRANApE SYSTFY 5 REa9tFD AS SNOWI FQt Ill IMIOAIm PlM11NG MEAS IDGTtD AOJACCIT ro SREEIi ALL IRIbcATOII(DRAIIA¢ SYSIFIIS NOT REOMaD BY nE UPTAN SHEET OIDDNES 1EQUBE AN ENCRpW l AaRIEIEwT ETEIX= BV COOT . NCOOT FOL CITY CIL STALE-Y.W NNED ROA9S. REEECiNQY. 'l 2 PAVEMENT MARKINGS SHALL BE N a Y 4' NATE PANT. p cF Nuxr BArr utw� v s CONTACT COOT OR NOCOT FOR AOONRIAA NFOWATYN REDMOBIC COST. SLBIrTTAI ATA UABWTM9IRAH¢ COYERAO REOIREMDITs. b b G ANGLE 60 b 3 ALTpUE11YE PNTI(ING MOLES, y� g s anvr Y wm } AN NSPECnI N 9)EOYE IS NEEDED FOL 1REE5 TNAr OLL E PLMIE9 R 11E SiRfET RIOIT R WAY OUE t0 ICNM OR OVER RI:QINXF11EN15. (alE al(r OERArWN OW-Y) AISLE WDn1S. MD OPERATION yL , I o Y z _ LliI1DSCAPE RI9ECn011 M]NOE THE FOLLOYIq. S i (TWO-WAY RAIDED PMg)D OR 4 -B1 S G i O� w e'OSP LZN1ur eAem NeAeB TAR 1Nst aMY SU60RAf1AGE INSPECTION 'REE RT/ELL ON 0.MITNC SNE f1EEClgN �I ' I �I I �I ' ' I BE CONSIDERED BY COOT) ON AA • I. GSE-BY-CASE BASS. O 6 _ SQ YY APPR SALSAMSPFCt10119 TREE IPPRW/1s/IIIEEL'R0115- To PCRMAT NG TE TOTREES, TR MAGE er 'RE CITY ARBOMST OR ASSISTANT .1 -336-{zr2 L 1�L 4�J 10-f O'd e'-e' ID'-? 'd Y'd 13'd t♦'d t{'d S n x _ Twrx a � -"" ew°.L M ..� nI5 IMT ROIDE PMOro N4ROVA. N E PARi1CAATNN N TAGINc THE TREES, O 1RFE PLANTMG NCTION IEIOATKN N9Ecn01 �N eme wNl eom Li,o.l THEA IKW THIO D All O' THE ABOIE wEEC110Ms I1Ll E RF]NDRIED BY TIE Ofl' IAIID OEYSIOPYDIT W. (uRBM1 FOESIRY SECTION) EY�T FL9 THE 1PQ MWAVAlS AS NOIFD. EI 15 A b g�g 5 E. C R "e PARKING AN o 0 ."Nr'nmtTY` RFERT.eRRIRRTYmBw. _�� _ � N: �a y�• s„ < �R < ..,fG�t»oNx�.>N®LN°t.N� I•-rtrdle•<• tr-c•Izdtr-c t!-o•tr-a•tr� gay{ � � ALL TRQS 91ALL MEET AIEAICMI S`_ARO FOI NURSERY STOCK, (Ams 26a1-TL♦) Fin Lx.Mnc cLrNR IR,RIr OUIMq tEK tfMir Mx ROOT eul aA w. Rom eAtL DEN � ( r ,_tr tr Sr tr NOT TO SCALE B g ! � s _` ( OF CHA RLOTN TREE PLANTING � of �� TREE PLANTING—NOTES CITY of CHARWM B 13 LAND DE�v SCANDeRns �� ]AND DEVEIAPYENT STANDARDS (DRAINAGE AND INSPECTION) �) IAND DEVWPI�NT STANDARDS PARKING STANDARDS E e (71AMA77E via= �pmui (FOR SINGLE AND MULTI-STEM TREES) 40.01 auwarENi INCLUDES CHARLO 8 6rN 40.10 IxARL(n E7 NmDCR C98RT01T8 N rN 0.09 PARKING SPACE PAVEMENT MARKINGS ° ° w ACCESSIBLE PARKING REQUIREMENTS %;."w —Q) 0 ® ® 0 c ® ® ACCESSIBLE12' �L AN$[ wIIID " (s¢ MICR 2) T ARxRO O CfE46E mAtES E� I@1wD 1T 1FNRfAD Pt D SEPLE4ENTM VM ACQS�E 901 (R7-E USED f nOK 5 ONLY 011E REINED AC2S�IE PARKING �� •(T{ GARP L�,.�' `Q- 9P/Aa EORD E YAM ACQ!!E Sro. SO.a Wrz SRN£ I— SE VM AMD AT EM'A1 - AOOl10NAL REaLRREo V Z 9'ACE. I. �� ........ ro YEAS ® ® ® ® ® aIMQroE i.n ro T6 r r r r eur ,t' s' 1 • ( VAN AGQEssIEE 9w m-E ///////J N s1a Na latae) � /� Y /� ' I /� 1 tl 1 A/\ 11 Y 1 V 1 tl 1 AcVcE.sAswE —9m m-E MAXIMUM _ SEALq _ 77943 �� E YNI = a V RESERVED ill mm — PARKING FFF���-------��x RESERVED .Sw V ALcf�E STAY rl 7P ro SDf 7 x (_9 1M1 (� 2) °� I p —SIGN RT-e C E S I BLE PENALTY PARKING `G' m &Xr x ® $250 —SONR7-e XX­ tm a tf rorAl 'SEE` — O © © LGS20—�37.6 RESERVE E IPARKING trtr PARKING Y CD n-e FiIvNiEe1wm,KrFIuR1.xV¢aYat _ PENALTY -SIGN aD9 = /30O rr �);�WMAXIMUMF MAXIMUM PENALTY —SN CDS4 SD.TORSERVE $zso IJSrmo - CtHal PARKING �RY.meie' TINE® '. ' w1TNImc T R7_� S oe C LEGEND AND BORDER - GREEN mQ f.fET~eUo,PN•l RNmN 11o0wMPAD5¢ItA1x FBMlORaEM53 DAETEweCII®IMeIRsBueII O1tnlcD WNM LNlMRT7 M-6a0DrrRE R N0NDt ANNEVENFDAMNTomE ro ® A mtat 'l2pupry C A 2 e 3/a S/S ,-try t-t/ID try ]-Are BKRND - WITE R SIGN APPROVED FOR USE UNDER GENERAL QULL)I- m(R:Nm LU Z LU mLYLNX eMA ttpl RAES AE LGoe1a f 1 ROS Air LaoRc mEµArt®w MYITAR w. • Na mNtwMls xOE Rw t-try FIY9ED OiADE STATUTE 20-37.6 N '4 p W K V PwT•tE. I 3 1ERIIc aFMLMKE FOI WMS WTL E WF 1G Mw Fr-YOQ Nu L>'�ta ® •D-ig(f DAL Lbw trY AwcwAtlaNIDDT) 9Dv3 D IETIDS .. .. THIS PENALTY SIGN Ls REOARm 1T1 A000IPMY ALL R7-B C� FM9ED MADE M=j H W Z_ O f3It =_—FOR-1— ` �J Iuuf=l�ll PARKING SIDS OECTED AFTER DECEMBER 31,1990 u a Imoat mi tRAmc t1RYEY1ra1 aw.tEMET.A aYi ETr B�AAIEITffwMNFaRTATK• AN• NENaARRRA aEAIltYM 6 » "� fBR,NMD T MD NG R•DeN O MO XNM GEM _TE�Ip nl INIIBM =III II M NOT TO SCALEI NOT TO SCALEI NOT TO SCALE • cLTY OF CHARLOTTE ~ S ACCESSIBLE PARKING ANDCITY 4",ob OF CHARLOTTE LAND DEVEUIPCM SUPPLEMENTAL VAN ACCESSIBLE cLTY of CHARLOTTE SUPPLEMENTAL ACCESSIBLE 8NlCT NUMBER SIGNAGE STANDARDS STANDARDS SIGN (R7-8P) LAND DEVEIAPMENT STANDARDS 50.10A wurrrt NCDan®cBAmarrasr� so.1o6 st(Ai*ns.(���J CRAMOM SIGN 50.10C 9 CD3.0 1 2 3 q 5 1 2 3 4 5 r.• DIA CORNER POST AT CORNERS F-.• Ola LINE PORT �T DW LME P06T �x _ mNr r _ �.� rxx eAA ECO ENERGY CHARLOD D PLAN VIEW M ro L TYPE IF 'TYPE III" + m'is amimi r •• I - IION RE SGABOWI ur fa r Awn as®Ncw®uxN ® T2'.A f THIN CLEARANCE -I ONE FRAME EACH SIDE OF GATES. L : NOTEPLACETUR1,1BIIC14E3ATGATES. L ' NOG RNNGS AT IS• O.0IIL- '. 4 '�' roN��MrL+r_ ya>Mx„ �r_rt� rme IDx ��� xw_ wm mxv axMaw.Ms ro_r� o_awasn• r ro_.urowm mix sxNeva ris r_rtsys ww• V°M� - ¢ NDTWOON EACH SIDE OF CORNERS. CHAIN LINK FENCE REQUIREMENTS PIPE BEDDING REQUIREMENTS SECTION VIEW A—A NO SCALE NO SCALE 1 VALVE BOX RING NO SCALE C wa C CAP' IMw �T 91/1 14�n� �9 SB!/{ t31/i I/4 PROVIDE RPZEAND RPDA DEVICES WITH APPROVED THERMAL ENCLOSURE TO INCLUDE HEATER DEVICE. ENCLOSURE SHWI L BE 9NOTB OR OTHER - n aiA Nrw 13 1/2 ✓R APPROVED EOLAL. COORDINATE WITH ELECTRICAL DWGS FOR FINALRIN WG REQS. 3. PROVIDE TWO(2)Ij•PYCCONDUITSFORTMNPER xIIbE Wi WELDED JOINT (TYP) o_ SWITCH Mgt HEATED ENCLOSURE. .. PROVIDEBASE CONCRETE SLAB IN MY,ORDANCE yil tAveNR eta IT REMOVABLE FABRICATED ALUMINUM HATCH - i- 6 WGH ENCLOSURE IMNUFACTURER5 Z� p REF STRUCTURAL PLANS FOR RED'S N RECOMMENDATIONS. 105 'MDT SD%' DIC1J15lAE MDpEL+; a Wn d Lar M�iA1}" I \///\//\ • . ANIULM •' \//\//\ \//\///\ .• •. \// /�' 10M1 NFATED END.OSIAff S I/4 1. ALL DINC41 NS AIE APPI® Im m IN IN— 2. .SRECD.C.11,➢CMINIIMISTHICgESi. L F ^ � O c"i � � c O e n ro e 9 W —.I— TSMLL m u S / �j\�/\ O.S44• IW! WALL C,4 �j \/\ �\ Gi K_ A�AttE.RI E MINI MM OF N• AYDYE THE II— ur iT > Pm� F _ q L� CO' " / /\\//�//\\//\\' \/\W\ /� I. 'A D' IHOIFATE2 TIE S[2E N6 fiElEtM1 ll1GT1Ol OF THE ACCESS ENING .�eMr AWMwxa4 sroneTa uda .rwY �// %\\%\\\ •'•\\// \j\\ \\ - 9bi UNIT ISA LKN M01 INSTN1m �6• FEtW HIB6Y0-�4 - ITIdR THE KATERS, ` 33 L s C �t }/�T_/ \ /z SLOPE \ /0</O\\ -- -- - �f. B \\j\\ .'• '.. , - \\j//\ j/\\j//\\\ •• • •' \\//\ \JIMRPz IMdRA' HIM DICLOSUIE B A C CROSSING OREQUIREMENTS 6" REDUCED PRESSURE DETECTOR ASSEMBLY SECTION A—AC, No SCALE r' UL LISTED FIRE DEPARTMENT CONNECTION REF STRUCTURAL B THREADS SHALL MEET CRY FRE DEP—NT REOIIREMENTS(S STORE FITTINGS) PLANS FOR RED'S FABRICATED GROUT a' BASE SUPPORT COMPACTED ABC rH Ir I C��O�. ALUMINUM HATCH WATERPROOF SEAL �r•/': O�tF GROOVED END CONNECTION _—RYP ABOVE GRADE) 2 5/8' 2 1/4" 5,EAL i 17943 4'PE-FLSPOOLPIECE 5/e' WASHER HEAD TIMBER I�10' 70' DRIVE SCREW SPIKES .,p G'C1{Pld {• WAFERCHECN VALVE A A TYPE B AGGREGATEADED WI SALL DRIP GN,, L OR`\\ 4 WASHED STONE Y PEEL SPOOL RECF I ENI ARCED VIEW 81W'a4' MI TEE p� �� HATCH HANDLE (TVP) f..M041 W O x CON:.9LPPORT VAD .W AND THawsraouc — B L R \.UNLOADING FIRE UNE HEADER RISER BOX LL w m Q r NO SCALE A NOTES: CTHK AYEROF A F YST WASHED STONE ALL MATERIN.S 9Wr11 BE ULFM AF3itOVEO. BALLAST W C O i W MI 2 ALL BIiR®PPE 3NAI.L BE NE9IRAMHI.IOINi. SUBNOTE: BALLAST W Z_ O V STONE GRADE CROSSING SHALL BE CONSTRUCim PER CSK STANDARDS AND SPECIFICATION& a W FIRE DEPT. CONNECTION DETAIL No SCALE STONE GRADE CROSSING NO SCALE SWEET NUMBER i a a�srrl'N :�sa.srai�e� cna.o & 1 2 3 4 5 CONTRACTION JOINT DETAIL: JOINT BY SOFTCUT METHOD. CONTRACTION CRACK 4000 PSI 0 28 DAYS W/ 6.6.6 WWF OR FIBERMESH D A ud d DENSE GRADED AGGREGATE SUBBASE SUBGRADE COMPACTED TO 100% STANDARD PROCTOR. ieZeIIel:421lw-1--iltsizweigg C SEEDING MIXTURE RATE (Ib/acre) Tao r— I. S— L. P— 50 KOM LapMPra 10 SEEDING NOTES In E— PMbn-U, -1 25b/-- BM kM w 10 Ib/am comm- B.mu4agra.. U. comm- B.ewbapw. -Iy Mon Y M uN 4y W b.aom0 a pat AR. Aue. U a. RN.s a -t appwr-a. r a.0 mat .rc.o arM .tb.. W Ib/- BaNlopraw w t5 b/w. BOrmubograa. Ta .A.fe NPH^G a.ahG )ala hW J.M, aae 15 b/ao. IWW B.mwfoya.. NOK.y.r, an« mI -Apr. R b w.l.abl. eo aw 1.npwwy mw. NURSE PLANTS B.MrA» MaY I .nO AUG. 14 eee 10 Ib/ C - mMl « 13 b/ SUAnpa.. FYh- fR way 1 w oe« AW.. 15 .ae b b/ rle (VONrJ. SEEDING DATES Bar PPaN. FOEA25 - SPL 75 Aup 10 - Ltt. 2A L.M Nbt.r: uµ FM. IS - Mar. 21 FW. I - APr. r5 ro b bat b w A.am aM bf..irNr M I. a.e.+aA Owe.MYq .1 Kobe b.p.e.m ow IMl-se+dse M0 hFcrte b wy slM1cfAe SOIL AMENDMENTS Awltft Dave 9rvune alrAWtwpr Nnalme wN 1,OW lo-ro-rD A.f1ii«. MULCH AmIY AOW b/ YaM rfrvr w 4evAW4nt row .I.IeGr.- .etobl. mu Mc Mob Nb.K by fa+t/W .iM a...t Mniny w mr V w by .NnPHp .iM o — mCwTG foot A tIIK sfvp Mapco B MAINTENANCE R.A lI m M. acme yew ufeea pro.M b Fuly oe.Ra.f.. Yay bs mm.ee aro w fo a yw, but moKly b rwf n4ca.wY R...M..MNb4 me nrftl A tlmloP✓ ano. irwrNeNy R.M1r«ivaTmle e11A bam NC EroMarf me SscGrraf CmNd PA..rhp .+e Oayn Mmutl, l08R PERMANENT SEEDING PERMANENT SEEDING SPECIFICA11ON NO SCALE IM 1 2 3 4 -A5 REL0INUEMYD CARE OIOLL E%ISTNO N sEti MR rnNc F10Q1 a RNL .nmoR oaf Nnta tlt aR tfl¢ BOLT Ivb fN .uLsrelE SSE a RNL oR — ►: 101110AM11 ^. talc : 1 a l ENCL08URE REDUCED PRESSURE tN TURN FULL PORT PRINCIPLE ASSEMBLY BRONZE BALI SNOT OFF CHECK VALVE Nt VALVE N1. 8 L NOTE 5 CHECK 1 tH TURN NLL POR! C� � BRONZE BALL 9HUi OFF VALVE AO, SEE rgTE 5. FORT 12- MIND' MAX. TLL1Tp-'m"i 4-TNICK 3pW PSI CONCRETE BLAB. SLAB FO EXTEND 4'BEYOND COVEN RPE MATERULLroEMFYDSFT. PAST OOTPRMR. TMS BErO RPE MATERML AB 9PEQFFD BY HARNETT COUNTY 3TAfONiD ro METIER&=PEC1fICNTgN6 TO BUILf1NG WT-0FF VALVE ENCLOSUfE NOTE.. wt RtOVIDERPZANDR DEVICES W(TN AFRIOVEp TIEP/.tAL 1. DOUBLE p1EC1(,V55 AR FSeSE LGL MU.T COISORM TO COUNTY OF ENCLOSURE TO NC, -HEATER IWiNETT.TANONOSPECFCATgN9 OEVIGE. ENCLOSME SHALL BE Z. THE COUNtt OF MARIETT APPROVED 3//'-S RP NClL0E99HN 9gTB0X• OR OTHER APPROVED OFFVALVESNt AN ASPAITl7F THEASSEAIBLY.NO EQUAL. SUGSRMIOILS SHALL SE PFJWIRED. 2. —1-1—SHALL BE 0_ ALL OLRDOON IN.TALLRTIOHB SMLLL BE INSTALLED N A P IAA%MUN OF 1000 W. 124 V, t RI. PROTECTNE COVERING APPROVED BY TUE COIRIY OF 11/JiNETT 3. COORDINATE WITH ELECfRKJLL BACKFLOW PREVENTION A01I/6TMTpl. DWROVIDE I FOR SE HIRING REQS 4. FITTINGS SHALL BE A. SPECT .---m 0. PBASE CONCRETE SLAB N ST -ARD SPECIFK TIONS. A, WRH ENCLOSURE MANVFACILRERS 5. TEST COCK I0,1 SHALL, BE UPSTREAM M SHUT OFF VALVE Rt AND IS REI—IENDAT S-PANTOFTM:APPROVEDASSEABLY. 6. RiOVXIE ENCLOSURE—A DRAIN PORT CAPABI E OF PASSING THE FULL FLOW FOR THE DFJICE 2" RP W/ HEATED ENCLOSURE ■ NO SCALE NOTE: INSTALL W sxatAR FASMw BEIEATH SIDEWALI6 FMISHED GPADE CURB &GUTTER Mw. V Dw SCHEIXILE 4o mc 4-1U NOTE: ALL SLEEVES NDTED ON PUAN. A94'PVC 9lEEVE 1 1B' DIA. CONCRETE COLLAR SIDEWALK/ PAVING SECTION OR EARTH r THREADED BRASS CLEANOUT PLUG MARKED SANITARY CLEANOUT COORDINATE LOCATION OF COORDIN T WITH OWNER TION 45 ELBOW LATERAL PIPE AS I IrI�Z�I� • ► • • _ U.S. FOUNDRY 6 MFG. CORP. EASTJORDAAIIROV Wt7Fm 0� IA, yecRLaKNYAi t•AMAL TEM M'A1MLlITYIETIXT SNEBSET6i0 �, (RE1f061®FTLBNI R11M0 Z ]� 1fiffirrJ �a �t"__--vii (2)N011 R9ETNATND Do Tyr w- FTNBGA 6 Prx HrXEe .� , ,? 'I PIDDPID RQolAR9 Y 1 ire OV �4NfyAq w4 -NDN PETEIRATfAO ��� �ti6. .DO WOZ P" HOLES N ;,�. ttw•BDBB Low �i 87A4 1&18' r11? -1i? WUJ�I W 3 1M' T T— 1 1&18' 919118' 7 �• 3 V8' 1? --'i VL- 11+-1 LU 1Zy -SZ 022 lame, W ,SnF �� NW z 1(C = Z Z o 1301 1R' 5.8Ay ..SC TYPE d01 MAdNNED flflRDD MACHINED .amtfos USF NR SURFACE fiw DATE 3M' 11M' �tN• r S, Y CLASS 35 131D' i t. .maa�F uu77 J H a )1N• H RgtMOIE._�DETAA WEIGHT -150 LB. MIR, 0% MINUS TOLERANCE _GKII�LER 1p 0� K WEIGHT -14318. MIN... D. MINUS TOLERANCE NOTES: LOAD RATING - HEAVY DUTY USE WITH TYPE A B, OR C FRAME MATERIAL -ASTM A48 - CLASS 35 GRAY IRON COVER SHALL CONFORM TO DIMENSION AND WEIGHT REQUIREMENTS. .� COATING - LNDIPPED COVER SHALL NOT BE OUT OF ROUND. D C eco -energy ECO ENERGY awaLOTTE. Nc a� t", -a � a rli n 17943-1 ' - `�'OINE��b� W f�r � fD a sow w A ai? v W ¢ () W W u90 W Meer NLwsu CD5.0 1 2 3 4 5 UNDISTDRBED EARTH NOTE FOR VERTICAL BEND - """"'. CONCRETE THRUST BLOCK SCHEDULE IN EXCESS OF ,i 1/4' ANCHORAGE MIN. D T a 7 3 6 3 r A � WA1B Bal `Cqq pµType -� / Cvm 1. Ir • ppr v.� m�ran.cr Nm \ W 1Y PIPE N / �0 �I CLASS A SIZE INCHES pp 45' 22 1 2 11 1/4' CONCRETE H L H L H L H L 2' .75' 1.Y .50' ,.0' .SO' .73' .50 .50' ® 4• 1.3' 1.5' 1.0 1.0 I B . ' 4.0' 1.5' 3.5 1.0' 3.0 1.0 1.5 a. 2.5' S.0' 2.5 4.0' 1.5' 3.5" 1.0' 2.S' 18 10' . ' •w ' . ' 4.0' 1.0 3.0 1FO 3.I FOR DESIGN DESIOH PRESSURE -200 PSI SHALL BE AS DESIGNED BY AN ENGINEER. TYPICAL CONCRETE THRUST COLLAR. MIN. OF 12' INTO UNDISTURBED MATERIAL ALL AROUND. __-- - D ECO ENERGY CHARLOTTE. NC ,ro- WATER D TOP xcraH . �� T"^A ""'"'• r TYPICAL SECTION SIZE SCHEDULE TEE OR BEND TYPICAL SEND c A TRENCH BOTTOM 3 ,/4 W. urorx Spa _ rw Lz,[N9wr' wast 1tIN 1 2 L 1/2 L CUSS A CLASS A �? 30M PSI 3000 PSI � 4 CONCRETE CONCRETE UNDISTURBED UNDISTURBED / EARTH EARTH \ ! ELEVATION 71ETICH TYPICAL CONCRETE THRUST COLLAR. MIN. WIDTH MN. SECTION A -A e• of WM® nae / OF 12' INTO g a�INSTALLATION sAxo� TAMPED 11MIM , /. UNOS USED UNDISTURBED SOIL I 1 -ep •� EXTENSION RESTRAINED JOINT PRE 1 1 1 1 a PLAN - TEE PLAN - BEND OF THHRR� SED LLAR E <%I� VALVE BOX REQUIREMENTS NO SCALE VALVE BOX INSTALLATION NO SCALE C THRUST BLOCKING NO SCALE CARR B� THRUST COLLAR ASND PIPE VARIES VARIES NO SCALE R 3 2 3 y 1 z AS ODECIED AS DIRECTED UMPER NOZIlE o FACE STREET AT 110' AMWA,N-DARLNG 5 1/4' MOD. B -B4 -B-5. OR MUELLER SUPER }T i R ON, s 1/4', GR 2' BITUMINOUS SURFACE COURSE MUELLER MODERN CENTUMON. 5 ALL THREE SAY. 5" BITUMINOUS BASE COURSE 10" GRADED AGGREGATE SUBBASE �7 O Z e ^s g A r r Via LIP BOTHB ENDS B' DEEP VALVE I mo BNG I 4 f # - MID -STATES PLASTICS B1Y1730-12 �IMSCPC 1730-RTR COVER NEPTUNE Y COMPOUND METER MIN REMOTE READ REGISTER GRADE TO SLOPE MY FROM COVER .. g> E IP a SECTION A -A SECTION B-BFORD \ GLE w i Ni 6' 7 SI'2 B CASING PIPE PK HW'Y R R PK SUPPORT ASYIBLY W11( MDBBLS ODETI51016 1215' 0.1118' 0.250' far.W f.IWaW P.W 4 p9I 13/1 3/4 1• 690' 12.75• O]BB' 0250' f. r.W P.IWaW r.W tl9r 1 L1 Y4 VALVE BOX, L1/2 g• PATE b I VALVE DUCTILE NRON W h TEE W/8' BRANCH OR HYDRANT IEE 6' •DIP PRE CY MIN. `N0. 11 51DNE `/ �L[ 'l� COMPACTED SUBGRADE, REF. GEOTECHNICAL REPORT FOR REO•S FORD ANOIE AETVR VAL CHECK VALVE ;;F� B : Ili w�`' r 9050 MAO' of 5 0281• fa2.W P.r.W P.Vr 140"" 13/ W4 W tur IBN' 0250' P.r.Vr P.r.Vr 0•.Vr 3 LGN' 13/4 3/4 12' 1320' RMB' 0250' 0.311• f.r.Vr 9'.IW.W V.Vr 3/8' D.7Y 13/4 3/4 M• 1320' 21A9' A25r f.T.W R.iW.W 6•. Vr 2LBr 21/4 194 S. I)AO' 30A0' 0.312• OA69• P.T.W f.IW.W P.Vr TED Z7Ar 3' Iwo 1/• 1950' 30A0• 0.312• r x? x W P.tW.W W x - V2'4 273r 3. 1 2T 2L60' 30A0' 0312' faT.OT P.lW.W P.YI' V2Y Z/Ar 3. 1 9/ g ` \/ /' PAVING SECTION, HEAVY NO SCALE DUTY NOTE MANUFACTURE MAY BE AS SHOWN OR APPROVED EWA.. �� V {y 21 2580' 36A0' ,375• P.r.w f.2W.W W. Vr l/2'4 33�' 3• I L 3O' 32A0' 12A0' 0469' 2.r.OW P12W.W I.W 3/1 383• 7 I 36' 383T' 12A0' A5A0' 1r.r1w r.2W.W r.Ve 3/1 4519' 3• I PROVIDE TWO 3/4'4 RODS THREADED AT ENDS (INC. NUTS) SPA AR .OPS.... YECH JOINT FITTINGSNO T BOER WATER METER DETAIL NO SCALE, ALL TO CONFORM TO Allo REQUIREMENTS ,y;2Y oS e S CASING PIPE NO SCALE DETAIL PIPE RN1Z s1ouLDrn PAVEMENT 7 € DITCH 5 BEYOND''-•.'VONNEEP'Ci": TOE OF SLOPE 17813 •CC.•�Y o �P Q 3/4'4 TE DOLT SHOULDER 3' 0' MIN. I ® 3/4'4 TE BOLT NUT ® 3/4'4 ROUND WASHER 0 ® SEE END Q 3/4'1 WAGED ROO (ORATED WITH COAL TAR) HARNESS DETAIL CARRIER PIPE - - - - - - - A (MIN.4 EACH/HYD) FIRE HYDRANT ASSEMBLY NO SCALE - - - - SOPE LSTEEL PRE GASNG 1/2 W. Y0. GRAVEL TYPICAL PIPE CROSSING A a m < Q eoe'z w W¢V O u w?? F2 NOTES: 1. SEE DIRAWNA FON H SIDE N.O CA AND PIPE IN O STEEL PIPEND ALl- . 2. NSTALL DRAMS EACH SIDE OF CARRIER PIPE IN DOWNHILL END WALL O M BORE AND JACK DETAIL NO SCALE iNQT NUMBER x 2 3 4 5 POND DAY 18' DIA RPE S, MI 24' TW.TDP WIDTH BEYOND 4' MIN PPE. TW. vrM1 DETPIfN 2' I cIrtOFF�H WACIEru MINE w cO1FAC1m wmi EOurwExi. ROILErW Ors IWI� ANTI—SEEP COLLAR DETAIL AY`M NO SC's CUT OFF TRENCH DETAIL NO SCALE GCE LAER. COVER 9DIL AND KED DAM INTO GCL LINER. COVER 90L AND PREPAREDXSTWMG GRPDE GCL LINERDETAIL i PREPARED SUM, REF . H GCL LINER OETPW SECTION B—B 4' TOPSOIL a SEED 10• uTroRAL s+ELF 5' - � NORMAL WgTEq ElEV. 688.0 IMPERMEABLE LAYER - (REFERTO BASIN TYPICAL SECTION) SHALLOW LAND SHALLOW YIAhTi il> HERBACEOUS PLANTS EMERGENT PLANTS VEGETATED SHELF MAINTENANCE SCHEDULE e• BED OF TOPSOIL [.n Awy tl detentim 1-- rs Wre pl, on 0v vegereOMs ,andp - fa. 1,A_ —Id b -I &] a needed mwll4e pi. bev0re..66lvd(courururd wb) !:oparewrM tkU et deMdrmr—.Ir Id Ul«IUbnl A(. Ore I—setae: fam{v�nmrttitrc.eq,u to AMANrsh d, PLm w th, r%AtAMd M . LITTORAL SHELF CROSS SECTION NO SCALE FOREBAY BAFFLE DETAIL NO SCALE ELEVATION BMP Inset Table Wet Pond ENDS hMerinodal Ethanol Transfer I /\ EMERGENCY SPILLWAY EL 724.35' 3 03STING GRADE ______-__________________________ 266.50' - 18' GASKETED JOE' 716.33 NOTE: 6" PERMANENT POOL :. FLARED DRAIN AND CONTROL VALVE SECTION NOT SHOWN FOR CLARITY. TYPICAL POND SECTION B—B SCALE 1'-5' 14' W ORIFICE, PLLAI. S CACHED TO BEARING BMS. FASTEN INV: 723.10 W/ ANGLEF ATTACHED TO A 1}'%I O IJ7TO OF CUTLET MALE FRAME MORTAR FRMS TO TDP OF OUTLET 8' SOI 60 PVC WAGER SIDE RI CONTROL STRUCTURE. W/ 2' SQUARE ACCESS NATION k LOCK DEMAND B' SLUICE CV INSIDE RISER E T-NMDIE UP THROUGH RISER GRATE 1O1 POPE, 6' SOL (YIN) ��--- ON UTTOAAL SELF— �IOP OF DAN 726.0 - 3 _ _. � 7 4 �L :Dai t — YR WATER LVL 72434' (462 T NORMAL POOL LEVEL 72200' ---------------------------- P '0 -RING AT 0.50 G 5 --- — —---- 9S Y 0u x T nuc Y IY w rDIWR ausiFlm AT ALT. IlntavNA : rY-x• Nr. 11 'W NOTES: 1. PRONDE WATER TIGHT SEAL INV: 716. CONCRETE FILL INSIDE CUT 7RENA MOUNID PPE JOINTS TO RISER W/ NON -SHRINK DROIT. CONCRETE BASE - 6'%8' 12' TW. W/ 10/10 61(6 WAN BOTTOM OF RISER. SLOPE TO RCP INVERT RF REF' DETAILL 2. GCL SHALL BE SEALED TO CONCRETE RISER W/ GRANULAR /pJ / UNDISTURBED SOL BENTONITE ON ALL SIDES PROTECTION - - -_ NB60B "39'W l SECTION A—A SCALE IAAW 2 emA�heALcauz 228 BASED W YELETATED 4QF ATEA 5,316 2. 