Loading...
HomeMy WebLinkAbout20161236 Ver 1_CAMA Application_20161214"v Coastal Management ENVIRONMENTAL QUALITY December 8, 2016 MEMORANDUM TO: FROM: SUBJECT: Applicant: PAT MCCRORY Governor DONALD R. VAN DER VAART ter'rc?;,rry 2 3 1 6 1 2 3 6 Karen Higgins, Compliance and Permitting Unit DWR - Water Quality Program Doug Huggett, Major Permits Coordinator Division of Coastal Management BRAXTON DAVIS CAMA/DREDGE & FILL Permit Application Review Thomas & Julie Gardner Project Location: Osprey Drive, Albemarle Shores Subdivision, Chowan County Proposed Project: Retaining wall, bulkhead, pier, platform, dwelling, pool, deck, fill Please indicate below your agency's position or viewpoint on the proposed project and return this form by 12/29/16 to 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Lynn Mathis at (252) 264-3902. When appropriate, in-depth comments with supporting data are requested. REPLY: SIGNED This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE Nothing Compares_-,, State of North Carolina I Environmental Quality I Coastal Management 401 S. Griffin St., Ste 300 1 Elizabeth City, NC 27909 252-264-39011252-331-2951[fax] 1. R1 3. 4. DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Thomas and Julie Gardner LOCATION OF PROJECT SITE: Lots #30 and #31 on Osprey Drive (Private Road), Albemarle off of Drummond's Point Road (SRI 100), in Chowan County, le Shores Subdivision, on the Albemarle Sound. C Photo Index: 20.06:154-6765 F15, F16, G15, H14, H15 Plane Coordinates: X: 32002764633.824ftUSE 0853 76024,45.24' W State Lat.: 37004'03.27" N Long.: INVESTIGATION TYPE: CAMA /D&F NVESTIGATIVE PROCEDURE: Dates of Site Visit: s o N er 30, 2016 I Was Applicant ING PROCEDURE: Application Received complete: December 2, 2016 5. PROCESS Office: Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan: Chowan County LUP Land Classification: W, TA & ES Conservation (B) AEC(s) Involved: (C) Water Dependent: Yes (D) Intended Use: Private Residential None (E) Wastewater Treatment: Planned: Septic System (F) Type of Structures: Existing: Nothing, pier & platform, bulkhead, retaining Planned: Dwelling, p wall and associated infrastructure. (G) Estimated Annual Rate of Erosion: 2' GRADED FILLED SHADING 7. HABITAT DESC11 RIPTION: 91 0s (A) Shallow Water Bottom: EW & PTA 510sf (B) High Ground: ES 49,407sf 22,093sf (C) Wetlands: 404 (D) Total Area Disturbed: 72,920sf 1.67 Acres (E) Primary Nursery Area: No (F) Water Classification: SB Open: No 1 986' of the installation of (4) 24" culverts PROJECT SUMMARY: Proposed development will, 3) include the following: 8• 22,093sf of 404 we retaining wall, 2) the filling under a fill driveway, 4) the construction of -255' of bulkheads sw9ithe ng pool, and, 8) a pier with a 20'x 20' platform, 6) a single family residence, 7 brick patio/pool deck. Thomas & Julie Gardner Field Investigation Report Page 2 Proiect Setting The applicant's project site consists of two vacant waterfront lots located at Albemarle Shores Subdivision, in Chowan County; more specifically described as being lots #30 and #31 on Osprey Drive. The property addresses are 226 and 228 Osprey Drive, Edenton, North Carolina. Both lots have unprotected shorelines totaling 255.33' abutting the Albemarle Sound. A 5' concrete barrier has been placed along the northeast corner of the applicant's shoreline by the adjacent property owner, to protect the corner of their bulkhead. There is a 5' to 6' high escarpment along the applicant's shoreline with clear evidence of erosion. It is estimated that the fetch at this site is over 9 miles, making the shoreline extremely susceptible to erosion. Both lots are deep (between 665' and 803') with two areas of high ground bisected by 1.968 acres of 404 wetlands. Uplands on the road side of the two