Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20161248 Ver 1_PlanSet_Full Size_20161216
OO Zaw 0, U0 �JU pzw ¢O¢ zpo UI o0m Ua0 x�ow � 'w OZw U _p .a, WUO OAU ~ zZ °om <U m x _¢ �pS OY1 w�a �WQ O z , o�m uor pzz Ow(D m�U a wizm3z on, woo oo w1z w3a xap �zw ¢0¢ ¢w a 15 zxw 3� oz� U -O 'zo W Ods Y U F U poo YV1Q 222 0oF� � o xZw �a� aJo O 0., PROJECT SITS Cvd,in take Rd GoozehrWe Rd 0 0 VICINITY MAP NTS BLACKBIRD DAM REMOVAL & STREAM MITIGATION SITE PHASE 1: DAM BREACH PLANS JOHN K SWAMP: HUC 030202011303 NOVEMBER 2015 I LOCATION: JOHNSTON COUNTY, NC Resource Environmental Solutions RESOURCE ENVIRONMENTAL SOLUTIONS, LLC DRAWING LIST TABLE DRAWING NO. DRAWING TITLE 1 COVER E1 EXISTING CONDITIONS C1 DAM BREACH PLAN EC1 EROSION & SEDIMENT CONTROL PLAN D1 DETAILS 302 JEFFERSON STREET RALEIGH, NC 27605 ShWK WDICKSON communitv infrastructure consultants NOTICE TO CONTRACTOR PRIOR TO CONSTRUCTION, DIGGING, OR EXCAVATION THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES (PUBLIC OR PRIVATE) THAT MAY EXIST AND CROSS THROUGH THE AREA(S) OF CONSTRUCTION, WHETHER INDICATED ON THE PLANS OR NOT. CALL "811" A MINIMUM OF 72 HOURS PRIOR TO DIGGING OR EXCAVATING. REPAIRS TO ANY UTILITY DAMAGED RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. REV RECORD: REV RECORD: BY DATE DESCRIPTION BY DATE DESCRIPTION Know what's below. Call before you dig PROFESSIONAL SEAL LU IrD LU H Z O W U ULLJ Z ~N N O Cc U v (0U O O Z O 0)p Z Ir Oi.3�°r°�cn w NQ 07O>U r-a� zcz� C 00 0 ♦^ U v ♦ � U Feu i .E 0 E O U G C mF— LL LL 0 m Z OQ CL LO T N �p T O oN z T w w o Q 0 U U d d W H U) z O Q C'3 cn � z W U °C a �W 0m J � � Q O0 T W W IIr Cf) 75 o� w o CE z m b Y W O C m o� W O U ui J H c� z Q CC 0 0 N W co m T N T z w z z o Q~ < O WKD PROJ. NO.: 20150095.00.RA II I � I I � I I oz I , C !A to :0 I I I I n I I� CHARLOTTE PARKER LOCAPO HEIRS DB 1255, PG 479 SURVEYED \ - 1 / I WSE DATE = 157.9 09/14/15 I WOOD 1SASSFDWB ., BUILDING — BASEMENT 173.93' 1 1 = .% I \ \ \ \ \ \ \ \ AIN 095E \ J / �� �� i I I I \ \ \ \ \ \\ tONCRETXWALL \ 1 / DELAPID a w \ \ \ \ \ WOODBUILDE G \ \ \ \ \ \ \ \ \ INV S RCP /y. l� \ \ \ p -ns \ L Ozz/yA�— \ \ 0 — — OHP — OIdR ' 0 162 = 1 \ I 1 I I \ \ 1 I \ \ I 1 POD \ \ \ I II I / I \ I l J \ \--TOP OF SPILL KY E�EVATION = 159. '+/- I / II �CONCRETI� WALL ^OfVCRETE WALL I Olt _ — o ✓ /"' \ I i Xyl G� FFE=162.94' / WOOD MILL (\1 Q9 BUILDING zz- LO 'CONCRETE PAD ( I DEPARTMENT OF— ' TRANSPORTATION DB 3370, PG 434 I A _ _zz— — — ;� 1111FF M111 1NFOPIHAT1I OF ROARD TOP 0r <'nN 'F 759.44 75. Transportation + Water Resources Urban Development + Geomatics 150.71 156.4c 160.70" 757.32 750.5` 756.80 15G II 756.23 