9INLOWWATER (L.OIEII NNf K SlElf):Sr91ALLDW LAND (OFFER NNF Di SHETFk 1.7Y1st i t. PRI.AWiXrGS TO H teYN Y pA . 5' PLItc AT WE O 2 nANTMG SEA t OF Rub GECSYNTHETIC CLAY (GCL) LINER W/12- SOIL /tYSOL COVER PROPOSED BERM. COMPACT SOIL 98% STANDARD PROCTOR 4 5 mAaNc tC w mrTEl CtAIDED Al CLI. I TW NS IMTr. 4•-3R•w KT. 9S Y 0u x T nuc Y IY w rDIWR ausiFlm AT ALT. IlntavNA : rY-x• Nr. PROPOSED PUWAIOIT ®M daa /,. g STORY DRAIN I D RioxRA M�aupsrprtn 12' WIDE. 6' THICK AP111°T NTLw.wro NmNNs AA.rwim-: tr-ar Yr. C:E" _AscMPrs ItrNNAu 2' l&fm AT -- YIFAYNS rt ­A - - MAAfN0 12'-&f MIu rrgUA vHlurNts MIN GRAVEL ACCESS _ /pJ / PERMANENT WHET It 00 MIG EYpNpr !ALGA' w0 rEI1WrRY6 00000' .MwYw�musLs we. vNAp 215 Am sA�wstL.wrn 228 PROTECTION - - -_ NB60B "39'W l o�rax mAxA rwA.aoW 228 A1, IlAmr a AtLaY Y 215 emA�heALcauz 228 BASED W YELETATED 4QF ATEA 5,316 2. 9INLOWWATER (L.OIEII NNf K SlElf):Sr91ALLDW LAND (OFFER NNF Di SHETFk 1.7Y1st i t. PRI.AWiXrGS TO H teYN Y pA . 5' PLItc AT WE O 2 nANTMG SEA t OF Rub R6. OR SHEETS fiE alYFpl Mil IMn DETAIL No SCALE FOR CONTINUATION t / FWEBAY BAFFLE I SEE DETAIN BELOW I \ T / STORM WATER BMP ACCESS � 1 /' h MNNTENANCE EASEMENT i � FORF9A AREA ,� ; \ 1 1 i 1 I 8' MAMTENANCE DRAIN .� VALVE. REF. GET LS r! R �e 8' SCM. IID PVC OC;T ' 2� - UNE O 0.501 ROPE (((( H 1 � A A t rt snvE (TW)� IUM urTROI SHELF FOft WATER QUALITY. .PLANTINGS(SHELF — — -� 5.5177 (SHELF AREA: 5,517 Si) -2:1 SLOPE BELOW WATER LEVEL (7W) PERMANENT OUTLET - PROTECTION ►_ N ' 266.60 LF OF 18' '0 -ANG GAS KETED JOINT a 0.008 EMERGENCY SPILLWAY, ---4 ELEV. 72A35' PRECAST CONC. RISER STRUCTURE RN ELEV. 724.20' WET POND GRADING PLAN SCALE: 1'-30' - L3 � Y E I A SIS SUM v5 �QaAA6 DRAI03 TKt Y aA a b' t4Yc �tS .,AIp6 FFR6>5 YMt PW.p mAaNc tC w mrTEl CtAIDED Al CLI. I TW NS IMTr. 4•-3R•w KT. 9S Y 0u x T nuc Y IY w rDIWR ausiFlm AT ALT. IlntavNA : rY-x• Nr. PUWAIOIT ®M daa _ et5 a6 TWWNf1. I—HLW 5� YpAe 6'IWG wTwTr: a=rrdv. aunDtm AT Nr. NIWIWIS 0 opo o°1I RioxRA M�aupsrprtn to' WEIF•; :" ': 9 F;r:� 1 C"'� F•� AP111°T NTLw.wro NmNNs AA.rwim-: tr-ar Yr. C:E" _AscMPrs ItrNNAu 2' l&fm AT -- YIFAYNS rt ­A - - MAAfN0 12'-&f MIu rrgUA vHlurNts MIN QYUSIFi® A~pi NTaYA1K YWINNS MATIMTY: Y-rP M. KEY TWE QUANTITY KEY TWE QUANTITY 00 MIG EYpNpr !ALGA' w0 rEI1WrRY6 00000' .MwYw�musLs we. vNAp 215 Am sA�wstL.wrn 228 '�,'.�'��`'.•�,'. TAAQ 215 o�rax mAxA rwA.aoW 228 A1, IlAmr a AtLaY Y 215 emA�heALcauz 228 BASED W YELETATED 4QF ATEA 5,316 2. 9INLOWWATER (L.OIEII NNf K SlElf):Sr91ALLDW LAND (OFFER NNF Di SHETFk 1.7Y1st i t. PRI.AWiXrGS TO H teYN Y pA . 5' PLItc AT WE O 2 nANTMG SEA t OF Rub ytAu ANo oclwm aolL t ITTORAL SHELF PLANTING fiE alYFpl Mil IMn DETAIL No SCALE ec ene ECO ENERGY CHANLOTIE. NC - 179434- } riHrt it vR LL rc rn >ro� w A amz o W O-0 w a eXE[T NUMBER CD7.0 DAM AND EMBANKMENT CONSTRUCTION 1.) GENERAL - THE POND AND DAM AREA SHALL BE CLEARED. GRUBBED AND STRIPPED OF ALL VEGETATIVE MATERIAL AND TOPSOIL PRIOR TO DAM CONSTRUCTION. THE DISPOSAL OF TREES, STUMPS, CONSTRUCTION DEBRIS, VEGETATIVE MATERIAL, ETC. SHALL NOT BE PERMITTED IN THE DAM OR POOL AREA, WHEN BLASTING IS USED TO REMOVE ROCK FROM THE POOL AREA, THE BLASTED AREA SHALL BE OVER -EXCAVATED TO A DEPTH OF AT LEAST TWO FEET (T) BELOW FINISHED GRADE AND BROUGHT BACK TO FINISHED GRADE WITH CLEAN RELATIVELY IMPERVIOUS SOIL MATERIAL COMPACTED IN PLACE. 2.) EARTH FILL DAMS A) THE CONSTRUCTION OF THE DAM SHALL FOLLOW THE STANDARDS OF THE NCDEQ DAM SAFETY, ITEMS LISTED BELOW ARE MINIMUM. BUT WILL BE VOID IF NCDENR REQUIREMENTS ARE MORE STRINGENT REQUIREMENTS. B) SOIL MATERIALS USED FOR EARTH FILL WHICH ARE HIGHLY PERMEABLE OR WHICH EXHIBIT SIGNIFICANT SHRINKAGE SWELL OR DISPERSION SHALL NOT BE USED IN THE EMBANKMENT. C) A CUTOFF TRENCH (CORE TRENCH) SHALL BE PROVIDED WITH A MINIMUM WIDTH OF FIVE FEET (S). THE CENTERLINE OF THE CUTOFF TRENCH SHALL BE LOCATED DOWNSTREAM OF THE INSIDE TOP OF SLOPE OF THE DAM. THE CUTOFF TRENCH SHALL BE CAREFULLY BACK-FILLED WITH HIGHLY IMPERMEABLE MATERIAL AND COMPACTED AT LEAST NINETY-EIGHT PERCENT (88%) OF STANDARD PROCTOR DENSITY. D) THE MINIMUM TOP WIDTH OF THE DAM SHALL BE TEN FEET (10') AND SLOPES SHALL NOT BE STEEPER THAN 3:1 (THREE HORIZONTAL TO ONE VERTICAL ON THE DAM OR UPSTREAM SIDE OF THE EMBANKMENT WITH 2:1 SLOPE ON THE DOWNSTREAM SLOPE OF THE DAM. THE SLOPES AROUND THE POND WILL BE 3:1 FOR EASE OF MAINTENANCE AND ACCESS OF THE POFD. E) ALL DISTURBED GROUND AREAS AND EMBANKMENTS SURROUNDING THE POND SHALL BE MECHANICALLY STABILIZED OR HAVE PERMANENT SEEDING SCHEDULE. 3.) LANDSCAPING AREAS AROUND THE POND A) THE LANDSCAPING WILL BE INSTALLED AND MAINTAINED PER THE REQUIREMENTS OF THE CURRENTS STORMWATER BMP MANUAL PER NCDENR WATER QUALITY SECTION. B) THE SOIL IN THE LITTORAL SHELF WILL HAVE AMENDMENTS PER NCDENR REQUIREMENTS PER CHAPTERS OF JULY 20070R CURRENT MANUAL FOR GOOD CONDITIONS TO MAINTAIN THE AQUATIC PLANTING REQUIRED FOR THE WATER QUALITY FEATURE. C) THE ENGINEER WILL COORDINATE WITH THE OWNER AND CITY OF CHARLOTTE ENGINEERING DEPT. FOR APPROPRIATE AGREEMENTS, COVENANTS, AND OTHER PAPER WORK REQUIRED FOR THE CERTIFICATION OF THE WATER QUALITY MEASURE. ENGINEER MUST MONITOR CONSTRUCTION, AND CERTIFY THE MEASURE AND PROVIDE AS-BUILTS UPON COMPLETION. OPERATION AND MAINTENANCE MAINTENANCE OF THE POND WILL FOLLOW THE CITY OF CHARLOTTE AND NCOEO STANDARD MAINTENANCE REQUIREMENTS AND MAINTENANCE WILL BE DONE AS PART OF THE STANDARDS SET UP BY THE STORMWATER BMP MANUAL AND CERTIFICATION FOR MAINTENANCE BY THE LOCAL ORDINANCE REQUIREMENTS INSPECTION EVERY MONTH OR AFTER A 1.0" RAINFALL EVENT: 1. REMOVE DERIS FROM THE OUTLET STRUCTURE. 2. CHECK AND CLEAR THE ORIFICES OF ANY OBSTRUCTIONS. 3. CHECK THE POND SIDE SLOPES: REMOVE TRASH, REPAIR ERODED AREA BEFORE THE NEXT RAINFALL EVENT. INSPECTKMs EVERY 3 MONTHS TO INCLUDE THE FOLLOWING: i. INSPECT THE COLLECTION SYSTEM (I.E. CATCH BASINS. PIPING, GRASSED SWALES) FOR PROPER FUNCTIONING. CLEAR ACCUMLUATED TRASH FROM BASIN GRATES AND BASIN BOTTOMS, AND CHECK PIPING FOR OBSTRUCTIONS. 2. CHECK POND INLET PIPES FOR UNDERCUTTING, REPLACE RIPRAP. AND REPAIR BROKEN PIPES. 3. RESEED GRASS SWALES TWICE A YEAR AS NECESSARY. REPAIR ERODED AREAS IMMEDIATLEY. 4, CHECK THE SLOPE ON THE DOWN STREAM SIDE OF THE DAM AND THE AREA BELOW THE EMERGENCY SPILLWAY FOR ERODED AREAS. REPAIR ANY AREAS WHERE EROSION MAY OCCUR IMMEDIATELY. INSPECTION EVERY 6 MONTHS TO INCLUDE THE FOLLOWING: 1. REMOVE ACCUMULATED SEDIMENT FROM THE BOTTOM OF THE OUTLET STRUCTURE. 2. CHECK POND DEPTH AT VARIOUS POINTS IN THE POND. IF DEPTH IS REDUCED TO 75% OF ORIGINAL PERMANENT SEDIMENT STORAGE DESIGN DEPTH, SEDIMENT WILL BE REMOVED TO AT LEAST ORIGINAL DESIGN DEPTH. 3. OWNER IS RESPONSIBLE FOR MAINTENANCE AND CLEAN OUT OF THE FOREBAY AREA AS NECESSARY FOR ROUTINE SEDIMENT REMOVAL AND TRASH. 4. OPERATE SULICE GATE DRAIN VALVE FROM FULLY OPEN TO FULLY CLOSED POSITION TO MAKE SURE THE VALVE IS WORKING PROPERLY. MAINTENANCE AS REQUIRED: 1. MOW THE SIDE SLOPES ACCORDING TO THE SEASON. MAXIMUM GRASS HEIGHT WILL BE 8. 2. WETLAND PLANTS AS SHOWN AND OTHER INDIGENOUS WETLAND PLAITS ARE ENCOURAGED ALONG THE POND PERIMETER. HOWEVER THEY MUST BE REMOVED OR TRIMMED IF THEY COVER THE ENTIRE SURFACE OF THE POND. CATTAILS ARE NOT ALLOWABLE WETLAND PLANTS. IF THEY BECOME PART OF THE POND, REMOVE THEM IMMEDIATELY. 3. THE ORIFICE IS DESIGNED TO DRAW DOWN THE POND IN A 2 TO 5 DAY TIME PERIOD. IF THE DRAWDOWN IS NOT ACCOMLISHED IN THAT TIME, THE SYSTEM MAY BE CLOGGED. THE SOURCE OF THE CLOGGIN MUST BE FOUND AND ELIMINATED. 4. ALL COMPONENTS OF THE DETENTION POND SYSTEM MUST BE KEPT IN GOOD WORKING ORDER. MAINTENANCE &INSPECTION LOGS: 1. THE OWNER SHALL KEEP A MAINTENANCE RECORD FOR THIS BMP. THE RECORD SFW1 BE KEPT IN A LOG IN A KNOWN SET LOCATION AND MADE AVAILABLE FOR INSPECTION AT THE REQUEST OF THE CITY OF CHARLOTTE OR NC DENR. 2. THE LOG SHALL RECORD THE DATES OF ALL INSPECTIONS AND ANY PERFORMED MAINTENANCE. GENERAL POND CONSTRUCTION NOTE 1. GCL LINER SHALL NOT BE LEFT IN A PARTIALLY CONSTRUCTED CONDITION. POND MUST BE COMPLETED FROM START TO FINISH WITHOUT INTERRUPTION. INSTALLATION OF MATTING SHALL BE PERFORMED WHEN CONDITIONS ALLOW FOR THE CONTINUOUS INSTALLATION OF SUBGRADE MATERIAL, GCL MATTING AND COVER MATERIAL. 2. IN THE EVENT THAT CONDITIONS CANNOT IMMEDIATELY BE MET TO PERMIT INSTALLATION, CONTRACTOR SHALL GRADE TO THE FULLEST EXTENT POSSIBLE BASED ON CONDITIONS AND STABILIZE PER EROSION SEEDING PLANS. 3. CONTRACTOR MAY RESUME POND CONSTRUCTION AND GCL LINER INSTALLATION UPON IMPROVEMENT OF CONDITIONS. ANY ACCUMULATED SILT SHALL BE REMOVED PRIOR TO SUBGRADE PREPARATION. 4. GC SHALL SECURE A BOND IN THE AMOUNT REQUIRED TO COVER FINAL POND CONSTRUCTION COSTS. PAYABLE TO THE CITY OF CONCORD. 5. FINAL POND CERTIFICATION WILL NOT BE PROVIDED UNTIL AFTER INSTALLATION OF GCL LINER, AND SUBGRADE/ COVER MATERIALS AND FINAL GRADING. 2 3 GCL MATTING.9ENIOIMT- OR APPROVED EOUA, PLACED WITH POLYPROPYLENE MEMBRANE A(a NBT aUsid- MIN PREPARED SUBGRADE MATERk1L 1 REOD, REF. NOTES BELOW OERLYNG SOILS OR UNFINISHED ROCK 71 TYPICAL BENTOMAT INSTALLATION TECHNIQUE NOTE: Liner. subgrede and cover malenal shell be prepared aTd installed under dry conditions. Contractor may install liner after Seasonal High Water Table (SHOUT) has receded to levels permitting Work. If SHOUT does not sufficiently re ede under natural conditions, then Contractor shall be responsible for any and all dewatering required to perform Work. SUBGRADE PREPARATION: Subgmde sudecas consisting of granuler soils, gravels Or rWgh stone ere not acceptable due to their large void fraction and puncture potential. If the underlying surface consists of large mcks or other material that cannot be mmo,ed, a 6" min. layer of Send or dean soil shall be prepared as a subgrade material. Prepared subgrade materials shall have a panicle -size distribution of at least 80% finer than the n60 sieve (0.25 mm) and shall he prepared as lollows- 1. The subgrade sMiace must be smooth and free of vegetation. sharp ged mckS. stones, sucks and other foreign Thaler that could mMact the GCL. 2. The subgrede should be rolled With a smooth-tlrum compactor W remove any wheel ruts greater than 1" In depth, footprints, or other abrupt changes. 3. All prebuscm ea1enong races than 0.5' shag be ra rieI crushed or pushedinto the surface With a.-th-drum compactor. 4. The GCL may be installed On a frozen subgrade, but the subgrade soil must meet the above requirements in the thawed stale. CO VER PLACEMENT: GC shall cover the entire GCL mat with a minimum of 12" of cover matenal W provide confining agrees to the GCL, eliminate the potential for seam separation and to prevent damage my equipment. erosion. Inc. Co mr material shall conform tc bre following stargartls: 1. Cover soils should be free of angular stories or other foreign matter that could damage the GCL GC shall consult manufacturer II cover soils have high concentrations of calcium (limestone, dolomite, gypsum, seashell fragments.) 2. Cover soilsshall have a particle size distributionrangi g between fines all 1" unless a cushioning geotexble is specified. 3. Cover was shall be pieced over the GCL using co aitr tion equipment that mirsmizes stresses on the GCL A minimum thickness of 12" of cover soil should be maintained between the equipment and the GCL at all times during the covenng process. 4. Sol rover should be placed in a manner that prevents the soil hem enlemg the GCL overlap zones. Soil rover should be pushed up on slopes, not down slopes to mimmae tensile forces on the GCL. 5. Cyclical welting and drying of the GCL can cause overlap separation. Sol cerver shall be placed promptly when- possible. 6. To avoid seam separation, the GCL should not be put in e,-Ve tension by the weight o ,amen( of textured geomembrane on steep slopes. Longitudinal seam overlaps shall be a minimum of 12" to reduce overlap separation. Additionally, Supplimental bentoniLa shall be applied to he seams per manufacturers recomendabons. GEOSYNTHETIC CLAY LINER (GCI) DETAIL NO SCALE 4 eco -energy i ECO ENERGY CHARLOTTE. NC SQUARE ACCESS HATCH AND LOCK CENTERED ON TOP 1 4'X4' PRECAST RISER UNIT B" SLUICE GV WITH t` f - I !h LIFT ROD FOR DRAM ♦' WSIOE ��.. C PLAN VIEW TOP OF RISER RW ]244.20.20 OPEN TOP W/ VARWNT SCREE]! FOR ANT -SIPHON CONIROL� 3.4" ORIRCE INV. F1EV: MAO' R" SCH. RD PVC WATER QUALITY CONTROL DEVICE AAAA NV - 722-00, 6" PVC CAP W/ 25" DIA. ORIFICE PLACED AT BOTTOM OF WATER DUALITY CONTROL DEVICE. 12' BELOW NORMAL POOL FOR TRASH PROTECTION 4 GCL TO BE SEALED TO CONCRETE RISER W/ GRMULAR BENTONITE ON ALL SIDES. FRONTIt► ISER S-RUCTUTE DETAIL, 18" RCP BEYOND N REM OF RISER BOX INV ELEV. 716.33 B Vk`r P IZ � > e� a H Y Z W W K U W 0 D¢ v a W !11!!7 FH1MBlR CD6.0 Table of Contents Narrative............................................................................................ 1 SoilsInformation.................................................................................. 2 Impervious Area Map - Existing Conditions .................................................. 6 ImperviousArea Map - Post Development................................................... 7 ProjectArea Rainfall Data....................................................................... 8 HydraflowRainfall Report.............................................................................................................................. 8 Calculationsfor Wet Pond....................................................................... 9 Permanent Storage Sizing Calculations........................................................................................................ 9 DesignProcedure Form 4.2.7......................................................................................................................10 DetentionWorksheet...................................................................................................................................12 Water Balance Result Summary (Clay Liner)..............................................................................................15 Pond Report - Permanent Storage Volume Calculations.............................................................................16 HydrographReturn Period Recap.............................................................18 Existing Conditions - Time of Concentration Calculations...............................19 Hydrograph Report, Site Pre -Construction Conditions...................................20 2 Year, 6 Hour Storm................................................................................................................................... 20 10 Year, 6 Hour Storm................................................................................................................................. 21 25 Year, 6 Hour Storm................................................................................................................................. 22 50 Year, 6 Hour Storm................................................................................................................................. 23 100 Year, 6 Hour Storm............................................................................................................................... 24 Hydrograph Report, Site Post -Construction Conditions..................................25 2 Year, 6 Hour Storm................................................................................................................................... 25 10 Year, 6 Hour Storm................................................................................................................................. 26 25 Year, 6 Hour Storm................................................................................................................................. 27 50 Year, 6 Hour Storm................................................................................................................................. 28 100 Year, 6 Hour Storm............................................................................................................................... 