HomeMy WebLinkAboutNCG030130 DMR SW (19) kiii‘ HIELD
E GINEERING, INC,
RECEIVED
October 3,2016 RECEIVE® OCT 0 6 o
Mr. Ryan Pennington O(• f 0 8 2016 CENTRAL FILES
Gastonia Components and Logistics CEN.- DWR SECTION
Daimler Trucks North America, LLC t S
1400 Tulip Drive �'�''�SEFIs
Gastonia,NC 28052
Subject: Monthly Sampling—September 2016
NPDES General Permit No.NCG030000-CoC o.NCG030'30
Daimler Trucks, Gastonia Components and Logistics,LLC
1400 Tulip Drive Gastonia,North Carolina
Shield Project No. 1140099-02
Dear Mr,Pennington:
Shield Engineering, Inc, (Shield) successfully collected monthly stormwater samples and completed the
qualitative assessment for Stormwater Discharge Outfall (SDO)#001 as well as the quarterly samples and
qualitative assessment for SDOs #002 and#003 at the Gastonia facility for the month of September. The
Qualitative Monitoring Report for SDOs #001, #002, and #003 and a partially completed Discharge
Monitoring Report form are attached to this cover letter. In addition, the analytical results for the
stormwater samples collected during the qualifying storm event on September 2, 2016 are attached to this
covet' letter. Results from the September 2" sampling event show an exceedance of the following
parameters at or above the corresponding benchmarks:
• SDO#001 (09/02/16)—Copper—0.0141 mg/L(Benchmark 0.007 mg/L)
• SDO#001 (09/02/16)—pH—9.1 S.U. (Benchmark 6.0-9.0 S.U.)
• SDO#003 (09/02/16)—Copper—0.0131 mg/L(Benchmark 0 007 mg/L)
Daimler's Gastonia facility remains in Tier Three of the NPDES General Permit No.NCG030000 at SDO
#001 for Copper. Shield will continue to perform monthly sampling at SDO #001 per Tier Two
requirements until instructed to halt by either Daimler or the State. Shield greatly appreciates the
opportunity to provide environmental services to Daimler Trucks, of North America If you have any
questions in reference to this document or require further information, please feel free to contact either of
the undersigned at(704)394-6913.
Respectfully,
SHIELD ENGINEERING,INC.
Mclii Ia Greene Wilt C.Boland,P.E,
Scnioi az ince!' l'rilteiptil Engineer
Attachments: Stormwater DMR,Qualitative Monitoring Report form,Analytical Results
H\Projects\201411140099-01 Stonnwater Sampling-Daimler Gastonia\Cover Letters\2016\Cover Letter-September 2016-Gastonia
Factlity,docx
4301 Taggart Creek Road Telephone 704 394 6913
Charlotte,NC 28208 www.shieldengineenng coni Fax 704 394 6968
Semi-annual Stormwater Discharge'Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000 "
Date submitted 10/2/16
CERTIFICATE OF COVERAGE NO.{,,,_ D301 SAMPLE COLLECTION YEAR 2016
FACILITY NAME Daimler Trucks—Gastonia Components&Logistics SAMPLE PERIOD ❑Jan-June ®July-Dec
PERSON COLLECTING SAMPLES Eian Fowler/Shield Engineering or // Monthly5 September
LABORATORY: Pace Analytical Services,Inc. Lab Cert.It 12 DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout DPNA
Comments on sample collection or analysis: Benchmark exceedance for ❑Zero-flow ❑Water Supply OSA
copper at SDOs#001 and#003;pH at S DO#001 1/Other _-- -
Fite °��VBE® PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3
Part A:Stormwater Benchmarks and Monitoring Results OCT 0 S 2016
�eN]'JC ❑No discharge this period?2
S LE.
((±']q Non-Polar O&G/
Date Sample 24-hour rainfall pri, ON Total Toxic
Outfall No. Collededl amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics5
(mo/dd/yr) , Inchesa Hydrocarbons
Benchmarks===> _ - 100 mg/L or 50 mg/1.4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L
SDO#001 9/2/16 Y 0.78 46.0 9.1 0.0141 <0.005 0.0268 <0.005 <0.486
1
SDO#002 1 9/2/16 0.78 11.0 7.6 <0.005 <0.005 0.011 <0.005 <0.486
F
SDO#003 9/2/16 0.78 9.6 7.7 0.0131 <0.005 0.018 <0.005 <0.486
I
1 Monthly sampling(instead ofserrai-annual)must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
3 The total precipitation must be recorded using data from an on-site rain gauge. Unattendedsitesmay be eligible for a waiver of the rain gauge requirement.
4 See General Permits Table 3 identifying the especially sensitive receiving,water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing,operations,manufacture semiconductors,manufacture
electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor
manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date:11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify,and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for rnanal:ng compliance with the permit monitoring requirement for total toxic organics
(TT0),I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
<,..) L,, Ica v-5
Name(Print name)
Title rint tile)
01,k
(Signature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL,<PQL, Non-detect, ND,or other similar non-numerical
format. When results are below the applicable limits,they must be reported in the format,"<XX mg/L",where XX is the numerical value of the detection
limit,reporting limit,etc. in mg/L.
Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results:only for facilities averaging>55 gal of new oil per month.
n No discharge this period?2
Date Sample 24-hour rainfall
Outfall No. 1
Collected amount, Non-polar O&G/TPH by
(mo/dd/yr) Inches3 EPA 1664(SGT-HEM) Total Suspended Solids pH
Benchmarks==_> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0—9.0 SU
Footnotes from Part A also apply to this Part B
*See General Permit text,Table 5,identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date:11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark,you must implement Tier 1,Tier 2,or Tier 3 responses. See General Permit text.
FOR PART AAND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO❑
IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES Q NO❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy_of this D.iOR,including all"No(Discharge"reports,within 30 days of receipt of the lab results for at end of monitoring period
in the case of"No Discharge"reports)to:
Division of Water Quality
Attn:DWQ Central Files
1617 Mail Service Center
Raleigh,North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I
am aw.re t at t er are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations."
i c
(Signature of •jmittee) (Da e)
Permit Date:11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012
Page 3 of 3