759.2 ; NO Al vs 4 149.6, 4 4 0 40 80 n;' �11LL RL7,LD1Nc DETAIL = n, I8 1�118— �-----rte REBA LEE CUSHING DB 959, PG 610 o \ \/ / 156 FT WIDE CONC. CORED SLAB BRIDGE J, CID I I I I I I N/F JAMES GARLAND SMITH DB 1206, PG 706 C5 -TB M DI TOPP- 58.24— — — — --T ' II HIGHWAY 96 (VARIABLE WIDTH ' PUBLIC) �— _oN4� =dHO----dHO-----dl�0156 — —--dHO — DEPARTMENT OF TRANSPORTATION DB 3387, PG 587 CLASS 1 RIP RAP HENRIETTA LEE HINES DB 1324, PG 649 PB 73, PG 250 PYRIGHT n_ W _ DICKSON R CO_ INC_ AI_I_ RIGHTS RFSFRVFD_ RFPRODIICTION OR HSF OF THF CONTFNTS OF THIS DOCIIMFNT- ADDITIONS OR DFI_FTIONS TO THIS DnCIJMFNT_ IN WHO[_ F OR IN PART_ WITHOLJT WRITTFN CONSFNT OF W _ DICKSON R CO_ INC__ IS PROHIRITFD_ nNl_Y COPIFS FROM THF nRIGINAI. OF THIS DOCIIMFNT_ MARKFD WITH AN ORIGINAL SIGNATHRF AND SFAI_ SHAI_I_ RF CONSIDFRFD TO RF VALID_ TRtJF COPIF FILE NAME: O:\Projects\Resource Environmental Sol utions\201 5009500RA - TO #3, Blackbird Dam Removal and Stream Mitigation Site\CADD\Plan Set\2015009500RA SHT EX COND.dwg - November 23, 2016 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 40 0 40 80 2 FULL SCALE " 1 = HALF SCALE 6i Q Q o N co N O J CL r z O H Z O M O H O O H a � C U Cl) z I 0 CC" O � Lu LL66 Q LU O U) Y wJ OC > -i LU Q W w M w J U) J vJ C1 z z O H O Q Op r� C/)O V (n J N z HU z LU O J w= 0¢ p�Uzcc Q p w o T LU 06 O LU � M J O cin O r � Q w w O� z °Cw p O C LLI G r C~/) U (! U 9 OC Q LU 7 O o LU Q = OLL. o ui 0U " LU J co o0 00 Q = N _F- Z H N oM d') Y z Ir U rn w LU U w www o Q a zoom J m O <�� PROJ. DATE: NOV 2015 Q.C.: TM Q.C. DATE: 11/2016 DRAWING NUMBER: El PROJ. NO.: 20150095.00. RA COPYRIGHT ©, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Sol utions\201 5009500RA - TO #3, Blackbird Dam Removal and Stream Mitigation Site\CADD\Plan Set\2015009500RA SHT DAM BREACH.dwg - November 23, 2016 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 CHARLOTTE PARKER LOCAPO HEIRS www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 40 DB 1255, PG 479 0 40 ___i__POND 2" = FULL SCALE \/ I I l 1 I\ W I Q N N/F JAMES GARLAND SMITH l O INSTALL RIP RAP FILTER BERM J IL r z I ` I DB 1206, PG 706 I I O W/ DISSIPATER PAD \ \ SEE DETAIL 2/D1 APPROXIMATE (ESTIMATED) QUANTITIES: BUILDING REMOVED 0 z CLASS IRIP-RAP: 315CU YDS (445 TNS) � // � DURING BREACH I I GRAVEL: 15 CU YDS (20 TNS) \ \ BUILDING AND WALLS \ I I I I I I I O O I / � C U I I I I \ I I LU . REMOVE APPROX. 