properties is 1.262 acres (54,972sf), and the upland area on sound side is —.735 acres (23,016sf). Albemarle Shores is a two phase 95 lot residential subdivision Zoned Al (Agricultural) by the Chowan County Planning Department. Located to the north of Albemarle Shores, at the end of Osprey Drive, is the entrance to The Refuge at Drummonds Point, a vacant waterfront residential subdivision. Located to the immediate north of the applicant's property is a developed residential lot, to the south is a vacant residential lot with an elevated walkway over the 404 wetlands to access the waterfront section of the property. The two lots abut Osprey Drive to the west and the Albemarle sound to the east. Vegetation includes, but is not limited to, Black Tupelo (Nyssa sylvatica), Narrow -leaved Cattail (Typha angustifolia), Bald Cypress (Taxodium distichum), Arrow Arum (Peltandra virginica), Virginia Chain Fern (Woodwardia virginica), Caric Sedge (Carex spp.), Swamp Loosestrife (Decodon verticillatus), groundsel tree (Baccharis halimifolia), carolina- jasmine (Gelsemium sempervirens), Sweet Bay (Mannoila virginiana), Catbrier (smilax bona nox), Loblolly Pine (Pinus teada), American Holly (Ilex opaca), Live Oak (Quercus Virginian), Poison Ivy, (Toxicodendron radican), Spanish Moss (Tillandsia usneoides), Red Maple (Acerrubrum), Wax Myrtle (Myrica cerifera), Virginia Creeper (Parthenocissus quinquefolia), and Pokeweed (Phytolacca americana). Water depths graduate from 0' at the shoreline to -3.5' at a distance 105' offshore. The waters adjacent to the project site are a known submerged aquatic habitat, but no vegetation was found within any proposed work area. One known historic site (CO 0247) is documented as being 3,500' south of the applicant's property. There are no known geologic formations or archaeological sites associated with the applicant's property. Development Proposal The applicant's, Thomas and Julie Gardner, propose the following development: 1) the filling of 22,093sf of 404 wetlands (for the construction of an access road and a waterfront building site), 2) the installation of a septic pumping station from the sound side of the property to a septic Thomas & Julie Gardner Field Investigation Report Page 3 drain field on the road side of the property, 3) the construction of 986' of retaining wall to contain the proposed wetland fill, 4) the installation of (4) 24" culverts to maintain a hydrological the connection between the wetland areas to the north and south of the proposed fill area, construction of a single family residence, 5) construction of a swimming pool, 6) installation of a brick patio/pool deck, 7) the construction of a -255' long vinyl bulkhead an average of 2' waterward of normal water level (NWL), and, 8) the construction of a 85' x 6' pier with a 20' x 20' platform. The applicant's consultant, George Wood, has submitted application to The Great Dismal Swamp Restoration Bank, LLC, to obtain 1:01 wetland mitigation credits in trade for the proposed wetland fill. Confirmation of the mitigation credit has not been received. The total area of proposed land disturbance will be-71,500sf (1.64 acres), and the total are of water impact will be 1,420sf Proposed development will involve the following: 1) Wetland Fill 404 Fill: a093sf Fill within the 75' Area of Environmental Concern (AEC) = 185sf 2) Shallow Water Bottom Fill Bulkhead: -255' long x 2'average (5' max.) waterward of NWL 51.t3sf 3) Impervious Surface ming pool, p Impervious Residence, swimatio/pool deck and gravel driveway = 9,436sf Within the 75' AEC = 1,416sf (40' from NWL at bulkhead alignment) 4) Open Water Shading - Location to be 25' south of the nearest riparian line. Pier: 85' x 6' = 510sf Platform: 20' x 20' = 400sf WR 5) Associated Land Disturbance Disturbance associated with the installation of the septic drain field, pumping station and bulkhead = 40AO7st Total area of impact: Land = 71,500sf Water= 1 420s 72 �21�s Anticipated Impacts 1) Approximately 22,093sf of 404 wetlands will be filled. 