29 Pond Report, Temporary Pool Storm Storage..............................................30 Hydrograph Report, Wet Pond Stormwater Routing......................................32 2 Year, 6 Hour Storm - Drainage to Pond Hydrograph ..................... 2 Year, 6 Hour Storm......................................................................... 10 Year, 6 Hour Storm - Drainage to Pond Hydrograph ................... 10 Year, 6 Hour Storm....................................................................... 25 Year, 6 Hour Storm - Drainage to Pond Hydrograph ................... 25 Year, 6 Hour Storm....................................................................... 50 Year, 6 Hour Storm - Drainage to Pond Hydrograph ................... 1 .......................................................... 32 .......................................................... 33 .......................................................... 34 .......................................................... 35 .......................................................... 36 .......................................................... 37 .......................................................... 38 Table of Contents 50 Year, 6 Hour Storm................................................................................................................................. 39 100 Year, 6 Hour Storm - Drainage to Pond Hydrograph........................................................................... 40 100 Year, 6 Hour Storm............................................................................................................................... 41 Post -Construction `Undetained' Time of Concentration Calculations.................42 Hydrograph Report, Post -Construction `Undetained'....................................43 2 Year, 6 Hour Storm................................................................................................................................... 43 10 Year, 6 Hour Storm................................................................................................................................. 44 25 Year, 6 Hour Storm................................................................................................................................. 45 50 Year, 6 Hour Storm................................................................................................................................. 46 100 Year, 6 Hour Storm............................................................................................................................... 47 Hydrograph Report, Wet Pond Stage -Time Graph.........................................48 2 Year, 6 Hour Storm................................................................................................................................... 48 10 Year, 6 Hour Storm................................................................................................................................. 49 25 Year, 6 Hour Storm................................................................................................................................. 50 50 Year, 6 Hour Storm................................................................................................................................. 51 Water Quality Volume Drawdown Graph....................................................52 ChannelProtection Volume Drawdown......................................................54 RiserBuoyancy Calculations...................................................................56 Storm Pipe Profiles w/ Hydraulic Grade (25 -YR Storm) ............................57-101 BoxCulvert Calculations...................................................................... 102 ii Project Stormwater Narrative The Intermodal Ethanol Transfer Facility — Charlotte project involves site improvements to develop a rail yard and supporting infrastructure. The project site is located at the CSX Way cul-de-sac in Charlotte, NC. Project property includes 53.80 acres zoned for industrial use. The site consists of mostly gentle to steep slopes with some generally flat areas that primarily drain South. There are minimal impervious areas on site. For calculation purposes, existing impervious was considered 0 acres. The project will disturb 18.50 acres during construction and will include removal of vegetation, installation of erosion control measures, grading, construction of a rail yard, utility building, and supporting infrastructure. Impervious area added during construction will result in a net increase of 5.78 acres over preconstruction conditions. Construction is expected to begin in November/ December 2016. The anticipated duration of construction is approximately 1 year. For the purposes of this project, a structural stormwater BMP has been designed to be installed to treat runoff from new built upon areas. The BMP for this site will receive flows from a drainage area of 7.65 acres of runoff. The remaining drainage area will remain pervious and has a hydrograph entitled'Undetained'. Hydrograph 5,'Total Post Out' is a combined hydrograph that combines the wet pond hydrograph with the undetained Hydrograph. The structural BMP chosen for this site is a wet detention basin designed for 85% TSS and 70% total phosphorus removal based on City of Charlotte storm water requirements. Waters discharge south to an existing stream. All new impervious areas on site will be treated by the basin. The table below displays pre and post construction peak discharges. Peak Discharge Table Pre -Construction Post -Construction 2 -YR 0.550 0.545 10 -YR 3.985 3.293 25 -YR 6.932 6.100 50 -YR 9.835 10.53 z A CD 8V O 80° 55'16'W r 33029W N R Z 3903000 3903100 3903200 3903500 3903000 3903100 39032W 3903300 3903400 3903500 Z 3903600 80° 56 0' W 8 Z 3902900 �,n > 80° 56 O" W 0 DZi Z 8 q � q N d 0 0 � O q Ome a ca 0 tt yMG D SSS222rrr555��� QQ 9 u N 25 O 7 Z D) $ 0[rA/jo1 O cn O 0 y{ 07 < N b CD C G7 N O G7 C CDD y( 2h 'G A CD 8V O 80° 55'16'W r 33029W N R Z 3903000 3903100 3903200 3903500 3903000 3903100 39032W 3903300 3903400 3903500 Z 3903600 80° 56 0' W 8 Hydrologic Soil Group—Mecklenburg County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest (AOI) 0 C The soil surveys that comprise your AOI were mapped at 1:24,000. Area of Interest (AOI) 0 C/D Warning: Soil Map may not be valid at this scale. Soils D Soil Rating Polygons Enlargement of maps beyond the scale of mapping can cause 0 A p Not rated or not available misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting 0 A/D Water Features soils that could have been shown at a more detailed scale. Streams and Canals – B Transportation Please rel on the bar scale on each ma sheet for ma Y P P Q B/D 1 r r Rails measurements. C .,.. Interstate Highways Source of Map: Natural Resources Conservation Service (] C/D Web Soil Survey URL: http://websoilsurvey.nres.usda.gov US Routes Coordinate System: Web Mercator (EPSG:3857) (] D Major Roads Maps from the Web Soil Survey are based on the Web Mercator 0 Not rated or not available Local Roads projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Soil Rating Lines Background Albers equal-area conic projection, should be used if more accurate op A Aerial Photography calculations of distance or area are required. A/D This product is generated from the USDA-NRCS certified data as of ,y B the version date(s) listed below. B/D Soil Survey Area: Mecklenburg County, North Carolina Survey Area Data: Version 14, Sep 10, 2014 Soil map units are labeled (as space allows) for map scales 1:50,000 p"r C/D or larger. D Date(s) aerial images were photographed: Feb 11, 2011—Feb .. Not rated or not available 13, 2011 Soil Rating Points The orthophoto or other base map on which the soil lines were ® A compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting ■ A/D of map unit boundaries may be evident. ■ B ■ B/D Cl) Usim Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 8/5/2016 Page 2 of 4 Hydrologic Soil Group—Mecklenburg County, North Carolina Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Mecklenburg County, North Carolina (NCI 19) Map unit symbol Map unit name Rating Acres In AOI Percent of AOI ApD Appling sandy loam, 8 to B 8.5 12.8% 15 percent slopes CeB2 Cecil sandy day loam, 2 B 6.9 10.4% to 8 percent slopes, moderately eroded CeD2 Cecil sandy day loam, 8 B 20.1 30.2% to 15 percent slopes, moderately eroded EnB Enon sandy loam, 2 to 8 C 17.4 26.2% percent slopes HeB Helena sandy loam, 2 to D 10.6 15.9% 8 percent slopes MO Monacan loam, 0 to 2 B/D 3.0 4.5% percent slopes, frequently flooded Totals for Area of Interest 66.5 100.0% USDA Natural Resources Web Soil Survey 8/5/2016 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Mecklenburg County, North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or Gay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method. Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher usDA Natural Resources Web Soil Survey 8/5/2016 211111111111 Conservation Service National Cooperative Soil Survey Page 4 of 4 v 0 :E CD W W cn Co N IMPERVIOUS AREA o_ cn � rn FRED ALEXANDER BLVD. (REMOVED FROM EXISTING IMPERVIOUS AREA CALCULATION) N 7 Q1 , v • � r 0 S � , �Q �, / SHALLOW CONCENTRATED m FLOW, 700 FT 7 —� -- CHANNEL FLOW, Z 680 FT. r SHEET FLOW o j' % 300 FT �o D ------------ `\ 0 o m m m CD z n ] 0 d w m y C N o cr c co / L m A PROJECT o m° BOUNDARY 11 0. �; B ¢ z 3 SAMPLING POINT 'A' n 14.40 ACRES, Tc=29.90 MINS c m m PRE CONSTRUCTION TOTAL ON SITE EX. IMPERVIOUS AREA 0.00 AC TOTAL AREA 53.80 AC TOTAL AREA, LESS FRED ALEXANDER BLVD AREA 51.03 AC BUA % 0.00% n s O O w EX. IMPERVIOUS AREA 0.00 AC IMPERVIOUS AREA ADDED 5.78 AC IMPERVIOUS AREA TOTAL E; 9 `° 0 fD TOTAL AREA, LESS FRED ALEXANDER BLVD AREA 51.03 AC BUA % 11.33% CD co z w CD a U) c- � � oN NATURAL AREA cn w m IMPERVIOUS AREA `J UNDETAINED 7 N FRED ALEXANDER BLVD. (REMOVED FROM 3 EXISTING IMPERVIOUS AREA CALCULATION) Z � 5 Z T N w. �N 1 m --T_ SHALLOW CONCENTRATED FLOW, 595 FT CHANNEL FLOW, g 812 FT. SHEET FLOW Z ° o �� 300 FT D _ 0 O m n N m0 m m .. /� , m C7 z Cl. h Yl o DRAINAGE TO POND, 7.65 ACRES, Tc=8.5 MINS PROJECT ' 0 BOUNDARY WET POND o `-' m 3 SAMPLING POINT 'A' Z 2 UNDETAINED 0 9.15 ACRES, Tc=29.80 MINS NATURAL AREA cn 1.92 ACRES N m POST CONSTRUCTION TOTAL ON SITE EX. IMPERVIOUS AREA 0.00 AC IMPERVIOUS AREA ADDED 5.78 AC IMPERVIOUS AREA TOTAL 5.78 AC TOTAL AREA 53.80 AC TOTAL AREA, LESS FRED ALEXANDER BLVD AREA 51.03 AC BUA % 11.33% NATURAL AREA CALCULATION TOTAL ON SITE IMPERVIOUS AREA 5.78 AC NATURAL AREA 5.78 x 0.25 = 1-0.25 1.92 AC O N CO Q M X d cr cc C CC LL E LL N j 7 � N C LL d C LL c E 1� c h E c w Fes- c M M ? O I i N E 111a O O O O CO O i CO O � O x O O r O N N M M M LL O O Cl) O � � N COO cn O 0 M O r O N N M M r C O O O O CA CO O a CO N m V O N O N N Cl) M -It u O co O O w m n r* -:7 Un C a O N O N M M I O V O O o q CP CR ao 00 M 0 o O o 0 0 0 ci C A CD O CO O M n M CO co 7 Q M O N O M M It v M w o m c r o M o ci ci 6 6 ci CO O O COO '7 COO q OR d 7 N O O O O O O O O d O O O O Co M n CD N O r O CO N N CO LL Dq O r O r r O r r � r O M O V N CD w r` O O CO O MV O N COO, CO r O 4 O O CO CO � CO w E O o OO CO 0 LO NNOMC 0 co 7 O O O O rc r` O of of 7 y 0� r N M Cn N O O �a N M 9 C M CD f` r` 0 O N O O O CO CO r C m O O C^O N O C N O N O f\ O CA CO O 01 f` c0 O O r E y _ O O Or O O o O L r N M Cn O N U O O r r al as O N CO Q M X d cr cc C CC LL E LL N j 7 � N C LL d C LL c E 1� c h E c w Fes- c M M CO O M O N N N O O O O CO O N CO O � O O O r O N N M M M O O Cl) O � � N COO cn O M O r O N N M M r O O O O CA CO O a CO N V O N O N N Cl) M -It O N O � r r* -:7 Un C a O N O N M M I O = O O O O O M O N O M M 7 yC N 7 CD O CO O M n M CO co i M O N O M M It v M C o m c r o M o ci ci 6 6 ci CO O O COO '7 COO q OR w N O N O M v v M 0 CL` O M O O OOO M O N O Cl) O IV CO CO CO O COO O CMO. N O COO M � r O M O V N CD w r` a` O CO O MV O N COO, CO r O 4 O O CO CO � CO w E O o OO CO 0 LO NNOMC 0 co C O O O rc r` O of of 7 y 0� r N M Cn N O O �a O N CO Q M X d cr cc C CC LL E LL N j 7 � N C LL d C LL c E 1� c h E c w Fes- c T O M O O O O O O O O r O CA O O O O O O T O 0) O O O O O O O of O O O 666 O C O m O O O O O O = N 64666666 _d Q T O � O O O O O O C o O r o M o ci ci 6 6 ci w CL` O O O O O A O O O O O O O O O O O � Cf! a` O O w o O o O O o C O O O O O O O O co CD O N O O O O O O N O N O O O O O O co O O O O O O O N O O O O O O r r C L E N CO r N C'7 0 tt� vi cn fn S 2 2 Z 2 0 NC Calculations for Wet Detention Basin Eco Energy Distribution Charlotte, NC FOR SIZING STORAGE OF POND Total Area Draining to Pond 7.65 AC 333,234.00 SF Percentage Impervious 72.29% Total Proposed Impervious Surface Area Draining to Pond 5.53 AC 240,886.80 SF Provided Permanent Pool Area 9244 SF Provided Permanent Pool Volume - 1' Sediment Storage 20686 CF Required Storage For 1"/24 HR of Runoff for Pond Rv =0.05+0.009(1) Rvpost 0.70 in./in V=3630 xRv xRd x A WQv= 3630* 0.70 *1 7.65 WQ v= 1 19,454.99 (ft) j required 0.45 ac -ft WQv= This is achieved above the permanent pool at elev= 723.02 at 19,467 CF WQv= (1.0)Rv 0.70 inches Modified CN 96.94 S = 1000/CN-10 S 1.49 inches Qd=(P-0.2S)^2/(P+0.8S) Qd 1.38 CPV 0.88 ac -ft Release Rate Water Quality Control Volume 0.05 cfs Release Rate Channel Protection Volume Control 0.30 cfs Approx. Storage Volume 1.33 ac -ft 4.2.7 Design Procedure Form Design Procedure Form: Wet pond WET POND FEASIBILITY 1. Is the use of a wet pond appropriate? 2. Confirm other design criteria and applicability. PRELIMINARY HYDROLOGIC CALCULATIONS 3. Compute, WQ„ water quality volume requirements Compute Runoff Coefficient, R. Compute WQv Volume requirements 4. Compute WQP peak flow Compute modified SCS curve number 5. Compute CPv Compute S (maximum retention) Compute 1 -yr, 24 -hr total rainfall depth Compute Qd (runoff volume) Compute CP„(chnnnel protection volume) Estimate tc (time of concentration) Estimate qu Compute approximate storage volume 6. Compute release rates Compute WQ„ release rate Compute CPv release rate 7. Compute site hydrologic input parameters Development Conditions Area CN (SCS curve number) Adjusted CN (curve number adjusted for 1 -inch storm) Time of concentration STORM WATER DETENTION BASIN DESIGN 8. Pretreatment volume VDlpre = Acres of Impervious Area (0.2")(V/12") 9. Compute Permanent Pool Volume and Water Quality Extended Volume Compute WQP/PP„ Compute PP„ Size extended detention — pool volume is greater of WQ„ or CP„ 10. Conduction grading and determine storage available for permanent pool (and WQv_ED volume if applicable) NOTES: Geosynthetic Clay Liner used. Water Balance calculations provided. Rv = 0.70 WQv = 0.45 acre -ft WQP = 13.41 cfs CN = 97 S = 1.36 Rainfall Depth = 2.58 inches Qd = 1.45 inches CP„ =.92 acre -ft tc = 0.142 hours qu = cfs/mit/inch Storage volume = 1.37 acre -ft Release Rate = 0.05 cfs Release Rate = 0.31 cfs Pre -developed Post -developed Undetained 14.4 acres 7.65 acres 9.14 acres 60 88 NA 97 .498 hours .142 hours .497 hours WQpre = 0.092 acre -ft WQ„/PP„ = 0.3 PP, = 1.489 acre -ft ED Pool Volume = 0.92 acre -ft Prepare an elevation -storage table and curve using the average area method for computing volumes. 10 Elevation Area Average Depth Incremental Cumulative Volume Area Volume Volume above Permanent Pool MSL acres acres ftacre-ft acre-ftacre-ft Reference Permanent Pool and Temporary Storage Pond Report 12. WQ„Orifice Computations Average ED release rate Release Rate = 0.05 cfs Average head, h = (ED elev. — Permanent pool elev.) / 2 h = 0.51 ft Area of orifice from orifice equation: Q = CA(2gh)0 5 A= 0.0145 ft2 Diameter = 1.63 in 13. Compute release rate for CPv control and Establish CPv elevation WSEL =723.99 ft Release rate Release Rate = 0.31 cfs Average head h = CPv elev. — Permanent pool elev.� / 2 h = 0.995 ft Area or orifice from orifice equation: Q = CA(2gh) 0 A =b.0645 ft2 Diameter = 3.44 in 14. Calculate Op release rate and water surface elevation Set up a stage -storage -discharge relationships. Peak stage for (WQv), the 1 -inch, 6 -hour storm Peak stage for (CPv), the 1 -yr, 24-hour storm Peak Q10 — Undeveloped Peak Q10 — Developed Peak Q25 — Undeveloped Peak Q25 — Developed Size emergency spillway, calculate 50 -year WSEL and set top of embankment elevation 15. Investigate potential wet detention basin hazard classification 16. Assess maintenance access and safety features. 