HomeMy WebLinkAboutNCG030130 DMR SW (20) I ,
RECEIVED
- AINEER N G , INCe
SEP232016
September 19, 2016 CENTRAL FILES
DWR SECTION
Mr. Ryan Pennington
Daimler Trucks North America, LLC- Gastonia Components and Logistics
1400 Tulip Drive
Gastonia,NC 28052
Subject: Monthly Sampling—August 2016
NPDES General Permit No.NCG030000/CoC No. '��G030 lg
Daimler Trucks, Gastonia Components and Logistics,LLC
1400 Tulip Drive,Gastonia,North Carolina
Shield Project No. 1140099-04
Dear Mr. Pennington:
Shield Engineering, Inc. (Shield) was unable to collect stormwater samples for Stormwater
Discharge Outfall (SDO)#001 at the Gastonia facility for the month of August 2016. According
to rainfall data collected for the month, qualifying storm events occurred on August 2nd, August
8th, August 21st, and August 27th, measuring 0.56 inches, 0.21 inches, 0.87 inches, and 0.14
inches, respectively. However, each of these events took place on a weekend day, after normal
business hours, or did not occur greater than 72 hours since the last qualifying storm event. As
the seasonal type of storm event has now changed to high intensity, short duration events,
usually commencing in late afternoon through early evening with little to no notice for
preparation, Shield will continue to monitor daily weather conditions and attempt to continue
coordination of appropriate staff and resources to facilitate adequate sample collection. Shield
was able to collect a substitute sample and perform a visual assessment during the next
qualifying storm event which occurred on September 2nd. A partially completed DMR form for
the month of August is attached to this cover letter for your signature and submittal to the State.
Daimler's Gastonia facility remains in Tier Three of the NPDES General Permit No.
NCG030000 at SDO #001. Shield will continue to perform monthly sampling at SDO #001 per
Tier 3 requirements until instructed to halt by Daimler. Shield greatly appreciates the opportunity
to provide environmental services to Daimler Trucks of North America. If you have any
questions in reference to this document or require further information, please feel free to contact
either of the undersigned at(704) 394-6913.
Respectfully,
SHIELD ENGINEERING,INC.
Melinda Greene M t C. Boland, P.E.
Senior Engineer P cipal Engineer
Attachment: Stormwater Discharge Monitoring Report(DMR)
4301 Taggart Creek Road Telephone 704.394.6913
www.shieldengineering corn
Charlotte,NC 28208 Fax 704 394,6968
L•
J
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 9/19/16
CERTIFICATE OF COVERAGE NO.f clef° = o 13g) SAMPLE COLLECTION YEAR 2016
FACILITY NAME Daimler Trucks—Gastonia Components&Logistics SAMPLE PERIOD ®Jan-June ❑July-Dec
PERSON COLLECTING SAMPLES N/A or ®Monthly' August
LABORATORY: N/A Lab Cert.# DISCHARGING TO CLASS ®ORW []HQW ['Trout I1PIVA
Comments on sample collection or analysis: Samples at SDO#001 not Dem-flow QWater Supply EISA
collected due to no rainfall/discharge during normal business ►!Other _
hours
RECEIVED PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -3
Part A:Stormwater Benchmarks and Monitoring Results SEP 2 3 2016
CENTRAL `l 5 ❑No discharge this period?2
Date Sample 24-hour rainfall
DWR
SEC ION Non-Polar O&G/
Outfall No. Total Toxic
i Total Suspended Solids Copper Lead Zinc Total Petroleum s
Collected amount, Standard units Organics
(mo/dd/yr) Inches3 Hydrocarbons
Benchmarks===> _ - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L
SDO#001 -
1 Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor
manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22;and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date:11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify,and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TM), I certify that to the best of my knowledge and belief,no dumping of concentrated toxic organics into the stormwater or areas which are exposes to rarnfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
lArolf Li/MC-5
Name(Print name)
VU
Titlerant ml
e L___,,
qi4 /(a
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non-numerical
format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new oil per month.
n No discharge this period?2
Date Sample 24-hour rainfall
Outfall No. 1
Collected amount, Non-polar O&G/TPH by
(mo/dd/yr) Inches3 EPA 1664(SGT-HEM) Total Suspended Solids pH
Benchmarks===> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0—9.0 SU
Footnotes from Part A also apply to this Part B
*See General Permit text,Table 5,identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date-11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECfiON B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO
IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑NO❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR,including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period
in the case of"No Discharge"reports)to:
Division of Water Quality
Attn:DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I
am aw.te that there a - significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations."
L
(Signature of P>rmittee) (Date)
Permit Date:11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012
Page 3 of 3