2) Project will result in the shading obottom wilopen be filledwater by thethe constructionplatform. a new 3) Approximately 510sf of shallow bulkhead. Thomas & Julie Gardner Field Investigation Report Page 4 4) The proposed development may temporarily disrupt animal populations within adjacent waters and the project area. 5) Installation of pilings for the proposed piers may result in temporally suspending sediments in the water. 6) During the project construction it is anticipated that noise levels may periodically increase above surrounding background (ambient) levels from heavy equipment. 7) Treated wood leaches over time in surrounding waters and sediment. The amount of leaching is dependent on the type of organic material present in the water bottom substrate, oxygen levels and water movement; however, it is estimated that 90% of the leaching will occur within the first 90 days. Submitted by: Lynn Mathis Date: December 2, 2016 RCM MP41 APPLICATION for Received. Nefor Development Permit �� 3 (last revised 12/27/06) M�Gc North Carolina DIVISI N OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) Applicant 1: First Name Thomas MI D. Last Name Gardner Applicant 2: First Name Julie MI M. Last Name Gardner If additional applicants, please attach an additional page(s) with names listed. Mailing Address 44 Ford Avenue PO Box City Wharton State NJ ZIP 07885 Country USA Phone No. 201 - 874 - 5801 ext. FAX No. - - Street Address (if different from above) City State ZIP Email gardner505@gmail.com 2. Agent/Contractor Information Business Name Environmental Professionals, Inc. Agent/ Contractor 1: First Name George MI H. Last Name Wood Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box 3368 City Kill Devil Hills State NC ZIP 27948 Phone No. 1 T2512 252 - 441 - 0239 ext. 105 hone No. 2 - 423 - 1234 ext. FAX No. 252 441 0721 Contractor # Street Address (if different from above) 1404 S. Virginia Dare Trail City Kill Devil Hills State NC ZIP 27948 - Email obxwood@yahoo.com <Form continues on back> 252-808-2848 .. 1-888-4RCO AST :: www. nccoastaImanagement. not PROJECT NARRATIVE THOMAS D. & JULIE M. GARDNER: , 2.1 11ti� LOTS 30 & 31— OSPREY DRIVE`S � ALBEMARLE SHORES II CHOWAN COUNTY, NORTH CAROLINA n0 m -F The applicant owns Lots 30 and 31 of Albemarle Shores I1 in Chowan County. The site is situated between the improved Osprey Drive and Albemarle Sound. Highground along Osprey Drive is available for wastewater disposal, and a highground area on the Albemarle Sound is desirable for residential construction. The project anticipates the need to fill wetlands which are subject to Section 404 of the Clean Water Act for access and to support the residential construction. Also proposed is the construction of a bulkhead along the eroding shoreline an average of 2 feet waterward of Normal Water yet not exceeding 5 feet. An 85 -foot long pier with a 20 x 20 foot tee is proposed to provide access to water for a shallow draft boat. Water depths at the end of the pier are approximately 3.5 feet. Of the 1.968 acres of wetlands at the site, 0.14 acres are proposed to be filled for access and 0.37 acres for house construction. All fill will be retained by a retaining wall with 15 -foot tiebacks. Mitigation is proposed for unavailable wetland impacts from The Great Dismal Swamp Restoration Bank. Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location - County (can be multiple) Street Address State Rd. # Chowan 228 Osprey Drive d. Approximate elevation of tract above NHW (normal high water) or Subdivision Name City State Zip Albemarle Shores II Pinus taeda, Nyssa sylvatica, Smilax bona-nox, Taxodium distichum, Mannolia virginiana, Typha latifolia NC - Phone No. Lot No. (s) (if many, attach additional page with list) - - ext. 30, 31, 1 , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank Albemarle Sound c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural []Manmade ❑Unknown Albemarle Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes []No work falls within. Chowan 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 250 �zp� ��Z� 172,715.4 (2 tracts) c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 88,121.9, 84,593.5, NWL (normal water level) (If many lot sizes, please attach additional page with a list) +/- 6' ❑NHW or ®NWL e. Vegetation on tract Pinus taeda, Nyssa sylvatica, Smilax bona-nox, Taxodium distichum, Mannolia virginiana, Typha latifolia f. Man-made features and uses now on tract None g. Identify and describe the existing land uses adjacent to the proposed project site. Residential h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? A-1 Agricultural District (Attach zoning compliance certificate, if applicable) ®Yes []No [INA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes ®No ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252-808-2808 . 1-888-4RCOA5T . www.nccoastatmanagernent.not Form DCM MP -1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? - .®Yes ❑No (ii) Are there coastal wetlands on the site? ❑Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ®Yes []No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. None o. Describe existing drinking water supply source. None p. Describe existing storm water management or treatment systems. None 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Single -Family Residential c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Bulldozer for fill, water jets and vibrating hammer for bulkhead, saws and hammers for construction d. List all development activities you propose. Pool, single-family residence, access road, bulkhead, and pier e. Are the proposed activities maintenance of an existing project, new work, or both? New f. What is the approximate total disturbed land area resulting from the proposed project? 1.64 ❑Sq.Ft or ®Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No [INA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. None Existing None Proposed L Will wastewater or stormwater be discharged into a wetland? []Yes ®No ❑NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA j. Is there any mitigation proposed? ®Yes []No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 252-808-2808 .. 1-888-4RCoAST . wvvw.nccoastaimanagement.net Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information - In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (t) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e�Theappropriate application fee. Check or money order made payable to DEN R. f. A I' ist of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Michael Brown Phone No. Address 10105 Orlando Stone Drive - Bristow, VA 20136 Name Louis Posedel Phone No. Address 205 Cameron Glen Drive - Apex, NC 27502 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. None I� h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date September 21, 2016 Print Name George H. Wo d Signature Please indicate application attachments pertaining to your proposed project. ®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ®DCM MP -3 Upland Development ®DCM MP -4 Structures Information 252-808-2808 .. 1-888-4RCOAST .. www.nccoostaimanagement.net Form DCM MP -2 EXCAVATION and FILL DMEC (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. 