Loading...
HomeMy WebLinkAbout20072114 Ver 1_Other Agency Comments_20080124 Permit Class NEW (-?bW P (-*it Number 4-08 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission ermt t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to N.C. Department of Transportation, 113 Airport Drive, Suite 100, Edenton, NC 27932 Authorizing development in Dare County at Ocean OutfalI #I at Curlew Street and Ocean Outfal1 #4 at Conch Street. Nag Head, as requested in the permittee's application dated 10/29/07_ including the attached workplan drawings (2) dated 7/13/07 and attached AEC Hazard Notice dated 11/20/07. This permit, issued on January 16, 2008 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may hP ciihiecr in fines_ imnrisonment or civil action. or may cause the permit to be null and void. Ocean Outfalls 1) In order to protect sea turtle populations, no work seaward of the frontal dune or the first line of stable natural vegetation, whichever is more restrictive, shall be conducted from May 1" to November 15'h of any year, without the prior approval of the Division of Coastal Management, in consultation with the N.C. Wildlife Resources Commission. 2) In performing maintenance and/or repair activities on the existing outfall structures, the repaired outfall pipes and associated structures shall not exceed the footprint of the existing outfall structures (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2011 Signed by the authority of the secretary of um,4r; u nu ti« Chairman of the Coastal Resources Commission. t Jams . Gregson, Director Division of Coastal Management This permit and its conditions are hereby accepted. In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal - Management Program. Signature of Permittee N.C. Department of Transportation Permit # 4-08 Page 2 of 3 ADDITIONAL CONDITIONS 3) The permittee shall post appropriate signs to warn the public of potential hazards during maintenance and construction activities. 4) The permittee shall remove all debris and construction material immediately upon project completion. 5) The elements of the support structures from the existing ocean outfalls that are no longer needed shall be removed in their entirety. 6) All materials and debris associated with the repair and/or maintenance of the existing ocean outfalls and associated materials shall be disposed of at an approved upland site or shall be recycled in an environmentally appropriate manner provided appropriate authorizations from any relevant state, federal, or local authorities are obtained. 7) Land-based equipment necessary for construction work shall be brought to the site through existing accesses. Should the work result in any damage to existing accesses, the accesses must be restored to pre-project conditions immediately upon project completion in that specific area. Temporary Sheet Pile 8) The temporary sheet piles shall be installed securely to minimize the likelihood that they will break loose and become a hazard during any damaging weather events that may occur while the project is underway. 9) The temporary sheet pile shall be removed in its entirety within 7 days after project completion. General 10) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 11) The N.C. Division of Water Quality (DWQ) authorized the proposed project on 12/13/07 for Ocean Outfall #1 (DWQ Project No. 07-2114) and Ocean Outfall #4 (DWQ Project No. 07-2113). General Water Quality Certification Nos. 3687 and No. 3688 were issued for each ocean outfall. Any violation of the Certifications approved by DWQ shall be considered a violation of this CAMA permit. 12) The permittee and/or their contractor shall contact the DCM Transportation Project Coordinator in Elizabeth City to schedule a preconstruction conference prior to project initiation NOTE: The permittee and/or its contractors should be aware of utilities during ingressentrance and egress from the project area to avoid damage with heavy equipment and materials delivery. The permittee should contact the Nags Head Water Department to confirm locations if necessary. N.C. Department of Transportation Permit # 4-08 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: The U.S. Army Corps of Engineers authorized the proposed project on 12/7/07 for Ocean Outfall #1 (COE Action ID No. SAW-2007-04026) and Ocean Outfall #4 (COE Action ID No. SAW- 2007-04027). A Nationwide Permit Number 3 and 33 was issued for each ocean outfall. NOTE: This permit does not eliminate the need to obtain any additional permits, approvals or authorizations that may be required.