HomeMy WebLinkAbout20080915 Ver 1_C-W Bridgewater repairs completion report to FERC_20161216
Strickland, Bev
From:Oakley, Mark <Mark.Oakley@duke-energy.com>
Sent:Friday, December 16, 2016 8:46 AM
To:Higgins, Karen; Tarver, Fred; Larsen, Cory; Goudreau, Chris J.;
bryan_tompkins@fws.gov; 'bboris@ci.morganton.nc.us'; Galleher, George A; Dunn,
Lynne; Lineberger, Jeff; Finley, Keith A; Fragapane, Phil; Todd, Shannon
Subject:Report to the FERC following completion of C-W Bridgewater repairs
Attachments:Report to the FERC following completion of Bridgewater repairs Dec 2016.pdf
The attached letter was filed with the FERC on Dec 15 reporting flow releases during the recently-completed
Bridgewater outage. The FERC requires Duke Energy to share the flow results with resource agencies, but provides no
specific direction beyond that. I believe the drops in flow below Critical Flow come as no surprise since there were times
when no units were generating. However, we do gain insight to leakage/seepage flows during non-generating periods
which are lower than with the old powerhouse. Please advise if additional consultation is necessary.
Thanks to you all, and Merry Christmas.
1