1. Access ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock (excluding (NLW or or other wetlands (WL)? If any boxes are checked, provide the Breakwater shoreline NWL) ❑CW []SAV ❑SB stabilization Length OWL []None (ii) Describe the purpose of the excavation in these areas: Width DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. Avg. Existing (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? NA NA []Yes []No ❑NA Depth (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the -disposal include any area in the water? Final Project (CW), submerged aquatic vegetation (SAV), shell bottom (SB), []Yes ❑No [INA NA NA (ii) If yes, how much water area is affected? Depth number of square feet affected. ❑CW []SAV [:]SB 1. EXCAVATION ®This section not applicable a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. c. (i) Does the area to be excavated include coastal wetlands/marsh d. High -ground excavation in cubic yards. (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW []SAV ❑SB OWL []None (ii) Describe the purpose of the excavation in these areas: 2, DISPOSAL OF EXCAVATED MATERIAL ®This section not applicable a. Location of disposal area. b. Dimensions of disposal area. c. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? ❑Yes ❑No [INA []Yes []No ❑NA (ii) If no, attach a letter granting permission from the owner. (ii) If yes, where? e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the -disposal include any area in the water? (CW), submerged aquatic vegetation (SAV), shell bottom (SB), []Yes ❑No [INA or other wetlands (WL)? If any boxes are checked, provide the (ii) If yes, how much water area is affected? number of square feet affected. ❑CW []SAV [:]SB ❑WL ❑None (ii) Describe the purpose of disposal in these areas: 252-808-2808 :: 1-888-4RCOAS-r :: wfvvro.nccoastaImanagement. not revised: 12/26/06 r Form DCIII) NIP -2 (Excavation and Fill, Page 2 of 2) 3. SHORELINE STABILIZATION ®This section not applicable (If development is a wood groin, use MP -4 — Structures) a. Type of shoreline stabilization: ®Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: c. Average distance waterward of NHW or NWL: +/- 2 e. Type of stabilization material: Wooden Bulkhead g. Number of square feet of fill to be placed below water level. Bulkhead backfill +/- 20 c. vds. Riprap Breakwater/Sill Other i. Source of fill material. Commercial Supplier b. Length: 252 feet Z ' Width: 1' d. Maximum distance waterward of NHW or NWL: +/- 5' f. (i) Has there been shoreline erosion during preceding 12 months? ®Yes ❑No ❑NA (ii) If yes, state amount of erosion and source of erosion amount information. Unknown h. Type of fill material. Sand 4. OTHER FILL ACTIVITIES ❑This section not applicable (Excluding Shoreline Stabilization) a. (i) Will fill material be brought to the site? ®Yes ❑No ❑NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW), If yes, (ii) Amount of material to be placed in the water 20 c. yds. (iii) Dimensions of fill area 252 x 2 (iv) Purpose of fill Backfill Bulkhead submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ®WL 22.093 sa. ft. ❑None (ii) Describe the purpose of the fill in these areas: driveway & single-family residence 5. GENERAL a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline, controlled? backhoe, or hydraulic dredge)? Fill material placed behind bulkhead or retaining wall(s). Backhoe c. (i) Will navigational aids be required as a result of the project? ❑Yes ®No [INA (ii) If yes, explain what type and how they will be implemented. N/A d. (i) Will wetlands be crossed in transporting equipment to project site? ❑Yes ®No [:]NA (ii) If yes, explain steps that will be taken to avoid or minimize environmental impacts. N/A September 21, 2016 Thomas D. & Julie M. Gardner Date Applicant e Gardner Appli Signature Project Name 252-808-2808 :: i-888-4RCOAS7 :: vvww.r>ccoasialrrean_gement.net revised: 