Loading...
HomeMy WebLinkAboutWQ0006785_Monitoring - 11-2016_20161207 (3)FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: W00006785 Facility Name: Murfreesboro WWTF County: Hertford Month: November Year. 2016 Did irrigation occur at this facility? 0 YES ❑ NO Field Name: 1-2 Field Name: 3-4 Field Name: 5-6 Field Name: 7-8 Area (acres): 13.9 Area (acres): 10.3 Area (acres): 9.6 Area (acres): 14.6 Cover Crop: Cover Crop: Cover Crop: Cover Crop: Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Annual Rate (in): 105.2 Annual Rate (in): 114.8 Annual Rate (in): 116.2 Annual Rate (in): 86.5 Weather Freeboard Field Irrigated? ❑ YES ❑ NO Field Irrigated? I] YES ❑ NO Field Irrigated? El YES ❑ NO Field Irrigated? ❑O YES ❑ No �. o c d E °• E °' o0 rn a '- �,_ r a7 �' m W ? a` L °'° d y �, °a Ear O °. F= � Q rn �, c 15 -0 J Earn 7` C E°v .x ° �= J a)"a o a) m °a Ew O d E- � Q E rn a C •rte D J Earn 7` C E°a ° = J 4) 0i °o O °. Q o a) ;; E° i- = rn �. C E'v O M J Earn 7` C E°v .x ° M = J m° o d a) r °a E° O O. H % Q = rn T C ,�o Q M J ETm 7` C E°o ° N = J OF in I ft ft I gal I min in in gal I min in I in gal I min in I in gal I min in in 1 PC 48 0 3.2 299,900 486 1.07 0.13 2 CL 52 0 3.22 299,900 378 0.79 0.13 299,900 396 0.76 0.11 3 PC 59 0 3.24 299,900 546 1.15 0.13 4 CL 57 0.23 3.24 5 C 39 0 2.34 299,900 546 1.15 0.13 299,900 396 0.76 0.11 61 C 36 0 1 3.4 299,900 1 360 0.79 0.13 299,900 492 1.07 0.13 7 C 40 0 3.46 8 C 34 0 3.5 299,900 360 0.79 0.13 299,900 534 1.15 0.13 9 CL 50 0 3.56 10 C 40 0.15 3.58 299,900 450 1.07 0.14 1 299,900 396 0.76 0.11 11 C 44 0 3.66 299,900 354 0.79 0.13 1 299,900 1 540 1.15 0.13 121 C 67 0 1 3.72 1 299,900 402 0.76 0.11 13 C 53 0 3.88 1 299,900 450 1.07 0.14 14 R 45 0.08 3.94 299,900 354 0.79 0.13 299,900 546 1.15 0.13 15 CL 47 0.13 4 16 C 34 0 4.02 299,900 444 1.07 0.14 17 C 37 0 4.06 299,900 540 1.15 0.13 348,900 480 0.88 0.11 181 C 36 0 1 4.14 299,900 1 354 0.79 0.13 19 C 46 0 4.26 1 250,000 360 0.89 0.15 20 C 43 0 4.22 299,900 354 0.79 0.13 299,900 540 1.15 0.13 21 C 32 0 4.3 225,000 306 0.57 0.11 22 C 25 0 4.34 225,000 336 0.80 0.14 23 C 26 0 4.36 1 225,000 270 0.60 0.13 1 225,000 402 0.86 0.13 241 R 44 0.07 1 4.42 1 299,900 402 0.76 0.11 25 PC 51 0.49 4.4 26 PC 47 0.24 4.46 299,900 438 1.07 0.15 27 C 33 0 4.64 299,900 354 0.79 0.13 28 C 33 0 4.7 1 299,900 402 0.76 0.11 29 CL 60 0 4.66 225,000 402 0.86 0.13 301 CL 66 0.061 4.52 1 1 11 225,000 1 330 1 0.80 0.15 31 Monthly Loading:2,624,200 6.95 72.47 2,499,400 8.94 109.18 2,549,300 9.78 113.94 2,373,3006 5.99 6 77.56 12 Month Floating Total (in): FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: W00006785 Facility Name: Murfreesboro WWTF County: Hertford Month: November Year: 2016 Did irrigation occur Field Name: 9-10 Field Name: 11 Field Name: 12 Field Name: 13 Area (acres): 9.4 Area (acres): 20.97 Area (acres): 15.26 Area (acres): 15.87 at this facility? Cover Crop: Cover Crop: Cover Crop: Cover Crop: p YES p NO Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Hourly Rate (in): 0.25 Annual Rate (in): 84.6 Annual Rate (in): 48 Annual Rate (in): 60.1 Annual Rate (in): 62.4 Weather Freeboard Field Irrigated? ❑' YES ❑ NO Field Irrigated? R1 YES ❑ NO Field Irrigated? El YES ❑ NO Field Irrigated? El YES ❑ NO ❑ o V m ' m m` E 0) F c - y^ °' a m c '- >1 CL mM m om ` - a Lh !. °' ° ° E01 y;; �c E� >¢ F-.` a� �,c �� ❑° J= E T rn �_c �°� x°° J m V o Em m:: °o E� oa j=c i Q = 0 �,c ��°� ❑o J= E a r c x°o J d o a E2 and �o E� oa c % FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Did the application rates exceed the limits in Attachment B of your permit? O Compliant ❑ Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? O Compliant ❑ Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? O Compliant ❑ Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? O Compliant ❑ Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? O Compliant ❑ Non -Compliant If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective taKen. Attacn aaamonal sneets IT Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Eric M Parker Permittee: Town of Murfreesboro Certification No.: 998793 Signing Official: Eric M Parker Grade: SI Phone Number: 252.396.3821 Signing Official's Title: WWTF ORC Has the ORC changed since the previous NDAR-17 ❑ yes p No Phone Number: 252.396.3821 Permit Exp.: 4/30/21 /lit a A, Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617