17. Attach landscaping plan Peak Stage= 722.99 ft Peak State = 723.46 ft Q10-undev = 4.130 cfs Q10-dev = 3.886 cfs Q25-undev = 7.252 cfs Q251ev = 7.203 cfs WSEL50 = 724.23ft Embankment Elevation = 726.0 ft Notes: Dam Embankment Height and Storage Volume result in low hazard classification. IN Project Name: City of Charlotte Land Development Division Detention Worksheet EEDS Intermodal Ethanol Transfer Facility Date: 9/14/16 Project Description: Attach brief explanation of detention plans and any assumptions if necessary. The Intermodal Ethanol Transfer Facility project involves the construction of a rail yard. Impervious areas will be directed to a wet pond located downstream. Flows will be released into an existing stream. PRE -DEVELOPED SUMMARY Basin area: 14.40 ac. (Delineated on attached drainage area map) Time of Concentration, Tcpre: 29.90 min. (Based on the SCS Method) (Tc path shown on attached map) Reference 3.9.6 of the Charlotte -Mecklenburg Storm Water Design Manual — SCS Travel Time. Curve Number, Cnpre: 60 POST -DEVELOPED SUMMARY Basin area: 16.80 ac. (Delineated on attached drainage area map) Time of Concentration, Tcpost: 29.80 min. (Based on the SCS Method) (Tc path shown on attached map) Reference 3.9.6 of the Charlotte -Mecklenburg Storm Water Design Manual — SCS Travel Time. Curve Number, Cnpost: 87 DETENTION SUMMARY Computer Method Used*: Hydraflow Hydragraphs Extension for AutoCAD Civil 3D 2016 *Land Development Plan Review Staff will verify all detention submittals using HEC -I for compliance with the City of Charlotte Zoning Ordinance, Section 12.6. This summary is to accompany all detention analysis and is not intended to replace that requirement. Pg 1 of 3 Revised 3/2005 12 Pre (cfs) Post (cfs) Routed (cfs) Elevation 2 yr. 0.550 0.545 0.208 723.42 10 yr. 3.985 3.293 2.003 724.29 50 yr. N/A 10.53 5.460 724.40 Pg 1 of 3 Revised 3/2005 12 PRE -DEVELOPED SUB -BASIN CALCULATIONS: Sub -basin Name/Level: W/ 705.00 (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Sloe (%) Mannings (n) Time (min.) Sheet Unpaved 300 4.67% 0.24 24.79 Sheet Paved 60 2.12 Undeveloped CeB2, MO, HeB, CeD2 Shallow Conc. (Unpaved) 700 4.57% 9.15 3.38 Shallow Conc. Paved B/D 60 32.68 Channel 680 1.54% 0.050 1.75 Pipe CNPre= 60 TOTAL N/A N/A N/A Tc pre = 29.90 Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Acreage(rohl Area) z (CN) 14.40 Undeveloped CeB2, MO, HeB, CeD2 B/D 60 60 2.12 Undeveloped CeB2, MO, HeB, CeD2 Shallow Conc. (Unpaved) 595 4.57% 9.15 2.88 Shallow Conc. Paved B/D 60 32.68 Channel 812 1.54% 0.050 2.09 Pipe CNPre= 60 POST -DEVELOPED SUB -BASIN CALCULATIONS: Sub -basin Name/Level: 'A'/ 705.00 (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Slope (%) Mannings (n) Time (min.) Sheet Unpaved 300 4.67% 0.24 24.79 Sheet Paved 32.26 2.12 Undeveloped CeB2, MO, HeB, CeD2 Shallow Conc. (Unpaved) 595 4.57% 9.15 2.88 Shallow Conc. Paved B/D 60 32.68 Channel 812 1.54% 0.050 2.09 Pipe CNp.st= 72.51* TOTAL N/A N/A N/A Tc p�1= 29.80 Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Acreage Fotal Area) z (CN) 5.53 Industrial CeB2, MO, HeB, CeD2 B/D 98 32.26 2.12 Undeveloped CeB2, MO, HeB, CeD2 B/D 60 7.57 9.15 Undetained CeB2, MO, HeB, CeD2 B/D 60 32.68 CNp.st= 72.51* Pg2of3 *combines Detained and Undetained CNs for Total Area Revised 3/2005 13 STORAGE / DISCHARGE CALCULATIONS *(If applicable) Complete Underground Storage Volume Table Elevation Underground * Above Ground Total Acc. Volume (cf) (Above and Underground) Acc. Volume for all Structures (cf) Area (sq. ft.) Inc. Volume (cf) Acc. Volume (cf) 716.50 1.63 In. 9534 0 0 Control Pipe 71900 (cfs) 11 800 11,333 61630 Inv. 720.00 18 Dia. 12,750 12,271 38,900 0.0145 Area 121M Cw= outlet pipe/struct) 4 52,134 Stage Discharge Co= orifice coefficient: Cw = weir coefficient. Orifice Area unit shall be square feet (sf). Elevation / Orifice 1 Orifice 2 Weir 1 Weir 2/Em. Outlet Emergency Total Q Stage 1.63 In. 3.40 In, Ft. Spillway Control Pipe Spillway (cfs) (ft) 722.00 Inv. —=FInv. Inv. (Controlled by 18 Dia. (Free flow out of 0.0145 Area r Area Cw= outlet pipe/struct) 64.00Length pond) Co=0.6 Co=0.6 Inv 16.33Inv. 15 724 20 Co= 0.6 724.35 Inv. Cw=3.33 Cw=2.6 722.00 0 0 0 0 0 0 0 723.00 0.07 0 0 0 0 0 0.07 724.00 0.10 0.26 - 0 0 0 0.36 725.00* 0.02 0.07 - 14.97 8.68 0 23.73 *exceeds 50 -yr storm event Underground Storage Volume Table (Ifapplicable) Provide additional storage volume tables if more structures are used. Elevation Acc. Volume (cf) Underground Structure # Length (ft.) Size/dia (ft.) Upper inv. Lower inv. Slope (%) Acc. Volume (cf) Underground Structure # Length (ft.) Size/dia (ft.) Upper inv. Lower inv. Slope (%) Acc. Volume (cf) Underground Structure # Length (ft.) Size/dia (ft.) Upper inv. Lower inv. Slope (%) Acc. Volume (cf) Underground Structure # Length (ft.) Size/dia (ft.) Upper inv. Lower inv. Slope (%) EN A4EENNG • PROPERTY MANAGEMENT Land Development Division 600 East Fourth Street, Charlotte, North Carolina 28202-2844 Telephone: 704/336-6692 Fax: 704/336-6586 landpermits.charmeck.org Pg 3 of 3 Revised 3/2005 14 Water Balance Result Summary (Clay Liner) 1 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2 Days/ Month 31 28 31 30 31 30 31 31 30 31 30 31 3 Precipitation (inches) 3.72 3.84 4.44 2.64 3.84 3.36 3.96 3.72 3.48 3.36 3.24 3.48 4 Evaporation (inches) 1.20 1.50 2.50 3.70 4.40 4.60 4.80 4.50 3.30 2.40 1.50 1.10 5 Runoff (acre-feet) 1.42 1.47 1.69 1.01 1.47 1.28 1.51 1.42 1.33 1.28 1.24 1.33 6 Pond Precipitation (acre-feet) 0.12 0.12 0.14 0.08 0.12 0.11 0.13 0.12 0.11 0.11 0.10 0.11 7 Evaporation (acre-feet) 0.04 0.05 0.08 0.12 0.14 0.15 0.15 0.14 0.11 0.08 0.05 0.04 8 Infiltration (acre-feet) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9 Monthly Balance (acre-feet) 1.50 1.54 1.76 0.97 1.45 1.24 1.48 1.39 1.33 1.31 1.29 1.40 10 Running Balance of Retained Pond Volume (acre-feet) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11 Pond Water Surface Elevation (feet) 725.00 725.00 725.00 725.00 725.00 725.00 725.00 725.00 725.00 725.00 725.00 725.00 12 Water Surface with Respect to permanent pool elevation (feet) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Rv 0.70 Drainage Area 7.65 ac Pond Area 16804 sf GCL Hydraulic Conductivity 5E-10 cm/sec 1.42E-06 ft/day Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2016 by Autodesk, Inc. v11 Pond No. 2 - Permanent Pool Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 716.50 It Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 716.50 9,534 0 0 0.50 717.00 9,974 4,876 4,876 1.50 718.00 10,875 10,420 15,296 2.50 719.00 11,800 11,333 26,630 3.50 720.00 12,750 12,271 38,900 4.50 721.00 13,726 13,234 52,134 5.00 721.50 14,223 6,986 59,120 5.50 722.00 16,804 7,747 66,867 Friday, 09 / 9 / 2016 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrFRSr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest EI. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 0.00 0.00 0.00 0.00 Invert EI. (ft) = 0.00 0.00 0.00 0.00 Weir Type = -- -- -- -- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a N -Value = .000 .000 .000 n/a Orifice Coeff. = 0.00 0.00 0.00 0.00 Exfl.(In/hr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Civ A Civ B Civ C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cult ft cis cis cis cis cfs cis cis cfs cis cfs cfs 0.00 0 716.50 --- - --- --- -- -- --- --- - - 0.000 0.05 488 716.55 - - -- -- - -- - --- - - 0.000 0.10 975 716.60 - --- -- -- -- --- --- --- -- - 0.000 0.15 1,463 716.65 -- -- -- - -- -- - -- - - 0.000 0.20 1,950 716.70 - -- -_ - - - __ __ - __ 0.000 0.25 2,438 716.75 - -- -- - - --- --- --- - -- 0.000 0.30 2,926 716.80 - - - -- - - - --- - - 0.000 0.35 3,413 716.85 - -- - - -- - -- --- - - 0.000 0.40 3,901 716.90 - - --- -- -- --- -- -- - - 0.000 0.45 4,388 716.95 - - -- -- - - - - - -- 0.000 0.50 4,876 717.00 - - -- - -- --- --- - -- -- 0.000 0.60 5,918 717.10 -- -- -- -- - -- - - - - 0.000 0.70 6,960 717.20 - - - -- -- - -- - - 0.000 0.80 8,002 717.30 -- -- -_ __ __ __ _ _ - __ 0.000 0.90 9,044 717.40 - - - -- - - - - - -- 0.000 1.00 10,086 717.50 - - -- - - -- - - - - 0.000 1.10 11,128 717.60 - --- --- - --- - --- -- - - 0.000 1.20 12,170 717.70 -- -- -- - -- -- - - - - 0.000 1.30 13,212 717.80 - - -- --- - -- --- -- - 0.000 1.40 14,254 717.90 -- --- --- -- -- - -- -- -- - 0.000 1.50 15,296 718.00 - --- - - - -- - - - - 0.000 1.60 16,430 718.10 -- --- --- -- --- --- --- --- -- - 0.000 1.70 17,563 718.20 -- -- -- -- - - -- -- - - 0.000 1.80 18,696 718.30 - -- --- -- -- - - -- - - 0.000 1.90 19,830 718.40 -- --- --- -- --- - --- --- - - 0.000 2.00 20,963 718.50 - -- -_ - - __ __ _ - - 0.000 2.10 22,096 718.60 - --- --- -- --- --- --- --- - - 0.000 2.20 23,230 718.70 - - -- - -- - -- --- - - 0.000 2.30 24,363 718.80 - - -- -- -- --- - --- - - 0.000 2.40 25,496 718.90 -- --- --- -- --- --- --- -- - - 0.000 2.50 26,630 719.00 -- - -- - -- - -- - - 0.000 2.60 27,857 719.10 -- - - -- - -- - -- - - 0.000 2.70 29,084 719.20 --- --- --- -- --- --- --- - -- -- 0.000 2.80 30,311 719.30 -- --- --- -- --- --- - - - - 0.000 2.90 31,538 719.40 -- --- - -- - --- --- --- - - 0.000 Continues on next page... 16 Permanent Pool Stage / Storage / Discharge Table Stage Storage Elevation Civ A ft cuft ft cis 3.00 32,765 719.50 -- 3.10 33,992 719.60 -- 3.20 35,219 719.70 - 3.30 36,446 719.80 -- 3.40 37,673 719.90 - 3.50 38,900 720.00 - 3.60 40,224 720.10 -- 3.70 41,547 720.20 - 3.80 42,870 720.30 -- 3.90 44,194 720.40 - 4.00 45,517 720.50 - 4.10 46,840 720.60 -- 4.20 48,164 720.70 - 4.30 49,487 720.80 - 4.40 50,811 720.90 -- 4.50 52,134 721.00 - 4.55 52,833 721.05 - 4.60 53,531 721.10 - 4.65 54,230 721.15 - 4.70 54,928 721.20 - 4.75 55,627 721.25 - 4.80 56,326 721.30 - 4.85 57,024 721.35 - 4.90 57,723 721.40 - 4.95 58,421 721.45 - 5.00 59,120 721.50 - 5.05 59,895 721.55 - 5.10 60,670 721.60 - 5.15 61,444 721.65 - 5.20 62,219 721.70 - 5.25 62,994 721.75 -- 5.30 63,768 721.80 - 5.35 64,543 721.85 - 5.40 65,318 721.90 - 5.45 66,092 721.95 - 5.50 66,867 722.00 - ...End Civ B Civ C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ds cfs cis cfs cis cis cis cis cis cis 0.000 0.000 0.000 -- - - -- -- - - 0.000 - -- -- - -- - - - 0.000 - - - - - - - - - 0.000 -- - -- -- -- -- -- - 0.000 -- - - - -- - - - 0.000 -- - -- -- - - - - - 0.000 -- -- -- - -- --- --- - - 0.000 - - - - - - - - 0.000 -- -- - - - - - - 0.000 - - -- - -- - - - - 0.000 - - - - - - - - - 0.000 - -- - -- -- -- - - 0.000 - - - -- - - - - - 0.000 -- - - -- - - - - - 0.000 -- - -- -- -- -- - - 0.000 - - - - - - 0.000 - - - -- - - 0.000 - - - - - _ - - -- - 0.000 -- - -- - - - - - - 0.000 -- -- - -- - -- - - - 0.000 - - - - - - - - - 0.000 - - - - 0.000 -- - -- - - - - -- 0.000 - - - - - - - - 0.000 -- - - - - - - - 0.000 -- -- - -- - -- -- - - 0.000 - - - - - - 0.000 -- -- - - - - - - - 0.000 - -- - -- - -- - - -- 0.000 -- - -- - - - 0.000 _- - -- -- - - - -- 0.000 -- - -- - -- -- - - 0.000 - - - - - - -- - - 0.000 17 Hydrograph Return Period Recap, flow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1 -yr 2 -yr 3 -yr 5 -yr 10 -yr 25 -yr 50 -yr 100 -yr 1 SCS Runoff - 0.000 0.550 --- ---- 3.985 6.932 9.835 12.34 Pre Developed 6.851 14.58 18.23 2 SCS Runoff - 0.000 --- 21.34 23.78 Post Developed 3 Reservoir 2 0.000 0.208 -- ------ 2.003 3.664 5.460 8.272 Wet Pond 4 SCS Runoff 0.000 0.349 - -- 2.532 4.405 6.249 7.844 Undetained 5 Combine 3,4 0.000 0.545 -- ---- 3.293 6.100 10.53 15.92 Total Post Out 0.000 0.000 0.000 6 SCS Runoff -- 9.460 -- - 0.000 0.000 WQ Drawdown 7 Reservoir 6 0.067 0.000 -- ------ 0.000 0.000 0.000 0.000 WQ Drawdown 8 SCS Runoff - 13.41 0.000 -- -- -- 0.000 0.000 0.000 0.000 CP Drawdown 9 Reservoir 8 0.215 0.000 - ------ 0.000 0.000 0.000 0.000 CP Drawdown Proj. file: WQ POND_SJS.gpw Friday, 09 / 9 / 2016 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3138 2016 by Autodesk, Inc. v11 Hyd. No. 1 Pre Developed Description A B C Totals Sheet Flow Manning's n -value = 0.240 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.12 0.00 0.00 Land slope (%) = 4.67 0.00 0.00 Travel Time (min) = 24.79 + 0.00 + 0.00 = 24.79 Shallow Concentrated Flow Flow length (ft) = 700.00 0.00 0.00 Watercourse slope (%) = 4.57 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.45 0.00 0.00 Travel Time (min) = 3.38 + 0.00 + 0.00 = 3.38 Channel Flow X sectional flow area (sqft) = 60.00 0.00 0.00 Wetted perimeter (ft) = 26.00 0.00 0.00 Channel slope (%) = 1.54 0.00 0.00 Manning's n -value = 0.050 0.015 0.015 Velocity (ft/s) =6.48 0.00 0.00 Flow length (ft) Q0})680.0 0.0 0.0 Travel Time (min) = 1.75 + 0.00 + 0.00 = 1.75 Total Travel Time, Tc.............................................................................. 29.90 min 19 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 1 Pre Developed Hydrograph type = SCS Runoff Peak discharge = 0.550 cfs Storm frequency = 2 yrs Time to peak = 4.50 hrs Time interval = 5 min Hyd. volume = 6,344 cuft Drainage area = 14.400 ac Curve number = 60* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.90 min Total precip. = 2.28 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 * Composite (Area/CN) _ [(14.400 x 60)] / 14.400 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 Pre Developed Hyd. No. 1 -- 2 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Hyd No. 1 Time (hrs) 20 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 1 Pre Developed Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 5 min Hyd. volume Drainage area = 14.400 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = TR55 Time of conc. (Tc) Total precip. = 3.72 in Distribution Storm duration = 6.00 hrs Shape factor Composite (Area/CN) = [(14.400 x 60)] / 14.400 Q (Cfs) 4.00 3.00 2.00 1.00 1.0 Hyd No. 1 2.0 Pre Developed Hyd. No. 1 -- 10 Year M 4.0 5.0 Friday, 09 / 9 / 2016 = 3.985 cfs = 2.83 hrs = 33,909 cuft = 60* = Oft = 29.90 min = SCS 6 -Hr = 484 .7 Q (cfs) 4.00 3.00 2.00 1.00 ' 1 0.00 7.0 Time (hrs) 21 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@) Civil 3DO 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 1 Pre Developed Hydrograph type = SCS Runoff Peak discharge = 6.932 cfs Storm frequency = 25 yrs Time to peak = 2.83 hrs Time interval = 5 min Hyd. volume = 51,468 cuft Drainage area = 14.400 ac Curve number = 60" Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.90 min Total precip. = 4.38 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Composite (Area/CN) _ [(14.400 x 60)1/ 14.400 Q (cfs) 7.00 LI -011111 5.00 4.00 3.00 2.00 1.00 0.00 ' 0.0 1.0 Hyd No. 1 Pre Developed Hyd. No. 1 -- 25 Year 2.0 3.0 4.0 5.0 6.0 Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 -1 0.00 7.0 Time (hrs) 22 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 1 Pre Developed Hydrograph type = SCS Runoff Peak discharge = 9.835 cfs Storm frequency = 50 yrs Time to peak = 2.75 hrs Time interval = 5 min Hyd. volume = 67,579 cuft Drainage area = 14.400 ac Curve number = 60* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.90 min Total precip. = 4.92 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Composite (Area/CN) = [(14.400 x 60)] / 14.400 Q (cfs) 10.00 Pre Developed Hyd. No. 1 -- 50 Year 8.00 6.00 1 I 4.00 2.00 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 1 Q (cfs) 10.00 • 11 4.00 2.00 ^--� 0.00 7.0 Time (hrs) 23 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc. v11 Hyd. No. 1 Time to peak Pre Developed Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 5 min Drainage area = 14.400 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 5.34 in Storm duration = 6.00 hrs Composite (Area/CN) _ [(14.400 x 60)] / 14.400 Q (cfs) 14.00 12.00 10.00 M 6.00 4.00 2.00 Friday, 09 / 9 / 2016 Peak discharge = 12.34 cfs Time to peak = 2.75 hrs Hyd. volume = 81,047 cuft Curve number = 60* Hydraulic length = 0 ft Time of conc. (Tc) = 29.90 min Distribution = SCS 6 -Hr Shape factor = 484 Pre Developed Hyd. No. 1 -- 100 Year 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 1 Q (cfs) 14.00 12.00 10.00 IN . W 4.00 2.00 -1 0.00 7.0 Time (hrs) 24 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 5 Time to peak Total Post Out Hyd. volume Hydrograph type = Combine Storm frequency = 2 yrs Time interval = 5 min Inflow hyds. = 3, 4 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 Friday, 09 / 9 / 2016 Peak discharge = 0.545 cfs Time to peak = 6.00 hrs Hyd. volume = 33,029 cuft Contrib. drain. area = 9.150 ac Total Post Out Hyd. No. 5 -- 2 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 20 40 60 80 100 120 140 160 180 Hyd No. 5 Hyd No. 3 Hyd No. 4 Time (hrs) 25 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 5 Time to peak Total Post Out Hyd. volume Hydrograph type = Combine Storm frequency = 10 yrs Time interval = 5 min Inflow hyds. = 3, 4 Total Post Out Friday, 09 / 9 / 2016 Peak discharge = 3.293 cfs Time to peak = 4.75 hrs Hyd. volume = 83,028 cuft Contrib. drain. area = 9.150 ac Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 10 20 30 40 50 60 70 80 90 100 110 120 130 Hyd No. 5 Hyd No. 3 Hyd No. 4 Time (hrs) 26 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 5 Total Post Out Hydrograph type = Combine Storm frequency = 25 yrs Time interval = 5 min Inflow hyds. = 3, 4 Q (cfs) 7.00 . Me 5.00 4.00 1.00 Friday, 09 / 9 / 2016 Peak discharge = 6.100 cfs Time to peak = 3.58 hrs Hyd. volume = 109,967 cuft Contrib. drain. area = 9.150 ac Total Post Out Hyd. No. 5 -- 25 Year Q (cfs) 7.00 MI 5.00 [KiI% 3.00 2.00 1.00 0.00 0.00 0 5 10 15 20 25 30 35 40 45 50 55 60 65 Hyd No. 5 Hyd No. 3 Hyd No. 4 Time (hrs) 27 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 5 Total Post Out Hydrograph type = Combine Storm frequency = 50 yrs Time interval = 5 min Inflow hyds. = 3, 4 Q (cfs) 12.00 10.00 M. ie Am 4.00 2.00 M 5 Hyd No. 5 Friday, 09 / 9 / 2016 Peak discharge = 10.53 cfs Time to peak = 3.00 hrs Hyd. volume = 133,342 cuft Contrib. drain. area = 9.150 ac Total Post Out Hyd. No. 5 -- 50 Year 10 Hyd No. 3 15 20 Hyd No. 4 25 Q (cfs) 12.00 10.00 . IN 4.00 2.00 � 0.00 30 Time (hrs) 28 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 5 Total Post Out Hydrograph type = Combine Storm frequency = 100 yrs Time interval = 5 min Inflow hyds. = 3, 4 Friday, 09 / 9 / 2016 Peak discharge = 15.92 cfs Time to peak = 2.83 hrs Hyd. volume = 152,224 cuft Contrib. drain. area = 9.150 ac Total Post Out Q (cfs) Hyd. No. 5 -- 100 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 5 Hyd No. 3 Hyd No. 4 Time (hrs) 29 Pond Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Pond No.1 - Temporary Storage Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 722.