12/26/06 Form DCM MP -3 n ; UPLAND DEVELOPMENT DCM-EC (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. GENERAL UPLAND DEVELOPMENT a. Type and number of buildings, facilities, units or structures proposed. One c. Density (give the number of residential units and the units per acre). one unit per 3.965 acres e. If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 days before land -disturbing activity begins. (i) If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? []Yes ®No ❑NA (ii) If yes, list the date submitted: g. Give the percentage of the tract within the coastal shoreline AEC to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. +/-6.6% i. Give the percentage of the entire tract to be covered by impervious and/or built -upon surfaces, such as pavement, building, rooftops, or to be used for vehicular driveways or parking. 5.5% Describe proposed method of sewage disposal On -Site Wastewater'- Ground Absorption I. Describe location and type of proposed discharges to waters of the state (e.g., surface runoff, sanitary wastewater, industrial/ commercial effluent, "wash down" and residential discharges). None b. Number of lots or parcels. 2 lots (combined) d. Size of area to be graded, filled, or disturbed including roads, ditches, etc. 1.64 acres f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for impervious surfaces. Concrete, Gravel h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. (i) Has a site development plan been submitted to the Division of Water Quality for review? ❑Yes ®No ❑NA (ii) If yes, list the date submitted: N/A k. Have the facilities described in Item (i) received state or local approval? ❑Yes []No ®NA If yes, attach appropriate documentation. m. Does the proposed project include an innovative stormwater design? []Yes ®No [INA If yes, attach appropriate documentation. 252-808-28082 :: 1-888-4RCOAST wwvv nccoastetmanegem$ryne# revised: 12126/08 Form DCC P-3 (Upland Development, Page 2 of 2) m. Describe proposed drinking water supply source (e.g., well, n. (i) Will water be impounded? ❑Yes ®No [INA community, public system, etc.) (ii) If yes, how many acres? Well o. When was the lot(s) platted and recorded? July 16, 1998 September 21, 2016 Date Gardner Project Name Thomas D. & Julie M. Gardner Applicant ame AppLVant Signature p. If proposed development is a subdivision, will additional utilities be installed for this upland development? ❑Yes ❑No ®NA 252-808-2808 :: 1-888-4RCOAST :: wwwmccmastalmanagement.net revised: 12/26/06 i � A Form DCM MP -4_h STRUCTURES DMEC (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: [--]Commercial ❑Public/Government ®Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number 1 (iii) Length 85 (iv) Width 6 (v) Floating ❑Yes ®No e. (i) Are Platforms included? ®Yes []No If yes: (ii) Number 1 (iii) Length 20 (iv) Width 20 (v) Floating []Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed 1 (ii) Number of slips existing 0 i. Check the proposed type of siting: ❑ Land cut and access channel []open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k• Typical boat length: 20' m. (i) Will the facility have tie pilings? []Yes ®No (ii) If yes number of tie pilings? 0 ❑This section not applicable b. (i) Will the facility be open to the general public? []Yes ®No d. (i) Are Finger Piers included? ❑Yes ®No If yes: (ii) Number N/A (iii) Length N/A (iv) Width N/A (v) Floating []Yes ®No f. (i) Are Boatlifts included? ❑Yes ®No If yes: (ii) Number 0 (iii) Length N/A (iv) Width N/A h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rail, repair or maintenance service ❑ Dockage, fuel, and marine supplies ❑ Dockage ("wet slips") only, number of slips: ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ® Other, please describe: cleats j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Open