Loading...
HomeMy WebLinkAbout20061804 Ver 12_Woodlands Site Calcs_20161215Woodlands @ Flowers Plantation Dan Ryan Builders 3131 RDU Center Drive Suite 120 Morrisville, NC 27560 Phone: SEAL i 19843 ' 'i .ij •. GIN STOCKS ENGINEERING, P.A. 7`6!!d 801 East Washington St. Phone: 252.459.8196 PO Box 1108 Fax: 252.459.8197 Nashville, NC 27856 Mobile: 252.903.6891 Email: mstocks@stocksengineering.com Stocks Engineering, P.A. 1100 Eastern Avenue PO Box 1108 Nashville, NC 27856 Project: Woodlands @ Flowers Planta Date: June 30, 2016 Page: 1 of 1 Post -Development Runoff Computations 10 -Year Storm EINIM Runoff Computations 10 -Year Storm Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor HGL Dns No. rate size length EL Dn EL Up . slope down up loss Junct line (cfs) (in) (ft) (ft) (ft) (°70) (ft) (ft) (ft) (ft) No. 1 JB#2-FES#1 27.05 30 C 42.0 240.00 247.14 17.000 241.74 248.88 0.86 248.88 End 2 DI#3-JB#2. 5.28 18 c 133.0 247.46 252.12 3.504 249.60 253.00 We 253.00j 1 3 CB#4-DI#3 5.04 18 c 14.0 252.32 252.60 2.000 253.25 253.46 n/a 253.46 j 2 4 CB#5-CB#4 3.76 18 c 20.0 252.80 253.20 2.000 253.75 253.94 n/a 253.94j 3 5 JB#6A-JB#2 21.77 24 c 77.0 247.46 247.85 0.506 249.46* 250.17* 0.75 250.92 1 6 CB#6-JB#6A 1.39 24 c 8.0 247.90 248.30 5.000 251.66* 251.66* 0.00 251.67 5 7 CB#7-JB#6A 20.38 24 c 40.0 247.90 248.10 0.500 251.01* 251.34* 0.33 251.66 5 8 DI#8-CB#7 13.17 24 c 101.0 251.91 252.92 1.000 253.01 254.21 0.30 254.21 7 9 DI#9-DI#8 8.01 18 c 139.0 253.02 272.48 14.000 254.48 273.56 Na 273.56j 8 10 JB#13-DI#9 1.53 18 c 140.0 272.68 276.88 3.000 274.09 277.35 n/a 277.35j 9 11 DI#14-JB#13 ' 1.53 18 c 48.0 277.08 277.56 1.000 277.50 278.03 n/a 278.03 10 12 CB#15-DI#14 1.15 18 c 19.0 277.66 278.00 1.789 278.19 278.41 n/a 278.41 j 11 13 CB#10-DI#9 5.59 18 c 101.0 272.68 274.70 2.000 273.94 275.60 n/a 275.60j 9 14 CB#11-CB#10 3.13 18 c 137.0 274.90 280.38 4.000 275.95 281.06 n/a 281.06j 13 15 DI#12-CB#11 1.34 18 c 69.0 280.58 281.96 2.000 281.30 282.40 n/a 282.40j 14 Project File: PIPE CALCS.stm Number of lines: 15 Run Date: 06-30-2016 NOTES: c = cir; e = ellip; b = box; Known Os only ; *Surcharged (HGL above crown). ; j - Line contains hyd. jump. Hydraflm Storm Sewers 2005 A a o J a O O O O O O O O M OJ Ol O M O O Y O N N O O O N L[J V N Lo O V N O O U O m N O h O M N N N t0 N N N N M U CN t N p 01 A V N � M D7 O M r m N C N Vl e O O N N rn o W cD h d' V V N t 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J> �f M1 N M N r Ol O O to O) V N O O M IJ IU A M N N N T N W N� Oi M M V 6 O N N N N N N N N N N N N N N N 'O N N N M M M V m M V M N N R Cl co M W V V .r- N N N W OP O O G q r V { fp O (O (O N M M N N V M O GI � Q � ci o of ri ai N z 'v "r p, N io v o o a m ro M1 v o ro v y r N N r o O o ry o v v m co v ❑ � O O O N N (V O O O O O O N U1 M O V N O ❑ M O V m (O M W (M N N N N N N N N N N N N N N N � N O O to O O N N N N O O N lU A N N N N N N N N N N N N N N N N N N N N at N M1 N < V N M r N M1 V N Ol � M O M M V O r V) a N N V N W O W m N N O O O O O O O O O O O O O O O O O N � M c7 O al W m �- a � �n u`> N N N N N N N N N N N N N N N E OD M r O l0 OJ M O N O � O O T O O O O O O O O O O O O O O O L C n o M w rn v °i m a 't Lq OR Lc� Iq c d N J c O ❑ t c ❑ O O N N lV N U A N N h 2 O M M 6 O M V V h c0 M iI) N N N N N N N N N N N N N N N U E o f0 N O <D O o OJ N N N N N O N E > O V M N d; W W O (D O (O (O m ) N j d x O ih N N M N A r (V V O 6 (n C N V V N O V V �U r A A M1 h N N U N N N N N N N N N N N N N N N J t Cn o N r N h M N W M V Q U W a N -o d N o r m6 o N M a E N C � O O U O N r a Z JC .�- O L a 3 d co E L O *a co O O N O CD N LO O N N O co LO N co m N O O co N O O r 0 rn 0 o 0 ti 0 m w C) U A L� Ino b6'LbZ '13 'nUl 09'£92 '13 wlRj :U� - 00'Zti+0 ejS 0 M O N O UI 00'OtiZ "13 'AU] 09'£t7Z '13 'PUaJ Ilepn0 - 00'00+0 els O O Cfl N W M O d O W co I` LO O Lo d' N 00 co N N N N N to C) U J Q U W a CL O CL W O L IL L 3 (D U) E L O 4.0N in0 OZ'E9Z '13 'nul o 0 O N O 0 4 N C6 o 0 N O 0 N m N CD o 0 dT NLO 0 0 O V N Etb'99Z ]A WN V :ul - o0'L9+� u3S N ul 08'Z9Z '13 'nul }n0 09'Z9Z '13 'nul Eb'99Z'IA wlRl E u UpiCoRg?tj cul in0 z6 Z9Z'12'nul 09'99Z'13 WIH Z :ul - 00'EE+I a7S ------------- N O_ O L U Gl o N cc ol h O N N ul 9h'LbZ '13 'nul ln0 VVLtiZ 13 'Aul o9,E9z'13 WN 00'00+0 LIS o O 0 O 0 O 0 O 0 O 0 0 0 O r V O b n N LO CO V o V N N N N N N N W E U J Q U W 0- a- CL - da m O L G. L co E L O co4-0 O O O O O O O O O O 0 O O V 06 N CO N O N N N N N O O r O rn }nO 99,ztz '13'nUl 0 co 09"L9Z "13 Wlij 9 :Ul - 00'LL+O elS 0 ti O m o c m m o � 0 O M O N O UI 9ti'LbZ '13 .nUJ ;nO ti6*Ztq '13 'nUJ 09'fi9Z 13 WN 00,00+0 BSS I N O O O O O O O O O O O O O d O 4 M N O O W N N N N N N E N Q) U Q U W a a 0 IL �F O L a L d d co E L O Cl)F O O O O O O O O O O O O LO N N N N N N O O T O O O co O h O O a+ v-. O L U CD CD O V O co O N in0 OE'�8jb7Zj 'iA 'AUI o 9nFf1990Dw+3 wo 0919Z ID WILL 00'00+0 e1S o o o 0 O 0 o 0 0 o 0 0 °JO d W O h It (o 00 LO LO N O O N N N N N N 9 O O N O N CII N m M N O (O N O a0 N O O N 0 0 M lnO 8b'ZLZ'13 'Aul 00'LLZ'13 MH 6 :ul - 00'08+Z EIS u� N --------------- 0 N N N t 2 N p O O N LO r Ul ZO'£9Z'13 'nul O ln0 Z6'Z9Z '13 'nul u 00'L9Z l3 WQJ 8 :ul - 00' bb+elS LO N O O ul 66' 69Z '13 'nulo lnO 04'SbZ '13 'nul hL'L9Z'13 WN L :u-7 - 00'0h+0 e1S uI 06'LbZ '13 'AUI LO `-4 lnO 99117Z '13 'nul 09'L9Z '13 w!a mil 00'00+0 els I I I 1 1 o 0 o N rn M o (O 0 of 0 O v o I N M V CO N _N N N N N N W 01 O L CL L 3 co E O N p 0 m N LO O 0 N O 0 ro N O 0 N O 0 N O 0 m N N N