Loading...
HomeMy WebLinkAbout20140762 Ver 2_RE R-2915C Preconstruction Meeting_20161212 Wanucha, Dave From:Wanucha, Dave Sent:Monday, December 12, 2016 1:22 PM To:Slaughter, Johnathan H; Kichefski, Steven L SAW; Chambers, Marla J; Gantt, Matt Cc:Eller, Douglas W Subject:RE: R-2915C Preconstruction Meeting Heath, I will not be able to attend the meeting. However, please remind those responsible of the following few selected permit conditions: • All jurisdictional areas need to be clearly marked by fencing prior to any land clearing activities; • Sediment and erosion control measures shall not be placed in jurisdictional areas including streams and wetlands; • No staging of equipment is permitted in jurisdictional areas including trout buffers; • Discharging hydroseed mixtures in or adjacent to surface waters in prohibited; • No excavation from, or waste disposal into, jurisdictional areas without appropriate notification and permit modification; • Report any violations of the permit to DWR within 24 hours of discovery; • Pipe installations at Site 13A require welded sills and baffles; and, • RCBC at Site 16 requires that both barrels be back-filled with larger native material. Thanks. Dave W. Dave Wanucha Division of Water Resources Transportation Permitting Unit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 1 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Slaughter, Johnathan H Sent: Tuesday, December 06, 2016 4:52 PM To: Kichefski, Steven L SAW <Steven.L.Kichefski@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov>; Chambers, Marla J <marla.chambers@ncwildlife.org>; Gantt, Matt <matt.gantt@ncdenr.gov> Subject: FW: R-2915C Preconstruction Meeting All, See email below regarding upcoming preconstruction meeting for R-2915C (middle section of US 221). This is one of our larger project so some of you may wish to attend. It will be in our new Division Office large conference room. 801 statesville road (Hwy. 115), North Wilkesboro. From: Elmore, Bethany Sent: Tuesday, December 06, 2016 4:33 PM To: Beaver, G Trent <tbeaver@ncdot.gov> Cc: Souther, Zachary S <zssouther@ncdot.gov>; Slaughter, Johnathan H <hslaughter@ncdot.gov>; Skeens, Brian C <bcskeens@ncdot.gov>; Miles, Randall S <rsmiles@ncdot.gov>; Miles, Daneil S <dmiles@ncdot.gov>; Wayne, David A <dwayne@ncdot.gov>; Absher, Larry R <lrabsher@ncdot.gov>; Hardister, J Dean <dhardister@ncdot.gov>; Freeman, R. Mark <mfreeman@ncdot.gov> Subject: R-2915C Preconstruction Meeting The Preconstruction Meeting for R-2915C will be held on Wednesday December 14, 2016 at 1:00 PM in the Large Conference Room Bethany Elmore Assistant Resident Engineer North Wilkesboro Construction North Carolina Department of Transportation 336 903 9171 office 301 Statesville Road PO Box 250 North Wilkesboro, NC 28659 2 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3