runabout I. (i) Will the facility be open to the general public? ❑Yes ®No 252-808-2808 :: 1-888-4RCOAST w+Nw rsccoestainrmanw�emQnt.ggt revised: 12/27/06 Form DCM MP -4 (structures, Page 2 of 4) 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live -aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes ❑No 252-808-2808 :: 1-888-4RCOAST :: www_nccoastaimanaaeement.net revised: 12/27/06 Forli'01 ®CM MP -4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes [:]No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a• Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community c• Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) 252-808-2808 :: 1-888-4RCOAST :: vvvvvv.ncc®astatmanage►e�ent.net revised: 12/27!06 Form DCM MP -4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines 25' Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 5.7 miles e. (i) Will navigational aids be required as a result of the project? ❑Yes ❑No ®NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. > 30' d. Water depth at waterward end of structure at NLW or NWL -3.5 8. OTHER ❑This section not applicable a. Give complete description: September 21, 2016 Date Gardner Project Name Thomas D. & Julie M. Gardner Applicant me Appi t Signature 252-808-2808 :: 1-888-4RCOAST :: www_niccoastaimanaaement.net revised: 12/27/06 MAJOR PERMIT FEE MATRIX Applicant: `//i/aU05 #*dZ-6'C ��•z.c��rc�e Selection Development Type Fee DCM % DWQ % (14300 16014351000931625 6253) (24300 1602 435100095 2341) I. Private, non-commercial E] development that does not $250 100%($250) 0%($0) involve the filling or excavation of any wetlands oro en water areas: II. Public or commercial development that does not $400 100%($400) 0%($0) involve the filling or excavation of any wetlands oro en water areas: E] Major Modification to a $250 100%($250) 0%($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). Private, non- commercial development, if $250 100%($250) 0%($0) General Water Quality Certification No. 3900 (See attached) can be applied: Ill(B). Public or commercial development, if General $400 100%($400) 0%($0) Water Quality Certification No. 3900 (See attached) can be applied. III(C). If General Water Quality Certification No. $400 60%($240) 40%($160) 3900 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality Certification No. $400 60%($240) 40%($160) 3900 (see attached) cannot be applied: IV. For development that El involves the filling and/or $475 60%($285) 40%($190) excavation of more than one acre of wetlands and/or open water areas: (PRIOR TO CONSTRUCTION) L Pi a -AND -LREA--&-!LILA--N-D-AR-LA-LALQ-U-LA--),AL UPLANDS ON ROADSIDE OF WETLANDS 1 __52 ACRES UPLANDS ON SOUNDSIDE OF WETLANDS 735 ACRES WETLANDS = 1,968 ACRES RD, I \ �l OSPREY �,15 ezALBEMARLE SOUND VICINITY MAP NTS 41 (o PROPOD N)j GRAVE ti DRIVEW-, Ib A) cei Q5, PROPOSE SEPTIC DRAINJ YIELD 11 AREA (PROPOSED CONSTRUCTION CALCULATIONS) AREA OF WETLAND FILL FOR DRIVEWAY = 5,891 SF AREA OF WETLAND FILL FOR HOUSE = 116,202 SF AREA OF WETLAND FILL WITHIN 75' AEC = 185 SF IMPERVIOUS SURFACE AREA WITHIN 75 1 ACE - 1,416 SIF TOTAL IMPERVIOUS SURFACE AREA = 9,436 SF TOTAL AREA OF DISTURBANCE = 71,500 Sk- CROSS SECTION A _0 BE DESIGNED BY OTHERS) TOP OF PROPOSED RETAN NG WALL DRIVEWAY EXISTING GRA CD FILL AREA + hI BOTTOM OF PROPOSED RETAIL41HG WALL 0 NOW OR FORMERLY BROWN D B. 470, PG, 205 P,C 11, SLID. 165A -D CONTROLN_ REPAIR AP -14k CULVERTS CORNER (2)-24"RCP All, L 7 Ar 2.023 ACRES A, PROPOSED CULVERTS (2)-24"RCI 0) 0b, 1.942 ACRES COP 10, L 19, NOW OR FORMERLY A/1 POSEDEL D.B.349, PG, 351 P -C. 1, SLD 165A -D NOTES: 1.) ALL DIS TAHC'E'S Stiu-NN ARE HORIZONTAL GROUND DISTANCES, 2.) AREA COMPUTED= BY USING COORDINATE METHOD. 