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 722.00 16,804 0 0 0.50 722.50 19,541 9,077 9,077 1.00 723.00 20,393 9,982 19,058 1.02 723.02 20,428 408 19,467 1.99 723.99 22,122 20,629 40,096 2.00 724.00 22,139 221 40,317 3.00 725.00 23,942 23,032 63,350 4.00 726.00 25,802 24,864 88,213 Friday, 09 19 / 2016 Culvert I Orifice Structures Weir Structures [A] [B] [C] [PrFRsrl [A] [B] [C] [D] Rise (in) = 18.00 1.63 3.40 0.00 Crest Len (ft) = 16.00 15.00 Inactive 0.00 Span (in) = 18.00 1.63 3.40 0.00 Crest El. (ft) = 724.20 724.35 724.50 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 2.60 2.60 3.33 Invert EI. (ft) = 716.33 722.00 723.10 0.00 Weir Type = 1 Broad Broad - Length (ft) = 64.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 0.50 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes No TW Elev. (ft) = 0.00 Note: CulverttOrfiice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Civ A Civ B CIV C PrfRsr Wr A Wr B Wr C Wr D Exfl User Total ft cult ft cfs cfs cfs cfs cfs cfs cis cfs cfs cfs cis 0.00 0 722.00 0.00 0.00 0.00 -- 0.00 0.00 0.00 - - - 0.000 0.05 908 722.05 18.44 oc 0.00 is 0.00 -- 0.00 0.00 0.00 -- - -- 0.004 0.10 1,815 722.10 18.44 oc 0.01 is 0.00 - 0.00 0.00 0.00 - - - 0.012 0.15 2,723 722.15 18.44 oc 0.02 is 0.00 - 0.00 0.00 0.00 -- - - 0.020 0.20 3,631 722.20 18.44 oc 0.03 is 0.00 - 0.00 0.00 0.00 -- - - 0.025 0.25 4,538 722.25 18.44 oc 0.03 is 0.00 - 0.00 0.00 0.00 -- -- -- 0.030 0.30 5,446 722.30 18.44 oc 0.03 is 0.00 -- 0.00 0.00 0.00 -- -- -- 0.034 0.35 6,354 722.35 18.44 oc 0.04 is 0.00 -- 0.00 0.00 0.00 - - - 0.037 0.40 7,261 722.40 18.44 oc 0.04 is 0.00 -- 0.00 0.00 0.00 -- - - 0.040 0.45 8,169 722.45 18.44 oc 0.04 is 0.00 -- 0.00 0.00 0.00 - - -- 0.043 0.50 9,077 722.50 18.44 oc 0.05 is 0.00 -- 0.00 0.00 0.00 - - - 0.046 0.55 10,075 722.55 18.44 oc 0.05 is 0.00 --- 0.00 0.00 0.00 -- - - 0.048 0.60 11,073 722.60 18.44 oc 0.05 is 0.00 -- 0.00 0.00 0.00 - -- -- 0.051 0.65 12,071 722.65 18.44 oc 0.05 is 0.00 --- 0.00 0.00 0.00 - - - 0.053 0.70 13,069 722.70 18.44 oc 0.06 is 0.00 -- 0.00 0.00 0.00 --- -- --- 0.055 0.75 14,068 722.75 18.44 oc 0.06 is 0.00 - 0.00 0.00 0.00 --- - - 0.058 0.80 15,066 722.80 18.44 oc 0.06 is 0.00 -- 0.00 0.00 0.00 -- - - 0.060 0.85 16,064 722.85 18.44 oc 0.06 is 0.00 -- 0.00 0.00 0.00 --- --- -- 0.062 0.90 17,062 722.90 18.44 oc 0.06 is 0.00 - 0.00 0.00 0.00 - - -- 0.064 0.95 18,060 722.95 18.44 oc 0.07 is 0.00 - 0.00 0.00 0.00 -- -- - 0.066 1.00 19,058 723.00 18.44 oc 0.07 is 0.00 --- 0.00 0.00 0.00 -- --- --- 0.067 1.00 19,099 723.00 18.44 oc 0.07 is 0.00 - 0.00 0.00 0.00 -- - - 0.067 1.00 19,140 723.00 18.44 oc 0.07 is 0.00 --- 0.00 0.00 0.00 --- -- -- 0.068 1.01 19,181 723.01 18.44 oc 0.07 is 0.00 --- 0.00 0.00 0.00 - -- -- 0.068 1.01 19,222 723.01 18.44 oc 0.07 is 0.00 - 0.00 0.00 0.00 - - --- 0.068 1.01 19,263 723.01 18.44 oc 0.07 is 0.00 --- 0.00 0.00 0.00 - -- -- 0.068 1.01 19,303 723.01 18.44 oc 0.07 is 0.00 -- 0.00 0.00 0.00 - - - 0.068 1.01 19,344 723.01 18.44 oc 0.07 is 0.00 --- 0.00 0.00 0.00 --- -- - 0.068 1.02 19,385 723.02 18.44 oc 0.07 is 0.00 -- 0.00 0.00 0.00 --- -- - 0.068 1.02 19,426 723.02 18.44 oc 0.07 is 0.00 - 0.00 0.00 0.00 --- - - 0.068 1.02 19,467 723.02 18.44 oc 0.07 is 0.00 --- 0.00 0.00 0.00 --- --- --- 0.068 1.12 21,530 723.12 18.44 oc 0.07 is 0.00 is - 0.00 0.00 0.00 -- - - 0.072 1.21 23,593 723.21 18.44 oc 0.07 is 0.03 is --- 0.00 0.00 0.00 -- -- -- 0.102 1.31 25,655 723.31 18.44 oc 0.08 is 0.08 is --- 0.00 0.00 0.00 -- --- -- 0.157 1.41 27,718 723.41 18.44 oc 0.08 is 0.12 is -- 0.00 0.00 0.00 -- - -- 0.205 Continues on next page... 30 Temporary Storage CIV C PrfRsr Stage / Storage / Discharge Table Stage Storage Elevation Civ A ft cult ft ds 1.50 29,781 723.50 18.44 oc 1.60 31,844 723.60 18.44 oc 1.70 33,907 723.70 18.44 oc 1.80 35,970 723.80 18.44 oc 1.89 38,033 723.89 18.44 oc 1.99 40,096 723.99 18.44 oc 1.99 40,118 723.99 18.44 oc 1.99 40,140 723.99 18.44 oc 1.99 40,162 723.99 18.44 oc 1.99 40,184 723.99 18.44 oc 2.00 40,207 723.99 18.44 oc 2.00 40,229 724.00 18.44 oc 2.00 40,251 724.00 18.44 oc 2.00 40,273 724.00 18.44 oc 2.00 40,295 724.00 18.44 oc 2.00 40,317 724.00 18.44 oc 2.10 42,620 724.10 18.44 oc 2.20 44,924 724.20 18.44 oc 2.30 47,227 724.30 18.44 oc 2.40 49,530 724.40 18.44 oc 2.50 51,833 724.50 18.44 oc 2.60 54,137 724.60 18.80 oc 2.70 56,440 724.70 22.96 oc 2.80 58,743 724.80 23.30 oc 2.90 61,046 724.90 23.53 oc 3.00 63,350 725.00 23.73 oc 3.10 65,836 725.10 23.92 oc 3.20 68,322 725.20 24.09 oc 3.30 70,809 725.30 24.25 oc 3.40 73,295 725.40 24.42 oc 3.50 75,781 725.50 24.57 oc 3.60 78,268 725.60 24.73 oc 3.70 80,754 725.70 24.89 oc 3.80 83,241 725.80 25.04 oc 3.90 85,727 725.90 25.19 oc 4.00 88,213 726.00 25.34 oc ...End - -- - 0.399 0.10 is Civ B CIV C PrfRsr Wr A Wr B Wr C Wr D Exfll User Total cis ds cis ds ds ds ds cis cis cis 0.08 is 0.16 is --- 0.00 0.00 0.00 - -- - 0.239 0.09 is 0.18 is - 0.00 0.00 0.00 - -- - 0.269 0.09 is 0.21 is - 0.00 0.00 0.00 - -- - 0.294 0.09 is 0.23 is --- 0.00 0.00 0.00 -- --- -- 0.318 0.09 is 0.24 is --- 0.00 0.00 0.00 - - - 0.339 0.10 is 0.26 is -- 0.00 0.00 0.00 - -- -- 0.359 0.10 is 0.26 is --- 0.00 0.00 0.00 -- -- -- 0.360 0.10 is 0.26 is - 0.00 0.00 0.00 - - - 0.360 0.10 is 0.26 is -- 0.00 0.00 0.00 -- --- - 0.360 0.10 is 0.26 is - 0.00 0.00 0.00 - -- -- 0.360 0.10 is 0.26 is - 0.00 0.00 0.00 -- - - 0.360 0.10 is 0.26 is --- 0.00 0.00 0.00 -- --- -- 0.360 0.10 is 0.26 is - 0.00 0.00 0.00 - - - 0.361 0.10 is 0.26 is -- 0.00 0.00 0.00 - -- - 0.361 0.10 is 0.26 is --- 0.00 0.00 0.00 -- - 0.361 0.10 is 0.26 is - 0.00 0.00 0.00 - - - 0.361 0.10 is 0.28 is --- 0.00 0.00 0.00 -- -- -- 0.381 0.10 is 0.30 is -- 0.00 0.00 0.00 - -- - 0.399 0.10 is 0.31 is -- 1.68 0.00 0.00 - -- - 2.099 0.11 is 0.33 is --- 4.76 0.44 0.00 -- -- -- 5.630 0.11 is 0.34 is -- 8.75 2.26 0.00 - - - 11.46 0.11 is 0.35 is - 13.47 4.87 0.00 -- -- - 18.80 0.03 is 0.14 is --- 15.41 s 7.37s 0.00 - -- -- 22.96 0.02 is 0.10 is -- 15.17s 8.00s 0.00 -- - - 23.29 0.02 is 0.08 is --- 15.04s 8.39s 0.00 -- --- - 23.52 0.02 is 0.07 is -- 14.97s 8.68s 0.00 - -- - 23.73 0.01 is 0.06 is - 14.92s 8.91s 0.00 - -- - 23.90 0.01 is 0.05 is -- 14.90s 9.10s 0.00 --- --- - 24.06 0.01 is 0.04 is - 14.92s 9.28s 0.00 - -- - 24.25 0.01 is 0.04 is -- 14.94s 9.42s 0.00 -- - -- 24.41 0.01 is 0.03 is -- 14.95s 9.55s 0.00 -- - -- 24.54 0.01 is 0.03 is - 14.96s 9.65s 0.00 - - - 24.65 0.01 is 0.03 is -- 15.02s 9.77s 0.00 --- --- -- 24.83 0.01 is 0.02 is - 15.05s 9.87s 0.00 - - -- 24.95 0.01 is 0.02 is -- 15.11 s 9.98s 0.00 --- --- -- 25.12 0.00 is 0.02 is --- 15.11 s 10.04s 0.00 --- -- --- 25.18 iTi Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 2 Post Developed Hydrograph type = SCS Runoff Peak discharge = 6.851 cfs Storm frequency = 2 yrs Time to peak = 2.50 hrs Time interval = 5 min Hyd. volume = 29,401 cuft Drainage area = 7.650 ac Curve number = 87* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.50 min Total precip. = 2.28 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 * Composite (Area/CN) = [(2.120 x 60) + (5.530 x 98)] / 7.650 Q (cfs) 7.00 .M • M 4.00 3.00 2.00 1.00 Post Developed Hyd. No. 2 -- 2 Year 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 2 Q (cfs) 7.00 9 -MIX 5.00 4.00 3.00 2.00 1.00 1 0.00 7.0 Time (hrs) 32 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 3 Wet Pond Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 5 min Inflow hyd. No. = 2 - Post Developed Reservoir name = Temporary Storage Storage Indication method used Q (cfs) 7.00 L-10IIJIll 5.00 4.00 "M 1.00 0.00 -L 0 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wet Pond Hyd. No. 3 -- 2 Year Friday, 09 / 9 / 2016 = 0.208 cfs = 6.25 hrs = 28,998 cuft = 723.42 ft = 27,899 cuft Q (cfs) 7.00 5.00 4.00 3.00 2.00 1.00 0.00 20 40 60 80 100 120 140 160 180 200 220 240 Hyd No. 3 Hyd No. 2 Total storage used = 27,899 cult Time (hrs) 33 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 2 Post Developed Hydrograph type = SCS Runoff Peak discharge = 14.58 cfs Storm frequency = 10 yrs Time to peak = 2.50 hrs Time interval = 5 min Hyd. volume = 61,989 cuft Drainage area = 7.650 ac Curve number = 87* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.50 min Total precip. = 3.72 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 * Composite (Area/CN) = [(2.120 x 60) + (5.530 x 98)] / 7.650 Q (cfs) 15.00 12.00 MOM 0"1 0.00 ' ' 0.0 1.0 Hyd No. 2 Post Developed Hyd. No. 2 -- 10 Year 2.0 3.0 4.0 5.0 6.0 Q (cfs) 15.00 12.00 3.00 —1 0.00 7.0 Time (hrs) 34 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2016 by Autodesk, Inc. v11 Hyd. No. 3 Wet Pond Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 5 min Inflow hyd. No. = 2 -Post Developed Reservoir name = Temporary Storage Storage Indication method used Q (cfs) 15.00 12.00 • 11 .11 3.00 0.00 0 15 Hyd No. 3 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wet Pond Hyd. No. 3 -- 10 Year Friday, 09 / 9 / 2016 = 2.003 cfs = 4.92 hrs = 61,482 cult = 724.29 ft = 47,096 cuft 30 45 60 75 90 105 120 135 Hyd No. 2 ; : ! Total storage used = 47,096 cuft Q (cfs) 15.00 12.00 • 11 3.00 _L- 0.00 150 Time (hrs) 35 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 2 Post Developed Hydrograph type = SCS Runoff Peak discharge = 18.23 cfs Storm frequency = 25 yrs Time to peak = 2.50 hrs Time interval = 5 min Hyd. volume = 77,772 cuft Drainage area = 7.650 ac Curve number = 87* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.50 min Total precip. = 4.38 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Composite (Area/CN) = [(2.120 x 60) + (5.530 x 98)] / 7.650 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 Post Developed Hyd. No. 2 -- 25 Year 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 2 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 7.0 Time (hrs) 36 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 3 Wet Pond Hydrograph type = Reservoir Storm frequency = 25 yrs Time interval = 5 min Inflow hyd. No. = 2 -Post Developed Reservoir name = Temporary Storage Storage Indication method used Q (cfs) 21.00 18.00 15.00 12.00 M 1. M 3.00 0.00 ' ' 0 10 20 Hyd No. 3 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wet Pond Hyd. No. 3 -- 25 Year 30 40 50 Hyd No. 2 Friday, 09 / 9 / 2016 = 3.664 cfs = 3.67 hrs = 77,264 cuft = 724.34 ft = 48,248 cuft Q (cfs) 21.00 18.00 15.00 12.00 m 3.00 0.00 60 70 80 90 100 110 120 Time (hrs) i i I f I Total storage used = 48,248 cult 37 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 2 Post Developed Hydrograph type = SCS Runoff Peak discharge = 21.34 cfs Storm frequency = 50 yrs Time to peak = 2.42 hrs Time interval = 5 min Hyd. volume = 90,909 cuft Drainage area = 7.650 ac Curve number = 87* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.50 min Total precip. = 4.92 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Composite (Area/CN) = [(2.120 x 60) + (5.530 x 98)] / 7.650 Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0.00 ' y 0.0 1.0 Hyd No. 2 Post Developed Hyd. No. 2 -- 50 Year 2.0 3.0 4.0 5.0 6.0 Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 1 0.00 7.0 Time (hrs) 38 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 3 Time to peak Wet Pond Hyd. volume Hydrograph type = Reservoir Storm frequency = 50 yrs Time interval = 5 min Inflow hyd. No. = 2 - Post Developed Reservoir name = Temporary Storage Storage Indication method used Q (cfs) 24.00 20.00 16.00 12.00 m 4.00 Friday, 09 / 9 / 2016 Peak discharge = 5.460 cfs Time to peak = 3.17 hrs Hyd. volume = 90,401 cuft Max. Elevation = 724.40 ft Max. Storage = 49,419 cuft Wet Pond Hyd. No. 3 -- 50 Year 10 20 30 Hyd No. 3 Hyd No. 2 Q (cfs) 24.00 20.00 16.00 12.00 0' 4.00 0.00 40 50 60 70 80 Time (hrs) Total storage used = 49,419 cult 39 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 2 Post Developed Hydrograph type = SCS Runoff Peak discharge = 23.78 cfs Storm frequency = 100 yrs Time to peak = 2.42 hrs Time interval = 5 min Hyd. volume = 101,234 cuft Drainage area = 7.650 ac Curve number = 87* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.50 min Total precip. = 5.34 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 ' Composite (Area/CN) _ [(2.120 x 60) + (5.530 x 98)] / 7.650 Post Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Hyd No. 2 Time (hrs) 40 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 3 Wet Pond Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 5 min Inflow hyd. No. = 2 -Post Developed Reservoir name = Temporary Storage Storage Indication method used Q (cfs) 24.00 20.00 16.00 12.00 : 15 4.00 0.00 ' 0 5 Hyd No. 3 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wet Pond Hyd. No. 3 -- 100 Year 10 15 — Hyd No. 2 Friday, 09 / 9 / 2016 = 8.272 cfs = 2.83 hrs = 100,725 cuft = 724.45 ft = 50,574 cuft 20 25 30 I Total storage used = 50,574 cuft Q (cfs) 24.00 20.00 16.00 12.00 4.00 _L_ 0.00 35 Time (hrs) 41 TR55 Tc Worksheet Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 4 Undetained Description A B C Totals Sheet Flow Manning's n -value = 0.240 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two-year 24 -hr precip. (in) = 3.12 0.00 0.00 Land slope (%) = 4.67 0.00 0.00 Travel Time (min) = 24.79 + 0.00 + 0.00 = 24.79 Shallow Concentrated Flow Flow length (ft) = 595.00 0.00 0.00 Watercourse slope (%) = 4.57 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) =3.45 0.00 0.00 Travel Time (min) = 2.88 + 0.00 + 0.00 = 2.88 Channel Flow X sectional flow area (sqft) = 60.00 0.00 0.00 Wetted perimeter (ft) = 26.00 0.00 0.00 Channel slope (%) = 1.54 0.00 0.00 Manning's n -value = 0.050 0.015 0.015 Velocity (ft/s) =6.48 0.00 0.00 Flow length (ft) ({0})812.0 0.0 0.0 Travel Time (min) = 2.09 + 0.00 + 0.00 = 2.09 Total Travel Time, Tc.............................................................................. 29.80 min 42 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 4 Undetained Hydrograph type = SCS Runoff Peak discharge = 0.349 cfs Storm frequency = 2 yrs Time to peak = 4.50 hrs Time interval = 5 min Hyd. volume = 4,031 cuft Drainage area = 9.150 ac Curve number = 60* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.80 min Total precip. = 2.28 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Composite (Area/CN) = [(9.150 x 60)] / 9.150 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0 00 Undetained Hyd. No. 4 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 - Hyd No. 4 Time (hrs) 43 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31318 2016 by Autodesk, Inc. v11 Hyd. No. 4 Undetained Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 5 min Drainage area = 9.150 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 3.72 in Storm duration = 6.00 hrs * Composite (Area/CN) = [(9.150 x 60)] / 9.150 Q (cfs) 3.00 2.00 1.00 1.0 2.0 Hyd No. 4 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Undetained Hyd. No. 4 -- 10 Year Friday, 09/9/2016 = 2.532 cfs = 2.83 hrs = 21,546 cuft = 60* = Oft = 29.80 min = SCS 6 -Hr = 484 3.0 4.0 5.0 6.0 Q (cfs) 3.00 2.00 1.00 -1 0.00 7.0 Time (hrs) 44 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 4 Undetained Hydrograph type = SCS Runoff Peak discharge = 4.405 cfs Storm frequency = 25 yrs Time to peak = 2.83 hrs Time interval = 5 min Hyd. volume = 32,704 cuft Drainage area = 9.150 ac Curve number = 60* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.80 min Total precip. = 4.38 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 Composite (Area/CN) = [(9.150 x 60)] / 9.150 Q (cfs) 5.00 Undetained Hyd. No. 4 -- 25 Year 4.00 3.00 2.00 1.00 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 4 Q (cfs) 5.00 4.00 3.00 2.00 1.00 �--i 0.00 7.0 Time (hrs) 45 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 4 Undetained Hydrograph type = SCS Runoff Peak discharge = 6.249 cfs Storm frequency = 50 yrs Time to peak = 2.75 hrs Time interval = 5 min Hyd. volume = 42,941 cuft Drainage area = 9.150 ac Curve number = 60* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 29.80 min Total precip. = 4.92 in Distribution = SCS 6 -Hr