Ino 00'9LZ '13 'AUI *19 S079Z Ua121 Z L :Ul - 00'LO+Z UISo0 UI 99'LLZ 'I3 'AUI N Ino 95LLZ '13 'AUI 00'L9Z'13 Wid L L :Ul - 00'99+L UIS LO UI 90'LLZ'13 'AUI up Ino 99'9LZ '13 'AUI 09'179Z '[A Wla 0 L :Ul - 00'0b -+UIS to N �^ L V R d O O r 0 0 v LO r 0 LO N 0I 99'ZLZ "13 'AUI Ino 917'ZLZ '13 'AUI 00'LLZ'13 wla 00'00+001S o w o o 0 o o O O O o o 0 0 co N co d N N N W "4c O 0 O m N (6 O 0 m N O 0 N m N o] O 0 N O 0 V N O 0 o N N M ;no 96' 68Z '13 'nul 9L'b8Z "13 wRi 9 4 :ul - 0010+£ e;S o m i r N uI 89'08Z'13 'nul ;n0 8E'08Z'13 'nul N 99'482 13 w!a K :ul 00'SE+Z e7S u� N N O O N t V A d O N ul 06'17LZ '13 'Aul ;no OL'bLZ 13 'Aul LE'6LZ '13 wRi o --IT 0 £6 :ul 00'60+6 elS tF --- I I I i ILO O LO ul 89'ZLZ'13 'nul N in0 8b'ZLZ'13'nul 00'LLZ'13 wN 00'00+0 a;S 0 o O 0 0 0 0 o m Go N m N V N O N d N N N W Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor HGL Dns No. rate size length EL On EL Up slope down up loss Junct line (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) (ft) No. 1 CB#17-FES#16 7.18 24 c 114.0 230.00 232.28 2.000 230.95 233.23 0.56 233.23 End 2 CB#19-CB#17 3.16 18 C 91.0 232.48 233.39 1.000 233.55 234.07 We 234.07 j 1 3 CB#18-CB#17 3.41 18 c 102.0 232.48 233.50 1.000 233.54 234.20 n/a 234.20j 1 PIPE CALCS II Number of lines: 3 Run Date: 06-30-2016 NOTES: c = cir; e = ellip; b = box; Known Qs only ; j - Line contains hyd. jump. nyoiaii� A a 2 G NO N N N y o 0 0 J T N m N O U W o C C MO U L U N N M V M p > N o a V 111 N ❑ o 0 0 W N 0 0 0 J o M o O M d N N N > L O O O M m o N c o v Do v r M a N v O O j L z o x m m c6o � ❑ 0 0 0 J > N O N N N N N M N > rn a 0 0 V0 d W N N N 9 d A � a o � ❑ r w x m o o ❑ o r N C x S N M M M O N N N U N C_ a m U U c J 2 N N m U W m a o a z 2 O L 0. L 3 N E L O CO ln0 8Z,Z£Z '13 'nuI O O N O O N O O N O O N O O N O O N O N f 9Z'62Z 'I3 w2i b :u--b o�. 0 O 0 rn 0 0 rIN z CD o d 0 LO 0 It O co O N O ul 00 OSZ I3 Aul c OUCC '13 'PUJS Ilegn0 - 00'00+0 e;S o O 0 o 0 o 0 O 0 o 0 0 0 f co m rn L6 N W N N N N N T O L- a. a L d 3 aD co E L O 4F co O O OO O (O O Cl? O O 00 00 LO N N N N N N O O Ino 6£'E£Z '13 'AUI 6L'9£Z '13 wl.0 Z :Ul - 00'L6+0 eTS O m O O O m o � O c m 00 O v O co O N O UI Hti'ZEZ 13 'AUI r }nO 9Z'Z£Z '13 'AUI 9Z'6EZ '13 wlRl 00'00+0 els O O O O W oO o M rn M w _m (n W r W Cl) ((> co N N O N N N E N U) U J U W d a N w 0 :E 4- 0 L a L d N E L O ++ cn O C) co O (0 O O m O T O o L6 r co N co 6 N co C14 O N N N N N N O T T }n0 09'£6Z '13 'AUI of9£Z'13 WDCI £ :U-1 - 00'ZO+4 e3S 0 o T CD m coco O O V LO LO CD V O co O N UI 8ti'Z£Z '13 "AUl o }n0 8Z'Z£Z '13 '^UI 9Z'6£Z '13 wIN All 0000+0 133S 14 o r O O O O O (O O O O M O T _y L W N T N 06 N 6 N N N � N Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor HGL Dns No. rate size length EL Dn EL Up slope down up loss Junct line (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) (ft) No. 1 MH#1-EX. SS 0.06 8 c 226.0 203.80 215.10 5.000 203.92 215.22 n/a 215.22 End 2 MH#12-MH#1 0.01 8 c 51.0 229.00 229.51 1.000 229.04 229.56 0.01 229.56 1 3 MH#11-MH#1 0.01 8 c 50.0 229.00 229.50 1.000 229.04 229.55 0.01 229.55 1 4 MH#2-MH#1 0.04 8 c 219.0 231.00 239.76 4.000 231.06 239.85 We 239.85 1 5 MH#3-MH#2 0.04 8 c 269.0 241.76 249.83 3.000 241.82 249.92 n/a 249.92 4 6 MH#10-MH#3 0.01 8 c 287.0 250.03 252.90 1,000 250.07 252.95 0.01 252.95 5 7 MH#4-MH#3 0.03 8 c 282.0 251.83 265.93 5.000 251.88 266.01 0.01 266.01 5 8 MH#5-MH#4 0.03 8 c 198.0 266.13 271.16 2.540 266.19 271.24 0.02 271.24 7 9 MH#6-MH#5 0.01 8 c 46.0 271.36 273.66 5.000 271.39 273.71 n/a 273.71 8 10 MH#7-MH#5 0.02 8 c 340.0 271.36 274.76 1.000 271.42 274.83 0.02 274.83 8 11 MH#8-MH#7 0.01 8 c 86.0 274.96 279.26 5.000 274.99 279.31 n/a 279.31 10 12 MH#9-MH#7 0.01 8 c 142.0 274.96 275.81 0.599 275.01 275.86 We 275.87j 10 Project file: Sewer Calcs.stm Number of lines: 12 Run Date: 06-30-2016 NOTES: c = cir; e = ellip; b = box; Known Os only ; j - Line contains hyd. jump. Hydraflow Storm Sewers 2005 v A a c uroi m o o m m o 0 o m o ro o J N O O O N N O O O O O O O Y O O O W O V O O O O O O V � � O O O r T N N O N ^ M O m m m m m ro m m m m `c ro M M c v L m o o co M o v u� a co a o N N A W m Aq M W O m a O W W w ro C N o A `q w m m [o rn In rn In m to o co o co m M co [o m Ln 0 0 0 0 0 0 0 0 0 0 0 0 W N N M V N (O A A A A A N N N N N N N N N N N N N W N N M M N M M N O N A Li CE V T m M M O> N N m m O C O Jb O 0 0 0 0 0 0 0 0 0 0 0 0 N^ N W m O N A M W - f9 i N � 16 Oi OI 01 Oi N (O (M V T to N N N N N N N N N N N N > UI N W mm O (OD N W > p W C O O O O W W M W N M O N A A (O A A O> m W O> [O N (D O (O Ol O O 6 O M IV O O O O O O O O O O O O L C N O E v:O O q Lq N N W W O C N N N N � � N m � ... O O O O O O L � L_ 0' (O 4 6 6 M fD M v y 0 0 0 0 0 0 0 0 0 0 o O o 0 0 0 06 0 0 0 0 0 0 m O o 0 o m o .