HomeMy WebLinkAboutWQ0006785_Monitoring - 11-2016_20161207 (3)FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of
Permit No.:
W00006785
Facility Name:
Murfreesboro WWTF
County:
Hertford
Month:
November
Year.
2016
Did irrigation occur
at this facility?
0 YES ❑ NO
Field Name:
1-2
Field Name:
3-4
Field Name:
5-6
Field Name:
7-8
Area (acres): 13.9
Area (acres): 10.3
Area (acres): 9.6
Area (acres):
14.6
Cover Crop:
Cover Crop:
Cover Crop:
Cover Crop:
Hourly Rate (in): 0.25
Hourly Rate (in): 0.25
Hourly Rate (in): 0.25
Hourly Rate (in):
0.25
Annual Rate (in): 105.2
Annual Rate (in): 114.8
Annual Rate (in): 116.2
Annual Rate (in):
86.5
Weather Freeboard
Field Irrigated?
❑ YES
❑ NO
Field Irrigated?
I] YES
❑ NO
Field Irrigated?
El YES
❑ NO
Field Irrigated?
❑O YES
❑ No
�.
o
c
d
E
°•
E
°' o0
rn
a '- �,_
r a7 �'
m W ?
a` L
°'°
d y �,
°a Ear
O °. F=
� Q
rn
�, c
15 -0
J
Earn
7` C
E°v
.x °
�= J
a)"a o
a) m
°a Ew
O d E-
� Q E
rn
a C
•rte
D
J
Earn
7` C
E°a
°
= J
4)
0i
°o
O °.
Q
o
a) ;;
E°
i-
=
rn
�. C
E'v
O M
J
Earn
7` C
E°v
.x ° M
= J
m° o
d a) r
°a E°
O O. H
% Q =
rn
T C
,�o
Q M
J
ETm
7` C
E°o
° N
= J
OF
in I ft ft
I gal I min
in
in
gal I min
in
I in
gal I
min
in
I in
gal I min
in
in
1
PC
48
0 3.2
299,900 486
1.07
0.13
2
CL
52
0 3.22
299,900 378
0.79
0.13
299,900 396
0.76
0.11
3
PC
59
0 3.24
299,900
546
1.15
0.13
4
CL
57
0.23 3.24
5
C
39
0 2.34
299,900
546
1.15
0.13
299,900 396
0.76
0.11
61
C
36
0 1 3.4
299,900 1 360
0.79
0.13
299,900 492
1.07
0.13
7
C
40
0 3.46
8
C
34
0 3.5
299,900 360
0.79
0.13
299,900
534
1.15
0.13
9
CL
50
0 3.56
10
C
40
0.15 3.58
299,900 450
1.07
0.14
1
299,900 396
0.76
0.11
11
C
44
0 3.66
299,900 354
0.79
0.13
1
299,900 1
540
1.15
0.13
121
C
67
0 1 3.72
1
299,900 402
0.76
0.11
13
C
53
0 3.88
1
299,900 450
1.07
0.14
14
R
45
0.08 3.94
299,900 354
0.79
0.13
299,900
546
1.15
0.13
15
CL
47
0.13 4
16
C
34
0 4.02
299,900 444
1.07
0.14
17
C
37
0 4.06
299,900
540
1.15
0.13
348,900 480
0.88
0.11
181
C
36
0 1 4.14
299,900 1 354
0.79
0.13
19
C
46
0 4.26
1
250,000 360
0.89
0.15
20
C
43
0 4.22
299,900 354
0.79
0.13
299,900
540
1.15
0.13
21
C
32
0 4.3
225,000 306
0.57
0.11
22
C
25
0 4.34
225,000 336
0.80
0.14
23
C
26
0 4.36
1 225,000 270
0.60
0.13
1
225,000
402
0.86
0.13
241
R
44
0.07 1 4.42
1
299,900 402
0.76
0.11
25
PC
51
0.49 4.4
26
PC
47
0.24 4.46
299,900 438
1.07
0.15
27
C
33
0 4.64
299,900 354
0.79
0.13
28
C
33
0 4.7
1
299,900 402
0.76
0.11
29
CL
60
0 4.66
225,000
402
0.86
0.13
301
CL
66
0.061 4.52
1 1
11 225,000 1 330 1
0.80
0.15
31
Monthly Loading:2,624,200
6.95
72.47
2,499,400
8.94
109.18
2,549,300
9.78
113.94
2,373,3006
5.99 6
77.56
12 Month Floating Total (in):
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of
Permit No.:
W00006785
Facility Name:
Murfreesboro WWTF
County: Hertford
Month:
November
Year:
2016
Did
irrigation occur
Field Name:
9-10
Field Name:
11
Field Name:
12
Field Name:
13
Area (acres):
9.4
Area (acres):
20.97
Area (acres):
15.26
Area (acres):
15.87
at this facility?
Cover Crop:
Cover Crop:
Cover Crop:
Cover Crop:
p
YES
p NO
Hourly Rate (in):
0.25
Hourly Rate (in):
0.25
Hourly Rate (in):
0.25
Hourly Rate (in):
0.25
Annual Rate (in): 84.6
Annual Rate (in): 48
Annual Rate (in): 60.1
Annual Rate (in):
62.4
Weather Freeboard
Field Irrigated?
❑' YES
❑ NO
Field Irrigated?
R1 YES
❑ NO
Field Irrigated?
El YES
❑ NO
Field Irrigated?
El YES
❑ NO
❑
o
V
m
'
m
m`
E
0)
F
c - y^
°' a m
c '- >1 CL
mM m om
` -
a Lh !.
°' ° °
E01 y;;
�c E�
>¢ F-.`
a�
�,c
��
❑°
J=
E T rn
�_c
�°�
x°°
J
m V o
Em m::
°o E�
oa j=c
i Q =
0
�,c
��°�
❑o
J=
E a r
c
x°o
J
d o a
E2 and
�o E�
oa c
%
FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of
Did the application rates exceed the limits in Attachment B of your permit?
O Compliant ❑ Non -Compliant
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
O Compliant
❑ Non -Compliant
Was a suitable vegetative cover maintained on all sites as specified in your permit?
O Compliant
❑ Non -Compliant
Were all setbacks listed in your permit maintained for every application to each permitted site?
O Compliant
❑ Non -Compliant
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
O Compliant
❑ Non -Compliant
If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of
the non-compliance and describe the corrective
taKen. Attacn aaamonal sneets IT
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Eric M Parker
Permittee: Town of Murfreesboro
Certification No.: 998793
Signing Official: Eric M Parker
Grade: SI Phone Number: 252.396.3821
Signing Official's Title: WWTF ORC
Has the ORC changed since the previous NDAR-17 ❑ yes p No
Phone Number: 252.396.3821 Permit Exp.: 4/30/21
/lit a
A,
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617