Storm duration = 6.00 hrs Shape factor = 484 ` Composite (Area/CN) = [(9.150 x 60)] / 9.150 Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0 00 0.0 1.0 Hyd No. 4 Undetained Hyd. No. 4 -- 50 Year Q (cfs) 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 2.0 3.0 4.0 5.0 6.0 7.0 Time (hrs) 46 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 4 Time to peak Undetained Hyd. volume Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 5 min Drainage area = 9.150 ac Basin Slope = 0.0% Tc method = TR55 Total precip. = 5.34 in Storm duration = 6.00 hrs Composite (Area/CN) = [(9.150 x 60)] / 9.150 Q (cfs) 8.00 AM 4.00 2.00 1.0 Hyd No. 4 2.0 Friday, 09 / 9 / 2016 Peak discharge = 7.844 cfs Time to peak = 2.75 hrs Hyd. volume = 51,499 cuft Curve number = 60* Hydraulic length = 0 ft Time of conc. (Tc) = 29.80 min Distribution = SCS 6 -Hr Shape factor = 484 Undetained Hyd. No. 4 -- 100 Year 3.0 4.0 5.0 .o Q (cfs) 8.00 4.00 2.00 — 0.00 7.0 Time (hrs) 47 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Hyd. No. 3 Wet Pond Hydrograph type = Reservoir Storm frequency = 2 yrs Time interval = 5 min Inflow hyd. No. = 2 -Post Developed Reservoir name = Temporary Storage Storage Indication method used. Elev (ft) 725.00 724.00 723.00 722.00 " 0 25 50 1. Temporary Storage Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wet Pond Hyd. No. 3 -- 2 Year Friday, 09 / 9 / 2016 = 0.208 cfs = 6.25 hrs = 28,998 cuft = 723.42 ft = 27,899 cuft 75 100 125 150 175 200 225 Elev (ft) 725.00 724.00 723.00 ' 722.00 250 Time (hrs) 48 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 3 Wet Pond Hydrograph type = Reservoir Peak discharge = 2.003 cfs Storm frequency = 10 yrs Time to peak = 4.92 hrs Time interval = 5 min Hyd. volume = 61,482 cuft Inflow hyd. No. = 2 -Post Developed Max. Elevation = 724.29 ft Reservoir name = Temporary Storage Max. Storage = 47,096 cuft Storage Indication method used Elev (ft) 726.00 725.00 724.00 723.00 722.00 0 25 50 1. Temporary Storage Wet Pond Hyd. No. 3 -- 10 Year 75 100 125 150 175 200 225 Elev (ft) 726.00 725.00 724.00 723.00 1 722.00 250 Time (hrs) 49 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 3 Wet Pond Hydrograph type = Reservoir Peak discharge = 3.664 cfs Storm frequency = 25 yrs Time to peak = 3.67 hrs Time interval = 5 min Hyd. volume = 77,264 cult Inflow hyd. No. = 2 - Post Developed Max. Elevation = 724.34 ft Reservoir name = Temporary Storage Max. Storage = 48,248 cuft Storage Indication method used Elev (ft) 726.00 725.00 724.00 723.00 722.00 0 25 50 1. Temporary Storage Wet Pond Hyd. No. 3 -- 25 Year 75 100 125 150 175 200 225 Elev (ft) 726.00 725.00 724.00 723.00 --1 722.00 250 Time (hrs) 50 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 3 Wet Pond Hydrograph type = Reservoir Peak discharge = 5.460 cfs Storm frequency = 50 yrs Time to peak = 3.17 hrs Time interval = 5 min Hyd. volume = 90,401 cuft Inflow hyd. No. = 2 -Post Developed Max. Elevation = 724.40 ft Reservoir name = Temporary Storage Max. Storage = 49,419 cuft Storage Indication method used Elev (ft) 726.00 725.00 724.00 723.00 722.00 " I' 0 25 50 1. Temporary Storage Wet Pond Hyd. No. 3 -- 50 Year 75 100 125 150 175 200 225 Elev (ft) 726.00 725.00 724.00 723.00 ' 722.00 250 Time (hrs) 51 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 6 WQ Drawdown Hydrograph type = SCS Runoff Peak discharge = 9.460 cfs Storm frequency = 1 yrs Time to peak = 3.17 hrs Time interval = 5 min Hyd. volume = 19,546 cult Drainage area = 7.720 ac Curve number = 97.5 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.50 min Total precip. = 1.00 in Distribution = Custom Storm duration = ZAECO Energy\EEDS Charlott6W6#94fibAdmin\Perrnit#B4\Stormwater\Charlott( Q (cfs) 10.00 WQ Drawdown Hyd. No. 6 -- 1 Year 8.00 6.00 4.00 2.00 0.00 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Hyd No. 6 Q (cfs) 10.00 M 4.00 2.00 —1 0.00 7.0 Time (hrs) 52 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2016 by Autodesk, Inc. v11 Hyd. No. 7 WQ Drawdown Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 5 min Inflow hyd. No. = 6 - WQ Drawdown Reservoir name = Temporary Storage Storage Indication method used Q (cfs) 10.00 : of W. Of 4.00 2.00 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage WQ Drawdown Hyd. No. 7 -- 1 Year 25 50 75 100 Hyd No. 7 Hyd No. 6 Friday, 09 / 9 / 2016 = 0.067 cfs = 6.17 hrs = 19,269 cuft = 722.99 ft = 18,804 cuft 125 150 175 200 225 1 Total storage used = 18,804 cuft Q (cfs) 10.00 m m 4.00 2.00 - L 0.00 250 Time (hrs) 53 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 8 CP Drawdown Hydrograph type = SCS Runoff Peak discharge = 13.41 cfs Storm frequency = 1 yrs Time to peak = 12.00 hrs Time interval = 5 min Hyd. volume = 36,211 cuft Drainage area = 7.720 ac Curve number = 87* Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.50 min Total precip. = 2.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(7.720 x 88)] / 7.720 Q (cfs) 14.00 12.00 10.00 .ed 4.00 0.00 ' 1' 0 2 4 Hyd No. 8 i CP Drawdown Hyd. No. 8 -- 1 Year Q (Cfs) 14.00 12.00 10.00 MI 4.00 2.00 `_-— ' 0.00 8 10 12 14 16 18 20 22 24 26 Time (hrs) 54 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2016 by Autodesk, Inc. v11 Friday, 09 / 9 / 2016 Hyd. No. 9 CP Drawdown Hydrograph type = Reservoir Peak discharge = 0.215 cfs Storm frequency = 1 yrs Time to peak = 19.83 hrs Time interval = 5 min Hyd. volume = 35,687 cuft Inflow hyd. No. = 8 - CP Drawdown Max. Elevation = 723.44 ft Reservoir name = Temporary Storage Max. Storage = 28,361 cuft Storage Indication method used Q (cfs) 14.00 12.00 10.00 8.00 4.00 2.00 0.00 0 25 Hyd No. 9 50 CP Drawdown Hyd. No. 9 -- 1 Year Q (cfs) 14.00 12.00 10.00 8.00 �1 4.00 2.00 I I I I I I 1 0.00 75 100 125 150 175 200 225 250 Time (hrs) Hyd No. 8 Total storage used = 28,361 cuft 55 Eco Energy Distribution - Stormwater Riser Structure Buoyancy Calculations Inside Dimensions of Riser: Width 4 Ft. Width Wall Tickness 0.5 Ft. Outside Dimensions of Riser: Width 5 Ft. Length Base Dimensions: Width 6 Ft. Length Depth of Riser 8.20 Ft. Volume of Riser 205.00 CF Volume of Base 36.00 CF Total Volume of Riser 241.00 CF Volume of Interior of Riser 131.20 CF Volume Deduction of Outlet Pipe 0.88 CF Volume of Concrete 108.92 CF Weight of Riser* 16337.53 Lbs. *Calculation does not included grouted base 4 Ft. 5 Ft. 6 Ft. Height 1 Ft. Force Buoyant = Riser Volume x unit weight of water (62.4 lbs/ cf) Force Buoyant = 15038.40 Lbs Force Ballast = Force Buoyant - Weight of Riser Force Ballast = -1299.13 Lbs. Volume Conc. Req. = Force Ballast/ unit weight of concrete in water (87.6 pcf) Volume Conc. _ -14.83 CF -0.55 CY Weight of Concrete = Volume of Concrete x unit weight of concrete in air (150 pcf) Weight of Concrete* _ -2224.54 Lbs *negative value indicates base is adequate 1 56 Line Profile (Line 1) - PIPE F6 Page 1 of 1 Line 1 - PIPE F6 Eley (ft) 742.00 742.00 736.00 730.' --77: 730.00 U, 72 724.00 71 718.00 712.00 712.00 E,- 65 9 95 Reach (ft) Storm Sewers Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q 1: Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 1 43.01 722.50 730.25 0.90 2.13 2.13 723.40 732.38 732.38 24.08 8.00 -3.00 4.00 CA , I Project File: � No. Lines: 45 Run Date: 9/9/2016 Storm Sewers Line Profile (Line 2) - PIPE F5 Line 2 - PIPE F5 El ev (it) [qb.UU — F ib ro (4b.W 742.00 — 742.00 738.0D .. ...... .... 738.00 734.00.............. 734.00 ­ ------- -------- — Lind ----------- 730.00—. Lib. J Id 730.00 Line 1 726.00 1 726.00 0 5 10 15 20 25 30 35 40 45 5D Reach (ft) Page I of 1 Stam Sewm Invert Elevation Depth of Flow Hydraulic Grade Line Velocity I Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (Cfs) M (ft) M (ft) M (ft) M M (ft/s) (ft/S) M (ft) 2 39.65 730.77 731.50 1.61 2.05 2.05 732.38 733.55 733.55 10.23 7.71 3.48 8.00 1 00 Project File: — -------- No. Lines: 45 _T Run Date: 9/9/20 16 Stam Sewm Line Profile (Line 3) - PIPE F4 751.00 746.00 741.00 736.00 731.00 Line 3 - PIPE F4 (ZU.W 0 5 10 15 20 25 30 751.00 746. DO 741.00 73.00 731.00 -fir, M 35 40 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line 0 W"W NOW Cover LW Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up Jnct (ft) Dn (ft/s) Up (fus) Dn (ft) Up (ft) 3 39.76 735.43 735.86 1.41 2.05 2.05 736.84 737.91 737.91 12.19 7.72 4.07 10.46 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sewers (ZU.W 0 5 10 15 20 25 30 751.00 746. DO 741.00 73.00 731.00 -fir, M 35 40 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up Jnct (ft) Dn (ft/s) Up (fus) Dn (ft) Up (ft) 3 39.76 735.43 735.86 1.41 2.05 2.05 736.84 737.91 737.91 12.19 7.72 4.07 10.46 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sewers o� 0 Line Profile (Line 4) - PIPE G4 742.00 738.00 734.00 746.00 742.00 738.00 734.00 730.00 t t t t t t t t t t 730.00 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Reach (ft) Page 1 of 1 Storm Sem Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Cl (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ftts) Dn (ft) Up (ft) 4 16.17 737.59 738.55 1.28 1.45 1.45 738.87 740.00 740.00 7.63 6.63 9.73 8.77 Project File:No. Lines: 45 Run Date: 9/9/2016 Storm Sem Line Profile (Line 5) - PIPE H4 Page 1 of 1 Storm Sewers Line 5 - PIPE H4 Elev (ft) 754.00 754.00 JB H4 750. D0 750. DO 7 745. DO745. ............................................................................................................................................................................................. 00 742.00 742.60 738.00 80 000 f - 0.8(% - _ 738.00 L 734.00 734.00 0 5 10 15 20 25 30 35 40 45 50 55 50 55 70 75 SO 85 90 95 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (n) (ft/s) (ft/s) (ft) (ft) 5 12.84 738.55 739.19 1.45 1.29 1.29 740.00 740.48 j 740.48 5.27 6.00 8.77 8.13 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sewers Line Profile (Line 6) - PIPE 14 Page 1 of 1 Storm Sewers B H4 Line 6 - PIPE 14 &ftJN4 750.00 7T- 750.00 747. OD 747.00 744.0 _.................................................. _............... ............ ............ .......... .............. ...... ...... ............ ............ ............ ............ ......... 744.00 741. 741.00 14.20M - a- @ 0. T% 738.04738.00 n e 5 735.00 735.10 0 10 20 30 40 50 50 70 80 90 1 GE '110 120 130 140 150 160 170 180 1 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up WS) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 6 9.50 739.69 740.97 1.15 1.19 1.19 740.84 742.16 742.16 6.54 6.32 8.13 6.85 File: No. Lines: 45 -:[Project Ru=Date: 9/9/2016 Storm Sewers Line Profile (Line 7) - PIPE J4 Page 1 of 1 Storm sewers Line 7 - PIPE A Elev (ft) JB A 751.00 751.00 748.00 77- 748.00 745.00 ........................................................................................................................................................................................... 745.00 742.00 1 LJ 742.00 Une 120 9 OLf - S°" ral 0.000 739.1 739.00 736.00 736.00 0 10 20 30 40 50 60 70 80 90 1 GG 119 120 131D 140 '150 Ruch (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 7 6.21 740.97 741.94 1.19 0.96 0.96 742.16 742.90 j 742.90 4.13 5.18 6.85 5.88 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm sewers Line Profile (Line 8) - PIPE K3 7.53.00 750. DD 747.00 744.00 Line 8 - PIPE K3 Elev (ft) JE JB K3 ........................................................................................................................................................................................... i 1 0.9 OU - 5" c 0.800 - = 753.00 747.00 744.00 MUCY 738.00 73$.()0 0 10 20 30 40 50 50 70 80 90 1 DO '110 120 130 140 150 Reach (Ai Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (fus) Dn (ft) Up (ft) 8 3.12 742.19 743.16 0.71 0.71 0.71 742.90 743.87 j 743.87 4.30 4.33 5.88 4.91 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm sewers CD CA Line Profile (Line 9) - PIPE K2 Line 9 - PIPE K2 Elev (ft) 754.00 754.00 751.00 751.00 I K2 748.00 748.00 745. DO 745.00 . ........ . ........... ........... .............. ........... 37. 1 MU - 12" @ 1.99° % LAC- I t5 742.00 742.00 739.00 739.00 0 5 10 15 20 25 30 35 40 45 50 Reach (ft) Page 1 of 1 Storm Sew Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (Cfs) Dn (ft) Up (ft) 744.16 Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn ON Up (ft/s) Dn (ft) Up (ft) 9 3.13 743.42 0.54 0.76 0.76 743.96 744.92 744.92 7.17 4.91 4.90 1.65 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sew Line Profile (Line 10) - PIPE E4 V9111:11 746.00 742.00 738.00 734.00 Line # 10 Project File: i 10 20 30 40 60 60 Invert Elevation Q Dn Up (cfs) (ft) (ft) 20.93 736.86 737.82 Depth of Flow Dn Up (ft) (ft) 1.56 1.64 746.00 742.00 738.00 _inc ; 734.00 730.{0 70 SG 90 1 D 110 120 130 140 Reach (ft) Hydraulic Grade Line Hw Dn Up Jnct (ft) (6) (ft) (ft) 1.64 738.42 739.46 739.46 No. Lines: 45 Page 1 of 1 Velocity Cover Dn Up Dn Up (ft/s) (ft/s) (ft) (ft) 7.94 7.60 10.46 9.50 Run Date: 9/9/2016 Stan sewer Line Profile (Line 11) - PIPE D4 Line 11 - PIPE D4 Elev (ft) 753.OG 753.00 749.00 749.00 746.00........................................................................................................................................................................................................ 745.00 741.00 741.00 737.00 Z U L e 'tt 733.00 733.(10 10 20 30 41" 11 u 12G 130 14fl Reach (ft) Invert Elevation Line # Q Dn Up Dn (cfs) (ft) (ft) (ft) 11 17.64 737.82 738.78 1.64 Project File: Page 1 of 1 Depth of Flow Hydraulic Grade Line Velocity Cover Up Hw Dn Up Jnct Dn Up Dn Up (ft) (ft) (ft) (ft) (ft) MIS) (ft/s) (ft) (ft) 1.51 1.51 739.46 740.29 j 740.29 6.41 6.92 9.50 8.54 No. Lines: 45 Run Date: 9/9/2016 Storm Sewer Line Profile (Line 12) - PIPE C4 Page I of 1 Storm Se"rs Line 12 - PIPE C4 Ele-v (ft) 754.00 — 754.00 EG G750. 750. CC,- 750.00 746.00 .... ............. ......... 746.00 742. CO 742.00 lir �2ry 738.00738.00 U, U % 734. CO — 734.00 0 10 20 30 40 5D 60 70 80 90 1 DD 110 120 130 140 Reach (ftl Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (fus) (ft) (ft) 12 14.31 738.78 739.74 1.51 1.36 1.36 740.29 741.10 j 741.10 5.62 6.28 8.54 7.58 Project File: 6 Run Date: 9/9/2016 Storm Se"rs Line Profile (Line 13) - PIPE C3 750.00 747.00 744.00 741.0 738.00 735.00 0 IR F+A I :._- .47 ninr, 8"1) Cin-., .4'. 5 10 15 `0 25 30 35 40 750.00 747.00 744.00 741.00 738.00 735.Q0 45 50 Reach tfti Page 1 of 1 swan small Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up DnUp Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (7) (ft) (8) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 13 3.76 742.64 743.35 0.61 0.83 0.83 743.25 744.17 744.17 7.49 5.43 5.68 2.46 C co Project File: No. Lines: 45 Run Date: 9/9/2016 swan small Line Profile (Line 14) - PIPE C2 Page 1 of 1 Line 14 - PIPE C2 Elev (ft) 749.00 749.00 AC 747.00 747.00 745. DO 745.00 48.038Lf - �� � 2. 0% Line t 743.00 ................................................................................................... 743.00 Lin , _ 741.00 741.00 739.00 739.00 0 5 10 15 20 25 30 35 40 45 50 55 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 14 2.33 743.69 744.49 0.67 0.67 1.48 744.36 745.63 745.97 6.68 6.67 2.45 1.65 Project File: No. Lines: 45 Run Date: 9/9/2016 Line Profile (Line 15) - PIPE C1 Line 15 - PIPE C1 Elev (ft) 749.00 749.00 _ `r`I Cl 747.00 747.00 ------------ 745. 745.00 t��J�Lf - ' � 2. 0%Line 44 743. a0.................................................................................................................................................................... 743.00 741.00 741.00 739. 739.00 0 20 45 50 Reach (ft) Page 1 of 1 Storm Sewers Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (afs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 15 1.45 744.49 745.29 0.67 0.67 1.45 745.97 746.47 746.74 4.17 4.17 1.65 0.85 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sewers Line Profile (Line 16) - PIPE K1 Page 1 of 1 Storm Sawmra Line 16 - PIPE K1 Eler (ft) 749.00 749.00 Yt K1 747.00 747.00 745.00 745.00 4 . UOOU - „ 2. 00% 743.00 r.................................................................................................................................................................................... 743.00 741.00 741.04 739.00 739.00 0 5 10 15 20 25 30 35 40 45 50 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up WS) (ft)— (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (flus) (ft) (ft) 16 1.54 744.49 745.29 0.46 0.58 0.58 744.95 745.87 745.87 5.93 4.78 1.65 0.85 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sawmra Line Profile (Line 17) - PIPE J3 Page 1ofI Storm Sew Line 17 - PIPE A Elev (ft) 753.00 753.00 750.00 750.00 .. YI J3 747.00 747.00 744.E .. ............ 