- Q> y m O N N N N N N N N N N N N N t> O O O O (O M M O O M t0 N t N j d� M O> 47 o fD Q U� a 3 � 0 0 0 0 0 0 0 0 0 0 0 o N m V% N W W N N W t0 c0 W W N LL 5 N N O d O L CL L 3 a� E L O ++ co LO O O O N O O O d N O O O M N O O O N N O O O N O O O O N O LO N ln0 06'962 '13 'Aul Mll 67'6EZ El WQA Ln 6 :u- 00'92+Z els I I 1 1 71H N N 0 0 N h r O r 0 N m r R d O O N N � IIIII N If III LO r O L IL L 3 aD co E L O *F+ co O O O O O O O O O O O O ON N N N N N O 0 I 0 rn O O I- ------------------------------ C) O M 3n0 65'6ZZ '13 'nul 69'L£Z '13 w121 Z :U l oo' L9+0 els O L L' d O 0 0 0 r co Lr O N O ul 00'6ZZ '13 'Aul }n0 06'96Z '13 'nul 67'6EZ '13 wl�:] 00'00+0 els O O O O O O O O O O O O ani O W LO V' 00 m N co CO N O N N N N N O O O O O O O O O O O O O Ct N N CO O N N N N N N O O O O O co O ti O }n0 09'6ZZ '13 'AUI v £L'L£Z '13 WNC £ :Ul - 00,05+0 SIS O 0 o O co c cc O N O ul 00'6ZZ '13 'Aul r }n0 O6'96Z '13 'nul 67'6£Z '13 w2i 00'00+0 e;s O O O O O O o O o O o O m W O It OO N (6 O N N N N N N 1p 4- 0 L- CL a L aD 3 aD co E L O i+ co O L- CL a L d 3 as co E O N }n0 06'Z9Z '13 '^ul O O N O O N LO O O N O O LO N O O N O O N O o 9879Z 'I3 w!2d 9 :ul 00'L8+Z els ,n N O LO N LO N N O O N LO ti r O Cf LO y r � o N O O I Lo N O ul EO 09Z 13 culN }n0 E8'617Z '13 'AUI Z5'09Z 'I3 wIb 00'00+0 e;s o $ O oO O o O O o O O O O O N N W N N N 0 O O O M ln0 96' 6LZ '13 'nUl 0 o O 07 N 0 0 W 1� NN 0 0 r (.0N 0 0 0 0 V N 0 LO 80'98Z l3 wlRj 8 :UT- 00'08+h els 0 v 0 N 0 O V O M UI £ 6'99Z '13 'AUI 0 ln0 E6'99Z '13 'nUl Cl) £4'6LZ'13 W!il L Ul - 00'ZB+Z els s v o m N O O N 0 -----------0 0 LO 0 0 LO UI E8' 69Z '13 'AU1 lnO £8'6t'Z '13 'AUI Z9'09Z '13 w!b 00'00+0 BIS o 0 0 0 0 0 0 0 0 -- o M N � N N W N Ld N y W �C 4- 0 L a L N E L O 4.0 co O O O O O O O O O O O O Om Op O N N N N N O 0 r O rn 0 m 0 0 m }nO 99'£LZ '13 'nui o s Ln 6171782 '13 wlRl 6 :ul 00'917+0 e}S O <t 0 0 m 0 N O ul 9C'6/Z '13 'nul r }nO 96' 6LZ '13 'nul 80,99z,13 Wlb 00'00+0 e}S o CD 0 o 0 0 0 0 0 O 0 o 0 m w O o 0) N d'co m r OD co O m m N N N N N 4- 0 L 0. L co E O 4-1N O O inO 9L'17LZ '13 '^UI Om 09,92Z AD WN O O N O O N O OO O N O O N 00 O N M 06 :ul - 00'017+0 eiS n N Cl) O O LO h N O N N N O O o N^ C. t � V _ h N r O r LO N r O O r LO fl - CD O LO u1 9S' 6LZ '13 '^ul u, }nO 96' 6LZ '13 '^ul ----------- N 80'99Z,13 wRi IIR 00'00+0 IBIS o 0 0 0 0 o o O O O m o rn N 000 N r N 00 m N o co N W M O L IL L 3 m E L O 4.0 cn O O O O O O O 0 O O 0 0 O N 4 (.6 00 O co N N N N N 0 0 r Ino 9Z'6LZ '13 'nut 0 rn LE'L8Z '13 uaRi L L :ul - 00'98+0 e3S 0 0 ti 0 0 O L 0 A m 0 v 0 co 0 N O ul 96'17LZ "13 'nul 3n0 9L'17LZ '13 'nut 09,99z,13 WIRJ 00'00+0 els o 0 0 o 0 0 o 0 O O o o O N O W OM N N V N (6 N OO N O N 0 0 j O O O O O O O N 4 CO N O j M N N N N N O s }nO 68'SLZ '13 'Aul T 9L'0H '13 w2i j I Z6 •u- 00 Zti+6 ejS 0 co T O N T O T T O O T OO v coF L a a C) � O m 0 0 O M O N ul 96'17LZ '13 'Aul }nO 9L'bLZ '13 'Aul o T 09,99z,ID WRi 00'00+0 BIS 0 o 0 0 0 C3 0 O 0 0 0 0 0 a O OM N d' co OO O W N N N N N ( r �,F> di � - Pb1J•i� w �T tests I`E - �- - SA = � mS '/• lad ac "7.-77 = O. o Z!S. J* '7.Y7 Ac-= o . 19 Pr 62 8. 2_ rz- " © 39'7 C, o ew A ---- - -- --- - - - = c. 3o -W o. 40-- - - - ----- l41 CF = C- Z N = o 0 - A 33 ZoA, S$ 2 SF -c =5(f-& Hes = 2. Lf D VS -4' ( 4_^)9. --r- L to 1 ,/ 8 _ Permit No. (to be provided by DWO) /� pp Project name Contact person Phone number Date Drainage area number II.'DESIGN INFORMATION Site Characteristics Drainage area Impervious area, post -development %Impervious Design rainfall depth Storage Volume: Non-SAWaters Minimum volume required Volume provided Storage Volume:'SA Waters 1.5' runoff volume Pre -development 1 -yr, 24 -hr runoff Post -development 1 -yr, 24-hrrunoff Minimum volume required Volume provided Peak Flow Calculations Is the prepost control of the lyr 24hr stone peak Bow required? 1 -yr, 24 -hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall Intensity: 1 -yr, 24-hrstorm Pre -development 1 -yr, 24 -hr peak Bow Post -development 1 -yr, 24 -hr peak flow Pre/Post 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 108 vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the stale -required temp. pool? Elevation of the top of the additional volume 252.459.8196 NA 338,4619' 130,244 if 36.48 % 1.0 in 11,197 is 12,220 ft" OK, volume provided is equal to or in excess of volume required. to to to to as Y (Y or N) 2.9 In 0.35 (uni0ess) 0.58 (uniffess) 0.12 infer OK 0.23 fts/sec 0.23 f?/sec 0.00 fts/sec 140.80 final 139.50 final 130.00 final 140.00 fmsl 139.00 final Data not needed for calculation option #1, but OK if provided. 137.00 fmsl 135.00 fmsl Data not needed for calculation option #1, but OK if provided. 2.00 B Yes (Y or N) 140.8 fmsl OK Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 2 WA CDEN NCDENR P t ' STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filed out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Project name Contact person Phone number Date Drainage area number II.'DESIGN INFORMATION Site Characteristics Drainage area Impervious area, post -development %Impervious Design rainfall depth Storage Volume: Non-SAWaters Minimum volume required Volume provided Storage Volume:'SA Waters 1.5' runoff volume Pre -development 1 -yr, 24 -hr runoff Post -development 1 -yr, 24-hrrunoff Minimum volume required Volume provided Peak Flow Calculations Is the prepost control of the lyr 24hr stone peak Bow required? 1 -yr, 24 -hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall Intensity: 1 -yr, 24-hrstorm Pre -development 1 -yr, 24 -hr peak Bow Post -development 1 -yr, 24 -hr peak flow Pre/Post 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 108 vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the stale -required temp. pool? Elevation of the top of the additional volume 252.459.8196 NA 338,4619' 130,244 if 36.48 % 1.0 in 11,197 is 12,220 ft" OK, volume provided is equal to or in excess of volume required. to to to to as Y (Y or N) 2.9 In 0.35 (uni0ess) 0.58 (uniffess) 0.12 infer OK 0.23 fts/sec 0.23 f?/sec 0.00 fts/sec 140.80 final 139.50 final 130.00 final 140.00 fmsl 139.00 final Data not needed for calculation option #1, but OK if provided. 