HomeMy WebLinkAbout20140798 Ver 1_Compliance Evaluation Inspection_20161215Wetland Inspection Report
Project Num: 20140798
Project Name: Big Creek III Stream Restoratior
County: Stokes
Location: Big Creek III Stream Restoration
Latitude: +36° 26'23"
SW Plan Location
Site Owner Name Tilley, Bruce
Inspection Date: 12/15/2016
Reason for Inspection Routine
Inspection Type: Site Inspection (non -DOT)
Inspection Contact Person:
On -Site Representative(s):
Primary Inspector: Sue L Homewood
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
0 Permit (401 WQC)
Inspection Summary:
Version: 1 Status: Issued
Project Type: Stream Restoration / Creation
Region: Winston-Salem
Longitude: -80° 55'09"
Title: Phone:
❑ Not Compliant
Phone: 336-776-9694
page: 1
Site Number: 20140798 Owner: Tilley, Bruce
Inspection Date: 12/15/2016 Inspection Type: Site Inspection (non -DOT) Reason for Visit: Routine
Permit (401 WQC) Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? ❑ ❑ ❑ 0
Are the culverts and/or filled areas installed properly? ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? ❑ ❑ ❑
Comment: Construction in 2014-2015. Some areas of stream channel are no longer stable due to some minor
changes to design during construction and extreme storm events occuring within first year. Unstable
areas are proposed for repair in early 2017. Will install additional toe wood, repair eroded banks, repair
failed structures, remove mid -channel bars, etc. Work is proposed to be conducted under authority of
original 404/401 (requested that Permittee confirm this with USACE)
page: 2