744. DO 1° 149Y - 1 ,� @ 1,98% Lille 16 741.OD 741.00 738.00 738.00 5 10 15 20 25 30 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (ds) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 17 3.28 743.12 743.50 0.56 0.78 0.78 743.68 744.27 744.27 7.24 5.03 5.20 2.31 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sew .. Storm Sew Line Profile (Line 18) - PIPE J2 749.00 747.00 745.00 V0101 741.00 Line 18 - PIPE J2 EI ev (ft) 'r''I J2 Et33.068L - 9' @ 2 00% - - Ur ............................................................................................................................. . Line 739.M 0 5 15 20 5 _ 35 40 749.00 747.00 745.00 e19 74.3.00 741.00 739.00 45 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Cl (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn MIS) Up (ft/S) Dn (ft) Up (ft) 18 2.33 743.83 744.49 0.67 0.67 1.40 744.50 745.55 745.89 6.68 6.67 2.31 1.65 A Project File: No. Lines: 45 Run Date: 9/9/2016 stogy sewers Line Profile (Line 19) - PIPE A Line 19 - PIPE J1 Elev (ft) 749.00 749.00 747.00 747.00 745.00 745.00 3S. 994U- "@2. Line 18 743.00...................................................................................................................................................... 743.00 741.00 741.00 739.00 739.00 0 5 35 40 45 50 Reach (ft) Page 1 of 1 Storm sewers Line # Q Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 19 1.45 744.49 745.29 0.67 0.67 1.37 745.89 746.39 746.66 4.17 4.17 1.65 0.85 4 Project File: No. Lines: 45 I Run Date: 9/9/2016 Storm sewers Line Profile (Line 20) - PIPE B4 750.00 747.00 744.00 741.00 738.00 i V91111M 747.00 744.00 i 741`.00 738.00 73C rtr% 10 20 30 40 50 50 70 S0 90 '100 110 120 130 140 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) -- Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 20 10.82 740.23 741.19 1.34 1.34 2.00 741.57 742.53 743.19 6.48 6.48 7.59 6.63 Project File: No. Lines: 45 Run Date: 9/9/2016 somm Line Profile (Line 21) - PIPE B3 Line 21 - PIPE B3 EI e-,, i, ft) [!D,3.UU J: 750.00 750.00 747.00 747.00 .......................... ............. 744. DO .. 744.00 ............ .... .......... 35,456 -f - 12" 2 00% 741.00741.00 L 738.00 738. DD 0 5 10 15 20 30 35 40 45 50 Reach (ft) Page 1 of 1 Stmm sewers Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (S) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (fus) (ft) (ft) 21 3.76 742.65 743.36 0.61 0.83 0.83 743.26 744.16 744.18 7.49 5.43 5.67 2.45 -4 Project File: No. Lines: 45 Run Date: 9/9/2016 Stmm sewers Line Profile (Line 22) - PIPE B2 Lite 22 - PIPE B2 E{ ev (ft) 14'tP. ULi f 49.UU 747.00 747.00 { 745.007T7 745.00 40 Lf 2. % 743.00 ............ .................. .................. ................ ................................................ .................. ......... u 21 741.00 741.00 730.00 730.00 20 Reach (ft) Page 1 of 1 Storm sewers Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (dS) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 22 2.33 743.69 744.49 0.67 0.67 1.48 744.36 745.63 745.97 6.68 6.67 2.45 1.65 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm sewers Line Profile (Line 23) - PIPE 131 Line 23 - PIPE B1 Elev (ft) 749.DD 749.00 `fl B1 747.00 747. DD 745.00 745.00 743.00 -.......................................................................................................................................................................... 743.00 741.00 741.00 739.00 739.00 0 5 10 15 20 25 30 35 40 45 50 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft)(I ft) 23 1.45 744.49 745.29 0.67 0.67 1.45 745.97 746.47 746.74 4.17 4.17 1.65 0.80.85 co Project File: No. Lines: 45 Run Date: 9/9/2016 Storm sewers Co 0 Line Profile (Line 24) - PIPE 13 Page 1of1 Storm Sem Line 24 - PIPE 13 Elev (ft) JB 14 751.00 751.00 Y1 13 748.00 748.00 745.00 . ........ 745.00 742.00 _ —170.08 Lin? 8 739.00 739.00 736.00 736. DD 0 5 10 15 20 25 30 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up WS) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) M/s) (ft/s) (ft) (ft) 24 3.60 742.82 743.21 0.59 0.81 0.81 743.41 744.02 744.02 7.45 5.29 5.50 2.60 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sem Line Profile (Line 25) - PIPE 12 749.00 747.00 746.00 743.00 741.00 739.00 0 Line 25 - PIPE 12 Page 1 of 1 EI ev (ft) 5 10 15 20 25 30 35 40 45 50 Invert Elevation Line # Q Dn Up Dn (cfs) (ft) (ft) (ft) 25 2.33 743.53 744.49 0.67 Project File: 749. DD 747. DD 745. D0 ie 39 743.00 741.00 739.00 55 60 Reach (ft) Depth of Flow Hydraulic Grade Line Velocity Cover Up Hw Dn Up Jnct Dn Up Dn Up (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 0.67 1.58 744.20 745.72 746.07 6.68 6.67 2.61 1.65 No. Lines: 45 Run Date: 9/9/2016 Storm Sewers Line Profile (Line 26) - PIPE H3 750.01) 747. �',C� 744.00 741.1DO 738.00 7qr, riri FJB H4 Line 26 - PIPE H3 11 bU.QU 747. DO '1744. DO 1.00 738.00 735. UV 5 20 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfS) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/S) Up (ft/s) Dn (ft) Up (ft) lip ............... . ...... h 490 -f 12" (T 2.00% ... ............. 0.82 742.92 743.85 743.85 7.48 5.40 6.00 2.78 CDRun Project File: No. Lines: 45 Date: 9/9/2016 Stwm Se"m 11 bU.QU 747. DO '1744. DO 1.00 738.00 735. UV 5 20 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfS) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/S) Up (ft/s) Dn (ft) Up (ft) 26 3.73 742.32 743.03 0.61 0.82 0.82 742.92 743.85 743.85 7.48 5.40 6.00 2.78 CDRun Project File: No. Lines: 45 Date: 9/9/2016 Stwm Se"m Line Profile (Line 27) - PIPE H2 Page 1of1 Line 27 - PIPE H2 Ele-v (ft) 74.00 749.00 `r' H2 747.00 ' 747. DD 745.00 745.00 743.00 - ....... ....._............. 743.00 Line 2 ,`; 741.00 741. DD 739.00 739.00 0 5 10 15 20 25 30 35 40 45 50 55 60 55 70 Reach ift) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 27 2.33 743.03 744.16 0.82 0.65 0.65 743.85 744.81 j 744.81 3.37 4.29 2.78 1.65 W Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sewers Line Profile (Line 28) - PIPE 1-11 Line 28 - PIPE H1 Bev M': 749.00 749.00 747. DD 747. DD 745.00 745.00 40.009Lf - „ @ 2. C 0% 743.00 L - .................................................................................................................................................................. 743.00 741.00 741.00 739.00 7a0 M 0 5 10 15 20 25 30 35 40 45 so 55 w Rew:h (it) Page 1 of 1 Storm Sewers Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (mss) (ft/s) (ft) (ft) 28 1.45 744.49 745.29 0.45 0.57 0.57 744.94 745.86 745.86 5.87 4.61 1.65 0.85 Co Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sewers Line Profile (Line 29) - PIPE D3 754.00 750.00 748. as 742.00 738.', L 7314 .00, u Line 29 - PIPE D3 EI e-: .: 10 15 20 25 30 35 40 7�4.aa 745.00 742. DO 73S. DO 7U.aa 4E, na Reach ift; Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (fus) (ft) (ft) 29 3.76 742.65 743.36 0.61 0.83 0.83 743.26 744.18 744.18 7.49 5.43 5.67 2.45 co Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Se"M CO Line Profile (Line 30) - PIPE D2 Line 30 - PIPE D2 749.00 l4U. UU iDv Y1 D2 747.00 747.00 745.00 745. DD 743.00 40 032U - 2. 0% Line 3 i 743.00 ......................................................................................... 4 Line 29 741.00 741.00 739.00 739.40 0 5 10 15 20 25 30 35 40 45 50 55 Reach (ft) Elev (ft) Page 1 of 1 swm Sm Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (ds) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (fUs) (ft/s) (ft) (ft) 30 2.33 743.69 744.49 0.67 0.67 1.48 744.36 745.63 745.97 6.68 6.67 2.45 1.65 ----I Project File: TNo. Lines: 45 Run Date: 9/9/2016 swm Sm Line Profile (Line 31) - PIPE D1 Line 31 - PIPE D1 Ede eft. 749.0D 749.00 747.00 j 747.00 745.00 745.00 4 .00OLf - "@2. 743.00.................................................................................................................................................................... 743. J 741.00 741M 7T4M 0 5 10 15 20 __ = 45 50 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q I T Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/5) (ft) (ft) 31 1.45 744.49 745.29 0.67 0.67 1.45 745.97 746.47 746.74 4.17 4.17 1.65 0.85 00 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm sewers Line Profile (Line 32) - PIPE A4 Page 1 of 1 Storm samB Line 32 - PIPE A4 Elev (M 753.E 753.00 JB BA 750.00 750.00 747.00 747.00 744.0D ........................................................................................................................................................................................................ 744.00 741.00 L90 Line 738.00 8.00 D 10 20 30 40 50 50 70 80 10 100 110 120 130 140 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (mss) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 32 7.29 741.19 742.15 1.50 1.49 1.76 743.19 743.64 743.91 4.13 4.13 6.63 5.67 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm samB Line Profile (Line 33) - PIPE A3 Line 33 - PIPE A,') Elev (ft) 754M 754.00 76 1 . CC' 751.00 748.x, 78.DO 745.,- .... ..... . .. .......... 745.00 35 456; -f - 18" Z 00% tfineN 742.00 739.007 - 739.00 35 4045 50 Reach (ft) Page I of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # a Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (Cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) 00 33 7.33 742.15 742.86 1.50 1.05 1.29 5.54 5.67 2.45 743.91 743.91 j 744.15 4.15 .— 00 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sewers Line Profile (Line 34) - PIPE A2 74O.GG 747.00 Valt:11 743.00 741.00 Line 34 - PIPE A2 Elev (ft) 749.00 747.00 745.00 1 C. 15 3u _ 4 739.00 45 50 Reach (ft) Page 1 of 1 Storm Sewers Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up WS) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 34 5.86 742.86 743.66 1.29 0.93 0.93 744.59 j 744.59 3.63 5.07 2.45 1.65 744.15 o Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sewers Line Profile (Line 35) - PIPE Al Page 1of1 Line 35 - PIPE Al 749.6E r 4�O. UU Y1 Al 747.00 747. DD 745.00 745.00 40 00OLf - 5" @ 2.00 Q 74.3.00.................................................................................................................................................................................... 743.00 741.00 741.00 739.DD 739.00 0 5 10 15 20 25 30 35 40 45 50 Reach (ft) Eley (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Veloaty Cover Line # Q (ds) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 35 5.01 743.91 744.71 0.68 0.91 0.91 744.59 745.62 745.62 7.30 5.25 1.65 0.85 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sewm N Line Profile (Line 36) - PIPE E3 Line 36 - PIPE E3 Elev (ft) 753.00 753.00 749.00 YI E3 749.00 746.00 745.00 741.00 12 . 10IL} 74-1.00 737.00 T37. DD Line 10 733.40 733.0D 0 5 10 15 20 25 3D 35 4D 45 50 Reach (ft) Page 1 of 1 storm sew Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (mss) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (mss) Dn (ft) Up (ft) 36 3.76 742.65 743.36 0.61 0.83 0.83 743.26 744.18 744.18 7.49 5.43 5.67 2.45 Project File: No. Lines: 45 Run Date: 9/9/2016 storm sew Line Profile (Line 37) - PIPE E2 Page 1 of 1 Storm Sewers Line 37 - PIPE E2 Flee M) 749.00 749.00 747.00 747.00 745.00 745.00 743.00 .................................................................................................................................................................. 743.00 741.00 741.00 739.00 73.9.00 0 5 1 D 15 20 25 30 355 40 45 5D 5�yC Ruch (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (fus) (ft) (ft) 37 2.33 743.69 744.49 0.67 0.67 1.48 744.36 745.63 745.97 6.68 6.67 2.45 1.65 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sewers Line Profile (Line 38) - PIPE E1 Line 38 - PIPE E1 EiT' ft. 749. GD 749.00 747. Q0 " 747.00 745.00 745. DO 4 .00OLf - " @ 2.0 % 743.00 ............................................................................................................................................................... 743.00 741.00 741.00 739.00 739.00 C' 1C` 1�' - -- - -r 4E '}0 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Cl Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up WS) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 38 1.45 744.49 745.29 0.67 0.67 1.45 745.97 746.47 746.74 4.17 4.17 1.65 0.85 p Project File: No. Lines: 46 —T Run Date: 9/9/2016 Ston" Sewell Line Profile (Line 39) - PIPE 11 Page 1of1 Line 39 - RIPE 11 EI ev (ft) r4y.UU YI 11 749.00 _ i 747. DD 747.60 745.00 745.60 3 .9944 - 2.9 % 743. DD................................................................................................................................................................................... 743.60 741.00 741.60 739.00 739.00 0 5 10 15 20 25 30 3.5 40 45 50 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfS) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn WS) Up (ft/s) Dn (ft) Up (ft) 39 1.45 744.49 745.29 0.67 0.67 1.54 746.07 746.56 746.83 4.17 4.17 1.65 0.85 C CA Project File: No. Lines: 45 Run Date: 9/9/2016 Storm sewers Line Profile (Line 40) - PIPE F3 Page 1 of I Storm se"m JB F4 Line 40 - PIPE F3 Elev (ft), 750.00 — W1 r- 750.00 746.00 ...................... ................................. 746.00 742.00742.00 —JYT79 -T7T27( FT—U97;- .......... ........ 738.00 739.00 734.00 734.00 730.00 730.00 0 5 10 .15 20 25 30 35 40 45 50 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (GfS) (ft/s) (ft/s) (ft) (ft) 40 3.76 742.65 743.36 0.61 0.83 0.83 743.26 744.19 744.19 7.49 5.43 5.67 2.45 Project File: Lines: 45 - Run Date: 9/9/2016 T Storm se"m Line Profile (Line 41) - PIPE F2 Line 41 - PIPE F2 Elea (ft) 749.00 Y1 F2 749.00 --- 747.00 747.00 745.00 745. CSC) 4021Lf -2. 0% 743.00 ................................................................................ 743.00 — Lin40 741.00 741.00 739.{ '7'1a m 0 5 10 15 20 25 30 35 40 45 50 55 �v Ruch (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 41 2.33 743.69 744.49 0.67 0.67 1.48 744.36 745.63 745.97 6.68 6.67 2.45 1.65 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm swmm CO Line Profile (Line 42) - PIPE F1 Line 42 - PIPE F1 749.00 f 4U. UU YI F1 747.00 747.00 745.00 745.00 4C. 00OU - " @ 2.00% 743.04.................................................................................................................................................................................... 743.00 741.00 741.00 739.00 739.00 0 5 10 15 20 25 3D 35 40 45 5D Reach (ftl EI ev (ft) Page 1 of 1 Storm Saw Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 42 1.45 744.49 745.29 0.67 0.67 1.45 745.97 746.47 746.74 4.17 4.17 1.65 0.85 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Saw Line Profile (Line 43) - PIPE G3 Line 43 - PIPE G3 Elev (ft) 754.00 754.00 75G. DG4, G, i 750.00 745. DD 746.00 742.00 _ a 742.00 738,00 738.DD Line '71A M 1 7'1d Mi 0 5 10 1E• 20 25 30 35 40 45 50 Reach (ft) Page 1 of 1 Storm sewers Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 43 3.76 742.65 743.36 0.61 0.83 0.83 743.26 744.18 744.18 7.49 5.43 —FProject 5.67 2.45 — File: No. Lines: 45 Run Date: 9/9/2016 Storm sewers Line Profile (Line 44) - PIPE G2 Line 44 - PIPE G2 Ele-. eft. 749.GG 74�.GG 747. GG 747.00 745. iia 745.00 743.00................................................................................................................................................. '43.00 Lin 4^, 74� .00 741.00 739.00 ?39.6G 0 5 1;, I_ 20 25 30 Reach (ftl Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up WS) (ft) () (ft) (6) () () (ft) (ft) (ft/s) M/S) (ft) (6) 44 2.33 743.69 744.49 0.67 0.67 1.48 744.36 745.63 745.97 6.68 6.67 2.45 1.65 g. Project File: No. Lines: 45 Run Date: 9/9/2016 swm, samB Line Profile (Line 45) - PIPE G1 Page 1 of 1 Storm Sewers Line 45 - PIPE G1 Elfu iti 749.00 749.00 Y1 � 1 747.00 747.00 745.00 745.00 4C 01 O U - " @ 2. IJ aro 743.00 .................................................................................................................................................................................... 743.00 741.00 741.00 739.00 739.00 0 5 10 15 20 25 30 35 4D 45 50 Ruch tft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 45 1.45 744.49 745.29 0.67 0.67 1.45 745.97 746.47 746.74 4.17 4.17 1.65 0.85 Project File: No. Lines: 45 Run Date: 9/9/2016 Storm Sewers Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3130 by Autodesk, Inc. Monday, Sep 12 2016 EEDS CHARLOTTE BOX CULVERT Invert Elev Dn (ft) = 710.00 Calculations Pipe Length (ft) = 300.00 Qmin (cfs) = 364.44 Slope (%) = 3.00 Qmax (cfs) = 364.44 Invert Elev Up (ft) = 719.00 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 84.0 Shape = Box Highlighted Span (in) = 96.0 Qtotal (cfs) = 364.44 No. Barrels = 1 Qpipe (cfs) = 364.44 n -Value = 0.013 Qovertop (cfs) = 0.00 Culvert Type = Flared Wingwalls Veloc Dn (ft/s) = 8.28 Culvert Entrance = 30D to 75D wingwall flares Veloc Up (ft/s) = 11.37 Coeff. K,M,c,Y,k = 0.026, 1, 0.0347, 0.81, 0.4 HGL Dn (ft) = 715.50 HGL Up (ft) = 723.01 Embankment Hw Elev (ft) = 725.36 Top Elevation (ft) = 749.00 Hw/D (ft) = 0.91 Top Width (ft) = 100.00 Flow Regime = Inlet Control Crest Width (ft) = 30.00 8e R. MM, 7{2.00 731.00 .2Tn00 718. W 710.00 702.00 EEDS CHARLOTTE BOX CULVERT H. kik 31.00 1500 700 -1 ^JO -9m -1700 R—h i1q BOX CuveH HGL Eft -k 102 Hydrology Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Box Culvert Drainage Area Hydrograph type = Rational Storm frequency (yrs) = 10 Drainage area (ac) = 53.000 Rainfall Inten (in/hr) = 7.238 OF Curve = SampleExpress.IDF Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 0.00 -10 0 Runoff Hyd - Qp = 364.44 (cfs) Monday, Sep 12 2016 Peak discharge (cfs) = 364.44 Time interval (min) = 1 Runoff coeff. (C) = 0.95 Tc by User (min) = 5 Rec limb factor = 1.00 Runoff Hydrograph 10 -yr frequency 5 Hydrograph Volume = 109,331 (cuft); 2.510 (acft) Q (cfs) 400.00 350.00 300.00 250.00 200.00 150.00 100.00 50.00 '%- 0.00 10 Time (min) 103 by! > m n D 735 Cst01 911 (, } A �: ��•_ V A A I „�\' _ --_740 �' \ `,�"h,� _ ` it i y��A�'w \ �Il l/ I -715 41 1-0 1 _ 11 i I 1 � � //// I ! I If / / J � � /''\• \\ I\ �1 � '� _ ��_ \ -__ _ _. _.