137.00 fmsl 135.00 fmsl Data not needed for calculation option #1, but OK if provided. 2.00 B Yes (Y or N) 140.8 fmsl OK Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 2 Permit Il. DESIGN INFORMATION- _ Surface Areas (to be pmvrded by DWQ) Area, temporary pool 14,179 11° 1,144 fe Area REQUIRED, permanent pool 8,462 fit? SAIDA ratio 2.50 (unidess) Average depth calculated Area PROVIDED, permanent pool, A._,, 9,999 ft OK Area, bottom of 1011 vegetated shelf, Aw_mw 5,619 8` 11 Area, sediment cleanout, top elevation (bottom of pond), Ab,, a 1,144 ft` Volumes Drawdown through orifice? Volume, temporary pool 18,852 Rs Insufficient. Volume does not agree with data previously entered. Volume, permanent pool, V,.,2, 31,192 11s 2.00 in Volume, forebay(sum of forebays if more than one forebay) 6,14311s Forebay % of permanent pool volume 19.7% % OK SAIDA Table Data 0.60 (unidess) Design TSS removal 90 % 0.33 it Coastal SAIDA Table Used? N (Y or N) N Mountain/Piedmont SAIDA Table Used? Y (Y or N) Weir type SAIDA ratio 2.50 (unldess) Average depth (used in SAIDA table): (unidess) Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, V°e„,,, 31,192 ft' Driving head (H) Area provided, permanent pool, A._y, 9,999 ft Average depth calculated 3.10 it OK Average depth used In SAIDA, d°„ (Round to nearest 0.511) 3.0 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Storage volume discharge rate (through discharge orifice or weir) Area provided, permanent pool, Ace _p d 9,99911` Area, bottom of 1 Oft vegetated shelf, Ay L ,w 5,619 fe 2.40 days Area, sediment cleanout, top elevation (bottom of pond), Ab,,„, 1,144 fe 'Depth” (distance blw bottom of 1Oft shelf and top of sediment) 2.00 it Average depth calculated it Average depth used in SAIDA, d°„ (Round to down to nearest 0.5ft) 11 Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.00 in Area of orifice (if -non -circular) in' Coefficient of discharge (Co) 0.60 (unidess) Driving head (H°) 0.33 it Drawdown through weir? N (Y or N) Weir type (unifless) Coefficient of discharge (Ca) (unidess) Length of weir (L) it Driving head (H) 11 Pre -development 1 -yr, 24 -hr peak flow 0.62 1131sec Post -development 1 -yr, 24 -hr peak flow 0.59 11slsec Storage volume discharge rate (through discharge orifice or weir) 0.06 fts/sec Storage volume drawdown time 2.40 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 a OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 5.3 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Valve and Drawdown Form SW401 Met Detention Basin-Rev.9A/l Oft Parts I. & II. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High Flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROM, - Overflow device, and - Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized, 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual Feld investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 1 of 1 Operation & Maintenance Agreement Project Name: Project Location: Woodlands @ Flowers Plantation (Pod NE -6) Flowers Plantation, Clayton, NC Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a I Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & corresponding O&M tables Bioretention Cell Quantitv:l 1 I Location Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level Spreader/VFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: User Defined BMP Present: Location(s), Location(s), Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): 1 No No g in a known set locatio These deficiencies can I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature: County of personally appeared before me this Edwin Woods Vice President, Dan Ran Builders NC, LLC 3131 RDU Center Drive, Suite 120 Morrisville, NC 27560 (252)747-4970 danrshank@danryanbuilders.com , a Notary Public for the State of do hearby certify that day of acknowledge the due execution of the Operations and Maintenance Agreement. Witness my hand and official seal, My commission expires Version 1.4 Date: and 9/2/2016 =V1 Mallual Page 1 of 7 STORM -EZ 9/2/2016 Version 1.4 O&M Manual Page 2 of 7 Important operation and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. - Wheeled or tracked equipment will NEVER be driven over the bioretention planting surface. - Special care will be taken to prevent sediment from entering the bioretention cell. - If standing water is present,2 days after rainfall, conduct an infiltration test of the soil media. After the bioretention cell is established, inspect it quarterly. Inspection activities shall be performed as follows and maintenance activites shall commence immediately to remediate any problems observed per the table below. BMP element: Potential problem: How to remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil to remove the gully, and plant a ground cover and erosive gullies have formed. water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale to smooth it over and provide erosion control swale. devices such as reinforced turf matting or riprap to avoid future problems. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The pretreatment area Flow is bypassing Regrade if necessary to route all flow to the pretreatment area. pretreatment area and/or Restabilize the area after grading. gullies have formed. Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than three possible. Remove the sediment and restabilize the pretreatment area. inches. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional practices. vegetation show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which can kill the tree if not removed). six months after planting. STORM -EZ 9/2/2016 Version 1.4 O&M Manual Page 3 of 7 Bioretention Maintenance Requirements (continued) BMP element: Potential problem: How to remediate the problem: The bioretention cell: soils and mulch Mulch is breaking down or has floated away. Spot mulch if there are only random void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging - remove and replace either just clogged with sediment. the top layers or the entire media as needed. Dispose of the spoil in an appropriate off-site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as recommended per the soil test and pH has dropped or heavy toxic soils shall be removed, disposed of properly and replaced with metals have accumulated in new planting media. the soil media. The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off-site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM -EZ 9/2/2016 Version 1.4 O&M Manual Page 4 of 7 Wet Detention Pond Maintenance Requirements The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The inlet device The pipe is clogged. Unclog the pipe. Dispose of the sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to smooth it over and provide erosion swale. control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and replace with clean stone. covered in sediment (if applicable). The forebay Sediment has accumulated to a depth greater than the Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it original design depth for will not cause impacts to streams or the BMP. sediment storage. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or Determine the source of the problem: soils, hydrology, disease, etc. dying. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. STORM -EZ 9/2/2016 Version 1.4 0&M Manual Page 5 of 7 The main treatment area Sediment has accumulated to Search for the source of the sediment and remedy the problem if a depth greater than the possible. Remove the sediment and dispose of it in a location where it original design sediment will not cause impacts to streams or the BMP. storage depth. The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and consult a professional to remove beaver activity is present. beavers. A tree has started to grow on Consult a dam safety specialist to remove the tree. the embankment. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. STORM -EZ 9/2/2016 Version 1A O&M Manual Page 6 of 7 Wet Detention Pond Design Summary Wet Pond Diagram WET POND ID FOREBAY MAIN POND 0 Permanent Pool EI. 239.5 Permanent Pool EI. 239.5 Temporary Pool EI: 240.5 Temporary Pool EI: 240.5 Pretreatment otherrNo No Clean Out Depth: 4.5 Clean Out Depth: 4.5 than forebay? Sediment Removal EI: 235 Sediment Removal El: 235 Has Vag. Filter? Bottom Elevation: 234 Bottom Elevation: 232 STORM -E2 9/2/2016 Version 1.4 O&M Manual Page 7 of 7 SPANGL,ER ENVIRONMENTAL, INC. Environmental Planning Environmental Permitting Environmental Consulting Environmental Construction Management ExpertTestimony May 31, 2016 Mr. Rob Shank Dan Ryan Builders, Inc. 3131 RDU Center Drive, Suite 120 Morrisville, NC 27560 RE: Flowers Townhomes SHWT Determination Rob: Please find attached an exhibit showing the field data for the above -referenced tract. The SHWT was determined to be in excess of of 54 inches BLS in the location of the proposed stormwater BMPs 1, 2, and 4, and at 52 inches BLS at location 3, as shown on the exhibit. Please feel free to contact me directly should you have any questions. Regards, Spangler Environmental, Inc,- 1% nc, "; •' \ 1 �Z •1rt�� James A. angler, CEI, A.W.A-SCE__, President "�;,;; CC: Mike Stocks, PE 4338 Bland Road Raleigh, N.C. 27609 phone 919-8754288 fax 919-875-4287-8351 1-866-SPANGLER www.spanglerenvironmental.com ._ ,}yam^'f :' FOREBAYIPOND VOLUME COMPARaM 0 WET DETENTION FOREBAY VOLUME COMPARISON FOREBAY VOLUME POND VOLUME ELEVATION SURFACE INCREMENTAL AREA VOLUME 234 446 546.0 235.0 646.0 763.0 236.0 880.0 1,012.0 237.0 1,144.0 1,289.5 238.0 1,435.0 1,593.5 239.0 1,752.0 939.3 239.5 2,005.0 SUM= 6,143.3 Forebay is of Pond. Pond Average Depth: Feet POND VOLUME ELEVATION SURFACE INCREMENTAL AREA VOLUME 232 845 1,129.5 233 1414 1,719.0 234 2024 2,349.0 235.0 2,674.0 3,021.0 236.0 3,368.0 3,730.0 237.0 4,092.0 4,467.5 238.0 4,843.0 5,231.0 239.0 5,619.0 3,402.0 239.51 7,989.0 SUM = 25,049.0 Buoyancy Resistance Calculations for Outlet Assumptions: Unit Weight of Saturated Soil [gsat] = 120 pcf Unit Weight of Concrete [gccnc] = 147 pcf Unit Weight of Water [gw] = 62.4 pcf Base Length [L] = 4 feet Same if Extended Moorbase Base Width [W] = 3 feet Same if Extended Moorbase Known: Inside Diameter of Wetwell (ft) = ID Outside Diameter of Wetwell (ft) = OD Depth of Structure (ft) = D Minimum Base Slab Thickness (in) = T Minimum Top Slab Thickness (in) = Tts Average Invert Thickness (in) = Ti Base Slab Area (ft) = A Displacement Volume, Wetwell (ft) = Vw Displacement Volume, Base Slab (ft) = Vbs Buoyant Force = B Effective Weight of Soil Over Slab Extension = S Structure Weight, Walls = Ww Structure Weight, Invert = Wi Structure Weight, Top Slab = Wts Structure Weight, Base Slab = Wbs Structure Weight, Total = W Table of Calculations: 2.78 3.44 8.8 6 0 6 2'X3' Box 2'X3' Box (L x W) or pi(L/2)` pi(OD/2)2D A(T/12) (Vw + Wbs) x 9, (gsat - gw) x (A-pi(OD/2)2)D (pi(OD/2)2 - pi(ID/2)2)Dgconc pi(I 13/2)2Tigconc pl(O D/2)2(Tts/12)gc.nc