100 LF OF EXISTING WALL & GRADE ANKS TOA 3:1 SLOPE L�D \ TO REMAIN. Q I I I WOOD 1SASSFDWB I BASE FFE D I \\\ \MENTBUILDING III \\ OO Op' ( Q W W M W U / IIIIII 3 MAIN FFE = 180.95 I \ / c A \B I l I I \ \ \ \ \ \ \ Z4ONCRET�WA IpgTE \ N O I / — / i� / n I �/ a I\ DEL API a WOODBUILDI G ! \ \ \ \\ \ \ / O \\ ,--TOP OF SPILL AY EFVATION = 1591+/- z Lu i \ INR6 \\\ \ \\ \ W = Q ^ UQ � > DC w Sib — — — ---� -� — — \ 4—\ \ \ \ \ ^ ONCRETE WALb JCONCRETV WALL Q U `oLU o W Q 0 U Z Q U O LL LLI CLED LL co (75 N z F --N oM U Y Z_ M o7 rn LU � Cr O (_)OD MILL BUILDING --- l- Q.C.: TM Q.C. DATE: 11/2016 DRAWING NUMBER: PROJ. NO.: 20150095.00. RA OHP \ I I I / / BUILDING TO REMAIN. _ — — —�-7--�- / / �' J — — A —�—� \ �� � o DEPARTMENT OF— I 111 III I �- _ // //�1�j / �✓ / � � I�<<�' DITOP=iM.2= ' TRANSPORTATION DB 3370, PG 434\ �_HIGHWAY 96 �C 'L / _ — — i— III ` 1 � — — — (VARIABLE WIDTH/ PUBLIC) //� r—_�+�--�I�� I C?\ �--o a '�� _ =dHO-----dHO -- — d O -- -- - DEPARTMENT OF TRANSPORTATION DB 3387, PG 587 REBA LEE CUSHING DB 959, PG 610 a o a GY N A N HENRIETTA LEE HINES DB 1324, PG 649 PB 73, PG 250 CONSTRUCTION SEQUENCE NOTES FOR BREACH: I 1. EXCAVATE THE TEMPORARY PONDING AREA FOR FILTER BERM AND CONSTRUCT PROPOSED RIP -RAP FILTER BERM AND DISSIPATER PAD. FILTER BERM MUST TIE TO EXISTING GROUND AT THE TOP OF BERM. UTILIZE TIMBER MATS AND/ OR TEMPORARY FILL TO COMPLETE CONSTRUCTION WHERE NECESSARY. 2. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON SHEET EC1. REMOVE ALL MARKED TREES WITHIN THE LIMITS OF DISTURBANCE UNLESS OTHERWISE DIRECTED BY ENGINEER. DISPOSE OF ALL MATERIAL OFFSITE AND IN A SAFE AND LEGAL MANNER. CONCRETE WALLS TO REMAIN WHERE POSSIBLE. DO NOT REMOVE ANY STRUCTURES UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 3. COMPLETE PROPOSED GRADING AND INSTALL TEMPORARY SUMP UPSTREAM OF FILTER BERM FOR ADDITIONAL DEWATERING AS NECESSARY. LEGEND APPROXIMATE BREACHED AREA LOD LIMITS OF DISTURBANCE FILTER BERM 1. DISSIPATER PAD TREES TO BE REMOVED COPYRIGHT ©, W.K. DICKSON & GO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: O:\Projects\Resource Environmental Sol utions\201 5009500RA - TO #3, Blackbird Dam Removal and Stream Mitigation Site\CADD\Plan Set\2015009500RA SHT DAM BREACH.dwg - November 23, 2016 - Ben Carroll vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "= 40 0 40 80 2" = FULL SCALE 1" = HALF SCALE I\ W cfl Q N co N O J IL r z O 0 z O 0 z O O z C U z g LU O U_ LU D Q ' O 2 Y O7 <_J Q W W M W U J 0 z z O H QO q) 0 U N Cl) J H z z z Lu = CL z z w W = Q ^ UQ � > DC w LU = F— Q F- LU Q � U) W O0 m °CLU w 0 Q U `oLU o W Q 0 U Z Q U O LL LLI CLED LL co Q J = Q �_ N N z F --N oM U Y Z_ M o7 rn LU 3 U z Cc Z Cr O OD o Q PROJ. DATE: NOV 2015 Q.C.: TM Q.C. DATE: 11/2016 DRAWING NUMBER: PROJ. NO.: 20150095.00. RA CHARLOTTE PARKER LOCAPO HEIRS DB 1255, PG 479 I i STAGING/STOCKPILE AREA �r l \ I ti %\ WOOD BUILDING