- �r II 111 I 7 i i _ t \ l / , 710 Ij \\ \ ,\\\ ~ - \\ _....,."770--•�,`.. �` _J�.+ _ r IIII 11 I` I __ ♦\• 4\a\.\`� �.. 7 '- \ _,- L-- �\. / III 11 I `\i\ \\o\ ` `: '�\�: ' "N' .���I�IIJI�I�II (IIII Il lll� i l \ \ a - \ ` I \ I 1 \ \ � 1 /( 1 \ I � I / �� •` � I 1 „ ;I�r I! ,I 111 h�� t \ I \ 1 v�wv�wv 4V �\ .. �`� \ w \ •, _� \` \ ,. � L i '��� �`�\ xl� * f. I j I !III I I 710.'_-' I � � s 1 Nii f .1.11/1/ l$(ryryll I I I a I m / I I ! N � I f f I I > D31aNEo 3r. DAM j.E 30.5.,-13 �j .s..,: xcaon DMI Bv: CIm BV: SOLICrtATgN NO.: SUBMITTED BY: ODNTRACi NO.: ECO EN ENOY• CHARLOTTE u /� �Ce-2rlel�y PLOTDATE PN1.-:45 LlER INTERMODAL FACILITY AS NOTED 20-5° -1B 20,5913 M WTED 812E: FLE NAAE: ' ' PROJECT NUMBER 2015945 ANSI D Ill CNL SD GRADING PLAN SHEET 3 OF 4 �'�Fqg'. En9lnN dnE, PAA D31aNEo 3r. DAM j.E 30.5.,-13 �j .s..,: xcaon DMI Bv: CIm BV: SOLICrtATgN NO.: SUBMITTED BY: ODNTRACi NO.: hn neo cqc %%IIXX% /� �Ce-2rlel�y PLOTDATE PN1.-:45 LlER AS NOTED 20-5° -1B 20,5913 M WTED 812E: FLE NAAE: ' ' ANSI D Ill CNL SD r r OX 7, I/ M \\ `! � fi ll111111j If a I ; I I I � I I Ill, II I'II IIII II I I I f I Ill., L 1 1 i I I I ryll IIII II I IIII II!111 J 1 VIII I, tiJ II rl ,I II�' „ fJl \ 1 _ III I/ I Il��uAAl , Iill I 1. IIH En9lnN dnE, PAA D31aNEo 3r. DAM j.E 30.5.,-13 �j .s..,: xcaon DMI Bv: CIm BV: SOLICrtATgN NO.: SUBMITTED BY: ODNTRACi NO.: hn neo cqc %%IIXX% /� �Ce-2rlel�y PLOTDATE PN1.-:45 LlER AS NOTED 20-5° -1B 20,5913 M WTED 812E: FLE NAAE: ' ' ANSI D Ill CNL SD 18' DUL PIPE D 24' TANG BEYOND PIPE, TW. -z� 3� ANTI -SEEP COLLAR DETAIL NO SCALE WASHED STONE FILTER FABRIC UNDER DAA_ MIRAI wOR APPROVED EQUAL C I LI IA POND DAM S' Vel. TOP WOnI 4' MRI DEPTH YN. C'. OR R T mENCH BAOIaIu A IC vrtR1 C� oPMENT.R­TWO rAMPOrETRoN EQUI E AMMIAE MnxMAMN DERBm AHO MNAMLM v AL IMM%sTAMNN RtOCTORI CUT OFF TRENCH DETAIL NO SCALE GCL LINER. COVER SOIL AND KEV DAM Mm PREPARED SO GRADE, REF. E1tIS11NG GRACE GCI, LINEA DETAIL 2 SECTION B -B CLASSIRPNAP BAFFLE 2 3 4' TOPSOIL k SEED 10' uTTONAL SHELF s WiT . m TTI NORMAL WATER ELEV. 688.0 IMPERMEABLE LAYER (REFERTO BASIN TYPICAL SECTION) - SHALLOW LAND SHALLOW WATER•L�a3, HERBACEOUS PLANTS EMERGENT PWITS 8' BED OF TOPSOIL _ VEGETATED SHELF MAINTENANCE SCHEDULE NnnwheNHy aJtrr,M wer dermrim laema Lz �rebli i.d ,M pL.a.n m W oe &d dMlf Gad pximera n(tFe Msm =Mold be rxvd r.n w srwil7il -&d m.W the pLnb b. es,ebad,ed I.wmlml u. wceb). No po Oof OWn d.- ­t �.Id be fVhl.d ­ . Ix J¢twtd feed—IMtrsr .d roesMbl,s Om putts m the r-eS4 ddrif. LITTORAL SHELF CROSS SECTION NO SCALE - TGPOFaAFFI .—w - I^ - CLAS61 RP RAP .ILAFF� — I .CL LINER, COVER 60LL AND PREPARED SUBGRADE. REF. GCL LINER DETAA ELEVATION FOREBAY BAFFLE DETAIL NO SCALE BMP Inset Table Wet Pond EEDS Intermodal Ethanol Transfer TYPICAL POND SECTION B -B SCALE 1•-5' OP ALUM. BAR GRATING ,'%d' BEARING BAts. FASTEN NV: 723.11• INV.. 716.33- W/ J -CLIPS ATTACHED TO A IrX1rnr GALVANIZED ANGLE FRAME MORTAR FRAME TO TOP OF OUTLET 8' SCH 80 PVC WATER DUALITY CONTROL W/ NON-SIHNNK GROUT. STRUCTURE, W/ Y SQUARE ACCESS HATCH t LOCK DEVICE. 8' SUMS GV INSIDE RISER W/ - 10:1 SLOPE. 6' SOIL (MIN) T -HANDLE UP THROUGH RISER GRATE _ EMERGENCY SPILLWAY ON uTTD RAL SHELF EL. 724.35' TOPOF DAM: 728.00' I 3 4 - 3 3 _ A 70 EXISTING GRADE- 1 r -- 2 -YR WATER LEVEL: 723.42' (27.8 ------------------------------------ 266.50' - 18' RCP '0-RMG _-------------------------GASKEIED JOINT -AT O.SO1G ----- 716.33 NOTE: 8' PERMANENT POOL RARER GRAN AND CONTROL VALVE SECTION NOT SHORN FOR CLARITY. CUTOFF TRENCH,_ REF. DETAIL ----- ---- - T -------------------------------- NOTES: INV.. 716.33- 1. PROVIDE WATER T,q/T SEAL ARGURI PPE JOINTS TO RISER CONCRETE BASE - 6'X6' W/ NON-SIHNNK GROUT. 12' THK. W/ 10/10 6X6 WWW 2. GCL SHALL BE SEALED TO - CONCRETE RISER W/ GRANULAR - ROR WTTSHELF 1 FOR WATER QUALITY, BENTONITE ON ALL SIDES .PLANTINGS SECTION A -A - - -� (SHELF AREA BELO'•, SCALE 1WR6W 5,517 a+ - 3 NORMAL POOL LEVEL: 722.DC' 2 11 CONCRETE FILL INSIDE BOTTOM OF RISER, SLOPE TD RCP INVERT 01L. UNOISIURBED SqL NTHETIC CLAY LINER W/12' 4 5 STORRMONgO�AIN D 111 / 12 RE 6' THICK GRAVEL ACCESS PERMANENT W711T / N69' 09' WIN / 1 1 GOR®AY BAFFLE, /\ SEE RETAIL BELOW f STORMWATER BMP ACCESS ' Q MAINTENANCE EVSEMENT�N � 1 ire 6' MAINTENANCE (RAN VALVE, REF. DETAILS 8' SON. BO PVC DI LME 1[ SLOPE O 0.50 : A �A N PERMANENT OUTFT PROTECTION: ' ♦-- 288.50 LF OF 18' '0 -RING GKSKETm JOINT a D.Sox,U/,, EMERGENCY SPILLWAY, m ELEV. 724.35' PRECAST CONC. RISER STRUCTURE. RIA ELEV, 724.20' WET POND GRADING PLAN SCALE: l'-30' =:= +'e s>o C ' 000°op >m EN, Woe 215t,A AF % 3:1 SLOPE (TYP)' TF1+OkB®,T 9WIA IAIO IMIWA2PM >x.W.NrsY AA 215 (--D-�._-�_ - - - - - ROR WTTSHELF 1 FOR WATER QUALITY, '. .PLANTINGS .. - - -� (SHELF AREA BELO'•, _ — — —.. :; -. 5,517 a+ - A 21 SLOPE SOW WATER LEVEL (TW) - 1 A 118.369•'- __�_- A - �Ni11F� 1 i I C ' 000°op >m EN, Woe 215t,A AF % 3:1 SLOPE (TYP)' TF1+OkB®,T 9WIA IAIO IMIWA2PM >x.W.NrsY AA 215 (--D-�._-�_ - - - - - ROR WTTSHELF 1 FOR WATER QUALITY, '. .PLANTINGS .. - - -� (SHELF AREA BELO'•, _ — — —.. :; -. 5,517 a+ - A 21 SLOPE SOW WATER LEVEL (TW) - A 118.369•'- __�_- A - =,5 SAVMAMR mIlY6 6RMD'S TR) =1r AWNdb f3T115v5 PAIR. vWIA, YM ffi: Y eA . S 0.116 MM lIE. VII` S PWG AT SPAQWi tut GM fFRiElI. CLUSTERED AT Kl. NIDNNSWAIWQ (N EAW,FA. tl1Kl0m KT. N10,YN3 MAIIIETr. 14'-]D' MT. MATAtltt: 1Y -A6- NT. PEIWMpNT INIa IlFP1M =,G R,s vra.c. (BUE FLAG) �::?.�;�IN I 1A T =2oCMEZTEMwA ,.:� EnGE a,.M�,WILR Fm�Awa xaus�iL�• sAi A"xiTwlATno x,vNKs ---� MxN� , „•HLA m TYITK scnW�--I �An�wrr. ausi0® Ar KTwuntc x,FArxs >uo wMEDA cARxxrs mAoo. QYUnE�n AST ALTuxAnNc xTatvNs YAIIMM,Y: — T. KEY TYPE OUANIM KEY TWE ANTITY 000°op >m EN, Woe 215t,A AF 228 TF1+OkB®,T 9WIA IAIO IMIWA2PM >x.W.NrsY AA 215 (--D-�._-�_ 228 A,NQW WA-OIC1mIT lYWAIMO XW1QM 215 226 BASED ON VEGETATED SHELF At EF. S] S SHALLDW WATER (LOFER WTLF OF SHW'k 256D SF SHALLOW LANG (UPPER HAY OF SHELF,z7W SF 1. RA EnrEOS M BE MNWM 2- MA . S PWG AT TME Q MD 2 PLWTWG SEASON 6 RUGS 91A.LL R EIYEDN APR ,Sx LITTORAL SHELF PLANING DETAIL NO SCALE ect-energy EDO ENERGY CHARLOTTE, MC tt' 17943" rp GH1A ,. Ms�JO iLLC Vl J m a Q w t�f D K L) I=D Z* 0-0 w a aNEET NUMBER - I CD7.0 2 DAM AND EMBANKMENT CONSTRUCTION 1.) GENERAL - THE POND AND DAM AREA SHALL BE CLEARED, GRUBBED AND STRIPPED OF ALL VEGETATIVE MATERIAL AND TOPSOIL PRIOR TO DAM CONSTRUCTION. THE DISPOSAL OF TREES, STUMPS, CONSTRUCTION DEBRIS, VEGETATIVE MATERIAL, ETC. SHALL NOT BE PERMITTED IN THE DAM OR POOL AREA, WHEN BLASTING IS USED TO REMOVE ROCK FROM THE POOL AREA THE BLASTED AREA SHALL BE OVER -EXCAVATED TO A DEPTH OF AT LEAST TWO FEET (7) BELOW FINISHED GRADE AND BROUGHT BACK TO FINISHED GRADE WITH CLEAN RELATIVELY IMPERVIOUS SOIL MATERIAL COMPACTED IN PLACE. 2.) EARTH FILL DAMS A) THE CONSTRUCTION OF THE DAM SHALL FOLLOW THE STANDARDS OF THE NCDEQ DAM SAFETY. ITEMS LISTED BELOW ARE MINIMUM. BUT WILL BE VOID IF NCDENR REQUIREMENTS ARE MORE STRINGENT REQUIREMENTS, B) SOIL MATERIALS USED FOR EARTH FILL WHICH ARE HIGHLY PERMEABLE OR WHICH EXHIBIT SIGNIFICANT SHRINKAGE SWELL OR DISPERSION SHALL NOT BE USED IN THE EMBANKMENT. C) A CUTOFF TRENCH (CORE TRENCH) SHALL BE PROVIDED WITH A MINIMUM WIDTH OF FIVE FEET (S). THE CENTERLINE OF THE CUTOFF TRENCH SHALL BE LOCATED DOWNSTREAM OF THE INSIDE TOP OF SLOPE OF THE DAM. THE CUTOFF TRENCH SHALL BE CAREFULLY BACK-FILLED WITH HIGHLY IMPERMEABLE MATERIAL AND COMPACTED AT LEAST NINETY-EIGHT PERCENT (BB%) OF STANDARD PROCTOR DENSITY. D) THE MINIMUM TOP WIDTH OF THE DAM SHALL BE TEN FEET (101 AND SLOPES SHALL NOT BE STEEPER THAN 3:1 (THREE HORIZONTAL TO ONE VERTICAL ON THE DAM OR UPSTREAM SIDE OF THE EMBANKMENT WITH 2:1 SLOPE ON THE DOWNSTREAM SLOPE OF THE DAM. THE SLOPES AROUND THE POND WILL BE 3:1 FOR EASE OF MAINTENANCE AND ACCESS OF THE POND. E) ALL DISTURBED GROUND AREAS AND EMBANKMENTS SURROUNDING THE POND SHALL BE MECHANICALLY STABILIZED OR HAVE PERMANENT SEEDING SCHEDULE. 3.) LANDSCAPING AREAS AROUND THE POND A) THE LANDSCAPING WILL BE INSTALLED AND MAINTAINED PER THE REQUIREMENTS OF THE CURRENTS STORMWATER BMP MANUAL PER NCDENR WATER QUALITY SECTION. 8) THE SOIL IN THE LITTORAL SHELF WILL HAVE AMENDMENTS PER NCDENR REQUIREMENTS PER CHAPTER 6 OF JULY 2007 OR CURRENT MANUAL FOR GOOD CONDITIONS TO MAINTAIN THE AQUATIC PLANTING REQUIRED FOR THE WATER QUALITY FEATURE. C) THE ENGINEER WILL COORDINATE WITH THE OWNER AND CITY OF CHARLOTTE ENGINEERING DEPT. FOR APPROPRIATE AGREEMENTS. COVENANTS, AND OTHER PAPER WORK REQUIRED FOR THE CERTIFICATION OF THE WATER QUALITY MEASURE. ENGINEER MUST MONITOR CONSTRUCTION, AND CERTIFY THE MEASURE AND PROVIDE AS-BUILTS UPON COMPLETION. OPERATION AND MAINTENANCE MAINTENANCE OF THE POND WILL FOLLOW THE CRY OF CHARLOTTE AND NCDEQ STANDARD MAINTENANCE REQUIREMENTS AND MAINTENANCE WILL BE DONE AS PART OF THE STANDARDS SET UP BY THE STORMWATER BMP MANUAL AND CERTIFICATION FOR MAINTENANCE BY THE LOCAL ORDINANCE REQUIREMENTS INSPECTION EVERY MONTH OR AFTER A 1.0' RAINFALL EVENT: 1. REMOVE DERIS FROM THE OUTLET STRUCTURE. 2. CHECK AND CLEAR THE ORIFICES OF ANY OBSTRUCTIONS. 3. CHECK THE POND SIDE SLOPES; REMOVE TRASH, REPAIR ERODED AREA BEFORE THE NEXT RAINFALL EVENT. INSPECTION EVERY 3 MONTHS TO INCLUDE THE FOLLOWING: 1 INSPECT THE COLLECTION SYSTEM (I.E. CATCH BASINS, PIPING, GRASSED SWALES) FOR PROPER FUNCTIONING. CLEAR ACCUMLUATED TRASH FROM BASIN GRATES AND BASIN BOTTOMS, AND CHECK PIPING FOR OBSTRUCTIONS. 2. CHECK POND INLET PIPES FOR UNDERCUTTING, REPLACE RIPRAP. AND REPAIR BROKEN PIPES. 3. RESEED GRASS SWALES TWICE A YEAR AS NECESSARY. REPAIR ERODED AREAS IMMEDIATLEY. 4. CHECK THE SLOPE ONTHE DOWN STREAM SIDE OF THE DAM AND THE AREA BELOW THE EMERGENCY SPILLWAY FOR ERODED AREAS. REPAIR ANY AREAS WHERE EROSION MAY OCCUR IMMEDIATELY. INSPECTION EVERY 6 MONTHS TO INCLUDE THE FOLLOWING: 1. REMOVE ACCUMULATED SEDIMENT FROM THE BOTTOM OF THE OUTLET STRUCTURE, 2. CHECK POND DEPTH AT VARIOUS POINTS IN THE POND. IF DEPTH IS REDUCED TO 75% OF ORIGINAL PERMANENT SEDIMENT STORAGE DESIGN DEPTH, SEDIMENT WILL BE REMOVED TO AT LEAST ORIGINAL DESIGN DEPTH. 3. OWNER IS RESPONSIBLE FOR MAINTENANCE AND CLEAN OUT OF THE FOREBAY AREA AS NECESSARY FOR ROUTINE SEDIMENT REMOVAL AND TRASH. 4. OPERATE SULICE GATE DRAIN VALVE FROM FULLY OPEN TO FULLY CLOSED POSITION TO MAKE SURE THE VALVE IS WORKING PROPERLY. MAINTENANCE AS REQUIRED: 1. MOW THE SIDE SLOPES ACCORDING TO THE SEASON. MAXIMUM GRASS HEIGHT WILL BE 6". 2. WETLAND PLANTS AS SHOWN AND OTHER INDIGENOUS WETLAND PLANTS ARE ENCOURAGED ALONG THE POND PERIMETER. HOWEVER THEY MUST BE REMOVED OR TRIMMED IF THEY COVER THE ENTIRE SURFACE OF THE POND. CATTAILS ARE NOT ALLOWABLE WETLAND PLANTS. IF THEY BECOME PART OF THE POND, REMOVE THEM IMMEDIATELY. 3. THE ORIFICE IS DESIGNED TO DRAW DOWN THE POND IN A 2 TO 5 DAY TIME PERIOD. IF THE DRAWDOWN IS NOT ACC40MLISHED IN THAT TIME. THE SYSTEM MAY BE CLOGGED. THE SOURCE OF THE CLOGGIN MUST BE FOUND AND ELIMINATED. 4. ALL COMPONENTS OF THE DETENTION POND SYSTEM MUST BE KEPT IN GOOD WORKING ORDER. MAINTENANCE &INSPECTION LOGS: 1. THE OWNER SHALL KEEP A MAINTENANCE RECORD FOR THIS BMP. THE RECORD SHALL BE KEPT IN A LOG IN A KNOWN SET LOCATION AND MADE AVAILABLE FOR INSPECTION AT THE REQUEST OF THE CIN OF CHARLOTTE OR NC DENR 2, THE LOG SHALL RECORD THE DATES OF ALL INSPECTIONS AND ANY PERFORMED MAINTENANCE. GENERAL POND CONSTRUCTION NOTE: I - 1. GCL LINER SHALL NOT BE LEFT IN A PARTIALLY CONSTRUCTED CONDITION. POND MUST BE COMPLETED FROM START TO FINISH WITHOUT INTERRUPTION. INSTALLATION OF MATTING SHALL BE PERFORMED WHEN CONDITIONS ALLOW FOR THE CONTINUOUS INSTALLATION OF SUSGRADE MATERIAL, GCL MATTING AND COVER MATERIAL. 2, IN THE EVENT THAT CONDITIONS CANNOT IMMEDIATELY BE MET TO PERMIT INSTALLATION, CONTRACTOR SHALL GRADE TO THE FULLEST EXTENT POSSIBLE BASED ON CONDITIONS AND STABILIZE PER EROSION SEEDING FLANS, 3. CONTRACTOR MAY RESUME POND CONSTRUCTION AND GCL LINER INSTALLATION UPON IMPROVEMENT OF CONDITIONS. ANY ACCUMULATED SILT SHALL BE REMOVED PRIOR TO SUBGRADE PREPARATION. 4. GC SHALL SECURE A BOND IN THE AMOUNT REQUIRED TO COVER FINAL POND CONSTRUCTION COSTS, PAYABLE TO THE CITY OF CONCORD. 5. FINAL POND CERTIFICATION WILL NOT BE PROVIDED UNTIL AFTER INSTALLATION OF GCL LINER, AND SUBGRADE/ COVER MATERIALS AND FINAL GRADING. �� IB" RCP BEYOND M REAR OF RISER BOX PULED AT BOTOM OF WATER NORMAU CONTROL DEICE. ITR BELOW NORMAL AL ¢a d INV DEEM 716.33 POOL FOR TRASH PROTECTION NOTE: alovloE le•MIN. covER k H SOIL pEplH oN LmoRAL SHELF 1 I WETPWD110TTOy IEIEV. VARES) I FOR WETLNID PLNRINGS COVER SOIL. 1S Mw, GCL MATTING. 9EMOMAT CL" OR APPROVED EWAL, PLACED WITH POLYPROPYLENE MEMBRANE MNR18r aUBGRAOE MATER AL uNF W .SHED Rock TYPICAL_3ENTOMAT INSTALLATION TECHNIOl1E NOTE: Liner, subgrade and gown material shall be prepared and inslaled under dry conditions. Contractor may install liner after Seasonal High Water Table (SHOUT) has receded to levels permitting work. If SHWT does not su0iaently recede under natural condi ions, than Contractor shall be n•sporlsible for any and all dewatering required to perform Mork. SUBGRADE PREPARATION: Subgade surfaces consisting of granular sods. gravels or rough stone are not acceptable We to their lage Void fraction and p-lum potential. K the underlying surface consists of large .ocks or other material Mat cannot be removed, a 6" min layer of send or dean sdi shall be prepared as a subgrace material. Prepared subgmde materials shall lave a parlicle-size dslnbution of at least 80% finer than the #60 sieve (0.25 mm) End shall be prepared as follows. 1. The subgrade surface must be smooth and free of vagetatbnsharp-edged rocks, stones, slicks and the, foreign male, that -,ad comad the GCL. 2. The= Shc14d be rolled with a smooth -drum compactor to remove any wheel ruts greater than 1` In depth, footprints, or other abrupt changes. 3. All prolresrorls ainending more than 0.5" shall be removed, crushed or pushed mho the surface with a smooth -drum wmpacton. 4 The GCL maybe installed on a fromn subgrade, but the subgratle soil must meal the above requirementsm the Bowed state. COVER PLACEMENT: GC shall cover the entre GCL mat with a minimum of 12' of cover material In provide confining stress to the GCL, eliminate the potential for seam separation and to prevent damage my equipment, erosion, etc. Cover material shall conform to the following standards 1. Cover soils should be bee of angular stones or other foreign matter that could damage tie OCL GC shall consult manufacturer d rover soils have high Concentrations, of caldum limestone, dolomite. gypsum, seashell fragments) 2. Cover sods shall have a pentacle size dslnbutan ranging between fines and 1' unless a cushioning geoledile is apedrled. 3. Cover soils shall be placed over the GCL using construction equipment that mimmizes stresses on the GCL. A minimum thickness of 12" of cover soil should be maintained between the equipment and the GCL at all times during the covering process. 4. Soil Cover should be placed in a mentor that prevens ft soul Iran entenng the GCL overlap zones. Soil cover should be pushed up On slopes, not down slopes to minimum tensile forces on the GCL 5. Cyclical wetting antl drying of the GCL can cause overlap separation. Soil ver shall be placed promptly wherever possible. 6. To avoid Seam sepsration, the GCL should not be put in sues. Iva tension by the weight or -cm of midlined geomambane on sleep slopes. Longitudinal seam overlaps shall be a r imum of 12` to reduce overlap separation. Atldil-ovally, supplemental bentonite shall be applied to the seams per manufacturer's moomendalions. GEOSYNTHETIC CLAY LINER (GCL) DETAIL NO SCALE 4'X4' RI ✓Y SLUICE LIR ROD fl TOP OF RISER RRA ELEV: 724.20 OPEN TOP W/ VARMNT SCREEN FOR ANTI -SIPHON CONTROL Or SCM. BO PVC QUALITY CONTROL INV. - T W/2' HATCH AND ON TOP ORFM WV. 723.10' e` PVC CAP w/ 2.5` 010. O IB" RCP BEYOND M REAR OF RISER BOX PULED AT BOTOM OF WATER NORMAU CONTROL DEICE. ITR BELOW NORMAL AL INV DEEM 716.33 POOL FOR TRASH PROTECTION GCL TO BE SEALED TO CONCRETE RISER W/ GRANULAR BENTONITE ON ALL SIDES. I i \ NOTE: CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO ENGINEER FOR BASE EL:716.00 RENEW AND APPROVAL PRIOR TQ FA&6CATION OF OUTLET STRUCTURE SCALE 1'-2' 2Gt-enemy ECO ENERGY cIIARLOTTE. Nc U gN m .J Yo> W CMZ D W U W Z � O-� U G W Bll!!T NUMBER CD8.0