A(T/12)gconc W. + W; + Wt. + Wbs Vw I Vbs B I S W +S=l 7195.62 (fts) I (fts) (lbs) I (Ibs) B =1 5492.85 FOS 81.751 6.281 5492.851 1657.81 Is W + S > B? YES 1 1.31 Conclusion: Since the weight of the structure and the base slab is greater than the buoyancy for of the wetwell, the resistance to buoyant force is provided. Watershed Model Schematic 1 - Pre -Development BD Project: Pre vs Post Calcs.gpw Hydraflow Hydrographs by intellsolve v9.22 2 - Post Development 3 - Outflow W Monday, Jun 27, 2016 2 Hydrograph Return Period Recap Hydraflow Hydrographs by Intelisolve v9.22 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1 -Yr 2 -Yr 3 -Yr 5 -Yr 10 -Yr 25 -Yr 50 -Yr 100 -Yr 1 SCS Runoff ------- 0.624 ------- ------- ------- ------- ------ ------- ------- Pre -Development 2 SCS Runoff ------- 13.89 ------ ------- ------- ------- ------- ------- ------- Post Development 3 Reservoir 2 0.594 ------- ------- ------- ------- ------- ------- ------- Outflow Proj. file: Pre vs Post Calcs.gpw Monday, Jun 27, 2016 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 0.624 2 720 4,404 ---- ------ ------ Pre -Development 2 SCS Runoff 13.89 2 718 27,796 ---- ------ ------ Post Development 3 Reservoir 0.594 2 820 26,240 2 240.82 16,527 Outflow Pre vs Post Calcs.gpw Return Period: 1 Year Monday, Jun 27, 2016 4 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Jun 27, 2016 Hyd. No. 1 Pre -Development Hydrograph type = SCS Runoff Peak discharge = 0.624 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 4,404 cuft Drainage area = 7.770 ac Curve number = 55 Basin Slope = 10.0% Hydraulic length = 950 ft To method = KIRPICH Time of conc. (Tc) = 3.71 min Total precip. = 2.89 in Distribution = Type Il Storm duration = 24 hrs Shape factor = 484 Pre -Development Q (cfs) Hyd. No. 1 -- 1 Year 1.00 0.90 [Sri#] 0.70 0.60 0.30 0.20 0.10 000 Q (cfs) 1.00 0.70 0.60 0.50 0.40 0.30 0.20 0.10 000 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs by Intellsolve v9.22 Hyd. No. 2 Post Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 7.770 ac Basin Slope = 4.0% Tc method = KIRPICH Total precip. = 2.89 in Storm duration = 24 hrs Q (cfs) 14.00 12.00 10.00 RM M A61#11 Post Development Hyd. No. 2 -- 1 Year u Monday, Jun 27, 2016 Peak discharge = 13.89 cfs Time to peak = 718 min Hyd. volume = 27,796 cuft Curve number = 78 Hydraulic length = 950 ft Time of conc. (Tc) = 5.29 min Distribution = Type II Shape factor = 484 Q (cfs) 14.00 12.00 10.00 MI . I� EWX 2.00 0.00 1 1 1 I I'� 1 I I I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 2 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 3 Hyd. volume Outflow Max. Elevation Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post Development Reservoir name = Wet Detention Pond 1 Storage Indication method used. Q (cfs) 14.00 12.00 W9 MM m 2.00 0.00 ' ' 0 480 — Hyd No. 3 •.E Outflow Hyd. No. 3 -- 1 Year Monday, Jun 27, 2016 Peak discharge = 0.594 cfs Time to peak = 820 min Hyd. volume = 26,240 cuft Max. Elevation = 240.82 ft Max. Storage = 16,527 cuft Q (cfs) 14.00 12.00 10.00 VWX .of m 2.00 0.00 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) — Hyd No. 2 ® Total storage used = 16,527 cuft Pond Report 7 Hydraflow Hydrographs by Intelisolve v9.22 Monday, Jun 27, 2016 Pond No. 1 - Wet Detention Pond 1 Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 239.50 It Stage / Storage Table Stage (ft) Elevation (ft) Contour area (scift) Incr. Storage (cult) Total storage (cuft) 0.00 239.50 9,994 0 0 0.50 240.00 12,352 5,587 5,587 1.50 241.00 14,179 13,266 18,852 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] LD1 Rise (in) = 36.00 2.00 0.00 0.00 Crest Len (ft) = 10.00 30.00 0.00 0.00 Span (in) = 36.00 2.00 0.00 0.00 Crest EI. (ft) = 240.80 240.85 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 236.00 239.50 0.00 0.00 Weir Type = Riser Broad --- --- Length(ft) = 60.00 0.10 0.00 0.00 Multistage = Yes No No No Slope (%) = 10.00 1.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) - Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Stage (ft) 2.00 1.80 - 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0.00 Note: CulveNOrifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s Stage / Discharge 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 - Total Q Elev (ft) 241.50 241.30 241.10 lVIVIq 240.70 240.50 240.30 240.10 239.90 239.70 239.50 8.00 Discharge (cfs) rf,w a s. nl r- (o a S D i:' u cc a ,v 4 Permit Number: (to be provided by DWQ) ♦`^ �m� ATFOv 2�/e�ryp9 Impervious area ~ NCDENR P1 V Design rainfall depth STORMWATER MANAGEMENT PERMIT APPLICATION FORM Peak Flow Calculations 401 CERTIFICATION APPLICATION FORM Is pre/post control of the 1 -yr, 24 -hr peak flow required? BIORETENTION CELL SUPPLEMENT 1 -yr, 24 -hr runoff depth This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. PROJECT INFORNIAT Project name Woodlands @ Flowers Plantation (NE -6) Contact name Kevin Vamell Phone number Date Drainage area number Site Characteristics 252.459.8196 June 27. 