Loading...
HomeMy WebLinkAbout20140798 Ver 1_Compliance Evaluation Inspection_20161215Wetland Inspection Report Project Num: 20140798 Project Name: Big Creek III Stream Restoratior County: Stokes Location: Big Creek III Stream Restoration Latitude: +36° 26'23" SW Plan Location Site Owner Name Tilley, Bruce Inspection Date: 12/15/2016 Reason for Inspection Routine Inspection Type: Site Inspection (non -DOT) Inspection Contact Person: On -Site Representative(s): Primary Inspector: Sue L Homewood Secondary Inspector(s): Facility Compliance Status: 0 Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: 0 Permit (401 WQC) Inspection Summary: Version: 1 Status: Issued Project Type: Stream Restoration / Creation Region: Winston-Salem Longitude: -80° 55'09" Title: Phone: ❑ Not Compliant Phone: 336-776-9694 page: 1 Site Number: 20140798 Owner: Tilley, Bruce Inspection Date: 12/15/2016 Inspection Type: Site Inspection (non -DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? ❑ ❑ ❑ 0 Are the culverts and/or filled areas installed properly? ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? ❑ ❑ ❑ Comment: Construction in 2014-2015. Some areas of stream channel are no longer stable due to some minor changes to design during construction and extreme storm events occuring within first year. Unstable areas are proposed for repair in early 2017. Will install additional toe wood, repair eroded banks, repair failed structures, remove mid -channel bars, etc. Work is proposed to be conducted under authority of original 404/401 (requested that Permittee confirm this with USACE) page: 2