3.) THE PROPER I,' IS LOCATED IN FLOOD ZONE "AE (6)" AND "SHADED X", AS SHOWI! HEREON, AND AS SHOWN ON FLOOD MAP PANEL 3720786z,00,i, DATED OCTOBER 16, 2008. (FEMA FLOOD ZONES ARE SUBJECT TO CHANGE). 4.) PROPOSED R- . 1,111,1ING, WALL TIE BACKS & SHORELINE BULKHEAD TIE BACKS ARE TO EXTEND ALONG THE ENTIRE LENGTH. THEY ARE NOT SHOW THE �!ITIRE LENGTH HEREON FOR THE PURPOSE OF CLARITY. CURVE TABLE CURVERJVE __T_ A�_ �_Erl,'TH I RADIUS TANGENT DELTA CHORD BEARING CHORD LENGTH , _ 861, 35,00' t5.t6 46*50'06" N53' 05' 43"E 27.82' GRAPHIC SCALE 60 0 30 60 120 ( IN FEET ) I inch = 60 ft. 2,40 1, NICHOLAS M. RACKLEY CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION FROM THE DEED DESCRIPTION RECORDED IN D.B. 475, PG. 738 & D.B. 475, PG, 741; THAT THE BOUNDARIES NOT SURVEYED ARE INDICATED AS DRAWN; THAT THE RATIO OF PRECISION AS CALCULATED IS 1:10,000+; THIS MAP WAS PREPARED IN ACCORDANCE WITH G.S. 47-30 AS AMENDED. WITNESS MY ORIGINAL SIGNATURE, [REGISTRATION NUMBER, AND SEAL -11-11S 12TH DAY OF OCTOBER, 2016, eceived 1, NICHOLAS M. RACKLEY PLS -5062, CERTIFY, F(II) C. THAT THE SURVEY IS OF AN EXISTING PARCEL OR PARCELS OF LAND AND DOES NOT CREATE A NEW STREET OR CHANCE AN EXISTING STREET, CROSS SECTION B PROPOSED (TO BE DESIGNED BY OTHERS) DWELLING TOP OF PROPOSED RETAINING WALL iTK + WETLANDS 0 TO REMAIN PROPOSED BULKHEAD WITH TIE BACKS BACKFILL AREA FOR BULKHEADING ISTIEIG GRADE 0 BOTTOM OF PROPOSED RETAINING WALL PROPOSED BULKHEAD TIE BACKS (SEE NOTE 4) SHORELINE SURVEY TRAVERSE LINE - (6 --19- 2015) CROSS SECTION C (TO BE DESIGNED BY OTHERS) TOP OF PROPOSED BULKHEAD & PIER ll� 0 0 BOTTOM OF PROPOSED BULKHEAD & PIER NORMAL WATER LEVEL ALBEMARLE SOUND PROPOSED RETAINING WALL. TIE BACKS (SEE NOTE 4) Lll,,,E TAB L I N E T­BEA­Rl _J (3 v'I WATER DEPTH (9-8--,016 L I si, 42 39"L L__ T[S332- 4' 35"v,, fi L2 S30' 29' 43"V, J11 Sf- A -B-B-B-B-B-B-8-& e -a e-a-B-EHa-B- PROPOSED BULKHEAD NALL 5C S2' 48 5'\""4, I_ 5 0, L6 e X P/ L7 S59' '02' _23" - V, E 4_5____� L8 '9 S71' 20' 16"V11 rL S36' 20 36,7"V1, LID NICHOLAS LA. +,,Y RIGHT OF WAY LINE PLS, 1-11 Lll,,,E TAB L I N E T­BEA­Rl _J (3 v'I WATER DEPTH (9-8--,016 L I si, 42 39"L L__ T[S332- 4' 35"v,, fi L2 S30' 29' 43"V, J11 EXISTING IRON DEBAR -B-B-B-B-B-B-8-& e -a e-a-B-EHa-B- PROPOSED BULKHEAD NALL E4 S2' 48 5'\""4, I_ 5 S46' 08 21", L6 SB* 07' 16"Y'y 06 L7 S59' '02' _23" - V, E 4_5____� L8 '9 S71' 20' 16"V11 rL S36' 20 36,7"V1, LID 4 S41' 15 3 RIGHT OF WAY LINE PROPOSED CONCRETE 1-11 S22' 53' 27 'J,, - - - - - - - - - - L.12 S17' 13' 33" lir L13 S17` 13' 3? `R -11 L14 S30- 53 45"), 8 L15 N75- 16 3-11"'Al 2 L16 N 4 3' 17' 15 " AS _17 N12' 34' 13"0v _18 Nl0* 42 36"V L19 N51' 34' 29"V, L20 S26* 07' 57"V, 1 8 I L21 S31' 127'53 L22 S83' 53' 12"4A S _3 L23 � S28' 40 23" Y 5 L24 S17' 11' 52E Lzs F s25° 12 2, y8 L26 1 S30° 0 3 5-, 4;_ L-27 S15' 15' 02"E L2; 56' 415 3i IV Su WELL COVER L29 S27- 45' 47"4, ENCROACHMENT - - - ------ __j 5,12 BULKHEAD j ENCROACHMENT CONCRETE BARRIERS /'TO BE REMOVED c '%7-__S66' 02 15 W 5,94' E -�_S58' 54' 43"W Eo 1 8-23" C S76' 22' 44"N 6.90' 11�051 F3 fl PROPOSED S54* 08"W PIER 0 :1 55.87' 2.0'X\ _S54' 15' 08"W '5 Vin 18,35 0 12' 50,,W )14' S54' 36' 40"W 38,24' S72' 05' 00"W bio 40.16' SPARSE SUBMERGED AQUATIC VEGETATION 28,6105' S' 18' 30"W LEGEND ALBEMARLE SOUND Q{ PROPOSED WELL v'I WATER DEPTH (9-8--,016 WETLAND SYMBOL FEMA FLOOD 70k,FLitt L SET IRON REBAR 30' CAMA BUFFER EXISTING IRON DEBAR -B-B-B-B-B-B-8-& e -a e-a-B-EHa-B- PROPOSED BULKHEAD NALL CALCULATED POINT .... ........................ ........ .................... ADJOINERS EXISTIN' PROPERTY LINE PROPERTY EXTENSION PROPOSED WEFLAFID FjI_, PROPERTY LINE FADED FOR CLARITY RIGHT OF WAY LINE PROPOSED CONCRETE - - - - - - - PROPERTY TIE LINE - - - - - - - - - - - - - - 404 WETLAND LINE PROPOSED PATIO "P2 U 43U Ln 01� r - C -4 u z 00 rn cn kn < w u ` 4 < P,