2016 Drainage area 76,666 ft' Impervious area 51,836 ft2 Percent impervious 67.6% % Design rainfall depth 1.0 inch Peak Flow Calculations to Is pre/post control of the 1 -yr, 24 -hr peak flow required? Y (Y or N) 1 -yr, 24 -hr runoff depth 2.89 in 1 -yr, 24 -hr intensity 0.12 in/hr Pre -development 1 -yr, 24 -hr peak flow 0.189 ft'/sec Post -development 1 -yr, 24 -hr peak flow 0.134 Whim Pre/Post 1 -yr, 24 -hr peak control -0.055 ft'/sec Storage Volume: Non -SA Waters Minimum volume required 4,217.0 ft' Volume provided 4,876.0 ft' OK Storage Volume: SA Waters OK 1.5' runoff volume ft' Pre -development 1 -yr, 24 -hr runoff to Post -development 1 -yr, 24 -hr runoff ft' Minimum volume required 0 ft' Volume provided ft' Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the biorelention cell 5,351.0 it' OK Length: ft Width: ft -or- Radius It Media and Soils Summary Drawdown time, ponded volume 6 hr OK Drawdown time, to 24 inches below surface 18 hr OK Drawdown time, total: 24 hr In-sdu soil. Soil permeability 0.101n/hr Insufficient. Increase infiltration rate or include underdrains. Planting media soil: Soil permeability 3.50 Inmr OK Soil composition % Sand (by volume) 86% OK % Fines (by volume) 10% OK % Organic (by volume) 4% OK Total: 100% Phosphorus Index (P -Index) of media 30 (unifless) OK Form SW401-Bioratengon-Rev.9 June 25, 2010 Parts I and II. Design Summary, Page 1 of 2 Basin Elevations Temporary pool elevation Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer). Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safely is used for sizing the underdralns? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planfing media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation of the top of the upturned elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flown? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP located at least 100 feel from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Permit Number: (to be provided by DWQ) 229.00 fmsl Y (Y or N) OK N (Y or N) 228 fmsl inches 226 fmsl 2 f 0.33 ft Y (Y or N) 4 Insufficient number of clean out pipes provided. 2 OK 1 f 224.67 fmsl 220 fmsl 4.67 ft OK N (Y or N) fmsl 228 ft 0 IM 111MIAL6 N (Y or N) Excess volume must pass through filter. ft N (Y or N) Show how Flow is evenly distributed. Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 0.52 ft/sec OK Is the area surrounding the cell likely to undergo development in N (Y or N) OK the future? Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an 'X7 in the shaded cell) Gravel and grass (flinches gravel followed by 3-5 it of grass) Grassed Swale Forebay Other Form SW401-Bloretention-Rev.e June 26, 2010 i7r Parts I and II. Design Summary, Page 2 of 2 Permit No: (to be assigned by .. Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Cell dimensions, - Pretreatment system, - High Flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), - Clean out pipe locations, - Overflow device, and - Boundaries of drainage easement. 2. Plan details (1° = 30' or larger) for the bioretention cell showing: - Cell dimensions - Pretreatment system, - High Flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off-site drainage (if applicable), - Clean out pipe locations, - Overflow device, and - Boundaries of drainage easement. - Indicate the P -Index between 10 and 30 3. Section view of the biorelention cell (1" = 20' or larger) showing: - Side slopes, 3:1 or lower - Underdrain system (if applicable), and - Bioretention cell layers [ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone if applicable), #57 stone, underdrains (if applicable), SHWT level(s), and overflow structure] 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in situ soil must include: - Soil permeability, - Soil composition (% sand, %fines, %organic), and - P -index. 5. A detailed planting plan (1° = 20' or larger) prepared by a qualified individual showing: - A variety of suitable species, - Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, - A planting detail, - The source nursery for the plants, and - Fertilizer and watering requirements to establish vegetation. 6. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations (including Onderdrain calculations, if applicable). 8. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 9. A copy of the deed restriction. Form SW401-Bioretention-Rev.7 Part In, Page 1 of 1 FLm.Ar-&-s ^(C -(, 4 -W la") ! Watershed Model Schematic 1 - Pre Development M Project: Pre vs Post Bioretention.gpw HydraFlow Hydrographs by Intellsolve v9.22 2 - Post Development 3 - Outflow W Monday, Jun 27, 2016 2 Hydrograph Return Period Recap Hydraflow Hydrographs by Intelisolve v9.22 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1 -Yr 2 -Yr 3 -Yr 5 -Yr 10 -Yr 25 -Yr 50 -Yr 100 -Yr 1 SCS Runoff ------- 0.189 ------- ------- ------- ------ ------- ------- ------- Pre Development 2 SCS Runoff ------- 5.716 ------- ------- ------ ------- ------- ------- ------- Post Development 3 Reservoir 2 0.134 ------- ------ ------- ------- ------- ------- ------- Outflow Proj. file: Pre vs Post Bioretention.gpw Monday, Jun 27, 2016 K3 Hydrograph Summary Report Hydraflow Hydrographs by lntelisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 0.189 1 719 998 ---- ------ ------ Pre Development 2 SCS Runoff 5.716 1 715 10,306 ---- ------ ------ Post Development 3 Reservoir 0.134 1 736 146 2 229.01 4,950 Outflow Pre vs Post Bioretention.gpw Return Period: 1 Year Monday, Jun 27, 2016 4 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Monday, Jun 27, 2016 Hyd. No. 1 Pre Development Hydrograph type = SCS Runoff Peak discharge = 0.189 cfs Storm frequency = 1 yrs Time to peak = 719 min Time interval = 1 min Hyd. volume = 998 cuft Drainage area = 1.760 ac Curve number = 55 Basin Slope = 7.0% Hydraulic length = 300 ft Tc method = KIRPICH Time of cone. (Tc) = 1.75 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 - 0.10 