INVS.17S I l� Imo% � I 1 I 1 I EROSION CONTROL: POND II I / / I / / / I I 1 1 I � LIMIT OF DISTURBANCE, N/F JAMES GARLAND SMITh DB 1206, PG 706 1. REVIEW CONSTRUCTION SEQUENCE FOR ADDITIONAL EROSION CONTROL MEASURES. ALL PERMANENT AND TEMPORARY EROSION CONTROL STRUCTURES (I.E ROCK CHECK DAMS, SILT FENCE AND TEMPORARY CONSTRUCTION ENTRANCES, SEE SHEET Cl) SHALL BE INSTALLED PRIOR TO THE START OF CONSTRUCTION OF THE LAND -DISTURBING ACTIVITY. 2. CONSTRUCTION ACCESS AREAS SHOWN ARE TO GUIDE CONTRACTOR DURING CONSTRUCTION. CONTRACTOR SHALL COORDINATE WITH ENGINEER IF ALTERNATIVE CONSTRUCTION ACCESS ROUTES WILL IMPROVE EFFICIENCY OF CONSTRUCTION. 3. ALL AREAS DISTURBED BY THE CONTRACTOR SHALL BE SEEDED PER THE SPECIFICATIONS IN THE SEEDING SCHEDULE SHOWN ON THIS SHEET. 4. MULCH: APPLY 2 TONS/ACRE GRAIN STRAW AND ANCHOR STRAW ON ALL OTHER DISTURBED AREAS. 5. EROSION CONTROL: A. INSTALL PERMANENT VEGETATIVE COVER AND THE LONG-TERM EROSION PROTECTION MEASURES OR STRUCTURES AS DIRECTED BY ENGINEER UPON CONSTRUCTION COMPLETION. APPROPRIATE EROSION CONTROL MEASURES MUST BE PLACED BETWEEN THE DISTURBED AREA AND AFFECTED WATERWAY AND MAINTAINED UNTIL PERMANENTLY VEGETATED. B. PROVIDE FOR HANDLING THE INCREASED RUNOFF CAUSED BY CHANGED SOIL AND SURFACE CONDITIONS. USE EFFECTIVE MEANS TO CONSERVE EXISTING ON-SITE SOIL CONDITIONS. C. DURING CONSTRUCTION ACTIVITIES, ALL DISTURBED AREAS SHALL BE STABILIZED AT THE END OF EACH WORKING DAY. USE TEMPORARY PLANT COVER, MULCHING, AND/OR STRUCTURES TO CONTROL RUNOFF AND PROTECT AREAS SUBJECT TO EROSION DURING CONSTRUCTION. D. ALL SEDIMENT AND EROSION CONTROLS ARE TO BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND AFTER ANY STORM EVENT OF GREATER THAN 0.5 INCHES OF PRECIPITATION DURING ANY 24-HOUR PERIOD. MAINTENANCE OF SEDIMENT TRAPPING STRUCTURES SHALL BE PERFORMED AS NECESSARY PER THESE INSPECTIONS. SILT FENCING SHALL BE INSTALLED AS SHOWN ON PLANS. E. STABILIZATION MEASURES SHALL BE INITIATED AT THE END OF EACH DAY IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED. GROUNDCOVER MUST BE ESTABLISHED PER THE "GROUND COVER SCHEDULE" SHOWN ON THIS SHEET IN AREAS WHERE CONSTRUCTION HAS TEMPORARILY CEASED. ALL AREAS WHERE FINAL GRADE HAS BEEN ESTABLISHED SHALL BE PERMANENTLY STABILIZED WITHIN 2 CALENDAR DAYS. F. CONTRACTOR MUST TAKE THE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO THE PAVED ROADWAY FROM CONSTRUCTION AREAS. DAILY REMOVAL OF MUD/SOIL MAY BE REQUIRED. G. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFF SITE SEDIMENTATION. CONTRACTOR SHALL REMOVE ALL TEMPORARY CONTROL DEVICES ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. H. SILT FENCING TO BE INSTALLED AROUND INDICATED STOCKPILE AREAS TO PREVENT LOSS OF SEDIMENT. STOCKPILE AREAS MAY BE RELOCATED UPON APPROVAL FROM ENGINEER. I. ASPHALT TACKIFIER SHALL NOT BE USED. J. ALL NECESSARY MEASURES MUST BE TAKEN TO PREVENT OIL, TAR, TRASH, AND OTHER POLLUTANTS FROM ENTERING THE ADJACENT OFF SITE AREAS. K. WETLANDS/STREAMS CANNOT BE ENCROACHED UNDER ANY CIRCUMSTANCES IF NOT APPROVED AS DESIGNATED IMPACT AREAS. L. ACTIVITIES MUST AVOID DISTURBANCE OF WOODY RIPARIAN VEGETATION WITHIN THE PROJECT AREA TO THE GREATEST EXTENT PRACTICABLE. REMOVAL OF VEGETATION MUST BE LIMITED TO ONLY THAT NECESSARY FOR COMPLETION OF THE PROJECT. M. NO ONSITE BURIAL OR BURNING OF VEGETATION OR CONSTRUCTION DEBRIS WILL BE PERMITTED. VEGETATIVE DEBRIS SHALL BE STOCKPILED AND DISPOSED OF ONSITE PER DIRECTION OF ENGINEER. N. ANY GRADING BEYOND THE CONSTRUCTION LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE NORTH CAROLINA EROSION CONTROL ORDINANCE, AND IS SUBJECT TO A FINE. O. PLEASE REFERENCE PLAN SHEET DETAILS AND NCDENR STANDARDS FOR CONSTRUCTION OF EROSION CONTROL MEASURES. P. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSION CONTROL MEASURES RELATED TO THE CONSTRUCTION SITE. Q. THE LOCATIONS OF SOME EROSION CONTROL MEASURES MAY HAVE TO BE ALTERED FROM THOSE SHOWN ON THE PLANS IF DRAINAGE PATTERNS CHANGE DURING CONSTRUCTION. R. IF IT IS DETERMINED DURING THE COURSE OF CONSTRUCTION THAT SIGNIFICANT SEDIMENT IS LEAVING THE SITE (DESPITE THE PROPER IMPLEMENTATION AND MAINTENANCE OF EROSION CONTROL MEASURES), THE PERSON RESPONSIBLE FOR THE LAND DISTURBING ACTIVITY IS OBLIGATED TO TAKE ADDITIONAL PROTECTIVE ACTION. IGHT n_ W _ DICKSON R CC)- INC_ ALL RIGHTS RESERVED. REPRnDIJCTinN nR I1SE nF THE IS D(')CIJME TEMPORARY SEEDING SCHEDULE - FALL SEEDING MIXTURE SPECIES RATE (LB/ACRE) RYE (GRAIN) 120 SEEDING DATES MOUNTAINS—AUG. 15 - DEC. 15 COASTAL PLAIN AND PIEDMONT—AUG. 15 - DEC. 30 SOIL AMENDMENTS FOLLOW SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. HENRIETTA LEE HINES DB 1324, PG 649 PB 73, PG 250 TEMPORARY SEEDING - LATE WINTER/EARLY SPRING SEEDING MIXTURE SPECIES RATE (LB/ACRE) RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE IN PIEDMONT 50 AND COASTAL PLAIN, KOREAN IN MOUNTAINS) OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. SEEDING DATES MOUNTAINS - ABOVE 2500 FT: FEB. 15 -MAY 15 BELOW 2500 FT: FEB. 1 -MAY 1 PIEDMONT - JAN. 1 -MAY 1 COASTAL PLAIN - DECA-APR. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IM- MEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. GROUND COVER SCHEDULE SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND 7 DAYS NONE SLOPES Raleigh, NC 27607 HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE (fl 919.782.9672 IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT SLOPES STEEPER THAN 3:1 7 DAYS STEEPER THAN 2:1,14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER 14 DAYS NONE (EXCEPT FOR PERIMETERS AND HWQ ZONES) THAN 4:1 I` u.i THIS DOCUMENT. IN WH FILE NAME: O:\Projects\Resource Environmental Solutions\2015009500RA - TO #3, Blackbird Dam Removal and Stream Mitigation Site\CADD\Plan Set\2015009500RA SHT DAM BREACH.dwg - November 23, 2016 - Ben Carroll ;i9 INC__ IS PROHIRITED_ (SNI THE M TEMPORARY SEEDING SCHEDULE - SUMMER SEEDING MIXTURE SPECIES RATE (LB/ACRE) GERMAN MILLET 40 IN THE PIEDMONT AND MOUNTAINS, A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB/ACRE. SEEDING DATES MOUNTAINS - MAY 15 -AUG. 15 PIEDMONT - MAY 1 -AUG. 15 COASTAL PLAIN - APR. 15 -AUG. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS AN ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. EROSION CONTROL LEGEND LOD LIMITS OF DISTURBANCE SILT FENCE STAGING/STOCKPILE AREA �• ' EROSION C•• - •(COIR TEMPORARY GRAVEL CONSTR. ENTRANCE/EXIT IGNATIIRE AND SEAL SHALL RE FILTER BERM DISSIPATER PAD RE VALID_ TRUE vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (fl 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 FULL SCALE: 1 "=40 0 40 80 2" FULL SCALE 1 " = HALF SCALE I` u.i cfl Q Q o N co N 0 T J IZ r z O H H z O M 0 z 0 O z I-_ U U) g w CL0 LL w o z 0 Q z O U) Y W J Q W W Cc W J 0 J vJ C z z O O H qz 0 Q J O q CO _U) o U �g _ LZ �— Z C7 = z Lui W O °C F_Q v wo T W CLij z (wj W Z) � J Q � w _ Q 0 w Cr0 Q 0 W LuO r � U o W °LLI6 Q O z zE �a Q= 0 O LL LO =� Ij 0 U) LLo �pco co z I— LU N M 0) U 0 Y z Ix `/)w rn LLJU § z crzm Q o0 O a m o 0 ¢�� PROJ. DATE: NOV 2015 Q.C. DATE: 11/2016 DRAWING NUMBER: EC1 PROJ. NO.: 20150095.00. RA WHEN AND WHERE TO USE IT SILT FENCE IS APPLICABLE IN AREAS: WHERE THE MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE FENCE IS 100 -FEET. WHERE THE MAXIMUM SLOPE STEEPNESS (NORMAL [PERPENDICULAR] TO FENCE LINE) IS 2H:1 V. THAT DO NOT RECEIVE CONCENTRATED FLOWS GREATER THAN 0.5 CFS. DO NOT PLACE SILT FENCE ACROSS CHANNELS OR USE IT AS A VELOCITY CONTROL BMP. CONSTRUCTION SPECIFICATIONS: 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461. SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0' TO 120' F. 2. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET. MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO FACILITATE FASTENING THE FABRIC. CONSTRUCTION: 1. CONSTRUCT THE SEDIMENT BARRIER OF EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 6. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 7. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 8. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. LOCATION HEIGHT A 2.5 FT B 3.0 FT C 3.0 FT LOCATION LENGTH A -B 10 FT B -C 30 FT TOTAL 80 FT #5 WASHED STONE 5' SEDIMENT STORAGE ZONE 6" STORMWATER STORAGE ZONE MIN 2:1 1' MAX. SEDIMENT DEPTH (CLEAN OUT POINT) SECTION VIEW GENERAL NOTES: DIMENSIONS SHOWN ARE THE MINIMUM ACCEPTED UNLESS OTHERWISE NOTED. 1.25 LB./LINEAR FT. STEEL EXTRA STRENGTH FILTER FABRIC BACKFILL TRENCH WITH COMPACTED EARTH FILTER FABRIC COMPACTED EARTH RUNOFF 8Llr FILTER FABRIC 4" USE EITHER FLAT -BOTTOM OR V -BOTTOM TRENCH SHOWN BELOW SILT FENCE INSTALLATION HEAVY DUTY PLASTIC TIE FOR STEEL POSTS BURY FABRIC FILTER FABRIC COMPACTED 18" TO 24" EARTH 18" TO 24" RUNOFF i - i I 8" =1 I I - 24" MIN - FLAT -BOTTOM TRENCH DETAIL 1.5' THICK GLASS I RIP RA= DISSIPATER PAD #5 WASHED STONE 6" MIN. THI(;' ExIstin o{{0 9 Koko \ \ \ \ A FLOW B PLAN VIEW --- NOTE /GROUND LEVEL IRFAC1.F SECTION A -A NOTE: END OF DIKE AT GROUND LEVEL TO BE HIGHER THAN THE LOWEST POINT OF FLOW CHECK. SUFFICIENT SANDBAGS ARE TO BE PLACED TO PREVENT SCOURING. SANDBAG BARRIERS SHALL BE CONSTRUCTED OF THREE LAYERS OF SANDBAGS. THE BOTTOM LAYER SHALL CONSIST OF 3 ROWS OF BAGS, THE MIDDLE LAYER SHALL CONSIST OF 2 ROWS OF BAGS AND THE TOP LAYER SHALL CONSIST OF 1 ROW OF BAGS. THE RECOMMENDED DIMENSION OF A FILLED SANDBAG SHALL BE APPROXIMATELY 0.5 FT X 0.5 FT X 1.5 FT. SANDBAG IMPERVIOUS DIKE D 1 NTS 24" MIN FILTER FABRIC V -SHAPED TRENCH DETAIL 1 TEMPORARY SILT FENCE D 1 NTS • • • V2• 1 I fa11 1 1 1 1 1 1 1 1 1 1 APPROX. ELEV. = 2.0' BELOW / EXISTING LAKE BOTTOM iIII I CLASS I RIP RAP EXCAVATE TO APPROX. ELEV. = 2.0' BELOW EXISTING LAKE BOTTOM 2:1 2.5 - 3.0 FT FLOW 1.5' THICK CLASS I RIP RAP DISSIPATER PAD FILTER FABRIC 3.0' THICK CLASS I RIP RAP BASE 2 RIPRAP FILTER BERM D 1 NTS PERSPECTIVE VIEW EXISTING DAM EMBANKMENT MIDDLE LAYER BOTTOM LAYER ENDS OF BAGS IN ADJACENT ROWS BUTTED SLIGHTLY TOGETHER PURPOSE: STABILIZED CONSTRUCTION ENTRANCES SHOULD BE USED AT ALL POINTS WHERE TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND MOVING DIRECTLY ONTO A PUBLIC ROAD. CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE DETAIL, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2 -INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS, OR AIRFIELD PAVEMENTS. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NTS GENERAL NOTES: 1. CONSTRUCT DAM ACCORDING TO NCDENR EROSION CONTROL MANUAL. 