0.05 000 Pre Development Hyd. No. 1 -- 1 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 5 Hydrograph Report Hydraflow Hydrographs by Intellsolve v9.22 Monday, Jun 27, 2016 Hyd. No. 2 Post Development Hydrograph type = SCS Runoff Peak discharge = 5.716 cfs Storm frequency = 1 yrs Time to peak = 715 min Time interval = 1 min Hyd. volume = 10,306 cuft Drainage area = 1.760 ac Curve number = 88 Basin Slope = 4.0% Hydraulic length = 300 ft Tc method = KIRPICH Time of conc. (Tc) = 2.18 min Total precip. = 2.89 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 Me 3.00 2.00 1.00 0.00 ' 0 120 240 Hyd No. 2 Post Development Hyd. No. 2 -- 1 Year 360 480 600 720 840 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 960 1080 1200 Time (min) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 3 Hyd. volume Outflow Max. Elevation Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 2 -Post Development Reservoir name = Bioretention Storage Indication method. used. EAltration extracted from Outflow. Q (cfs) 6.00 5.00 4.00 M11 2.00 1.00 0.00 ' 0 60 120 Hyd No. 3 Outflow Hyd. No. 3 -- 1 Year 0 Monday, Jun 27, 2016 Peak discharge = 0.134 cfs Time to peak = 736 min Hyd. volume = 146 cuft Max. Elevation = 229.01 ft Max. Storage = 4,950 cuft Q (cfs) 6.00 W11111I111 K8 3.00 2.00 1.00 0.00 180 240 300 360 420 480 540 600 660 720 780 Time (min) — Hyd No. 2 ®Total storage used = 4,950 cuft Pond Report 7 Hydraflow Hydrographs by Intelisolve v9.22 Monday, Jun 27, 2016 Pond No. 1 - Bioretention Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 228.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (scift) Incr. Storage (cuft) Total storage (cuft) 0.00 228.00 4,401 0 0 1.00 229.00 5,351 4,876 4,876 2.00 230.00 6,358 5,855 10,731 2.50 230.50 7,422 3,445 14,176 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 0.00 0.00 0.00 Crest Len (ft) = 10.00 10.00 0.00 0.00 Span (in) = 24.00 0.00 0.00 0.00 Crest El. (ft) = 229.00 230.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert EI. (ft) = 224.00 0.00 0.00 0.00 Weir Type = Riser Broad -- -- Length (ft) = 32.00 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 6.58 0.00 0.00 n/a N -Value =.013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 3.500 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Nota: Culvert/Orifice outflows are anal zed under inlet (Ic) and outlet (so) control. Weir risers checked for orifice conditions (k,) and submergence (s). Stage (ft) 3.00 2.00 1.00 0.00 ' 0.00 4.00 Total Q Stage / Discharge 8.00 12.00 16.00 20.00 24.00 28.00 32.00 36.00 40.00 44.00 Elev (ft) 231.00 230.00 229.00 ' 228.00 48.00 Discharge (cfs) Skimmer Sediment.Basin Worksheet (Drainage Area Nfust be Less Than 10 Acres) Area Disturbed = Z. 3Z Acres Runoff Area ' = Z-3 7. Acres Q10 = C x I x A= o. x x 2•37- •mq cfs Basin Volume Calculation: Volume of Sediment = ( 2_37- Ac.) x (1800 cf sed./year) x (1 year) ' = A. 1.7 LQ cf Assume Z foot of basin depth, therefore area of the pit Z,obZ Square Feet Try ( go wide) x ( long) x ( foot deep) Sediment Basin. Surface Area Calcufationr Surface Area (SF) = Qto x 325 sf/cfs x 325 sf/cfs � 47 Surface Area — Use ( wide) x (. long) x ( foot deep) Sediment Basin Surface Area — Weir Design and VefocitV Check; Q10 = cfs; Q = CLH"2; H = [Q/CL]2i3 _ [ 6.4" / (2.68)( Aa )las _ o. 3`7 feet Velocity Check -> ( )/( 1 ) ( 0• -7) _ • 6 Z fps, OK 4 Skimmer Orifice Design 0.25 .5 1 2 3 5 7 10 O.f 1 1 1000 10000 Basin Volume (From Worksheet: Basin Dewatering Time (1-3 Days): 100000 Skimmer Oriface, Diameter- (From, Chart): 1 1 11 1 0. 1 1000000 d — Ce Skimmer Sediment.Basin Worksheet (Draivagc Area Must be Less Thair 10 Acres) Area Disturbed = Acres Runoff Area WO Acres Q10=C x I x A =0. x x i• cfs Basin Volume Calculation: Volume of Sediment = ( Ac.) x (1800 cf sed./year) x (1 year) cf Assume foot of basin depth, therefore area of the pit IG -74 Square Feet Try ( wide) x ( 70 long) x (• foot deep) Sediment Basin. Surface Area Calculation: Surface Area (SF) = Qjo x 328 sf/cfs O x 325 sf/cfs - sf (.:i4 70_ /� Surface Area - 61C Use ( wide) x (. long) x ( foot deep) Sediment Basin Surface Area - Weir Design and VelOCit1/ Check: QIo so cfs; Q = CLH3i2; H = [Q/CL]zrs = [ / (2.68)( ® _ 0•3Z• feet Velocity Check 3 ( °�. ®)/( fC) ) ( a-37) /° 7C) -fps, OK 4 M 0.25 .5 2 3 5 O.i 6- 1000 Skimmer Orifice Design 10000 Basin Volume (From Worksheet: Basin Dewatering Time (1-3 Days): Skimmer Oriface Diameter- (From, Chart) 100000 3' 1000000 Skimmer Sediment -Basin Worksheet (Drainage Area Must be Less Than 10 Acres) Area Disturbed = 7.( Z. Acres Runoff Area _ . 8 2 Acres Q10=C x I x A oss x"73%x �•� 2 o cfs Basin Volume Calculation: Volume of Sediment = LIS 7- Ac.) x (1800 cf sed./year) x (1 year) o=1(® cf Assume Z foot of basin depth, therefore area of the pit 7, o39 Square Feet Try ( wide) x ( long) x ( . foot deep) Sediment Basin ®191 SF L -16E Surface Area Calculation; Surface Area (SF) = Q10 x 325 sf/cfs ZO x 325 sf/cfs .. = (Ssf Surface Area — Use ( wide) x (. long) x ( foot deep) Sediment Basin Surface Area — Weir Design and Velocity Check: Qio = cfs; Q = CLH3/2; H = (Q/CL12/3 =[-2P--2,O/(2.68)( bo ))2/3 o feet Velocity Check ( )/( 30 ) (0.40) /. �� fps, ox 4 Skimmer Orifice Design 0 M 4 0.25 day 0.5 day I .. y I S days . ! .-- �.ID days . a.f I I I L I I I 1-11, 0.1 1000 10000 -100000 1000000 Basin Volume (From Worksheet: Iff 19'7 Basin Dewatering Time (1-3 Days): .3 Skimmer Oriface Diameter, (From, Chart): •✓�,