2. ROCK DAM RIPRAP SHALL BE 50/50 MIX OF CLASS I AND II. 3. PLACE ROCK DAM AS SHOWN ON PLANS. EXTEND CLASS B RIP RAP ROCK APRON 5 FEET DOWNSTREAM FROM TOE OF ROCK DAM. 5'-0" MIN. SPILLWAY CREST 3:1 - CLASS I AND II RIP RAP 1.5' THICK CLASS B ROCK APRON CUTOFF TRENCH SECTION B -B 1.5' THICK CLASS B ROCK APRON 2:1 1' MIN OF # 5 WASHED STONE aFLOW FLOW 5 WASHED ONE A B� PLAN W (SPILLWAY) MIN 2/3 STREAM WIDTH 2' t1 - - - -2' MIN. BELOW _ LOWEST BANK LEVEL (MIN) CLASS I AND FILTER II RIP RAP SECTION A -A FILTER FABRIC FABRIC TEMPORARY ROCK CHECK DAM NTS TOP LAYER EARTH SURFACE TRENCH 0.25' DEEP ONLY WHEN PLACED ON EARTH SURFACE SECTION B -B NOTES: 1. EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND/OR ISOLATED SECTIONS OF CHANNEL. 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. 3. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. A MAXIMUM OF 200 FEET MAY BE DISTURBED AT ANY ONE TIME. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING PUMP SIZE SUFFICIENT TO PUMP BASE FLOW. 5. DIKE MUST BE CONSTRUCTED OF NON -ERODIBLE MATERIALS SUCH AS SANDBAGS. SEQUENCE OF CONSTRUCTION FOR TYPICAL PUMP AROUND 1. INSTALL STILLING BASIN AND STABILIZED OUTFALL USING CLASS A RIP RAP AT THE DOWNSTREAM END OF THE DESIGNATED PROJECT WORKING AREA. 2. THE CONTRACTOR SHALL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK AREA TO THE STABILIZED OUTFALL. 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND DEWATERING PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL ALSO BE PUMPED TO AN OUTFALL STABILIZED WITH CLASS A RIP RAP. 5. THE CONTRACTOR SHALL EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. WHEN DEWATERING AREA, ALL DIRTY WATER MUST BE PUMPED THROUGH A SILT BAG. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM DIKE FIRST. 6. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP RAP AND IMPERVIOUS DIKES AND STABILIZE DISTURBED AREAS WITH SEED AND MULCH. 7. ALL WORK IN POND MUST BE COMPLETED BEFORE REMOVING IMPERVIOUS DIKE. DE-WATERIN PUN IMPERVIOUS DIKE SILT BAC LOCATIOI` STABI CLASS A S I ONE STABILIZED OUTFALL CLASS A STONE EXISTING GROUND 15' TO 20' L FILTER FABRIC L g OF CLASS A STONE EXISTING CHANNEL SILT BAG PROFILE HOSE PUMPAROUND PUMP US DIKE ZGE HOSE LD BE WORK DISCHARGE HOSE PUMP AROUND & DEWATERING DETAIL NTS DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F-0374 LLI cfl Qo o N co O r -1 IL r z O Z) U) z O O LLH z O O z CO U z Lug O U_ Lu < 660 z LU Q ' OQ 2 Y (0 W J LULd Q LU 5- W 0 J Z z O H Q Lo O 0 (DI - ~ 0 J z z z Lu QCL = z W J °C Q Cc H C) >oc Q Cl) w W 06 m frLu O cin > W w 0 W o Er O CD IT' -'LU U LU � p (n Q Q z LL LO W 0 CLO ILL MJLJm Q Q J = � �_ co N 1 z F- N oM 0') CO U `� Z_ rz � U) M u. U z �zm Cr m o O Q�2 PROJ. DATE: NOV 2015 Q.C.: TM Q.C. DATE: 11/2016 DRAWING NUMBER: D1 PROJ. NO.: 20150095.00. RA